1 2017 Environmental s The following list details environmental s made by the Vancouver Fraser Port Authority for the period January 1, 2017 to December 31, 2017: Please note, on July 13, 2015, the port authority launched a new project and environmental review () process, which included the development of four new categories of review matching the scale and potential impacts of the project under review: A, B, C, or D. Project reviews that commenced prior to the launch of the new process are categorized as legacy. 1 Nick Ebrahim Shared Dollarton Highway North Vancouver C Canadian Dry Storage Canadian Dry Storage Truck & Trailer Parking, Fraser Richmond Legacy Richmond Lands 3 VFPA Engineering Maintenance Building Retaining Wall Replacement and Vancouver B Foreshore Stabilization (soft shoreline) 4 VFPA Maintenance Maintenance Building Retaining Wall Replacement and Vancouver B Foreshore Stabilization (rock armour slope) 5 VFPA Engineering Centerm Container Terminal Shore Power Project Vancouver B Amendment - Substation Relocation 6 Spire Construction Inc. Distribution Warehouse Facility Richmond C DP World Vancouver Delivery of New Quay Crane to Centerm Vancouver B CPMCO (Cascadia Port Management Annex 1 & 4 South Roadway Project Vancouver B Corporation) 9 Neptune Bulk Terminals (Canada) Ltd. Neptune Terminals Dust Suppression Upgrade North Vancouver C Coteau Consulting Ltd. on behalf of Suncor Lubricant Facility Demolition & Rail Improvements Burnaby B Suncor Energy Products Partnership 11 Fraser Surrey Docks LP Container Operations of Dry Bulk Material Surrey C Sonjin Enterprises Waterlot Structures Demolition New Westminster B VFPA Portside Road Emergency Access Connector Richmond B Queensgate Marina Strata Floating Home at #8-750 South Dyke Road, New New Westminster B Westminster 15 Chevron Canada Limited Chevron Refinery Foreshore Final Remedy Burnaby B VFPA concluded that the project must not be carried out and the project permit application was denied. Page 1 of 12

2 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) Page 2 of Kinder Morgan Canada Terminals Maintenance Dredging West Vancouver B Fibreco Export Inc. Fibreco Terminal Enhancement Project North Vancouver C Nova Pacific Environmental Ltd. on Removal of Boathouse and Launch Rails at 4535 Belcarra Belcarra B behalf of Jianying Zhang Bay Road 19 Western Canada Marine Response Oil Spill Emergency Response Base Vancouver C Corporation (WCMRC) 20 Nickel Bros. on behalf of Westshore Temporary Barge Ramp Landing Delta B Terminals 21 Fraser River Pile & Dredge (GP) Inc. on CIPA Lumber Foreshore Stabilization Delta B behalf of CIPA Lumber 22 City of Vancouver Engineering Services, Creekside Drive Bike Path Upgrades Vancouver B Project Delivery Branch 23 Canada Place Corporation Stormwater Utility Upgrade on Parkade Entry Ramp Vancouver A Vancouver Aquarium PollutionTracker - Caged Mussel Study Multiple A Kingfisher Docks Ltd. on behalf of Ross Saito 277 Turtlehead Road Pile Replacement Belcarra A Golder Associates on behalf of Greater Vancouver Sewerage & Drainage District Geotechnical Drilling Investigation for Lions Gate WWTP Sewer Conveyance West Vancouver A Benjamin and Anna Falcone Dock Ramp Repair North Vancouver A PGL Environmental on behalf of Western Westgate Pumping Test North Vancouver A Stevedoring Company Limited 29 Saam Smit Westminster Inc. New Westminster Dock - Pile Installation New Westminster A All-Sea Enterprises Ltd. Underwater Hull Cleaning - M/V Nectar Sea Vancouver A Benjamin and Anna Falcone Replacement Dock Ramp North Vancouver A Central City Films Filming - The Flash - Installation of Temporary Billboard Vancouver A Golder Associates Ltd. on behalf of Metro Annacis Island Outfall: Fraser River Pre-Discharge Salinity Delta A Vancouver Monitoring Program 34 VFPA Engineering Canada Place Cruise Terminal Camel Cleaning Vancouver A Leander McCabe and Marlene McCabe Pier Repairs Alderside Road, Port Moody Port Moody A

3 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 36 Tsleil-Waututh Nation Maplewood Flats Wood Waste Investigation Phase 2 North Vancouver B Strata Plan LMS 3671 Pile Installation New Westminster A VFPA Environmental Programs VFPA Forage Fish Spawning Assessment Multiple A All-Sea Enterprises Ltd. Underwater Hull Cleaning - M/V Striggla Vancouver A All-Sea Enterprises Ltd. Underwater Hull Cleaning - M/V Kirkeholmen Vancouver A Fraser River Pile & Dredge (GP) Inc. on S and R Sawmills Ltd. Pile Replacements Surrey A behalf of S and R Sawmills Ltd. 42 Viterra Cascadia Terminal Maintenance Dredging at Viterra Cascadia Vancouver A Tim and Shannon Scharnberg Deck and Step Repair Port Moody A SLR Consulting (Canada) Ltd. on behalf Detailed Environmental Site Investigation at Apex Terminals Surrey A of VFPA Environmental Programs Inc. 45 Westshore Terminals Ltd. Bailey Bridge Replacement Delta B Versacold Logistics Services Inc. Waterlot Cleanup Vancouver A Pan Pacific Hotel & Vancouver Canada Place East and West Logo Works Vancouver A Convention Center 48 Fraser River Pile & Dredge (GP) Inc. on Flavelle Sawmill Maintenance Dredging Port Moody A behalf of Mill & Timber Products - Flavelle Sawmill Co. Ltd. 49 VFPA Engineering Canada Place Cruise Terminal Camel Modifications Vancouver A Fraser Grain Terminal Ltd. Former Bekaert Site Demolition Surrey C VFPA Engineering Main Street Dock Floats Repair Vancouver A Cargill Power System Upgrade North Vancouver C Westshore Terminals Limited Partnership Spon Com Chemical Addition System Delta B Westshore Terminals Limited Partnership Big Bertha Spray Towers Delta B All-Sea Enterprises Ltd. Underwater Hull Cleaning - Buena Ventura Vancouver A Vancouver Convention Centre Outdoor Show Pool Drainage Vancouver A Gabrielle Torlay Wharf Replacement at 956 Alderside Road Port Moody A Page 3 of 12

4 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) Page 4 of Neptune Bulk Terminals (Canada) Ltd. Grading and Re-Sealing of Former Canola Oil Tank Site North Vancouver B Golder Associates Ltd. on behalf of Metro Annacis Island Outfall: Sampling and Analysis Program to Delta A Vancouver Inform a Disposal at Sea Permit Application 60 VFPA Engineering Geotechnical Drilling at Fraser Wharves Richmond A Omicron Canada Inc. Blundell and No. 7 Road Canal Maintenance Access Roads Richmond B Advisian (WorleyParsons Group) on Pacific Terminal - Berth No. 2 North Dolphin Repairs Vancouver A behalf of Viterra Inc. 63 Docks 'R Us Marine Systems on behalf of Wharf Replacement at 1034 Alderside Road Port Moody A Dotty DeCroos 64 Keystone Environmental Ltd. on behalf of Phase 2 Environmental Site Assessment Richmond A VFPA Environmental Programs 65 TransLink Pattullo Bridge Replacement Project - Geotechnical Drilling Surrey B Investigation Phase B 66 SLR Consulting Ltd. on behalf of VFPA Freeport - Stage 2 Preliminary Site Investigation (PSI) Surrey A Environmental Programs 67 PGL Environmental Consultants on behalf Stage 2 Preliminary Site Investigation Vancouver A of Harvest Fraser Richmond Organics Ltd. 68 Fraser River Pile & Dredge (GP) Inc. Sediment Sampling within Fraser River Main Navigation Multiple A Channel (km -1 - km 35) 69 Fraser River Pile & Dredge (GP) Inc. on Lafarge No. 9 Road Cement Plant Pile Replacement Richmond A behalf of Lafarge Canada 70 SNC-Lavalin Inc. on behalf of VFPA Environmental Programs Former Queensborough Sawmill New Westminster A Golder Associates on behalf of VFPA Environmental Programs Stage 2 Preliminary Site Investigation - Vancouver Drydock and Seaspan Sites North Vancouver A VFPA Engineering Kla-Wichen Boathouse East Pontoon Repair Vancouver A VFPA Engineering 2017 Steel Piling Inspection Program Vancouver A PBX Engineering on behalf of VFPA Infrastructure Delivery VFPA Richmond Properties CCTV Installation Richmond A

5 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) Page 5 of Gulzar Transport 201 Duncan Street (East) New Westminster B Hansen's Releasing Company Inc. Temp Vehicle Storage Duncan St. Site (West) New Westminster B Fraser River Pile & Dredge (GP) Inc. on Southern Railway Queensborough Bridge Swing Span New Westminster A behalf of Southern Railway of British Columbia Limited Repairs 78 Peter Kiewit Sons ULC Parking, Laydown, and Works Yard New Westminster B Vancouver Fraser Port Authority (VFPA) Supplementary Planting at Glenrose Tidal Marsh Delta A West Coast Reduction Ltd. Truck and Trailer Parking at Former Marco Site Vancouver B VFPA Engineering Fraser Wharves Bank Protection and Debris Deflector Richmond B Repairs 82 CN Environment Geotechnical Drilling at Mile Bridge Surrey B Neptune Terminals Guardhouse Replacement North Vancouver B Metro Vancouver Northwest Langley WWTP Pilot Receiving Environment Surrey A Monitoring 85 Vancouver Fraser Port Authority (VFPA) Richmond Logistics Hub- Area IV Site Prep Richmond B Golder Associates Ltd. on behalf of Domtar Inc. Supplemental Environmental Characterization of Soil - Foot of Braid Street Coquitlam B SNC-Lavalin Inc. Lynnterm Eastgate Supplemental Drilling Program North Vancouver A VFPA Real Estate Removal of Sunken Vessel Western Express Delta B BDL group (Barbieri Development Deep Cove North Shore Marina - Retaining Wall North Vancouver B Limited) 90 Viterra Inc. Utility Bridge Replacement with Utility Tunnels Vancouver B JJM Construction Ltd. Sapperton Bar Pile Removal New Westminster A Columbia Containers Ltd. Fifth Rail Track at 2775 Commissioner Street Vancouver B Pacific Custom Log Sorting Steel Pile Installation and Log Storage New Westminster B WWL Vehicle Services Canada, Ltd. Additional Surface Parking Area for WWL Delta B Fraser River Pile & Dredge (GP) Inc Wharf Street - Pile Replacement Maple Ridge A Fraser River Pile & Dredge (GP) Inc Wharf Street - Pile Replacement Maple Ridge A

6 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) Page 6 of All-Sea Enterprises Ltd. Underwater Hull Cleaning - Westwood Olympia Vancouver A Nadine Sheppard Deck Repair North Vancouver A Kiewit Ledcor TMEP Partnership (KLTP) Fraser River Geotechnical Drilling Program Multiple A Neptune Bulk Terminals Canada Ltd. Neptune Cargill Overpass Extension North Vancouver B Fraser River Pile & Dredge (GP) Inc. on WWL Annacis Terminal Berth No.2 - Timber Pile Delta A behalf of WWL Vehicle Services Canada, Ltd. Replacements 102 SNC-Lavalin Inc. on behalf of VFPA Environmental Drilling - Richmond Leachate Lagoon Richmond A Environmental Programs 103 Fisheries and Oceans Canada Ballast Water Sampling Program North Vancouver A TELUS on behalf of PIRET TELUS Metal Cabinet and Conduit Richmond B Fraser River Pile & Dredge (GP) Inc. on CIPA Lumber - Maintenance Dredging Delta A behalf of CIPA Lumber Co. Ltd. 106 All-Sea Enterprises Ltd. Underwater Hull Cleaning - Star Japan Vancouver A ALM2 Marine Ltd. on behalf of Canadian Replacement of Navigational Aids Port Moody Port Moody A Coast Guard 108 Stantec Consulting Ltd. on behalf of Fraser Wharves Soil Remediation Richmond B VFPA Environmental Programs 109 Metro Vancouver Installation of In-water Current Monitors in Burrard Inlet Vancouver A District of North Vancouver Gravel/sand Relocation Work North Vancouver A Bernard Jeske Bank Stabilization at Wharf Street, Maple Ridge Maple Ridge B Foreshore Technologies Inc. (FTI) Transfer of Two Houses onto a Barge from Harbourside North Vancouver A Place, North Vancouver 113 Fraser River Pile and Dredge (GP) Inc. on Maintenance Dredging Surrey A behalf of S & R Sawmills Ltd. 114 Vancouver Pile Driving Ltd. Vancouver Pile Driving Stub Dock Improvements North Vancouver B Ikea IKEA 7031 York Rd. Richmond B CH2M Hill on behalf of Pacific Coast Terminals Environmental Site Investigation Y Track Port Moody A

7 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 117 Golder Associates Ltd. on behalf of Vancouver Drydock Company Limited Partnership and Seaspan ULC Detailed Site Investigation (DSI) - Vancouver Drydock and Seaspan Sites North Vancouver A Kiewit Ledcor TMEP Partnership Kiewit Employee Parking and Float Dock - Commissioner Vancouver B Street 119 Foreshore Technologies Inc. (FTI) on House Transfer (3) from Shore to Barge in North Vancouver North Vancouver A behalf of Nickel Bros. 120 Lhoist North America of Canada Inc. Lhoist North America of Canada Multi-Year Maintenance Langley A Dredging 121 Kiewit Ledcor TMEP Partnership (KLTP), Fraser River Water Withdrawal for Pipeline Construction Multiple A on behalf of Trans Mountain Pipeline ULC 122 PGL Environmental Consultants on behalf Contaminated Soil Remediation A of Harvest Fraser Richmond Organics Ltd. 123 VFPA VFPA Floats Pile Replacement Vancouver A All-Sea Enterprises Ltd. Underwater Hull Cleaning - Genco Auvergne Vancouver A Vancouver Fraser Port Authority (Infrastructure Delivery) obo Canadian Border Services Agency Tsawwassen Container Examination Facility Delta B SNC-Lavalin Inc. on behalf of VFPA Environmental Programs Former Queensborough Sawmill Environmental Site Investigation New Westminster A JJM Construction Ltd. Sub-Bottom Profiling near Centerm Vancouver A Vancouver Board of Parks and Recreation Stanley Park and English Bay Seawall Repairs Vancouver B Peter Hall Barge Transport of Tree Removal Debris, 4750 Eastridge North Vancouver A Road, North Vancouver 130 Peter Kiewit Sons ULC 2115 Commissioner St - Sites 1 and 2 - Geotechnical and Vancouver A Site Investigation 131 Hemmera on behalf of Fraser Surrey Docks Supplemental Phase II ESA (Soil and Groundwater Investigation) at Fraser Surrey Docks Surrey A Page 7 of 12

8 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 132 Metro Vancouver Annual Retrieval and Deployment of Three Sub-Surface Vancouver A Instrument Moorings in Vancouver Harbour 133 Richard Gage Dock Replacement Due To Damage Belcarra A Keystone Environmental Ltd. on behalf of Sediment Sampling, New Westminster New Westminster A Anthem Duncan Developments Ltd. 135 Kruger Products LP Pile Removal as Part of Surrender of Lease New Westminster A All-Sea Enterprises Ltd. Underwater Hull Cleaning - Stella Eva Vancouver A Saam Smit Canada Inc Commissioner Street - Proposed Office Building Vancouver A Ideal Welders Ltd. Pier Partial Demolition to Increase Barge Capacity Delta A Kingfisher Docks Ltd. on behalf of 4704 Eastridge Road Dock Mooring North Vancouver A Marlene Nielsen 140 Ledcor Constructors Inc. and Stantec Geotechnical and Environmental Site Investigation Burnaby A Consulting Ltd. on behalf of Kinder Morgan Canada, Inc. 141 Corporation of Delta Repair Water Main and Meter Delta A Stantec Consulting Ltd. on behalf of Neptune Geotechnical and Environmental Soil Investigation North Vancouver A Neptune Bulk Terminals (Canada) Ltd. 143 Kingfisher Docks Ltd. on behalf of the Goldsworthy Pier Pile and Float Replacement North Vancouver A Corporation of the City of North Vancouver 144 Industra Group on behalf of the City of Wharf and Revetment Maintenance at Waterfront Road Vancouver A Vancouver 145 Nels Guloien Dock Repair at 748 Alderside Road Port Moody A Lynnterm - West Gate Terminal - G3 Pump Test - G3 Terminal Vancouver North Vancouver A Terminal Vancouver Limited Partnership 147 Pacific Custom Log Sorting Ltd. Dolphin Replacement Coquitlam A Donald Heron Pile Replacement Delta A Stantec Consulting Ltd. on behalf of VFPA Environmental Programs Former Fraser Wharves Environmental Drilling Program Richmond A Page 8 of 12

9 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 150 All-Sea Enterprises Ltd. Underwater Hull Cleaning - Hanjin Scarlet Vancouver A Dennis and Sharon Hazlett Dock Maintenance Belcarra A Hemmera Envirochem Inc. on behalf of ITBL Environmental Drilling and Sediment Investigation Burnaby A Island Tug and Barge Limited 153 Delta Farmers Institute DFI Salinity Monitoring Project Delta A Fraser River Pile & Dredge (GP) Inc. on Valiant Log Sort Maintenance Dredging Port Coquitlam A behalf of Valiant Log Sort 155 Seaspan ULC Outfitting Pier (T-Dock) Pile Replacement at Seaspan, 50 North Vancouver A Pemberton Ave. 156 R.F. Binnie & Associates Ltd. on behalf of Portside Road Extension - Geotechnical Investigation Richmond A VFPA 157 Fraser River Pile & Dredge (GP) Inc. on Float Plane Dock and Shear Boom Repairs Pitt Meadows A behalf of Pitt Meadows Airport Society (YPK) 158 Mud Bay Drilling (2015) Ltd. on behalf of Geotechnical Investigation, Riverside Drive North Vancouver A the Greater Vancouver Water District 159 PGL Environmental Consultants Base Line Environmental Investigation at Tymac Launch Vancouver A Service Ltd., Main Street Dock 160 Linwood Homes Ltd. Water Lot Clean-Up Delta A Fraser River Pile & Dredge (GP) Inc. on Port Haney Wharf - Miscellaneous Repairs Maple Ridge A behalf of the City of Maple Ridge 162 SNC-Lavalin Inc. Former Queensborough Sawmill Environmental Site New Westminster A Investigation 163 Jeff Henderson Construction Ltd. on Warehouse Building Alterations North Vancouver B behalf of Vancouver Pile Driving Ltd. 164 VFPA Engineering VFPA Roof Replacement at 7911 Grauer Road Richmond A Fraser River Pile & Dredge (GP) Inc. on behalf of ChemTrade Electrochem Inc. Chemtrade Electrochem Inc. Marine Structural Repairs North Vancouver A Page 9 of 12

10 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 166 Fraser River Pile & Dredge (GP) Inc. on Interfor Acorn Division Sawmill - Pile Replacements Delta A behalf of International Forest Products Acorn Division Sawmill 167 Docks 'R Us Marine Systems on behalf of Seawall Repairs, Alderside Road Port Moody A Nicholas Springate 168 Docks 'R Us Marine Systems on behalf of New Ramp and Float Re-Skinning, Strathcona Road North Vancouver A Malcolm Parry BC Ltd. Turning Point Brewery Dock Removal Project Delta A Fraser River Pile & Dredge (GP) Inc. on behalf of Southern Railway of BC 171 Fraser River Pile & Dredge (GP) Inc. on behalf of Westshore Terminals Ltd. Queensborough Bridge Crossing - Swing Span Pier New Westminster A Protection Pile Installations Westshore Terminals Shoreline Protection Repairs Delta B GCT Canada LP GCT Deltaport Fendering Upgrade at Berth 2 Delta B City of New Westminster Wood Street Pump Station Replacement - Densification New Westminster B Piling and Coffer Dam 174 VFPA Engineering Aerator Installation in Fraser Richmond Lagoons Richmond A Mainland Sand and Gravel ULC Maintenance Dredging at Dock Road Berth, Surrey Surrey A Well Balanced Designs Landscaping at 4563 Stonehaven Avenue North Vancouver A Translink Phase B Geotechnical Investigations Program Pattullo Surrey B Bridge Replacement Project 178 Douglas Frederick Darby-Petrunia Dock Installation for Commercial and Residential Boat New Westminster A Moorage, South Dyke Road 179 GCT Canada Vanterm Temporary Construction Access Vancouver A Fraser River Pile & Dredge (GP) Inc. on Queensborough Bridge Crossing - Debris Deflection Boom New Westminster A behalf of Southern Railway of BC Installation 181 Fraser River Pile & Dredge (GP) Inc. on Maintenance Dredging Maple Ridge A behalf of Interfor Hammond Division Sawmill 182 Skyscraper Filming Filming Car Stunt Scene Coquitlam A Page 10 of 12

11 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 183 Corporation of Delta Locate and Hydro Excavate Sanitary Man Hole, Robson Road 184 Kinder Morgan Canada Terminals Limited Partnership 185 Fraser River Pile & Dredge (GP) Inc. on behalf of Seaspan ULC 186 Fraser River Pile & Dredge (GP) Inc. on behalf of Southern Railway of BC 187 Fraser River Pile & Dredge (GP) Inc. on behalf of Seaspan ULC Surrey A Dock Maintenance Repairs at Kinder Morgan Canada North Vancouver A Terminals North Vancouver Facility Pile Replacement at S & R Sawmills Crew Dock Surrey A SRY BC Annacis Rail Barge Ramp - Maintenance Dredging Delta A Pile Replacement at Sapperton Barge Tie-up Surrey A Subsea Global Solutions Underwater Hull Cleaning - Silver Hannah Vancouver A Schnitzer Steel Canada Ltd. Groundwater Monitoring Well Replacement Surrey A Brewster Inc. doing business as FlyOver 24K Electric Heater Installation Vancouver A Canada 191 Nels Guloien Recreational Retaining Wall and Stair Repair Port Moody A Fraser River Pile & Dredge (GP) Inc. Westshore Berth 2 Timber Pile Replacement Delta A Metro Vancouver Regional District Annacis Water Supply Tunnel Project Surrey A Fraser River Pile & Dredge (GP) Inc. on S & R Sawmills Ltd. Pile Replacements Surrey A behalf of S & R Sawmills Ltd. 195 Harvest Fraser Richmond Organics doing Installation of City Water Supply Backflow Preventer Vancouver A business as Smithers Enterprises Inc. Protection Kiosk 196 Ausenco Engineering Canada Ltd. on Chemtrade Phase II Bulkhead Wall Rehabilitation North Vancouver B behalf of Chemtrade Electrochem Inc. 197 Foreshore Technologies Inc. Sediment and Water Sampling in support of a Pattullo Multiple A Bridge Environmental Assessment 198 Island Tug and Barge Limited Remedial Excavation Island Tug and Barge - Parcel A Burnaby A Fraser Burrard Diving Limited Pacific Environmental Science Center Intake Cleaning and North Vancouver A Inspection 200 Vancouver Pile Driving Ltd. Vanpile Yard 2017 Maintenance Dredging North Vancouver A Page 11 of 12

12 VANCOUVER FRASER PORT AUTHORITY Environmental s (2017) 201 SubSea Global Hull Cleaning Underwater Hull Cleaning Test at Anchorage Vancouver A Kiewit-Ledcor TMEP Partnership (KLTP) Baseline Environmental Investigation Vancouver A Sacchetti Construction Ltd. Truss Strengthening - Fraser River Bridge - CN - Yale Surrey A Seaspan ULC Seaspan Delta Facility Maintenance Dredging Delta A Navy League of Canada Boat Shed Electrical Shore Power Delta A Southernstar Enterprises Inc. Disposal of Sinking Ruskin Barge Richmond A Allen Lacroix & Jill Gamblen Install Float Home at Queensgate Marina New Westminster A Fraser River Pile & Dredge (GP) Inc. on CIPA Lumber Pile Relocation Delta A behalf of CIPA Lumber 209 Fraser River Pile & Dredge (GP) Inc. FRPD Fraser and Pitt River Pile Replacement and Removal Multiple A Pilot Project 210 BC Pacific Enterprises Ltd. Geotechnical Drilling Investigation at FSD IDC Surrey A Schnitzer Steel Canada Ltd. Schnitzer Barge Ramp Deck Repairs Surrey A Fraser River Pile & Dredge (GP) Inc. MV Island Commander Moorage - Float and Abutment Delta A Repairs 213 Ed Furumori Boat House Demo and Re-Alignment North Vancouver A VFPA Maintenance VFPA Annacis Channel Danger Tree Removal Delta A Metro Vancouver Water Discharge Port Mann Main No 2 Fraser River Coquitlam A Neptune Bulk Terminals (Canada) Ltd. Neptune Terminals Annual Structural Repairs North Vancouver A Transportation Investment Corporation Old Port Mann Bridge Rubble Removal at Old Pier N2 Coquitlam A of British Columbia 218 VFPA Engineering Camel Replacement Project at Canada Place Vancouver A Neptune Bulk Terminals (Canada) Ltd. Neptune Berth 1 Mooring and Dredging Study - Sediment North Vancouver A Sampling 220 Island Tug and Barge Ltd. Additional Lighting Burnaby A Page 12 of 12

HOPEWELL DISTRIBUTION CENTRE

HOPEWELL DISTRIBUTION CENTRE HOPEWELL DISTRIBUTION CENTRE PHASE IV - Up to 330,540 Square Feet Available for Lease DARREN CANNON* 604 662 2637 darren.cannon@colliers.com STUART MORRISON* 604 662 2676 stuart.morrison@colliers.com ANDREW

More information

BACKGROUNDER Office of the Premier Government of Canada

BACKGROUNDER Office of the Premier Government of Canada 2009OTP0058-000553 March 27, 2009 BACKGROUNDER Office of the Premier Government of Canada INFRASTRUCTURE INVESTMENTS IN THE NORTH SHORE The North Shore Trade Area provides a critical connection to overseas

More information

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY AAPA Marine Terminal Management Training Program September 18, 2015 Tom Corsie, PPM Vice-President, Real Estate TODAY S AGENDA

More information

Environmental Reviews January 1-December 31, 2014

Environmental Reviews January 1-December 31, 2014 1 Greater Vancouver Water District / Metro Vancouver 2 JJM Construction Ltd. Port Mann Water Tunnel Project PP 09-048 2009 Amendment for Erosion Protection Berm Installation at 8828 River Road, Delta,

More information

Environmental Reviews January 1-December 31, 2013

Environmental Reviews January 1-December 31, 2013 1 PROPONENT Vancouver Airport Fuel Facilities Corporation (VAFFC) OF Vancouver Airport Fuel Delivery (VAFD) Project - Harmonized fed-prov EA only EAP 11-006 2011-01-06 2013-12-16 2 Royal Vancouver Yacht

More information

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT Annacis Island Wastewater Treatment Plant OUTFALL PROJECT PORT COMMUNITY LIAISON COMMITTEE - DELTA John Newby SENIOR VICE PRESIDENT CDM SMITH Delta, Tuesday, March 7, 2017 Andrea Winkler PROGRAM MANAGER

More information

North Shore Waterfront Liaison Committee (NSWLC) Meeting Notes

North Shore Waterfront Liaison Committee (NSWLC) Meeting Notes North Shore Waterfront Liaison Committee (NSWLC) Meeting Notes DATE: Friday, July 6, 2018 TIME: LOCATION: CHAIR 8:00am 10:30am Seaspan - Training Room on Level 4 (2 Pemberton Avenue, North Vancouver) Duncan

More information

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY SPECIAL AUTHORIZATION Page 1 of 6 PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE Passenger Transportation Licence Licence Holder: NEW WESTMINSTER, BC Trade Name(s):

More information

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019 Abbotsford, BC 65,000 SF in Available Q 209 33,229 SF in Available Q2 209 NOW UNDER CONSTRUCTION! CHRIS MORRISON, Executive Vice President 604 66 085 chris.morrison@colliers.com VITO DECICCO, Senior Vice

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan Welcome The objectives of this open house are to: Share information on the new investments and funding proposed for the Phase Two Plan Gather feedback from people across the region about the Phase Two

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,

More information

superseded by 2008 nhc report

superseded by 2008 nhc report Steveston North Jetty Steveston South Jetty Georgia Strait Middle Arm West Vancouver UEL Legend Vancouver North Vancouver City North Arm Richmond Canoe Pass Fraser Valley Regional District North Vancouver

More information

HOLDOM SKYTRAIN STATION

HOLDOM SKYTRAIN STATION HOLDOM SKYTRAIN STATION 2111 Holdom Avenue, Burnaby, BC MILLENIUM LINE RETAIL SUMMARY Holdom SkyTrain is located prominently on the southwest corner of Lougheed Highway and Holdom Avenue. This SkyTrain

More information

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE how it started Downtown Waterfront Park How It Started March 2009 City of New Westminster Purchases 3.2 Hectare Westminster Pier Site March 2009 City of New Westminster and Design Team develop plan for

More information

HOLDOM SKYTRAIN STATION

HOLDOM SKYTRAIN STATION HOLDOM SKYTRAIN STATION 2111 Holdom Avenue, Burnaby, BC NEW TRANSIT ORIENTED RETAIL! SUMMARY Holdom SkyTrain is located prominently on the southwest corner of Lougheed Highway and Holdom Avenue. This SkyTrain

More information

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

APPENDIX A: SCREENLINE SURVEY STATION DETAILS and Count Details APPENDIX A: SCREENLINE SURVEY STATION DETAILS Table 12 expands on the Quick Facts in Table 1 by providing count details for all screenlines as well as individual stations. The following

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT Derick Fluker* 604 638 2125 dfluker@form.ca *Personal Real Estate Corporation Jack Allpress* 604 638 1975 jallpress@form.ca Layla Vera 604 398 4352 lvera@form.ca

More information

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017 List of Environmental Reports and Documents Regarding Hazardous Materials August 10, 2017 Pier 70 1999 Annual Ground Water Monitoring Report for Piers 70 and 94, Tetra Tech, Inc., February 2000. 1999 Annual

More information

STADIUM- CHINATOWN SKYTRAIN STATION

STADIUM- CHINATOWN SKYTRAIN STATION STADIUM- CHINATOWN SKYTRAIN STATION 590 Beatty Street, Vancouver, BC SERVICING HIGH TRAFFIC DOWNTOWN CORE! SUMMARY Stadium-Chinatown SkyTrain Station is located in downtown Vancouver and sees 28,530 riders

More information

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN : East Columbia Street (13,451 VPD) JOIN : FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC Northgate Village Lougheed Mall BUILDING 9 Austin Avenue Lougheed Highway

More information

South Westminster and Bridgeview

South Westminster and Bridgeview City of Surrey SURREY South Westminster and Bridgeview Industrial Areas WASHINGTON STATE, USA Located on the south shore of the Fraser River, the Bridgeview (307.14 acres/124.295 hec) and South Westminster

More information

Developmental Cost Charge (DCC) Program Summary

Developmental Cost Charge (DCC) Program Summary Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage

More information

False Creek Harbour Authority Fishermen s Wharf

False Creek Harbour Authority Fishermen s Wharf False Creek Harbour Authority Fishermen s Wharf 42 nd Annual Conference of Pacific Coast Congress of Harbormasters & Port Managers Vancouver, British Columbia Welcome PCC Members, Sustaining Members, Exhibitors,

More information

Barge and Tug Fleet. Construction of the BC

Barge and Tug Fleet. Construction of the BC Construction of the BC Barge and Tug Fleet A BRIEF HISTORY PRESENTED BY: MALCOLM Mc LAREN ALLIED SHIPBUILDERS (RETIRED) Overview of the BC Shipbuilding Industry 1900 to Present Total Number of Steel Vessels

More information

Application Summary. Taxi - Amendment to Licence

Application Summary. Taxi - Amendment to Licence Application Summary Taxi - Amendment to Licence Application # 354-16 Applicant Royal City Taxi Ltd. Trade Name (s) Principals Address Current Licence Royal City Taxi DHILLON, Chamkaur MAGHERA, HArinder

More information

FOR SALE. Opportunity to own a brand new, high quality industrial unit in the core of Metro Vancouver. DELTA LINK BUSINESS CENTRE PHASE II

FOR SALE. Opportunity to own a brand new, high quality industrial unit in the core of Metro Vancouver. DELTA LINK BUSINESS CENTRE PHASE II FOR SALE DELTA LINK BUSINESS CENTRE PHASE II 7727 BEEDIE WAY, DELTA, BC DeltaLinkBusinessCentre.com EACH UNIT COMES EQUIPPED WITH MEZZANINE Opportunity to own a brand new, high quality industrial unit

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

Vancouver Island Rail ISLAND CORRIDOR FOUNDATION

Vancouver Island Rail ISLAND CORRIDOR FOUNDATION Vancouver Island Rail ISLAND CORRIDOR FOUNDATION June 2015 VANCOUVER ISLAND RAIL CORRIDOR June 2015 2 Railway Infrastructure Improvement Funding Total $20.9M Project - Update Regional Districts Railway

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot

More information

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050 (All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal

More information

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:

More information

Site Formation Works of the Kai Tak Cruise Terminal Project

Site Formation Works of the Kai Tak Cruise Terminal Project Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site

More information

Aid to Local Ports FY19 Requests

Aid to Local Ports FY19 Requests City Accomack- Greenbackville Harbor Phase III Accomack-Quinby Harbor Bulkhead Cape Charles- Installation of 4 th breakwater Total Project Cost Amount Requested Proposed Allocation Carryover Request $260,000.00

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

Task Force Meeting #2

Task Force Meeting #2 Task Force Meeting #2 July 9, 2013 Project Precedents Granville Island, Vancouver B.C. South Waterfront, Portland OR Jack London Square, Oakland CA Brooklyn Basin, Oakland CA Chula Vista Bayfront, Chula

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Port of San Diego Overview and Updates. September 2017

Port of San Diego Overview and Updates. September 2017 Port of San Diego Overview and Updates September 2017 Port of San Diego Jurisdiction 34 miles of waterfront 2,403 acres of land 3,535 acres of water Port Tidelands Coronado San Diego National City Chula

More information

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about

More information

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S. Sunken Barge ARTHUR J & Tug MADISON Case Study by LCDR Chico Knight, DBA, M.S. July 19, 2012 Background On 19JUL, Sector Detroit was notified by the tug DRUMMOND ISLANDER II that the 110 dredge barge ARTHUR

More information

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation City of Coquitlam Closed Bids 2010 Closed Request for Information (RFI) 84431 - Engineering Consultant Design Services 2010/2011 Infrastructure Projects Kerr Wood Leidal Associates Ltd. Dayton and Knight

More information

Leaders in energy management

Leaders in energy management 1 Island Health 2002 76 90 166 2 Vancouver Coastal Health Authority 2002 47 102 149 3 Overwaitea Food Group 2002 39 108 147 4 Fraser Health Authority 2002 56 86 142 5 The University of British Columbia

More information

Limestone Road Industrial Area Brandon Manitoba ~141 Acres Rail Accessible, Ready for Development

Limestone Road Industrial Area Brandon Manitoba ~141 Acres Rail Accessible, Ready for Development Limestone Road Industrial Area Brandon Manitoba ~141 Acres Rail Accessible, Ready for Development Dan Fontaine Business Development Specialist 204.729.2133 or 1.866.729.2132 D.Fontaine@brandon.ca EconomicDevelopmentBrandon.com

More information

April 17, Ray Greene Marketing Manager Port of Argentia

April 17, Ray Greene Marketing Manager Port of Argentia April 17, 2018 Ray Greene Marketing Manager Port of Argentia What is the Port of Argentia Who came before us Port Features Board & Staff Vision & Recent Achievements Tenants & Port Users Current Priorities

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018 TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND PNWER November 2018 INVESTING IN CANADA PLAN EXISTING FUNDS Of the $180+ billion, 12-year Investing in Canada Plan, $10.1 billion has been dedicated to

More information

Centerm Expansion Project Marine Transportation Impact Study

Centerm Expansion Project Marine Transportation Impact Study Vancouver Fraser Port Authority Centerm Expansion Project Marine Transportation Impact Study Prepared by: AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax

More information

Vancouver s non-motorized watercraft strategy

Vancouver s non-motorized watercraft strategy Vancouver s non-motorized watercraft strategy Phase 2 - Public Engagement Discussion Guide February 19 - March 16, 2018 For more information about the strategy and to fill out the survey, visit vancouver.ca/onwater

More information

UK Port Infrastructure Project Pipeline Analysis Report

UK Port Infrastructure Project Pipeline Analysis Report UK Port Infrastructure Project Pipeline Analysis Report Prepared by Moffatt & Nichol, for the British Ports Association, March 2018 Following release of the Analysis of the National Infrastructure and

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004 2004 BUDGET July 6, 2004 2004 TAX RATES Municipal Education Total Residential 0.01434078 0.00296000 0.01730078 Multi-residential 0.02674555 0.00296000 0.02970555 Commercial 0.02940061 0.02268611 0.05208672

More information

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND Agenda Item 3 IOPC/OCT17/3/15 Date 17 October 2017 Original English 1992 Fund Assembly 92A22 1992 Fund Executive Committee 92EC69 Supplementary Fund Assembly SA14 INCIDENTS INVOLVING THE IOPC FUNDS 1992

More information

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin Harbor Location: Duluth-Superior Harbor is located at the westernmost tip of Lake Superior. Authority: River & Harbor Act of

More information

748 Ramirez Avenue Phone: Florida 32159

748 Ramirez Avenue Phone: Florida 32159 Terry R. Upson 748 Ramirez Avenue Phone: 352 259 7699 Lady Lake E-mail: terry_upson@yahoo.com Florida 32159 QUALIFICATIONS AND COURSES ATTENDED Unlimited British Masters license with dangerous cargo endorsement

More information

Decision (Applicant claims urgent public need )

Decision (Applicant claims urgent public need ) Decision (Applicant claims urgent public need ) Page 1 Application: Applicant: Address: 93-09 UPN Royal City Taxi Ltd. 436 Rousseau St, New Westminster BC V3L 3R3 Principals: GHUMAN, Parambir DHLLON, Chamkaur

More information

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 PND Engineers, Inc. Founded in 1979 Headquartered in Anchorage, Alaska with offices in Juneau, Seattle, Houston and Vancouver, B.C. International

More information

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 15.1.1 Harbour East-Marine Drive Community Council December 3, 2015 TO: SUBMITTED BY: Chair and Members of Harbour East - Marine Drive Community

More information

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD All the ports in Mozambique are owned by CFM (Caminhos de Ferro de Mozambique). Many of the ports have been given to private companies to manage the

More information

Alexandria Port, Egypt

Alexandria Port, Egypt Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

NOTE ALL CRUISES WEATHER DEPENDANT. FOR MORE INFO CALL or, (cell)

NOTE ALL CRUISES WEATHER DEPENDANT. FOR MORE INFO CALL or, (cell) 2015 Skippers meeting Sunday Nov 29th @ 12:noon at Reed Point Marina in the Marine Studies building just west from the main office on the docks to the left of Thunderbird Yacht Sales FOR MORE INFO CALL

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

ECHO Vessel Slowdown Trial. Duncan Wilson Vice-President, Corporate Social Responsibility

ECHO Vessel Slowdown Trial. Duncan Wilson Vice-President, Corporate Social Responsibility ECHO Vessel Slowdown Trial Duncan Wilson Vice-President, Corporate Social Responsibility How might slowing vessels affect underwater noise? Vessel slowdown trial 11kn Vessel slowdown trial Why: The trial

More information

Coastal vessels The number of insurance accidents and accident rate fluctuation 8.0%

Coastal vessels The number of insurance accidents and accident rate fluctuation 8.0% 1 2 3 4 5 6 1 In November 2013, a Loss & Prevention Seminar under the theme of Prevention of damage to harbour facilities was held at the following five areas: Tokyo, Kobe, Imabari, Fukuoka and Saeki.

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 04 Aug 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE Minutes of the Regular Meeting of the Metro Vancouver Regional District (MVRD) Regional Parks Committee held at 9:01 a.m. on Wednesday, June 7,

More information

Port dues and charges Free port of Ventspils

Port dues and charges Free port of Ventspils Port dues and charges Free port of Ventspils Adopted by the Ventspils Freeport Board s Decision No.3/11 of 22.02.2008 Board s Decision No.7/8 of 19.06.2009 Board s Decision No.15/24 of 20.11.2009 Board

More information

Marine Transportation Safety Investigation Report M17P0406

Marine Transportation Safety Investigation Report M17P0406 Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)

More information

A Depression-Era Collingwood Ship Makes Its Final Journey. By H. David Vuckson

A Depression-Era Collingwood Ship Makes Its Final Journey. By H. David Vuckson A Depression-Era Collingwood Ship Makes Its Final Journey By H. David Vuckson The Great Depression of the 1930 s saw little activity at the Collingwood Shipyard other than grass growing on the two building

More information

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE PRESS RELEASE September 28, 2015 WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE On February 10 th, M/V GOODFAITH amid severe weather run aground on the north coast of Andros. Bulk Carrier

More information

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River

More information

A GUIDE FOR THE USE OF CITY WHARVES

A GUIDE FOR THE USE OF CITY WHARVES A GUIDE FOR THE USE OF CITY WHARVES VESSEL MOORAGE APPLICATION PROCESS GENERAL INFORMATION Moorage on any of the City s three piers is permitted by obtaining a Moorage Agreement from the City Wharf Manager.

More information

Economic Sectors. The region is home to what many consider to be one of the most valuable timber supplies in the Province.

Economic Sectors. The region is home to what many consider to be one of the most valuable timber supplies in the Province. Sectors Economic Sectors With Powell River s strategic location it is no wonder the area is blessed with many successful industries and sectors. The strength of Powell River s economic condition comes

More information

the foss seattle shipyard helping you succeed in a competitive market

the foss seattle shipyard helping you succeed in a competitive market the foss seattle shipyard helping you succeed in a competitive market the foss shipyard advantage When you decide to invest in your fleet, you can count on Foss s proven track record to get the job done

More information

BETTER BUSINESS BUREAU 2015

BETTER BUSINESS BUREAU 2015 BONSOR COMMUNITY CENTRE 6550 BONSOR AVE BURNABY CAMERON RECREATION CENTRE 9523 CAMERON ST BURNABY CONFEDERATION COMMUNITY CENTRE FOR 55+ 4585 ALBERT ST BURNABY EDMONDS COMMUNITY CENTRE 7433 EDMONDS STREET

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

PRICE REDUCED. Delaware River Port Development Opportunity 707 Water Street, Gloucester City, New Jersey. Sale Price $2,650,000

PRICE REDUCED. Delaware River Port Development Opportunity 707 Water Street, Gloucester City, New Jersey. Sale Price $2,650,000 Largest Available Land Pier on the Delaware River Development Incentives Avail Delaware River Port Development Opportunity 707 Water Street, Gloucester City, New Jersey Property Description 10.5 acre riverfront

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in

Photo list of facilities built under the projects of CJSC HT Morstroy Design Institute in Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in 2000 2016 Construction as of March 31, 2016 2016 General Designer 2015 General Designer 2015 General Designer

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

WEEKLY INCIDENT SITUATION REPORT

WEEKLY INCIDENT SITUATION REPORT PEP Region WEEKLY INCIDENT SITUATION REPORT PERIOD: 2 Mar 15 to 8 Mar 15 Search and Rescue Air Land Inland Water Dangerous Goods and Oil Spills Motor Vehicle Incidents Other (floods fire etc.) General

More information

10 Acre Oceanfront Hidden Basin - Nelson Island, BC

10 Acre Oceanfront Hidden Basin - Nelson Island, BC 10 Acre Oceanfront Hidden Basin - Nelson Island, BC Jamie Zroback jamie@landquest.com 1 (604) 483-1605 Jason Zroback jason@landquest.com 1 (604) 414-5577 The Source for Oceanfront, Lakefront, Islands,

More information

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99

More information

Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update 1 Port Everglades 2014 Master/Vision Plan Update Public Meeting May 28, 2014 2 Agenda Port Everglades Mission Project Background 2014 Master/Vision Plan Update Process Status of 2009 5-Year Master Plan

More information

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM endry Marine HENDRYMARINE.COM Our Busines.s Hendry Marine Industries, Inc. (HMI) consists of a diverse range of maritime businesses, including commercial and government ship repair, marine environmental

More information

Redesigning The Waterfront

Redesigning The Waterfront San Francisco Maritime National Park Service U.S. Department of the Interior National Historical Park California Redesigning The Waterfront A Self-Guided Walking Tour Then & Black Point Cove, ca. 1910.

More information

Appendix B. Cultural Heritage Properties

Appendix B. Cultural Heritage Properties Appendix B Cultural Heritage Properties Existing Conditions Report Page 1 1. CHL Industrial Port Lands Industrial District. Bounded by Lake Shore Boulevard on the north, Leslie Street on the east, Inner

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

FOR SALE FOR SALE SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC

FOR SALE FOR SALE SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC FOR SALE CO-LISTED BY: *Personal Real Estate Corporation BOE IRAVANI* 604 640 5837 boe.iravani@ca.cushwake.com JOE GENEST* 604 398 4341 jgenest@form.ca JON BUCKLEY* 604 630 0215 PROPERTY HIGHLIGHTS INVESTMENT

More information

Policy Research Corporation

Policy Research Corporation Policy Research Corporation SOUND SOLUTIONS BASED ON SCIENTIFIC RESEARCH The role of Maritime Clusters to enhance the strength and development of maritime sectors Country report Malta INTRODUCTION TO COUNTRY

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for Santa Cruz Wharf Improvement Project Briefing Paper Prepared by City of Santa Cruz for U.S. Army Corps of Engineers Interagency Meeting 12 November 2014 Santa Cruz Wharf Improvement Project Constructed

More information

Ship traffic and the Roberts Bank Terminal 2 Project

Ship traffic and the Roberts Bank Terminal 2 Project Roberts Bank Terminal Project Ship traffic information sheet The Vancouver Fraser Port Authority is responsible for ensuring that Canada s largest port is ready for growing trade and the ships that trade

More information

North Cruise Berth Projects PortMiami

North Cruise Berth Projects PortMiami North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of

More information