Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility.
|
|
- Hugo Patrick
- 5 years ago
- Views:
Transcription
1
2 Up side crossing approach Down side crossing approach Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. It is an occupation level crossing which is located on Aliwal Road. A station can be seen from the level crossing. At Harts Drove UWCM level crossing the orientation of the road/path from the north is 175 ; the orientation of the railway from the north to the up line in the up direction is 100. Low horizon can result in sun glare; sun glare is a known issue. There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk. Site visit general observations: The crossing is in good order with few faults recorded from last inspection. One history of abuse in the last 12 months: LC Misuse - Tractor crossed over Harts Drove LC whilst 13:58 Ipswich - Peterborough was stationary in the station. 12-Nov LEVEL CROSSING USAGE 2.1 RAIL The train service over Harts Drove UWCM level crossing consists of passenger and freight trains. There are 186 trains per day. The highest permissible line speed of trains is 75mph. Trains are timetabled to run for 24 hours per day. Assessor s notes: 2.2 USER CENSUS DATA Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 2 of 17
3
4
5
6 Assessor s another train coming notes: This is likely during normal services and risk could increase when trains are out of sequence on this section of line. 3.5 INCIDENT HISTORY A level crossing safety event has been known to occur at Harts Drove UWCM level crossing in the last twelve months. Assessor s incident history notes: LC Misuse - Tractor crossed over Harts Drove LC whilst 13:58 Ipswich - Peterborough was stationary in the station. 12-Nov-14 Gate discipline (including barriers) Reports indicate that the gates are ALWAYS CLOSED. Assessor s notes on operational disruptions: trains cautioned if gates are left open Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 6 of 17
7
8
9 5.2 CONCLUSIONS Assessor s notes: This crossing sits on the edge of Whittlesea between the station MG and Ramsey road AHB, with the town to the north and countryside to the south. the crossing is an UWC+MWL crossing with an adjoining FP section, it sits high so there is no problems with flooding, just across on the down side is an AWA treatment site with tankers crossing over to collect waste, there is also farmed fields with a farmhouse and assorted buildings, the farm AU is very proactive and regularly speaks to me whilst i am inspecting the crossing, the AWA tankers should follow a procedure of booking in with AWA office and the signal box on arrival at the crossing and departing. The most recent misuse has been a tractor crossing in front of a train; the train was believed to be stopped in the station. there was an issue with graffiti at the crossing with all signage daubed with girls names and the words my bitches written everywhere, this was cleaned off and covert cameras installed, after a period of time the crossing was revisited and graffiti had reappeared, the cameras were checked and good pictures showing a young girl writing on the signs were viewed, the details were all then sent to the local college and they did a very good job of identifying the girls, who admitted their part and wrote the appropriate letters of apology to myself with their parents being informed. there are various projects looking at closure of this crossing including ETCS and dedicated closure teams, an upgrade of a small track on the down side approach to a usable road with passing places so the AWA and farm sites are reachable is a good option and an alternative footpath section being offered on the up side. A nine day census carried out by Sotera has been captured for this RA and any future ones giving us a better insight into the usage of this crossing. There are Whistleboards at this crossing for the purposes of the FP section; these are thought to be historic mitigation as now there is MWL available with signage for the UWC & FP sections. Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 9 of 17
10 Options below: 1. INSTALL STRAIL DECKING: This is a good option offering a solid surface with a good life expectancy and anti-slip available for pedestrians operating UWC gates. Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 10 of 17
11 2. CLOSURE VIA ROAD BRIDGE: This option is covered by project teams covering closures and ETCS, an upgrade of a small track on the down side approach to a usable road with passing places so the AWA and farm sites are reachable is a good option and an alternative footpath section being offered on the up side. 3. CLOSURE VIA UNDERPASS: This option is covered by project teams covering closures and ETCS, an upgrade of a small track on the down side approach to a usable road with passing places so the AWA and farm sites are reachable is a good option and an alternative footpath section being offered on the up side. 4. INSTAL POGO GATES. Optioned on 15/04/16 A good option for this crossing to reduce time spent by users at the crossing Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 11 of 17
12 ANNEX A ADDITIONAL PHOTOGRAPHS UP DIRECTION DOWN DIRECTION Network Rail Infrastructure Ltd Registered Office Kings Place, York Way, London N1 9AG Registered in England and Wales No www networkrail co uk Passive Level Crossing Risk Assessment Template v1.0 [July 2014] Page 12 of 17
13
14
15
16
17
The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.
1.3 ENVIRONMENT Up side crossing approach Down side crossing approach The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. It is a public footpath
More informationThere are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.
1.3 ENVIRONMENT Up side crossing approach Down side crossing approach It is a domestic level crossing which is located at the station. At CROWLE STATION level crossing the orientation of the road/path
More information2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.
2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is
More informationFelixstowe Branch Line FAQ
Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.
More informationPassive Level Crossings. Crossings where users are in control of their actions
1 Passive Level Crossings Crossings where users are in control of their actions / Level Crossings in your area Over 6,300 level crossings in the UK LNE & EM Route 1,870 level crossings. Gateshead Skiff
More informationThank you for your of 1st June You requested the following information:
By email: d Network Rail Freedom of Information The Quadrant Elder Gate Milton Keynes MK9 1EN T 01908 782405 E FOI@networkrail.co.uk 26 th June 2018 Dear, Information request Reference number: FOI2018/00689
More informationLevel Crossing Risk Assessment Polegate MCB
Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1
More informationDocument Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail
Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary
More informationAll queries and paragraph references, as set out in red below, relate to Mark Brunnen s Proof of Evidence (NR27/1).
This note summarises the information requested by Cambridgeshire County Council at Public Inquiry for the Network Rail (Cambridgeshire Level Crossing Reduction) Order, together with Network Rail s responses.
More informationThe Network Rail (Suffolk Level Crossing Reduction) Order
Aidan Dunn Interim Director of Resource Management Suffolk County Council Endeavour House 8 Russell Road Ipswich IP1 2BX Network Rail James Forbes House 27 Great Suffolk St London SE1 0NS 27 July 2017
More informationAppendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin
Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council
More informationOur ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.
Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationTRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER
Suffolk (Level Crossing Reduction) Order Statement of Case TRANSPORT AND WORKS ACT 992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER
More informationThe case for a local rail station. At Great Blakenham, Suffolk.
The case for a local rail station At Great Blakenham, Suffolk. The London to Norwich (Great Eastern) main rail line passes through Great Blakenham in Suffolk, a village which adjoins Claydon and Barham.
More informationTransport Assessment Appendix M: Avonmouth Impacts
Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay
More informationSuffolk Local Access Forum s (SLAF) response to Network Rail s consultation on level crossing closures.
SLAF Suffolk Local Access Forum SLAF PO Box 872 Ipswich Suffolk IP1 9JW Network Rail Anglia Level Crossings Tel: 01473 264452 Fax: 01473 216877 Email: slaf@suffolk.gov.uk Web: http://publicrightsofway.onesuffolk.net/suffolk
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationAirdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1
Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)
More informationRoad-Rail Interface Safety
Road-Rail Interface Safety A guide to RSSB research in Road-Rail Interface Safety April 2011 RSSB 1 Road-Rail interface safety research 2 RSSB The photographs in the guide appear courtesy of ATOC/Paul
More informationWELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE
PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen
More informationMulti-storey station car park opens in New Year
Multi-storey station car park opens in New Year Luton s new multi-storey station car park, off Midland Road, will open on 10 January 2011, offering motorists a safer, more secure, convenient and user-friendly
More informationNear miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)
between Athlone and Westport Report 08061401 (issued 11 th of May 2009) Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent
More informationWhat s happening with Transport in Bristol?
What s happening with Transport in Bristol? Bristol Local Transport Plan Update Autumn 2002 getting Bristol to work Bristol s five-year Local Transport Plan was published in July 2000 after extensive public
More informationEDINBURGH AIRPORT LTD COACHPARK
EDINBURGH AIRPORT LTD COACHPARK - Terms & Conditions of Use - October 2013 CONTENTS SECTION 1. 0 Introduction 1. Purpose 2. Authorised Users 2.0 Responsibilities 2.1 Edinburgh Airport Ltd 2.2 Bus and Coach
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationMeeting held at FCC Environment Offices Thursday 12 th March 2015
Calvert Landfill Liaison Committee Meeting held at FCC Environment Offices Thursday 12 th March 2015 Present: Ms A Macpherson (chair) Ms J Phipps Mr S Essam Mr P Gaskin Ms R Bellamy Ms S D Amon Mr R Webster
More informationLevel Crossings Configuration Standards
Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document
More informationAbout Us. An introduction to Network Rail
About Us An introduction to Network Rail London King s Cross 02 Contents 04 A better railway for a better Britain 06 Network Rail in numbers 08 Our structure 10 Our routes 12 The national framework 14
More informationInvesting in our local rail network June 2014
Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing
More informationPolicy Railway crossings
Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1
More informationCHALLENGES IN DELIVERING SAFER ROADS IN ENGLISH LOCAL AUTHORITIES
CHALLENGES IN DELIVERING SAFER ROADS IN ENGLISH LOCAL AUTHORITIES Tony Ciaburro Corporate Director for Place Commissioning Northamptonshire County Council CHANGING LOCAL GOVERNMENT LANDSCAPE COMBINED AUTHORITIES
More informationWales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government
Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,
More informationLevel Crossings Design and Installation
Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document
More informationNon-technical summary
Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,
More informationWhy build a third runway, when you can build a longer runway?
Why build a third runway, when you can build a longer runway? Cheaper. Simpler. Politically Realistic. Cheaper. Simpler. Politically Realistic. We recommend that the Government selects our extended runway
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationMiddlesbrough Football Club Access Statement 2018/19
Middlesbrough Football Club Access Statement 2018/19 Welcome to The Riverside Stadium Home of Middlesbrough Football Club Middlesbrough Football Club is fully committed to providing equal access to all
More informationEconomic Development Sub- Committee
Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and
More informationRailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements
- - Proposed Train Service Improvements TO GRIMSBY Show Your Support: www.railfair.co.uk TO SLEAFORD LINCOLN Hykeham Swinderby Collingham TO DONCASTER & THE NORTH NEWARK NORTHGATE NEWARK CASTLE TO PETERBROUGH
More informationSydney CBD - Partnering with the coach industry for solutions
Sydney CBD - Partnering with the coach industry for solutions Steve Issa Executive Director Operations and Planning Transport for NSW 16 June 2017 Tomorrow s Sydney Responding to growth: Sydney s population
More informationCONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd
CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS 1. Introduction A REVIEW OF SURFACE ACCESS Response by Newcastle International Airport Ltd Newcastle is the largest airport in the North
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationChapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes
Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationAppendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes
Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,
More informationChapter 12 Route window W15 Dog Kennel bridge. Transport for London
Chapter 12 Route window W15 DOG KENNEL BRIDGE 12 Route window W15 12.6 southwards to North Park Road and Richings Park Golf Course. To the west side of this route window is the built-up edge of Slough
More informationLow cost solutions to improve safety at level crossings in Hungary
2 nd Session of Group of Experts on Safety at Level Crossings Low cost solutions to improve safety at level crossings in Hungary Alexandru Árpád MOGYORÓS Ministry of National Development - Hungary Transport
More informationProduced by: Destination Research Sergi Jarques, Director
Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2017 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation
More informationCabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016
Page 1 The Future of Wareham Foot Level Crossing Cabinet Date of Meeting 24 February 2016 Cabinet Member(s) Peter Finney Cabinet Member for Environment Colin Jamieson - Cabinet Member for Economy and Growth
More informationSteve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd
Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd A453 Widening M1 Junction 24 to A52 Nottingham Project Details Project Details Widen 11.5km of existing single carriageway Project
More informationThe Bus Services Bill and Municipal Bus Companies
The Bus Services Bill and Municipal Bus Companies Summary Why we need bus services What are municipal bus operators? Network Warrington Being commercial/serving the community Bus Services Bill Value to
More informationWare Farm. Ottery St Mary, Devon
Ware Farm Ottery St Mary, Devon Ware Farm Ottery St Mary Devon EX11 1PJ Ottery St Mary 1.7 miles Exeter 12 miles Honiton 5 miles The Coast at Sidmouth 8 miles London Waterloo 2 hours and 45 minutes (Distances
More informationSTIRLING TO KINCARDINE RE-OPENING OF LINE
PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th
More informationTHE MARLOWE: RISK ASSESSMENT
Venue Name The Marlowe RA Title Risk Assessment for Lone Working and Personal Safety RA Reference Nos 16 New Activity Review Annually Date of RA / Review 11/02/2019 Change of Activity Assessor / Reviewer
More informationProduced by: Destination Research Sergi Jarques, Director
Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2016 Economic Impact of Tourism Headline Figures Oxfordshire - 2016 number of trips (day & staying) 27,592,106
More informationIOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.
IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant
More informationProduced by: Destination Research Sergi Jarques, Director
Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism North Norfolk District - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors
More informationProduced by: Destination Research Sergi Jarques, Director
Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation
More informationAbout Us. An introduction to Network Rail
About Us An introduction to Network Rail London King s Cross 02 Contents 04 A better railway for a better Britain 06 Network Rail in numbers 08 Our structure 10 Our routes 12 The national framework 14
More informationECCLES STATION NEWS JUNE 2016 NEWS
ECCLES STATION NEWS JUNE 2016 NEWS Passengers travelling through Oxenholme, Cumbria will have a smoother, more reliable journey following a weekend of upgrade work by Network Rail's orange army. Engineers
More informationFind us online at motability.co.uk. Your. Handbook. for the Motability Scheme
Handbook Your for the Motability Scheme Find us online at motability.co.uk Welcome to years of worry-free mobility We want you to find the experience of leasing with us as simple as possible. This handbook
More informationRail Update Station Usage Statistics and Network Rail Performance
Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update
More informationThe impact of investments & storms on the economic benefits provided by the South West Coast Path National Trail to the region between 2010 and 2014
Cumulatve increase since 2010 The impact of investments & storms on the economic benefits provided by the South West Coast Path National Trail to the region between 2010 and 2014 Key findings Between 2010
More informationMeeting Report. Listening Session for Greenways + Blueways May 27, LaPorte County Solid Waste & Water Conservation Office, 6:00 8:00
May 27, 2015 LaPorte County Solid Waste & Water Conservation Office, 6:00 8:00 Of the three meeting participants, two filled out the participant survey. The demographic results were as follows: o Caucasian:
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationModule TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014
GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents
More informationGK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by
GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192
More informationPersonnel views of Barrie Old one of Peter Lind site engineers Renfrew Bypass (M8) (February 2018).
The Renfrew Bypass (M8) A Personal Look Back To 50 Years + Ago When I reported to the Peter Lind site office on Renfrew Road Paisley (The Old Fire Station) on the 15 th November 1965 aged 20 years, as
More informationPUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER
PUBLIC INQUIRY APPLICATION BY NEWTWORK RAIL UNDER TRANSPORT AND WORKS ACT 1992 PROPOSED NETWORK RAIL SUFFOLK LEVEL CROSSING REDUCTION ORDER OBJ/27-FOREST HEATH DISTRICT COUNCIL PROOF OF EVIDENCE S22 Weatherby
More informationRail Sta s cs Compendium Great Britain Annual
Rail Stascs Compendium Great Britain 2017-18 Annual Publicaon Date: 4th December 2018 Next release: November 2019 Background This annual compendium publication contains a summary of the statistical releases
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationDRAYCOTT IN THE CLAY PARISH COUNCIL
Page 1530 DRAYCOTT IN THE CLAY PARISH COUNCIL Minutes of Parish Council Meeting held on 13 July 2017 Apologies: Present: Chairman Cllr Mark Flavell, Vice Chairman Cllr Nigel Powlson and Cllr Barbara Marshall
More informationHS2 Update 19 FEBRUARY 2017
HS2 Update 19 FEBRUARY 2017 Agenda HS2 Proposal Alternatives Issues HS2 Meeting Feedback Call to Action Help and Resources HS Proposal Overview of proposed route and operations Route Overview Branch line
More informationIntegration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems
Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive
More informationAn Introduction to HS2
July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.
More informationGabilan House Park View Road Woldingham CR3 7DN
Gabilan House Park View Road Woldingham CR3 7DN Step inside Gabilan House A mature and tastefully upgraded residence with separate annexe and gym standing within an acre plot overlooking Marden Park.
More informationWorcestershire Girlguiding County Risk Assessment for Outside Area Blackmore Campsite. concerns to their Warden.
Leader in charge = Adult who is 18+ years of age Worcestershire Girlguiding County Risk Assessment for Outside Area Blackmore Campsite Hazard Risk Who would this affect What can be done to lesson the risk
More informationMinutes of Public Meeting
Minutes of Public Meeting Oxford-Bicester Rail Improvements Merton Village Hall, 31 st March 2015, 7.30pm The meeting was convened by Merton Parish Council, and was opened by Cllr. Fred Foxon (FF). He
More informationInfrastructure for Growth
A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has
More informationWelcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012
Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More informationSetting the Stage for an Independent and Vibrant Life
Chapter 4: Setting the Stage for an Independent and Vibrant Life Coping with a falling birth rate and a graying population Steady progress has been made toward barrier-free buildings, public facilities
More informationWrabness Parish Council
Wrabness Parish Council Minutes of the meeting held on Wednesday 12 th July 2017 in Wrabness Village Hall at 7.30 pm Present: Mr R Colley (Vice Chairman), Mr T Harvey, Mr M Cole, Ms R Thornton, Mr F McGowan,
More informationLEVEL CROSSING SAFETY
01 Stephen Aaron Rees / Shutterstock SPONSORS LEVEL CROSSING SAFETY SUPPLEMENT Infrabel progressively increases safety at level crossings Ann Billiau, Director-General, Rail Access, Infrabel Portugal raises
More informationDRAFT - Minutes of the Annual General Meeting of the Watford Fields Residents Association Monday 22 nd October 2018 at 7pm
DRAFT - Minutes of the Annual General Meeting of the Watford Fields Residents Association Monday 22 nd October 2018 at 7pm The Living Room, Wellsprings Church, Watford Welcome Jags welcomed everybody to
More informationNetwork Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version
More informationTRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004
TRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004 HSE INTERIM REPORT 9 November 2004 Page 1 of 7 SUMMARY The HSE investigation into the incident at Ufton Automatic
More informationGeneral Meeting Minutes
20 th September 2017, 10:00am Town Hall, Middlesbrough General Meeting Minutes Attending: Mike Roff (Vice Chair), Councillor Carson, Mike Cherrett, Peter Clark, Christine Corbett. Guests: Andrew Casey
More informationASLEF Response to Welsh Affairs Select Committee Inquiry Provision of Cross- Border Services for Wales October 2008
ASLEF Response to Welsh Affairs Select Committee Inquiry Provision of Cross- Border Services for Wales October 2008 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest
More informationHeathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018
1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016
More informationRiverside Heights, Norwich. Travel Plan
RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk
More informationlighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007
DESIGN MANUAL FOR ROADS AND BRIDGES volume 8 section 2 traffic signs and lighting traffic signs and road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts
More informationNORTON & LENCHWICK PARISH COUNCIL. Minutes of the Norton & Lenchwick Parish Council Meeting held on 3rd November 2009 in the Village Hall at 19h30
NORTON & LENCHWICK PARISH COUNCIL Minutes of the Norton & Lenchwick Parish Council Meeting held on 3rd November 2009 in the Village Hall at 19h30 Present Cllr Fletcher (Chair) Cllr Leonard Cllr Worthington
More informationSOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016
SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities
More informationKing s Dyke Level Crossing Replacement - Initial Investigation
King s Dyke Level Crossing Replacement - Initial Investigation Cambridgeshire County Council 7 th June 2013 Notice This document and its contents have been prepared and are intended solely for Cambridgeshire
More information