1 Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016
2 PURPOSE Staff requests that the Strategic Development Committee approve and recommend that the Board of Directors authorize the President and Chief Executive Officer to execute permanent easements across Metropolitan Washington Airports Authority (Airports Authority) property at Washington Dulles International Airport (Dulles International) in favor of the Virginia Department of Transportation (VDOT) in connection with the Route 28 widening project.
3 BACKGROUND VDOT is undertaking a project (Project) in Fairfax and Loudoun Counties to improve traffic flow and alleviate traffic delays between Route 50 and Old Ox Road, along the Route 28 corridor, by widening Route 28 from three lanes to four lanes in each direction at certain hotspots. Approximately five miles of the Project is located adjacent to, or within Dulles International. Portions of Route 28 are constructed on Airport property under a 1977 easement granted by the Federal Aviation Administration. VDOT now requires additional easements for the use of property at four locations, in order to complete the Project.
4 BACKGROUND (Continued) Specifically, southbound Route 28 will be increased from three lanes to four lanes from just north of the Sterling Boulevard interchange to just north of the Route 50 interchange and northbound Route 28 will be increased from three lanes to four lanes from the McLearen Road interchange to the Dulles International Airport Access Highway. VDOT is requesting a permanent transportation easement across acres. VDOT also requests temporary easements across acres for construction purposes. These easements will expire upon completion of the Project.
5
6 DISCUSSION Airports Authority staff evaluated the request and submitted comments and changes to VDOT. VDOT made design changes to the proposed improvements in order to satisfy Airports Authority concerns and reduced the amount of Airports Authority property affected by the Project. After construction, the Project will improve traffic flow to key exits on Route 28, which represent some of the heaviest existing traffic load in the corridor.
7 DISCUSSION (Continued) The Project will benefit the Airports Authority and the users of the Airport by reducing congestion along Route 28, to and from Dulles International. Consistent with longstanding practice, VDOT will not be assessed a charge for these easements.
8 RECOMMENDATION Staff requests that the Strategic Development Committee approve and recommend that the Board of Directors authorize the President and Chief Executive Officer to execute permanent easements across Airports Authority property at Dulles International in favor of VDOT in connection with the Route 28 widening project.
9
10 REPORT TO THE STRATEGIC DEVELOPMENT COMMITTEE REQUEST OF VIRGINIA DEPARTMENT OF TRANSPORTATION FOR EASEMENTS ACROSS WASHINGTON DULLES INTERNATIONAL AIRPORT PROPERTY AT ROUTE 28 ACTION REQUESTED MAY 2016 That the Strategic Development Committee approve and recommend to the Board of Directors that it authorize the President and Chief Executive Officer to execute permanent easements across Metropolitan Washington Airports Authority (Airports Authority) property at Washington Dulles International Airport (Dulles International) in favor of the Virginia Department of Transportation (VDOT) in connection with its Route 28 widening project. BACKGROUND VDOT is undertaking a project (Project) to improve traffic flow and alleviate traffic delays between Route 50 and Old Ox Road, along the Route 28 corridor, by widening Route 28 from three lanes to four lanes in each direction at certain identified points, referred to as hotspots. The Project is located in Fairfax and Loudoun Counties, starting miles north of the intersection of Route 50 and Route 28, and ending miles north of the intersection of Sterling Boulevard and Route 28. Specifically, southbound Route 28 will be increased from three lanes to four lanes from just north of the Sterling Boulevard interchange to just north of the Route 50 interchange. Northbound Route 28 will be improved from three lanes to four lanes from the McLearen Road interchange to the Dulles International Airport Access Highway. These improvements will increase the capacity of Route 28. Approximately five miles of the Project is located adjacent to, or within, Dulles International. Portions of Route 28, as currently constructed, are on Airports Authority property, and are subject to easements conveyed to VDOT by the Federal Aviation Administration in In order to complete the Project, VDOT requires additional property at four locations on Airports Authority property along Route 28 consisting of a permanent transportation easement across an additional acres (139,087 square feet) and a temporary easement consisting of acres (208,260 square feet) to facilitate construction of the Project. The temporary easement will expire upon completion of the Project. The requested easement areas are shown on Exhibit A.
11 DISCUSSION Staff worked with VDOT to evaluate this request for the permanent and temporary easements and submitted comments and changes to VDOT. VDOT adequately addressed the Airports Authority s issues by making various design changes and also reduced the size of the easements it originally requested. The final design for those portions of the Project located on Dulles International property ensures that the Airports Authority s interests are protected and minimizes the amount of Airports Authority property required for the Project. After construction, the Project is projected to improve traffic flow to key exits on Route 28, which represent some of the heaviest existing traffic load in the corridor. The Project is expected to reduce congestion and stop-and-go traffic that is often present between Route 50 and Sterling Boulevard. The Project will benefit the Airports Authority and users of Dulles International by reducing congestion along Route 28. VDOT will not be assessed a charge for the easements under the Airports Authority s practice of providing easements on its land to governmental entities at no cost. CONCLUSION Staff requests that the Strategic Development Committee approve and recommend to the Board that it authorize the President and Chief Executive Officer to execute permanent easements across Airports Authority property located at Dulles International (as shown on Exhibit A), in favor of VDOT in connection with its Route 28 widening project. Prepared by: Attachment Office of General Counsel May 2016
12
13 Proposed Resolution Authorizing the Conveyance of Easements to the Virginia Department of Transportation Across Washington Dulles International Airport Property at Route 28 WHEREAS, The Virginia Department of Transportation is undertaking a project in Fairfax and Loudoun Counties to improve Route 28 by widening it from three lanes to four lanes in each direction at certain locations; WHEREAS, Approximately five miles of this project is located adjacent to, or within property at Dulles International; WHEREAS, Portions of Route 28 are constructed on Airport property under a 1977 easement granted by the Federal Aviation Administration; WHEREAS, In order to complete this project, the Virginia Department of Transportation has requested permanent transportation easements at four locations on Airport property, totaling acres; WHEREAS, the Route 28 widening project will benefit the Airports Authority and the users of Dulles International; and WHEREAS, The Strategic Development Committee has reviewed the proposed easements, as presented by staff at its May 2016 meeting, and recommended that the easements should be granted at no cost; now, therefore be it RESOLVED, That the President and Chief Executive Officer is authorized and directed to execute the easement to the Virginia Department of Transportation as identified in detail in the documents presented to the Board of Directors at its May 2016 meeting. For Consideration by the Strategic Development Committee and Board of Directors on May 18, 2016
Report to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route
More informationREPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE
REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform
More informationArlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager
Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak
More informationREPORT TO THE DULLES CORRIDOR COMMITTEE
REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR ELECTRICAL POWER SERVICE FOR INTERIM TESTING, COMMISSIONING AND PRE-REVENUE OPERATIONS FOR PHASE 2 OF THE DULLES
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationMcLean Citizens Association Transportation Committee Project Briefing
McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight
More informationREPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO AWARD CONTRACTS FOR TAXICAB CONCESSIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT
REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO AWARD CONTRACTS FOR TAXICAB CONCESSIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT June 2018 PURPOSE The Business Administration Committee approved and
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationPublic Information Meetings. October 5, 6, 7, and 15, 2015
Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound
More informationReport to the Dulles Corridor Advisory Committee
Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationDesign Public Hearing
Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationProposed Dulles Toll Road Rate Adjustments
Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings
More informationConcord Road Interchange. Standard hours of work
Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass
More informationRECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES
RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationElected Officials and Media Briefing I-395 Express Lanes Northern Extension
Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda
More informationAttachment 1 R BACKGROUND REPORT
Attachment 1 R15-108 BACKGROUND REPORT The Trailblazer Sign System is Phase II of the County s Economic Development and Tourism related Wayfinding System. Since Board approval of R-09-401 (Attachment 2)
More informationDulles Corridor Improvements. Drive to Ride
Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements
More informationMetropolitan Washington Airports Authority (MWAA)
RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationReport to the Business Administration Committee
Report to the Business Administration Committee Recommendation to Award a Sole Source Concession Contract for a Third-Party Provided Registered Traveler Program at Washington Dulles International and Ronald
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationMEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015
MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationA retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation
Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More information1803 West Hwy 160 Monte Vista, CO (719) TTY (719)
USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center
More informationMUNICIPAL TRANSPORTATION AGENCY City and County of San Francisco. BRIEF DESCRIPTION: Approving traffic and parking modifications itemized below
THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 MUNICIPAL TRANSPORTATION AGENCY City and County of San Francisco DIVISION: Parking and Traffic Division BRIEF DESCRIPTION: Approving traffic and parking modifications
More informationPerformance Measure Summary
Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number
More informationSUMMARY MINUTES STRATEGIC DEVELOPMENT COMMITTEE MEETING OF OCTOBER 19, 2016
SUMMARY MINUTES STRATEGIC DEVELOPMENT COMMITTEE MEETING OF OCTOBER 19, 2016 Ms. Wells chaired the October 19 Strategic Development Committee Meeting, calling it to order at 9:35 a.m. A quorum was present
More informationMEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting
COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation
More informationConstruction Staging Area 700 Bay Street - Elizabeth Street and Walton Street
REPORT FOR ACTION Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street Date: March 7, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services,
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationFull I-35E Mainlane Closure at Beckley Avenue - July 27-30
July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationA New Era of Transportation Solutions
A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationI-66 Inside the Beltway Feasibility Study
I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationAs the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.
REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 16, 2005 DATE: March 28, 2005 SUBJECTS: A. Adoption of the Fort Myer Heights North Plan. B. GP-300-04-1 Adoption of the following General
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since
More informationCommittee for Dulles. June 9, Jack Potter, MWAA President & CEO
Committee for Dulles June 9, 2016 Jack Potter, MWAA President & CEO Dulles International is the Premier International Gateway to the Capital Region Dom Intl Total Mainline Airlines 10 29 37* Destinations
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More information2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION
2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION Travel Forecasting Subcommittee Friday, May 22, 2015 C. Patrick Zilliacus Figure 1 HOV System Overview Montgomery
More informationA DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer
A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects
More informationDavid Johnson. Tom, Attached please find the final scoping letter and figures for your review. David
David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More informationResolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: October 28, 2015 Item Number: 8.B.1.b. Subject: Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities
More information# 7. Date of Meeting: September 2, 2015 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT:
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 7 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Traffic Congestion and Safety Improvements at
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationI-95/395 HOV/Bus/HOT Lanes Project Overview
I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview
More informationNational Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014
National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration
More information77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &
77 McDonnell- - Monday thru Friday NORTHBOUND Effective: March 18, 2019 & Valley Industries 4:53A 4:59A 5:10A 5:18A 5:27A 5:39A 5:33A 5:39A 5:50A 5:58A 6:07A 6:19A 6:13A 6:19A 6:31A 6:39A 6:49A 7:02A 6:53A
More informationPublic Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street
Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street Arlington County Department of Environmental Services Transportation Division
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More information26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA
Clause No. 26 in Report No. 12 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 26, 2014. 26 APPLICATION FOR APPROVAL TO EXPROPRIATE
More informationFIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66
FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationConstruction Staging Area 19 Western Battery Road
REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationProviding public transportation since 1999 between Washington and Milwaukee Counties
Providing public transportation since 1999 between Washington and Milwaukee Counties Background Information Started in 1999, funded by a three-year CMAQ grant. Employers and fare revenue covered local
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationREPORT TO THE BUSINESS ADMINISTRATION COMMITTEE PROPOSED AMENDMENT TO METROPOLITAN WASHINGTON AIRPORTS REGULATIONS ON TAXICAB DISPATCH FEE AT RONALD REAGAN WASHINGTON NATIONAL AIRPORT JANUARY 2009 ACTION
More informationAdministration and Projects Committee Meeting STAFF REPORT July 3, 2014 Page 2 of 2 Agreement Consultant Project General Scope CT 107 URS Corporation
Administration and Projects Committee Meeting STAFF REPORT Meeting Date: July 3, 2014 Subject Summary of Issues Recommendations Authorize s to Various Agreements Over the years, the Authority has contracted
More informationMUNICIPALITY OF ANCHORAGE
DATE: June 3, 2009 MUNICIPALITY OF ANCHORAGE PARKS & RECREATION DEPARTMENT MEMORANDUM PRC #09-35 TO: FROM: SUBJECT: Parks and Recreation Commission Tom Korosei, Park Planner Proposed Land Exchange for
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationRappahannock River Crossing Project; Ms. J. V. Langan; May 28, 2015 Page 2 of 6
Page 2 of 6 VDOT engaged the consultant firm McCormick Taylor to conduct the historical research and Phase I and Phase II field investigations necessary to identify and assess the significance of archaeological
More informationPassenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting
This document is scheduled to be published in the Federal Register on 05/03/2016 and available online at http://federalregister.gov/a/2016-10334, and on FDsys.gov [ 4910-13] DEPARTMENT OF TRANSPORTATION
More informationI-75 in Hamilton County Project Termini
I-75 in Hamilton County Project Termini Introduction As part of the North South Transportation Initiative (NSTI), capacity improvements were recommended for the I-75 corridor through Hamilton County from
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationCOMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.
COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the
More informationMORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS
STATE OF THE ART BETTER TECHNOLOGY MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS REACH & FREQUENCY Las Vegas Billboards is dedicated to giving the reach and frequency needed for a successful
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More information3 ASSESSMENT OF THE CORRIDOR
3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in
More informationTransform66 Transportation Management Plan: Transit & TDM Strategies
Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp
More informationYork Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President
Meeting of the Board of Directors On June 9, 2011 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Spadina Subway Project Update YORK-#3369547
More informationReport to the Board of Directors
May 2018 Report to the Board of Directors Recommendation to Award Contracts for Electronic Security Systems Maintenance, Support, and Network Administration At Washington Dulles International Airport and
More informationPardon Our Dust Public Information Meeting
Pardon Our Dust Public Information Meeting Robert G. Ridgell, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer July 12, 2018 Project Team and Leadership Virginia
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More information9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING
Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST
More information