TRANS-TEXAS CORRIDOR (TTC-35)

Size: px
Start display at page:

Download "TRANS-TEXAS CORRIDOR (TTC-35)"

Transcription

1 TRANS-TEXAS CORRIDOR (TTC-35) Madrid, 16 December TTC-35 High-Priority Trans-Texas Corridor 1

2 STRATEGIC OPERATION Consolidating a presence in a market of strategic importance for the company s expansion The first time a private-sector operator defines and plans the development of an infrastructure corridor for a country Sizeable capacity to create value: -Cintra, a strategic partner of the State of Texas in designing and planning the infrastructure corridor and the financing system -Possibility (preferential right) of directly obtaining concessions worth US$6 billion in the next five years ( ) Concession period: 50 years Winning consortium: Cintra (85%) and Zachry (15%) The operation is coherent with the strategic objectives: large investments, the world s leading power, long-term contract, and controlling stake TTC-35 High-Priority Trans-Texas Corridor 2

3 TTC-35 THE High-Priority PROJECT Trans-Texas Corridor 3

4 THE PROJECT TTC-35: - total investment: between US$ 29 and US$ 36.7 billion - linking the Mexican border at Lower Rio Grande (McAllen) with the Oklahoma state line (north of Dallas) miles (1,300 km) long and 1,200 feet (360 m) wide multi-use transport corridor: - toll roads with lanes for light and heavy traffic - freight and high-speed rail - other infrastructure and utilities objectives of the project: - economic development: TTC-35 will run parallel to the oversaturated Interstate 35, the main artery of NAFTA, connecting Mexico, the US and Canada - reduce congestion: the population is set to double in the next 25 years one of four high-priority corridors identified in Texas; together the four measure 4,000 miles and will cost between US$145.2 and US$183.5 billion TTC-35 High-Priority Trans-Texas Corridor 4

5 THE PROJECT 800 miles (1,300 km) long AUTOPISTA CAMIONES AUTOPISTA LIGEROS AUTOPISTA LIGEROS AUTOPISTA CAMIONES FERROCARRIL ALTA VELOCIDAD FERROCARRIL OTRAS MERCANCIAS INFRAESTRUCTURAS 1,000-1,200 feet ( m)wide TTC-35 High-Priority Trans-Texas Corridor 5

6 THE PROJECT Utilities: water, energy (natural gas and oil pipelines), telecommunications, optical fibre and high-tension power lines Light vehicles: 3 lanes each way (3 x 2) Heavy vehicles: 2 lanes each way (2 x 2) Rail: 3 lines (high-speed, commuter and freight) TTC-35 High-Priority Trans-Texas Corridor 6

7 STRATEGIC TTC-35 High-Priority PARTNER Trans-Texas Corridor CONTRACT 7

8 THE CONTRACT 1 Strategic partner Cintra is now a strategic partner of the Texas Department of Transportation, assisting it to analyse, identify, plan, develop and finance the multi-use corridor through various infrastructure projects (road, rail and utilities) to be developed in the short, medium and long term 2 Preferential right to concessions Cintra has the preferential right to develop the projects defined for the short term ( ) directly, i.e. without the need for public tender 3 Other rights Cintra can also bid for the other projects offered by the Texas Department of Transportation in the rest of the corridor TTC-35 High-Priority Trans-Texas Corridor 8

9 PLANNED TTC-35 High-Priority INVESTMENTS Trans-Texas Corridor 9

10 PLANNED INVESTMENTS Total investment in the corridor: between US$ 29 and US$ 36.7 billion 14 projects identified SH 130, Seg 5&6 TTC-35, Dallas Southeast Connector TTC-35, Dallas Northeast Connector TTC-35, Georgetown to Temple TTC-35, San Antonio Southeast Loop TTC-35, Temple to Dallas SE Connector UP Railroad Relocation (Mopac) IH 10 Expansion, Seguin to San Antonio Southeast Loop SH 130, Seg. 1 to Dallas to Austin Freight Rail Dallas to Austin High Speed Rail Austin San Antonio High Speed Rail TTC-35, Forth Worth Southwest & Northwest Connectors TTC-35, San Antonio to Rio Grande Valley TTC-35 High-Priority Trans-Texas Corridor 10

11 PLANNED INVESTMENTS Cintra plans to directly develop (preferential right) five of the seven projects (all toll roads), with an investment value of approximately US$ 6 billion Project Length (miles) Investment (US$ Mn) Concession system Launch / Construction SH 130, Seg 5&6 (*) TTC-35, Dallas Southeast Connector (*) TTC-35, Dallas Northeast Connector (*TTC- 35, Georgetown to Temple (*) TTC-35, Temple to Dallas SE Connector (*) , ,694 DBFO DBFO DBFO DBFO DBFO 2005/ / / / /2010 TTC-35, San Antonio Southeast Loop UP Railroad Relocation (Mopac) 315,1 5, DBFO DB 2008/ /2011 (*) Projects which Cintra plans to develop directly DBFO: Design, Build, Finance and Operate; DB: Design and Build 441,7 7,299 TTC-35 High-Priority Trans-Texas Corridor 11

12 THE TTC-35 High-Priority CONSORTIUM Trans-Texas Corridor 12

13 THE CONSORTIUM 85% 15% Zachry Construction Corporation 15% of the consortium 50% of the construction work on the concession projects developed by the consortium in the corridor second-largest construction company in Texas one of the top 40 construction companies in the US TTC-35 High-Priority Trans-Texas Corridor 13

14 THE CONSORTIUM - CINTRA In addition to the Texas contract, Cintra manages 17 toll road concessions (Artxanda tunnel managed via Europistas) REGIONAL BREAK-DOWN OF INVESTMENTS TOTAL: 2 BILLION EUROS Chile 19% Spain 26% Skyway 407 ETR Radial 4 Ausol II Ausol I Madrid-Levante Autema N4-N6 Norte Litoral Algarve M-45 Collipulli-Temuco Santiago - Talca Temuco-Río Bueno Europistas Talca - Chillán US 24% Ireland 3% Canada 23% Portugal 5% (*) Based on Cintra s internal valuations TTC-35 High-Priority Trans-Texas Corridor 14

15 THE CONSORTIUM AND ITS ADVISORS Over 120 people from 19 companies participated in drafting Cintra s bid CONSORTIUM Cintra (85%) Zachry (15%) CONSTRUCTORS Ferrovial (50%) + Zachry (50%) CONSULTANTS Earth Tech JPMorgan Securities PWC Engineering design planning Finance Financial advisors LEGAL ADVISORS Bracewell & Patterson TTC-35 High-Priority Trans-Texas Corridor 15

16 BIDDING TTC-35 High-Priority Trans-Texas PROCESS Corridor 16

17 BIDDING PROCESS Milestone Gov. Perry gave go-ahead to the Trans-Texas Corridor project TxDOT completed design First contract of its type signed in Texas Necessary legislation passed RFPQ issued PQS submitted by proposers RFDP issued for industry review RFDP issued to proposers Bidding deadline Proposal evaluation process Winning consortium announced Contract signed Date January 2002 June 2002 June 2002 June July September January April August November December 2004 Jan./Feb TTC-35 High-Priority Trans-Texas Corridor 17

18 TRANS-TEXAS CORRIDOR (TTC-35) TTC-35 High-Priority Trans-Texas Corridor 18

US-460 CONCEPTUAL PROPOSAL

US-460 CONCEPTUAL PROPOSAL US-460 Presentation Conceptual to VDOT Independent Review Proposal Panel Presentation to VDOT Independent Review Panel December 6, 2010 Long-Term Partnership Over 150 years, the map has changed but the

More information

Table of Contents Qualifications and Experience...2

Table of Contents Qualifications and Experience...2 Table of Contents Table of Contents...1 1. Qualifications and Experience...2 1.1. The Proposer and Consortium...2 1.2. Relevant Experience...7 1.3. Contact Person...12 1.4. Project References...12 1.5.

More information

Ferrovial increases net profit by 12%, to 287 million euro

Ferrovial increases net profit by 12%, to 287 million euro All-time record backlog: 23.695 billion euro Ferrovial increases net profit by 12%, to 287 million euro Revenues expanded by 2.8% to 3.758 billion euro, supported by solid performance in the international

More information

Good morning, ladies and gentlemen. Joaquín Ayuso. Chief Executive Officer

Good morning, ladies and gentlemen. Joaquín Ayuso. Chief Executive Officer Good morning, ladies and gentlemen. Joaquín Ayuso Chief Executive Officer Ferrovial Cash flow: 650 Construction 270 Infrastructure 136 Services 187 Real Estate 17 Corporation 41 Year-end cash position:

More information

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, 2010 9:00 AM to Noon Welcome Mark Mathews, the Facilitator, welcomed the I-35 Corridor Segment Committee 1

More information

INTERSTATE 35 CORRIDOR UPDATE

INTERSTATE 35 CORRIDOR UPDATE INTERSTATE 35 CORRIDOR UPDATE Transportation Commission Workshop July 27, 2016 I-35 Corridor Planning History Lauren D. Garduño, P.E. 2 I-35 Corridor Planning Previous Planning on I-35 1999,IH 35 Trade

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy José Zozaya President, General Manager and Executive Representative Kansas City Southern de México General Overview of KCSM

More information

Engineers Conference Nassau, Bahamas. October 31, 2014

Engineers Conference Nassau, Bahamas. October 31, 2014 Engineers Conference Nassau, Bahamas October 31, 2014 Overview ACS Group ACS Group is a global leader in infrastructure development and ranked # 1 on ENR s list of Top International Contractors in 2013

More information

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska Crossing Canada s Other Border Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska This Presentation Highlights :! Multi-Modal Infrastructure Investment! Northern Economic

More information

A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012

A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012 A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012 Key factors impacting the border The Economy! Border wait times increasing, in excess of 45+ minutes in 24-hour cycle Outdate infrastructure

More information

Padornelo Tunnel. Zamora (Spain)

Padornelo Tunnel. Zamora (Spain) MANAGEMENT REPORT Padornelo Tunnel. Zamora (Spain) LETTER FROM THE CHAIRMAN 3 Fellow shareholder, Ferrovial ended 2015 in a good financial and business position, which allows it to look to 2016 and subsequent

More information

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No.

Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. 1. Report No. FHWA/TX-06/0-4644-1 Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. Accession No. 4. Title and Subtitle The Trans-Texas Corridor and the Texas Airport System:

More information

Results GENERAL OVERVIEW

Results GENERAL OVERVIEW January-September 2014 Results TOLL RO ADS S E R V I C E S C ONSTRUCTION A I R P O R T S GENERAL OVERVIEW The results of the first nine months of 2014 show revenue growth of 10.2% to EUR6,488mn, principally

More information

2. STRATEGY AND VALUE CREATION

2. STRATEGY AND VALUE CREATION 2015 Management Report. Ferrovial S.A. and subsidiaries 12 2. STRATEGY AND VALUE CREATION 2.1 GLOBAL STRATEGY BUSINESS MODEL, VISION AND VALUES Ferrovial is one of the leading global providers of infrastructure

More information

1 st US - Kosovo Trade Forum New York, New York

1 st US - Kosovo Trade Forum New York, New York Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation

More information

(More) Reasons Why Texas Needs the Hyperloop

(More) Reasons Why Texas Needs the Hyperloop (More) Reasons Why Texas Needs the Hyperloop Federico Schaffler, PhD Director Texas Center for Border Economic and Enterprise Development. Texas A&M International University, Laredo, Texas. wfschaffler@tamiu.edu

More information

ISA AND ITS BUSINESS UNITS

ISA AND ITS BUSINESS UNITS Directly and through its 30 affiliates and subsidiaries, ISA executes important projects in linear infrastructure systems that enhance continental development. For such purpose, its activities are focused

More information

NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S.

NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S. NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S. INTRODUCTION KEY FACTS FROM THE NATIONAL TOLL FACILITIES USAGE ANALYSIS 31 TOLL AUTHORITIES from across

More information

2003 ANNUAL REPORT. Group description Financial information Annual accounts Corporate Governance Corporate Social Responsibility

2003 ANNUAL REPORT. Group description Financial information Annual accounts Corporate Governance Corporate Social Responsibility 2003 ANNUAL REPORT Group description Financial information Annual accounts Corporate Governance Corporate Social Responsibility 2003 IN FIGURES Millions of euros 2003 2002 2001 2000 % 03/02 CAGR% 03/00

More information

CONCESSIONS COMMITED TO PUBLIC-PRIVATE PROJECTS

CONCESSIONS COMMITED TO PUBLIC-PRIVATE PROJECTS CONCESSIONS COMMITED TO PUBLIC-PRIVATE PROJECTS contents ACCIONA, profitability, development and sustainability 05. About ACCIONA Concessions 06. Current portfolio 24. Social Infrastructures 08. 10. Strategy

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,846,222 Award Type Amount Current Allocation in 2013 in 2014 in 2015 in 2016

More information

Results January December 2015 Ferrovial, S.A. & Subsidiaries

Results January December 2015 Ferrovial, S.A. & Subsidiaries Results January December 2015 Ferrovial, S.A. & Subsidiaries 25 February 2016 INDEX Results January - December 2015. Ferrovial S.A. & subsidiaries INDEX... 2 GENERAL OVERVIEW... 3 Business performance...

More information

Related Expertise Concession Projects - PPP

Related Expertise Concession Projects - PPP Related Expertise Concession Projects - PPP IMPETUS-ISIS for Attiki Odos ISIS and Impetus developed a traffic model for the offer that Attiki Odos, SA had provided in the bidding process and won the contract

More information

Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway

Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway B Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway of the Balkans, and the Doorway to the Central Europe.

More information

MAJOR PROJECTS

MAJOR PROJECTS MAJOR PROJECTS 2017-2019 MINISTRY OF PUBLIC WORKS JUNE 2017 CONCESSIONS - The Loa Route - Route 5: Section Caldera - Antofagasta - Re-tender of Route N 5 Los Vilos La Serena and Conurbation - Interconnection

More information

20 years of competition in the German regional passenger market. Tobias Heinemann, Chief Commercial Officer Transdev GmbH, Berlin

20 years of competition in the German regional passenger market. Tobias Heinemann, Chief Commercial Officer Transdev GmbH, Berlin 20 years of competition in the German regional passenger market Tobias Heinemann, Chief Commercial Officer Transdev GmbH, Berlin Transdev is a global mobility service provider Canada United Kingdom Sweden

More information

Point of view. Infrastructure industry and concessions in Chile

Point of view. Infrastructure industry and concessions in Chile Point of view Infrastructure industry and concessions in Chile November 2016 Point of view Infrastructure industry and concessions in Chile Investments in concessions (p.3) M&A opportunities (p.21) The

More information

7.5 Concessions Division

7.5 Concessions Division 7.5 Concessions Division The Sacyr Group s infrastructure concessions business started up in 1996 when the Group was awarded its first concession in Chile: Los Vilos-La Serena section of Route 5. Since

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

3. FERROVIAL FINANCIAL CAPITAL: BUSINESS PERFORMANCE A. GENERAL OVERVIEW saw the financial closing of:

3. FERROVIAL FINANCIAL CAPITAL: BUSINESS PERFORMANCE A. GENERAL OVERVIEW saw the financial closing of: 24 3. FERROVIAL 2015 3.1 FINANCIAL CAPITAL: BUSINESS PERFORMANCE A. GENERAL OVERVIEW In operating terms, 2015 was notable for the traffic growth at infrastructure assets: toll roads in Europe, the US and

More information

Consolidated Director s Report Ferrovial, S. A. and Subsidiaries

Consolidated Director s Report Ferrovial, S. A. and Subsidiaries Consolidated Director s Report 2013 Ferrovial, S. A. and Subsidiaries Board of directors 25 February 2014 nero septiembre 2012 Resultados INDEX I. Group activities, strategy and organisation... 3 II. Business

More information

EP8.2 Presentation Exhibition GO Station Improvements

EP8.2 Presentation Exhibition GO Station Improvements EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts

More information

Commercial & Multifamily Sites FALCON POINTE - Pflugerville, Texas

Commercial & Multifamily Sites FALCON POINTE - Pflugerville, Texas Commercial & Multifamily Sites FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park (under construction) Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville Pkwy SUBJECT 2 SUBJECT

More information

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL 1 AUSTRALIA S LARGEST RAIL FREIGHT NETWORK OPERATOR ARTC is a company under the Corporations Act owned by the Commonwealth

More information

January - December 2017 Results

January - December 2017 Results FERROVIAL - JANUARY - DECEMBER 2017 RESULTS Ɩ 1 FERROVIAL, S.A. & SUBSIDIARIES January - December 2017 Results 28 February 2018 PHOTO: 407 ETR toll road. Toronto (Canada). FERROVIAL - JANUARY - DECEMBER

More information

BORDER WEST EXPRESSWAY (LOOP 375)

BORDER WEST EXPRESSWAY (LOOP 375) BORDER WEST EXPRESSWAY (LOOP 375) 2015 Project Update Agenda 1 2 3 4 Team Overview Project Details Questions 2 Teams Owner Texas Department of Transportation Independent Engineer HDR Engineering Atkins

More information

Asset Portfolio. Key figures and location JULY, 2018

Asset Portfolio. Key figures and location JULY, 2018 Asset Portfolio Key figures and location JULY, 2018 Index 1. ALEATICA Footprint 03 2. CHILE 04 Toll Roads Ports 06 3. COLOMBIA 09 Toll Roads 10 4. SPAIN 11 Toll Roads Ports Railways 12 5. MEXICO 18 Toll

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015 INFORMATION ONLY Subject: Metrolinx Presentation Date: June 22, 2015 At its meeting on June 22, 2015, the TTC Board will receive a presentation on Metrolinx from Robert Prichard, Metrolinx Board Chair

More information

DIRECT PUBLIC INVESTMENT

DIRECT PUBLIC INVESTMENT DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama

More information

Use a Texas highway map or Texas digital highway map and the blank Texas map on the next page to complete the following tasks.

Use a Texas highway map or Texas digital highway map and the blank Texas map on the next page to complete the following tasks. IR-28: Mapping the Texas Core Use a Texas highway map or Texas digital highway map and the blank Texas map on the next page to complete the following tasks. 1. Use the highway map of Texas to do the following.

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

description of company

description of company description of company description of company description of company Ferrovial se consolida como el mayor gestor privado de infraestructuras de transporte del mundo. Description of Company 10 Global presence

More information

Mexico's Logistics Infrastructure Update " Ciudad Juárez, Chihuahua May 16,2008

Mexico's Logistics Infrastructure Update  Ciudad Juárez, Chihuahua May 16,2008 Mexico's Logistics Infrastructure Update " Ciudad Juárez, Chihuahua May 16,2008 Global Logistics Update Comparative Country Rankings (Quality of Infrastructure) MEXICO USA BRAZIL JAPAN GERMANY CHINA 61

More information

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements Committee for Melbourne Briefing Note 2013-14 Victorian State Budget Overview of Key Announcements Strong and secure finances In 2013-14, the Coalition Government will deliver an estimated operating surplus

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018 TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND PNWER November 2018 INVESTING IN CANADA PLAN EXISTING FUNDS Of the $180+ billion, 12-year Investing in Canada Plan, $10.1 billion has been dedicated to

More information

Industrial Market Report

Industrial Market Report CLIENT FOCUSED. RESULTS DRIVEN. Lubbock Industrial Map Statistics The Lubbock industrial market continues to expand Southwest with the majority of new construction being in this sector followed by the

More information

JEFFERSON DAVIS HIGHWAY MARKERS By Kathy Hillman At the 1913 UDC Convention in New Orleans, President General Mrs. Alexander B.

JEFFERSON DAVIS HIGHWAY MARKERS By Kathy Hillman At the 1913 UDC Convention in New Orleans, President General Mrs. Alexander B. JEFFERSON DAVIS HIGHWAY MARKERS By Kathy Hillman At the 1913 UDC Convention in New Orleans, President General Mrs. Alexander B. White recommended that the UDC secure for an ocean-to-ocean highway from

More information

Infrastructure in Mexico

Infrastructure in Mexico Infrastructure in Mexico Alonso Quintana Chief Financial Officer Empresas ICA, S.A.B. de C.V. Mexico City February 16, 2010 National Infrastructure Plan 2007-2012: Requirements and Goals by Sector Sector

More information

Commercial, Office, Retail & Medical Site FALCON POINTE - Pflugerville, Texas

Commercial, Office, Retail & Medical Site FALCON POINTE - Pflugerville, Texas Commercial, Office, Retail & Medical Site FALCON POINTE Pflugerville, Texas FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville

More information

Infrastructure Policy Priorities for New Zealand

Infrastructure Policy Priorities for New Zealand Infrastructure Policy Priorities for New Zealand The problem Transport investment international comparisons Funding gap Solutions: Debt financing: Infrastructure Bonds, PPPs Tax Increment Financing TIF

More information

Tower 55 Rail Reliever Study Technical Advisory Group

Tower 55 Rail Reliever Study Technical Advisory Group Tower 55 Rail Reliever Study Technical Advisory Group April 17, 2009 North Central Texas Council of Governments Transportation Department Welcome & Introductions Approval of the February 13, 2009 Meeting

More information

Outlıne of the Presentatıon

Outlıne of the Presentatıon Outlıne of the Presentatıon Background and Objectives What has been achieved National Perspective Regional Perspective Estimated Financing Requirements What is Needed Chingola-Solwezi-Jimbe Railway Line

More information

Project Advisory Group. May 23, 2013

Project Advisory Group. May 23, 2013 Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open

More information

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5 29 December 2014 BHP Billition Canada Inc. 130 3rd Avenue South Saskatoon SK S7K 1L Canada Tel +1 306 385 8400 www bhpbilliton.com Canada Transportation Act Review Secretariat 350 Albert Street Ottawa

More information

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE From a landlocked to a land linked Zambia CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE Presented by Ministry of Transport Works Supply and Communications and October 2013 Presented to PUBLIC-PRIVATE DIALOGUE FORUM

More information

SH121 Toll Project D.1. KEY PERSONNEL RESUMES AND REFERENCES

SH121 Toll Project D.1. KEY PERSONNEL RESUMES AND REFERENCES SH121 Toll Project D.1. KEY PERSONNEL RESUMES AND REFERENCES D.1.Key Personnel KEY PERSONNEL Fernando Redondo Pedro Losada Rhonda Price Jose Carlos Esteban Mark D. Smith Fidel Saenz Esteban Trigueros Jesus

More information

Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )

Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link ) 1 Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link ) Vienna Airport Josef Zitzler bmvit unit II/Infra2 Infrastructure planning Bled, 15/05/2018

More information

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority IBTTA Global Tolling Summit; Salzburg, Austria September 6, 2018 The Rise of Managed

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

Commercial, Office, Retail & Medical Sites FALCON POINTE - Pflugerville, Texas

Commercial, Office, Retail & Medical Sites FALCON POINTE - Pflugerville, Texas Commercial, Office, Retail & Medical Sites FALCON POINTE Pflugerville, Texas FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville

More information

Airport Privatization

Airport Privatization Airport Privatization Seventeenth ACI World Annual General Assembly Conference Bijan Vasigh, Ph.D. Professor College of Business Embry-Riddle Aeronautical University Daytona Brach, Fl 32114 bijan@avionconsult.com

More information

The Belfast Manifesto

The Belfast Manifesto TheBelfast Manifesto NIIRTA The Northern Ireland Independent Retail Trade Association (NIIRTA) strongly supports The Belfast Manifesto. This should be required reading for election candidates to both Belfast

More information

1.37 Acre Corner Commercial Office, Retail or Medical Site

1.37 Acre Corner Commercial Office, Retail or Medical Site 1.37 Acre Corner Commercial Office, Retail or Medical Site Opening 2018 Typhoon Texas Waterpark Multi-Family & Condo Developments Falcon Pointe Blvd Baylor Scott & White Medical Center SITE Exclusively

More information

International Rail Opportunities

International Rail Opportunities International Rail Opportunities Jake Rudham 17 th June 2016 1 Presentation title - edit in the Master slide Some Initial Considerations There is a lot happening in rail across the world not just in the

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

IAT Annual Conference 'Driving Forward

IAT Annual Conference 'Driving Forward Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/-

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/- Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/- Port of Pensacola, one of Florida s 15 Deep Water Ports PORT PENSACOLA FACTS: Shortest steaming distance pier side to the 1st sea buoy in the Gulf

More information

Results, January March 2018

Results, January March 2018 FERROVIAL - RESULTS JANUARY MARCH 2018 Ɩ 1 FERROVIAL, S.A. & SUBSIDIARIES Results, January March 2018 10 May 2018 PHOTO: I-66, Virginia, USA FERROVIAL - RESULTS JANUARY MARCH 2018 Ɩ 1 GENERAL OVERVIEW

More information

Commercial Development Update MetroTex Forecast

Commercial Development Update MetroTex Forecast Commercial Development Update 10.5.18 John Terrell Vice President Commercial Development Dallas Fort Worth International Airport 1 Texas: #1 in Economic Climate CNBC Best State For Business 2018 Chief

More information

Doing business. in Nuevo Leon

Doing business. in Nuevo Leon Doing business in Nuevo Leon WHERE IS NUEVO LEON? CANADA USA MEXICO NUEVO LEON Capital city: Monterrey Subdivisions: 51 municipalities Surface: 64,156 km ECONOMIC OVERVIEW THE HIGHEST GDP PER CAPITA IN

More information

Paseo del Bajo Road Corridor Project

Paseo del Bajo Road Corridor Project SHOWCASE PROJECTS Image courtesy of AUSA BUENOS AIRES, ARGENTINA Paseo del Bajo Road Corridor Project May 2018 PROJECT OVERVIEW The USD 700 million Paseo del Bajo project is a transformative road corridor

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Shaping the Future of Railway Institute of Railway Technology

Shaping the Future of Railway Institute of Railway Technology Shaping the Future of Railway Institute of Railway Technology 21 st September 2016 Adams Williams Manufacturing Lead Major Bids Team Rail Relationships creating success Opportunities in Rail Page 2 Trains,

More information

Regional Planning for Tri-Rail Coastal Link

Regional Planning for Tri-Rail Coastal Link 2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,

More information

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality Presentation to: 14 th Annual Southwestern Rail Conference Texas Rail Advocates by Judge

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

Improving Houston METRO HOV/HOT Lane Safety Fall TexITE: Fort Worth August 31 st, 2012 Dustin Qualls, PE, PTOE Nader Mirjamali, PE

Improving Houston METRO HOV/HOT Lane Safety Fall TexITE: Fort Worth August 31 st, 2012 Dustin Qualls, PE, PTOE Nader Mirjamali, PE Improving Houston METRO HOV/HOT Lane Safety 2012 Fall TexITE: Fort Worth August 31 st, 2012 Dustin Qualls, PE, PTOE Nader Mirjamali, PE Agenda for Today s Presentation I. II. III. IV. V. Introduction to

More information

INVESTMENT OPPORTUNITIES IN MYANMAR 6 th October, 2016

INVESTMENT OPPORTUNITIES IN MYANMAR 6 th October, 2016 INVESTMENT OPPORTUNITIES IN MYANMAR 6 th October, 2016 Infrastructure Hotels and Tourism Construction Other Sectors INVESTMENT OPPORTUNITIES Telecommunication Electricity Generation Industrial zones Roads

More information

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT Colima, Mexico Tel: +52 (312) 316-2028 Fax: +52 (312) 316-2034 E-mail: sefome@col.gob.mx Infrastructure Colima's modern and well-developed infrastructure

More information

Emirates Upgrades United States Network with New Services to Seattle and Dallas

Emirates Upgrades United States Network with New Services to Seattle and Dallas City Tourism Emirates Upgrades United States Network with New Services to Seattle and Dallas Emirates, one of the world s fastest growing airlines, unveiled major new expansion plans for the United States

More information

CHAPTER 3 PARK AND RIDE DEMAND ANALYSIS

CHAPTER 3 PARK AND RIDE DEMAND ANALYSIS CHAPTER 3 PARK AND RIDE DEMAND ANALYSIS The TCI analysis was supplemented by a travel demand analysis that identified the relative magnitude of park-and-ride opportunities in the three-county Capital Area

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

Sales: (780)

Sales: (780) WHO IS ICEWERX Icewerx specializes in providing top notch digital billboard advertising space and superior client services. We use only the highest grade digital displays available with the truest color

More information

Greece: Bright opportunities for the future. December 2, 2010

Greece: Bright opportunities for the future. December 2, 2010 Greece: Long History in PPPs Bright opportunities for the future December 2, 2010 The Greek PPP market Focal point in regional PPP practice Significant history & expertise on PPP projects Clear legal framework

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

January - March 2016 Results Ferrovial, S.A. and subsidiaries

January - March 2016 Results Ferrovial, S.A. and subsidiaries January - March 2016 Results Ferrovial, S.A. and subsidiaries 4 May 2016 INDEX January March 2016 Results. Ferrovial S.A. and subsidiaries INDEX... 2 GENERAL OVERVIEW... 3 BUSINESS PERFORMANCE... 3 TOLL

More information

PREMIER PLAZA PHASE 1

PREMIER PLAZA PHASE 1 LEASING INFORMATION JEFFREY E. SMITH 956 221 0461 PREMIER PLAZA PHASE 1 LUXURY SHOPPING CENTER 25,000 SQ FT MCALLEN, TEXAS INTERSTATE HIGHWAY MCALLEN 69 MCALLEN INTERNATIONAL AIRPORT INTERSTATE HIGHWAY

More information

Technical Advisory Committee. May 14, 2013

Technical Advisory Committee. May 14, 2013 Technical Advisory Committee May 14, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delayed

More information

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT Adolfo Suárez Madrid-Barajas Airport A landmark airport 53.4 million Passengers +5.9% 387 thousand Operations +2.5% Gateway to Latin America 27 destinations

More information

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Ministry of Transportation

Ministry of Transportation Ministry of Topics: Hurontario Light Rail Transit & Extension Mobility Hubs Regional Express Rail (RER) & High Speed Rail (HSR) Hwy 407/410 Connections to Brampton Uptown GTA West Corridor Connecting Brampton

More information