1 REFERENCE NO. : PIQ / 019 PUBLIC INQUIRY QUESTION RAISED BY: The Inspectors DATE: 20/02/17 RESPONDED BY: Ben Sibert DATE: 10/03/17 SUBJECT: Engineering Proof of Evidence Elucidations The attached document provides updates to provide responses to questions of elucidation raised by Mr Wadrup in correspondence dated 20 February 2017.

2

3 Engineering Proof of Evidence Elucidations Ben Sibert, BEng CEng FICE MIStructE MCIHT Welsh Government, Engineering Design Contents 1. Introduction Clarifications... 2 Page 1

4 1. Introduction 1.1 This document provides updates to provide responses to questions of elucidation raised by Mr Wadrup in correspondence dated 20 February Clarifications 2.1 Evidence Section 4.38: Question: Given that the inquiry will need to justify the CPO of land necessary for the construction of the road, what justification is there in the provision of a dual carriageway rather than a single carriageway which would cater for the traffic demand? Am I correct in seeing this link road as one simply connecting to gyratory junctions rather than linking to unimpeded dual carriageways? 2.2 Evidence Section 4.38: Response: I have clarified in my evidence in section 4.38 that the reason for the choice of a dual two lane link road is on the basis of a) Strategic WG decision and b) to be broadly consistent with the advice of TD 9/93. At The Plan stage of the Scheme, the Glan Llyn link was established as a dual lane highway as shown in the Stage 2 Scheme Assessment Report Volume 2, Drawing No. M4OA DR- C-XX-0164 Section C sheet 1 of 3. Matthew Jones has explained further the strategic reasons for the choice of a dual two lane carriageway. 2.3 Evidence Table 3: Question: a) Traffic forecasting report figure It is not clear what the do-something flows are predicted to be on the length of the proposed motorway between junction 23 and 23 A. These are quoted at 15,400 and 20,300 vpd east and westbound, but that seems to be impossible looking at the adjacent figures. b) I cannot reconcile table 3 in the proof with figure 10.6 in the report. For example, J23-Glan Llyn is shown as 52,200 vpd in the proof but 54,000 in the report. Similarly, there is a slight discrepancy in the projected flow between the docks and J29. Clarity required please. c) It would be useful to have a comparable table setting out the 2022 flows for the do Page 2

5 minimum situation on the existing M4 West of J23A, that is traffic flow ranges compared to predicted traffic. 2.4 Evidence Table 3: Response to point a): The forecast Do Something opening year 2022 two way AADT on the proposed new motorway between junctions 23 and 23A is 54,000. The figures are quoted on Figure 10.6 of the Revised Traffic Forecast Report (Doc ) where the label is closer to the proposed new Glan Llyn Junction. The figures 15,400 E/B and 20,300 W/B (Totalling 35,700 two way AADT) are the Do Something flows for the proposed new dual two lane trunk road link connecting to the reclassified M4 to the west of the west bound free flow link from the M4. These figures therefore include traffic travelling from the M4 to the reclassified M4 as well as traffic travelling from the M48 to the reclassified M4. Refer to the extract from Figure 10.6 is included below for clarity as new Figure 14 to my evidence: Forecast 2022 Traffic on the Dual two lane Trunk Road Link Forecast 2022 Traffic on the M48 Forecast 2022 Traffic on the proposed new motorway between Glan Llyn Junction and J23 with the M48. Figure 14 Extract of Figure 10.6 from Revised Traffic Forecasting Report (Doc ) Page 3

6 2.5 Evidence Table 3: Response to point b): There is an error in the data in Table 3 which I have identified in my list of errata for my evidence (WG 1.5.4). The Core Scenario Forecast 2022 AADT figures between J23- Glan Llyn and Docks-J29 should be transposed. A corrected table is given below: Carriageway Standard Opening Year AADT flow ranges from TA 46/97 Core Scenario Forecast 2022 AADT All D3M Minimum Maximum J23 Glan Llyn Glan Llyn - Docks Docks J29 D2M up to 41,000 D3M 25,000 67,000 54,000 54,500 52,200 D4M 52,000 90,000 Revised Evidence Table 3 Proposed New Motorway Traffic Flow and Cross Section 2.6 Evidence Table 3: Response to point c): Additional Table 3a below provides summary of the Do-Minimum forecast traffic flows along the existing M4 north of Newport, with figures taken from Figure 10.6 of the December 2016 Revised Traffic Forecasting Report (Doc ), compared with the opening year AADT flow ranges from TA 46/97. Section of existing M4 Existing carriageway Opening Year AADT flow ranges from TA 46/ Do Minimum Forecast two way configuration 1 Minimum Maximum AADT. J29-J28 D3M 25,000 67, ,200 J28-J27 D3M 25,000 67, ,200 J27-J26 D3M 25,000 67, ,900 J26-J25a D2M up to 41,000 76,300 J25a-J25 D2M up to 41,000 98,500 J25-J24 D3M 25,000 67, ,900 J24-J23a D3M 25,000 67,000 89,200 Additional Evidence Table 3a Do Minimum Traffic Flow and Cross Section for the Existing M4 North of Newport. 2.7 Evidence para 4.72: Question: Do any of these reduced verge and central reservation widths compromise forward SSSD for the design 1 Note that the existing M4 cross sections do not match exactly the D3M and D2M requirements of TD 27/05 Figure 4-1a. Page 4

7 speed, for example southwest of Duffryn and east of the proposed viaduct? 2.8 Evidence para 4.72: Response: There are no stopping sight distance (SSD) departures from standards which are directly related to the reduction of the central reservation (CR) width nor the reduced carriageway width over the River Usk Crossing. There are seventeen permitted relaxations to SSD including those at Duffryn and east of the River Usk, plus two more on the River Usk Crossing and thirteen around Magor. There are a total of eight departures from standards relating to SSD, although none of these are attributable directly and only to the reduction in widths of CR and verge. These are located one at Castleton Interchange, one at Docksway Junction and six around Magor Junctions 23 and 23A. 2.9 Evidence para 4.110: Question: There is no mention of the effect that the viaduct would have on shipping bound for the quay sides along the River Usk upstream of the viaduct. As I understand it, this is theoretically is an area within the Port of Newport Evidence para 4.110: Response: As shown on Amendment Scheme Order Schedule 3 (Doc ) and Figure 6 in my evidence, the crossing of the River Usk would provide for 33.54m of clearance between Mean High Water Springs tide level of +6.49mAOD and the soffit of the bridge. The Statutory Harbour Authority for navigation on the River Usk is the Newport Harbour Commissioners who have objected to the Scheme (OBJ0071). Their objection does not relate to the bridge crossing of the River Usk. As described by Jonathan Vine (WG ) in his evidence, the bridge over the River Usk would not impede shipping activities on the River Usk. The Navigational Risk Assessment Workshop discussed the risks of collision with the River Usk Crossing in the vicinity of the River Usk. The Newport Harbour Commissioners were represented at the Navigational Risk Assessment Workshop and, with agreement from the other parties present, deemed the navigational clearance provided over the River Usk to be more than adequate for the Page 5

8 vessels currently using the River Usk. Following the workshop the Navigation Risk Register (Doc ) was updated to record that the clearance provided in the bridge design was a Project Specific Mitigation Measure for the risk and hazard of vessel collision with the section of bridge over the River Usk during both the Construction and Operation phase Evidence para 4.136: Question: Presumably no borrow pit would be located within any SSSI area? 2.12 Evidence para 4.136: Response: Correct, there are no borrow pits within any SSSI area Evidence para 4.175: Question: As the proposed channels are to be lined, it follows that they cannot filter water vertically through the subsoil. That being the case how do the channels empty, other than through wind and evaporation forces? I can understand the attenuation principle but I need clarity on how the water (potentially polluted) would discharge into the adjacent areas Evidence para 4.175: Response: Along the embankments on the Gwent Levels, the water which would run off from the carriageway surface in to the grass lined channels would be conveyed by gravity by way of the longitudinal fall of the carriageway and embankment levels to intake chambers. From these intake chambers, the water would be piped in to the water treatment areas, commencing with the forebay pollution control lagoon, then in to the attenuation and permanent dilution lagoon and then in to the reed bed before discharge to the water course. Further details of this all of these features can be found in the Drainage Strategy Reports as Appendix 2.2 to the March 2016 ES (Doc ) and Appendix S2.2 to the September 2016 ES (Doc ). I note in particular that Figure 2 to Appendix S2.2 shows a typical arrangement of the collection of water from the grass lined channels to the Water Treatment Area, showing the location of intake chambers. The intake chambers and direction of fall of the grass lined channels are also shown Page 6

9 on the Highway Drainage and Reen Mitigation Drawings, Figure R2.5 to the ES and its supplements, with the latest list of drawings given in Section 7 of my main evidence Evidence para 4.249: Question: Why would the Welsh Government need any easement rights to maintain the ditches which would lie inside the CPO. Should that be referring to ditches which lie outside the boundary? 2.16 Evidence para 4.249: Response: Across the Gwent Levels, the highway fenceline and land in the CPO have been drafted to minimise the encroachment of the highway on to the SSSI land. This would be achieved by placing the highway fenceline close to the earthworks embankment and leaving essential mitigation measures of field ditches and reens outside the highway fenceline. As shown in Figure 15 below, which is an extract of the Typical Cross Section drawing, the CPO includes for Title, Essential mitigation and S250 rights to provide for construction and maintenance of the field ditches. The arrangement for replacement reens is similar. Refer also to: a) The Design Options Report (Doc ); option H1; Appendix C, figure 2 b) The Alignment and Junctions Report (Doc ); Appendix A Cross Sections - Typical Sections Drawings M4CaN DJV-HML-ZG_GEN- DR-CH Page 7

10 New Evidence Figure 15 Extract from Typical Cross Sections Drawing from Alignment and Junctions Report (Doc ) 2.17 Evidence para 4.260: Question: Obviously, some clarity is required in respect of this paragraph, for example with whom would the agreement be made? 2.18 Evidence para 4.260: Response: In the majority of cases the modifications to the CPO relate to changes as a result of objections and through consultation with land owners and are contained within the draft CPO footprint. The intention of the Welsh Government is to seek the agreement of the relevant land interest to the modification and advise the Inspectors accordingly. If written agreement were not achieved, and if there is no additional land is involved, the Welsh Government would still submit the modification to the Public Local Inquiry and would propose to the Inspectors that the CPO be made including the modifications Evidence para 5.12: Question: With no agreement in place can it be assumed that the proposed modification would still be recommended? 2.20 Evidence para 5.12: Response: Yes, as described in response to question on section above. Page 8

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

201- No. (W. ) HIGHWAYS, WALES

201- No. (W. ) HIGHWAYS, WALES W E L S H S T A T U T O R Y I N S T R U M E N T S 201- No. (W. ) HIGHWAYS, WALES The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

201- No HIGHWAYS, WALES THE HIGHWAYS ACT 1980

201- No HIGHWAYS, WALES THE HIGHWAYS ACT 1980 HIGHWAYS, WALES 201- No THE HIGHWAYS ACT 1980 THE M4 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) TO WEST OF JUNCTION 29 (CASTLETON) AND CONNECTING ROADS) AND THE M48 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) CONNECTING

More information

The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29. The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29

The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29. The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton Contents Page 1 INTRODUCTION 1 2 OPTIONS CONSIDERED Intermediate J

Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton Contents Page 1 INTRODUCTION 1 2 OPTIONS CONSIDERED Intermediate J Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton April 2006 This report takes into account the particular instructions and requirements of our client. It is not intended for

More information

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Planning & Sustainable document. It contains an update following the addition

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to

More information

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 2 For a local inquiry into: SUMMARY PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case A21 TONBRIDGE TO PEMBURY DUALLING Statement of Case In Respect of Applications for the Demolition of Listed Buildings Under the Provisions of the Planning (Listed Buildings and Conservation Areas) Act

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence:

YORK STREET INTERCHANGE. Public Inquiry. Proof of Evidence: Department for Regional Development - TransportNI YORK STREET INTERCHANGE Public Inquiry Proof of Evidence: (Summary) by Michael Megarry URS Beechill House 40 Beechill Road Belfast BT8 7RP THIS PAGE INTENTIONALLY

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun. Statement of Case / Proof of Evidence

A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun. Statement of Case / Proof of Evidence A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun Statement of Case / Proof of Evidence The Welsh Government s Reasons for Proposing that the Published Draft Orders should be made

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

1. Summary of key points 2

1. Summary of key points 2 Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC

Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC 1. Please would IWC confirm the date the Plan area was designated.

More information

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007 DESIGN MANUAL FOR ROADS AND BRIDGES volume 8 section 2 traffic signs and lighting traffic signs and road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Civil Aviation Authority. Information Notice. Number: IN 2016/052

Civil Aviation Authority. Information Notice. Number: IN 2016/052 Civil Aviation Authority Information Notice Number: IN 2016/052 Issued: 9 June 2016 EASA ED Decision 2016/09/R Rescue and Firefighting Services Remission Factor, Cargo Flights, etc. This Information Notice

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

M20 junction 10a improvement scheme. We want to hear your views

M20 junction 10a improvement scheme. We want to hear your views M20 junction 10a improvement scheme We want to hear your views March 2016 2 About us Highways England, formerly the Highways Agency, is a government run company. We are responsible for operation, maintenance

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Appendix F Public authorities responses

Appendix F Public authorities responses Planning Proposal under sec 55 of the EP&A Act LEP Refinements Appendix F Public authorities responses Appendix F Public authorities responses Prior to public exhibition, consultation was made with the

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond Phase 2b Route Decision Moving Britain Ahead July 2017 September 2016 High Speed Two: From Crewe to Manchester, West Midlands

More information

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement Introduction The Government s Road Investment Strategy, published in 2014, sets out the vision for the strategic road network

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Derry Hill and Bingley Road, Menston. Accidents waiting to happen.

Derry Hill and Bingley Road, Menston. Accidents waiting to happen. Derry Hill and Bingley Road, Menston. Accidents waiting to happen. School Bus unable to pass on Hawksworth Drive References: Derry Hill - 10/04551/MAF Bingley Road - 10/06229/MAO Bingley Road - 11/05691/OUT

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY 21/10/15 Twenty-sixth Directors of Civil Aviation of the Eastern Caribbean Meeting (E/CAR/DCA/26) New Orleans, United States, 1-3 December 2015 Agenda Item 6: Air Navigation Matters 6.1 GREPECAS Update

More information

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008 European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008 OF THE EUROPEAN AVIATION SAFETY AGENCY of 1 September 2008 for a Commission Regulation amending Regulation (EC) No 216/2008 of the European

More information

Hearing Statement. M4 Corridor Around Newport Public Inquiry. St Modwen Developments Ltd

Hearing Statement. M4 Corridor Around Newport Public Inquiry. St Modwen Developments Ltd St Modwen Developments Ltd February 2017 Hearing Statement Prepared on behalf for: St Modwen Developments Ltd by: Tim Gent BA (Hons) BPl MRTPI Savills 12 Windsor Place Cardiff CF10 3BY savills.co.uk PREFACE

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm Item. 11 Report title: Ward(s) or groups affected: From: Classification: Open Date: 22 September 2011 Decision Taker: Camberwell Community Council Grove Vale parking consultation East Dulwich, South Camberwell

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

A63 Preferred Route Announcement

A63 Preferred Route Announcement Safe roads, Reliable journeys, Informed travellers Castle Street Improvements A63 Preferred Route Announcement Preferred Route Announcement i An Executive Agency of the Introduction During Spring 2009,

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

Land Use and Environmental Control

Land Use and Environmental Control ICAO-ACI/LAC Seminar on Bird Hazards, Environmental Protection and Land Use at Airports for the NAM/CAR/SAM (Americas) Regions Miami, 24-27 April 2001 Land Use and Environmental Control Michiel Vreedenburgh

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

9 June I:\CIRC\MSC\01\1305.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

9 June I:\CIRC\MSC\01\1305.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T2-MSS/2.11.1 MSC.1/Circ.1305 9 June 2009 REVISED GUIDANCE TO MASTERS, COMPANIES

More information

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP Powys Local Development Plan Position Statement - Gypsy and Traveller Accommodation Incorporating an action statement and implications for the LDP September 2016 Powys LDP, Position Statement Gypsy and

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Submission by Heathrow Southern Railway Ltd.

Submission by Heathrow Southern Railway Ltd. Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Appendix C Stage 1 Road Safety Audit

Appendix C Stage 1 Road Safety Audit Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4.

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Welcome. Great Yarmouth Third River Crossing.  Norfolk County Council Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord

More information

Gorse Stacks, Bus Interchange Excavations Interim Note-01

Gorse Stacks, Bus Interchange Excavations Interim Note-01 Gorse Stacks, Bus Interchange Excavations 2015 Prepared for: Cheshire West & Chester Council Interim Note-01 1 Introduction & Summary Background Since c. 2000 investigations associated with redevelopment

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Questions and Answers Cape Town Agreement of 2012

Questions and Answers Cape Town Agreement of 2012 Questions and Answers Cape Town Agreement of 2012 1. What is the Cape Town Agreement of 2012? The Cape Town Agreement of 2012 (the Agreement) sets internationally agreed minimum standards for the design,

More information

Subpart A General Purpose... 7

Subpart A General Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Subpart

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

Paul Griffiths, BEng (Hons), IENG, MCIHT

Paul Griffiths, BEng (Hons), IENG, MCIHT The Cheshire East Borough Council (Crewe Green Link South) Compulsory Purchase Order 2013 Public Inquiry Further Statement of Evidence Spur Roads Paul Griffiths, BEng (Hons), IENG, MCIHT June 2013 Contents

More information

Third Parties/Crossing

Third Parties/Crossing Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working

More information

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016 NHS Greater Glasgow & Clyde NHS Board Chief Officer, East Dunbartonshire HSCP 20 February 2018 Paper No: 18/08 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND)

More information

September 20, Submitted via

September 20, Submitted via Department of Homeland Security U.S. Citizenship and Immigration Services Office of Policy and Strategy Chief, Regulatory Coordination Division 20 Massachusetts Avenue, NW Washington, DC 20529-2020 Submitted

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

THE HIGHWAYS ACT and- THE ACQUISITION OF LAND ACT 1981

THE HIGHWAYS ACT and- THE ACQUISITION OF LAND ACT 1981 Rebuttal Volume 1/1 25 th September 2014 THE HIGHWAYS ACT 1980 -and- THE ACQUISITION OF LAND ACT 1981 THE HIGHWAYS (INQUIRIES PROCEDURE) RULES 1994 COMPULSORY PURCHASE (INQUIRIES PROCEDURE) RULES 2007

More information

West Sussex Local Authority Parking Enforcement Agreement

West Sussex Local Authority Parking Enforcement Agreement Report to Cabinet 24 th March 2016 By the Cabinet Member for Local Economy DECISION REQUIRED Not Exempt West Sussex Local Authority Parking Enforcement Agreement Executive Summary The existing Agency Agreement

More information

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 10/2/05 FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 The attached constitutes the report on Agenda Item 5 and should be inserted

More information