1 IRONTON-RUSSELL BRIDGE REPLACEMENT District 9 Ohio Department of Transportation

2 Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge

3 Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge The Ironton-Russell Bridge is a 2,401-foot, two-lane truss structure. It was built by the Wisconsin Bridge Company for the Ironton-Russell Bridge Company and opened to traffic in 1922 as a toll bridge. In 1982, the State Bridge Commission transferred control of the bridge to ODOT. In 1999, a strain gage monitoring system was installed by the University of Cincinnati s Infrastructure Institute to calculate the level of stress on selected bridge members. In addition to annual inspections, the bridge has undergone several repair projects, as well as a rehabilitation in Under federal definitions, the bridge has been classified as structurally deficient and functionally obsolete. Although a bridge is classified as structurally deficient," it does not imply that it is unsafe.

4 Ironton-Russell Bridge Replacement Old to New: Inception & Design In 1999, ODOT undertook a replacement project study, which was furthered with four corridor options for the construction of a new bridge. By 2003 EIS completed Preferred alternative selected ROD issued The alignment to relocate the bridge from Second and Jefferson streets in downtown Ironton to the U.S. Route 23 viaduct, south of downtown Russell in Kentucky, was selected based on public opinion and following numerous meetings with the general public and local community leaders from both Ironton and Russell. Original cost estimate: $75-$80 million (2005) Final state s estimate: $99 million (2006) Original contract bid amount: $109 million (2006) Cost inflation at bid letting due to structure type, geometrics and materials. Bids were rejected and project was reviewed, evaluated for redesign. Redesign process began in late 2006, with consultants undertaking making changes to the structure type, working within the selected footprint and maximizing cost efficiency for construction of a new bridge.

5 Ironton-Russell Bridge Replacement Proposed Ironton-Russell Bridge

6 Ironton-Russell Bridge Replacement Proposed Ironton-Russell Bridge

7 Ironton-Russell Bridge Replacement Proposed Ironton-Russell Bridge Construction of a new Ironton-Russell Bridge is under way, with preliminary work beginning March Project sold January 2012; contract awarded to Brayman Construction Company for approximately $81.3 million, which is funded by ODOT s Major Bridge Program and ODOT s single, largest project to be awarded this year. Project will relocate the Ohio approach to Second & Jefferson Streets in downtown Ironton & the Kentucky approach to the U.S. 23 viaduct at Bellefonte Street, south of Russell. Interim completion (new bridge open to traffic) - Fall 2015; final completion (demolition of old bridge) - Summer 2016

8 Ironton-Russell Bridge Replacement New Ironton-Russell Bridge Two-lane, cable-stayed bridge; Two Delta-shaped towers, measuring approximately 300 feet from the top to the river; Eight cast-in-place, reinforced concrete piers: Tallest pier will be 80 feet Widest pier will be 60 feet One hundred twenty cables of varying size: 15 pairs each in the Ohio & Kentucky back spans 30 pairs in the main span Thus far, construction has consisted of: Clearing the banks of both state shores Drilling shafts for the Kentucky abutment Laying foundations for piers in Ohio

9 Clearing At Kentucky Abutment

10 Clearing At Kentucky Abutment

11 Pier 1 Rebar Cage Kentucky Approach

12 Lowering Dowel Cage For Pier 1 Column

13 Assembly Of Pier 1 Cap

14 Setting Rebar Cage Into Casing

15 Lowering Casing For Pier 1

16 Installing Casing At Pier 1

17 Tying Rebar For Cage at Pier 1

18 LAWRENCE COUNTY CONSTRUCTION SEASON 2012 District 9 Ohio Department of Transportation

19 DISTRICT CONSTRUCTION PROGRAM ohio department of transportation ODOT District 9 will launch its largest construction season in district history. ODOT District 9 will award more than 90 projects through the calendar year. ODOT District 9 will boast a budget of nearly $167 million dollars through the first half of Fiscal Year ODOT District 9 will be home to the single largest project to be awarded in the state this year. Included in the 2012 construction season are: 35 Preservation 43 Maintenance 4 Safety 7 Enhancement 2 Facilities 1 Major New Bridge Replacement

20 2012 Construction Cost Estimates ohio department of transportation Cost figures reflected in graph are approximate.

21 Ongoing & Upcoming Projects In addition to the Ironton-Russell Bridge project, the 2012 construction season in Lawrence County consists of South Point SRTS Sidewalk Construction on Park, High & Washington streets in South Point Construction Schedule: Fall 2012 Estimated Construction Cost: $153,000 C.R Bridge replacement over Storms Creek on Lawrence Street, just north of Ironton Construction Schedule: Summer Fall 2012 Estimated Construction Cost: $834,189 S.R Resurfacing between Sand Hollow Road & Olive Branch Road Construction Schedule: Under Way Estimated Construction Cost: $1,598,685 U.S. 52 Bench cleaning at various locations between S.R. 93 & Crabtree Hollow Road Construction Schedule: Nearing Completion Estimated Construction Cost: $245,986 ohio department of transportation

22 Ongoing & Upcoming Projects Emergency Slide Repairs S.R S.R /4.30 S.R S.R S.R S.R & S.R S.R S.R S.R S.R S.R S.R /3.70 S.R S.R U.S ohio department of transportation

23 Looking Ahead ohio department of transportation Chesapeake Bypass Phase 2

24 Looking Ahead Chesapeake Bypass Phase 2 DESIGN ohio department of transportation Stantec completing final design. Exploring design options & re-evaluating Phase 2 alignment: Side slopes (25% vs. 33%) At-grade intersection at S.R. 243 Slight adjustments near Brentwood Village Construct Super 2 facility to match Phase 1 Tracking Schedule: Aerial Mapping - Done Complete Soil Borings - Done Environmental Field Studies - Done Preferred Alternative - Done Design Plans at 50% - Done Right of Way Plans Environmental Document - Summer 2012 ENVIRONMENTAL Document to be re-evaluated & approved by agencies in fall of 2012

25 Looking Ahead ohio department of transportation Chesapeake Bypass Phase 2 RIGHT OF WAY Total-take ROW acquisition under way with limited number of interested property owners. ROW acquisition will take approximately 16 to 18 months after ROW plans are completed. Current funding commitment of $4 million for design, with an additional $5 million in earmarks for total-take right of way. Estimated Cost: $94 million (includes preliminary engineering, right of way & construction). No timetable for construction.

26 LAWRENCE COUNTY CONSTRUCTION SEASON 2012 District 9 Ohio Department of Transportation

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

U.S. 33 Ravenswood Connector

U.S. 33 Ravenswood Connector U.S. 33 Ravenswood Connector Project History When I-77 was planned to pass less than five miles east of Ravenswood, West Virginia in Jackson County, officials began taking steps to acquire an Ohio River

More information

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E. P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

The Covered Bridges of Preble County. Past, Present and Future By: R. Kyle Cross, P.E., P.S.

The Covered Bridges of Preble County. Past, Present and Future By: R. Kyle Cross, P.E., P.S. The Covered Bridges of Preble County Past, Present and Future By: R. Kyle Cross, P.E., P.S. The History of the 8 Covered Bridges There are 8 covered bridges in Preble County. Only 2 of them are moved for

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Phoenix Sky Harbor transit guideway bridge

Phoenix Sky Harbor transit guideway bridge Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW

THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW Aerial view of Phase IIIA progress in December (Race Street extension to the left over Lot 2 parking facility construction). THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW This is 2015: The Banks Project

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

I-75 in Hamilton County Project Termini

I-75 in Hamilton County Project Termini I-75 in Hamilton County Project Termini Introduction As part of the North South Transportation Initiative (NSTI), capacity improvements were recommended for the I-75 corridor through Hamilton County from

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia September 18, 2013 Nicholas J. Roper, P.E. District Bridge

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate CALENDAR YEAR 2018 / 2019 FISCAL YEAR 2019 Grandview & University Roundabout Grandview & University Intersection Street / Intersection Reconstruction 900,000 TSF, ICAAP, STP 850,000 East-West Corridor

More information

PROGRESS REPORT. OCTOBER and NOVEMBER 2013

PROGRESS REPORT. OCTOBER and NOVEMBER 2013 PROGRESS REPORT OCTOBER and NOVEMBER 2013 Published December 20, 2013 The Banks Project Results to Date Bid Package #12 Progress Part 1 Elements (TC-30) Reconstruction of Freedom Way, Rosa Parks Street

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018 WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 26, 2017 Good News: City offices will be closed Monday, May 29 th, in

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

IATA Fuel Efficiency Program

IATA Fuel Efficiency Program IATA Fuel Efficiency Program IATA Fuel Efficiency Program The program was launched by IATA in 2004 in response to the rising price of fuel. It is focused on supporting the airlines to increase fuel efficiency

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

Florida Department of TRANSPORTATION. First Coast Expressway

Florida Department of TRANSPORTATION. First Coast Expressway Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway

More information

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces. A trusted partner Multiplex is a trusted partner for all types of retail projects from Greenfield developments to refurbishments and vibrant mixed-use precincts, in both cities and regional locations.

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

Two townships received top

Two townships received top Awards 35 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Increase Safety on Roads and Bridges Two townships were recognized during PSATS 95 th Annual Educational

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Seattle Center Director s Report

Seattle Center Director s Report Seattle Center Director s Report Parks and Seattle Center Committee August 4, 2011 Seattle Center Monorail Deferred Major Maintenance Program (DMMP) History Seattle Center Monorail was built by the Alweg

More information

Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders

Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders Sponsored by Accelerated Bridge Construction University Transportation

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

North Augusta s s Riverfront

North Augusta s s Riverfront North Augusta s s Riverfront Progression of Hammond s s Ferry Plan 2002 2005 2008 Progression of Riverfront Center Plans 2002 2005 2008 2009 Boeckh Plan North Augusta Brick Yards (1938) Hammond s s Ferry

More information

EVANSVILLE METROPOLITAN PLANNING ORGANIZATION TECHNICAL COMMITTEE MINUTES

EVANSVILLE METROPOLITAN PLANNING ORGANIZATION TECHNICAL COMMITTEE MINUTES Seyed Shokouhzadeh Executive Director EVANSVILLE METROPOLITAN PLANNING ORGANIZATION TECHNICAL COMMITTEE MINUTES Regular meeting held at 10:00 a.m. in Room 318 Civic Center Complex Administration Building

More information

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE Outline 1. SRTP -- Definition & Introduction 2. Measures and Standards 3. Current Practice in SRTP & Critique 1 Public Transport Planning A. Long Range (>

More information

Community Services Associates, Inc. (CSA) Maintenance, Enhancements and Major Projects Committee March 1 st, 2018

Community Services Associates, Inc. (CSA) Maintenance, Enhancements and Major Projects Committee March 1 st, 2018 Community Services Associates, Inc. (CSA) Maintenance, Enhancements and Major Projects Committee March 1 st, 2018 On Thursday, March 1 st 2018, a regular meeting of the Maintenance, Enhancements and Major

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Park Acquisition. Wally & Bee s Last Stop Resort & Residence. Washington County Planning & Parks Department. January 19, 2016

Park Acquisition. Wally & Bee s Last Stop Resort & Residence. Washington County Planning & Parks Department. January 19, 2016 Wally & Bee s Last Stop Resort & Residence Park Acquisition Washington County Planning & Parks Department January 19, 2016 Debora Sielski Deputy Planning & Parks Administrator Park Acquisition Wally &

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

MADERA COUNTY. Measure T & SB-1 Projects

MADERA COUNTY. Measure T & SB-1 Projects MADERA COUNTY Measure T & SB-1 Projects Measure T Projects: Avenue 26/Road 29 Rehabilitation (Measure T/FLAP) Oakhurst Midtown Connector (Measure T/SB-1 LPP) North Fork Roundabout (Measure T/CMAQ) Road

More information

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET PILOT STUDY PUBLIC MEETING KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond

More information

CLIVE ELEMENTARY SCHOOL

CLIVE ELEMENTARY SCHOOL CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.

More information

Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend

Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend What is it? Major capital investment to double track 16 miles of our railroad

More information

Municipal Facilities PD - DuJIS. Automatic Remote Blanket sensing to eliminate weekend checks - Water & Sewer Sewer Capital 12,000-12,

Municipal Facilities PD - DuJIS. Automatic Remote Blanket sensing to eliminate weekend checks - Water & Sewer Sewer Capital 12,000-12, Advances/Transfers Advance to TIF 11 Advance to TIF 11 Advanced CIP CIP 752,960 175,000 144,490 144,490 144,490 144,490 Advances/Transfers Advance to TIF 4 Advance to TIF 4 Advanced CIP CIP (525,000) (125,000)

More information

SWINGING OVER SCHUYLKILL THE HISTORY OF THE PW&B AND BRIDGE NO. 31

SWINGING OVER SCHUYLKILL THE HISTORY OF THE PW&B AND BRIDGE NO. 31 THE SWINGING OVER SCHUYLKILL THE HISTORY OF THE PW&B AND BRIDGE NO. 31 The Philadelphia, Wilmington & Baltimore Railroad Company (PW&B) was formed in 1836. In 1838, the railroad was enlarged by the joining

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Neighbourhood Committee NDG - Westmount. September 12, 2016

Neighbourhood Committee NDG - Westmount. September 12, 2016 Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

I-70/I-71 Project Public Meeting Presented By

I-70/I-71 Project Public Meeting Presented By I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

Preliminary Agenda Indianapolis Airport Authority August 3, :30 a.m. 2. Approve Minutes of the Regular Meeting of July 20, 2007.

Preliminary Agenda Indianapolis Airport Authority August 3, :30 a.m. 2. Approve Minutes of the Regular Meeting of July 20, 2007. Preliminary Agenda Indianapolis Airport Authority August 3, 2007 8:30 a.m. 1. Call to order. 2. Approve Minutes of the Regular Meeting of July 20, 2007. 3. Ordinances and Resolutions PUBLIC HEARING ON

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information