superseded by 2008 nhc report

Size: px
Start display at page:

Download "superseded by 2008 nhc report"

Transcription

1 Steveston North Jetty Steveston South Jetty Georgia Strait Middle Arm West Vancouver UEL Legend Vancouver North Vancouver City North Arm Richmond Canoe Pass Fraser Valley Regional District North Vancouver District Greater Vancouver Regional District South Arm Delta Burnaby Belcarra Port Moody New Westminster Anmore Port Mann Surrey White Rock Coquitlam Port Coquitlam Pitt Meadows Pitt River Langley City Pitt Lake Maple Ridge Langley Township Alouette Lake Mission Mission Rail Bridge Abbotsford Scale - 1:, 1 1 Distance in Kilometres UTM NAD Zone Sumas Mountain DATE: DEC Harrison River Chilliwack FRASER BASIN COUNCIL LOWER FRASER RIVER HYDRAULIC MODEL Site Map northwest hydraulic consultants Kent - DWG BY: CM Figure 1.1 \\Linux-services\projects\ Fraser Profile\GIS\GIS Project Files\sitemap.mxd

2 Discharge (m /s) Flow Volume (km ) , 7. Annual Maximum Discharge at Hope 7,9 9,, Year Annual Runoff Volume at Hope Year Trends in Annual Fraser River Discharge at Hope December Figure.1

3 Water Level (m GSC) 9 7 WSC Curve WSC Curve WSC Curve 's 7's 's 9's Discharge (m /s) WSC Rating Curves and Discharge Measurements at Mission Gauge December Figure.

4 Velocity (m/s) Depth (m) Velocity (m/s) y =.x y =.x.9 Discharge (m /s) y =.1x Velocity vs. Discharge Depth vs. Discharge Discharge (m /s) Velocity vs. Depth Depth (m) Hydraulic Geometry at Mission Gauge (MH) December Figure.

5

6

7 Dune Steepness in the Fraser River Manning's Roughness Dune Height (m) y =.x Dune Length (m) Steveston Survey Line 1 Steveston Survey Line Mission Froude Number versus Manning's Roughness Froude Number (-) Steveston Mission Dune Characteristics at Mission and Steveston December Figure.

8 Predicted Mean Velocity at Mission Mean Velocity (m/s) Manning's Roughness Discharge (m /s) Predicted Channel Roughness Assumed lower limit for flat bed Mission observed Engelund-Hansen Einstein-Barbarossa Van Rijn Discharge (m /s) Predicted from observed dune geometry Engelund-Hansen Einstein-Barbarossa Predicted Channel Roughness at Mission December Figure.7

9 Dredge Volume (million cubic metres) 7 1 North Arm - Total South Arm - Borrow South Arm - Maintenance Ratio of Annual Dredging Volume to Bed Material Inflow at Mission Year 7 1 Ratio of Dredge Volume to Material Inflow Historic Trends in Dredging on the Lower Fraser River December Figure.

10 Water Level (m GSC) Pitt River near Port Coquitlam Fraser River at Port Mann Year Trends in Water Levels Pitt River and Port Mann December Figure.9

11 rt po 1 % %% % 17 1 %% 1 WOODWARD REACH 7 % ANNACIS 1 % %% % 1A 7 1 % 9 ANNIEVILLE CANADIAN COAST GUARD STRUCTURE INDEX F.R. - LADNER REACH PARSONS 1- NORTH ARM BREAKWATER - NORTH ARM JETTY - STEVESTON NORTH JETTY - STEVESTON SOUTH JETTY - STEVESTON WINGDAMS No. & - STEVESTON STRUCTURE (not indexed) 7- WOODWARD TRAINING WALL 9- DEAS & KIRKLAND ISL. BANK PROTECTION - FRASER RIVER TRIFURCATION- PHASE FRASER RIVER TRIFURCATION- PHASE 1- FRASER RIVER TRIFURCATION- PHASE 1- SAPPERTON 'V' DIKE 1A- SAPPERTON WINGDAMS 1- ALBION TRAINING WALL su p er se d ed CANOE PASSAGE 1 % BEDFORD 7 ENTERPRISE 9 BRIDGE CROSSINGS 1- ANNACIS ISLAND WEST CAUSEWAY - ANNACIS ISLAND EAST CAUSEWAY - DERWENT BRIDGE - WESTHAM ISLAND - ALEX FRASER - SKYTRAIN 7- PATULLO - PATULLO RAILWAY 9- PORT MANN - MISSION 11- MISSION RAILWAY 1- JACOB-HALDI 1- NO. ROAD BRIDGE 1- DINSMORE BRIDGE 1- MIDDLE ARM (MORAY) 1- NEW AIRPORT CONNECTOR 17- MARPOLE RAIL BRIDGE 1- OAK ST. BRIDGE 19- KNIGHT ST. SOUTH - CN RAIL - LULU TO BURNABY 1- QUEENSBOROUGH - QUEENSBOROUGH RAILWAY - MITCHELL ISLAND - KNIGHT ST. NORTH - ARTHUR LAING -CP RAIL 7- PITT RIVER N SCALE - 1:, BRIDGE LOCATION CANADIAN COAST GUARD STRUCTURES 11 % % W E S DISTANCE IN KILOMETRES UTM NAD ZONE MATSQUI NOTES: 1) DATA TAKEN FROM FISHERIES AND OCEANS CANADA CANADIAN COAST GUARD WATERWAYS DEVELOPMENT DWG. NO. FR--, AUGUST 199. LOWER FRASER RIVER HYDRAULIC MODEL River Control Structures and Road/Railroad Bridges DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS FRASER BASIN COUNCIL LEGEND % 1 11 % 9 % % 1 %% by 19 GRAVESBEND REACH % % NORTH ARM nh MIDDLE ARM % SAPPERTON c NORTH ARM re %% - DWG BY: WPH northwest hydraulic consultants FIGURE.1

12 MH MH MH MH MH MH11 MH MH MH17 MH MH MH MH MWLAP STAFF GAUGE QUEENSBOROUGH PORT MANN KENNEDY PUMP STATION BAYNES PUMP STATION SALMON RIVER ALBION FERRY GLEN VALLEY SILVERDALE McLENNAN CREEK MATSQUI SLOUGH DEWDNEY HATZIC GAUGE NO < S 9 re T$1 c $T nh S S W'11 W'1 T $ 1 W ' 1S ' 9W W ' W' U%1 W'7 ANNIEVILLE $T LEGEND 1 MUNICIPAL GAUGE 1 MWLAP STAFF GAUGE 1 WSC HYDROMETRIC STATION 1 CHS TIDAL GAUGE W' U% S $T W' LADNER REACH CANOE PASSAGE ed S 1 U% S 111 W' 11 W ' PARSONS RECORDER CONTINUOUS INTERMITTENT INTERMITTENT INTERMITTENT CONTINUOUS CONTINUOUS INTERMITTENT INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS ID CHS TIDAL GAUGE GAUGE NO POINT ATKINSON VANCOUVER HARBOUR SANDHEADS LIGHT NEW WESTMINSTER S W' U% U% 1 BEDFORD 7 7 U%S 1 ENTERPRISE U% 9 S U% U% U % MATSQUI se d W' S W' W' WOODWARD REACH W' S U% 9 SCALE - 1:, FRASER BASIN COUNCIL N W E S DISTANCE IN KILOMETRES UTM NAD ZONE LOWER FRASER RIVER HYDRAULIC MODEL Tidal and Hydrometric Gauge Locations DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS su p GRAVESBEND REACH MUNICIPAL GAUGE BATH SLOUGH WESTHAM ISLAND ELLIOT & RIVER RD. B & RIVER RD. NO. RD. NELSON RD. 9 RIVER RD. QUEEN'S PUMP QUEENSBOROUGH QUAYSIDE MANSON BRAID STREET 19nd STREET YORKSON SALMON RIVER CONFLUENCE er MIDDLE ARM ANNACIS NORTH ARM S 7 U% SAPPERTON by NORTH ARM S ID rt FRASER R. AT STEVESTON FRASER R. AT DEAS ISLAND TUNNEL FRASER R. (NORTH ARM) AT VANCOUVER FRASER R. AT NEW WESTMINSTER FRASER R. AT PORT MANN COQUITLAM R. AT PORT COQUITLAM PITT R. NEAR PORT COQUITLAM ALOUETTE R. NEAR HANEY PITT R. NEAR ALVIN NORTH ALOUETTE R. AT nd ST. FRASER R. AT MISSION FRASER R. AT PORT HAMMOND FRASER R. AT WHONOCK ID GAUGE NO. po ID WSC HYDROMETRIC STATION - DWG BY: WPH northwest hydraulic consultants FIGURE.

13 Water Level (m GSC) Pacific Standard Time (Day-Hour) Mission Whonnock Salmon River (Municipal) 19nd St (Municipal) Pitt River Port Mann New Westminter (CHS) Manson (Municipal) Nelson Rd. (Municipal) No. Rd. (Municipal) Steveston (CHS) Tidal Estimate (Triton) Freshet Calibration Main Arm Water Levels December Figure.

14 rt.7%.7% < WESTHAM ISLAND.% 7% McMILLAN ISLAND % CRESCENT ISLAND BEDFORD 9% 7 % DEAS ISLAND LADNER REACH ENTERPRISE 9% 9 % MATSQUI ISLAND 71% MATSQUI 9% su p er se d ed CANOE PASSAGE << << c 7% ANNACIS ISLAND 9% < nh ANNIEVILLE 9% PARSONS < DOUGLAS ISLAND << re po 1% by ANNACIS % < 1% < << WOODWARD REACH BARNSTON ISLAND % << GRAVESBEND REACH <.% < << < 7.7% MIDDLE ARM LULU ISLAND % % < SEA ISLAND NORTH ARM SAPPERTON < MITCHELL ISLAND.% < NORTH ARM SCALE - 1:, W E S < LEGEND FLOW SPLIT SURVEY LOCATION FRASER BASIN COUNCIL N DISTANCE IN KILOMETRES UTM NAD ZONE NOTES: 1) PERCENTAGES REFER TO TOTAL FRASER RIVER FLOW AND CORRESPOND TO AVERAGE RECORDED VALUES. ) DATA COLLECTED BY PWGSC (MAY-JUNE, AND NOV, -JAN, ). LOWER FRASER RIVER HYDRAULIC MODEL Recorded Flow Spits DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS - DWG BY: WPH northwest hydraulic consultants FIGURE.

15 Manning's Roughness Coefficient Flow (m /s) 197 & 197 WSC Measurements Model Calibration/Verification 19 Model Calibration/Verification 19 Upper bound n-value 19 Best est. n-value 19 Lower bound n-value Flow vs. Roughness Sumas Mountain to Douglas Island December Figure.

16 Water Level (m GSC) 9 7 WSC Curve WSC Curve WSC Curve MIKE11 Model Discharge (m /s) Comparison of WSC Rating Curve and Model Prediction at Mission Gauge December Figure.

17 1 7 9 Chainage (km) Base Run +% n +% n -% n Water Level (m GSC) Steveston New Westminster Port Mann Mission Roughness Sensitivity Fraser River Freshet Design December Figure.1

18 Water Level (m GSC) 1 Steveston Base Run n.7 Manning's n.9 Manning's n. Manning's n. Manning's n. Manning's n. 199 Profile New Westminster Port Mann 7 9 Chainage (km) Mission Roughness Sensitivity (Km 7 to ) Fraser River Freshet Design Flood December Figure.

19 1 7 9 Chainage (km) Base Run +% Inflow -% Inflow Water Level (m GSC) Steveston New Westminster Port Mann Mission Inflow Sensitivity Fraser River Freshet Design December Figure.

20 1 7 9 Chainage (km) Base Run +.m Global Warming +% Swing Water Level (m GSC) Steveston New Westminster Port Mann Mission Ocean Level Sensitivity Fraser River Freshet Design December Figure.

21 1 7 9 Chainage (km) Base Run Local Bed Scour Water Level (m GSC) Steveston New Westminster Port Mann Mission Sensitivity to Local Scour Fraser River Freshet Design December Figure.

22 Water Level (m GSC) Steveston Base Winter Run Base Freshet Run +% Roughness -% Roughness New Westminster Port Mann 7 9 Chainage (km) Mission Roughness Sensitivity Fraser River Winter Design December Figure.

23 Chainage (km) Base Winter Run Base Freshet Run +% Inflow -% Inflow Water Level (m GSC) Steveston New Westminster Port Mann Mission Inflow Sensitivity Fraser River Winter Design December Figure.7

24 Water Level (m GSC) Steveston Base Winter Run Base Freshet Run -Year Inflow -Year Inflow New Westminster Port Mann 7 9 Chainage (km) Mission Inflow Sensitivity (Event Based) Fraser River Winter Design December Figure.

25 Water Level (m GSC) Steveston Base Winter Run Base Freshet Run Global Warming Scenario New Westminster Port Mann 7 9 Chainage (km) Mission Ocean Level Sensitivity Fraser River Winter Design December Figure.9

26 Water Level (m GSC) 1 Steveston Base Run 199 Profile Inflow 1 Inflow 17 Inflow 17 Inflow 1 Inflow 1 Inflow 1 Inflow 1 Inflow 1 Inflow 1 New Westminster Port Mann 7 9 Chainage (km) Mission Range of Inflows Fraser River Freshet Design December Figure.1

27 Dike Elevation (m GSC) Ground LiDAR.1 1 Distance (m) Coquitlam Dike Ground Survey vs. LiDAR December Figure.

28 Chainage (km) Dredging Stoppage km to km 11 Dredging Stoppage km to km Increase in Predicted Flood Level (m) Steveston Mission Massey Tunnel Alex-Fraser Bridge New Westminster Port Mann Dredging Sensitivity Fraser River Freshet Design December Figure 7.1

HOPEWELL DISTRIBUTION CENTRE

HOPEWELL DISTRIBUTION CENTRE HOPEWELL DISTRIBUTION CENTRE PHASE IV - Up to 330,540 Square Feet Available for Lease DARREN CANNON* 604 662 2637 darren.cannon@colliers.com STUART MORRISON* 604 662 2676 stuart.morrison@colliers.com ANDREW

More information

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019 Abbotsford, BC 65,000 SF in Available Q 209 33,229 SF in Available Q2 209 NOW UNDER CONSTRUCTION! CHRIS MORRISON, Executive Vice President 604 66 085 chris.morrison@colliers.com VITO DECICCO, Senior Vice

More information

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

APPENDIX A: SCREENLINE SURVEY STATION DETAILS and Count Details APPENDIX A: SCREENLINE SURVEY STATION DETAILS Table 12 expands on the Quick Facts in Table 1 by providing count details for all screenlines as well as individual stations. The following

More information

HOLDOM SKYTRAIN STATION

HOLDOM SKYTRAIN STATION HOLDOM SKYTRAIN STATION 2111 Holdom Avenue, Burnaby, BC MILLENIUM LINE RETAIL SUMMARY Holdom SkyTrain is located prominently on the southwest corner of Lougheed Highway and Holdom Avenue. This SkyTrain

More information

HOLDOM SKYTRAIN STATION

HOLDOM SKYTRAIN STATION HOLDOM SKYTRAIN STATION 2111 Holdom Avenue, Burnaby, BC NEW TRANSIT ORIENTED RETAIL! SUMMARY Holdom SkyTrain is located prominently on the southwest corner of Lougheed Highway and Holdom Avenue. This SkyTrain

More information

STADIUM- CHINATOWN SKYTRAIN STATION

STADIUM- CHINATOWN SKYTRAIN STATION STADIUM- CHINATOWN SKYTRAIN STATION 590 Beatty Street, Vancouver, BC SERVICING HIGH TRAFFIC DOWNTOWN CORE! SUMMARY Stadium-Chinatown SkyTrain Station is located in downtown Vancouver and sees 28,530 riders

More information

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan Welcome The objectives of this open house are to: Share information on the new investments and funding proposed for the Phase Two Plan Gather feedback from people across the region about the Phase Two

More information

September Samsung Double-th -in-Rebate

September Samsung Double-th -in-Rebate September Samsung Double-the-mail-in-Rebate Appliances Unlimited 1200, Lougheed High Way Coquitlam Bay 7 Oaks Shopping Centre, 32900 South Fraser Way Abbotsford Bay 100-2929 Barnet Highway Coquitlam Bay

More information

Implementation Plan for local governments

Implementation Plan for local governments ATTACHMENT 2 Lower Fraser River Corridor Project Implementation Plan for local governments September TABLE OF CONTENTS Introduction p.1 GOAL 1 CONNECT HOPE TO THE SALISH SEA 1.1 CANYON TO COAST TRAIL STRATEGY

More information

% Chg Due to Market Light Industry Region

% Chg Due to Market Light Industry Region Region Vancouver Island 01 Capital 213 City of Colwood 15.11% 5.96% 3.73% Vancouver Island 01 Capital 234 City of Victoria 16.35% 9.10% 11.52% Vancouver Island 01 Capital 302 District of Central Saanich

More information

Leaders in energy management

Leaders in energy management 1 Island Health 2002 76 90 166 2 Vancouver Coastal Health Authority 2002 47 102 149 3 Overwaitea Food Group 2002 39 108 147 4 Fraser Health Authority 2002 56 86 142 5 The University of British Columbia

More information

BETTER BUSINESS BUREAU 2015

BETTER BUSINESS BUREAU 2015 BONSOR COMMUNITY CENTRE 6550 BONSOR AVE BURNABY CAMERON RECREATION CENTRE 9523 CAMERON ST BURNABY CONFEDERATION COMMUNITY CENTRE FOR 55+ 4585 ALBERT ST BURNABY EDMONDS COMMUNITY CENTRE 7433 EDMONDS STREET

More information

Top 75 British Columbia Secondary Schools

Top 75 British Columbia Secondary Schools Top 75 British Columbia Secondary Schools The schools are listed in descending order according to their academic performance as measured by the overall rating in 2005/2006. Source: The Fraser Institute

More information

Where to buy Snappy Grains Barley in BRITISH COLUMBIA

Where to buy Snappy Grains Barley in BRITISH COLUMBIA 100 Mile House Save-On-Foods #1 95A Cariboo Highway 97 250-395-2543 Abbotsford Save-On-Foods 2140 Sumas Way 604-504-4453 Save-On-Foods #300-32700 S. Fraser Way 604-854-5318 Save-On-Foods #101-1888 North

More information

LifeLabs Legal Urine Drug Screen Designated Collection sites

LifeLabs Legal Urine Drug Screen Designated Collection sites LifeLabs Legal Urine Drug Screen Designated Collection sites Patient must attend a designated LifeLabs Patient Service Centre Monday to Friday, between 9:00am and 1 hour before closing. City PSC Name Fax

More information

DELIVERY SCHEDULE THE RIGHT PRODUCTS TO THE RIGHT PLACES, RIGHT ON TIME

DELIVERY SCHEDULE THE RIGHT PRODUCTS TO THE RIGHT PLACES, RIGHT ON TIME DELIVERY SCHEDULE THE RIGHT PRODUCTS TO THE RIGHT PLACES, RIGHT ON TIME UPDATED: APRIL 27 2017 MAINLAND DELIVERY SCHEDULE 1 West End / Stanley Park 1 Gastown / Coal Harbour 1 Yaletown / Granville District

More information

Vancouver Downtown & West

Vancouver Downtown & West BC Children s Hospital Foundation 938 West 28th Avenue, Vancouver BC V5Z 4H4 www.bcchf.ca RBC LOCATIONS ACROSS BC VANCOUVER DOWNTOWN & WEST VANCOUVER EAST/BURNABY SOUTH VANCOUVER/RICHMOND NORTH SHORE SURREY

More information

2013 June 2014 `

2013 June 2014 ` 2013 June 2014 ` 9657474 9657474 Metro Vancouver Regional Park Visitor Survey CONTENTS Executive Summary... 1 Introduction... 2 Background... 2 Survey Results... 3 Detailed Summary by Overall Park System...

More information

Developmental Cost Charge (DCC) Program Summary

Developmental Cost Charge (DCC) Program Summary Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage

More information

Welcome! metrovancouver.org. Aldergrove Regional Park - Management Plan

Welcome! metrovancouver.org. Aldergrove Regional Park - Management Plan Welcome! Aldergrove Regional Park - Management Plan The process to create a Management Plan for Aldergrove Regional Park is underway and we would like your input on the draft Vision, Framework and Concept.

More information

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN : East Columbia Street (13,451 VPD) JOIN : FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC Northgate Village Lougheed Mall BUILDING 9 Austin Avenue Lougheed Highway

More information

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY SPECIAL AUTHORIZATION Page 1 of 6 PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE Passenger Transportation Licence Licence Holder: NEW WESTMINSTER, BC Trade Name(s):

More information

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE Minutes of the Regular Meeting of the Metro Vancouver Regional District (MVRD) Regional Parks Committee held at 9:01 a.m. on Wednesday, June 7,

More information

Transit Network Review translink.ca

Transit Network Review translink.ca Transit Network Review 2017 TRANSIT NETWORK REVIEW 2017 Table of Contents OVERVIEW... 1 PUBLIC AND STAKEHOLDER ENGAGEMENT... 2 OUTREACH AND ENGAGEMENT AT A GLANCE... 3 NEXT STEPS...4 WHAT WE HEARD AND

More information

IMPORTANT MEMBERSHIP MEETINGS

IMPORTANT MEMBERSHIP MEETINGS BC s Community Social Services Workers IMPORTANT MEMBERSHIP MEETINGS There will be important membership meetings for all of BC s community social services workers to discuss: Municipal Pension Plan Negotiations

More information

Mental Health and Substance Use Centres (Plan G) Contact Information

Mental Health and Substance Use Centres (Plan G) Contact Information Colu Mental Health and Substance Use Centre (MHSUC) Catchment Physical Address City Postal Code Phone Number Fax Number Health Authority 1 Abbotsford Abbotsford area #11 32700 George Abbotsford V2T 4V6

More information

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT Derick Fluker* 604 638 2125 dfluker@form.ca *Personal Real Estate Corporation Jack Allpress* 604 638 1975 jallpress@form.ca Layla Vera 604 398 4352 lvera@form.ca

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

TABLE 1A - PROVINCIAL OVERVIEW OF RECALCULATED 2008/09 OPERATING GRANTS

TABLE 1A - PROVINCIAL OVERVIEW OF RECALCULATED 2008/09 OPERATING GRANTS TABLE 1A - PROVINCIAL OVERVIEW OF RECALCULATED 2008/09 OPERATING GRANTS FAS 2008/09 Recalculated Basic Supplementary Funding Recalculated School District Enrolment- Unique Unique Operating Based Enrolment

More information

REDEFINING THE NEW BUSINESS HUB OF GUILDFORD TOWN CENTRE

REDEFINING THE NEW BUSINESS HUB OF GUILDFORD TOWN CENTRE REDEFINING THE NEW BUSINESS HUB OF GUILDFORD TOWN CENTRE BUILDING OVERVIEW ANCHOR TENANT OPPORTUNITY OCCUPANCY DATE Offering prominent building signage for a large format tenant. Occupancy estimated for

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Application Summary. Taxi - Amendment to Licence

Application Summary. Taxi - Amendment to Licence Application Summary Taxi - Amendment to Licence Application # 354-16 Applicant Royal City Taxi Ltd. Trade Name (s) Principals Address Current Licence Royal City Taxi DHILLON, Chamkaur MAGHERA, HArinder

More information

BCLC Gambling Service Provider Commissions Report Fiscal Year 2015/16

BCLC Gambling Service Provider Commissions Report Fiscal Year 2015/16 BCLC Gambling Service Provider Commissions Report Fiscal Year 2015/16 Table of Contents British Columbia s Gambling Operations Model... 2 Service Provider Capital Investments and Development Commissions

More information

Multiculturalism Grants Paid to Community Organizations 2016/17 (by community) - March, 2017

Multiculturalism Grants Paid to Community Organizations 2016/17 (by community) - March, 2017 Multiculturalism Grants Paid to Community Organizations 2016/17 (by community) - March, 2017 City Organization Name Multiculturalism Grant Abbotsford Abbotsford Community Services Abbotsford Abbotsford

More information

2012/13 STORE SALES BY REGION UNAUDITED

2012/13 STORE SALES BY REGION UNAUDITED VANCOUVER ISLAND/COAST Alert Bay 225 739,550 114,710 6,470 14,240 63,966 30,034 5.6% 12.4% 55.8% 26.2% Bella Coola 232 1,532,900 224,496 16,599 23,877 155,300 28,720 7.4% 10.6% 69.2% 12.8% Campbell River

More information

Selected Maps of British Columbia Published During 1976 and 1977

Selected Maps of British Columbia Published During 1976 and 1977 Selected Maps of British Columbia Published During 1976 and 1977 Compiled by MAUREEN WILSON, Map Division, Library of the University of British Columbia. Land Status maps. Metric edition 1:125,000. 92

More information

RETAIL REPORT METRO VANCOUVER FALL 2016 LEE & ASSOCIATES COMMERCIAL REAL ESTATE (BC) LTD.

RETAIL REPORT METRO VANCOUVER FALL 2016 LEE & ASSOCIATES COMMERCIAL REAL ESTATE (BC) LTD. RETAIL REPORT METRO VANCOUVER FALL 2016 LEE & ASSOCIATES COMMERCIAL REAL ESTATE (BC) LTD. OVERVIEW METRO VANCOUVER MARKET The Metro Vancouver retail market remains stable heading into Q4 of 2016 despite

More information

BCLC Gambling Service Provider Commissions Report Fiscal Year 2016/17

BCLC Gambling Service Provider Commissions Report Fiscal Year 2016/17 BCLC Gambling Service Provider Commissions Report Fiscal Year 2016/17 Table of Contents British Columbia s Gambling Operations Model... 2 Casino Service Provider Capital Investments and Development Commissions

More information

British Columbia. Shoppers Drug Mart SEVENOAKS SHOPPING CENTRE SOUTH FRASER WAY, UNIT 143 ABBOTSFORD, BC, V2S 5A1 Phone:

British Columbia. Shoppers Drug Mart SEVENOAKS SHOPPING CENTRE SOUTH FRASER WAY, UNIT 143 ABBOTSFORD, BC, V2S 5A1 Phone: Shoppers Drug Mart 32900 SEVENOAKS SHOPPING CENTRE SOUTH FRASER WAY, UNIT 143 ABBOTSFORD, BC, V2S 5A1 Phone: 604-853-9481 Shoppers Drug Mart 32390 SOUTH FRASER WAY SOUTH FRASER WAY, UNIT #1 ABBOTSFORD,

More information

K.~ Mike Redpath Senior Manager, Parks ( )

K.~ Mike Redpath Senior Manager, Parks ( ) City of Richmond Report to Committee To: Parks, Recreation and Cultural Services Committee Date: June 4, 2014 From: Mike Redpath File: 06-2400-05-01/2014- Senior Manager, Parks Vol 01 Re: Experience the

More information

Rider ' s Guide. Blue Bus PROUDLY SERVING THE COMMUNITY SINCE Information:

Rider ' s Guide. Blue Bus PROUDLY SERVING THE COMMUNITY SINCE Information: Blue Bus Rider ' s Guide PROUDLY SERVING THE COMMUNITY SINCE 1912 Information: 604-985-7777 Effective September 2, 2017 Subject to minor adjustments. Welcome Aboard! West s Blue Bus transit system is one

More information

IMTC RESOURCE MANUAL 2015

IMTC RESOURCE MANUAL 2015 IMTC RESOURCE MANUAL 215 CONTENTS INTRODUCTION TO IMTC The IMTC Program 5 Map of the Cascade Gateway 6 Objectives 8 Structure 9 Participating agencies 1 Funding 11 THE CASCADE GATEWAY Intro to the Cascade

More information

USACE GALVESTON DISTRICT PROJECT UPDATE

USACE GALVESTON DISTRICT PROJECT UPDATE USACE GALVESTON DISTRICT PROJECT UPDATE 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 DREDGE YOUR DOCKS 2018 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

MSC/ACDF Approved Diagnostic Facilities DU - DIAGNOSTIC ULTRASOUND as of December 8, 2015

MSC/ACDF Approved Diagnostic Facilities DU - DIAGNOSTIC ULTRASOUND as of December 8, 2015 1 Private CLEARBROOK X-RAY & ULTRASOUND 102-32475 SIMON AVE ABBOTSFORD ABBOTSFORD REGIONAL AND 32900 MARSHALL ROAD ABBOTSFORD CANCER Private BROOKE RADIOLOGY ASSOCIATES 100-4980 KINGSWAY BURNABY Private

More information

METRO VANCOUVER REGIONAL DISTRICT (MVRD) - PARKS BOARD OF DIRECTORS

METRO VANCOUVER REGIONAL DISTRICT (MVRD) - PARKS BOARD OF DIRECTORS Meeting 1 of 4 METRO VANCOUVER REGIONAL DISTRICT (MVRD) - PARKS BOARD OF DIRECTORS REGULAR BOARD MEETING Friday, January 26, 2018 9:00 A.M. 28 th Floor Boardroom, 4730 Kingsway, Burnaby, British Columbia

More information

BCLC Gambling Service Provider Commissions Report Fiscal Years 2012/13 and 2013/14

BCLC Gambling Service Provider Commissions Report Fiscal Years 2012/13 and 2013/14 BCLC Gambling Service Provider Commissions Report Fiscal Years 2012/13 and 2013/14 Table of Contents British Columbia s Gambling Operations Model... 1 Casino Service Provider Capital Investments and Development

More information

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY ANNUAL FLOW RELEASES INSTREAM FLOW REQUIREMENT (IFR) IMPLEMENTATION AND MONITORING (October 2004 to September 2005) TOWER ON MALIBAMATŠO RIVER @ KAO REPORT N0.6

More information

2010/11 Community Gaming Grant Recipients Grant Category: Arts and Culture

2010/11 Community Gaming Grant Recipients Grant Category: Arts and Culture Gaming Policy and Enforcement Branch 2010/11 Community Gaming Grant Recipients 100 Mile House 100 Mile House and District Soccer Association $ 32,400.00 100 Mile House Total $ 32,400.00 Abbotsford BC Old

More information

State/Province. Clinic. Clinic. Grand Canyon Therapy. Clinic. Ruehle-Kumar Karen 1322 W. Amberwood Dr. Phoenix

State/Province. Clinic. Clinic. Grand Canyon Therapy. Clinic. Ruehle-Kumar Karen 1322 W. Amberwood Dr. Phoenix Ruehle-Kumar Karen 1322 W. Amberwood Dr. Phoenix 85045 480-214-3234 karenkumar@cox.net Grand Canyon Therapy Colyar Terry 29761 N 69th Dr Peoria 85383 (623) 930-7888 tdcolyar@cox.net State/Province BC Asad

More information

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS In field November 14 20, 2018 Conducted by Research Co. (Mario Canseco) Online survey of 1,900 adults in Metro

More information

1716. PRESENT: 1. By striking out subsection (3) of Section and substituting the following:-

1716. PRESENT: 1. By striking out subsection (3) of Section and substituting the following:- 1716. Approved and ordered this 27th day of July, A.D. 1959. At the Executive Council Chamber, Victoria, C --c Administrator. PRESENT: N. The Honourable Bennett Wicks Black Bonrer Steaoy Kiernan Martin

More information

Delivery Zone and Sod Item Guide Western Canada

Delivery Zone and Sod Item Guide Western Canada Delivery Zone and Sod Item Guide Western Canada Delivery Zone and Sod Item Guide On the following pages you can find all FSA codes (first 3 digits of your postal code) that we are able to deliver to. If

More information

Funders/Service Partners 2016

Funders/Service Partners 2016 Funders/Service Partners 2016 Accenture Access Pro Bono ACT2 Alexandra Neighbourhood House Applied Science Technologists & Technicians of BC Arc teryx Asia Pacific Foundation of Canada BC Community Response

More information

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced:

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced: Partnerships BC evaluates, structures and implements partnership solutions which serve the public interest. The company is committed to commercial viability, transparent operations and achieving wide recognition

More information

PRESENT: recommend: By deleting Schedule 1 of Section and substituting the following:

PRESENT: recommend: By deleting Schedule 1 of Section and substituting the following: 1993. Approved and ordered this 13th day of July At the Executive Council Chamber, Victoria, Lieutenant-Governor. PRESENT: The Honourable Bennett Gaglardi Bonner Blaek Williston Loffmark Campbell Chant

More information

CANADIAN FLYER T T O S TTOS CANADIAN DIVISION EXECUTIVE. From the President MEETING DATES. Inside this issue:

CANADIAN FLYER T T O S TTOS CANADIAN DIVISION EXECUTIVE. From the President MEETING DATES. Inside this issue: T T O S CANADIAN FLYER Volume 1, Issue 6 October 2003 Inside this issue: President s Message & The Winner is... The Royal Hudson 3 Coming Events 4 Club Supporters 5 Photo Gallery... 6 Island Members...

More information

Retail Report. Metro Vancouver Annual Retail Market Report

Retail Report. Metro Vancouver Annual Retail Market Report 2017 Retail Report Metro Vancouver Annual Retail Market Report Market Overview METRO VANCOUVER MARKET The Metro Vancouver retail market continues to lead BC retail growth as we enter 2017. Industry demand

More information

WEEKLY INCIDENT SITUATION REPORT

WEEKLY INCIDENT SITUATION REPORT EMBC Region WEEKLY INCIDENT SITUATION REPORT PERIOD: 28 Jan 19 to 3 Feb 19 Search and Rescue Air Land Inland Water Dangerous Goods and Oil Spills Motor Vehicle Incidents Other (floods fire etc.) General

More information

Standing Committee on Planning, Transportation and Environment

Standing Committee on Planning, Transportation and Environment ADMINISTRATIVE REPORT Report Date: June 16, 2014 Contact: Jerry Dobrovolny Contact No.: 604.873.7331 RTS No.: 10637 VanRIMS No.: 08-2000-20 Meeting Date: June 25, 2014 TO: FROM: SUBJECT: Standing Committee

More information

2016 Development Cost Charges (DCC) UPDATE

2016 Development Cost Charges (DCC) UPDATE 2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated

More information

WEEKLY INCIDENT SITUATION REPORT

WEEKLY INCIDENT SITUATION REPORT WEEKLY INCIDENT SITUATION REPORT PERIOD: 15 Sep 14 to 21 Sep 14 Search and Rescue Dangerous Motor Other General PEP Region Goods and Vehicle (floods Enquiries Air Land Inland Oil Spills Incidents fire

More information

BCLC Gambling Service Provider Commissions Report

BCLC Gambling Service Provider Commissions Report BCLC Gambling Service Provider Commissions Report 1997 2010 table of contents British Columbia s Gambling Operations Model... 1 Casino Service Provider Commissions... 3 Casino Service Provider Capital

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY AAPA Marine Terminal Management Training Program September 18, 2015 Tom Corsie, PPM Vice-President, Real Estate TODAY S AGENDA

More information

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

South Westminster and Bridgeview

South Westminster and Bridgeview City of Surrey SURREY South Westminster and Bridgeview Industrial Areas WASHINGTON STATE, USA Located on the south shore of the Fraser River, the Bridgeview (307.14 acres/124.295 hec) and South Westminster

More information

METRO VANCOUVER INDUSTRIAL MARKET

METRO VANCOUVER INDUSTRIAL MARKET Research & Forecast Report METRO VANCOUVER INDUSTRIAL MARKET Second Quarter 6 Table of Contents Metro Market Overview... Market Summaries... North... 3 Burnaby & New Westminster... 4 Tri-Cities... 5 Richmond...

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority

More information

Hydrology Input for West Souris River IWMP

Hydrology Input for West Souris River IWMP Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff

More information

Licence Frequency Site Site Name Record Identifier Identifier ON1276 Amherstburg - Front St/Middle Side Rd

Licence Frequency Site Site Name Record Identifier Identifier ON1276 Amherstburg - Front St/Middle Side Rd Annex 3 Provisions for Canadian land mobile assignments within the coordination zone that are operating according to the 2001 SCP and are not included in the new SCP and revisions to Arrangement F Canadian

More information

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249 Thirteenth International Water Technology Conference, IWTC 13 2009, Hurghada, Egypt 1249 EVALUATION OF LOCAL SCOUR AROUND BRIDGE PIERS (RIVER NILE BRIDGES AS CASE STUDY) Sherine Ismail Assoc. Prof., Survey

More information

2018 Development Cost Charges (DCCs) Update

2018 Development Cost Charges (DCCs) Update 2018 Development Cost Charges (DCCs) Update Agenda DCC Overview DCC Update Proposed DCC Rates Next Steps DCCs - OVERVIEW Why do we have DCCs? DCCs pay for the costs of expanding and upgrading the community

More information

Children Who Witness Abuse Counselling Programs Contact List

Children Who Witness Abuse Counselling Programs Contact List Children Who Witness Abuse Counselling Programs Contact List Location 100 Mile House Axis Family Resources Ltd 250-395-3145 info@axis.bc.ca Abbotsford Women's Resource of the Fraser Valley 604-855-3363

More information

PA S S P O R T HISTORIC SITES IN DELTA VOLUME II. Historic Sunbury & Annieville BRITISH COLUMBIA

PA S S P O R T HISTORIC SITES IN DELTA VOLUME II. Historic Sunbury & Annieville BRITISH COLUMBIA Delta Heritage PA S S P O R T HISTORIC SITES IN DELTA VOLUME II Historic Sunbury & Annieville BRITISH COLUMBIA PA S S 5 St. Mungo Cannery 6 St. Mungo and Glenrose Archaeological Sites 7 Riverview Market

More information

Community/Proponent Project Amount Abbotsford Abbotsford-James Treatment Plant Bio Solids Dewatering $2,170,000

Community/Proponent Project Amount Abbotsford Abbotsford-James Treatment Plant Bio Solids Dewatering $2,170,000 2008CS0077-001007 June 27, 2008 BACKGROUNDER Ministry of Community Development Western Economic Diversification Canada Ministry of Transportation and Infrastructure 103 PROJECTS BENEFIT BRITISH COLUMBIANS

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot

More information

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT Sherine S. Ismail Prof., Head of Lake Nasser studies department, Nile Research Institute, E-mail:sherine_shawky@yahoo.com ABSTRACT Nile water discharges

More information

WEEKLY INCIDENT SITUATION REPORT

WEEKLY INCIDENT SITUATION REPORT EMBC Region WEEKLY INCIDENT SITUATION REPORT PERIOD: 22 Jan 18 to 28 Jan 18 Search and Rescue Air Land Inland Water Dangerous Goods and Oil Spills Motor Vehicle Incidents Other (floods fire etc.) General

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

Building Energy Performance Index (BEPIs)

Building Energy Performance Index (BEPIs) Education Sector Energy Manager Strategic Planning Session Building Energy Performance Index (BEPIs) September 19, 2012 Robert Greenwald, P.Eng., MBA SD44 (North Vancouver) Energy Manager Agenda 25 min

More information

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE REGULAR MEETING May 9, 2018 9:00 AM 28 th Floor Committee Room, 4730 Kingsway, Burnaby, British Columbia A G E N D A 1 1. ADOPTION OF THE AGENDA

More information

IMTC Resource Manual. 20th Anniversary For the International Mobility & Trade Corridor Program

IMTC Resource Manual. 20th Anniversary For the International Mobility & Trade Corridor Program IMTC th Anniversary 1997-17 17 Resource Manual For the International Mobility & Trade Corridor Program YEARS OF COORDINATION IN THE CASCADE GATEWAY TABLE OF CONTENTS Introduction to IMTC 5 The Cascade

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2019 2014 November 28, 2013 November 22, 2018 TO to January 1, 7, 2020 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

WEEKLY INCIDENT SITUATION REPORT

WEEKLY INCIDENT SITUATION REPORT EMBC Region WEEKLY INCIDENT SITUATION REPORT PERIOD: 5 Sep 16 to 11 Sep 16 Search and Rescue Air Land Inland Water Dangerous Goods and Oil Spills Motor Vehicle Incidents Other (floods fire etc.) General

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2018 2014 November 28, 2013 November 23, 2017 TO to January 2, 7, 2019 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

Sod Delivery Guide FSAs and Cities Western Canada

Sod Delivery Guide FSAs and Cities Western Canada Sod Delivery Guide FSAs and Cities Western Canada Guide de livraison de gazon par codes postaux et villes Ouest du Canada Please Note: If your FSA and city is not listed in the following list, we do not

More information

Long term morphological analysis and simulations

Long term morphological analysis and simulations Long term morphological analysis and simulations Dr.-Ing. Markus Promny Bundesanstalt für Gewässerkunde / Federal Institute of Hydrology GESINUS 2010 - Liège - 29./30.07.2010 page 1 1D-models of German

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For Grain (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update February 19, 19 For Grain (18-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var.

More information

Decision (Applicant claims urgent public need )

Decision (Applicant claims urgent public need ) Decision (Applicant claims urgent public need ) Page 1 Application: Applicant: Address: 93-09 UPN Royal City Taxi Ltd. 436 Rousseau St, New Westminster BC V3L 3R3 Principals: GHUMAN, Parambir DHLLON, Chamkaur

More information

CONCEPTUAL DRAWING VILLAGE PEDESTRIAN WALKWAY

CONCEPTUAL DRAWING VILLAGE PEDESTRIAN WALKWAY CONCEPTUAL DRAWING VILLAGE PEDESTRIAN WALKWAY 2 3 Contents WELCOME TO WILLOWBROOK OUR VISION 6 7 OUR LOCATION 10 11 A DYNAMIC NODE 12 13 OUR SHOPPING CENTRE TODAY 14 15 OUR CURRENT MIX 18 19 OUR SHOPPER

More information

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY ANNUAL FLOW RELEASES INSTREAM FLOW REQUIREMENT (IFR) IMPLEMENTATION AND MONITORING (October 2005 to September 2006) REPORT N0.7 OCTOBER 2007 STRATEGIC AND CORPORATE

More information

Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority

Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority 12 References AME (2010). PHPA South West Creek Approvals Initial Plume Modelling Input.

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m Last

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

Grain Monitoring Program

Grain Monitoring Program Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update.November, 1 For 1 (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m

More information

Walk-On Waterfront Executive Home Qualicum Beach, BC

Walk-On Waterfront Executive Home Qualicum Beach, BC Walk-On Waterfront Executive Home Qualicum Beach, BC Jamie Zroback jamie@landquest.com 1 (604) 483-1605 Jason Zroback jason@landquest.com 1 (604) 414-5577 Marketing British Columbia to the World The Source

More information

2014 Library Grant Allocations

2014 Library Grant Allocations 2014 Library Grant Allocations Libraries Branch Ministry of Education March 28, 2014 Table of Contents Table 1: 2014 Library Grants Summary 3 Operating Grant 5 Table 2: 2014 Operating Grant: Calculation

More information