Volume Contents and Alpha-Numeric Index to the NRA Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) Standards

Size: px
Start display at page:

Download "Volume Contents and Alpha-Numeric Index to the NRA Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) Standards"

Transcription

1 Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) GE-CON June 2015 General Standards

2 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving the country s national road and light rail networks. About TII Publications TII maintains an online suite of technical publications, which is managed through the TII Publications website. The contents of TII Publications is clearly split into Standards and Technical documentation. All documentation for implementation on TII schemes is collectively referred to as TII Publications (Standards), and all other documentation within the system is collectively referred to as TII Publications (Technical). This system replaces the Design Manual for Roads and Bridges ( ) and the Manual of Contract s for Road Works ( MCDRW). Attributes Each document within TII Publications has a range of attributes associated with it, which allows for efficient access and retrieval of the document from the website. These attributes are also contained on the inside cover of each current document, for reference. For migration of documents from the and RPA to the new system, each current document was assigned with new outer front and rear covers. Apart from the covers, and inside cover pages, the documents contain the same information as previously within the or RPA systems, including historical references such as those contained within and MCDRW. Attributes TII Publication Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) TII Publication GE-CON Number Activity General (GE) Set Standards Stream Contents (CON) Publication Date June 2015 Number Historical GD 02 and MCDRW s For all documents that existed within the or the MCDRW prior to the launch of TII Publications, the document reference used previously is listed above under historical reference. The TII Publication Number also shown above now supersedes this historical reference. All historical references within this document are deemed to be replaced by the TII Publication Number. For the equivalent TII Publication Number for all other historical references contained within this document, please refer to the TII Publications website.

3 Volume 0 Section 1 1 GD 02/15 Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges (including Erratum No. 1) June 2015 St. Martin s House, Waterloo Road, Dublin 4 Tel: Fax info@nra.ie Web:

4 Summary: This document provides a list, volume by volume, of the current documents of the Design Manual for Roads and Bridges. It also provides an index in alpha-numeric order. This document is updated regularly and may be used as a check of the current status of the and the implementation documents. Recent changes are listed on Pages 24 to 27. Published by National Roads Authority, Dublin, 2015

5 National Roads Authority Design Manual for Roads and Bridges ( ) Erratum No. 1 to Design Manual for Roads and Bridges Volume 0 Section 1 1 GD 02 - Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges The Design Manual for Roads and Bridges ( ) GD 02 is amended as follows: - 1. Throughout document Issue date for TD 19 changed from June 2015 to June Throughout document for BD 89 changed from to Throughout document Issue date changed from June 2015 to March Throughout document Issue date for TD 27 changed from June 2015 to April 2014 June

6 DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 0 INTRODUCTION AND GENERAL REQUIREMENTS SECTION 1 INDEX AND INTRODUCTION PART 1 GD 02/15 VOLUME CONTENTS AND ALPHA- NUMERIC INDEX TO THE DESIGN MANUAL FOR ROADS AND BRIDGES Contents Erratum No Volume Contents Pages 2. Alpha-Numeric Index 3. Enquiries June 2015

7 1. CONTENTS s Available for Use in Ireland 1.1 The has been prepared specifically for the design, construction and management of National Roads in Ireland. GD 02 provides the volume contents and alpha-numeric index to the Design Manual for Roads and Bridges: it should be read in conjunction with GD 01: Introduction to the Design Manual for Roads and Bridges. 1.2 The contains a mix of Standards and Advice Notes. Standards are designated by the letters BD, BE, GD, HD, SH or TD and Advice Notes by the letters BA, HA and TA. 1.3 The Standards and Advice Notes of Volumes 0 to 9 of the are listed in the tables in section one. These tables provide the reference (Volume, Section, ), the full title and the date of publication of each document. The tables in section 2 provide a full alpha numeric listing of all the documents in alphabetical order. Historical Note The was originally based largely on the UK Design Manual for Roads and Bridges when it was first published, with appropriate adaptations for use in Ireland. Since that time, the has gradually developed more and more stand-alone documentation that is fully independent of the UK. For reasons of scale, economy, necessity and priority, the objective to develop a Manual that stands fully independent of the UK has not yet been achieved. As a result, certain documentation included as Addenda and those documents included for background reading continue to rely wholly or partly on their UK equivalent. The following points should be noted: 1. All references to the UK Standards and Advice Notes shall be read as references to the documents as implemented in accordance with the relevant. 2. Volumes 10 to 15 of the UK are not implemented for use in Ireland although some elements may be cross referenced by the Environmental Assessment and Construction Guidelines and by the Project Appraisal Guidelines. 3. UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these documents must make due allowance for any differences from UK circumstances. 4. Some UK Standards and Advice Notes are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in the Tables 0a to 9a. They should, accordingly, not be referred to. 5. In some cases the continues to reference parts of the UK that have been superseded or withdrawn from the UK. The relevant UK document date of these parts is highlighted by the use of an 'antique text' style. June

8 VOLUME 0: INTRODUCTION and GENERAL REQUIREMENTS Standard or Advice Note Standard Number Section 1: Index and Introduction GD 02 Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges GD 01* Introduction to the Design Manual for Roads and Bridges June 2015 December 2013 Section 3: General Procedures GD 100 Departures from Standards and Specification (including Erratum No 1, dated June 2013) March GD 101 Preparation & Delivery Requirements for As-Built Records March GD 102 Approval and Sign-off Requirements for Design ation on National Road Schemes December 2013 Table 0: Standards and Advice Notes for Use in Ireland June

9 VOLUME 1: HIGHWAY STRUCTURES: APPROVAL PROCEDURES AND GENERAL DESIGN Number Section 1: Approval Procedures Standard or Advice Note 1.1.1A BD 2* Technical Approval of Road Structures on Motorways and Other National Roads Section 2: Other Procedural s BD 95* Treatment of Existing Structures on Highway Widening Schemes. Section 3: General Design BD 60* Use of I.S. EN for the Design of Accidental Actions or Standard January 2009 December 2014 December 2010 UK BA 59 Design of Highway Bridges for Hydraulic Action - May BD 57* Design for Durability December BA 41 The Design and Appearance of Bridges - February BD 84 Strengthening of Concrete Bridge Supports Using Fibre Reinforced Polymers December 2002 N/A N/A N/A N/A August BD 90 Design of FRP Bridges and Highways Structures - May BD 85 Strengthened Highway Structures Using Externally Bonded Fibre Reinforced Polymer - November 2008 Table 1: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

10 VOLUME 2: HIGHWAY STRUCTURES: DESIGN (SUBSTRUCTURES AND SPECIAL STRUCTURES) MATERIALS Number Standard or Advice Note or Standard Section 2: Special Structures BD 94* Design of Minor Structures December BD 51* Design Criteria for Portal and Cantilever Sign/Signal Gantries December 2014 UK BD 65 Design Criteria for Collision Protection Beams - February BD 12 Design of Corrugated Steel Buried Structures with Spans Greater Than 0.9 Metres and up to 8 Metres [and Correction, February 2002] December BD 67 Enclosure of Bridges December 2000 N/A N/A November 2001 August BA 67 Enclosure of Bridges - August BD 29 Design Criteria for Footbridges July 2004 August A TD 19* Safety Barriers (including Amendment No. 2) June N/A BD 78 Design of Road Tunnels December BD 82 Design of Buried Rigid Pipes December 2000 August 1999 August BD 91 Unreinforced Masonry Arch Bridges - November 2004 Section 3: Materials and Components BD 20 Bridge Bearings. Use of BS 5400: 9: 1983 December 2000 October BD 52* The Design of Road Bridge Parapets March 2013 N/A BD 47 Waterproofing and Surfacing of Concrete Bridge Decks December 2000 August BA 47 Waterproofing and Surfacing of Concrete Bridge Decks - August BD 33 Expansion Joints for Use in Highway Bridge Decks December 2000 Table 2: Standards and Advice Notes Available for Use in Ireland November 1994 Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 1 Amended as per Erratum No.1, Item 1 June

11 Number Standard or Advice Note or Standard UK BA 26 Expansion Joints for Use in Highway Bridge Decks - November BA 36 The Use of Permanent Formwork - February BD 7 Weathering Steel for Highway Structures December 2002 November 2001 Section 4: Paints and Other Protective Coatings BD 35* Quality Assurance Scheme for Paints and Similar Protective Coatings [and Errata Sheet, February 2000] June BD 43 Criteria and Materials for the Impregnation of Concrete Highway Structures [Note: BD43/90 has been superseded in the UK by BD 43/03, but BD 43/90 is still valid in Ireland.] December 2000 April BA 85 Coatings for Concrete Highway Structures and Ancillary Structures - May 2004 Table 2 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

12 VOLUME 3: HIGHWAY STRUCTURES: INSPECTION AND MAINTENANCE Number Section 1: Inspection Standard or Advice Note or Standard UK BD 54* Management of Post Tensioned Concrete Bridges June BA 50* Post-tensioned Concrete Bridges - Planning, Organisation June and Methods for Carrying Out Special Inspections BA 93* Structural Assessment of Bridges with Deck Hinges June BA 86* Advice Notes on the Non-destructive Testing of Road Structures Section 2: Maintenance June BD 87* Maintenance Painting of Steelwork June BD 89 The Conservation of Road Structures June Section 3: Repair BA 43* Strengthening, Repair and Monitoring of Post-tensioned Concrete Bridge Decks June BD 27 Materials for the Repair of Concrete Highway Structures - November BA 35* Inspection and Repair of Concrete Road Structures June BA 83* Cathodic Protection for Use in Reinforced Concrete Road Structures June BA 87* Management of Corrugated Steel Buried Structures June BA 88* Management of Buried Concrete Box Structures June Table 3: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 2 Amended as per Erratum No. 1, Item 2 June

13 Number Section 4: Assessment Standard or Advice Note BD 21* The Assessment of Road Bridges and Structures (including Erratum No. 1, dated December 2014) BA 16* The Assessment of Road Bridges and Structures BA 38* Assessment of the Fatigue Life of Corroded or Damaged Reinforcing Bars BA 39* Assessment of Reinforced Concrete Half-joints BD 48* The Assessment and Strengthening of Road Bridge Supports BA 54* Load Testing for Bridge Assessment BA 55* The Assessment of Bridge Substructures and Foundations, Retaining Walls and Buried Structures BA 52* The Assessment of Concrete Road Structures Affected by Alkali Silica Reaction BD 56* The Assessment of Steel Road Bridges and Structures BA 51* The Assessment of Concrete Structures Affected by Steel Corrosion BD 44* The Assessment of Concrete Road Bridges and Structures BA 44* The Assessment of Concrete Road Bridges and Structures BD 61* The Assessment of Composite Road Bridges and Structures BD 79* The Management of Sub-standard Road Structures BD 81* BD 101* BD 86* Use of Compressive Membrane Action in Bridge Decks Structural Review and Assessment of Road Structures The Assessment of Road Bridges and Structures for the Effects of Abnormal and Exceptional Abnormal Load Vehicles using SV and SOV Load Models or Standard UK June June June June June June June June June June June June June June June 2014 June 2014 March Table 3 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

14 Number Standard or Advice Note Section 5: Standards and Advice Notes superseded by Eurocodes but required for Assessment or Standard UK BA 9* The use of BS : 1980 code of practice for fatigue BD 9* The use of BS : 1980 code of practice for fatigue June June BD 13* Design of steel bridges. Use of BS :2000 June BD 15* General Principles for the Design and Construction of Bridges: Use of BS 5400 : 1 : 1988 June BD 16* Design of composite bridges. Use of BS 5400: 5: 1979 June BD 24* The design of concrete highway bridges and structures. Use of BS 5400: 4: BD 28* Early Thermal Cracking of Concrete [and Amendment No. 1, 1989] BD 31* The design of buried concrete box and portal frame structures June June June BD 37* Loads for highway bridges June BA 42* The Design of Integral Bridges June BD 49* Design Rules for Aerodynamic Effects on Bridges June BA 58* The Design of Concrete Highway Bridges and Structures with External and Unbonded Prestressing BD 58* The Design of Concrete Highway Bridges and Structures with External and Unbonded Prestressing June June BD 74* Foundations June BA 19* The Use of BS 5400: 3: 1982 December BA 24* Early Thermal Cracking of Concrete December Table 3 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

15 VOLUME 4: Number Section 1: Geotechnical GEOTECHNICS AND DRAINAGE Standard or Advice Note HA 44 Earthworks: Design and Preparation of Contract s [and Amendment No. 1, April 1995] or Standard UK - June HA 48 Maintenance of Highway Earthworks and Drainage [Note: HA 48/93 has now been replaced in the UK by HD 41/03 (Maintenance of Highway Geotechnical Assets), but HA 48/93 is still valid in Ireland.] HA 68 Design Methods for the Reinforcement of Highway Slopes by Reinforced Soil and Soil Nailing Techniques - April February HA 70 Construction of Highway Earthworks - December HA 74 Treatment of Fill and Capping Materials Using Either Lime or Cement or Both HA 73 Site Investigation for Highway Works on Contaminated Land 4.1 HA 43 Geotechnical Considerations and Techniques for Widening Highway Earthworks - November May February HA 120 Guidance on Trenchless Installation of Services - August 2008 Section 2: Drainage HA 71 The Effects of Highway Construction on Flood Plains [and Amendment No. 1, August 1998] HD 78* Design of Outlets for Surface Water Channels (including Amendment No. 1) - May 1995 March HD 139* Edge of Pavement Details (including Amendment No. 1) March HD 103* Vegetated Drainage Systems for Road Runoff (including Amendment No. 1) HD 106* Drainage of Runoff from Natural Catchments (including Amendment No. 1) HD 45* Road Drainage and the Water Environment (including Amendment No. 1) March March March TA 80 Surface Drainage of Wide Carriageways - February HA 33 Design of Earthworks Drainage, Network Drainage, Attenuation & Pollution Control March HD 33* Drainage Systems for National Roads (including Amendment No. 1) March Table 4: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 3 Amended as per Erratum No. 1, Item 3 June

16 Number Standard or Advice Note or Standard UK Section 2: Drainage (continued) HD 102* Spacing of Road Gullies (including Amendment No. 1) March HA 105 Sumpless Gullies - February HA 79 Edge of Pavement Details for Porous Asphalt Surface Courses HA 219 Determination of Pipe Roughness and Assessment of Sediment Deposition to Aid Pipe Design HD 137* Hydraulic Design of Road-Edge Surface Water Channels (including Amendment No. 1) - February November 2009 March HA 41 A Permeameter for Road Drainage Layers - April HD 83* Safety Aspect of Road Edge Drainage Features (including Amendment No. 1) HD 140* Determination of Pipe and Bedding Combinations for Drainage Works (including Amendment No. 1) HA 104 Chamber Tops and Gully Tops for Road Drainage and Services: Installation and Maintenance HA 113 Combined Channel and Pipe System for Surface Water Drainage March March November February HD 107* Design of Outfall and Culvert Details (including Amendment No. 1) March HD 118* Design of Soakaways (including Amendment No. 1) March HD 119* Grassed Surface Water Channels for Road Runoff (including Amendment No. 1) March Table 4 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 4 Amended as per Erratum No. 1, Item 3 June

17 UK Standard or Advice Note Number Section 1: Earthworks HD 22 Managing Geotechnical Risk HD 41 Maintenance of Highway Geotechnical Assets SH 7 Specification for Road and Bridge Works: Soil Suitability for Earthworking- Use of the Moisture Condition Apparatus Section 2: Drainage HD 43 Drainage Data Management System for Highways Agency HA 217 Alternative Filter Media and Stabilisation Techniques for Combined Surface and Sub-Surface Drains Table 4a: UK Standards and Advice Notes Not Applicable in Ireland June

18 VOLUME 5: ASSESSMENT AND PREPARATION OF ROAD SCHEMES Number Standard or Advice Note UK Section 1: Assessment of Road Schemes TA 44 Capacities, Queues, Delays and Accidents at Road Junctions Computer Programs ARCADY/3 and PICADY/3 (TRRL). (5.1.2) * National Roads Project Management Guidelines* dated January 2010 (available from ) TA 46 Traffic Flow Ranges for Use in the Assessment of New Rural Road Standards TA 79 Traffic Capacity of Urban Roads [and Amendment No. 1, May 1999] - July N/A - February May TA 11 Traffic Surveys by Roadside Interview - November TA 22 Vehicle Speed Measurement on All-Purpose Roads - November TA 30 Choice Between Options for Trunk Road Schemes - July 1982 Section 2: Preparation and Implementation HA 46 Quality Assurance for Highway Design - June HD 15* Network Safety Ranking December HD 17* Road Safety Inspection December HD 16* Temporary Safety Measures Inspection Guidelines December HA 17* Road Safety Inspection Guidelines December 2014 N/A N/A N/A N/A HD 18* Road Safety Impact Assessment June 2012 N/A HD 19* Road Safety Audit March 2015 N/A HA 19 Road Safety Audit Guidelines March 2015 N/A Table 5: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

19 Number Standard or Advice Note UK 5.2 HA 13 The Planting of Trees and Shrubs - February TA 91 Provision for Non-Motorised Users - February 2005 Table 5 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. Number Section 1: Assessment of Road Schemes UK Standard or Advice Note TD 37 Scheme Assessment Reporting SH 1 The Traffic and Economic Assessment of Road Schemes in Scotland 5.1 TD 11 Use of Certain Departmental Standards in the Design and Assessment of Trunk Road Schemes 5.1 SH 4 Lane Rental Section 2: Preparation and Implementation HD 42 Non-Motorised User Audits Table 5a: UK Standards and Advice Notes Not Applicable in Ireland June

20 VOLUME 6: ROAD GEOMETRY Number Standard or Advice Note or Standard UK Section 1: Links TD 9* Road Link Design February 2012 N/A 6.1.1B TD 10* Road Link Design for Type 2 and Type 3 Dual Carriageways TD 27* Cross Sections and Headroom (including Amendment No.2) TA 85* Guidance on Minor Improvements to National Roads (including Erratum No. 1, dated April 2013 and Erratum No. 2, dated June 2013) Section 2: Junctions December 2007 April March 2013 N/A N/A N/A TD 22 Layout of Grade Separated Junctions January 2009 February TD 54 Design of Mini Roundabouts - August TD 16 Geometric Design of Roundabouts January 2009 August TA 78 Design of Road Markings at Roundabouts - November TD 50 The Geometric Layout of Signal-Controlled Junctions and Signalised Roundabouts January 2005 November TD 39 The Design of Major Interchanges December TD 40 Layout of Compact Grade Separated Junctions January 2009 April 1994 July TD Geometric Design of Major/Minor Priority Junctions and Vehicular Access to National Roads November 2011 N/A TA 86 Layout of Large Signal Controlled Junctions - February TA 23 Junctions and Accesses: Determination of Size of Roundabouts and Major/Minor Junctions - December 1981 Section 3: Highway Features TD 36 Subways for Pedestrians and Pedal Cyclists. Layout and Dimensions December 2000 July 1993 Table 6: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 5 Amended as per Erratum No. 1, Item 4 June

21 Number Standard or Advice Note or Standard UK TA 66 Police Observation Platforms on Motorways December TD 69* The Location and Layout of Lay-bys and Location Markers December 2010 January TA 70 The Location and Layout of Online Service Areas June 2013 N/A 6.3 TA 57 Roadside Features - January TA 81 Coloured Surfacing of Road Layouts - February TD 51 Segregated Left Turn Lanes and Subsidiary Deflection Islands at Roundabouts (6.3.5) * Guidelines on Traffic Calming in Towns and Villages on National Routes* dated February 2005 (Available from ) July 2004 N/A November N/A TD 300* Rural Cycle Scheme Design (including Amendment No. 1, dated December 2014) April 2014 N/A Table 6 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. Section 1: Links Number UK Standard or Advice Note TD 70 Design of Wide Single 2+1 Roads Section 2 Junctions TD 42 Geometric Design of Major/Minor Priority Junction TD 41 Vehicular Access to All Purpose Trunk Roads Section 3: Highway Features TA 87 Trunk Road Traffic Calming TA 90 The Geometric Design of Pedestrian, Cycle and Equestrian Routes TA 98 The Layout of Toll Plazas Table 6a: UK Standards and Advice Notes Not Applicable in Ireland June

22 VOLUME 7: PAVEMENT DESIGN AND MAINTENANCE Number Standard or Advice Note or Standard UK Section 1: Preamble HD 23* Use of Volume 7 March Section 2: Pavement Design and Construction HD 24 Traffic Assessment (and Amendment No. 1, July 2011) December A HD Pavement & Foundation Design December 2010 February 2006 N/A HD 39 Footway Design Jan 2005 May HD 300 Design of Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes (including Amendment No. 1) March Section 3: Pavement Maintenance Assessment and Renewal HD 28* Management of Skid Resistance November 2011 N/A HD 30* Pavement Asset Repair and Renewal - Scheme Approval Procedure (including Erratum No. 1) HD 31* Pavement Assessment, Repair and Renewal Principles (including Erratum No. 1) Section 5: Surfacing and Surfacing Materials HD 36* Surfacing Materials for New and Maintenance Construction, for Use in Ireland (including Amendment No.1) HD 37 Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes March March March June Section 6: Product Approval HD 301 Approval of Specific Products June Table 7: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. 6 Amended as per Erratum No. 1, Item 3 June

23 Number Section 2: Pavement Design and Construction HD 25 Foundations HD 26 Pavement Design Section 3: Pavement Maintenance Assessment HD 28 Skidding Resistance UK Standard or Advice Note HD 29 Data for Pavement Assessment Section 4: Pavement Maintenance Methods HD 32 Maintenance of Concrete Roads SH 4 Scottish Routine Maintenance Management System HD 40 Footway Maintenance Table 7a: UK Standards and Advice Notes Not Applicable in Ireland June

24 VOLUME 8: TRAFFIC SIGNS AND LIGHTING Number Standard or Advice Note Section 1: Traffic Signals and Control Equipment or Standard TD 35 MOVA System of Traffic Control at Signals December 2000 UK August TA 12 Traffic Signals on High Speed Roads - May TA 15 Pedestrian Facilities at Traffic Signal Installations - May TA 16 General Principles of Control by Traffic Signals - May TD 24 All Purpose Trunk Roads: Inspection and Maintenance of Traffic Signals and Associated Equipment 8.1 TA 82 The Installation of Traffic Signals and Associated Equipment TA 84 Code of Practice for Traffic Control and Information Systems for All-Purpose Roads Section 2: Traffic Signs and Road Markings TA 58 Traffic Signs and Road Markings for Lane Gains and Lane Drops on All Purpose Dual Carriageway and Motorway Trunk Roads - August May May June TA 19 Reflectorisation of Traffic Signs - September TD 25 Inspection and Maintenance of Traffic Signs on Motorway and All-Purpose Trunk Roads [and Correction, August 2003] 8.2 TD 26 Trunk Roads and Trunk Road Motorways: Maintenance of Road Markings 8.2 TD 33 The Use of Variable Message Signs on All Purpose and Motorway Trunk Roads - February March 1986 December 2000 September TA 56 Hazardous Cattle Crossings: Use of Flashing Amber Lamps - September TA 60 The Use of Variable Message Signs on All Purpose and Motorway Trunk Roads - August TD 89 Use of Passively Safe Signposts, Lighting Columns and Traffic Signal Posts to BS EN 12767: May 2008 Table 8: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

25 Section 3: Lighting Number Standard or Advice Note 8.3 TD 23 Trunk Roads and Trunk Road Motorways: Inspection and Maintenance of Road Lighting 8.3 TA 49 Appraisal of New and Replacement Lighting on Trunk Roads and Trunk Road Motorways [and Amendment No. 3 dated July 1990] 8.3 TD 34 Design of Road Lighting for the Strategic Motorway and All Purpose Trunk Road Network Section 4: Traffic Management at Roadworks TA 64 Narrow Lane and Tidal Flow Operations at Roads Works on Motorways and Dual Carriageway Trunk Roads with Full Width Hard Shoulders or Standard UK - November August 2007 February 2012 August April TA 92 Crossover and Changeover Design - November TD 49 Requirements for Lorry Mounted Crash Cushions - November 2007 Section 5: Pedestrian Crossings TA 68 The Assessment and Design of Pedestrian Crossings - November 1996 Table 8 Continued: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. June

26 Number Section 1: Traffic Signals and Control Equipment UK Standard or Advice Note TD 7 Statutory Approval of Traffic Control Equipment SH 6 Criteria for Traffic Light Signals at Junctions Section 2: Traffic Signs and Road Markings TA 61 Currency of the Traffic Signs Manual TA 93 Traffic Signs to Tourist Attractions in England: Guidance for Tourist Signing General Introduction TD 52 Traffic Signs to Tourist Attractions in England: Tourist Signing Trunk Roads TA 94 Traffic Signs to Tourist Attractions in England: Guidance for Tourist Signing Local Roads TD 53 Traffic Signs to Retail Destinations and Exhibition Centres in England & Wales Trunk Roads Table 8a: UK Standards and Advice Notes Not Applicable in Ireland June

27 VOLUME 9: NETWORK TRAFFIC CONTROL AND COMMUNICATIONS Number Standard or Advice Note Section 3: Traffic Control and Surveillance Standards of Provision or Standard HD 20* Loop Detectors for Motorways October 2013 UK TA 71 Motorways. Overview - February 1997 Section 5: Infrastructure Design TA 77 Traffic Control and Communications Infrastructure Design October 2013 Table 9: Standards and Advice Notes Available for Use in Ireland Note: UK Standards and Advice Notes indicated in italics are not formally implemented by the but should be considered as background reading indicating good practice. N/A - June

28 Number Section 1: Communications Standards of Provision TD 46 Motorway Signalling UK Standard or Advice Note TD 45 Motorway Incident Detection and Automatic Signalling (MIDAS) TD 18 Criteria for the Use of Gantries for Traffic Signs and Matrix Traffic Signals on Trunk Roads and Trunk Road Motorways Section 2: Communications Design Guide TA 70 Motorways. Introduction Section 3: Traffic Control and Surveillance Standards of Provision TD 17 Criteria for the Provision of Closed Circuit Television on Motorways HD 20 Loop Detectors for Motorways Section 4: Systems Design TA 72 National Motorway Communications Systems (NMCS) TA 73 Motorway Emergency Telephones TA 74 Motorway Signalling TA 75 Motorway Transmission Design TA 76 Motorway Control Offices TA 83 Guide to the Use of Variable Message Signs for Strategic Traffic Management on Trunk Roads and Trunk Road Motorways Section 5: Infrastructure Design TA 77 Motorways Table 9a: UK Standards and Advice Notes Not Applicable in Ireland June

29 2. ALPHA-NUMERIC INDEX This Index lists, in alpha-numeric order, the documents in the as implemented in Ireland, together with their references and date of issue. All information is current at the date of publication of this document. Series The following series of Standards and Advice Notes are listed: BA Advice Notes Bridges and Structures BD Standards Bridges and Structures BE Technical Memorandum - Bridges GD Standards - General Requirements HA Advice Notes Roads HD Standards Roads TA Advice Notes Traffic Engineering and Control TD Standards Traffic Engineering and Control - Introductions to Volumes Notes: 1. This index lists documents relating to the UK which have been adopted for use in Ireland. With the exception of those Standards and Advice Notes which are for background reading only, UK documents which have not been implemented in Ireland are not listed. 2. Standards and Advice Notes which have been prepared by the National Roads Authority to replace the equivalent UK documents are prefixed with and shown with an asterisk (for example, BD 2/01*). They are included in the relevant parts of the index. 3. All Standards and Advice Notes of the UK which have been adopted for use in Ireland have a corresponding which describes particular requirements of the National Roads Authority. The date of the current is given for each document. 4. The UK number is given for each document to assist in locating it within the manual. These numbers are in the form Volume.Section. (e.g ). However, documents issued before the compilation of the UK in 1992 (and some later ones) do not have numbers; they are identified by Volume and Section and are generally placed at the end of the relevant Section. Also, in some instances several documents have the same number. 5. The documents listed in Tables 1 and 3 have been published since the issue of the previous edition of the Alpha-Numeric Index. 6. Lists of the documents withdrawn since the previous edition of the Alpha-Numeric Index are included in Tables 2 and 4. These documents have been archived as appropriate. June

30 Number Date of Issue Table 1: UK s Introduced into the Since May 2015 Notes: 1. s as listed in italics are to be considered as providing background reading indicating good practice. In some case this may be an interim status pending ongoing review prior to formal implementation. June

31 Number Date of Issue Table 2: Previously referenced UK s Withdrawn from the Since May 2015 June

32 Number Date of Issue GD Volume Contents and Alpha Numeric Index to the Design Manual for Roads and Bridges June 2015 TD Safety Barriers (including Amendment No. 2) June BD The Conservation of Road Structures June 2015 HD Road Drainage and the Water Environment (including Amendment No. 1) HD Design of Outlets for surface Water Channels (including Amendment No. 1) HD 103 HD 106 HD Vegetated Drainage Systems for Road Runoff (including Amendment No. 1) Drainage of Runoff from Natural Catchments (including Amendment No. 1) March March March March Edge of Pavement Details (including Amendment No. 1) March HD Drainage Systems for National Roads (including Amendment No. 1) March HD Spacing of Road Gullies (including Amendment No. 1) March HD Safety Aspect of Road Edge Drainage Features (including Amendment No. 1) HD 137 HD 140 HD 107 HD 118 HD Hydraulic Design of Road-Edge Surface Water Channels (including Amendment No. 1) Determination of Pipe and Bedding Combinations for Drainage Works (including Amendment No. 1) March March March Design of Outfall and Culvert Details (including Amendment No. 1) March Design of Soakaways (including Amendment No. 1) March Grassed Surface Water Channels for Road Runoff (including Amendment No. 1) March TD Cross-sections and Headroom (including Amendment No. 2) April HD Design of Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes (including Amendment No. 1) HD Pavement Assessment Repair and Renewal Scheme Approval Procedure (including Erratum No. 1) HD Pavement Assessment, Repair and Renewal Principles (including Erratum No.1) HD Surface Materials for New and Maintenance Construction, for Use in Ireland (including Amendment No. 1) HD Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes March March March March June Amended as per Erratum No. 1, Item 1 8 Amended as per Erratum No. 1, Item 2 9 Amended as per Erratum No. 1, Item 3 10 Amended as per Erratum No. 1, Item 4 June

33 Number Date of Issue HD Approval of Specific Products June 2015 Table 3: s Issued Since May 2015 June

34 Number Date of Issue Table 4: s Withdrawn Since May 2015 June

35 Notes: ADVICE NOTES BRIDGES AND STRUCTURES (BA SERIES) 1. Equivalent Advice Notes are indicated by *. 2. UK Advice Notes indicated in italics are not formally implemented by the but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these documents must make due allowance for any differences from UK circumstances. Some UK Advice Notes are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in Chapter 1 of this volume. They should, accordingly, not be referred to. Date of Issue BA 9* BA 16* The use of BS : 1980 code of practice for fatigue The Assessment of Road Bridges and Structures. BA 19* The Use of BS 5400: 3: 1982 December 2014 BA 24* Early Thermal Cracking of Concrete December 2014 BA 26 BA 35* Expansion Joints for Use in Highway Bridge Decks Inspection and Repair of Concrete Road Structures June June November 1994 BA 36 The Use of Permanent Formwork February 1991 BA 38* BA 39* Assessment of the Fatigue Life of Corroded or Damaged Reinforcing Bars Assessment of Reinforced Concrete Halfjoints BA 41 The Design and Appearance of Bridges February 1998 June June June Continued: June

36 ADVICE NOTES BRIDGES AND STRUCTURES (BA SERIES) (Continued) Date of Issue BA 42* The Design of Integral Bridges June BA 43* BA 44* BA 47 BA 50* BA 51* BA 52* Strengthening, Repair and Monitoring of Post-tensioned Concrete Bridge Decks The Assessment of Concrete Road Bridges and Structures Waterproofing and Surfacing of Concrete Bridge Decks Post-tensioned Concrete Bridges - Planning, Organisation and Methods for Carrying Out Special Inspections The Assessment of Concrete Structures Affected by Steel Corrosion The Assessment of Concrete Road Structures Affected by Alkali Silica Reaction June June August June June June BA 54* Load Testing for Bridge Assessment June BA 55* BA 58* BA 59 The Assessment of Bridge Substructures and Foundations, Retaining Walls and Buried Structures The Design of Concrete Highway Bridges and Structures with External and Unbonded Prestressing Design of Highway Bridges for Hydraulic Action June June May BA 67 Enclosure of Bridges August BA 83* Cathodic Protection for Use in Reinforced Concrete Road Structures June Continued: June

37 ADVICE NOTES BRIDGES AND STRUCTURES (BA SERIES) (Continued) Date of Issue BA 85 BA 86* BA 87* Coatings for Concrete Highway Structures and Ancillary Structures Advice Notes on the Non-destructive Testing of Road Structures Management of Corrugated Steel Buried Structures BA 88* Management of Buried Concrete Box Structures BA 93* Structural Assessment of Bridges with Deck Hinges May June June June June June

38 Notes: STANDARDS BRIDGES AND STRUCTURES (BD SERIES) 1. Equivalent Standards are indicated by *. Other Standards are UK Standards which are to be used in conjunction with the relevant Addenda. 2. UK Standards shown in italics have not been implemented for use in Ireland but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these Standards must make due allowance for any differences from UK practice. Some UK Standards are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in Chapter 1 of this volume. They should, accordingly, not be referred to. Date of Issue BD 2* Technical Approval of Road Structures on Motorways and Other National Roads January 2009 BD 7 Weathering Steel for Highway Structures November 2001 BD 9* BD 12 The use of BS : 1980 code of practice for fatigue Design of Corrugated Steel Buried Structures with Spans Greater Than 0.9 Metres and up to 8 Metres [and Correction, February 2002] BD 13* Design of steel bridges. Use of BS :2000 BD 15* BD 16* General Principles for the Design and Construction of Bridges: Use of BS 5400 : 1 : 1988 Design of composite bridges. Use of BS 5400: 5: 1979 BD 20 Bridge Bearings. Use of BS 5400: 9: 1983 BD 21* BD 24* BD 27 The Assessment of Road Bridges and Structures (including Erratum No. 1, dated December 2014) The design of concrete highway bridges and structures. Use of BS 5400: 4: 1990 Materials for the Repair of Concrete Highway Structures 1.1.1A December 2002 June November December 2002 June June June October December 2000 June June November Continued: June

39 STANDARDS BRIDGES AND STRUCTURES (BD SERIES) (Continued) Date of Issue BD 28* Early Thermal Cracking of Concrete [and Amendment No. 1, 1989] June BD 29 Design Criteria for Footbridges August July 2004 BD 31* BD 33 BD 35* The design of buried concrete box and portal frame structures Expansion Joints for Use in Highway Bridge Decks Quality Assurance Scheme for Paints and Similar Protective Coatings June November December 2000 June BD 37* Loads for highway bridges June BD 43 BD 44* BD 47 BD 48* BD 49* BD 51* Criteria and Materials for the Impregnation of Concrete Highway Structures The Assessment of Concrete Road Bridges and Structures Waterproofing and Surfacing of Concrete Bridge Decks The Assessment and Strengthening of Road Bridge Supports Design Rules for Aerodynamic Effects on Bridges Design Criteria for Portal and Cantilever Sign/Signal Gantries April December 2000 June August December 2000 June June December BD 52* The Design of Road Bridge Parapets March BD 54* Post-tensioned Concrete Bridges. Prioritisation of Special Inspections BD 56* The Assessment of Steel Road Bridges and Structures BD 57* Design for Durability December 2010 June June Continued: June

40 STANDARDS BRIDGES AND STRUCTURES (BD SERIES) (Continued) Date of Issue BD 58* BD 60* BD 61* The Design of Concrete Highway Bridges and Structures with External and Unbonded Prestressing Design of Highway Bridges for Vehicle Collision Loads The Assessment of Composite Road Bridges and Structures June December 2010 BD 65 Design Criteria for Collision Protection Beams February June BD 67 Enclosure of Bridges August December 2000 BD 74* Foundations June BD 78 Design of Road Tunnels August December 2000 BD 79* The Management of Sub-standard Road Structures BD 81* Use of Compressive Membrane Action in Bridge Decks June June BD 82 Design of Buried Rigid Pipes August December 2000 BD 84 BD 85 BD 86* Strengthening of Concrete Bridge Supports Using Fibre Reinforced Polymers Strengthened Highway Structures Using Externally Bonded Fibre Reinforced Polymer The Assessment of Road Bridges and Structures for the Effects of Abnormal and Exceptional Abnormal Load Vehicles using SV and SOV Load Models August December 2002 November 2008 March BD 87* Maintenance Painting of Steelwork June BD The Conservation of Road Structures June BD 90 Design of FRP Bridges and Highways Structures BD 91 Unreinforced Masonry Arch Bridges November 2004 BD 94* Design of Minor Structures December 2014 BD 95* BD 101* Treatment of Existing Structures on Highway Widening Schemes. Structural Review and Assessment of Road Structures May December June Amended as per Erratum No. 1, Item 2 June

41 Note: STANDARDS GENERAL REQUIREMENTS (GD SERIES) 1 Equivalent Standards are indicated by *. 2 Some UK Standards are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in the specific volumes to which they relate. They should, accordingly, not be referred to. Date of Issue GD 02 GD 01* GD 100 GD 101 Volume Contents and Alpha-Numeric Index to the Introduction to the Design Manual for Roads and Bridges Departures from Standards and Specification (including Erratum No. 1, dated June 2013) Preparation & Delivery Requirements for As-Built Records June December March March GD 102 Approval and Sign-off Requirements for Design ation on National Road Schemes December June

42 Notes: ADVICE NOTES ROADS (HA SERIES) 1. Equivalent Advice Notes are indicated by *. 2. UK Advice Notes indicated in italics are not formally implemented by the but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these documents must make due allowance for any differences from UK circumstances. Some UK Advice Notes are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in the specific volumes to which they relate. They should, accordingly, not be referred to. Date of Issue HA 13 The Planting of Trees and Shrubs February 1981 HA 17* Road Safety Inspection Guidelines December HA 19* Road Safety Audit Guidelines March HA 33 HA 37 Design of Earthworks Drainage, Network Drainage, Attenuation & Pollution Control Hydraulic Design of Road Edge Surface Water Channels March August HA 39 Edge of Pavement Details August HA 40 Determination of Pipe and Bedding Combinations for Drainage Works November HA 41 A Permeameter for Road Drainage Layers April HA 43 HA 44 Geotechnical Considerations and Techniques for Widening Highway Earthworks Earthworks: Design and Preparation of Contract s [and Amendment No. 1, April 1995] February June HA 46 Quality Assurance for Highway Design June HA 48 HA 68 Maintenance of Highway Earthworks and Drainage [Note: HA 48/93 has now been replaced in the UK by HD 41/03 (Maintenance of Highway Geotechnical Assets), but HA 48/93 is still valid in Ireland.] Design Methods for the Reinforcement of Highway Slopes by Reinforced Soil and Soil Nailing Techniques April February Continued: June

43 ADVICE NOTES ROADS (HA SERIES) (CONTINUED) Date of Issue HA 70 Construction of Highway Earthworks December 1994 HA 71 HA 73 HA 74 HA 78 HA 79 The Effects of Highway Construction on Flood Plains [and Amendment No. 1, August 1998] Site Investigation for Highway Works on Contaminated Land Treatment of Fill and Capping Materials Using Either Lime or Cement or Both Design of Outfalls for Surface Water Channels Edge of Pavement Details for Porous Asphalt Surface Courses May May November January 1996 February 1997 HA 83 Safety Aspects of Road Drainage Features November 1999 HA 102 Spacing of Road Gullies November 2000 HA 103 HA 104 Vegetative Treatment Systems for Highway Runoff Chamber Tops and Gully Tops for Road Drainage and Services: Installation and Maintenance May November 2009 HA 105 Sumpless Gullies February 2004 HA 106 Drainage Run Off from Natural Catchments February 2004 HA 113 Combined Channel and Pipe System for Surface Water Drainage February HA 118 Design of Soakaways May HA 119 Grassed Surface Water Channels May HA 120 HA 219 Guidance on Trenchless Installation of Services Determination of Pipe Roughness and Assessment of Sediment Deposition to Aid Pipe Design August November June

44 Note: STANDARDS ROADS (HD SERIES) 3 Equivalent Standards are indicated by *. Other Standards are UK Standards which are to be used in conjunction with the relevant Addenda. 4 Some UK Standards are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in the specific volumes to which they relate. They should, accordingly, not be referred to. Date of Issue HD 15* Network Safety Ranking December 2014 HD 16* Temporary Safety Measures Inspection Guidelines December 2014 HD 17* Road Safety Inspection December HD 18* Road Safety Impact Assessment June HD 19* Road Safety Audits March HD 20* Loop Detectors for Motorways October HD 23* Use of Volume 7 March HD 24 Traffic Assessment (and Amendment No. 1, July 2011) February 2006 HD Pavement and Foundation Design December 2010 HD 28* Management of Skid Resistance November 2011 HD 30* Pavement Asset Repair and Renewal - Scheme Approval Procedure (including Erratum No. 1) HD 31* HD 33* HD 36* HD 37 Pavement Assessment, Repair and Renewal Principles (including Erratum No. 1) Drainage Systems for National Roads (including Amendment No. 1) Surfacing Materials for New and Maintenance Construction, for Use in Ireland (including Amendment No. 1) Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes March March March March December A June HD 39 Footway Design May January 2005 HD 45* Road Drainage and the Water Environment (including Amendment No. 1) March Continued: 12 Amended as per Erratum No. 1, Item 3 June

45 STANDARDS ROADS (HD SERIES) (CONTINUED) HD 78* HD 83* HD 102* HD 103* HD 106* HD 107* HD 118* HD 119* HD 137* HD 139* HD 140* HD 300 Design of Outlets for Surface Water Channels (including Amendment No. 1) Safety Aspect of Road Edge Drainage Features (including Amendment No. 1) Spacing of Road Gullies (including Amendment No. 1) Vegetated Drainage Systems for Road Runoff (including Amendment No. 1) Drainage of Runoff from Natural Catchments (including Amendment No. 1) Design of Outfall and Culvert Details (including Amendment No. 1) Design of Soakaways (including Amendment No. 1) Grassed Surface Water Channels for Road Runoff (including Amendment No. 1) Hydraulic Design of Road-Edge Surface Water Channels (including Amendment No. 1) Edge of Pavement Details (including Amendment No. 1) Determination of Pipe and Bedding Combinations for Drainage Works (including Amendment No. 1) Design of Bituminous Mixtures, Surface Treatments, and Miscellaneous Products and Processes (including Amendment No. 1) Date of Issue March March March March March March March March March March March March HD 301 Approval of Specific Products June Amended as per Erratum No. 1, item 3 June

46 Notes: ADVICE NOTES TRAFFIC ENGINEERING AND CONTROL (TA SERIES) 1 Equivalent Advice Notes are indicated by *. 2 UK Advice Notes indicated in italics are not formally implemented by the but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these documents must make due allowance for any differences from UK circumstances. Some UK Advice Notes are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in the specific volumes to which they relate. They should, accordingly, not be referred to. Date of Issue TA 11 Traffic Surveys by Roadside Interview November TA 12 Traffic Signals on High Speed Roads May TA 15 TA 16 Pedestrian Facilities at Traffic Signal Installations General Principles of Control by Traffic Signals TA 19 Reflectorisation of Traffic Signs September 1981 TA 22 TA 23 TA 30 TA 44 TA 46 TA 49 Vehicle Speed Measurement on All-Purpose Roads Junctions and Accesses: Determination of Size of Roundabouts and Major/Minor Junctions Choice Between Options for Trunk Road Schemes Capacities, Queues, Delays and Accidents at Road Junctions Computer Programs ARCADY/3 and PICADY/3 (TRRL) Traffic Flow Ranges for Use in the Assessment of New Rural Road Standards Appraisal of New and Replacement Lighting on Trunk Roads and Trunk Road Motorways [and Amendment No. 3 dated July 1990] May May November 1981 December July July February August Continued: June

47 ADVICE NOTES TRAFFIC ENGINEERING AND CONTROL (TA SERIES) (CONTINUED) Date of Issue TA 56 Hazardous Cattle Crossings: Use of Flashing Amber Lamps September TA 57 Roadside Features January TA 58 TA 60 TA 64 Traffic Signs and Road Markings for Lane Gains and Lane Drops on All Purpose Dual Carriageway and Motorway Trunk Roads The Use of Variable Message Signs on All Purpose and Motorway Trunk Roads Narrow Lane and Tidal Flow Operations at Roads Works on Motorways and Dual Carriageway Trunk Roads with Full Width Hard Shoulders June August April TA 66 Police Observation Platforms on Motorways January December 2002 TA 68 The Assessment and Design of Pedestrian Crossings November TA 70 The Location and Layout of Online Service Areas June TA 71 Motorways. Overview February TA 77* Traffic Control and Communication Infrastructure Design October TA 78 Design of Road Markings at Roundabouts November TA 79 Traffic Capacity of Urban Roads [and Amendment No. 1, May 1999] May TA 80 Surface Drainage of Wide Carriageways February 1999 TA 81 Coloured Surfacing of Road Layouts February TA 82 TA 84 The Installation of Traffic Signals and Associated Equipment Code of Practice for Traffic Control and Information Systems for All-Purpose Roads May May TA 85* Guidance on Minor Improvements to March National Roads (including Erratum No. 1, dated April 2013 and Erratum No. 2, dated June 2013) TA 86 Layout of Large Signal Controlled Junctions February Continued: June

48 ADVICE NOTES TRAFFIC ENGINEERING AND CONTROL (TA SERIES) (CONTINUED) Date of Issue TA 87 Trunk Road Traffic Calming February 2004 TA 90 The Geometric Design of Pedestrian, Cycle and Equestrian Routes February 2005 TA 91 Provision for Non-Motorised Users February 2005 TA 92 Crossover and Changeover Design November June

49 STANDARDS TRAFFIC ENGINEERING AND CONTROL (TD SERIES) Notes: 1 Equivalent Standards are indicated by *. Other Standards are UK Standards which are to be used in conjunction with the relevant Addenda. 2 UK Standards shown in italics have not been implemented for use in Ireland but should be considered as 'background reading' indicating good practice for the activity, or materials, under consideration. Users of these Standards must make due allowance for any differences from UK practice. Some UK Standards are specifically excluded from the. These are considered as conflicting with current practice in Ireland (or be of no relevance) and are listed in Chapter 1 of this volume. They should, accordingly, not be referred to. Date of Issue TD 9* Road Link Design February 2012 TD 10* Road Link Design for Type 2 and Type 3 Dual Carriageways December B - TD 16 Geometric Design of Roundabouts August January 2009 TD 19* Safety Barriers (including Amendment No.2) June A - TD 22 Layout of Grade Separated Junctions February 2006 TD 23 TD 24 TD 25 TD 26 TD 27* TD 33 TD 34 Trunk Roads and Trunk Road Motorways: Inspection and Maintenance of Road Lighting All Purpose Trunk Roads: Inspection and Maintenance of Traffic Signals and Associated Equipment Inspection and Maintenance of Traffic Signs on Motorway and All-Purpose Trunk Roads [and Correction, August 2003] Trunk Roads and Trunk Road Motorways: Maintenance of Road Markings Cross Sections and Headroom (including Amendment No. 2) The Use of Variable Message Signs on All Purpose and Motorway Trunk Roads Design of Road Lighting for the Strategic Motorway and All Purpose Trunk Road Network November January August February March April September December 2000 August February 2012 TD 35 MOVA System of Traffic Control at Signals August December 2000 TD 36 Subways for Pedestrians and Pedal Cyclists. Layout and Dimensions July December 2000 Continued: 14 Amended as per Erratum No. 1, Item 1 15 Amended as per Erratum No. 1, Item 4 June

50 STANDARDS TRAFFIC ENGINEERING AND CONTROL (TD SERIES) (CONTINUED) Date of Issue TD 39 The Design of Major Interchanges April December 2000 TD 40 TD TD 49 TD 50 TD 51 Layout of Compact Grade Separated Junctions Geometric Design of Major/Minor Priority Junctions and Vehicular Access to National Roads Requirements for Lorry Mounted Crash Cushions The Geometric Layout of Signal-Controlled Junctions and Signalised Roundabouts Segregated Left Turn Lanes and Subsidiary Deflection Islands at Roundabouts July January 2009 November 2011 November 2007 November 2004 November January July 2004 TD 54 Design of Mini Roundabouts August TD 69 TD 89 The Location and Layout of Lay-bys and Location Markers Use of Passively Safe Signposts, Lighting Columns and Traffic Signal Posts to BS EN 12767:2007 December May TD 300* Rural Cycle Scheme Design (including Amendment No. 1, dated December 2014) April June

51 3. ENQUIRIES 3.1 All technical enquiries or comments on this document or any of the documents listed as forming part of the should be sent by to addressed to the following: Head of Network Management, Engineering Standards & Research National Roads Authority St Martin s House Waterloo Road Dublin 4... Pat Maher Head of Network Management, Engineering Standards & Research June

52 Ionad Ghnó Gheata na Páirce, Stráid Gheata na Páirce, Baile Átha Cliath 8, Éire Parkgate Business Centre, Parkgate Street, Dublin 8, Ireland (01) (01)

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007 DESIGN MANUAL FOR ROADS AND BRIDGES volume 8 section 2 traffic signs and lighting traffic signs and road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

APPENDIX A RELEVANT DOCUMENTATION

APPENDIX A RELEVANT DOCUMENTATION APPENDIX A RELEVANT DOCUMENTATION A.1 RELEVANT REFERENCE MATERIAL, LEGISLATION AND REGULATIONS All documents in this appendix are subject to amendment being superseded. Any designer installer shall be

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

CERTIFICATE OF APPROVAL No CF 5631 JOTUN A/S

CERTIFICATE OF APPROVAL No CF 5631 JOTUN A/S CERTIFICATE OF APPROVAL No CF 5631 1 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of PO Box 2021, Sandefjord,

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

CERTIFICATE OF APPROVAL No CF 5303 CONTEGO INTERNATIONAL INC.

CERTIFICATE OF APPROVAL No CF 5303 CONTEGO INTERNATIONAL INC. CERTIFICATE OF APPROVAL No CF 5303 1 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of 1013 Arthur Street,

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS. August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ / 019 PUBLIC INQUIRY QUESTION RAISED BY: The Inspectors DATE: 20/02/17 RESPONDED BY: Ben Sibert DATE: 10/03/17 SUBJECT: Engineering Proof of Evidence Elucidations The attached document

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

IAT Annual Conference 'Driving Forward

IAT Annual Conference 'Driving Forward Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence:

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence: Department for Regional Development - TransportNI YORK STREET INTERCHANGE Public Inquiry Proof of Evidence: (Summary) by Michael Megarry URS Beechill House 40 Beechill Road Belfast BT8 7RP THIS PAGE INTENTIONALLY

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire Council Policy Published by South Cambridgeshire District Council November 2016 Adoption and Maintenance of Sustainable

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Twinwall Multi-Fittings

Twinwall Multi-Fittings Twinwall Multi-Fittings Twinwall Surface Water Drainage 24 BBA Approved Twinwall Multi-Fittings Available Compatible with Relevant BBA Approved Polyethylene Twinwall Pipes Couplers, Sealing Rings, Road

More information

Certificate No: EW624

Certificate No: EW624 Certificate No: EW624 Abbey Pynford Helical Pile System Description of Product This is an assessment of a Steel Helical Pile System that can be used as a deep foundation solution instead of other foundation

More information

North West smart motorways 100 miles of extra lanes

North West smart motorways 100 miles of extra lanes North West smart motorways 100 miles of extra lanes September 2018 North West smart motorways 100 miles of extra lanes At Highways England we believe in a connected country and our network makes these

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Research Briefing Flood and Coastal Erosion Risk Management in Wales Research Briefing Flood and Coastal Erosion Risk Management in Wales Author: Wendy Dodds Date: September 2017 National Assembly for Wales Research Service The National Assembly for Wales is the democratically

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

M20 junction 10a improvement scheme. We want to hear your views

M20 junction 10a improvement scheme. We want to hear your views M20 junction 10a improvement scheme We want to hear your views March 2016 2 About us Highways England, formerly the Highways Agency, is a government run company. We are responsible for operation, maintenance

More information

OFFERING THE UK A LIFELINE

OFFERING THE UK A LIFELINE OFFERING THE UK A LIFELINE R oad markings are the most cost-effective safety device available to road engineers. Markings guide road users, provide advance warning of potential dangers ahead and create

More information

Inside Government Conference Case Study: Norwich Northern Distributor Road

Inside Government Conference Case Study: Norwich Northern Distributor Road Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What

More information

Draft Strategic Plans for Coillte s eight Business Area Units ( )

Draft Strategic Plans for Coillte s eight Business Area Units ( ) Draft Strategic Plans for Coillte s eight Business Area Units (2011-2015) Response to Public Consultation from Mountaineering Ireland April 2013 1 Introduction Mountaineering Ireland welcomes this opportunity

More information

Conservatory awning W8 Description

Conservatory awning W8 Description 1 3 4 Application Large-area external sun shading system for shading glazed conservatories, patio roofs and pergolas with flat pitch roofs. Function principle: tensioning system via toothed belt with steel

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

ADVICE ON Cattle Grids

ADVICE ON Cattle Grids ADVICE ON 2 Definition A cattle grid, for highway purposes, is a device designed to prevent the passage of animals, or animals of any particular description, but to allow the passage of all or some other

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

Glasgow City Region City Deal Guide to Information Available City Deal Publication Scheme

Glasgow City Region City Deal Guide to Information Available City Deal Publication Scheme The Freedom of Information (Scotland) Act 2002 (the Act) requires Scottish public authorities to produce and maintain a publication scheme. Authorities are under a legal obligation to: publish the classes

More information

SNOWDONIA ENTERPRISE ZONE

SNOWDONIA ENTERPRISE ZONE CPF 4614: Snowdonia Enterprise Zone: Llanbedr Access Improvements SNOWDONIA ENTERPRISE ZONE LLANBEDR ACCESS IMPROVEMENTS WELTAG STUDY PLANNING STAGE AND APPRAISAL (STAGE 1) REPORT CPF: 4614 Client: Gwynedd

More information

NOTE: For the main document, The Traffic Signs Regulations and General Directions 2016 and subsequent amendments visit:

NOTE: For the main document, The Traffic Signs Regulations and General Directions 2016 and subsequent amendments visit: NOTE: For the main document, The Traffic Signs Regulations and General Directions and subsequent amendments visit: http://tsrgd.co.uk/documents/traffic-signs-regulations-and-general-directions DfT Circular

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, D.C. TSO-C124b Effective Date: 04/10/07 Subject: Technical Standard Order FLIGHT DATA RECORDER SYSTEMS

More information

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E. P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The A19 Trunk Road The A19 tends to live in the shadow of the more well known A1 it runs more or less parallel with. However, it is no less important

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Regional summary - Wellington

Regional summary - Wellington Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

BAE SYSTEMS (OPERATIONS) LIMITED

BAE SYSTEMS (OPERATIONS) LIMITED Page 1 2011-24-06 BAE SYSTEMS (OPERATIONS) LIMITED Amendment 39-16870 Docket No. FAA-2011-0908; Directorate Identifier 2010-NM-251-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes

More information

Isle of Wight Council TOURISM SIGNING POLICY

Isle of Wight Council TOURISM SIGNING POLICY Isle of Wight Council TOURISM SIGNING POLICY 2005 1 st April 2005 1 CONTENTS Introduction Page 3 Section I - Eligibility Criteria for Tourism Signing Page 5 1. General Requirements Applicable to all Attractions

More information

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach It is a domestic level crossing which is located at the station. At CROWLE STATION level crossing the orientation of the road/path

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices Nasser Hossain Senior Engineer, Roads & Structural Assets, City of Sydney City of Sydney (COS) LGA The City of Sydney LGA

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed

More information

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011 STATUTORY INSTRUMENTS 2011 No. 1040 ROAD TRAFFIC The Traffic Signs (Amendment) Regulations and General Directions 2011 Made - - - - 30th March 2011 Laid before Parliament 6th April 2011 Coming into force

More information