1 A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun Statement of Case / Proof of Evidence The Welsh Government s Reasons for Proposing that the Published Draft Orders should be made PART C SUMMARY STATEMENT Document WG BY Mark Dixon BEng (Hons) CEng CEnv MICE Chief Witness for the Welsh Government March 2018

2 1. Personal Statement 1.1 My name is Mark Dixon. I am a Chartered Civil Engineer and have been the Welsh Government s Project Engineer with responsibility for the A465 Heads of the Valley Dualling Sections 5 and 6: Dowlais Top to Hirwaun since The evidence in this Proof of Evidence is true and the opinions expressed are my true and professional opinions. Page 1 of 20

3 2. Scope of Evidence 2.1 This Summary Statement covers the background and justification for constructing the Published Scheme which is outlined in more detail in documents (WG 1.1.1) and (WG 1.1.2). In order to assist me in presenting evidence at this Public Local Inquiry, I will rely on the following Expert Witnesses to cover their respective specialist fields: i. Mr David Sallis Engineering Design (WG 1.2) ii. Mr Jonathan Thirkettle Highways Engineering (WG 1.3) iii. Mr Dudley Morrell Traffic (WG 1.3) iv. Mr John Siraut Economic (WG 1.4) v. Mr Matthew Robinson Construction (WG 1.5) vi. Mrs Wendy Bateman Environmental Coordination and Nature Conservation (WG 1.6) vii. Mr Andrew Clarke Noise and Vibration (WG 1.7) viii. Dr Hazel Peace Air Quality (WG 1.8) ix. Mr Rupert Lovell Landscape (WG 1.9) x. Mr Jonathon Mullis Cultural Heritage (WG 1.10) xi. Ms Voirrey Costain Sustainable Development (WG 1.11) xii. Mr Tony Kernon Agriculture (WG 1.12) Page 2 of 20

4 3. Published Draft Orders 3.1 The draft Amendment (Line) Order (DD 2.1.1) and draft Side Roads Order (SRO) (DD 2.1.2) were published on 13 July 2017 and the draft Compulsory Purchase Order (CPO) (DD 2.1.3) was published on 3 rd August The objection period for all of these ended on 7 September In addition, an Environmental Statement (DD , ) together with a Statement to Inform an Appropriate Assessment (SIAA) (DD 2.2.9) of the potential effects of the Published Scheme on the Blaen Cynon Special Area of Conservation (SAC) and Usk Bat Sites SAC was prepared and published on 13 July A formal notice in relation to the acquisition of Common Land from Cwm Taff Fechan Riverside Common (DD 2.3.4) was published on 08 March 2018 with the objection period ending on 29 March A formal notice in relation to the acquisition of Common Land from Gelligaer and Merthyr Common (DD 2.3.5) was published on 15 March 2018 with the objection period ending on 05 April Draft supplementary Side Roads Order and Compulsory Purchase Orders (DD2.5.1) and an Environmental Statement Supplement (DD ) were prepared and published on the 7 March I confirm that the Welsh Government gave notice of its intention to hold this Public Local Inquiry(PLI) and a pre-inquiry meeting to all objectors individually on 21 December 2017 (DD ) and by a notice published in the press on 27 December 2017 (DD ) in accordance with The Highways (Inquiries Procedure) Rules 1994 (DD ) and The Compulsory Purchase by Ministers (Inquiries Procedure) (Wales) Rules 2010 (DD ). I confirm that a public notice announcing the intention to hold this PLI was published in the Page 3 of 20

5 press on the 25 th January 2018 (DD ) and a notice that gave details of this PLI was published on 12 March 2018 (DD ). Page 4 of 20

6 4. Background 4.1 The need to dual the A465 between Abergavenny and Hirwaun was identified in the 1990 South Wales Area Traffic Study (SWATS) (DD 4.1). At that time the A465 between the A40 near Abergavenny and the M4 at Llandarcy was of varying standard. 4.2 The length between Abergavenny and Hirwaun was identified for upgrade leading to a public consultation in 1994 and the announcement of a Preferred Route in Between Dowlais Top and Hirwaun, this comprised on line widening of the existing A465 corridor (the Red Route), with a modification at Hirwaun comprising a new off-line section to the south between the Hirwaun and Trewaun junctions. 4.3 In 1997, a draft Line Order and Environmental Statement was published for the Project, as well as draft Side Road and Compulsory Purchase Orders for the sections between Tredegar to Dowlais Top and Abergavenny to Gilwern. 4.4 A Public Local Inquiry followed in 1998 and in 1999 the Line Order for the A465 Abergavenny to Hirwaun (DD ) was made along with the CPO and SRO described previously. Page 5 of 20

7 4.5 The project was split into seven sections which were subsequently reduced to six sections as follows by combining the original Sections 6&7: Section Location One Abergavenny to Gilwern Two Gilwern to Brynmawr Three Brynmawr to Tredegar Four Tredegar to Dowlais Top Five Dowlais Top to A470 Junction Six A470 Junction to Hirwaun 4.6 In 2008 the Welsh Transport Appraisal Guidance (WelTAG) (DD 6.1.3) was published. As the Scheme had a Line Order in place the transitional arrangements detailed in the Guidance did not require a WelTAG appraisal to be undertaken for the Scheme. In 2011 a review of the Scheme objectives and in 2015 a review of the impact of changes in appraisal methodology, policy, planning and statutory designation on the Preferred Route selection were undertaken by Jacobs. The reviews concluded that the Preferred Route remained the preferred option. 4.7 Section 4 was completed in 2004, Section 1 in 2008 and Section 3 in Section 2 is currently under construction to be completed in This Public Inquiry considers only the proposals for Sections 5 and The Welsh Government propose that Sections 5 and 6 would be delivered as a single project through partnership between the Welsh Page 6 of 20

8 Government and the private sector using the new Mutual Investment Model (DD ). In October 2015, Jacobs was appointed as Technical Advisor to develop the outline design, complete a detailed Environmental Impact Assessment and provide support and advice to Welsh Government through the statutory processes. As part of this contract, the 1999 Line Order design was developed in more detail, including minor amendments to the route and junction layouts These changes have resulted in the need to publish a draft Amendment Order to the 1999 Line Order for the section between Dowlais Top and Hirwaun (DD 2.1.1) Since October 2015, there has been extensive engagement with stakeholders. These include exhibitions and meetings with local councils, affected landowners and businesses. An Environmental Liaison Group (ELG) has also been established to discuss the environmental implications of the Published Scheme and 2 reviews held with the Design Commission for Wales (DCfW) In July and August 2017, the draft Orders, along with the ES and SIAA for Sections 5 and 6 were published and were exhibited at the draft Orders Exhibitions held during August 2017 at Hirwaun Primary School; Ysgol-y-Graig Primary School, Cefn Coed; Pantysgallog Primary School, Pant; Cefn Community Centre, Cefn Coed; Pen Y Dre High School, Gurnos and Dowlais Primary School, Dowlais. Page 7 of 20

9 5 The Need for the Published Scheme 5.1 The A465 trunk road is an important part of the Welsh Government s strategic road network and Trans-European Transport (TEN-T) Network connecting South and West Wales to the English Midlands and acts as a strategic link for the south Wales ports. 5.2 The A465 provides an east-west connection for the towns and communities within the northern regions of the south Wales valleys and links these communities to Wales s main cities including the Cardiff and Swansea Bay City Regions and beyond. 5.3 The A465 Heads of the Valleys dualling is not a series of individual schemes, but one Scheme delivered in sections. This route is critical to the Welsh economy providing vital routes for business, leisure and tourism as well as local residents. The improvement of the A465 is seen by the Welsh Government as an important part of its programme for economic regeneration. The dualling of Sections 5 and 6 would complete the last link of the Abergavenny to Hirwaun project to realise the full potential of the dualling project. 5.4 The Published Scheme is located predominately within the administrative areas of Rhondda Cynon Taf County Borough Council and Merthyr Tydfil County Borough Council, apart from east of Dowlais Top which lies within the Caerphilly County Borough Council. In addition, part of the Scheme west of the A470 junction is located within the Brecon Beacons National Park. 5.5 Problems associated with this section of the existing A465 include: i. Substandard road alignment; ii. Substandard visibility and stopping sight distances; iii. Lack of overtaking opportunities; Page 8 of 20

10 iv. Lack of provision for non-motorised users; v. Accident clusters, particularly at or near existing junctions; vi. Conflict between local and strategic through traffic at junctions; vii. Congestion at peak times; viii. Lack of resilience leading to difficult conditions for highway maintenance and management of traffic; ix. Poor links between communities; x. Slow moving vehicles on uphill gradients; xi. Frequency of side road junctions onto the trunk road; and, xii. Substandard lay-bys. 5.6 The Published Scheme would address the above issues. 5.7 The A465 is one of the key routes in Welsh Government s management of strategic traffic in south east Wales. The Published Scheme would complete the dual carriageway link that would enable the Strategic Box (A449/A40/A465/A4060/A470/M4) to function effectively. 5.8 The A465 passes through the Heads of the Valleys region, an area of economic and social deprivation which has been the subject of regeneration programmes. The problems have been linked in part to poor accessibility to key public services and connectivity between local communities, and the main towns and cities. 5.9 The Our Valleys, Our Future Delivery Plan (DD ) and the Cardiff Capital Region City Deal identify the importance of transport improvements to economic growth. The Scheme would address congestion and capacity issues completing a dual carriageway route through the Valleys, providing a critical northern cross Valley link for the Metro and improving the resilience of the City Deal transport network. The Swansea Bay City Deal Region identifies the criticality of good transport links. The Scheme would complete the dual carriageway link from the English Midlands contributing to the success of the City Deal. Page 9 of 20

11 5.10 The direct and wider economic benefits of the Scheme would exceed the cost of the Scheme. The Initial Benefit Cost Ratio (BCR) which includes the direct economic benefits is The Adjusted BCR which includes the wider economic benefits is 1.1. The Adjusted Present Value of Benefits is million and the Present Value of costs is million The Published Scheme would be likely to deliver wider economic benefits which cannot easily be quantified or monetized and which are not, therefore, captured by the Adjusted BCR. These include: the social impact of improved accessibility and increased social inclusion; improved accessibility for tourists and, perhaps most importantly, the perception and attractiveness of the Heads of the Valleys area as an area in which to invest Schemes within the National Transport Finance Plan (DD ) are funded from the Welsh Government s capital transport budget. The Welsh Government has given a funding commitment for the A465 Heads of the Valleys Dualling Sections 5 and 6 in the agreed budget for years 2017/2018 and 2018/2019, subject to satisfactory completion of the statutory process The A465 is a revenue funded project where the revenue would be required in the next Assembly period. The Welsh Government has committed to budget for the revenue required to fund the Scheme during the relevant Spending Round(s). Page 10 of 20

12 6. Objectives of the Published Scheme 6.1 The key legislation, strategies and policies of the Welsh Government were taken into account when the Scheme Objectives were developed. Since the publication of the Scheme Objectives new legislation and policy has been published and these have also been considered. Details of these key documents are set out in Part A of this Statement (WG 1.1.1). 6.2 The proposed Scheme contributes to the delivery of many of the aims and objectives set out in these strategy and policy documents. Of particular note are the transport related Well-being Objective set out in Prosperity for All: A National Strategy (DD ) and transport objectives set out in One Wales: Connecting the Nation, the Wales Transport Strategy (DD 6.1.2). The proposed Scheme would improve the reliability of the road system, especially between key settlements and sites on the main east-west routes, enhance international connectivity and increase safety and security on the highway network 6.3 The aim of the Published Scheme is to dual the A465 in a sustainable manner taking into account the local, regional and national social, economic and environmental needs and obligations. This aim would be met through the design which draws a balance between engineering design standards, social impacts and preserving the natural and built environment as far as is practical. 6.3 The over-arching Scheme objectives are to: Facilitate economic regeneration of the Heads of the Valleys area by improving accessibility, reducing journey time and improving journey time reliability. Strengthen resilience on the A465 by improving standards and enhancing road safety Page 11 of 20

13 6.4 The Scheme specific objectives for the Published Scheme based on the problems identified are: i. Maintain the current level of service and to carry out improvements; ii. Reduce journey times for private and commercial road users; iii. Facilitate economic regeneration; iv. Enhance road safety and reduce casualties; v. Deliver a Scheme that is sustainable; vi. Improve provision for cyclists and pedestrians, providing opportunity for healthy lifestyle and a reduction in short vehicle journeys; vii. Deliver a Scheme which minimises future maintenance requirements and disruption to the network; viii. Reduce journey time variability and improve resilience on the A465; ix. Use the A465 to manage traffic effectively and improve resilience on the strategic road network in South East Wales; x. Deliver a Scheme that integrates with public transport and the local transport network; and xi. Do all this with proper care for the environment. Page 12 of 20

14 7. Description of the Published Scheme 7.1 The Published Scheme is approximately 17.7km long and would extend from Dowlais Top, north-east of Merthyr Tydfil, to the junction with the A4059 and A4061 at Hirwaun Roundabout, south-west of Hirwaun. The Scheme would include a 1.4km length of off-line improvement between the Hirwaun and Trewaun Junctions and a short offline section east of the widened Taf Fechan viaduct with the remainder improved by on-line widening of the existing A It is proposed to upgrade the existing 3 lane road to a dual carriageway with free flowing grade-separated junctions. The road cross-section would comprise twin 7.3m wide carriageways, with 1.0m wide hard strips, 2.5m (minimum) wide verges and a 2.5m (minimum) wide central reserve. 7.3 The new road would be a 70mph dual carriageway with six grade separated junctions allowing drivers on the A465 to pass through uninterrupted. 7.4 The Published Scheme has been designed by reference to the Design Manual for Roads and Bridges, with appropriate relaxations and departures from standard to enable minimum land take commensurate with safe design and mitigation measures. 7.5 The environmental and economic appraisal of the Published Scheme assumes that the Cynon Valley Gateway (Aberdare Bypass), which is a priority project for RCTCBC, would be completed. Page 13 of 20

15 8. Environmental Appraisal and Mitigation 8.1 The environmental assessment of impacts and effects of the proposed improvement, together with mitigation measures are reported in detail in the Environmental Statement (DD , ) and Environmental Statement Supplement (DD ). An Appropriate Assessment has been carried out to determine the impact on the Blaen Cynon SAC and the Usk Bat Sites SAC (DD 2.2.9). Page 14 of 20

16 9. Sustainable Development 9.1 The development of this Scheme has taken into account the requirements of the Well-being of Future Generations (Wales) Act 2015 (Well-being Act) (DD ) and a Sustainable Development Report (DD ) and Sustainable Development Report Supplement (DD 2.4.4) have been published. Page 15 of 20

17 10. Construction 10.1 Subject to satisfactory completion of the statutory procedures, a Project Company including contractors, designers and financiers would be procured to detail design, build, finance and operate the Scheme. Construction is expected to take approximately three years commencing in 2019 with the road being opened in The procurement contract would include requirements to maintain traffic flow along the A465 and a mechanism for charging the Project Company for non-permitted lane and road closures to incentivise the Project Company to keep them to a minimum The procurement contract would also include requirements for Community Benefits. These would include targets to maximise the impact of public spending in the local communities and a mechanism for deductions from monies owed to the Project Company for failure to deliver these targets. Page 16 of 20

18 11. Land Acquisition and Compensation 11.1 The land-take and rights to be acquired shown in the CPO is the minimum necessary to construct, mitigate, operate and maintain the Published Scheme. Land required only during the construction phase for temporary works has been separately identified in the Welsh Government letters, which accompanied the publication of the CPO The provisions of the Acquisition of Land Act 1981 (DD ) would apply. Page 17 of 20

19 12. Summary of Support, Objection and Representations 12.1 At the time of writing this Summary a total of 144 letters have been received in response to the published draft Orders. Of these 101 have been classed as objections, 1 as letters of support and 42 as miscellaneous. 3 objections are from statutory bodies. 10 objections have been withdrawn. Page 18 of 20

20 13. Conclusions 13.1 The Published Scheme would accord with key relevant Welsh Government, regional and local policies and plans The proposals would meet the Scheme objectives and provide a highway designed to current standards, with improved safety, greater overtaking opportunities, faster journey times and more reliable journeys with resilience to accommodate future traffic The proposals would optimise consistency of highway standard for the dualled A465 between Abergavenny and Hirwaun. It would complete the link providing a continuous dual carriageway standard between the M50 and M4 and enhance the benefits for the areas served by Sections 1 to The proposals would establish the A465 as an attractive alternative to the M4, improve the performance of the A465 as a TEN-T route and improve the resilience of the trunk road network in south Wales The direct and wider economic benefits of the Scheme would exceed the cost of the Scheme. In addition, the Scheme would deliver benefits to the local communities through improved accessibility, social inclusion, opportunities during construction and long term investment in and regeneration of in the Heads of the Valleys economy and the wider Welsh economy Page 19 of 20

21 13.6 The Welsh Government recognises that the Published Scheme would have an impact on a number of residential dwellings and local businesses as well as this particularly sensitive local environment. However, when considered against the benefits of the Scheme and with appropriate mitigation measures in place, it concludes that on balance these impacts are acceptable The proposals would improve local, regional and nationally accessibility to key services, main settlements and sites, and would contribute to the overall regeneration of the Heads of the Valley area A465 Heads of the Valleys dualling is not a series of individual schemes, but one Scheme delivered in sections. The Welsh Government believes that completion of this final link is essential to ensure that the local, regional and national benefits and opportunities of this critical strategic route are maximised for the whole of the Heads of the Valleys region and Wales. Page 20 of 20

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

1. Summary of key points 2

1. Summary of key points 2 Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Planning & Sustainable document. It contains an update following the addition

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 2 For a local inquiry into: SUMMARY PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion

More information

A47 Business Case. Gateway to Growth ALLIANCE

A47 Business Case. Gateway to Growth ALLIANCE Business Case Gateway to Growth ALLIANCE September 2017 3 By planning for the longer term we can ensure that we maximise the resulting economic benefits for our communities. Cllr William Nunn, Leader of

More information

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case A21 TONBRIDGE TO PEMBURY DUALLING Statement of Case In Respect of Applications for the Demolition of Listed Buildings Under the Provisions of the Planning (Listed Buildings and Conservation Areas) Act

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Major Schemes and the wider Strategic Network

Major Schemes and the wider Strategic Network Major Schemes and the wider Strategic Network This Chapter details the County Council s priorities for taking forward Major Scheme projects between 2006 and 2011. It also reviews longer-term major scheme

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29. The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29

The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29. The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ / 019 PUBLIC INQUIRY QUESTION RAISED BY: The Inspectors DATE: 20/02/17 RESPONDED BY: Ben Sibert DATE: 10/03/17 SUBJECT: Engineering Proof of Evidence Elucidations The attached document

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981

Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981 Report Section 226 Town and Country Planning Act 1990 S.13 Local Government (Miscellaneous Provisions) Act 1976 Acquisition of Land Act 1981 The London Borough of Barnet (Brent Cross Cricklewood) Compulsory

More information

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals Camborne, Pool, Redruth East West link road key messages An overview of the project proposals Revision 1 May 2013 Introduction The aim of the new east west link now under construction is to improve accessibility,

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009 PERTH AND KINROSS COUNCIL 4 09/494 Enterprise and Infrastructure Committee 4 November 2009 STRATEGIC PRIORITIES FOR TOURISM AND AREA TOURISM PARTNERSHIP ARRANGEMENTS Report by Depute Director (Environment)

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Research Briefing Flood and Coastal Erosion Risk Management in Wales Research Briefing Flood and Coastal Erosion Risk Management in Wales Author: Wendy Dodds Date: September 2017 National Assembly for Wales Research Service The National Assembly for Wales is the democratically

More information

DEVELOPING A PLAN FOR SOUTH EAST S WATERWAYS

DEVELOPING A PLAN FOR SOUTH EAST S WATERWAYS LOOKING FORWARD TO THE NEXT 10 YEARS DEVELOPING A PLAN FOR SOUTH EAST S WATERWAYS Oxford Canal Corridor John Best, Chair South East Waterway Partnership Welcome Banbury / Oxford Canal Programme Partnership

More information

PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER

PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER OBJ/27-FOREST HEATH DISTRICT COUNCIL PROOF OF EVIDENCE S22 Weatherby

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642.

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER In consultation with the Chairman of the Assets Regeneration Committee Title Report of 13 October2015 Brent Cross Cricklewood Regeneration: Thameslink Station

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP Powys Local Development Plan Position Statement - Gypsy and Traveller Accommodation Incorporating an action statement and implications for the LDP September 2016 Powys LDP, Position Statement Gypsy and

More information

A63 Preferred Route Announcement

A63 Preferred Route Announcement Safe roads, Reliable journeys, Informed travellers Castle Street Improvements A63 Preferred Route Announcement Preferred Route Announcement i An Executive Agency of the Introduction During Spring 2009,

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

Bus and Community Transport Services in Wales

Bus and Community Transport Services in Wales Bus and Community Transport Services in Wales Call for evidence The Enterprise and Business Committee of the National Assembly for Wales is carrying out an inquiry into Bus and Community Transport Services

More information

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study Item: 11 Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY Regional Air Service Development Study PURPOSE OF REPORT To introduce the draft Executive Summary of the Regional Air

More information

West of England. Priority Places Requiring Public Investment

West of England. Priority Places Requiring Public Investment West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips

More information

Paul Griffiths, BEng (Hons), IENG, MCIHT

Paul Griffiths, BEng (Hons), IENG, MCIHT The Cheshire East Borough Council (Crewe Green Link South) Compulsory Purchase Order 2013 Public Inquiry Further Statement of Evidence Spur Roads Paul Griffiths, BEng (Hons), IENG, MCIHT June 2013 Contents

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

In your area. Stonebroom to Clay Cross LA09. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

Welcome and introduction

Welcome and introduction Welcome and introduction Welcome to this public exhibition. The purpose of the exhibition is to present the preferred option for the Maybole Bypass and explain the need for the scheme, its objectives and

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial

More information

Message from the Managing Director... r...

Message from the Managing Director... r... Message from the Managing Director... r... Our first full trading year has been a challenging and rewarding period for the team during the early life of the Company, a year during which we have gained

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

M20 junction 10a improvement scheme. We want to hear your views

M20 junction 10a improvement scheme. We want to hear your views M20 junction 10a improvement scheme We want to hear your views March 2016 2 About us Highways England, formerly the Highways Agency, is a government run company. We are responsible for operation, maintenance

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).

More information

Working Towards Sustainable Tourism in England s AONBs

Working Towards Sustainable Tourism in England s AONBs Working Towards Sustainable Tourism in England s AONBs Purpose: this Accord sets out a shared vision for tourism in England s Areas of Outstanding Natural Beauty (AONBs) and outlines the contribution that

More information

M54 to M6/M6 Toll Link Road Public consultation

M54 to M6/M6 Toll Link Road Public consultation to M6/M6 Toll Link Road Public consultation 15 September 2017 to 13 October 2017 Contents Introduction 4 5 Why do we need this scheme? 6 Previous consultation 7 8 Modified options 9 Option B West 10 Option

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales. Guidance for the Tourism Industry

Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales. Guidance for the Tourism Industry Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales Guidance for the Tourism Industry August 2013 Figure 1: Motorway and Trunk Roads in Wales Holyhead A55 Bangor Conwy Llandudno

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

Jim O Sullivan Chief Executive

Jim O Sullivan Chief Executive Jim O Sullivan Chief Executive Imperatives Customer Service Safety Delivery The Strategic Road Network (SRN) Connects the nation Supports the wider transport network Drives the economy 4,300 miles of SRN

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction