2 ARGENTINA INVESTMENT OPPPORTUNITIES
3 INTRODUCTION NICHOLSON Y CANO S EXPERTISE IN INFRASTRUCTURE In the specific field of the area of major infrastructure, construction and engineering projects, our law firm has a significant background experience, with the advantage of having recognized partners with proven practical experience, who have also participated and/or advised in institutional forums (as the Construction and Infrastructure Committee of the International Bar Association -IBA-, Infrastructure and Real Estate Committee of the American Chamber in Argentina -AMCHAM-, UK Society of Construction Law, European Society of Construction Law, etc.). Nicholson y Cano offers a comprehensive range of services from setting up the legal structure of infrastructure and construction projects to their financing and operation, including Public and Private Works and, in general, PPP, PFI, BOT, BOO, BO, BOOT, DBOM, DBFO, O&M, EPC, and EPCM s contracts, among others. We have been involved in different public and private projects within the framework of the abovementioned infrastructure contracts, long term contracts that incorporate finance, design, building, operating and maintaining public infrastructure projects. The Firm also provides specialized advice related to power plants, petrochemical and geothermal plants, T-Lines, pipelines, dredging works, gas plants, highways, trains, subways, ports and marine terminals and also the applicable operation and maintenance agreements as needed. The legal counseling also comprises the follow-up of these contracts, project management, claims management, risks assessments, and all types of financial mechanisms (Public and Private). Our firm and team members have provided advise in more than 100 projects both in Argentina and in the rest of Latin America (Chile, Brazil, Colombia, Mexico, Perú, Venezuela and Uruguay), during their different stages and throughout the project s life, from risk assessment and management, to preparing RFPs, participating in bidding processes, negotiation, contract management and dealing with judicial and extrajudicial claims and arbitration. We also have experience as counsel to the different parties that may be involved in this type of projects (sponsors, developers, clients, construction companies, banks, trustees). Please find below just a sample list of the projects we have participated indifferent stages (offers, risk management analysis, project life, drafting and negotiation of contracts, contract management, claims, and arbitrations, among others).
4 ARGENTINA IN PROJECTIONS ROADS: DUPLICATING HIGHWAYS, RECORDS ON NUMBERS OVER 20,000 KM OF FINISHED WORKS= 2,800 km highways+ 2,500 km safe roads + 13,000 km enhanced roads+ 2,000 km new paved roads+ 250 new engineering projects. AIR TRANSPORT: DUPLICATING DOMESTIC PASSENGERS We will go from 10.5 to 22 million passengers, with the entrance of new companies and enhancement of 19 of the most important airports in the country. FREIGHT RAIL: GREATER SHARE OF TRANSPORTED CARGO WITH NEW RAILS 1,600 km of rails will be renewed in General Belgrano and 1,626 km in San Martin new locomotive and 3,500 wagons to improve state company. empresa estatal Belgrano Cargas y Logística. METROPOLITAN TRAINS: DUPLICATE PASSENGERS USING THE NETWORK 245 new stations/ 60 crossings/ 3 high rails / 421 km rail enhancement/ Electrification of Roca up to La Plata / Automatic breaks for 7 lines / Tren Sarmiento undergrounding ENHANCEMENT OF ROADS WITH PUBLIC TRANSIT PAVING: 6,500 paved streets (650 km) 30 departments in AMBA and La PlataBRT: 10 finished (La Matanza, Tres de Febrero, Morón, Rosario 1 y 2, Santa Fe 1 y 2, Neuquén, Corrientes, Córdoba) PORTS: MORE FREIGHT, COST REDUCTION AND EXPORT INCREASE 6 finished: Comodoro Rivadavia, Madryn (Storni y Piedra Buena), Ushuaia, Itá Ibaté. 3 ongoing works: Bahía Blanca (under construction), Mar del Plata (under construction) and Quequén (under construction)
5 ROADS 182 tenders for a total of USD 10,082 MM (approx.) The list below features future tenders: Category Description Road Section Province Budget (Million USD) Tender Source of funding Highway AU RN 11 Resistencia - Formosa RN 11 T- 02: Resistencia - Int. RP 90 Chaco 36 Nov- 17 Treasury Highway AU RN 33 Rufino - Rosario RN 33 T- 05: Pérez - Int. RN A008 Santa Fé 27 Nov- 17 Treasury Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 5 Carlos Casares - Santa Rosa Buenos Aires 24 Nov- 17 PPP Safe Roads Corridor Iberá RN 12 Corredor del Iberá Corrientes 24 Nov- 17 Treasury Highway AU RN 12 Corrientes - Posadas RN 12 Corrientes - Posadas Corrientes 72 Dec- 17 Treasury Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Córdoba 22 Dec- 17 Treasury Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Santiago del Estero 23 Dec- 17 Treasury Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 9 Córdoba - Santiago del Estero Santiago del Estero 29 Dec- 17 Treasury Repaving RePaving RN 16 RSP - Salta RN 16 T- 02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero 22 Dec- 17 Treasury Special Work Road connection to Resistencia bridge and Corrientes capital Many New bridge Resistencia - Corrientes Corrientes - Chaco 900 Dec- 17 PPP
6 ROADS Category Description Road Section Province Budget (Million USD) Special Work Bridge Santo Tomé - Santa Fe RN 11 Conexión Vial Santa Fe - Santo Tomé Santa Fé 140,0 Jan-18 TBC Tender Source of funding Special Work Access to Ports of Rosario RN 1V11 Int. RN A012 - Int. AP 01 Santa Fé 117,0 Jan-18 Treasury Highway Access to Ports of Bahía Blanca RN 3 T-01: Paso Urbano por Bahía Blanca Buenos Aires 71,5 Jan-18 PPP Special Work Access to Ports of Bahía Blanca RN 0252 T-01: Paso Urbano por Bahía Blanca Buenos Aires 84 Jan-18 PPP Highway AU RN A005 Circunvalación Río Cuarto RN A005 Int. RN 8 - Int. RN 36 Córdoba 51,6 Jan-18 Treasury Safe Roads AU RN 12 Corrientes - Posadas RN 12 Corrientes - Posadas Corrientes 21,3 Jan-18 Treasury Repaving Repaving RP 1 Jujuy RP 1 T-08: San Pedro - Pichanal Jujuy 31,2 Jan-18 Tresury - BID Special Work Cristo Redentor System RN 7 T06: Adecuación de Túnel Libertador y Caracoles Mendoza 200 Jan-18 PPP Safe Roads AU RN 11 Santa Fe - Reconquista RN 11 Santa Fé - Reconquista Chaco 21,1 Jan-18 Treasury Safe Roads AU RN 14 Libres - Posadas RN 14 Paso de los Libres - Posadas Corrientes 30,6 Jan-18 Treasury Safe Roads AU RN 35 Realicó - Río Cuarto RN 35 Realicó - Río Cuarto Córdoba 37,5 Jan-18 Treasury Safe Roads Road Corridor Resistencia - Corrientes RN A030 Road Corridor Resistencia - Corrientes Chaco 20 Jan-18 Treasury
7 ROADS Category Description Road Section Province Budget (Million USD) Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales La Pampa 18,6 Mar-18 Treasury Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 9,6 Mar-18 Treasury Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 3,3 Mar-18 Treasury Highway AU RN 34 Rosario - Sunchales RN 0034 T-02: Int. RN A012 - San Genaro Santa Fé 57,0 Apr-18 Treasury Safe Roads Corridor Iberá RN 0123 Corridor Iberá Corrientes 16,6 Apr-18 Treasury Safe Roads Safe Roads RN 174 Rosario - Villaguay Tender Source of funding RN 0174 Rosario - Villaguay Entre Ríos 17,4 Apr-18 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 64,5 Apr-18 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 60,0 Apr-18 Treasury Safe Roads Safe Roads RN 14 San José - San Vicente Safe Roads Corridor NOA RN 0065 Corridor NOA Safe Roads Safe Roads Safe Roads RN 237 R Collón Curá - Bariloche Safe Roads RN 237 R Collón Curá - Bariloche RN 0014 San José - San Vicente Misiones 18,0 Apr-18 Treasury Santiago del Estero 49,0 Apr-18 Treasury RN 0237 R Collón Curá - Bariloche Neuquén 13,3 Apr-18 Treasury RN 0237 R Collón Curá - Bariloche Neuquén 13,3 Apr-18 Treasury Special Work Access to Ports of Rosario RP 0010 Int. RN A012 - Int. AP 01 Santa Fé 7,5 Apr-18 Treasury Repaving Repaving RN 16 RSP - Salta RN 0016 T-02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero 17,3 May-18 Treasury
8 ROADS Category Description Road Section Province Repaving Repaving RN 16 RSP - Salta RN 0016 T-02: Lte. Cha/Sgo - Lte. Sgo/Cha Santiago del Estero Budget (Million USD) Tender Source of funding 13,8 May-18 Treasury Safe Roads AU RN 33 Bahía Blanca - Pigüé RN 0033 Bahía Blanca - Pigüé Buenos Aires 18,6 May-18 PPP Safe Roads AU RN 32 Pergamino - Rosario RN 0032 Pergamino - Rosario Buenos Aires 14,4 May-18 PPP Safe Roads AU RN 32 Pergamino - Rosario RN 0032 Pergamino - Rosario Santa Fé 17,4 May-18 Treasury Highway Repav Au 7 San Luis RN 0007 Variante Desaguadero Mendoza 30,0 Jun-18 Treasury Highway AU RN 229 Bahía Blanca - Punta Alta RN 0229 T-03: Dorrego - Bahía Blanca Buenos Aires 25,9 Jun-18 PPP Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 15,9 Jun-18 PPP Special Work Cristo Redentor System RN 0007 T04: Variante Uspallata Mendoza 25,0 Jul-18 PPP Special Work Road Corridor Resistencia - Corrientes RN A030 T-02: Segundo Bridge Resistencia - Corrientes Chaco - Corrientes 600,0 Jul-18 Treasury Special Work Access to Ports of Rosario RP 0091 Int. RN A012 - Int. AP 01 Santa Fé 17,5 Jul-18 Treasury Special Work Vial Integration Santa Fe - Paraná RN A007 T-02: Bridge SF-Paraná Santa Fé-Entre Ríos 500,0 Jul-18 Treasury
9 ROADS Category Description Road Section Province Budget (Million USD) Tender Source of funding Safe Roads Vial Integration Santa Fe - Paraná RN A007 Vial Integration Santa Fe - Paraná Entre Ríos 14,0 Jul-18 Treasury Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 15,0 Jul-18 PPP Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 0005 Carlos Casares - Santa Rosa Buenos Aires 15,3 Jul-18 PPP Safe Roads Corridor NOA RN 0009 Corridor NOA Tucumán 13,8 Jul-18 Toll Safe Roads Corridor NOA RN 0009 Corridor NOA Tucumán 15,0 Jul-18 Toll Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 18,3 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 18,0 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 19,2 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 19,5 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,0 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,6 Jul-18 PPP Safe Roads Safe Roads RN 33 Pigüé - Rufino RN 0033 Pigüé - Rufino Buenos Aires 15,0 Jul-18 PPP Safe Roads AU RN 188 San Nicolás - Junín RN 0188 San Nicolás - Junín Buenos Aires 11,4 Jul-18 PPP
10 ROADS Category Description Road Section Province Budget (Million USD) Safe Roads AU RN 188 San Nicolás - Junín RN 0188 San Nicolás - Junín Buenos Aires 16,8 Jul-18 PPP Tender Source of funding Paving Paving RP 0008 Int. RN 12 - Int. RN 14 RP 0008 T-02: Int. RN 14 (Campo Grande) - Int. RN 12 (Jardín de América) Misiones 26,7 Aug-18 Treasury Safe Roads AU RN 5 Carlos Casares - Santa Rosa RN 0005 Carlos Casares - Santa Rosa Buenos Aires 14,1 Aug-18 PPP Highway AU RN 16 Resistencia - RSP RN 0016 T-03: Peaje Makallé - Int. RP 9 Chaco 32,0 Oct-18 Tresuary Safe Roads Corridor NOA RN 0009 Corridor NOA Salta 8,4 Oct-18 Toll Safe Roads Corridor NOA RN 0009 Corridor NOA Salta 7,2 Oct-18 Toll Safe Roads AU RN 20 Caucete - San Juan RN 0020 Acceso Este San Juan San Juan 9,1 Jan-19 Treasury Safe Roads AU RN 3 Azul - Bahía Blanca RN 0003 Azul - Bahía Blanca Buenos Aires 11,1 Jan-19 PPP Safe Roads AU RN 9 Córdoba - Santiago del Estero RN 0009 Córdoba - Santiago del Estero Santiago del Estero 7,5 Jan-19 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 15,0 Jan-19 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 18,9 Jan-19 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 15,0 Jan-19 Treasury
11 ROADS Category Description Road Section Province Budget (Million USD) Tender Source of funding Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 22,4 Jan-19 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 25,0 Jan-19 Treasury Safe Roads AU RN 11 Santa Fe - Reconquista RN 0011 Santa Fé - Reconquista Santa Fé 18,9 Jan-19 Treasury Safe Roads Corridor Iberá RN 0012 Corridor Iberá Corrientes 12,2 Jan-19 Treasury Safe Roads AU RN 12 Corrientes - Posadas RN 0012 Corrientes - Posadas Corrientes 9,6 Jan-19 Treasury Safe Roads AU RN 22 Bahía Blanca - Chichinales RN 0022 Bahía Blanca - Chichinales Río Negro 3,6 Jan-19 Treasury Safe Roads AU RN 33 Bahía Blanca - Pigüé RN 0033 Bahía Blanca - Pigüé Buenos Aires 9,9 Jan-19 PPP Highway AU RN 34 Rosario - Sunchales RN 0034 T-01: Int. RN A08 - Int. RN A012 Santa Fé 25,4 Jan-19 Treasury Safe Roads Road Corridor RN 40 Los Cipreses - Samoré RN 0040 Futaleufú - Samoré Río Negro 5,7 Jan-19 Treasury Repaving Repaving RN 16 RSP - Salta RN 0016 T-04: Quebrachal - Int. RN 9/34 Salta 12,0 Apr-19 Treasury Repaving Repaving RN 16 RSP - Salta RN 0016 T-04: Quebrachal - Int. RN 9/34 Salta 17,4 Apr-19 Treasury Safe Roads Road Corridor Resistencia - Corrientes RN A030 Road Corridor Resistencia - Corrientes Corrientes 24,0 Jul-19 Treasury
12 RAILWAYS 26 tenders for a total of USD 891 MM (approx.) The list below features future tenders: Category Description Province Budget (Million USD) Tender Source of funding Tracks Tracks renewal Tapiales - González Catán - Belgrano Sur line Buenos Aires 15 Nov-17 Treasury Electrification Substitution swichtes 20 kv for 9 subestations Buenos Aires 7 Dec-17 Treasury Civil Works Improvements in service station : Concordia, Timbues, San Cristobal, Monte Caseros, Guemes, Paso de los Libres, Garupá y Zarate Many 7 Jan-18 Treasury Tracks Tracks renewal Bouchardo - Huinca Renanco Córdoba 30 Feb-18 Treasury
13 PORTS 6 tenders in 2017: USD 2,000 MM The list below features future tenders: Description Province Budget (Million USD) Tender Source of funding Concession Buenos Aires port Buenos Aires City 2,000 TBC PPP Adequacy spirng to La Plata port Buenos Aires 50 dic-17 Treasury
14 AIRPORTS 62 tenders in 2017: USD 750 MM The list below features future tenders: Airports Description Province Budget (Million USD) Tender Source of funding Ezeiza Leading electrical substation (P49) / medium voltage feeders Buenos Aires 2 Nov-17 Direct Investments / trust Iguazú Parking Misiones 3,1 Nov-17 Direct Investments / trust
15 URBAN MOBILITY 12 tenders : 5,798 MM USD The list below features future tenders: Category Description Province Budget (Million USD) Tender Source of funding RER Interchanges Metropolitan Area of Buenos Aires Treasury RER Construcción Correo Central Station Metropolitan Area of Buenos Aires Treasury RER Connection Sarmiento line Metropolitan Area of Buenos Aires Treasury RER Overpass San Martín line Metropolitan Area of Buenos Aires Treasury RER Electrification Belgrano Sur line, Belgrano Norte line and Mitre line Metropolitan Area of Buenos Aires 1, Treasury
16 Contact Details Marcelo Lamesa Partner Direct: (+54 11) Eduardo Koch Partner Direct: (+54 11) Mariana Guzian Partner Direct: (+54 11)
17 BRAZIL INVESTMENT OPPPORTUNITIES
18 FEDERAL GOVERNMENT
19 AVIATION Divestiture of Infraero s participation in the concessionaires of the aiports of Brasília, Confins, Galeão and Guarulhos 2nd and 3rd quarters of 2018 Qualification of the airports of: Maceió/AL, João Pessoa/BP, Aracaju/SE, Juazeiro do Norte/CE, Campina Grande/PB, Recife/PE, Várzea Grande/MT, Rondonópolis/MT, Sinop/MT, Alta Floresta/MT, Barra do Garças/MT, Vitória/ES; Macaé/RJ and Congonhas/SP. 4th quarter of 2018
20 ROAD Studies of the road BR-153 in the States of Goiás and Tocantins. 3rd/ 4th quarters 2018 Qualification of the road 364, in the States of Rondônia and Mato Grosso). 3rd/ 4th quarters 2018
21 PORTS Qualification of the liquified petroleum gas terminal Miramar, in the Port of Belém/PA MIR 01, BEL 05 e BEL 06 (onerous assignment). 4th quarter of 2017 / 1st quarter of 2018 Qualification of the liquid bulk terminals in the Port of Belém/PA BEL 02A, BEL 02B, BEL 04, BEL 08, BEL 09. 2nd/ 3rd quarters of 2018 Qualification of the liquid bulk terminals in Vila do Conde/PA VDC 12. 2nd/ 3rd quarters of 2018
22 PORTS Qualification of three grains terminals in Paranaguá PAR07, PAR 08 and PARXX. 2nd/ 3rd quarters of 2018 Qualification of the liquid bulk terminal in Vitória/ES. 2nd/ 3rd quarters of 2018 Privatization of CODESA (Companhia Docas do Espírito Santo). 3rd/ 4th quarters of 2018
23 ENERGY Concession of eleven lots of energy transmission installation in the States of Bahia, Ceará, Pará, Paraná, Paraíba, Pernambuco, Piauí, Rio Grande do Norte, Minas Gerais and Tocantis. 4th quarter 2018
24 OIL AND GAS ANP s 15th Concession Bidding Round 1st/2nd quarters of 2018 ANP s 5th Marginal Accumulation Bidding Round 2nd quarter of 2018 ANP s 4th Pre-Salt Bidding Round 1st/2nd quarters of 2018
25 AGRICULTURE Privatization of CASEMG (Companhia de Armazéns e Silos do Estado de Minas Gerais) 3rd/ 4th quarters 2018 Privatization of CEASAMINAS (Centrais de Abastecimento de Minas Gerais S.A.) 3rd/ 4th quarters 2018
26 NATIONAL DEFENSE Public-Private Partnership (PPP) for the Integrated Communication Network of the Aeronautics Command (COMAER) 4th quarter 2017 / 1st quarter 2018
27 FINANCE Concession of the LOTEX (Lottery) 4th quarter 2017 Privatization of the National Mint (Casa da Moeda) 3rd/ 4th quarters 2018
28 STATE OF SÃO PAULO
29 ENERGY Privatization of CESP (Companhia Energética de São Paulo) To be announced PARKS Concession of 108 parks in the city of São Paulo 2018 TRANSPORTS Concession for the management of Bilhete Único (transport card) in the city of São Paulo Concession of 27 bus terminals in the city of São Paulo December, 2017/ January, 2018 December, 2017/ January, 2018
30 PARKING OTHERS Concession of winch and parking lot of removed cars in the city of São Paulo Concession of Pacaembú Stadium in the city of São Paulo. July, 2018 November, 2017 Concession of twenty-two cemeteries and one crema.tory in the city of São Paulo To be announced
31 STATE OF RIO DE JANEIRO
32 SEWAGE Privatizatiom of CEDAE (Compania Estadual de Águas e Esgotos do Rio de Janeiro) To be announced
33 Contact Details Thomas Felsberg Founding Partner Anneliese Moritz Senior Associate Tel: +55 (11)
34 CHILE INVESTMENT OPPPORTUNITIES
35 Facts about Chile o Population: 17.8 million; o GDP: US$23,478 per capita; o GDP expected to grow 2.8% on 2018 (according to OECD); o Credit Ratings Investment Grade: A+ - S&P; Aa3 - Moody s; and A - Fitch TERating.
36 ENERGY Tender Process Transmission Expansion Plan Projects * The tenders for transmission works for the expansion processes scheduled for 2017 on the National Grid will be held. The purpose of these bid processes is to award the construction and subsequent exploitation of a total of 16 projects on the national transmission system, valued at over US$ 390 million, as well as 98 projects for the zonal transmission system, valued at over US$ 760 million; Tenders will be held on the national transmission system in 2017 for both new and expansion works. This system consists of the transportation network supporting power transmission to supply the entire country; Tenders for new works include the concession for executing and subsequently exploiting the transmission project, with annual income corresponding to the value awarded in the bid. The Coordinator is holding the tenders for new works; Tenders for expansion works under EPC contract, include the construction of the transmission project, with a payment corresponding to the value awarded in the bid. These tenders are being held by the owner of the facilities that will be expanded. * Information as published by the Coordinator.
37 ENERGY Tender Process Transmission Expansion Plan Projects * National and foreign transmission companies that operate existing transmission facilities in Chile or other countries may submit tenders for new works. National or foreign companies with experience executing power transmission works in Chile or other countries may submit tenders for expansion works. Bidding companies may submit tenders individually or as a consortium which, in the latter case, must be established in Chile. The system for remunerations and payment of transmission works is stipulated in the law and in more specific regulations. For new works, the successful bidder s remuneration will consist of the Annual Value of Transmission per Section (AVTS or VATT in Spanish, Valor Anual de la Transmisión por Tramo) based on its financial bid and indexation formula, which will be applied during a 20-year period starting with the startup date. After that time, the facilities and their valuation will be reviewed and updated in the Existing Facility Valuation Study, which is performed every four years according to law The AVTS will be paid by the end consumers to their respective suppliers through a Single Rate previously set by the regulator. The suppliers will collect the amounts of this Single Rate and will pay the transmission facility owners according to a monthly payment calculation determined by the Coordinator. For expansion works, the successful bidder must receive the investment value (I.V.) based on its financial bid for executing the works or group of works. The payments will be made during the execution of the works according to the schedules defined in the Bid.
38 PROJECTS FOR TENDER A. NEW WORKS
39 PROJECTS FOR TENDER B. EXPANSION WORKS
40 PROJECTS FOR TENDER C. TENDER SCHEDULES
41 HIGHWAYS Second Concession of Route G-66 (The Fruit Road ). Date for Receipt of Offers: February 2, 2018 Date for Receipt of the Economic Offer: February 23, 2018 Second Concession Highway 5 (Pan American Route) Between Los Vilos and La Serena. Date for Receipt of Offers and Economic Offers: Scheduled for First Semester 2018 Concession Term: Information not available yet. Public Concession US$599 million approx. 138 km 35 years Valparaíso, Metropolitana and Libertador Gral. Bernardo O'Higgins Regions. Public Concession US$490 million 245 km Coquimbo Region, Provinces of El Loa, Choapa and Limarí, and Municipalities of La Serena, Coquimbo, Canela and Los Vilos.
42 HIGHWAYS Highway 5 (Pan American Route) Between Caldera and Antofagasta Date for Receipt of Offers and Economic Offers: Information not available yet. Concession Term: Information not available yet. Public Concession US$605 million approx. 469 km Atacama and Antofagasta Regions, Provinces of Antofagasta, Copiapó and Chañaral and Municipalities of Antofagasta, Copiapó, Chañaral and Caldera. Costanera Central Highway in the Santiago Area. Américo Vespucio Las Vizcachas Tranche. Date for Receipt of Offers and Economic Offers: Information not available yet. Concession Term: Information not available yet. Public Concession US$1.016 million 12 km Metropolitan Region, Provinces of Santiago and Cordillera, Municipalities of La Florida and Puente Alto.
43 HIGHWAYS Costanera Central Highway in the Santiago Area. Isabel Riquelme Américo Vespucio Tranche. Date for Receipt of Offers and Economic Offers: Not available yet. Concession Term: Not availble yet. Public Concession US$812 million approx. 10 km Metropolitan Region, Provinces of Santiago and Cordillera, Municipalities of Santiago, Macul, Pedro Aguirre Cerda, San Joaquín, San Miguel, Estación Central. Concession for Improvement of Route G- 21 (Road to Santiago s Mountain and Ski Resorts) Date for Receipt of Offers and Economic Offers: Estimated for First Semester 2018 Concession Term: Information not available yet. Public Concession US$92 million 30 km Metropolitan Region, Santiago Province, Municipality of Lo Barnechea.
44 HIGHWAYS Metropolitan Highway of Puerto Montt Date for Receipt of Offers and Economic Offers: Not available yet. Concession Term: Not availble yet. Public Concession US$321 million approx. 32 km Los Lagos Region, Province and Municipality of Llanquihue. Chiloé Highway Date for Receipt of Offers and Economic Offers: Information not vailable yet. Concession Term: Information not avalable yet. Public Concession US$236 million 121 km Los Lagos Region, Province of Chiloé and Municipalities of Ancud, Castro, Chonchi and Dalcahue.
45 AIRPORTS Fourth Concession of the El Tepual Airport in Puerto Montt, Chile. Date for Receipt of Offers: January 16, 2018 Date for Receipt of the Economic Offer: January 16, 2018 Concession of the Balmaceda Airport. Date for Receipt of Offers and Economic Offers: Information not available yet. Public Concession US$30million approx square meters passengers terminal 6 years Puerto Montt, Llanquihue Province, Los Lagos Region. Public Concession US$27 million square meters 15 years Aysén Region, Province and Municipality of Coyhaique.
46 WATER MANAGEMENT Concession of the Catemu Dam (Reservoir) Date for Receipt of Offers and Economic Offers: Estimated for First Semester 2018 Concession of the La Tranca Dam (Reservoir) Date for Receipt of Offers and Economic Offers: Information not available yet. Concession Term: Information not available yet. Public Concession US$423 million approx. 180 hm3 15 years Valparaíso Region, Province of San Felipe and Municipality of Catemu. Public Concession US$154 million 15 years Coquimbo Region, Province of Limarí and Municipality of Combarbalá.
47 WATER MANAGEMENT Concession of the Los Angeles Dam Date for Receipt of Offers and Economic Offers: Estimated for First Semester 2018 Concession Term: Information not available yet. Concession of the Murallas Viejas Dam (Reservoir) Date for Receipt of Offers and Economic Offers: Estimated for First Semester 2018 Concession Term: Information not available yet. Public Concession US$185 million approx. 30 hm3 15 years Region and Province of Valparaíso and Municipality of La Ligua. Public Concession US$116 million 50hm3 15 years Coquimbo Region, Province of Limarí and Municipality of Combarbalá.
48 Contact Details Juan Turner Partner Tel: Tel:
49 COLOMBIA INVESTMENT OPPPORTUNITIES
50 MASS TRANSPORTATION AND ROADS ALO Street 13 Autopista Norte In order to decongest the accesses to Bogota, there are plans to buid a highway that connects the north and south boundaries of the city through the western areas of the city. US$ 800 million Current Status: Bidding process scheduled to start in June 2019 Bogotá Transfer Station SETP Sincelejo Improve the quality of life and bring the city to economic, social and technological development through the Strategic Public Transport System. The transfer station has two options (i) A building and a basement, or (ii) two buildings and two basements. US$ 165 million Current Status: Bidding process scheduled to start in July 2018 Sincelejo
51 MASS TRANSPORTATION AND ROADS ALO Tramo Sur: Canoas Calle 13 This road is intended to decongest Bogota and offer another route to vehicles entering through the neighbor municipality of Soacha, connecting it with Bogota s main exit through the west. Project includes: Construction of the driveway 19.5kms between Canoas and 13 Street. Construction 8kms (Phase I). Rehabilitate the 11.5kms Between Canoas and Bosa Avenue (Phase II). Bikeway path parallel to the road. US$ 330 million Current Status: Bidding process scheduled to start in February 2018 Bogotá
52 MASS TRANSPORTATION AND ROADS North Accesses Bogota Phase I The phase 1 involves the part of the project outside Bogota: Improvement of the existing road and the construction of the second road by the seventh street from the 245 to La Caro. Re localization of the toll. Enlargement in two lanes in the west and east lane of the North highway between the street 245 and the. Andes toll Enlargement in one lane between the Andes toll and La Caro. Construction of the double lane connecting Hatogrande or Chia variant, from the north highway to the Cajica variant. US$ 400 million Current Status: Awarded December 2016 and is now in the financing process Bogotá North Accesses Bogota Phase II The phase 2 involves the part of the project within Bogota: Studies, design, construction, improvement, rehabilitation, environmental and property management, administration, operation and maintenance of Autopista Norte and Carrera Séptima, from 182th Street to 245th Street US$ 500 million Current Status: Bidding process scheduled to start in February 2018 Bogotá
53 MASS TRANSPORTATION AND ROADS Transmilenio Mass Transport System 63rd and 127th Street To improve the current mobility conditions of the city in Avenida Jose Celestino Mutis (63 and 127 Street), a project has been created for the development of road infrastructure that includes exclusively mass transportation, private transportation and non-motorized modes of transportation. This would include: New connections east-west between Bogota and the Region. Increase in the core capacity of Transmilenio buses. Innovative public policy scheme (private vehicle users pay for expressway use). US$ 1.3 billion Current Status: Bidding process scheduled to start in July Bogotá
54 MASS TRANSPORTATION AND ROADS Other districts projects in formulation The district will finance with resources of the general system of royalties, the studies and design of 10 road projects, which cumulatively will require an estimated investment of US $300 billion: US$ 300 million Bogotá 1. South Railway (Ferrocarril del Sur). 2. Northern Railway Network (Corredor Férreo del Norte). 3. Longitudinal avenue of the west (from Soacha to boundaries with Chia). 4. Canal Salitre and Rionegro. 5. Expansion of 80 street. 6. Avenue Centenario. 7. Avenue Av. San (170 street). 8. Autonorte from Héroes to street Avenue Boyaca from street 183 to Chía. 10. Circunvalar of the east from exit to Llano to Av. Villavicencio.
55 MASS TRANSPORTATION AND ROADS Third Group 4G Roads The third group of Fourth Generation Roads is currently underway, after the successful completion of the first and second groups. Bucaramanga Pamplona Contract value: US $550 million Current status: Awarded April 2016, in the process of financing Pamplona Cúcuta Contract value: US $750 million Current status: Awarded April 2017, in the process of financing US$ 1.3 billion Santander Region RegioTram Regional Train A local railroad will be built in order to connect the populations of Facatativa, Madrid, Mosquera and Funza, all of which are located on the outskirts of Bogota, to the city center. The railway will have 17 stations, 41 km of two-way railroads, and will transport 126,000 people each day. The National Government will contribute 68% of funds to the project. US$ 500 million Current status: Project approved end of October 2017 Bogota/ Cundinamarca Region Term: 8 years (to be completed in 2027)
56 AIRPORTS Airport Ernesto Cortissoz US$ 175 million Current status: awarded December 2014; is now in the financing process. Baraquilla International Airport of Matecaña Pereira Airport El Dorado II Gustavo Rojas Pinilla, San Andres, y El Embrujo de Providencia Airport Cartagena US$ 95 million Current status: awarded November 2016 is now in the financing process. Pereira US$ 1 billion Current status: Pre- feasibility, bidding process scheduled to start in February Bogota US$ 100 million Current status: Pre- feasibility, bidding process scheduled to start in June San Andres y Providencia US$ 100 million Current status: Approval Process, bidding process scheduled to start in May 2018, with an 7 year project term. San Andres y Providencia
57 FLUVIAL PROJECTS Magdalena s River Navigation Recovery A project aimed at the navigation recovery of Colombia s most important river, which extends more than 500 km. The maintenance and canalizing project will span from the country s northern coast to Cundinamarca, the capital department and will include works in Puerto Salgar, Barrancabermeja, and the departments of Cundinamarca, Antioquia, Santander, Boyacá and more. Over 160 subprojects for creating channels will take place. Once completed, the navigability of the river will extend for 908km, allowing for ships in the Caribbean to navigate into the center of the country. Project length: 10 years. US$ 700 million Current Status: Bidding process scheduled to start in February Bogotá
58 PUBLIC SERVICES Sanitation and Waste Management Contract A public service of sanitation and waste management contract will soon be awarded under the concept of areas of exclusive service. In general terms, the purpose of the contract is to provide the public service of sanitation and waste management in the city of Bogota, especially regarding (i) non-recyclable waste collection, (ii) cleaning of roads and public areas, (iii) maintenance of lawns and vegetation on public spaces, and (iv) transportation of the waste that is generated by the previous activities to the disposal sites. US$ 700 million Current Status: Bidding process scheduled to close on November 17, 2017 Bogotá Contract term: 8 years
59 Contact Details Carlos Mantilla Partner Tel: 57 1)
60 MEXICO INVESTMENT OPPPORTUNITIES
61 ELECTRICITY CFE: Interconnection of Baja California Sur to the National Interconnected System (SIN) The scope of the Project consists in the design, construction, equipment, installation, operation and maintenance of 1,896 kilometers of electric lines that will run at a voltage of 400 KV, which will allow the interconnection of Baja California Sur and Mulegé systems with the National Interconnected System (SIN) for its Spanish acronym; through an undersea cable of direct current technology. With this new electric circuit line, 1,750 MV will be transported in order to enhance the energy demand of this region. Estimated Investment: TBD. Type of Project: Public-Private. Selection Process: Public Bid. Payment Source: Project Revenues / Rates. Term: 25 years. Status: Pre-investment. CFE: Electric Power Transmission Line, Yautepec Ixtepec. Design, construction, equipment, operation and maintenance of 1,200 kilometers of an electric power transmission line that will run at 500 KV from Ixtepec, Oaxaca to Yautepec, Morelos. This new line will allow for the conduction of 3,000 MW generated from wind power at the Tehuantepec Isthmus. Estimated Investment: US$1,200 million. Type of Project: Public-Private. Selection Process: Public Bid. Payment Source: Project Revenues / Rates. Term: 25 years. Status: Pre-investment.
62 ELECTRICITY CFE: Southeast Wind Power Plant IV & V Design, construction, equipment, operation and maintenance of a wind power plant with a brute capacity of 600 MW of electric energy. The capacity of each wind turbine will be determined by the winner of the bidding, but in no case shall it be lower than 1,500 kw per wind turbine, without exceeding a limit of 400 wind turbines total for the power plant. Estimated Investment: US$1,330,558, Type of Project: Public-Private. Selection Process: Public Bid. Payment Source: Project Revenues / Rates. Term: 20 years. Status: Registered; Request for Proposals expected by 2018.
63 HYDROCARBONS Lázaro Cárdenas Acapulco Gas Pipeline. Design, construction, operation and maintenance of a 331 kilometer gas pipeline that will introduce natural gas into the State of Guerrero. Estimated Investment: US$456 million. Type of Project: Public-Private. Type of Contract: Concession Contract. Selection Process: Public Bid. Payment Source: Project Revenues / Rates. Term: 20 years. Status: Pre-investment.
64 HYDROCARBONS Round 3. Shallow Waters. Exploration and Extraction of Hydrocarbons in Shallow Waters for Round 3 Public Bid 1, (Burgos, Tampico-Misantla Veracruz and Southeast Cuencas). Shared Production Contracts for the exploration and extraction of hydrocarbons in shallow waters, within 35 contractual areas, divided into 3 sectors. Estimated Investment: Depending on the contractual area awarded. Type of Project: Public-Private. Type of Contract: Shared Production Contract. Selection Process: Public Bid. Payment Source: Project Revenues, depending on the findings in each contractual area. Term: 30 years. Status: Proposals for each contractual area will be received separately on March 27, 2018.
65 HYDROCARBONS Jáltipan Salina Cruz Gas Pipeline. Design, construction, operation and maintenance of a 247 kilometer gas pipeline that will reinforce the current natural gas transport infrastructure in the Tehuantepec Isthmus region. Estimated Investment: US$643 million. Type of Project: Public-Private. Type of Contract: Concession Contract. Selection Process: Public Bid. Payment Source: Project Revenues / Rates. Term: 20 years. Status: Pre-investment.
66 TRANSPORTS Extension of the Colective Transportation System s Line A : Chalco - La Paz. Construction of the infrastructure and equipment required to provide massive urban transport through a rail system in the Chalco-La Paz corridor, with a length of kilometers; the development of a terminal with a patio and workshop; 6 intermediate stations and a fleet of 7 trains of 9 cars each, additional to the 25 existing ones in the current Line A of the Collective Transportation System. Estimated Investment: US$622,979, Type of Project: Public. Type of Contract: Public Works. Selection Process: Public Bid. Payment Source: Budgetary. Term: TBD. Status: Registered; Request for Proposals scheduled for 2017.
67 TRANSPORTS NAICM: New Mexico City International Airport East and West Central Utility Plants ( CUPs ). Construction of 3 CUPs that will provide the following services to the airport's central facilities through distribution tunnels: Production of hot and cold water. Production of drinking water. Power backup generators. Fire protection equipment. Two will be built on middle airport campus over an area of 30,000 m2, rendering the aforementioned services to the terminal building, control tower, support buildings and the emergency operations center of the airport. The other one will be on the southeastern campus over an area of 10,000 m2, which will provide services to military and government facilities. The rendition of these services will be carried out in a sustainable manner considering a cost reduction of 50% for the generated energy. Estimated Investment: Not Available.* Type of Project: Public. Type of Contract: Public Works. Selection Process: Public Bid. Payment Source: Budgetary. Term: TBD. Status: Proposals will be received on January 10, *In accordance with the Federal Expense Budget, the amount approved for the New Mexico City International Airport Project, for the year 2017 is $5,500,000, Mexican Pesos.
68 TRANSPORTS Extension of Line 4 of the Collective Transportation System, Martín Carrera - Tepexpan. Extension of Line 4 of the Public Transport System from Martin Carrera to Tepexpan with a length of kilometers and the development of a terminal with patio and workshop, 19 intermediate stations and a fleet of 24 new trains with 9 cars each. Estimated Investment: US$1,293,555, Type of Project: Public. Type of Contract: Public Works. Selection Process: Public Bid. Payment Source: Budgetary. Term: TBD. Status: Request for Proposals expected by 2017.
69 TRANSPORTS NAICM: Elevated Access Road to the Terminal Building, Tunnel and Subway Station Structure. This project includes the construction of the main access roads of entrance and exit to the New Mexico City International Airport, in six lanes with an approximate length of 700 meters. Estimated Investment: Not Available.* Type of Project: Public. Type of Contract: Public Works. Selection Process: Public Bid. Payment Source: Budgetary. Term: TBD. Status: Request for Proposals expected to be issued on June 29, *Expense budget for the project on 2018 is yet to be determined.
70 TRANSPORTS PEMEX: Salina Cruz Port. This project consists in the conclusion of the construction of a 1.6 kilometers breakwater arm and four docking positions. Estimated Investment: US$520 million. Type of Project: TBD. Type of Contract: TBD. Selection Process: TBD. Payment Source: Project revenues. Term: TBD. Status: Request for Proposals expected by the end of *Expense budget for the project on 2018 is yet to be determined.
71 TRANSPORTS Transisthmic Corridor: Coatzacoalcos Salina Cruz. This project will consist in the design, construction, equipment, operation and maintenance of a railway corridor that will connect Coatzacoalcos, Veracruz and Salina Cruz, Oaxaca. This project is expected to have an economic relevance similar to The Panama Canal. Estimated Investment: TBD.* Type of Project: Public**. Type of Contract: TBD. Selection Process: Public bid. Payment Source: TBD. Term: TBD. Status: Pending announcement. *Expense Budget for 2018 is yet to be issued by Congress; nonetheless, the project is contemplated by both, the Development Plan for Oaxaca and the Development Plan for Veracruz. ** The Special Economic Zones Law, which is expected to allow for the project to be developed, entered into force in June 1º, 2016.
72 FIBRA E FIBRA E It is a financial vehicle designed after traditional Fibra and Master Limited Partnerships models, under a Trust Agreement; it is meant to attract both public and private investment by means of IPOs issued in the Mexican Stock Market for ongoing and new projects. Its investments will maintain a ratio of 25% destined for new projects, while 75% for mature ongoing projects. Fibra E will invest mainly in the following types of projects: Oil processing, refining, sales, transport and storage; transport, storage, distribution and retail of natural gas, and duct transport and storage of petrochemicals. Generation, transmission and distribution of electricity. Infrastructure projects such as roads, highways, railways, bridges, ports, telecommunications, public security, and sewerage.
73 Contact Details M. Alejandro Ripoll González Partner Tel: 01 (33)
74 PERU INFRASTRUCTURE INVESTMENT OPPPORTUNITIES
75 ELECTRICITY 220kV Tintaya-Azángaro Transmission Line Design, financing, construction, operation and maintenance of a 220kV transmission line of approximately 128 km with capacity of 450 MA, as well as the expansion of the Tintaya and Azangaro substations. Concession contract / self sustained PPP Status: to be awarded in the 2nd half of 2017 US$59 million 30 years Cusco and Puno regions Re-energizing 1000 MVA from 500kV Carrabayllo Chimbote Trujillo Transmission Line and Variable reactive compensator in 500 kv Trujillo Norte Substation Concession contract / self sustained PPP Status: to be awarded in the 2nd half of 2017 US$64 million Ancash, La Libertad and Lima regions
76 HYDROCARBON Massive Use of Natural Gas Distribution System through a natural gas grid Design, financing, construction, operation and maintenance of the distribution system of natural gas through pipeline networks in twelve cities, in order to supply natural gas. Concession contract / self sustained PPP Status: to be awarded in the 1st half of 2018 US$350 million 32 years Apurimac, Ayacucho, Huancavelica, Junin, Cusco, Puno, and Ucayali regions Southern Peruvian Natural Gas Pipeline The project was awarded to the consortium formed by Odebrecht and Graña y Montero on However, the Concession Contract was cancelled due to the concessionaire did not get the financial closing. The new concessionaire will be in charge of finishing the construction and operation of the South Peruvian Natural Gas Pipeline and other associated natural gas infrastructure, and transfer it to the Peruvian Government. Concession contract / co financed PPP Status: to be awarded in the 1st half of 2018 US$5-6 billion 34 years Cusco, Arequipa, Puno and Moquegua Regions
77 SANITATION Massive Use of Natural Gas Distribution System through a natural gas grid Design, finance, build, operate and maintain of infrastructure works, including a 10 km tunnel, a water treatment plant and compensation reservoirs, among others. Concession contract / self sustained PPP Status: To be awarded in 2018 US$700 million 30 years Junin and Lima regions
78 PORTS AND WATERWAYS Modernization and development of the Salaverry Multipurpose Terminal Modernization of the infrastructure of the Salaverry Terminal, which involves the construction, installation, operation and exploitation of its infrastructure for the attention of the ships and other services required. Concession contract / self sustained PPP Status: to be awarded in 2017/2018. US$250 million 30 years La Libertad region San Juan de Marcona Port Terminal Develop new port infrastructure and equipment to provide services of (i) storage and shipment of bulk cooper and iron that would be exported by mining companies; and, (ii) receiving of sulfuric acid, diesel fuel 2, explosives, among others. Self sustained PPP / unsolicited proposal under evaluation. Proponent: Terminal Portuario Jinzhao Perú S.A. US$60 million Ica region
79 PORTS AND WATERWAYS Huancayo Huancavelica Railway Rehabilitation, maintenance and operation of the km railway and rolling stock provision. Concession contract / co financed PPP Status: to be awarded in the 2nd half of 2017 US$204 million 30 years Junín and Huancavelica regions Line 3 and Line 4 of the Metro Network of Lima and Callao Elaboration of the engineering studies, design, finance, construction, equipment, acquisition of the rolling stock, operation and maintenance of the 38 km. long railway. Concession contract / co financed PPP Status: to be awarded in 2018/2019 US$5 Billion Lima and Callao region
80 PORTS AND WATERWAYS Barranca Lima Ica Commuter Railway Design, building, maintenance and operation of a commuter train of 473 km that will connect the cities of Barranca, Lima and Ica. Concession Contract / co financed PPP Status: To be awarded in 2019/2020 US$1.5 billion Lima and Ica regions Interoceanic Railway Megaproject Peruvian, Brazilian and Chinese authorities have been discussing the construction of a 5300 km rail link between Peru s pacific coast and the Brazilian Atlantic. The proposed line would run from the port of Ilo in southern Peru to the Brazilian Açu port. The three countries signed a memorandum of understanding in November Type of contract to be determined Status: under evaluation US$10 Billion approx. Peru and Brazil
81 ROADS Longitudinal de la Sierra Road /Section IV Rehabilitation and maintenance (117 km) and periodic maintenance (498 km) of the road. Concession contract / co financed PPP Status: to be awarded in 2018 US$465 million 25 years Junin, Huancavelica, Ayacucho, Apurimac and Ica regions Longitudinal de la Sierra Road / Section V Initial periodic maintenance and operation of 422 km of the road. Concession contract / co financed PPP Status: to be awarded in 2018/2019 US$400 million approx. 25 years Cusco and Puno regions
82 ROADS Peripheral Road Construction of the highway of 33.2 Km to connect the northern districts of Lima and the rest of the city. Co financed PPP / unsolicited proposal under evaluation. Proponent: Consortium formed by Ferrovial and JJC Contratistas Status: to be awarded in 2nd half of 2018 US$2 billion 30 years Lima and Callao regions
83 AIRPORTS Chinchero Airport The new concessionaire will be in charge of the construction and operation of Chincheros International Airport. Concession contract / co financed PPP Status: to be awarded in 2018/2019. US$600 million 40 years Cusco region
84 REAL ESTATE Industrial Park in Ancon Design of a modern space dedicated to the industrial sector of different magnitudes in Lima. Assets transference Status: to be awarded in the 1st half of 2018 US$500 million 15 years Lima region
85 HEALTH High-complexity hospital in Chimbote Design, construction and equipment of the hospital, as well as operation of complementary services. Concession contract / co financed PPP Status: to be awarded in 2nd half of 2018 US$110 million 20 years Ancash region High-complexity hospital in Piura Design, construction and equipment of the hospital, as well as operation of complementary services. Concession contract / co financed PPP Status: to be awarded in 2nd half of 2018 Social Health Insurance Institute for children and Teenagers Design, construction, equipment, operation and maintenance of the complementary services for the population of ages 0 to 17 nationwide. Concession contract / co financed PPP Status: to be awarded in 2nd half of 2018 US$114 million approx. 20 years Piura region US$170 million approx. 20 years Lima region
86 TELECOMMUNICATIONS Broadband installation for the Integral Connectivity and social development in Amazonas, Ica and Lima Increase access to telecommunications services in the regions through the expansion of broadband transport networks to benefit to 586 rural locations. Assets Transference contract Status: to be awarded in 2017/2018 US$160 million Amazonas, Ica and Lima regions Broadband installation for the Integral Connectivity and social development in Junin, Puno, Moquegua and Tacna Increase access to telecommunications services in the regions through the expansion of broadband transport networks to benefit to 586 rural locations. Assets Transference contract Status: to be awarded in 2017/2018 US$170 million approx. Junin, Puno, Moquegua and Tacna regions
87 MINING Michiquillay Copper Fields Transference of 18 mining concessions which comprises copper fields, gold, silver and molybdenum. Current ore resources are estimated at million metric tons (TM) with an average cut off of 0.4% Cu, and million metric tons (TM) with an average cut off of 0.3% Cu. Assets Transference contract Status: to be awarded in 2017/2018 US$2 billion Cajamarca region
Updated on November 28, 2016
Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals projects) 2016-2018 Updated on November 28, 2016 LONGITUDINAL
More informationInvestment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals
Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals projects) THE AMAZON WATERWAY (Second call) CALLED Loreto
More informationINFRASTRUCTURE GAP
INFRASTRUCTURE GAP 2016-2025 GAP BY SECTORS THROUGH 2025 Other 28% Transportion 36% Strategic pillar: Telecoms 17% Energy 19% Total gap: US$ 159,6 billion Source: AFIN NATIONAL INFRASTRUCTURE PLAN STATE
More informationEndless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director
Endless investment opportunities in public infrastructure and services 2014-2015 Carlos Herrera Investors Servicing Director PROINVERSION The State agency for the private investment promotion. Promotes
More informationInvestment Opportunities in public infrastructure and public services ProInversión (State Initiatives and Unsolicited proposals projects)
Investment Opportunities in public infrastructure and public services ProInversión (State Initiatives and Unsolicited proposals projects) 2017-2018 July 20, 2017 Longitudinal de la Sierra Road section
More informationStatus of the National Transport Plan and its impact on the development of the country
Status of the National Transport Plan and its impact on the development of the country CHALLENGES ACROSS THE TRANSPORT SECTOR PORTS AND WATERWAYS ROADS 40% of the network in poor conditions 95% of freight
More informationPeru: Investment Opportunities Infrastructure and public services
Peru: Investment Opportunities Infrastructure and public services 2017-2018 Carlos Ganoza Chief of Advisors Ministry of Economy and Finance April 19th 1 PERU S STRONG MACROECONOMIC CREDENTIALS ALLOW FOR
More informationInvestment Opportunities in public infrastructure and public services ProInversión (State Initiatives and Unsolicited proposals projects)
Investment Opportunities in public infrastructure and public services ProInversión (State Initiatives and Unsolicited proposals projects) 2017-2018 April 21,2017 Longitudinal de la Sierra Road section
More informationMAJOR PROJECTS
MAJOR PROJECTS 2017-2019 MINISTRY OF PUBLIC WORKS JUNE 2017 CONCESSIONS - The Loa Route - Route 5: Section Caldera - Antofagasta - Re-tender of Route N 5 Los Vilos La Serena and Conurbation - Interconnection
More informationPeru: Investment Opportunities Infrastructure and public services
Peru: Investment Opportunities Infrastructure and public services 2017-2018 PERU S STRONG MACROECONOMIC CREDENTIALS Real GDP, 2004-2018* (%Variation) Real GDP Forecasts for Latin America 2017 (Annual Average
More informationDIRECT PUBLIC INVESTMENT
DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama
More informationPrivate Investment and Public Works
Our Law Firm l Our Team l Practice Areas l Pro Bono PERU REPORT FROM THE EDITOR Welcome to the October edition of Estudio Echecopar's Newsletter. As the new administration reaches its first 100 days in
More informationPublic Concession Opportunities in Brazil
Public Concession Opportunities in Brazil This folder presents information on certain public bids expected to occur throughout 2018. Some of these bids aim at granting concessions, while others are part
More informationInvestment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion Updated to September 2
Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion 2014-2015 Updated to September 2 TRANSPORT INFRASTRUCTURE THE AMAZON WATERWAY CALLED Loreto Ucayali Implementation
More informationARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES
ARGENTINA 2016-2019 MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA OVERVIEW 2018 1 2 3 Population: 45 million 8 country on surface 24 provinces 4 55 airports 5 39 millions of passengers
More informationInfrastructure: Networks to Sustain Development
Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:
More informationArgentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders
Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records
More informationINFRASTRUCTURE GAP
INFRASTRUCTURE GAP 2016-2025 GAP BY INDUSTRY THROUGH 2025 Other 28% Transport 36% Strategic pillar: Telecoms 17% Energy 19% Total gap: US$ 159,6 billion Source: AFIN NATIONAL INFRASTRUCTURE PLAN STATE
More informationInvestment Opportunitiesin Public infrastructure and Public Service ProInversion Updated to April 22, 2015
Investment Opportunitiesin Public infrastructure and Public Service ProInversion 2015-2017 Updated to April 22, 2015 WHY INVEST IN PERU? 1. Internationally acknowledged macroeconomic soundness 2. Friendly
More information08-15 FDI/GDP (%, average) Foreign Direct Investment (Avg. USD BB/Year) Average 4.5% % 5.0% 6.0x 3.9% 3.4% 2.
1 ~ ~ 2 74.9 Foreign Direct Investment (Avg. USD BB/Year) 90-00 08-15 8.4% 08-15 FDI/GDP (%, average) 6.0x 12.5 2.9x 9.4 27.4 19.7 1.4x 5.8x 6.6x 12.4 5.4x 9.7 7.1 8.2 3.4 1.9 1.5 5.0% 3.9% 3.4% 2.4% Average
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationImplementation Status & Results Argentina AR Basic Municipal Services Project (P060484)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services
More informationMARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists
MARKET REPORT Argentina: Low-Cost Airlines - the New Protagonists SEPTEMBER 2018 Low-Cost Airlines: The New Protagonists in Argentina Since its creation, the Argentine air market has been extremely closed,
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationCHILE: Infrastructure, The Challenges Ahead
CHILE: Infrastructure, The Challenges Ahead Hernán de Solminihac Vice President CPI - Chile Former Minister of Public Works and Minister of Minning Professor Civil Engineering and Planning Director of
More informationImplementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)
More informationThe hemispheric program for the eradication of foot and mouth disease challenges and lessons learned
The hemispheric program for the eradication of foot and mouth disease challenges and lessons learned OIE/FAO Global Conference on Foot and Mouth Disease. The Way Towards Global Control 24 26 June 2009
More informationAssessing the Impacts of ENSO on South American Agriculture
Assessing the Impacts of ENSO on South American Agriculture Mark Brusberg United States Department of Agriculture Office of the Chief Economist / Presented to: The International Symposium on Synergistic
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:
More informationCS Peru Commercial Briefing Americas Business Forum
CS Peru Commercial Briefing Americas Business Forum September 12-14, 2012 Sheryl Maas Senior Commercial Officer Lima, Peru Peru Population: 29 Million Capital: Lima (Pop. 9 million) Other Major Cities:
More informationTelecommunication Projects for Regions of Peru Fund for Investments in Telecommunications - FITEL
Telecommunication Projects for Regions of Peru Fund for Investments in Telecommunications - FITEL What is FITEL? FITEL is a fund for the provision of universal access, meaning such access in the country
More information-2SD +2SD -3SD -2SD -3SD -2SD
National 1975 0. -5.99 2.2 39.7 16.1 00218 URBAN 0. -5.99 0.9 30.2 10.9 URBAN 0. -5.99 1.0 31.8 9.5 Region natural: Costa URBAN 0. -5.99 0.4 19.1 6.3 Region natural: Lima URBAN 0. -5.99 0.0 43.6 30.8 Region
More information8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala
8.INFRASTRUCTURE #INVESTINGUATEMALA Industry in Guatemala General information of the country Capital City Currency Exchange Rate (2013) Official Language Population Labor Force (2013) GDP (2013) FDI inflows
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117
More informationInfrastructure in Mexico
Infrastructure in Mexico Alonso Quintana Chief Financial Officer Empresas ICA, S.A.B. de C.V. Mexico City February 16, 2010 National Infrastructure Plan 2007-2012: Requirements and Goals by Sector Sector
More informationOperational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS
International Civil Aviation Organization SAM/IG/12-WP/12 South American Regional Office 26/09/13 Twelfth Workshop/Meeting of the SAM Implementation Group (SAM/IG/12) - Regional Project RLA/06/901 (Lima,
More informationImplementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure
More informationLARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA
LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA This report describes the situation in Argentina with respect to large-scale land acquisitions (LSLA) uploaded to the Land Matrix. This analysis was based
More informationCBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés
CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés Buenos Aires, December 5 th 2014 Bioceanico Aconcagua - Video http://youtu.be/ty2ljemubc4?list=uucj5hpq1jmbzksz7zc35h3q 2 Location CÓRDOBA
More informationVI Meeting of the Executive Steering Committee
VI Meeting of the Executive Steering Committee 23 24 November, 2004 Lima, Republic of Peru 2004 Project Portfolio INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA Project Portfolio
More informationPublic Works Research Institute
Public Works Research Institute INTERNATIONAL WORKSHOP ON WATER HAZARD AND RISK MANAGEMENT SOME EXPERIENCES OF FLOOD MANAGEMENT IN ARGENTINA VÍCTOR POCHAT National Director for Water Policies,Coordination
More informationImplementation Status & Results Argentina AR Road Safety (P116989)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation
More informationSESSION 4 INFRASTRUCTURE
SESSION 4 INFRASTRUCTURE Mauricio Endo affiliated with KPMG International Cooperative ( KPMG International ), a Swiss entity. All rights reserved. Printed in Brazil. 1 Country Overview Regionalization
More informationLanding in South America & Peering Landscape in Argentina
Landing in South America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet
More informationJ.P. Morgan 9 th Annual Global Emerging Markets Corporate Conference. Miami, February 2018
J.P. Morgan 9 th Annual Global Emerging Markets Corporate Conference Miami, February 2018 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated
More informationXXXIX REPICA, JULY 25-28, 2017, BELIZE CITY, BELIZE
LA IMPORTANCIA DE LAS ASOCIACIONES PUBLICO PRIVADAS EN EL DESARROLLO PORTUARIO XXXIX REPICA, JULY 25-28, 2017, BELIZE CITY, BELIZE Jorge Durán Chief of the Secretariat Inter-American Committee on Ports
More informationINVESTMENT PROJECTS IN THE PERUVIAN MINING
INVESTMENT PROJECTS IN THE PERUVIAN MINING ROMULO MUCHO Rio de Janeiro, October 21st, 2016 romulomucho1@gmail.com PERU'S GEOGRAPHIC INFORMATION COUNTRY OVERVIEW ECONOMIC GROWTH RATES Latinamerica projections:
More informationCorporate Social Responsibility in the Peruvian Mining Industry Milpo s experience. Lima, September 2016 Q & A
Corporate Social Responsibility in the Peruvian Mining Industry Milpo s experience Lima, September 2016 Q & A VOTORANTIM METAIS Our key knowledge as a Peruvian mining company has been complemented since
More informationISA AND ITS BUSINESS UNITS
Directly and through its 30 affiliates and subsidiaries, ISA executes important projects in linear infrastructure systems that enhance continental development. For such purpose, its activities are focused
More informationImplementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential
More informationBRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014
BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014 AATES, Asociación Argentina de Túneles y Espacios Subterráneos Tacuarí 32, Piso 9 ; CP 1071 Buenos Aires, Argentina E-mail : administracion@aates.org.ar
More informationLanding in Latin America & Peering Landscape in Argentina
Landing in Latin America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet
More informationSecond Quarter 2017 Results Presentation. August 2017
Second Quarter 2017 Results Presentation August 2017 Second Quarter 2017 Highlights Revenues per ASK increased by 10.3% as a result of proactive capacity management. Operating revenues increased by 7.7%
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection
More information3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor
3.3 COST ESTIMATION OF THE MAIN PROJECTS (1) Main projects 1) Improvement of export corridor The promotion of exports is indispensable for the development of the Paraguayan economy, and improvement of
More informationPort Cooperation & Logistic Development in Emerging Markets
New Exploration in the Transitional Era BIPC, 2017 Port Cooperation & Logistic Development in Emerging Markets Fernando Gamboa Director General of Ports Authorities Management & Development Coordination
More informationInfrastructure Developments in Brazil s Northern Arc
THIS REPORT CONTAINS ASSESSMENTS OF COMMODITY AND TRADE ISSUES MADE BY USDA STAFF AND NOT NECESSARILY STATEMENTS OF OFFICIAL U.S. GOVERNMENT POLICY Voluntary - Public Date: 9/20/2017 GAIN Report Number:
More informationMEXICO OVERVIEW. April 2018
MEXICO OVERVIEW April 2018 1 MEXICO What makes it a good opportunity? LOCATION bounded by Pacific Ocean and Gulf of Mexico (GOM), the United States, and Central America The shortest distance between the
More informationInvestment Opportunities in the Hydrocarbon Sector of Peru. Eng. Winston Wusen January 14 th, 2013
Investment Opportunities in the Hydrocarbon Sector of Peru Eng. Winston Wusen January 14 th, 2013 PERÚ An attractive country to invest in oil and gas hydrocarbon activities 1. PERUPETRO S.A. WHO IS PERUPETRO
More informationIndicative Territorial Planning
INITIATIVE INITIATIVE FOR FOR THE THE INTEGRATION INTEGRATION OF OF REGIONAL REGIONAL INFRAESTRUCTURE INFRAESTRUCTURE IN IN SOUTH SOUTH AMERICA AMERICA Indicative Territorial Planning IIRSA PROJECT PORTFOLIO
More informationRail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy
Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy José Zozaya President, General Manager and Executive Representative Kansas City Southern de México General Overview of KCSM
More informationEARNINGS 2Q2016 RELEASE. August 30, 2016
EARNINGS RELEASE 2Q2016 August 30, 2016 RELEVANT CORPORATE EVENTS 2Q2016 MULTIPLAZA LA FELICIDAD BOGOTÁ - CUNDINAMARCA RELEVANT CORPORATE EVENTS New market maker with Credicorp: a value adding tool for
More informationConference Call 1Q14 Results. Investor Relations May 15, 2014
Conference Call Results Investor Relations May 15, 2014 1 Highlights 2 Highlights Net revenues of R$2.5 billion in the quarter, an increase of 20% or R$411 million quarter-over-quarter; EBIT totaled R$144
More informationNOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION
NOVEMBER 2011 - YEAR III MARKETWATCH LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION THE REGION IN PERSPECTIVE LAC in Perspective - 2011 Facts % of the world 595 mi people 9,3 $ 5,8 tri
More informationRakennusalan mahdollisuudet Latinalaisessa Amerikassa. Heta Pyhälahti Region Americas
Rakennusalan mahdollisuudet Latinalaisessa Amerikassa 25.5.2010 Finpro Finpro Heta Pyhälahti Region Americas Content Latin American countries and Construction ti sectors Reconstruction in Chile Timber
More informationNorte Grande Road Infrastructure (P120198)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768
More informationRegional Economic Report July- September 2014
Regional Economic Report July- September 2014 December 11, 2014 Outline I. Introduction II. Results July September 2014 A. Economic Activity B. Inflation C. Economic Outlook III. Final Remarks Introduction
More informationINDEX. ARCHITECTURE Formosa
PRINCIPAL WORKS INDEX SANITATION & DRINKING WATER --------------------------------------------------------------------------------------- 3 WATER TREATMENT PLANTS -------------------------------------------------------------------------------------------
More informationMay El Dorado International Airport. Aeropuerto Internacional El El Dorado
May 2018 El Dorado International Airport. Aeropuerto Internacional El El Dorado ABOUT ODINSA We are a Colombian concession company that belongs to Grupo Argos, dedicated to the structuring, promotion,
More informationConsolidated Q15LTM 38,122 35,658 35,798 34,259 29,556 17% 6,138 15% 5,090 10% 3,742 16% 4,735
73% Revenue 14% 13% Construction Concessions Airports 8% 42% 50% Consolidated 2011 2012 2013 2014 2Q15LTM Backlog 2011 2012 2013 2014 2Q15 LTM Civil Mining Industrial * Other JVs Months 34,259 35,319 25,029
More informationJefatura de Gabinete de Ministros. Unidad Plan Belgrano
Jefatura de Gabinete de Ministros Plan Belgrano Plan Belgrano Strategic Guidelines Plan Belgrano Social, Production and Infrastructure plan to reduce Inequality and promote Economic Growth in Northern
More informationWhy Colombia Investment Environment & Business Opportunities
Why Colombia Investment Environment & Business Opportunities Tobias Meurer Mai 2017 Table of Content 1. Recent Macroeconomic Developments 2. Investment Environment 3. Export Platform 4. Wood processing
More informationPUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation
PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation Rebuilding Puerto Rico Mr. Omar J. Marrero, Esq. Executive Director Puerto Rico Public-Private Partnerships Authority & Central
More informationPERU: LAND OF OPPORTUNITIES
PERU: LAND OF OPPORTUNITIES PERU: POPULATION Chancay Department Area % Population Population Piura 6.12% 1,906,481 La Libertad North 5.90% 1,837,947 Lambayeque 21% 4.06% 1,264,757 Cajamarca 5.06% 1,576,273
More informationLarrain Vial Conference. Santiago, Chile March 2009
Larrain Vial Conference Santiago, Chile 16 17 March 2009 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating results.
More informationMexico's Logistics Infrastructure Update " Ciudad Juárez, Chihuahua May 16,2008
Mexico's Logistics Infrastructure Update " Ciudad Juárez, Chihuahua May 16,2008 Global Logistics Update Comparative Country Rankings (Quality of Infrastructure) MEXICO USA BRAZIL JAPAN GERMANY CHINA 61
More informationCONSTRUCTION SERVICES FOR MINING
CONSTRUCTION SERVICES FOR MINING WWW.STRACONGYM.COM 1 LEADING WORLD CLASS MINING CONTRACTOR IN LATIN AMERICA OUR VALUES ARE THE INPUT FOR OUR ETHICS CHARTER, POLICIES, PROCESSES, LEADERSHIP STYLE, AND
More informationOSITRAN s Institutional Framework
2008/SOM3/EC/SEM/009 Agenda Item: 3 OSITRAN s Institutional Framework Submitted by: Peru Seminar on Best Practices in Regulation and Promotion of Efficiency in Transport Infrastructure Facilities Lima,
More information1 st US - Kosovo Trade Forum New York, New York
Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation
More informationLatin America Airfinance Conference
13 th Annual Latin America Airfinance Conference 14-15 September 2017 Belmond Copacabana Palace, Rio de Janeiro, Brazil Andres Del Valle Senior Vice President Corporate Finance LATAM Airlines Group From
More informationInfrastructure Report Uruguay 2014
Page 1 Market Research Infrastructure Report Uruguay 2014 Prepared by Your guide to doing business in Latin America Miryam Lazarte, Founder & CEO Page 2 EXECUTIVE SUMMARY Despite Uruguay's small size and
More informationACS/2013/TRADE Customs Working Group.INFO.001 IMPACT OF THE WELCOME
ACS/2013/TRADE Customs Working Group.INFO.001 IMPACT OF THE WELCOME Panama Logistic Center of the Americas Reaching the full potential of its geographical position Operational Results FY2011 FY2012 Transits
More informationSantander 22 nd Annual Latin American Conference. Cancun, January 2018
Santander 22 nd Annual Latin American Conference Cancun, January 2018 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating
More informationDoing Business in Colombia. U.S. Department of Commerce International Trade Administration
Doing Business in Colombia Colombia at a Glance Strategic geographical location Rated #16 as tourist destination in 2010 by NY Times Fastest growing market in Latin America for oil and gas production Headlines
More informationANNEX 18 Integration Sectoral Processes
INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA IIRSA ANNEX 18 Integration Sectoral Processes IX Meeting of the Executive Steering Committee of IIRSA December 4th and 5th, Montevideo,
More informationISA, MULTI LATIN-AMERICAN with 33 companies and 4 businesses in eight countries
Transport Transport Intelligent Real-Time Management Systems of Smart Real-Time Management Systems company in, MULTI LATIN-AMERICAN with 33 companies and 4 businesses in eight countries , directly and
More informationVII INTERNATIONAL EXPLORERS CONFERENCE PROEXPLO 2011
VII INTERNATIONAL EXPLORERS CONFERENCE PROEXPLO 2011 Peru: Country for Exploration Building Bridges: February 6-8, 2011 Lima, PERU 1. ORGANIZING COMMITTEE ORGANIZING COMMITTEE Guido Del Castillo, PROEXPLO
More informationAsset Portfolio. Key figures and location JULY, 2018
Asset Portfolio Key figures and location JULY, 2018 Index 1. ALEATICA Footprint 03 2. CHILE 04 Toll Roads Ports 06 3. COLOMBIA 09 Toll Roads 10 4. SPAIN 11 Toll Roads Ports Railways 12 5. MEXICO 18 Toll
More informationSuccesses and Failures of the Policies of Water Supply and Wastewater Services in Argentina
4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply
More informationLatin America Logistics Overview. Brazil, Argentina and Chile
Latin America Logistics Overview Brazil, Argentina and Chile Brazil Country Overview Brazil has the largest and most modern industrial park in Latin America. Brazil's diverse industries range from automobiles,
More informationFact Sheet ELANBiz: Country Profile Brazil 1
Fact Sheet ELANBiz: Country Profile Brazil 1 Prepared by ELANBIZ Trade Expert in Brazil. Updated to February, 2018 For additional information, use our service Ask the Expert Basic Information Official
More informationANALYSIS OF THE INCORPORATION OF THE NORTHEASTERN AND CENTRAL-WESTERN TERRITORIES OF BRAZIL INTO IIRSA INTEGRATION AND DEVELOPMENT HUBS FINAL REPORT
ANALYSIS OF THE INCORPORATION OF THE NORTHEASTERN AND CENTRAL-WESTERN TERRITORIES OF BRAZIL INTO IIRSA INTEGRATION AND DEVELOPMENT HUBS FINAL REPORT October 2012 Table of Contents Executive Summary...
More informationMeeting of. Rio de. Janeiro, Brazil. the Integration. System (CMS) Continuous. 3, 4 and 5. obstacles and
Meeting of the Executive Technical Group on the Integration Priority Project Agenda (API) and the Continuous Monitoring System (CMS) August 27 and 28, 2013 Rio de Janeiro, Brazil NOTES OF THE MEETING On
More informationBRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018
BRAZIL FEDERAL ROADS GIF Advisory Council Meeting April 18, 2018 ROAD CONCESSIONS IN BRAZIL BRAZIL ROAD CONCESSIONS CONTEXT A set of Road Concessions Agreements from the 90s will expire over the next years
More informationChapter 19 Test on South America
Name Part 1 - Labeling (27 pts.) Chapter 19 Test on South America Score A. Locate the countries and territory contained in the word box below on the map of South America on the next page. Write the name
More informationBank of America Merrill Lynch 2018 Emerging Markets Corporate Credit Conference. Miami, May 2018
Bank of America Merrill Lynch 2018 Emerging Markets Corporate Credit Conference Miami, May 2018 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated
More informationTRANS-TEXAS CORRIDOR (TTC-35)
TRANS-TEXAS CORRIDOR (TTC-35) Madrid, 16 December 2004 www.cintra.es TTC-35 High-Priority Trans-Texas Corridor 1 STRATEGIC OPERATION Consolidating a presence in a market of strategic importance for the
More informationSTRATEGIC PILLARS OF PROINVERSION
2018-2021 PROJECTS STRATEGIC PILLARS OF PROINVERSION INTERNATIONAL ACKNOWLEDGMENT Millones CONTRACT AWARD EVOLUTION 2011 2018 10,000 USD Millones Million N 9,000 8,000 $9,985.5 50 45 40 7,000 35 6,000
More information