1 Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July

2 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date 7 July 2016 Scheme Scheme Description The existing situation M5 Junction 25 (M5 J25) is a large five-arm grade separated roundabout with a 3-lane circulatory carriageway beneath the motorway mainline as shown in Error! Reference source not found.. The motorway off-slip arms operate under full time signal control to reduce traffic queuing back onto the motorway at peak times. To the east of the junction there is a signalised junction with Ruishton Lane which also forms the access to the Park and Ride site. The A358 is single carriageway here, with two westbound lanes and a single eastbound lane (restricted by the structure over the Blackbrook watercourse). There is a merge-in-turn in the eastbound direction immediately after the exit from Junction 25, and this is a source of congestion at peak times. East of the Park and Ride junction the road widens to two lanes in both directions but reduces back to a single lane through Henlade village; also a source of congestion at peak times. Henlade village is a declared Air Quality Management Area. Beyond Henlade village the A358 extends south east and connects with the A303 at Ilminster. To the west of Junction 25 the A358 is a dual carriageway (known as the Toneway corridor) which provides access to the Taunton urban area. Figure 1 Existing layout The growth aspirations for Taunton The Heart of the South West Strategic Economic Plan (SEP) establishes Taunton as one of the key urban centres around which a large proportion of growth is assumed to take place. The adopted Core Strategy (2012) for Taunton Deane outlines a requirement for 13,000 dwellings to be built within the Taunton Urban Area by In addition to these new homes the Core Strategy states that 9,500 jobs will be provided through a range of employment land uses. 2

3 The Taunton Deane adopted Core Strategy and submitted Site Allocations and Development Management Plan both refer to the need for a second Strategic Employment Site (SES) to complement other employment allocations within the borough. The preferred site for this development is to the south east of Junction 25. This development will cover a 25 hectare site and may include a Business Park and industrial units.it is estimated that the site will provide over 3000 jobs and hence a significant boost to the local economy. Highway capacity and traffic impact at Junction 25 are recognised as key constraints associated with the delivery of this potential development site. In December 2015 TDBC confirmed their intention to bring forward the SES with a commitment to develop and adopt a Local Development Order (LDO) for the site. Once in place the LDO is equivalent to planning consent for any uses which adhere to the LDO s parameters. TDBC have estimated that the LDO will be in place in mid-2017 The Existing Problems at M5 Junction 25 M5 Junction 25 is heavily used at peak times and carries a total traffic volume of around 5,000 vehicles during the weekday peak hours. Average hourly inter-peak volumes are in the order of 3,500 vehicles with about 6% of traffic being HGV s (the proportion of HGV s on A358 is 9%). Junction 25 experiences high levels of traffic congestion at peak times with queues frequently extending along the A358 towards Henlade and occasionally back up onto the mainline M5. The key problems at the junction can be summarised as follows: Some entries are not signal controlled and therefore have limited capacity when circulatory flows within the roundabout are high (there are not enough gaps in the traffic to allow vehicles to enter the roundabout). M5 Southbound off-slip entry is under pressure due to high motorway flow conflicting with high circulatory flow. Width restriction over the Blackbrook watercourse limits eastbound exit capacity on the A358. The junction has limited facilities for non-motorised users, a cycle and footpath runs around the southern side of the junction however users find crossing the southbound M5 on-slip difficult due to the lack of priority and accelerating vehicles The Proposed layout It is not possible to increase the capacity of the junction within its current footprint. Following consideration of a range of options the layout shown at Figure 2 below is proposed. The main components of the scheme are - A new link between A358 / Ruishton Lane / Park and Ride junction with footway /cycleway along one side and a new roundabout to the south of the park and ride site A new link between the new roundabout and the existing M5 J25 roundabout on an embankment and crossing Broughton Brook with a new structure with footway / cycleway along each side (not shown) Elongating the existing M5 J25 roundabout on the eastern side Widening the existing circulatory arms (underneath M5) to accommodate an additional lane Moving the pedestrian / cycle facility to behind the bridge supports by removing some of the sloping embankment. Signalisation of o M5 J25 / Blackbrook Park Ave o M5 J25 / A358 Toneway o M5 J25 / new link road Realignment of signals at M5 J25 / M5 Southbound off slip A toucan crossing on the new link road between new roundabout and M5 J25 roundabout close to the new roundabout. 3

4 Figure 2 Proposed layout Highways England are currently developing proposals for dualling the A358 between Ilminster and the M5 at Taunton, as part of the upgrading of the complete A303/A358 route between the M3 and M5 at Taunton to dual carriageway Express Way standard. The scheme for dualling the A358 is in the first Roads Investment Strategy, with a target commencement date in Spring The proposed route for the A358 will not be clear until Highways England initiate consultation later in The proposed M5 Junction 25 layout shown above would be compatible with a southern bypass route for Henlade. Scheme Objectives The scheme to improve capacity at M5 Junction 25 has four objectives:- Objective 1 - Support the economy in Taunton by facilitating the delivery of employment and residential development. Objective 2 Better manage peak hour traffic congestion at Junction 25 and improve access to Taunton and the motorway. Objective 3 Improve accessibility to Taunton and future development areas for pedestrians and cyclists. Objective 4 Reduce carbon emissions, compared to a non-intervention scenario. Summary of Options Assessment In developing the M5 Junction 25 proposals an Options Assessment report was produced which considered the following options:- Signalisation, widening of the circulating carriageway and realignment of entries Widening and extension of motorway slip roads A Haydon Lane link road to access the employment site A new motorway junction north of Junction 25 Enhancement of the existing park and ride service 4

5 Improved public transport along A358 corridor Demand management and smarter choices The OAR concluded that the first option, signalisation of the Junction 25 roundabout, was the most appropriate option. Stakeholders A Memorandum of Understanding has been developed and signed by partners working towards the development of the strategic employment site. Key stakeholders will include Taunton Deane Borough Council Summerfield Developments Highways England County and Borough Councillors General public There has not yet been a public consultation exercise about the M5 Junction 25 proposals. 5

6 FINANCIAL SUMMARY Main Expenditure Items ( m) 14/15 15/16 16/17 17/18 18/19 19/20 20/21 Total Design (inc surveys, site investigations etc) Preliminaries New link road and junctions Upgrades to existing roundabout Main contractors OH&P Contingency Inflation TOTAL SCHEME COST Scheme Funding Funding Source Funding Amount ( m) Total Local Contribution (Secured) Total Local Contribution (Unsecured) Total LTB Requirement TOTAL LTB Contribution Total Scheme Cost ( m) LTB Contribution ( m) From SEP Total Scheme Cost ( m) LTB Contribution ( m) Variation in Scheme Cost Variation in LTB Contribution ( m) 0 6

7 VALUE FOR MONEY STATEMENT Assessment Detail Initial BCR 10.8 The Business Case has been reviewed, discussed with Somerset, and an amended submission received. The forecasting and assessment use standard transport economics, compliant with WebTAG. There is some uncertainty in the assessment pending clarity from Highways England regarding the route and timing of the A358 dualling. Adjusted BCR 10.8 No other benefits monetised Non-Monetised Impacts Balance between beneficial impacts relating to travel and adverse relating to the local environment. No adjustment to BCR required Beneficial impacts from: Reliability Journey Quality Security Adverse impacts from: Noise (slight) Landscape (slight) Historic environment (moderate) Flooding (large) Water quality (slight) Key Risks, Sensitivities and Uncertainties in the Assessment There is a degree of uncertainty at present about the scale of quantified benefits which the scheme will deliver over time, pending a clearer understanding of the nature and timing of the A358 dualling. There is also some uncertainty about the cost of the Junction 25 scheme Sensitivity tests completed for Low and High development scenarios these give BCRs ranging from 6.3 to The Strategic Employment Site at Junction 25 is not included in the Core and Low growth scenarios, but is included in the High growth scenario. Further sensitivity tests were conducted to reflect the impact of the A358 dualling. The BCRs range from 10.0 if the A358 is dualled to Junction 25, to 3.2 if the dualling includes free flow slip roads linking the A358 directly with the M5 (south). While the current assessment is that the scheme would result in Very High Value for Money there is some risk that it may fall into the High category. Value for Money Category Very High 7

8 DELIVERABILITY Key Risks to Delivery The inter-relationship of the scheme with both the Strategic Employment Site and the Highways England A358 dualling scheme introduces significant risk to the timescale for delivery. There are a number of procedural risks The Local Development Order for the Strategic Employment site; planning consent for the Junction 25 scheme; land acquisition; approval to work on the Highways England network; drainage consents, etc. Financial risks the cost estimate is at this stage not fully developed and this introduces uncertainty. Environmental Impact Overall slight adverse impact on natural and historic environment. The main concerns are the impact on water resources and biodiversity, and on listed buildings and a regionally important archaeological heritage asset Social and Distributional Impact Overall the scheme is appraised to be beneficial in terms of its social impacts, with some being positive and the others neutral. Journey Quality shows significant social benefits, which safety and security are also positive. Physical activity, access to services and affordability are all neutral. RECOMMENDATION Independent Transport Advisor Recommendations It is recommended that the Local Transport Board:- 1) Approve Programme Entry for M5 Junction 25 Capacity Improvements as part of the LTB Programme; 2) Note that the proposed layout for the scheme is contingent upon the promotion of the Strategic Employment Site by Taunton Deane BC through a Local Development Order, and the development by Highways England of proposals for dualling the A358 between Ilminster and Taunton. 3) Note that the cost estimate for the scheme will be further refined, and in view of the inter-relationship with the Strategic Employment Site and A358 a further report is to be considered before the scale of the financial contribution from the Growth Deal 2 programme is determined. In the interim the indicative allocation remains at 12.90m 4) In view of the scale of the current estimate the promoters should make every effort to secure additional external funding. 8

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

TEUE-OAR-008. Tiverton EUE Extension. Option Assessment Report Final Draft December 2013

TEUE-OAR-008. Tiverton EUE Extension. Option Assessment Report Final Draft December 2013 TEUE-OAR-008 Tiverton EUE Extension Final Draft December 2013 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD PREPARED BY Name: Stuart Jarvis Position: Assistant Transport Planning Officer

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Transport for Lancashire Committee 1 st July 2013 Local Major Transport Scheme Investment Programme Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Executive

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

A358 Taunton to Southfields Dualling Scheme. Corfe Parish THE FACTS

A358 Taunton to Southfields Dualling Scheme. Corfe Parish THE FACTS A358 Taunton to Southfields Dualling Scheme Corfe Parish THE FACTS A358 (Southfields to M5) Highways England only proposed 1 route for public consultation Other A303 schemes recently been in public consultation

More information

A358. Taunton to Southfields Dualling Scheme Public consultation

A358. Taunton to Southfields Dualling Scheme Public consultation 5 Taunton to Southfields Dualling Scheme Public consultation 1 31 3 61 5 0 3 3 43 5 3 50 5 M27 0 57 10 A2 7 54 23 054 Bo ISLE OF WIGHT ne ur 51 th ou m Weymouth 3 11 Fareham 3 4 Southampton 04 56 5 3 61

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

M56. New Junction 11a Summary of the consultation report

M56. New Junction 11a Summary of the consultation report M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

Improving the A47 Great Yarmouth junction improvements. Public consultation

Improving the A47 Great Yarmouth junction improvements. Public consultation Improving the Great Yarmouth junction improvements Public consultation March 2017 2 Improving the corridor: We are improving the around Peterborough, Norwich and Great Yarmouth to create better, safer

More information

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version NB. The Excel file also includes the BAFB and Full approval cost tables. South Yorkshire BRT Northern Route Full Approval September 2013

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Planning & Sustainable document. It contains an update following the addition

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

M56. New Junction 11a Preferred route announcement

M56. New Junction 11a Preferred route announcement New Junction 11a Preferred route announcement August 2017 New Junction 11a Preferred route announcement Introduction The New Junction 11A scheme introduces a new motorway junction to the motorway between

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

Lower Thames Crossing

Lower Thames Crossing Lower Thames Crossing Post-Consultation Scheme Assessment Report Volume 7 Volume 7: Appraisal Summary and Recommendations Lower Thames Crossing 2017 - APPRAISAL SUMMARY AND RECOMMENDATIONS Contents Section

More information

A63 Preferred Route Announcement

A63 Preferred Route Announcement Safe roads, Reliable journeys, Informed travellers Castle Street Improvements A63 Preferred Route Announcement Preferred Route Announcement i An Executive Agency of the Introduction During Spring 2009,

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

Transport Business Case Report Maidstone Integrated Transport Package

Transport Business Case Report Maidstone Integrated Transport Package Transport Business Case Report Maidstone Integrated Transport Package CO04300369/013 Revision 01 January 2016 Document Control Sheet Project Name: Maidstone Integrated Transport Package Project Number:

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014 Draft Mobility Management Plan Background

More information

Busway between West Cambourne site and the junction of the A1303 / A428

Busway between West Cambourne site and the junction of the A1303 / A428 Project: A428 To: CCC Subject: Routes From: Atkins Date: 14 April 2016 cc: This note summarises the policy references to a bus link between Cambourne and Cambridge, in particular references to the route

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Inside Government Conference Case Study: Norwich Northern Distributor Road

Inside Government Conference Case Study: Norwich Northern Distributor Road Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What

More information

Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area

Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area between Essex County Council Hertfordshire County Council Highways England

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan. Addendum to Guildford Borough Proposed Submission Local Plan June 2016 Strategic Highway Assessment Report: High level review of potential of key changes in the Guildford borough Proposed Submission Local

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

SE LEP Business Case Executive Summary Colchester ITP

SE LEP Business Case Executive Summary Colchester ITP SMALL SCHEMES EXECUTIVE SUMMARY OF BUSINESS CASE For Colchester Integrated Transport Package (ITP) Please note that this proforma is designed to collect key information about the project. The scheme promoters

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Welcome. Great Yarmouth Third River Crossing.  Norfolk County Council Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage

More information

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation Launceston City Council Kings Meadows Traffic Management Report for Public Consultation November 2013 This report: has been prepared by GHD for Launceston City Council and may only be used and relied on

More information

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY 2015 18 National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY OVERVIEW Transport investment in the Bay of Plenty is targeted to support significant residential growth, new industrial

More information

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction

More information

Section A: Scheme Summary

Section A: Scheme Summary Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Regional Investment Programme

Regional Investment Programme Regional Investment Programme A27 Worthing and Lancing improvements Report on Public Consultation April 2018 Registered office Bridge House, 1 Walnut Tree Close, Guildford, GU1 4LZ Highways England Company

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

M3 junction 9 improvements scheme

M3 junction 9 improvements scheme M3 junction 9 improvements scheme Have your say January to February 2018 M3 junction 9 improvement scheme Have your say Have your say M3 junction 9 scheme map This brochure provides a summary of the proposal

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government

More information

RUISHTON AND THORN FALCON PARISH COUNCIL MINUTES OF THE MEETING HELD ON 6 MARCH 2002 COMMENCING AT 7.30 PM

RUISHTON AND THORN FALCON PARISH COUNCIL MINUTES OF THE MEETING HELD ON 6 MARCH 2002 COMMENCING AT 7.30 PM RUISHTON AND THORN FALCON PARISH COUNCIL MINUTES OF THE MEETING HELD ON 6 MARCH 2002 COMMENCING AT 7.30 PM Present: Apologies: Coun. Marshall (Chairman), Anderdon, Dickinson, House, Lowe, Rexworthy, Shattock,

More information

A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun. Statement of Case / Proof of Evidence

A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun. Statement of Case / Proof of Evidence A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun Statement of Case / Proof of Evidence The Welsh Government s Reasons for Proposing that the Published Draft Orders should be made

More information

Context. Site Development. Brassington Avenue

Context. Site Development. Brassington Avenue 1 Context This public exhibition is being held to present NEW proposals for the development of the Brassington Ave site in Sutton Coldfield town centre. NEW Come and see proposals for We would very much

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

A303 Stonehenge Amesbury to Berwick Down

A303 Stonehenge Amesbury to Berwick Down A303 Stonehenge Amesbury to Berwick Down The case for the scheme Contents The A303 Corridor 4 Amesbury to Berwick Down 5 The case for the scheme 5 Map of the area 6 Objective 1: Transport 7 Objective 2:

More information

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals Camborne, Pool, Redruth East West link road key messages An overview of the project proposals Revision 1 May 2013 Introduction The aim of the new east west link now under construction is to improve accessibility,

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

M56. New Junction 11a Report on the public consultation

M56. New Junction 11a Report on the public consultation M56 New Junction 11a Report on the public consultation August 2017 M56 New Junction 11a - Report on the public consultation CONTENTS 1 EXECUTIVE SUMMARY... 1 2 INTRODUCTION... 3 2.1 Purpose of this report...

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Inquiry held on 24 May 2016 by Jonathan Bore MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 27 June 2016 Appeal Ref: APP/Y3940/A/14/2223354

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement Introduction The Government s Road Investment Strategy, published in 2014, sets out the vision for the strategic road network

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan REPORT OF THE EXECUTIVE DIRECTOR OF PLACE TO CABINET

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Jim O Sullivan Chief Executive

Jim O Sullivan Chief Executive Jim O Sullivan Chief Executive Imperatives Customer Service Safety Delivery The Strategic Road Network (SRN) Connects the nation Supports the wider transport network Drives the economy 4,300 miles of SRN

More information

City Deal in South Lanarkshire. Gordon Mackay, Head of Roads & Transportation Services

City Deal in South Lanarkshire. Gordon Mackay, Head of Roads & Transportation Services City Deal in South Lanarkshire Gordon Mackay, Head of Roads & Transportation Services 6 November 2015 To cut a long story short... 3 SLC Transport projects made the top 20 from Local Transport Strategy

More information

Trigger Point Justification Note 30 th August 2013

Trigger Point Justification Note 30 th August 2013 1. Introduction Trigger Point Justification Note 30 th August 2013 DCC constructed a highway assignment model of Tiverton and the surrounding area and this suggested that in pure capacity terms, up to

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Capital & Counties. October 2007

Capital & Counties. October 2007 Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing

More information

Brinckerhoff (March 2014) 1 Transport Annex, Report 5, A30 Carland Cross to Chiverton Cross Business Case: Parsons

Brinckerhoff (March 2014) 1 Transport Annex, Report 5, A30 Carland Cross to Chiverton Cross Business Case: Parsons Scheme/Package A30 Carland Cross to Chiverton Cross 1 The Challenge Journey time reliability of the A30 strategic route Journey time increases and variability are constraining economic growth to the west

More information

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS MAY, 2016 HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS Type of document (Final)

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Oxfordshire Local Enterprise Partnership

Oxfordshire Local Enterprise Partnership LEP Name County FOI The request(s) Oxfordshire Local Enterprise Partnership Oxfordshire Transport related I would like to request information on the status of and on the appraisal of local transport schemes

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Bid Manager Name and position: Mark Speed Transport and Infrastructure Planning Team Manager

Bid Manager Name and position: Mark Speed Transport and Infrastructure Planning Team Manager Applicant Information Local authority name(s)*: Peterborough City Council Bid Manager Name and position: Mark Speed Transport and Infrastructure Planning Team Manager Name and position of officer with

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

A47 Business Case. Gateway to Growth ALLIANCE

A47 Business Case. Gateway to Growth ALLIANCE Business Case Gateway to Growth ALLIANCE September 2017 3 By planning for the longer term we can ensure that we maximise the resulting economic benefits for our communities. Cllr William Nunn, Leader of

More information

Lower Thames Crossing

Lower Thames Crossing Lower Thames Crossing Post-Consultation Scheme Assessment Report Volume 2 Volume 2: Introduction and Existing Conditions Lower Thames Crossing 2017 - INTRODUCTION AND EXISTING CONDITIONS Contents Section

More information

Local Pinch Point Fund Application Form

Local Pinch Point Fund Application Form Local Pinch Point Fund Application Form Guidance on the Application Process is available at: https://www.gov.uk/government/organisations/department-for-transport/series/local-pinch-pointfund Please include

More information

Department for Regional Development TransportNI. The Roads (Northern Ireland) Order 1993 The Local Government Act (Northern Ireland) 1972

Department for Regional Development TransportNI. The Roads (Northern Ireland) Order 1993 The Local Government Act (Northern Ireland) 1972 Department for Regional Development TransportNI The Roads (Northern Ireland) Order 1993 The Local Government Act (Northern Ireland) 1972 DEPARTMENTAL STATEMENT on the PROPOSED YORK STREET INTERCHANGE Environmental

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information