Nashville, Tennessee (direct, non-stop destination from RSW)

Size: px
Start display at page:

Download "Nashville, Tennessee (direct, non-stop destination from RSW)"

Transcription

1

2 Nashville, Tennessee (direct, non-stop destination from RSW) This is Music City and Nashville s lively downtown doesn t disappoint. Sounds resonate from popular locations like the Country Music Hall of Fame and Museum, the Ryman Auditorium venue, the Johnny Cash Museum, the Musicians Hall of Fame and Museum and the Tennessee Performing Arts Center to countless small venues tucked in the over 200 bars and restaurants within downtown Nashville. Buzzing with creative-types, Nashville s heart is also a hub for art galleries and studios, theater and museums including the lauded Frist Center for the Visual Arts. A downtown Art Walk spanning a 10-block by 10-block maze of sidewalks along the western shores of the Cumberland River lists over 75 locations, and the first Saturday of each month residents and visitors come out in droves to explore the city s art scene after hours. The arty trend continues in downtown s SoBro (South of Broadway), where a bevvy of boutique hotels and quirky foodie eateries such as City Winery, a 300,000 square foot warehouse that is one-part winery and one-part restaurant and music venue, have opened in recent years. Visit quirky and quaint neighborhoods and stop at local eateries to sample dishes such as slow-roasted barbecue, authentic hot chicken, and Nashville's own frosty cocktail, the Bushwhacker. Mix the fun of a bar crawl, with shots of entertaining history and stories from the city's past, add a splash of silly toasts and a garnish of other Nashville surprises. When it s time to reconnect with nature, be sure to visit Cummins Falls to complete a fun, relaxing and memorable Tennessee experience. Image(s) Creative Commons, Wikimedia : Public Domain

3 May 15, 2018 Ms. Fran Myers Airports Special Management Committee Lee County Port Authority Terminal Access Road, Suite 8671 Fort Myers, Florida Dear Ms. Myers: Attached is the Southwest Florida International Airport and Page Field Airport Monthly Project Summary for the month of May This report is prepared by the Lee County Port Authority Development Division each month and reflects the current status of work efforts, schedules and budgets for ongoing projects. If you have any questions regarding any of the attached information, please do not hesitate to contact me. Respectfully, LEE COUNTY PORT AUTHORITY Emily M. Underhill Emily M. Underhill, P.E., A.A.E. Division Director, Development EMU/rrt cc: Airports Special Management Committee Jeff Mulder, A.A.E., Executive Director Mark R. Fisher, A.A.E., Deputy Executive Director - Development

4 RSW Projects FMY Projects Air Traffic Control Tower (ATCT)... 1 Page Field Rehabilitation of Runways And Rehabilitation of Airside Pavements Associated Taxiway Rehabilitation of Roads 3 Skyplex Boulevard Terminal Building Charging Stations 5 Terminal Building Expansion Ticket Counter and Gate Podium Modernization RSW Tenant Improvement Projects FMY Tenant Improvement Projects Skyplex LLC - Gartner Skywalk Shopping Center

5 RSW Air Traffic Control Tower (ATCT) AECOM Technical Services, Inc. 2/11/2013 Completion Date: 6/1/2018 (Design Only) This project provides for design services, environmental permitting and mitigation for a new Air Traffic Control Tower (ATCT) and Terminal Radar Approach Control Facility (TRACON) located midfield between existing runway and the future parallel runway. The test pile vibration monitoring data is being analyzed and reviewed within the 3D finite element model of the tower. Quarry blast location data has been received and will factor into the results. The test pile site has been restored. Coordination continues with the Federal Aviation Administration (FAA) and LCPA staff regarding schedule impacts. A six month extension from the Lee County Department of Community Development was received in order to respond to comments from the various Lee County departments. The design team is preparing to resume work on completing the tower design plans after review of impacts from the quarry vibrations. The environmental team continues to review tree topping impacts in preparation for another bid package to obtain additional panther habitat units (PHU s). $62,332, $21,450, $40,882, $10,725, $10,725, Development Division - April 2018 RSW Air Traffic Control Tower (ATCT) 1

6 RSW Rehabilitation of Airside Pavements CM/GC: Kimley-Horn & Associates Owen-Ames-Kimball, Co. 4/5/2017 Completion Date: 6/30/2019 (Design Only) RSW has a network of airside pavement infrastructure (taxiways and aircraft parking aprons) that has been constructed at various times from as early as 1979 (during the original RSW construction) through 2005 (as part of the Midfield Terminal construction). Maintaining these pavement areas is critical to the safe continued operation of aircraft at RSW. This project will evaluate all pavement and recommend rehabilitation measures to correct existing pavement distresses and extend the useful life of airport infrastructure. Notice to proceed for design phase was issued to Design and Construction consultants. The design team is going through the badging process and meetings are being scheduled with operations in order to plan the first task of surveying the pavements. Last Updated By Hector Yanez: 4/23/2018 5:08:27 PM $65,000, $2,993, $62,006, $1,496, $1,496, Development Division - April 2018 RSW Rehabilitation of Airside Pavements 2

7 RSW Rehabilitation of Roads CM/GC: Johnson Engineering, Inc. Owen-Ames-Kimball, Co. 10/27/2016 Completion Date: 2/28/2020 (Design Only) The Southwest Florida International Airport has a network of public, non-public, landside and airside roadways that serve the vehicular transportation needs of its patrons, employees, and other customers. The landside roadway infrastructure has been constructed at various times from 1979 through This project will plan for the necessary rehabilitative measures to correct existing pavement distresses in order to maintain the level of service needed. A Notice to Proceed (NTP) has been issued to the design and construction consultants in early April The design consultant has begun the surveying of all landside roads. Last Updated By Hector Yanez: 3/27/2018 4:38:40 PM $21,500, $1,397, $20,102, $698, $698, Development Division - April 2018 RSW Rehabilitation of Roads 3

8 RSW Skyplex Boulevard CM/GC: David Douglas Associates, Inc. Wright Construction 4/11/2012 Completion Date: 3/31/2018 (Design Only) This project will include permitting and environmental approval, roadway, drainage, utility, landscaping, signage, marking and lighting design for Skyplex Boulevard between Daniels Parkway and Chamberlin Parkway. Bidding phase began in early April A pre-bid meeting was held on April 18, Bids to be received on May 11, 2018.Last Updated By Hector Yanez: 4/23/2018 5:10:21 PM $14,256, $1,326, $12,929, $663, $663, Development Division - April 2018 RSW Skyplex Boulevard 4

9 RSW Terminal Building Charging Stations Atkins North America, Inc. CM/GC: Owen-Ames-Kimball Co. D l t Di i i A il /25/2017 Completion Date: 12/31/2018 In order to better serve our passengers, this project looks at installing in-seat charging stations for all the seats in the secured areas. The in-seat power stations will be installed in the concourses at each gate to accommodate passengers that are traveling through RSW with laptop, smartphone and other personal electronic devices. These in-seat power stations can accommodate power cords and USB cables for the passenger s convenience. Each unit allows passengers comfortable seating while their electronics are charging before their flight. The bidding for the project was completed in March The construction phase was approved at the Airports Special Management Committee (ASMC) meeting held on April 17, 2018 and will be submitted for approval to the Joint Board in May. Last Updated By Hector Yanez: 4/23/2018 5:11:46 PM $791, $691, $100, $691, RSW Terminal Building Charging Stations 5

10 RSW Terminal Building Expansion CM/GC: Atkins North America, Inc. Manhattan Construction (Florida), Inc. 3/9/2017 Completion Date: 6/30/2020 (Design Only) The increase in passenger volume within limited corridor spaces during peak hour operations has negatively impacted the terminal s functionality. There are conflicting passenger flow patterns, insufficient space to provide additional screening for passengers within the limits of the security screening checkpoint areas, insufficient length of queuing, and the building systems are challenged to support peak hour passenger volume. The Lee County Port Authority is also seeking to increase concession amenities for the general public. Notice to Proceed (NTP) to the design and construction consultants was issued early April The team is currently scheduling bi-weekly meetings and advancing towards the completion of the pre-conceptual phase in June Last Updated By Hector Yanez: 4/23/2018 5:13:19 PM $160,000, $4,490, $155,509, $1,754, $2,735, Development Division - April 2018 RSW Terminal Building Expansion 6

11 RSW Ticket Counter and Gate Podium Modernization CM/GC: Schenkel and Shultz Manhattan Construction (Florida), Inc. 3/9/2017 Completion Date: 3/30/2019 Modernization of various passenger processing areas at RSW; such as check-in ticket counters, including back wall signage and integral baggage scales, gate podiums at the respective airline boarding areas of the concourses, customs inspection stations for Federal Inspection Services (FIS), airline curbside check-in counters and customer service counter at the car rental customer service building shall be analyzed and updated to accommodate more automated processes based on new technology. In addition, the creation of a standardized look shall be implemented while respecting individual airline and rental car branding. Working Group Meeting on April 24, 2018 Notice to Proceed (NTP) for the design was issued on April 10, 2018 and the design schedule has been issued. The consultant is proceeding with the design and the 30% schematic design submittal to Lee County Port Authority is anticipated for June 28, Last Updated By Hector Yanez: 4/23/2018 5:14:39 PM $8,000, $646, $7,353, $258, $388, Development Division - April 2018 RSW Ticket Counter and Gate Podium Modernization 7

12 RSW Skyplex LLC - Gartner Hole Montes Inc. Contractor: Completion Date: Skanska US 8/25/ /31/2018 Skyplex LLC is developing a corporate office campus for Gartner Inc. The campus consists of two office buildings and an amenities building designated as Phase 1 of construction. Building A (88,700 SF), connecting atrium (7,000 SF) and building C (97,200 SF) are being constructed first. The amenities building (15,000 SF) consists of a fitness center and spa. This campus will also include appropriate parking spaces. Maximum building height is 45 feet above-ground-level. All three floor levels of concrete in building A have been poured. The concrete block construction for building D is near completion. The steel framework for building C has been completed. Conversations have begun to run gas lines to the amenities building (D). All underground rough-ins are in progress. The contractor will be holding Safety Week beginning April 23, The Port Authority fire department and police department staff will be participating in the safety week providing training and information for the workers. The crane NOTAM will be extended to the end of September so work may continue as necessary. Development Division - April 2018 RSW Skyplex LLC - Gartner 8

13 RSW Skyplex LLC - Gartner Development Division - April 2018 RSW Skyplex LLC Gartner 9

14 RSW Skywalk Shopping Center Marc Wiener AIA Contractor: Completion Date: 8/1/2016 Malcolmson Co. 5/15/2018 Construction of a Publix grocery store and thirteen outparcels located on Daniels Parkway between Paul J. Doherty Parkway and Fuel Farm Road. Hot Gyros & More The contractor for Hot Gyros & More has substantially completed all of his work. The Port Authority fire inspector signed off on all permits. The restaurant is anticipated to open mid-may after certificate of occupancy has been issued by Lee County staff. One vacant unleased retail space remains. Completion Date: 05/15/2018 *** Last Updated By Debbie Zemaitis: 4/20/2018 3:08:26 PM Development Division - April 2018 RSW Skywalk Shopping Center 10

15 Page Field Rehabilitation of Runway And Associated Taxiways CM/GC: Hole Montes Owen-Ames-Kimball Co. 11/6/2017 Completion Date: 8/31/2018 The project is to provide construction services for the airfield pavement rehabilitation project at Page Field (FMY). The construction services include the pavement rehabilitation of Runway 13-31, drainage improvements, replacement of culverts under the runway, replacement of runway edge and threshold lights, signage and the installation of new Precision Approach Path Indicators (PAPI) and Runway End Identification Lights (REIL) for each approach. Electrical work continues with installation of light fixtures and guidance signs. The sodding and seeding operations continue. Runway asphalt grooving commenced the second week of April Last Updated By Hector Yanez: 4/23/2018 5:06:49 PM $9,848, $9,190, $658, $7,352, $1,838, Development Division - April 2018 Page Field Rehabilitation of Runway And Associated Taxiways 11

Kansas City, Missouri (direct, non-stop destination from RSW)

Kansas City, Missouri (direct, non-stop destination from RSW) Kansas City, Missouri (direct, non-stop destination from RSW) Kansas City straddles the Missouri-Kansas state line, sometimes causing travelers to wonder which state they are in. Here are a few tips to

More information

Image(s) Creative Commons, Wikimedia : Public Domain

Image(s) Creative Commons, Wikimedia : Public Domain Las Vegas, Nevada (direct, non-stop destination from RSW) Las Vegas is Spanish for "The Meadows. Its official name is City of Las Vegas and is often referred to simply as Vegas. It is the 28th-most populated

More information

Dusseldorf, Germany (direct, non-stop destination from RSW)

Dusseldorf, Germany (direct, non-stop destination from RSW) Dusseldorf, Germany (direct, non-stop destination from RSW) Dusseldorf is a regional economic powerhouse straddling the banks of the Rhine River. It is the capital city of the German state of North Rhine-Westphalia

More information

Cologne, Germany (direct, non-stop destination from RSW)

Cologne, Germany (direct, non-stop destination from RSW) Cologne, Germany (direct, non-stop destination from RSW) Cologne is the largest city in the German federal State of North Rhine-Westphalia and the fourth populated city in Germany (after Berlin, Hamburg,

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Dallas Love Field Capital Program. September 16, 2015

Dallas Love Field Capital Program. September 16, 2015 Dallas Love Field Capital Program September 16, 2015 1 The Dallas Airport System Dallas Love Field, Dallas Executive Airport, Downtown Vertiport A $86 million City of Dallas enterprise Operated by the

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015 Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Kansas City Aviation Department. Community Listening Session

Kansas City Aviation Department. Community Listening Session Kansas City Aviation Department Community Listening Session Listening Session Purpose The Kansas City Aviation Department is moderating these community listening sessions in order to gather feedback from

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

BUSH INTERCONTINENTAL AIRPORT

BUSH INTERCONTINENTAL AIRPORT JULY 2014 BUSH INTERCONTINENTAL AIRPORT Project 500N-Terminal D, Phase III-Gate D9 A380 Conversion Project Manager: Randy Williams Everything is Bigger Terminal D at IAH The saying everything is bigger

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Hazardous Wildlife Management

Hazardous Wildlife Management Hazardous Wildlife Management ACI-NA Joint Session Technical & Operations Committee Public Safety & Security Committee Emily Underhill, P.E. Division Director - Development March 16, 2009 Who We Are The

More information

Aviation Operating Administration/Executive

Aviation Operating Administration/Executive Aviation Operating Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness,

More information

DALLAS LOVE FIELD MAY 2015 DRAFT

DALLAS LOVE FIELD MAY 2015 DRAFT 8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

Kansas City Aviation Department. August 25, 2015

Kansas City Aviation Department. August 25, 2015 Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

FBO Request for Proposal Lake Cumberland Regional Airport

FBO Request for Proposal Lake Cumberland Regional Airport FBO RFP Process Request for Proposal: Lake Cumberland Regional Airport, Somerset, Kentucky. The Somerset- Pulaski County Airport Board, manager of the Lake Cumberland Regional Airport, is requesting proposals

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

Request for Proposals. Aviation Service Providers At Tri-Cities Airport

Request for Proposals. Aviation Service Providers At Tri-Cities Airport Request for Proposals Aviation Service Providers At Tri-Cities Airport Proposals Due February 27, 2009 2:00 PM Village of Endicott 1009 E Main St. Endicott, New York 13760 Page 1 of 6 Introduction The

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016)

75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016) COMMERCIAL AVIATION #2 AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) #3 AIRPORTS (ENR 2016) 75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS PILOTING YOUR SUCCESS FROM THE GROUND UP Designing and

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014

Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014 Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking February 11, 2014 Presentation Agenda 1. Overview of Findings 2. Definitions 3. Airport Benchmarking Caveats 4. Benchmark

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

Savannah / Hilton Head International Airport Master Plan Update

Savannah / Hilton Head International Airport Master Plan Update EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Quarterly Performance Measurement Report

Quarterly Performance Measurement Report Quarterly Performance Measurement Report Department: Aviation Section: Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

SOUTH CAROLINA AERONAUTICS COMMISSION

SOUTH CAROLINA AERONAUTICS COMMISSION SOUTH CAROLINA AERONAUTICS COMMISSION STATEWIDE AIRFIELD PAVEMENT MANAGEMENT SYSTEM UPDATE AIRPORT: LEXINGTON COUNTY AT PELION 106 AIRPORT ROAD PELION, SC 29123 SOUTH CAROLINA AERONAUTICS COMMISSION 2553

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

JWN Runway Safety Area Project Summer 2015 Closure

JWN Runway Safety Area Project Summer 2015 Closure JWN Runway Safety Area Project Summer 2015 Closure March 2015 Welcome and Overview Doug Kreulen, Chief Operating Officer Robert Ramsey, P. E., A.A.E. Chief Engineer Overview Purpose of Closure Concurrent

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

What is an Airport Master Plan?

What is an Airport Master Plan? What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

Annual Report 2017 Vero Beach Regional Airport June 1, 2018

Annual Report 2017 Vero Beach Regional Airport June 1, 2018 Annual Report 2017 Vero Beach Regional Airport June 1, 2018 TO: Vero Beach City Council - January 2018 RE: 2017 Annual Airport Commission Report 2017 has been another busy year for the Airport. Much of

More information

Section (a)(1). Description of Projects Impose and Use

Section (a)(1). Description of Projects Impose and Use November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear

More information

Planned Procurement Opportunities Report. January 2019

Planned Procurement Opportunities Report. January 2019 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 COUNTY OF INYO REQUEST FOR QUALIFICATIONS For Airport Environmental Services Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 County of Inyo Public Works Department P.O.

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM FREQUENTLY ASKED QUESTIONS September 2017 Master Plan Update: 1. What is a Master Plan Update? The objective of a Master Plan Update (MPU)

More information

CVG Overview Connect with CVG March 29, 2017

CVG Overview Connect with CVG March 29, 2017 CVG Overview Connect with CVG March 29, 2017 Launching Point Strategic Plan CVG Launching Point Strategies for 2016 and Beyond Vision: Make travel through CVG and unforgettably positive experience Mission:

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

e-link October November

e-link October November e-link is a quarterly newsletter for our tenants, vendors and business partners to stay linked in with the projects, accomplishments and development at Southwest Florida International Airport and Page

More information

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held

More information

TampaInternationalAirport

TampaInternationalAirport TampaInternationalAirport Tampa CommercialService AirportLocation TampaInternationalAirport(TPA)islocatedinWest CentralFloridaservingastheprimaryaircarierairport forthetampabayregion.theairportisapproximately

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information