Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Size: px
Start display at page:

Download "Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1"

Transcription

1 Environmental Statement Page INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway) line and to carry out linked improvements to the existing railways between Airdrie and Drumgelloch in the west and Bathgate and Edinburgh in the east. These proposals will enable the provision of a passenger service which runs from west of Glasgow s Queen Street Station to Edinburgh s Waverley Station, via Airdrie and Bathgate, with intermediate stations at Drumgelloch, Caldercruix and Armadale. The proposal arose from the Scottish Executive s Central Scotland Transport Corridor Studies (CSTCS) as a potential mitigation measure to alleviate traffic pressure on the M8 east-west motorway route and enhance public transport through Central Scotland. 1.2 Initial Technical Feasibility Study and Scheme Development In January 2003, the Scottish Ministers accepted the recommendations of the CSTCS seeking to re-open the Airdrie to Bathgate rail link as part of a frequent service from West of Glasgow to Edinburgh, and committed to provide funding for the development of the project. The detailed routeing and engineering feasibility of the rail link was assessed by Jacobs Babtie in an Initial Technical Feasibility Report completed in June Jacobs Babtie were later appointed in February 2005, through competitive tendering as the Project Manager for the subsequent development stages through to construction completion. Network Rail accepted the invitation to act as Promoter of the schemed, in principle, in May 2005 and formally took on this role on 1 st October The Promoter has worked with Jacobs Babtie and other key stakeholders to develop the details of the scheme including engineering design, stakeholder and public consultations, timetabling, and station locations, leading to the preparation of the Bill documents. A Design Development Appraisal to demonstrate compliance of the scheme with the principles of planning and appraisals described in Scottish Transport Appraisal Guidance (STAG) has been completed. 1.3 Proposed Passenger Service The scheme will significantly improve public transport opportunities for the large population residing in the suburbs of the major cities and outlying towns along the route, in order to reach employment locations away from the centres of Glasgow and Edinburgh. By reducing the current need to change modes during journeys it will increase the attractiveness of public transport to less mobile groups and to car users alike. This service will attract some patronage from alternative public transport services, such as competing bus and parallel train services, by virtue of the direct suburb to suburb links it provides. The higher frequency train services will provide a more attractive alternative to the private car for many journeys in the M8 corridor. Journey times by public transport for these journeys will be considerably shorter than at present. The Promoters estimate that the introduction of this proposal will offer good value for money with a Benefit/Cost Ratio of The new railway will provide a passenger service using electric trains with 4 trains per hour frequency in each direction. It will restore and enhance a public transport link that has been lacking since the railway was closed. Buses have not provided an alternative to a railway service with the result that access to the area is difficult. This has left the area in North Lanarkshire cut off from sources of employment and education in Edinburgh and the area in West Lothian finding the same difficulty travelling to Glasgow and the west.

2 Environmental Statement Page 2 The 23km (14.4 miles) of re-opened railway along with the upgraded Bathgate Branch would enable the 4 trains per hour (tph) in each direction to operate in the following pattern: All existing stations west of and including a relocated Drumgelloch Station are to maintain their current service pattern of 4 tph to Airdrie and 2tph at Drumgelloch. Intermediate stations at Caldercruix and Armadale to have stops at 2tph frequency Relocated Bathgate Station, Livingston North, and Uphall are to have their stops increased from 2tph to 4tph. 1.4 Proposed Works between Drumgelloch and Bathgate The proposal is that the line be double tracked and electrified throughout, with the potential of extension of the Helensburgh and Balloch services beyond Airdrie and Drumgelloch to Edinburgh. There will also be potential to operate services to Paisley and Glasgow Airport. The proposed route is split between active parts of the Scottish rail network and a section between Drumgelloch and Bathgate where the previous rail alignment has largely been converted to cyclepath. Considerable work is required to bring back the former alignment into use as a modern passenger railway. This would include: Laying track along the entire route length to current standards; Realignment of sections of the alignment to meet the line speed criteria and utilise the available solum; Assessment of impact and identification of possible mitigation options for residential and other developments adjacent to the proposed alignment; Assessment of and proposed remedial works to the numerous bridges, culverts and retaining walls along the route; Upgrading or closure of various crossings of the former railway; Electrification of the route; Installation of an appropriate signalling and telecommunications system along the route, including two radio masts; Associated civil engineering works along the route; and Re-alignment of the existing cyclepath. 1.5 Linked Improvements The linked improvements are required on the existing railway to ensure there is sufficient track capacity to accommodate the new services and to electrify those sections that are not currently electrified. This includes: Works necessary to re-double the Airdrie-Drumgelloch and Bathgate-Cawburn Junction sections of line; An assessment of clearances and works necessary to electrify the line from Airdrie/ Drumgelloch to Haymarket; Changes to signalling; Installation and/or upgrading of overhead line equipment and power supplies.

3 Environmental Statement Page Statutory Context Scottish Private Bills The construction of new railway infrastructure requires specific statutory authorisation. (This is needed so as to give statutory sanction to what could otherwise be a public or private nuisance and as the only means of authorising the compulsory purchase of the land required for the railway). Prior to devolution, railways in Scotland were authorised by means of provisional orders made under the Private Legislation Procedure (Scotland) Act 1936, which confers functions on the Secretary of State and the UK Parliament. The Scotland Act 1998 (Modifications of Schedule 5) Order 2002 had the effect of devolving to the Scottish Parliament functions connected with the promotion and construction of railways which start, end and remain in Scotland. Such railways must now be authorised by a Private Bill in the Scottish Parliament Environmental Impact Assessment (Scotland) Regulations 1999 (SI 1999/1) European legislation (EC Directive 85/337 EEC as amended by EC Directive 97/11/EC) provides the framework for Environmental Impact Assessment ( EIA ). In Scotland, this is transposed into domestic law for development projects consented under planning legislation through the Environmental Impact Assessment (Scotland) Regulations 1999 (as amended by the Environmental Impact Assessment (Scotland) Amendment Regulations 2002) ( the EIA Regulations ). The requirements of the EIA Regulations are applied to the procedures for Scottish Private Bills authorising works by virtue of Rule 9A.2.3(c)(iii) of the Standing Orders of the Scottish Parliament and Annexes K to N of the Presiding Officer s Determinations. This ES has been prepared for and on behalf of Network Rail in accordance with those requirements Permitted Development Rights The Bill, if passed, will effectively operate as a granting of planning permission in respect of the works it authorises. This is because article 3 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 ( the 1992 Order ) grants planning permission for the classes of development specified in Schedule 1 to the Order, in particular Class 29 in Part 11 (Development under Local or Private Acts or Orders) and Class 34 of Part 13 (Development by Statutory Undertakers). Class 29 specifies development authorised by (among other legislative instruments) an Act of the Scottish Parliament. The extent of permission granted is restricted in the ways described in Class 29 and Class 34 and development authorised by article 3 may require environmental assessment. 1.7 Bill Objectives The purpose of the Bill is to seek and obtain all necessary powers to construct and reopen the rail link between Airdrie and Bathgate with an electrified double track railway that would generally follow the solum of the old railway line. The Bill also provides for linked improvements to existing railway lines to provide for an electrified double track railway between west of Glasgow and Edinburgh via Airdrie and Bathgate. This involves works on and adjacent to sections of the existing railway lines at Airdrie to Drumgelloch, and Bathgate to Edinburgh. Additional stations are proposed for Caldercruix and Armadale and relocated stations at Drumgelloch and Bathgate. The existing cycle track on the former railway solum is to be relocated.

4 Environmental Statement Page 4 The objectives of such a railway are: to improve direct access to labour markets in Glasgow, Edinburgh, and West Lothian for people living in the Airdrie to Uphall corridor. to stimulate economic growth of the Airdrie to Uphall corridor by improving the connectivity of the area. to assist in the delivery of social inclusion to communities in the Airdrie to Uphall corridor by providing enhanced public transport opportunities to those without access to private cars. to contribute towards increasing the number of people using public transport in Central Scotland and provide these communities with improved access into the national rail network. to offer a public transport alternative to the M8 thus helping to reduce the rise in road congestion and subsequent environmental impacts. to construct a rail link that will allow for existing services on the Glasgow North electrics to operate as through services to Edinburgh providing an alternative to the Edinburgh - Glasgow main line service, thus assisting in reducing congestion at peak times Delivery of the Airdrie to Bathgate rail link is a key aim of national, regional and local transport and planning policy. In addition to authorising the construction of a railway between Airdrie and Bathgate, the Bill includes powers to do the following: Authorise the compulsory purchase of land or rights required for the works specifically authorised in the Bill or where further land is required for the linked improvements; Authorise the construction of replacement crossings of the railway and accesses to premises; Authorise the acquisition and use of land for two new stations, at Caldercruix and Armadale and relocated stations at Bathgate and Drumgelloch; Authorise the acquisition of rights to construct and maintain improvements to bridge and other railway structures; Provide for the relocation of the cyclepath which currently runs along the former Airdrie to Bathgate railway line; Authorise the acquisition and use of land for a light maintenance depot and a replacement rail served car storage yard, both at Bathgate. In connection with the works the Bill provides for the closure and/or diversion of some roads and footpaths that currently cross the former railway to avoid potential road/ rail incursions, and the construction of various ancillary works along the route as necessary to accommodate the railway. The linked improvements which form part of the project but which do not require special powers in the Bill, require the upgrading of the existing railway between Airdrie and Drumgelloch and east of the relocated Bathgate station on what is currently the Bathgate to Edinburgh line. These works include in particular: upgrading a section of existing single track through Livingston to double track renewal of existing freight line near Bathgate to passenger standard electrification of the route

5 Environmental Statement Page 5 re-construction of Livingston North and Uphall stations to accommodate double track bridge renewals. Some of these linked improvements may be carried out by the Promoter under its existing statutory powers and permitted development rights. However, many of the works require additional land outwith the existing operational railway where existing powers may not apply. Accordingly, the Bill contains the necessary powers for the Promoters to acquire the land and execute these works. The works at Livingston North and Uphall stations will require planning permission while listed building consent will be required for installation of overhead line equipment (OLE) on Birdsmill viaduct. 1.8 The Consultant Team To prepare the Environmental Statement to accompany the planning Private Bill, Jacobs Babtie commissioned Ironside Farrar, Environmental Consultants. Specialist input has been provided by the following consultants: Hamilton & McGregor Acoustics Division: Noise Andy Irwin Associates: Vibration Institute of Occupational Medicine: Air Quality AOC Archaeology: Cultural Heritage ECOS Countryside Services: Ecology, Biodiversity and Nature Conservation JDC Ecology: Badger Survey S J Pritchard: Bat Survey

6 Environmental Statement Page 6

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM CONTENTS INTRODUCTION 3 POLICY OBJECTIVES OF THE BILL 3 BACKGROUND 4 NECESSITY FOR A PRIVATE BILL 6 DETAILS OF THE PROPOSED RAILWAY

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

WAVERLEY RAILWAY (SCOTLAND) BILL

WAVERLEY RAILWAY (SCOTLAND) BILL WAVERLEY RAILWAY (SCOTLAND) BILL PROMOTER S MEMORANDUM INTRODUCTION 1. This document relates to the Waverley Railway (Scotland) Bill introduced in the Scottish Parliament on 11 September 2003. It has been

More information

STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL

STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM INTRODUCTION 1. This document relates to the Stirling-Alloa-Kincardine Railway and Linked Improvements Bill introduced

More information

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services. BRIEFING NOTE FOR BUS OPERATORS Inverclyde statutory Quality Partnership Scheme - 2015 What is an sqps? A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Changes to your services

Changes to your services Changes to your services Saturday 30 May - Sunday 26 July 2015 Glasgow - Falkirk High - Edinburgh Alloa / Dunblane / Stirling - Edinburgh Edinburgh - Glenrothes - Edinburgh (Fife Circle)...plus busier

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT Forth Crossing Public Transport Corridor: Introductory Notes The Scottish Association for Public Transport (SAPT) is concerned that the

More information

Scotland s railways - today

Scotland s railways - today Cynulliad Cenedlaethol Cymru National Assembly for Wales Y Pwyllgor Menter a Busnes Enterprise and Business Committee Ymchwiliad i r Blaenoriaethau ar gyfer Inquiry into the Priorities for the future dyfodol

More information

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013 Park and Ride Update Committee Strategy and Programmes Date of meeting 29 November 2013 Date of report 6 November 2013 Report by Assistant Chief Executive (Operations) 1. Object of report To update the

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

ON BEHALF OF NHS LOTHIAN, WE ARE DELIGHTED TO OFFER FOR SALE BANGOUR VILLAGE HOSPITAL, DECHMONT, WEST LOTHIAN.

ON BEHALF OF NHS LOTHIAN, WE ARE DELIGHTED TO OFFER FOR SALE BANGOUR VILLAGE HOSPITAL, DECHMONT, WEST LOTHIAN. On behalf of ON BEHALF OF NHS LOTHIAN, WE ARE DELIGHTED TO OFFER FOR SALE BANGOUR VILLAGE HOSPITAL, DECHMONT, WEST LOTHIAN. A UNIQUE DEVELOPMENT SITE IN SCOTLAND S CENTRAL BELT WITH THE POTENTIAL FOR

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS 2015/16 Council LOGO 0 ABOUT US Strathclyde Partnership for Transport (SPT) is the Regional Transport Partnership for the west of Scotland and is a partnership of twelve councils. SPT was established by

More information

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh Gateway Connected Bathgate Lothian Gateway 05 The Site Whitehill Industrial Estate Development is being undertaken by Riddochhill Developments Limited, based at: Stotforth Hill House Windlestone Rushyford

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

EDINBURGH AIRPORT RAIL LINK BILL

EDINBURGH AIRPORT RAIL LINK BILL Final Draft 2 EDINBURGH AIRPORT RAIL LINK BILL Draft PROMOTER S MEMORANDUM INTRODUCTION 1. This document relates to the Edinburgh Airport Rail Link Bill introduced into the Scottish Parliament on [ ] 2005.

More information

WRITTEN STATEMENT BY THE WELSH GOVERNMENT

WRITTEN STATEMENT BY THE WELSH GOVERNMENT WRITTEN STATEMENT BY THE WELSH GOVERNMENT TITLE Environment (Amendment Etc.) (EU Exit) Regulations 2018 DATE 10 December 2018 BY Julie James AM, Leader of the House and Chief Whip Environment (Amendment

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

OFFICE INVESTMENT FOR SALE KELVIN HOUSE BUCHANAN GATE BUSINESS PA RK STEPPS GL ASGOW G33 6FB

OFFICE INVESTMENT FOR SALE KELVIN HOUSE BUCHANAN GATE BUSINESS PA RK STEPPS GL ASGOW G33 6FB KELVIN HOUSE BUCHANAN GATE BUSINESS PA RK STEPPS GL ASGOW G33 6FB Executive Summary Successful and growing Business Park location which has attracted a range of high profile occupiers including Scottish

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

TO THE HONOURABLE THE COMMONS OF THE UNITED KINGDOM OF GREAT BRITAIN AND NORTHERN IRELAND IN PARLIAMENT ASSEMBLED

TO THE HONOURABLE THE COMMONS OF THE UNITED KINGDOM OF GREAT BRITAIN AND NORTHERN IRELAND IN PARLIAMENT ASSEMBLED =53 IN PARLIAMENT HOUSE OF COMMONS SESSION 2005-06 CROSSRAIL BILL PETITION Against the Bill - On Merits - Praying to be heard by Counsel, &c. TO THE HONOURABLE THE COMMONS OF THE UNITED KINGDOM OF GREAT

More information

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is June 2018 www.hs2.org.uk In your area Stourton to Hunslet LA17 High Speed Two (HS2) is to Leeds M621 HUNSLET A639 STOURTON M621 A61 M1 A63 A639 M1 HS2 Phase 2b to Birmingham the Government s planned new

More information

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership South West of Scotland Transport Partnership.org.uk Regional Transport Strategy Revised June 2008 Serving Dumfries and Galloway South West of Scotland Transport Partnership.org.uk SOUTH WEST OF SCOTLAND

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS Q1. Why are parking charges being introduced to East Lothian`s coastal car parks? The coastal car parks are required to assist

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

AGENDA ITEM No.?.::...

AGENDA ITEM No.?.::... AGENDA ITEM No.?.::..... NORTH LANARKSHIRE HEALTH AND SOCIAL CARE INTEGRATION JOINT Motherwell, 18 July 2017 at 1.30 pm. Note of Meeting of the NORTH LANARKSHIRE HEALTH AND SOCIAL CARE INTEGRATION JOINT

More information

Submission by Heathrow Southern Railway Ltd.

Submission by Heathrow Southern Railway Ltd. Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,

More information

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition:

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition: LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE 568 Introduction 1. This paper invites the Committee to consider for the third time the following Petition: PE 568 by the Scottish Accessible Transport

More information

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 EARL/S2/06/9/A EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 The Committee will meet at 2.00 pm in Committee Room 6 1. Decisions on taking

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

M54 to M6/M6 Toll Link Road Public consultation

M54 to M6/M6 Toll Link Road Public consultation to M6/M6 Toll Link Road Public consultation 15 September 2017 to 13 October 2017 Contents Introduction 4 5 Why do we need this scheme? 6 Previous consultation 7 8 Modified options 9 Option B West 10 Option

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

The Commission states that there is a strong link between economic regulation and safety. 2

The Commission states that there is a strong link between economic regulation and safety. 2 European Cockpit Association Piloting Safety ECA POSITION ON THE PROPOSAL FOR REGULATION ON COMMON RULES FOR THE OPERATION OF AIR TRANSPORT SERVICES IN THE COMMUNITY - Revision of the Third Package of

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

What is Rail Futures?

What is Rail Futures? What is Rail Futures? Rail Futures Institute is an independent nonpartisan group. It was formed to advocate cost-effective rail and intermodal solutions for public transport and freight problems based

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17 Proposed Capital Programme to 2018/19 including the Capital Budget Date of meeting 4 March 2016 Date of report 29 February 2016 Report by Assistant Chief Executive (Business Support) 1. Object of report

More information

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642.

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER In consultation with the Chairman of the Assets Regeneration Committee Title Report of 13 October2015 Brent Cross Cricklewood Regeneration: Thameslink Station

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as

More information

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011 STATUTORY INSTRUMENTS 2011 No. 1040 ROAD TRAFFIC The Traffic Signs (Amendment) Regulations and General Directions 2011 Made - - - - 30th March 2011 Laid before Parliament 6th April 2011 Coming into force

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY (COUNCILLOR RAMESH PATEL)

PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY (COUNCILLOR RAMESH PATEL) CYNGOR DINAS CAERDYDD CITY OF CARDIFF COUNCIL CABINET: 15 DECEMBER 2016 CARDIFF WEST TRANSPORT INTERCHANGE REPORT OF DIRECTOR CITY OPERATIONS AGENDA ITEM: 9 PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY

More information

Waverley Railway (Scotland) Bill. Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY

Waverley Railway (Scotland) Bill. Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY Waverley Railway (Scotland) Bill Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY Non -Technical Summary of the Outline Business Case submitted to the Waverley Railway (Scotland) Bill Committee Turner

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016 NHS Greater Glasgow & Clyde NHS Board Chief Officer, East Dunbartonshire HSCP 20 February 2018 Paper No: 18/08 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND)

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Union Station Rail Corridor East

Union Station Rail Corridor East Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed

More information

Welcome and introduction

Welcome and introduction Welcome and introduction Welcome to this public exhibition. The purpose of the exhibition is to present the preferred option for the Maybole Bypass and explain the need for the scheme, its objectives and

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Scottish Parliament Bibliography

Scottish Parliament Bibliography Scottish Parliamentary and Statutory Publications July 2006 - April 2007 SPCB 2009 This document is also available on the Scottish Parliament website: The text pages of this document are produced from

More information

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy

More information

Official Journal of the European Union L 146/7

Official Journal of the European Union L 146/7 8.6.2007 Official Journal of the European Union L 146/7 COMMISSION REGULATION (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

United Kingdom Civil Aviation Authority

United Kingdom Civil Aviation Authority Proposed Changes to CAA Scheme of s United Kingdom Civil Aviation Authority 1 INTRODUCTION 1.1 Details of revisions proposed to apply from 1 April 2017 are shown in red within this Enclosure. Current charges

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Transport for Lancashire Committee 1 st July 2013 Local Major Transport Scheme Investment Programme Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Executive

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

UK Experience with Bus Restructuring

UK Experience with Bus Restructuring UK Experience with Bus Restructuring Outline 1. Background 2. Bus Deregulation outside London 3. London strategy 4. Results to date 5. Edinburgh Case Study 1 Background Prior to mid-1980s, UK local bus

More information

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information

Scottish Pilgrim Routes Forum Scottish Charitable Incorporated Organisation - SC045212

Scottish Pilgrim Routes Forum Scottish Charitable Incorporated Organisation - SC045212 Scottish Pilgrim Routes Forum Scottish Charitable Incorporated Organisation - SC045212 Report and Accounts for the period 1 st August 2015 to 31 July 2016 (1) Reference and administrative information Scottish

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016 Agenda 11 Strathclyde Bus Alliance progress update Date of meeting 9 December 2016 Date of report 15 November 2016 Report by Assistant Chief Executive (Operations) 1. Object of report The object of this

More information

In your area. South Kirkby to Sharlston Common LA14. June Introduction

In your area. South Kirkby to Sharlston Common LA14. June Introduction June 2018 www.hs2.org.uk In your area South Kirkby to Sharlston Common LA14 A645 to Leeds A628 A638 Sharlston A639 Crofton Wragby HS2 Phase 2b Wintersett A638 Kinsley Ryhill A628 Hemsworth A6201 South

More information

PORTISHEAD BRANCH LINE (METROWEST PHASE 1) ORDER NOTICE PUBLICISING A PROPOSED APPLICATION FOR A DEVELOPMENT CONSENT ORDER

PORTISHEAD BRANCH LINE (METROWEST PHASE 1) ORDER NOTICE PUBLICISING A PROPOSED APPLICATION FOR A DEVELOPMENT CONSENT ORDER Section 48 Planning Act 28 Regulation 4 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 29 PORTISHEAD BRANCH LINE (METROWEST PHASE 1) ORDER NOTICE PUBLICISING A PROPOSED

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Aeroplane Noise Regulations (as amended and as applied to the Isle of Man)

Aeroplane Noise Regulations (as amended and as applied to the Isle of Man) Aeroplane Noise Regulations 1999 (as amended and as applied to the Isle of Man) Contents Table of Contents Contents Foreword... i... iii 1. Citation and commencement... 1 3. Interpretation... 1 4. Noise

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd The Hybrid Bill and the journey to Royal Assent Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing

More information