Whittier Bridge Project
|
|
- Phoebe Cobb
- 5 years ago
- Views:
Transcription
1 Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1
2 Project Description The project limits extend on I-95 from Exit 57 (Route 113/Storey Avenue) in Newburyport to Exit 60 (Route 286/Toll Road) in Salisbury. The existing six lane I-95 Whittier Bridge over the Merrimack River will be replaced with a new eight lane structure. A four mile section of I-95, including associated bridge crossings, will be widened to provide four lanes in each direction to match the existing roadway cross sections to the south and north. The project includes the construction of the first longitudinal shared use path within an Interstate Highway layout in the Commonwealth. The path, which will cross the Merrimack River on the easterly portion of the new I-95 Northbound Whittier Bridge, will connect the Newburyport Park and Ride lot on Route 113 (Storey Avenue) in Newburyport to Route 110 in Salisbury. The existing Whittier Bridge will remain open to traffic throughout construction of the new I-95 Northbound Bridge. The additional width that will be provided for the shared use path will allow the new I-95 Northbound Bridge to temporarily carry all of the existing six lanes on I-95 Northbound and Southbound while the existing Whittier Bridge is demolished and the new I-95 Southbound Bridge is constructed. 10/21/2016 2
3 Design Changes Pier Column Changes The Base Technical Concept (BTC) design was modified to eliminate cantilevered pier caps. Base Technical Concept (Vertical Columns) The revised design reduces bending stresses at the pier caps, which will result in increased durability, extended service life and reduced maintenance costs. Revised Design (Battered Columns) 10/21/2016 3
4 Design Changes Precast Concrete Culvert at Abandoned Railroad Railroad Culvert and 110 Deck Replacement The BTC called for the bridges at Route 110 and the abandoned railroad to be reconstructed and widened towards the median. The design proposed to repair the existing bridge decks; however, inspection of the decks revealed inadequate thickness and substantially more areas in need of repair than originally anticipated. MassDOT issued an owner-directed change to replace the existing bridge decks at Route 110 and to replace the existing bridges at the abandoned railroad with a precast concrete arch culvert. These changes will result in extended service life and reduce long-term maintenance costs. These design changes will increase the overall project cost by approximately $3.6M and contribute to the additional time needed to complete the project. I-95 NB over Route 110 Deck Demolition 10/21/2016 4
5 10/21/2016 5
6 Upcoming Milestones Opening of the New I-95 NB Whittier Bridge I-95 NB traffic was shifted onto the new bridge in October I-95 SB traffic was shifted onto the new bridge in November Opening of the New I-95 NB Whittier Bridge I-95 SB traffic will be shifted onto the new bridge in July The Project completion date is scheduled for early September /21/2016 6
7 Municipal Small Bridge Program 10/21/2016 7
8 Eligible Bridges BRI s span length Not eligible for federal aid 1,300 Municipally Owned BRIs in MA 10/21/2016 8
9 Funding Non-federal aid state funds $50 million over five years Approved projects will be funded through reimbursement agreements. The maximum amount of reimbursement, including design and construction costs is per year, per municipality. 10/21/2016 9
10 Program Description Key Points Applications accepted 3 times per year Oct. 31 st, Feb. 28 th & June 30 th. Emergency applications can be submitted anytime. Maximum reimbursement is $500,000 per municipality per year. Project can be for replacements or for preservations. Multiple bridges can be combined in one application ($500k maximum for entire application). 10/21/
11 Review and Approval Process 10/21/
12 Projects under Construction Acton- Carlisle- Westford- Bruce Freeman Rail Trail Extension, including 6 Railroad Bridges & 1 New Bridge over Route 2A/119 (Phase II-A) (#604532) $11 million Spring 2018 Completion Bedford- Billerica- Middlesex Turnpike Improvements, from Crosby Drive north to Manning Road, includes Reconstruction of B (Phase III) (29492) $29.3 million January 2017 Bid Opening Billerica- Reconstruction of Allen Road, from Route 3A to Webb Brook Road (5,400 Feet) (#601426) $8.3 million Fall 2018 Completion Billerica- Construction of MassDOT Maintenance Facility at Concord Road and Route 3 (Exit 27) (#607821) $5.3 million Fall 2016 Completion Billerica- Reconstruction of Route 3A (Boston Road) at Charnstaffe Lane $XX million MassWorks Grant Project Burlington- Adaptive Traffic Control Signal System Installation on Cambridge Street, Middlesex Turnpike & Burlington Mall Road (#608068) $1.6 million Fall 2017 Completion 10/21/
13 Chelmsford- Tewksbury- Interstate Maintenance & Related Work on I-495 (#606174) $12.4 million Spring 2017 Completion Chelmsford- Bridge Superstructure Replacement, C , Hunt Road over I-495 (#607123) $7.9 Million Fall 2017 Completion Lexington- Bridge Replacement, L , Route 2 (EB & WB) over Route I- 95/Route 128 (Design-Build) (600703) $59.6 million Substantial Completion Fall 2016 Lexington- Burlington- Interstate Maintenance & Related Work on I-95 (606170) $23.5 million Late Summer 2017 Completion Lexington- Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street (#607409) $4.9 million December 2016 Bid Opening 10/21/
14 Lowell- Bridge Replacement, L , VFW Highway over Beaver Brook (#602932) $14.4 million - Fall 2018 Completion Lowell- Bridge Replacement, L , Market Street over the Western Canal (#604537) $3.7 million NTP Pending Westford- Intersection & Signal Route 110 & Tadmuck Road (#607251) $3.7 million January 2017 Bid Opening 10/21/
15 Projects in Design Billerica- Intersection & Signal Improvements at Route 3A (Boston Road) and Allen Road (#608181) $2.6 million 2017 TIP Chelmsford- Traffic Signal Installation at Route 110 & Route 495 (2 Locations) (#607401) $1.2 million TIP Chelmsford- Traffic Signal Installation at Route 495 (Exit 42) & Route 4 (#607421) $1 million TIP Chelmsford- Bridge Deck Replacement, C (2K7), Route 4 (North Street) over I-495 (#607506) $2.4 million TIP Chelmsford- Intersection Improvements at Route 129 and Riverneck Road (#608344) $3 million TIP 10/21/
16 Lowell- Reconstruction and Rehabilitation of Six Bridges (Enel Bridges) Tiger Grant (#608240) $15.4 Million Design Ongoing Lowell- Connector Reconstruction, from Thorndike Street to Gorham Street (#604694) $937, TIP Lowell- Reconstruction & Related Work On VFW Highway (#605966) $5.7 Million 2019 TIP Lowell- Intersection & Signal Improvements at 2 Locations: Route 113 (Varnum Avenue & VFW Highway) at Mammoth Road & VFW at Aiken Street (#607752) $1.2 million 2017 TIP Lowell- Improvements on Route 38 at Four Intersections (#606189) $ TIP Lowell - Lord Overpass Reconstruction (#607862) $15.5 million - Design Ongoing 10/21/
17 Lowell- Pedestrian Walkway & Bicycle Connection at Pawtucket Falls Overlook, from Vandenberg Esplanade to School Street (#607885) $2.2 million 2019 TIP Lowell- Deck Replacement, L (2H5), Lowell Connector (NB) over Industrial Avenue East (#608257) $1.6 million 2019 TIP Lowell- Deck Replacement, L (2HG), Lowell Connector (SB) over Industrial Avenue East (#608678) $ TIP Tewksbury- Intersection Improvements at Main Street, Salem Road and South Street (#608346) $2.1 million 2020 TIP Tewksbury- Resurfacing and Sidewalk Reconstruction on Route 38 (#608297) $ 4 million 2021 TIP Tewksbury- Bridge Replacement, T , Mill Street over Shawsheen River (#607534) $1.2 million 2019 TIP 10/21/
18 Westford- Intersection Groton Road (Route 40) & Dunstable Road (#608037) $1.6 million 2018 TIP Westford- Intersection Groton Road (Route 40) & Oak Hill Road (#608036) $2 million 2017 TIP 10/21/
19 I-95 North to Route 3 North 10/21/
20 I-95 South to MTP/Route 3 North 10/21/
21 I-95 South to MTP/Route 3 North 10/21/
22 Burlington Adaptive Signal System 10/21/
23 Questions??? 10/21/
24 Middlesex 3 Coalition Board of Directors Meeting Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. David Gendall, Director Community & Customer Management October 21,
25 Meeting Details Agenda Introductions Safety Message Company Overview Infrastructure Investments Complex Construction Process National Grid Attendees David Gendall Director MA Community & Customer Management Grace Sawaya Jurisdictional Manager Community & Customer Management Susan Griffin Jurisdictional Manager Community & Customer Management
26 National Grid in the US
27 National Grid in the UK
28 National Grid in Massachusetts Gas Distribution Boston Gas Colonial Gas Network of approximately 7,193 miles of gas pipelines covers an area of approximately 1,352 square miles. Provide services to 675,000 consumers. Network of approximately 3,841 miles of gas pipelines covers an area of approximately 622 square miles. Provide services to 201,000 consumers. Single Rate plan covering both companies ~24% ~28% ~48% Massachusetts Electric Electricity Distribution Network of approximately 13,560 miles of overhead line covers an area of approximately 4,625 square miles. Provide services to 1.28 million consumers. 1.3M electric customers 0.9M natural gas customers 231 communities served of 351 in MA 4,800 MA employees Nantucket Electric Provide services to 12,900 consumers on Nantucket Island Regulated as part of Massachusetts Electric Single Rate plan covering both companies 28
29 Infrastructure Investment (2016/17 examples) MERRIMACK VALLEY / NORTH SHORE
30 Expanding the Power Grid MV Reliability Project (MVRP) Expand capacity to Massachusetts by adding new, high capacity transmission lines - $85M investment Meadowbrook Substation Expand capacity in Lowell/Chelmsford by adding four new 13kV feeders and high capacity transformers - $35M investment Tyngsborough Substation Improve reliability by adding two 23/13kV transformers and new feeder positions - $2.4M Investment Old Boston Rd Substation Expand capacity in Tewksbury/Lowell by adding two new 13kV feeders and a new 13kV open air substation with five feeders - $16M Investment 30
31 31
32 Securing Electric Service with National Grid COMPLEX CONSTRUCTION PROCESS
33 Communication is crucial to success Customer Developer Consultants/Engineers National Grid Customer Fulfillment Contract Management Distribution Design Real Estate DigSafe Operations Scheduling / Resource Planning Civil Construction Account Management / Billing Municipal City Engineer City Council Water & Sewer Utilities DPW Abutters
34 Contact Us Electric Natural Gas Distributed Generation New Service Request New Service Request New Interconnection Request for Solar Report an Outage Report a Gas Emergency
Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationTABLE C-1: Greenhouse Gas Regional Highway Project Tracking
Project Description CO 2 Description 606223 Acton-Concord - Bruce Freeman Rail Construction (Phase II-B) TBD Acton - Intersection and Signal Improvements on SR 2 and SR 111 607748 (Massachusetts Avenue)
More informationPre-Construction Public Meeting July 2017
Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More information2004 Congestion Management System Report
Chapter 3: Roadways 3.3.2.5 Analysis: Bottlenecks and Congested Segments on ed-access Highways Much like arterial roadways, where bottlenecks and delays are usually found at signalized intersections (and
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationNortheast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015
Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationCommonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017
Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationP3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.
P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations
More informationFFY 2017 Federal Funds Obligations by MPO
Berkshire 602280 DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO 09/12/2017 $272,473.00 ROUTE 8 608167 CLARKSBURG- RESURFACING AND RELATED WORK ON ROUTE 8, FROM THE 04/19/2017 $3,254,458.24
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationFFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee
FFY 2017-2021 Transportation Improvement Program (TIP) Development March 11, 2016 Cape Cod Joint Transportation Committee Transportation Improvement Program (TIP) + The TIP is a five-year schedule of regional
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More informationFY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY
Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North
More informationDesign Meeting Presentation
Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures
More informationTable 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects
Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY QUINCY QUINCY INTERSECTION
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationCVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11
FY 13 Transportation Priorities Central Vermont State & Town Bridge Projects STOWE LAMO ILLE CO. ELMORE ELMORE LAMOILLE CO HARDWICK CALEDONIA CO WALDEN S TOWE BOLTON CHITTENDEN C O WORCESTER 17 WOODBURY
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY
TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationSudbury to Hudson Transmission Reliability Project
An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationIRONTON-RUSSELL BRIDGE REPLACEMENT
IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing
More informationPURPOSE AND NEED REPORT. I-93 Transit Investment Study
PURPOSE AND NEED REPORT I-93 Transit Investment Study Submitted to: The New Hampshire Department of Transportation and Massachusetts Executive Office of Transportation Submitted by: HNTB Corporation May
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationAtlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)
Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City
More informationEXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report
II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationConstructor: Joseph B. Fay
1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationMinnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects
Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 1 N 14 9 Chisago Interstate Highway 2011 Project Sites 8 12 6 Anoka 1 6 0 6 22 6 6 9 12 7 7 7 284 74 2 41 71 29
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationNeedham Heights Neighborhood Association February Rail Trail Overview
Needham Heights Neighborhood Association February 4 2013 Rail Trail Overview Stone Dust Path, Devils River WI Needham Rail Trail Greenway: Working with the town to assist, advise and coordinate rail trail
More informationAPPENDIX I: Inventory of Existing Regional Trails in Freedom s Way National Heritage Area
Appendix I: Inventory of Existing Regional Trails in Freedom s Way National Heritage Area 351 APPENDIX I: Inventory of Existing Regional Trails in Freedom s Way National Heritage Area CRITERIA for inventory
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationLawrence Loop SWOT Analysis
Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationConcord s Colonial Inn
Concord s Colonial Inn http://www.concordscolonialinn.com/ 48 Monument Square, Concord, Massachusetts, USA 01742 978-369-9200 or 800-370-9200 (Toll Free) Distance to WR&D: 3 miles Summary: 5 minute drive
More informationThe Covered Bridge of Pepperell
The Covered Bridge of Pepperell 1742 - An uncovered wooden bridge historically referred to as the cart bridge at Joseph Blood s Fordway, links Groton West Parish and Groton. Cost Unknown 1753 - As Pepperell
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationPROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018
WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the
More information