Level Crossing Risk Assessment Polegate MCB

Size: px
Start display at page:

Download "Level Crossing Risk Assessment Polegate MCB"

Transcription

1 Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1

2 CONTENTS 1 INTRODUCTION Background Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE Crossing details Environment Future developments Incident history over the last 5 years 10 3 OPTION ASSESSMENT Residual risks Option Selection 12 4 APPROVALS 13 Polegate MCB Level Crossing Risk Assessment 2

3 1 INTRODUCTION 1.1 Background This document provides the necessary supporting safety information to a decision making process for the renewal of Polegate MCB level crossing, leading to recommendations as to the most suitable level crossing option that reduces the risk to as low as reasonably practicable. This report includes the necessary risk assessment to support the chosen option. 1.2 Reason for the risk assessment This risk assessment has been produced in conjunction with the East Sussex Resignalling project which will see the abolition of Polegate Signalbox and the renewal of Polegate MCB Crossing. This document demonstrates the decision making undertaken in determining the practicability of this proposal and the evaluation of the necessary safety measures required at the level crossing; culminating in a single preferred option. This document is derived from and fulfils the guidance criteria stipulated. The signalling renewal works associated with this project, East Sussex re-signalling, is driven by asset condition, safety and obsolescence. The project is also part of the National Operating Strategy (NOS) scheme which will achieve the signalling renewal and the Control Period 4 (CP4) operating strategy objectives through the resignalling of the East Sussex line. The scope of the project includes the abolition of 5 mechanical Signal Boxes, Berwick, Polegate, Hampden Park, Pevensey and Westham and Bexhill. The project will also close the manned gate box at Havensmouth and re control the existing Eastbourne area to a new workstation which will be situated in the new Three Bridges Operating Centre. The project is also looking at line speed improvements where existing Permanent Speed Restrictions are present between Glynde and Hampden Park. Polegate MCB Level Crossing Risk Assessment 3

4 2 DESCRIPTION OF THE SITE 2.1 Crossing details Down side crossing approach Up side crossing approach Polegate MCB Level Crossing Risk Assessment 4

5 2.1 Crossing Details cont d Crossing Name Crossing Type Strategic Route Network Rail Line of Route Engineers Line Reference (ELR) Mileage OS Grid Reference Post Code Road Name (type) Local Authority Supervising Signalbox Electrification (type) Number of Running Lines Line Speed at Crossing Maximum Permissible Line Speed Polegate MCB Sussex Keymer Junction to Eastbourne KJE3 19m 35ch TQ BN26 6AQ Unclassified - High Street East Sussex County Council Polegate 3 rd Rail DC Two 90mph 90mph Polegate MCB Level Crossing Risk Assessment 5

6 2.2 Environment Polegate MCB Level Crossing Risk Assessment 6

7 a) approaches Polegate MCB is of a single carriageway in each direction of travel. The carriageways are clearly defined with central road markings painted up to and including over the level crossing. The width of each carriageway approach remains consistent throughout and this is continued across Polegate MCB itself. There are no significant gradients present on either side of the level crossing which could be considered detrimental to the stopping of traffic. Polegate MCB is situated on an unclassified road High Street and is situated adjacent to Polegate Railway Station. High Street Polegate links the A22 to the A27. b) Local properties, businesses and amenities Polegate MCB is situated in a rural/urban area with residential properties and a mixture off retail outlets on both sides of the crossing. There are also local schools within the area. c) Rail approach and usage Polegate MCB level crossing is located on the line of route known as the Keymer Junction to Eastbourne line. The permissible line speed at this location is 90mph on both lines. The maximum permissible line speed is 90mph. The level of service over the crossing is normally 8 trains per hour, 4 to Lewes and 4 to Eastbourne. There is no booked freight on this line with services being electric passenger services operated by Southern Trains. Future Control of Polegate MCB Following the abolition of 5 mechanical Signal Boxes, Berwick, Polegate, Hampden Park, Pevensey and Westham and Bexhill, closure of the manned gate box at Havensmouth and the re control the existing Eastbourne area to a new workstation which will be situated in the new Three Bridges Operating Centre. This workstation will also be responsible for the supervision of 4 MCB OD, 2 CCTV and 4 AHB crossings. A full ergonomics study was undertaken in August 2011 which concluded that the existing signalling controls of the Berwick, Polegate, Hampden Park, Pevensey and Westham, Bexhill, Havensmouth and Eastbourne could be transferred to the new Three Bridges Operating Centre. This ergonomics study however was based on the Signaller having operation of 3 MCB OD, 3 CCTV and 4 AHB crossings. The ergonomics study will be revisited once final design is complete. Polegate MCB Level Crossing Risk Assessment 7

8 Sectional Appendix Extract Polegate MCB Level Crossing Risk Assessment 8

9 2.3 Future developments There are no future developments planned in the Berwick MCB area. Network Rail continues to monitor planning applications and will review the risks at Berwick should things change Polegate MCB Level Crossing Risk Assessment 9

10 2.4 Incident history over the last 5 years The following table details the incident number and type known to have occurred at Polegate MCB level crossing within the past 5 years. Incident date Fataities Collisions Barrier strikes Near misses Other 30/11/ /05/ /08/2009 Person vaulted the barriers MOP tripped on crossing Taxi zig zagged around barriers 04/01/2010 White van struck barrier 24/01/ /07/ /11/ youths climbed over barriers MOP walked off the end of platform MOP on crossing refused to move 28/09/2011 Mobility scooter struck barrier 20/12/2011 Bus struck barrier male walked across in front of stationary train when barriers were down not a near miss There have been a number of red light violations, and MOP jumping the barriers which are listed above under misuse. There have been no reported near misses. There has been 1 reported accident at this location which involved a tripping accident on the crossing. Polegate MCB Level Crossing Risk Assessment 10

11 3 OPTION ASSESSMENT 3.1 Residual risks Polegate MCB level crossing was risk assessed on the 22 nd June 2010 in accordance with the approved company standards and processes. The collected data set derived (inclusive of thirty minute census) was fully evaluated by the All Level Crossing Risk Model (ALCRM). The ALCRM evaluation for Polegate is an individual risk score of F and a collective risk score of 2 based upon the collection data set defined above; F2.* The key risk drivers identified by the toolset and which contribute toward this risk score are: Crossing near station Large number of users The census carried out in June 2010 translated into an expected average of 6885 vehicular movements and 2214 pedestrian movements per day over the level crossing. For later comparison, a full 9-day census was undertaken. The survey covered the period Saturday, 15 January 2011 to Sunday, 23 January 2011 inclusive. The survey hours were scheduled as to hours daily. The results of the 9-day survey are shown in the table below:- The Nationwide Data Collection service who undertook the survey observed the following busiest times: For vehicles the busiest quarter hourly period occurred at hours on Thursday 20 th January vehicles. For pedestrians the busiest quarter hourly period occurred at hours on Monday 17 th January Adult pedestrians and 103 unaccompanied children. Polegate MCB Level Crossing Risk Assessment 11

12 3.2 Option Selection The table below affords a summary of the options considered*, the safety reductions achieved and the benefit to cost ratio applicable to each. * The options listed are not ordered by preference. * Cost benefit analysis has been undertaken within ALCRM for comparable purposes; third party funding agreed in principle for delivery. Option ALCRM Risk Score ALCRM FWI Safety Benefit FWI Cost Benefit Cost Ratio Comments MCB Manually Controlled F2 MCB-CCTV H ,000, MCB-OD (obstacle detection system) H ,000, Closure by bridging M ,000, This option would require the attention of the Signaller at Three Bridges Operating Centre to operate the barrier controls. This option would be automatic and would only require the Signaller at Three Bridges Operating Centre to monitor the barrier controls. This option would eradicate delay to users of Polegate MCB and also nullify all associated risk drivers attributed to the level crossing. Polegate MCB Level Crossing Risk Assessment 12

13 The upgrade of Polegate MCB level crossing to type approved full barrier MCB-OD is the single option selected for progression following evaluation. This option is considered to represent the greatest cumulative benefit when taking account of safety risk, risk reduction and cost benefit. Informed decision making With closure and bridging discounted through lack of business justification, the upgrading of the level crossing to MCB OD was considered. MCB-OD will have the facility to record red light jumpers registration numbers which will reduce the misuse at this location. It was noted that there were differences in the levels of traffic and pedestrians recorded in ALCRM and that of the 9 day census. 4 APPROVALS Prepared By: Date: 02 April 2013 Approved By: Signature: Job Title: Project Operations Interface Specialist Signature: Job Title: Operations Risk Advisor Date: 29 May 2013 Approved By: Date: 29 May 2013 Signature: Job Title: Signal & Telecoms Maintenance Engineer Polegate MCB Level Crossing Risk Assessment 13

Thank you for your of 1st June You requested the following information:

Thank you for your  of 1st June You requested the following information: By email: d Network Rail Freedom of Information The Quadrant Elder Gate Milton Keynes MK9 1EN T 01908 782405 E FOI@networkrail.co.uk 26 th June 2018 Dear, Information request Reference number: FOI2018/00689

More information

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014. 2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December Laxon Terrace - Sarawia Click to add title Street Rail Level Crossing Public Forum December 2012 www.aucklandtransport.govt.nz Overview of Presentation Objectives and Reasons for Separation Project Background

More information

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach It is a domestic level crossing which is located at the station. At CROWLE STATION level crossing the orientation of the road/path

More information

Road-Rail Interface Safety

Road-Rail Interface Safety Road-Rail Interface Safety A guide to RSSB research in Road-Rail Interface Safety April 2011 RSSB 1 Road-Rail interface safety research 2 RSSB The photographs in the guide appear courtesy of ATOC/Paul

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

STIRLING TO KINCARDINE RE-OPENING OF LINE

STIRLING TO KINCARDINE RE-OPENING OF LINE PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER

PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER OBJ/27-FOREST HEATH DISTRICT COUNCIL PROOF OF EVIDENCE S22 Weatherby

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Passive Level Crossings. Crossings where users are in control of their actions

Passive Level Crossings. Crossings where users are in control of their actions 1 Passive Level Crossings Crossings where users are in control of their actions / Level Crossings in your area Over 6,300 level crossings in the UK LNE & EM Route 1,870 level crossings. Gateshead Skiff

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

The case for a local rail station. At Great Blakenham, Suffolk.

The case for a local rail station. At Great Blakenham, Suffolk. The case for a local rail station At Great Blakenham, Suffolk. The London to Norwich (Great Eastern) main rail line passes through Great Blakenham in Suffolk, a village which adjoins Claydon and Barham.

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

Scotchbarn Lane, Prescot Accessibility Statement

Scotchbarn Lane, Prescot Accessibility Statement Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009) between Athlone and Westport Report 08061401 (issued 11 th of May 2009) Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent

More information

East Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure

East Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure East Sussex Strategic Partnership Transport Update 2 March 2016 Jon Wheeler Team Manager Strategic Economic Infrastructure Summary Transport and Economic Growth Strategic Transport Bexhill Hastings Link

More information

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility.

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. Up side crossing approach Down side crossing approach Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. It is an occupation level crossing which is located on Aliwal

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

All queries and paragraph references, as set out in red below, relate to Mark Brunnen s Proof of Evidence (NR27/1).

All queries and paragraph references, as set out in red below, relate to Mark Brunnen s Proof of Evidence (NR27/1). This note summarises the information requested by Cambridgeshire County Council at Public Inquiry for the Network Rail (Cambridgeshire Level Crossing Reduction) Order, together with Network Rail s responses.

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book GE/RT8000/HB18 Rule Book Uncontrolled When Printed Handbook 18 Duties of a level crossing attendant Handbook 18 Issue 4 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative

More information

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public.

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public. HERNE BAY AREA MEMBER PANEL 16 TH JANUARY 2018 Subject: Director/Head of Service: Decision Issues: Classification: CCC Wards: Summary: To Note/Comment: Next stage in process: Proposed Charges and Conditions

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016 Page 1 The Future of Wareham Foot Level Crossing Cabinet Date of Meeting 24 February 2016 Cabinet Member(s) Peter Finney Cabinet Member for Environment Colin Jamieson - Cabinet Member for Economy and Growth

More information

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007 DESIGN MANUAL FOR ROADS AND BRIDGES volume 8 section 2 traffic signs and lighting traffic signs and road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL A170 Sutton Bank Application for a Permanent Traffic Regulation Order (TRO) for Prohibition of HGVs The purpose of this document is to support a request from

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013 Park and Ride Update Committee Strategy and Programmes Date of meeting 29 November 2013 Date of report 6 November 2013 Report by Assistant Chief Executive (Operations) 1. Object of report To update the

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

M4 Junctions 3 to 12 Smart motorway

M4 Junctions 3 to 12 Smart motorway Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

Requirements for Level Crossings

Requirements for Level Crossings Railway Group Standard Requirements for Level Crossings Synopsis This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

Report To: Scrutiny Committee Date: 1 March Claire Onslow Head of Tourism & Economic Development

Report To: Scrutiny Committee Date: 1 March Claire Onslow Head of Tourism & Economic Development Agenda Item No: Report Title: Report No: Benchmarking Tourist Information Centres Report To: Scrutiny Committee Date: 1 March 2012 Lead Councillor: Ward(s) Affected: Report By: Cllr Tony Nicholson All

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT 14/02/2014 Reference number 102470 PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT DYKE ROAD CYCLE AND PEDESTRIAN IMPROVEMENTS PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT IDENTIFICATION TABLE Client/Project

More information

Lower Thames Crossing

Lower Thames Crossing Lower Thames Crossing Post-Consultation Scheme Assessment Report Volume 2 Volume 2: Introduction and Existing Conditions Lower Thames Crossing 2017 - INTRODUCTION AND EXISTING CONDITIONS Contents Section

More information

The Network Rail (Suffolk Level Crossing Reduction) Order

The Network Rail (Suffolk Level Crossing Reduction) Order Aidan Dunn Interim Director of Resource Management Suffolk County Council Endeavour House 8 Russell Road Ipswich IP1 2BX Network Rail James Forbes House 27 Great Suffolk St London SE1 0NS 27 July 2017

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information

Ermine Street Environmental Enhancements

Ermine Street Environmental Enhancements Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER

TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER Suffolk (Level Crossing Reduction) Order Statement of Case TRANSPORT AND WORKS ACT 992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER

More information

COMMERCIAL OPERATIONS

COMMERCIAL OPERATIONS Cornell University UAV Guidelines Office of Risk Management and Insurance Purpose: The Office of Risk Management and Insurance has published guidelines as a resource for members of the University community

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Ridership Growth Strategy (RGS) Status Update

Ridership Growth Strategy (RGS) Status Update For Information Ridership Growth Strategy (RGS) Status Update Date: July 10, 2018 To: TTC Board From: Deputy Chief Executive Officer Summary The TTC s Ridership Growth Strategy (RGS), with all its components,

More information

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan eastsussex.gov.uk East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan October 2013 Contents 1. Introduction... 3 2. East Sussex Rail Network... 4 3. Rail Responsibilities.... 6 4. Rail

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London Chapter 12 Route window W15 DOG KENNEL BRIDGE 12 Route window W15 12.6 southwards to North Park Road and Richings Park Golf Course. To the west side of this route window is the built-up edge of Slough

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

22-24 Station Road, Erdington, Birmingham, B23 6UB

22-24 Station Road, Erdington, Birmingham, B23 6UB Committee Date: 16/10/2014 Application Number: 2014/05377/PA Accepted: 24/07/2014 Application Type: Full Planning Target Date: 18/09/2014 Ward: Erdington 22-24 Station Road, Erdington, Birmingham, B23

More information