Ermine Street Environmental Enhancements

Size: px
Start display at page:

Download "Ermine Street Environmental Enhancements"

Transcription

1 Ermine Street Environmental Enhancements

2 As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme of environmental enhancements along Ermine Street. The scheme, co-designed with the Parish Council and local partners, was developed through a working group and the local community was consulted in 206 and 207 to finalise the design. Since then the scheme has been through an extensive Road Safety Audit assessment by Cambridgeshire County Council and has now been cleared for implementation. It was agreed that the works would go into a legally binding agreement as part of the S06 Agreement for the development, with a commitment for the scheme to be in place by the time the 250th home is occupied at Alconbury Weald. So far, the development has residents in about 30 homes and while the scheme is being delivered later than we had hoped we are still pleased to be delivering it ahead of schedule. This booklet sets out the principles, approach and detail of the final approved scheme and the planned programme of works for its implementation. If you have any queries or would like to talk through the scheme, please get in touch with Rebecca Britton at Urban&Civic: T E rbritton@urbanandcivic.com alconbury-weald.co.uk. The principles The aim of the scheme is to reduce the number of vehicles on Ermine Street passing through the Stukeleys and to control any increase along this route as a result of the new development. It does this by: Reducing the attraction of Ermine Street as a quicker short cut for cars; Reducing speeds within the Stukeleys and improving residents priority to the roads through the villages; and Enhancing the village feel and making it safer and more attractive for residents, and for those walking and cycling about. The plans The details of the plans are shown over the following pages and include: Narrowing the width of the Ermine Street carriageway. Changing the priority of key junctions through the village. Reducing the existing 40mph speed limit at the south end of Great Stukeley to 30mph. Additional measures will form part of a second phase of works later in the development, including: Cycle connection running the length of Ermine Street from Alconbury Weald, through the Stukeleys to Huntingdon. Additional pedestrian crossings and cycle crossings at key points. A review and potential implementation of additional speed restrictions. Delivery programme We have been working with local contractor, Breheny Civil Engineering, on delivery plans that minimise disruption whilst the work is being carried out. The work will be carried out in phases, starting this September at the north end of Little Stukeley. It will be completed during March 209. There will be a break from all works over Christmas and New Year. Phase one Running from the start of September to the middle of November, Mondays to Fridays. With works starting from the chicane end of Little Stukeley through to the Baptist Church by the USAF entrance. Traffic signals will commence Monday mornings at 9:30am and be off by 4pm on each Friday afternoon. On weekdays work will be from 8am till 7pm where possible to shorten the programme of works. Work will be undertaken using two way and three way traffic signals, as required, first at Mill Road Junction, then Sanders Close, then Church Way. The access to all homes will remain open and unrestricted. If a short period of restriction is required, this will be prearranged with the house occupier prior to work commencing. As each phase of work is delivered, each home along the affected area will receive an update and contact numbers for the work teams. Wider context and future plans This scheme has been developed in the context of a number of other wider developments, including: The A4 upgrade, which will see a whole new strategic route upgrade from Alconbury through to Cambridge. The existing A4 will become a local road to Huntingdon, renamed the A307. The Southern Gateway entrance will connect Alconbury Weald directly to the A4. The application for this connection has been submitted to the District Council. The access is the first part of a future transport hub at Alconbury Weald, which will include a Rail Station and prioritised bus connection as part of Guided Busway Route B.

3 KEY:- KEY:PAVEMENT CONSTRUCTION TYPE P - FULL DEPTH CONSTRUCTION TO PAVEMENT CONSTRUCTION TYPE P - FULL DEPTH CONSTRUCTION TO MI LL D A RO Central island to be added. 2 Existing traffic calming feature (chicane) to be retained. 3 Carriageway to be narrowed and verge extended. Central island removed but speed cushions replaced as part of new alignment 4 Junction alignment and priority will change so Ermine Street traffic slows to give priority to/check for any traffic from Mill Road. Road surface treatments will guide traffic within narrowed carriageway. 5 New speed cushions to be put in on new alignment. H OSE S CL CHURC DER SAN 2 FOR CONTINUATION SEE PREVIOUS PAGE 4 3 FOR CONTINUATION SEE NEXT PAGE 5 NOTE NUMBERS - REFER TO NOTES IN BOX NBURY O ANCE TR MAIN EN NOTE NUMBERS - REFER TO NOTES IN BOX BUS STOP PAVEMENT CONSTRUCTION TYPE P4 FOOTS CONSTRUCTED TO CCC HERCS APPIX - TYPE B PAVEMENT CONSTRUCTION TYPE P4 FOOTS CONSTRUCTED TO CCC HERCS APPIX - TYPE B Installation of new bus shelter and narrowing of carriageway with pavement surfacing to the junction with Church Way. 7 Removal of central island and reapplying speed cushions to new alignment of road.

4 KEY:- KEY:PAVEMENT CONSTRUCTION TYPE P - FULL DEPTH CONSTRUCTION TO PAVEMENT CONSTRUCTION TYPE P - FULL DEPTH CONSTRUCTION TO CCC HERCS APPIX. 2 ' H' ORT CH D 'N UR ROA CH R OA RCH D 'S FOR CONTINUATION SEE PREVIOUS PAGE CHU FOR CONTINUATION SEE NEXT PAGE D EN 0 9 NOTE NUMBERS - REFER TO NOTES IN THE BOX TH NOTE NUMBERS - REFER TO NOTES IN THE BOX Carriageway to be narrowed and verge extended, with central islands removed. 2 Junction priority and alignment changed to ensure Ermine Street traffic slows/stops to give right of way or check for traffic from Church Road. Landscaping and road surface treatments support the slowing and guiding of traffic along the new alignment. OU 8 PAVEMENT CONSTRUCTION TYPE P4 FOOTS CONSTRUCTED TO CCC HERCS APPIX - TYPE B PAVEMENT CONSTRUCTION TYPE P4 FOOTS CONSTRUCTED TO CCC HERCS APPIX - TYPE B 8 Remove central island and reinstate speed cushions on new alignment. 9 Changing of alignment and priority at junction to slow Ermine Street traffic to check for/give right of way to traffic from Church Road. This will enable landscaping and include surface treatments to guide drivers. 0 Narrowing of carriageway along the length, with verge extended and speed cushions removed, with repairs to carriageway.

5

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Introduction of traffic control measures to improve congestion and air quality within the town centre

Introduction of traffic control measures to improve congestion and air quality within the town centre Objectives Introduction of traffic control measures to improve congestion and air quality within the town centre Independent of a realignment of the B4009 (new edge road) To focus on the here and now Impact

More information

Histon Road Local Liaison Forum (HR LLF) Minutes

Histon Road Local Liaison Forum (HR LLF) Minutes Histon Road Local Liaison Forum (HR LLF) Minutes Date: Monday 6 th November 2017 Time: 6.30pm Venue: Meadows Community Centre, Cambridge. CB4 3XJ Present: LLF Members Mike Todd-Jones, City Council Arbury

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Traffic Calming and Road Safety Provision Options Woore Village

Traffic Calming and Road Safety Provision Options Woore Village Traffic Calming and Road Safety Provision Options Woore Village Contents 1 Executive Summary 4 2 Introduction 6 2.1 Background 6 3 Existing Provisions and Conditions 7 3.1 Background supporting option

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015 Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works June 2018 Update The following report provides an update on the current position of all of the schemes which the Maldon District Local Highway Panel (LHP)

More information

New of fic e sp ace. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA

New of fic e sp ace. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA OFFICE New of fic e sp ace Alconbury Enterprise Campus To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA alconbury-campus.co.uk A new office building is

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE The following report provides an update on the current position of all of the

More information

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL City Deal City Centre Enabling Infrastructure Public Realm Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL Strategic Context National Planning Framework 3 Glasgow Economic Leadership

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford CHLP1 CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford Chairman: Panel Members: County Councillor Dick Madden Chelmsford City Council Councillors Michael

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY :00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY :00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN Minute Item 1 UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY 2018 18:00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN Chairman: Panel Members: Also Present: Councillor S Walsh Councillors

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Busway between West Cambourne site and the junction of the A1303 / A428

Busway between West Cambourne site and the junction of the A1303 / A428 Project: A428 To: CCC Subject: Routes From: Atkins Date: 14 April 2016 cc: This note summarises the policy references to a bus link between Cambourne and Cambridge, in particular references to the route

More information

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS. August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme September 2018 Update

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme September 2018 Update MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works September 2018 Update The following report provides an update on the current position of all of the schemes which the District Local Highway Panel (LHP)

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

CANTERBURY CITY COUNCIL. Minutes of a meeting of the JOINT TRANSPORTATION BOARD held on 19 July 2005 at the Guildhall, Westgate, Canterbury

CANTERBURY CITY COUNCIL. Minutes of a meeting of the JOINT TRANSPORTATION BOARD held on 19 July 2005 at the Guildhall, Westgate, Canterbury Agenda Present: CANTERBURY CITY COUNCIL Minutes of a meeting of the JOINT TRANSPORTATION BOARD held on 19 July 2005 at the Guildhall, Westgate, Canterbury City Councillor Todd (Chairman) County Councillors

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

WOKING INTEGRATED TRANSPORT PROJECT

WOKING INTEGRATED TRANSPORT PROJECT Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business

More information

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018 Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board, JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad

More information

Road Investment Strategy A1 East of England Strategic Road Study

Road Investment Strategy A1 East of England Strategic Road Study Road Investment Strategy 2020-2025 A1 East of England Strategic Road Study Report of the fourth meeting of the Stakeholder Reference Group March 2017 The fourth meeting of the A1 Stakeholder Reference

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

ECC Councillor Andrew Sheldon. ECC Councillors Dave Blackwell and Jill Reeves

ECC Councillor Andrew Sheldon. ECC Councillors Dave Blackwell and Jill Reeves CASTLE POINT BOROUGH COUNCIL LOCAL HIGHWAYS PANEL MINUTES 11 th OCTOBER 2018 AT 15:00 COMMITTEE ROOM 1, CASTLE POINT COUNCIL OFFICES, KILN ROAD, BENFLEET, SS7 1TF Chairman: Panel Members: ECC Councillor

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne

Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne Present: Members Roger Buisson (Chairman), Jill Tuffnell, Erika Wedgwood,

More information

High Lane Residents Association

High Lane Residents Association High Lane Residents Association Meeting Notes & Updates Meeting 7 th December 2017 High Lane Library Actions and Updates since Last Meeting 1.1 Withdrawal of 303 Local Shopper Bus Service: we have had

More information

Bespoke occupier solutions up to 2 million sq ft for sale/to let

Bespoke occupier solutions up to 2 million sq ft for sale/to let Bespoke occupier solutions up to 2 million sq ft for sale/to let Unique Industrial/ Development Opportunity www.newarkgateway.co.uk CROSSROADS TO THE NORTH, SOUTH, EAST AND WEST Strategic Location ROAD

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 27)

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 27) MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 27) This Potential List identifies all of the scheme requests which have been received for the consideration of the Maldon District Local

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Enterprise Way. The new Airport City link road. June 2017 Progress Update Enterprise Way The new Airport City link road June 2017 Progress Update Airport City Manchester is one of the most exciting business destinations in development today. The total planning area of Airport

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

About this consultation

About this consultation About this consultation With under 18 months to go until the XX Commonwealth Games in Glasgow, the role of each of the Games Venues is coming sharply into focus. Glasgow 2014 Ltd. will be progressing planning

More information

Edinburgh Waverley capacity upgrade

Edinburgh Waverley capacity upgrade Edinburgh Waverley capacity upgrade As part of our rail upgrade plan, and in order to facilitate the introduction of longer trains and to prepare for projected future growth in demand for both track and

More information

Further details on interventions and funding are available within each Local Area Implementation Plan.

Further details on interventions and funding are available within each Local Area Implementation Plan. Greater Manchester Implementation Profiles Local Area Implementation Plans have been prepared for each of the ten District areas in Greater Manchester, and are available on the LTP3 website www.tfgm.com/ltp3.

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28)

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Maldon District

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

A338 PACKAGE SCHEMES STAKEHOLDER GROUP MEETING. MINUTES/ACTIONS FROM MEETING HELD 1 st March 2017

A338 PACKAGE SCHEMES STAKEHOLDER GROUP MEETING. MINUTES/ACTIONS FROM MEETING HELD 1 st March 2017 A338 PACKAGE SCHEMES STAKEHOLDER GROUP MEETING MINUTES/ACTIONS FROM MEETING HELD 1 st March 2017 Attendees: Ian Kalra Mike Read Claire Clark Peter Cottrell Stuart Durant Hollie Hinde David Harrop Paul

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

Cllrs C I Black, K H Hudson (Chairman), Mrs G A Lucas-Gill, T E Mountain, and M J Steptoe

Cllrs C I Black, K H Hudson (Chairman), Mrs G A Lucas-Gill, T E Mountain, and M J Steptoe County Councillors: District Councillors: Visiting Councillors: Officers: Cllrs Mrs T Chapman Cllrs C I Black, K H Hudson (Chairman), Mrs G A Lucas-Gill, T E Mountain, and M J Steptoe District Cllrs Mrs

More information

A350 and C13 route management scheme

A350 and C13 route management scheme A350 and C13 route management scheme Dorset County Council is working with town and parish councils to agree a medium-term solution for the A350 and C13. Dorset County Council has received 2,492,000 from

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

New office space. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA

New office space. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA OFFICE New office space Alconbury Enterprise Campus To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA alconbury-campus.co.uk A new office building is coming

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 4 th February 2017 to Friday, 10 th February 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below

More information

Welcome to the September 2018 edition of my highways newsletter.

Welcome to the September 2018 edition of my highways newsletter. Welcome to the September 2018 edition of my highways newsletter. This publication is distributed monthly to members, town and parish councillors and other key decision makers. Please take a few minutes

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

West Midlands Sustainable Urban

West Midlands Sustainable Urban West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 24 th March 2018 to Friday, 30 th March 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below

More information

TRANSPORT UPDATE. September/October 2018

TRANSPORT UPDATE. September/October 2018 TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Nine weeks into our transformation As we approach the halfway point of our extended closure

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: Huntingdon Road, Cambridge June 217 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 9 th September 2017 to Friday, 15 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed

More information

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council Birmingham Connected Briefing October 2018 Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council A period of transformational change for the city centre and beyond Creating

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

The case for a local rail station. At Great Blakenham, Suffolk.

The case for a local rail station. At Great Blakenham, Suffolk. The case for a local rail station At Great Blakenham, Suffolk. The London to Norwich (Great Eastern) main rail line passes through Great Blakenham in Suffolk, a village which adjoins Claydon and Barham.

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

ROCHFORD LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2018 AT 2.00 PM COMMITTEE ROOM 4, CIVIC SUITE, RAYLEIGH Civic Suite, 2 Hockley Road, Rayleigh, SS6 8EB

ROCHFORD LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2018 AT 2.00 PM COMMITTEE ROOM 4, CIVIC SUITE, RAYLEIGH Civic Suite, 2 Hockley Road, Rayleigh, SS6 8EB ROCHFORD LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2018 AT 2.00 PM COMMITTEE ROOM 4, CIVIC SUITE, RAYLEIGH Civic Suite, 2 Hockley Road, Rayleigh, SS6 8EB Chairman: Vice-Chairman: Panel Members: Visiting Member:

More information

Inside Government Conference Case Study: Norwich Northern Distributor Road

Inside Government Conference Case Study: Norwich Northern Distributor Road Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

A47 Business Case. Gateway to Growth ALLIANCE

A47 Business Case. Gateway to Growth ALLIANCE Business Case Gateway to Growth ALLIANCE September 2017 3 By planning for the longer term we can ensure that we maximise the resulting economic benefits for our communities. Cllr William Nunn, Leader of

More information

Central Section Conditional Outputs Statement

Central Section Conditional Outputs Statement Railfuture Oxford to Cambridge (East West Rail) campaign Briefing note on the East West Rail route Central Section conditional outputs statement and benefits to Cambridgeshire Central Section Conditional

More information