BORDER WEST EXPRESSWAY (LOOP 375)
|
|
- Eugenia Montgomery
- 5 years ago
- Views:
Transcription
1 BORDER WEST EXPRESSWAY (LOOP 375) 2015 Project Update
2 Agenda Team Overview Project Details Questions 2
3 Teams Owner Texas Department of Transportation Independent Engineer HDR Engineering Atkins North America Rodriguez Transportation Group VRX PaveTex Engineering and Testing Don Durden, Inc. DBA Civil Engineering Consultants Surveying And Mapping 3
4 Teams Developer Abrams-Kiewit Joint Venture Design Consultant: Kellogg Brown & Root Services (KBR) Control Section Job Utility Coordinators, LLC Universal Field Services, Inc. ACI Consulting URS PSI 4
5 Overview Project is located in Southwest El Paso Alternative route to IH-10 through downtown El Paso Closes the gap to Loop 375 Provides better connectivity around El Paso Improves access to UTEP & downtown Promotes region s growth & development 5
6 Overview On August 22, 2014, TxDOT officials executed a design-build agreement with Abrams- Kiewit, JV for the design, construction and comprehensive maintenance of the project. In November, the name changed from Border Highway West Extension Project to the 6
7 Overview Project Basics $447M Contract $35M DBE Goal 1095 days 7.4 miles 5.6 miles tolled Groundbreaking Ceremony on November 12,
8 Schedule Milestones Notice to Proceed 1: October 2014 Start of Design: October 2014 Notice to Proceed 2: December 2014 Start of Construction: April 2015 Substantial Completion: Fall
9 Schedule Major Activities Design Fall 2014 Spring 2016 ROW Acquisition Fall 2014 Winter 2015 Utility Relocations Fall 2014 Summer 2016 Construction Spring 2015 Fall
10 Project Work Areas Work Areas 1 - Coles/Paisano Interchange 2 - Racetrack Dr. to Spur Spur 1966 to Paso Del Norte Bridge 4 - Downtown Loop 375 Reconstruction 10
11 Project Work Areas Work Area 1 Coles/Paisano Interchange Approximately 18 months 11
12 Work Area 1 - Coles/Paisano Interchange 12
13 Work Area 1 - Coles/Paisano Interchange 13
14 Project Work Areas Work Area 2 Racetrack Dr. to Spur 1966 Approximately 30 months 14
15 Work Area 2 Executive Center SPUI Interchange 15
16 Work Area 2 IH-10 & UPRR Mainlines 16
17 Work Area 2 IH-10 & UPRR Mainlines 17
18 Project Work Areas Work Area 3 Spur 1966 to Paso Del Norte Bridge Approximately 31 months 18
19 Work Area 3 - Spur
20 Work Area 3 - Downtown 20
21 Work Area 3 - Chihuahuita Park & Downtown 21
22 Project Work Areas Work Area 4 Downtown Loop 375 Reconstruction Approximately 12 months 22
23 Work Area 4 - Downtown Loop 375 Reconstruction 23
24 Work Area 4 - Downtown Loop 375 Reconstruction 24
25 Project Details - Aesthetics 25
26 Project Details - Aesthetics 26
27 Project Details - Aesthetics 27
28 Project Details - Aesthetics 28
29 29
30 Project Details Project Stakeholders City of El Paso Camino Real Regional Mobility Authority (CRRMA) International Boundary and Water Commission (IBWC) U.S. Customs and Border Protection (CBP) Railroads Union Pacific Railroad (UPRR) Burlington Northern Santa Fe (BNSF) ASARCO Trustee Utilities El Paso Electric Company (EPEC) El Paso Water Utilities (EPWU) 30
31 Project Details 31
32 Project Details 32
33 Project Details 33
34 Project Details 34
35 Project Details 35
36 36
37 Visualization 37
38 Questions 38
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationFreight Study Phase II. Kick-Off Meeting
TxDOT El Paso Freight Study Phase II Kick-Off Meeting July 6, 2012 Overview Introduction of Team Introduction of Team Objectives of Study Study Tasks Methodology of Study Schedule Team Members TxDOT Jennifer
More informationSeptember 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov September 1, 2017 I-10 night closures scheduled for September 5-7. 27-hour full
More informationI-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make
More informationElected Officials Briefing
Elected Officials Briefing North Metro Rail Line February 12, 2015 1 Welcome and Introductions 2 Rick Clarke RTD Assistant General Manager Capital Programs 3 The RTD FasTracks Plan 122 miles of new light
More information2013 El Paso County Comprehensive Mobility Plan. December 16, 2013
2013 El Paso County Comprehensive Mobility Plan December 16, 2013 2013 El Paso County Comprehensive Mobility Plan Map No. Project Name 01 I-10 COLLECTOR DISTRIBUTOR LANES 02 I-10/BORDER HIGHWAY CONNECTORS
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationI-35 Reconstruction Project
I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,
More informationTEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES
TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:
More informationDr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006
Political and Institutional Aspects of Rio Grande/ Río Bravo Basin Management Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006 Institutional
More informationI-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More informationMilestone: Bridge to Nowhere scheduled for demolition Aug 14
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14
More informationStakeholders Meeting
Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation
More informationNeed County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low
PIONEER TRAILS REGIONAL PLANNING COMMISSION TRANSPORTATION NEEDS -- 2015 TRANSPORTATION PLANNING GOALS BY MODOT CATEGORIES Pioneer Trails transportation needs are listed according to MoDOT s two major
More informationMain Line System Recommendations
(Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationMission Statement. Spur 601 Project Highlights
Mission Statement SPUR 601 is a TxDOT project dedicated to provide a safe, efficient, reliable new corridor to improve the mobility in east-central El Paso. The SPUR 601 team is working in partnership
More informationBOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY
BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY Presented to the City Council By the City Manager s Office May 10, 2016 1 Topics Update on Projects From Previous Bond Programs Prior to 2014 2014 Bond Program
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationSUNPORT SOUTH BUSINESS PARK
SUNPORT SOUTH BUSINESS PARK IS A NEW 330 ACRE DEVELOPMENT WITH RAIL, INTERSTATE AND AIRPORT ACCESS IN ALBUQUERQUE, NEW MEXICO. WHATEVER YOUR INDUSTRIAL NEED IS, SUNPORT SOUTH DELIVERS. COLLIERS INTERNATIONAL
More informationEL PASO COUNTY REGIONAL TRANSIT INSTITUTIONAL OPTIONS ASSESSMENT STUDY
EL PASO COUNTY REGIONAL TRANSIT INSTITUTIONAL OPTIONS ASSESSMENT STUDY Sponsored by: El Paso County Funding Support: Texas Department of Transportation Technical Assistance to the County: Texas A&M Transportation
More informationTower 55 Rail Reliever Study Technical Advisory Group
Tower 55 Rail Reliever Study Technical Advisory Group April 17, 2009 North Central Texas Council of Governments Transportation Department Welcome & Introductions Approval of the February 13, 2009 Meeting
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov A daytime lane closure on Mesa all week is needed to complete Sunday s demo
More informationDowntown Dallas Priority Parks DEVELOPMENT AND FUNDING AGREEMENT
Downtown Dallas Priority Parks DEVELOPMENT AND FUNDING AGREEMENT Park and Recreation Board April 19, 2018 Purpose Provide background information on the four (4) priority Downtown Parks Carpenter Park Harwood
More informationThe Texas Department of Transportation El Paso District
The Texas Department of Transportation El Paso District From US 54 to Racetrack Drive El Paso County CSJ: 2552-04-027 Summary of Third Public Scoping Meeting Meeting Date: University of Texas at El Paso
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov January 18, 2017 Mesa Continuous for 6 weeks The following closures started
More information± Acres Fore Sale
+/ 51.27 A N. L 1604 N R ± 51.27 Acres Fore Sale Frontage on Loop 1604 West of Nacogdoches Access from Nacogdoches Rd. Next to the Union Pacific Railway UP Railway is designated as a potential future stop
More informationUS 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012
US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda
More informationU.S. - Mexico Border Crossing Profile
Page 1 of 8 U.S. - Mexico Border Crossing Profile Profile of Monthly Border Crossing Times Experienced by Commercial Vehicles Entering the United States from Mexico Through Various Land Ports of Entry
More informationU.S. - Mexico Border Crossing Profile
Page 1 of 8 U.S. - Mexico Border Crossing Profile Profile of Monthly Border Crossing Times Experienced by Commercial Vehicles Entering the United States from Mexico Through Various Land Ports of Entry
More informationA Brief Overview of the Rio Grande Compact 04/26/06
A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer
More informationTRAIL ANNUAL REPORT
TRAIL ANNUAL REPORT 2016-17 Identify Undeveloped projects identified in the City s Greenprint or trail database 15.90 miles Study Projects that have been or are currently being studied to determine a feasible
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More informationCity of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020
Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13
More informationAviation, Rail, & Trucking 6-1
6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be
More informationThe Olathe Quiet Zone
The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF
More informationNATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S.
NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S. INTRODUCTION KEY FACTS FROM THE NATIONAL TOLL FACILITIES USAGE ANALYSIS 31 TOLL AUTHORITIES from across
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationFred Milch Project Review Manager East Central Florida Regional Planning Council
RESHAPING THE ROLE OF PARKS, RECREATIONAL AREAS, AND GREEN SPACE TO ENHANCE LIVABILITY Fred Milch Project Review Manager East Central Florida Regional Planning Council St. Johns River to Sea Loop Webinar
More informationStrategic Advantages. Steve Boecking Vice President Hillwood August 26, 2011
Strategic Advantages Steve Boecking Vice President Hillwood August 26, 2011 - Phoenix Award Overview HILLWOOD, A PEROT COMPANY Ross Perot, Jr. - Chairman Large-scale, private developer One of the top 10
More informationAN INVESTMENT IN CALIFORNIA S FUTURE
AN INVESTMENT IN CALIFORNIA S FUTURE Michelle Boehm, Southern California Regional Director Society of American Military Engineers (SAME) July 8, 2014 San Diego, CA WORLD LEADING INVESTMENT IN A WORLD LEADING
More informationTRANS-TEXAS CORRIDOR (TTC-35)
TRANS-TEXAS CORRIDOR (TTC-35) Madrid, 16 December 2004 www.cintra.es TTC-35 High-Priority Trans-Texas Corridor 1 STRATEGIC OPERATION Consolidating a presence in a market of strategic importance for the
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationAll closures this week happen at night, including full closures of Mesa and I-10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each
More informationMeasure R Program Update
Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th
More informationCorridor Management Committee Meeting. April 2, 2014
Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationGuide to MS416 Albert Bettle Papers
University of Texas at El Paso DigitalCommons@UTEP Finding Aids Special Collections Department 6-26-2017 Guide to MS416 Albert Bettle Papers Armand J. Avila The University of Texas at El Paso Follow this
More informationInvestment Sale Opportunity with Value Add Potential
Retail Investment Opportunity Strong Multi-Tenant Mix 9484 Dyer St, El Paso, TX *Not actual photo Investment Sale Opportunity with Value Add Potential 4901 N. Mesa, Ste 3B El Paso, TX, 79912 Ph: 915 859
More informationExecutive Summary Downtown Park Fund Allocation HEARING DATE: MAY 5, 2016
Executive Summary Downtown Park Fund Allocation HEARING DATE: MAY 5, 2016 Date: April 28, 2016 Case No.: 2016 004634CWP Project Name: Allocation of $4,000,000 from the Downtown Park Fund for the Renovation
More informationNew Orleans Public Belt Railroad Corporation Acquisition and Operation Exemption. Public Belt Railroad Commission of the City of New Orleans
This document is scheduled to be published in the Federal Register on 12/27/2017 and available online at https://federalregister.gov/d/2017-27931, and on FDsys.gov FR-4915-01-P SURFACE TRANSPORTATION BOARD
More informationA History of the Construction of the Radial Expressway System in Cook County
ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation
More informationINTERSTATE 35 CORRIDOR UPDATE
INTERSTATE 35 CORRIDOR UPDATE Transportation Commission Workshop July 27, 2016 I-35 Corridor Planning History Lauren D. Garduño, P.E. 2 I-35 Corridor Planning Previous Planning on I-35 1999,IH 35 Trade
More informationNorthside Redevelopment Strategy
Northside Redevelopment Strategy April 2, 2014 Isaac Barrow Real Estate Manager 1 Presentation Overview Study Overview Review Recommended Development Alternative Current Efforts and anticipated next steps
More information@ WWW.TOWNCENTERATMONTECILLO.COM 12350 Montwood, Suite 100 El Paso TX 79928 +1 915 859-3017 naielpaso.com 1200 Summit Avenue, Suite 800 Fort Worth, TX, 76102 +1 817 885-8333 robertlynn.com Paso El Paso,
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More informationOrigins June 2005 Update:
Downtown Freeways Building freeways through central business districts was a costly and difficult task. Numerous freeways converged in a small area, requiring a large number of freeway-to-freeway interchanges.
More informationA number of goals were identified during the initial work on this Big Lake Transportation Plan.
C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as
More informationINTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO
INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO CHARACTERISTICS OF THE U.S.-MEXICO BORDER Land Boundary 674 miles Colorado River 24 miles Rio Grande 1,254 miles Over 12 million residents
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationInternational Bridges Metropia Bridges App
International Bridges Metropia Bridges App - Metropia Bridges App Project Update Overview of Wait Times Customs Border Protection (CBP) Line of sight Reliable? As long as it s consistently wrong, that
More informationTHE BIG PICTURE. Week of March 4, Bring your dog. Bring your kids. Bring a picnic and spend the day with us! Free and open to the public.
We're celebrating Buda's 138th Birthday with free cupcakes and bubble fun! Come hang out with us at the visitor center in Stagecoach Park for a free cupcake donated by our local Walmart and play under
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationNEBRASKA OPERATION LIFESAVER STATE COMMITTEE MEETING May 16,
NEBRASKA OPERATION LIFESAVER STATE COMMITTEE MEETING May 16, 2013 www.nebraskaol.org www.oli.org MEETING CALLED TO ORDER Carol Daley called the meeting to order and Gary Sydzyik gave the Safety Briefing.
More informationGSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT
About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South
More informationWayfinding and the Visitor Experience 2013 FD2S INC.
Wayfinding and the Visitor Experience Wayfinding = Signage Wayfinding = the practice of helping people find their way Communities dicover that visitors are constantly lost I m lost! Or potentially popular
More informationWest Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018
West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments
More informationDowntown Tunnel/Midtown Tunnel/MLK Extension Project
Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented to: HRTPO Board, January 19, 2012 Presented by: Frank Fabian, P.E., Senior Project Manager, Virginia Department of Transportation 1 PROJECT
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationUnit 13: La Entrada The Spanish Enter New Mexico
Assessment Activities: Student Activity Sheet Activity 1. Matching Place Names Draw a line to connect the Spanish Place Name with its English definition. 1. Los Alamos a. mayor 2. Española b. the stream
More informationNOW DIVISIBLE TO 2,500 SF
NOW DIVISIBLE TO 2,500 SF FOR LEASE 222 E. Carrillo Street, Suite 101, Santa Barbara, California 93101 HayesCommercial.com Property Overview Located in the Cabrillo Business Park, this remodeled, two-story
More informationQUIET ZONE IMPLEMENTATION PLAN
QUIET ZONE IMPLEMENTATION PLAN Overview: o Recommended Strategy April 2008 o Status of Quiet Zone Plan o BNSF, ICC, & IDOT Crossing Closure Incentive Offers o Quiet Zone Implementation Costs o Funding
More informationDowntown Tunnel/Midtown Tunnel/MLK Extension Project
Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented to: Transportation Technical Advisory Committee, January 4, 2012 Presented by: Frank Fabian, P.E., Senior Project Manager, Virginia Department
More informationAppendix L Technical Memorandum Aesthetics
Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationA BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012
A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012 Key factors impacting the border The Economy! Border wait times increasing, in excess of 45+ minutes in 24-hour cycle Outdate infrastructure
More informationAGENDA. Call to Order ~ Roll Call. Public Comments (Non Agenda Items). Commissioners and Manager Comments.
Lea County Board of County Commissioners Regular Meeting Thursday, February 7, 2019 9:00 A.M. Lea County Courthouse - Commission Chambers 100 North Main Avenue, Lovington, New Mexico Notice of this Meeting
More informationI-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon
I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, 2010 9:00 AM to Noon Welcome Mark Mathews, the Facilitator, welcomed the I-35 Corridor Segment Committee 1
More informationUpdate of MDX Open Road Tolling
Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure
More informationBOOGIE WOOGIE AUTO TOUR 1
BOOGIE WOOGIE AUTO TOUR 1 4 6 3 5 7 1 2 10 9 8 Route # 1 Alternate Return Route 1 Historic Harrison County Courthouse & Museum 2 Texas & Pacific Railway Depot & Museum 3 Antebellum Childhood Home Lady
More informationYucca Mountain Nuclear Fuel Locations and Associated Rail Facilities. Rancho Seco Nuclear Generating Station, California
Yucca Mountain Nuclear Fuel Locations and Associated Rail Facilities Rancho Seco Nuclear Generating Station, California Yucca Mountain: Nuclear Fuel Locations and Associated Rail Facilities October 1,
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationPROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018
WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the
More informationBeaverhead-Deerlodge National Forest Butte Ranger District
United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest 1820 Meadowlark Lane Butte, MT 59701 406 494-2147 File Code: 1950 Date: September 1, 2010 Dear Interested Party:
More informationA RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EL PASO THAT:
A RESOLUTION EXPRESSING THE CITY OF EL PASO S INTENT TO CREATE TRANSPORTATION REINVESTMENT ZONE NO. 1 TO FINANCE TRANSPORTATION PROJECTS IN SUPPORT OF THE COMPREHENSIVE MOBILITY PLAN FOR EL PASO; SETTING
More informationLos Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations
Los Angeles County Metropolitan Transportation Authority Metro Rail Gold Line Eastside Extension - Operations Metro Gold Line System Description The Metro Gold Line is currently a 13.6 mile, double track
More informationTRINITY RIVER CORRIDOR
TRINITY RIVER CORRIDOR MODIFIED DALLAS FLOODWAY PROJECT UPDATE May 12, 2015 Jon Loxley Project Manager Dallas Floodway Project Fort Worth District U.S. Army Corps of Engineers US Army Corps of Engineers
More informationMINISTRY OF PUBLIC WORKS REPUBLIC OF PANAMA
MINISTRY OF PUBLIC WORKS REPUBLIC OF PANAMA PROJECT INFORMATION PACKAGE marzo de 2016 ESTIMATED PUBLIC BIDS SCHEDULE S The projects mentioned below refer to projects programmed to be executed between 2015
More informationUS-460 CONCEPTUAL PROPOSAL
US-460 Presentation Conceptual to VDOT Independent Review Proposal Panel Presentation to VDOT Independent Review Panel December 6, 2010 Long-Term Partnership Over 150 years, the map has changed but the
More informationJEFFERSON DAVIS HIGHWAY MARKERS By Kathy Hillman At the 1913 UDC Convention in New Orleans, President General Mrs. Alexander B.
JEFFERSON DAVIS HIGHWAY MARKERS By Kathy Hillman At the 1913 UDC Convention in New Orleans, President General Mrs. Alexander B. White recommended that the UDC secure for an ocean-to-ocean highway from
More information2016 Regional Transportation Alternatives Program (TAP) Grant Application
2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City
More informationWELCOME TO THE OPEN HOUSE
WELCOME TO THE OPEN HOUSE US 281 North Loop 1604 to Borgfeld Drive CSJ: 0253-04-146 & 0253-04-138 May 12, 2016 Please sign in Explore the exhibits Submit a comment form Ask questions We want to know your
More informationInvesting in Brampton s downtown
Investing in Brampton s downtown 1 REVITALIZING DOWNTOWN BRAMPTON The Next Chapter Public Information Session November 2, 2011, 7 9 pm AGENDA Welcome and opening remarks: City of Brampton Southwest Quadrant
More informationFederal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013
Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.
More informationWelcome Land Use Element... LU-1
Welcome Land Use Element... LU-1 Land Use Plan... LU-3 Residential Land Uses... LU-12 Commercial Land Uses... LU-14 Mixed Use... LU-16 Industrial Land Uses... LU-18 Automobile-Related Land Uses... LU-19
More information