Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

Size: px
Start display at page:

Download "Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012"

Transcription

1 Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012

2 BACKGROUND Work and consultations regarding the development of the Railway-Roadway Grade Crossings Regulations (RRGCR) have been ongoing since the introduction of the Railway Safety Act (RSA) in Reviews of the RSA acknowledged that the multi-jurisdictional nature of grade crossings is at the root of safety deficiencies at grade crossings. Development of the RRGCR is a Transport Canada priority and addresses the Transportation Safety Board recommendation to formulate grade crossing regulations. 2

3 Overview of Consultation Process John Gelder and Robert Dénommé Facilitators, Sinapse

4 TODAY S OBJECTIVES Present key elements of the regulatory proposal Review what Transport Canada heard during Phase 1 Discuss any additional comments or concerns. 4

5 GROUND RULES Open & non-judgmental communication Respect for all viewpoints - every idea has merit One speaker rule Equal opportunity air time Cells and Blackberries Keep to agreed agenda Other? 5

6 TODAY S AGENDA 08:30-08:45 Registration 08:45-08:55 08:55-09:05 09:05-10:15 Introductory Remarks Luc Bourdon, Director General, Rail Safety, Transport Canada Objectives, Agenda and Approach to the Discussion Facilitator Presentations by Transport Canada 1. Proposed Approach Marie-Josée Goulet, Chief Engineer, Rail Safety Operations 2. Key Elements Bruce Kavanagh, Regional Manager, Railway Engineering 10:15-10:30 Health Break 10:30-12:00 Presentation of Submissions Followed by Question Period Selected participants 12:00-13:00 Lunch 13:00-14:00 Structured open discussions Facilitator 14:00-14:15 Health Break 14:15-15:15 15:15-15:30 15:30-16:00 Structured open discussions (continued) Facilitator Next Steps Marie-Josée Goulet Wrap-Up Facilitator 6

7 Proposed Approach Marie-Josée Goulet Chief Engineer, Rail Safety Operations

8 PURPOSE OF PRESENTATION 1. Cabinet Directive on Streamlining Regulations (CDSR) Process 2. Closing the Gap 3. Cost - An Overarching Comment 4. Regulatory Proposal 5. Policy Approach 8

9 CDSR PROCESS The CDSR (April 1, 2007) aims to achieve the greatest overall benefit to current and future generations of Canadians as follows: POLICY DEVELOPMENT: Triage Statement determined high impact proposal; Options considered; Cost-benefit analysis; Draft Policy (associated standards); and Consultations internal/external. REGULATORY DEVELOPMENT: Draft regulatory proposal; Regulatory Impact Assessment Statement (RIAS); Pre-publication in Canada Gazette, Part I; and Departmental review and government approvals. COMING-INTO-FORCE AS A REGULATION: Publication in Canada Gazette, Part II. 9

10 CLOSING THE GAP The draft Policy is expected to improve crossing safety and reduce the number of collisions, fatalities, injuries and property damage at grade crossings. HISTORICAL GOVERNMENT INTERVENTION CROSSING COLLISIONS WITHOUT PROPOSAL (PROJECTED) WITH REGULATION (PROJECTED) POSITIVE BENEFIT/COST RATIO TIME 10

11 COST AN OVERARCHING COMMENT Cost apportionment: Funding: Facts: Refer to the Canadian Transportation Agency Transport Canada s mandate is safety Grade Crossing Improvement Program (GCIP) not linked All owners of federally-regulated grade crossings will be able to apply No program will be developed specifically for these Regulations RTD 10 published in 2002 as best engineering practice Owners have always been responsible for the safety of their grade crossings The policy will clarify the roles and responsibilities between road owners and railway companies Sightlines are not a new concept G4A You, as grade crossing owners, are best positioned to identify additional costs that the coming-into-force of the Regulations would entail 11

12 REGULATORY PROPOSAL The RRGCR would: promote safer grade crossings to save lives, prevent severe injuries and derailments; clarify roles and responsibilities; and provide comprehensive safety standards. With an approach that is: phased-in; focused on making grade crossings owners accountable; and proactive. 12

13 POLICY APPROACH Railway Companies Road Owners Sharing of information Regulations Phased-in regulatory requirements, roles & responsibilities and process Standards Establishes best engineering practices Safer Grade Crossings Input Activities based on 3 pillars Ultimate outcome 13

14 Key Elements Bruce Kavanagh Regional Manager, Railway Engineering

15 PURPOSE OF PRESENTATION 1. POLICY SCOPE 2. POLICY DETAILS: Roles and Responsibilities Timelines Sharing of Information Safety documentation / Safety Reviews Canadian Railway-Roadway Grade Crossings Standards (formerly RTD 10) Other Technical Components 15

16 POLICY SCOPE All Federally Regulated Grade Crossings Includes all grade crossings whose road is a public road. A public road is always opened or maintained by a road authority. e.g.: public roads, pedestrian paths and bicycle paths Public Railway Companies Private Includes all grade crossings whose road is a private road. e.g.: residential, agricultural, commercial and industrial grade crossings Road Authorities Are RESPONSIBLE AUTHORITIES. Are public authorities having the legal authority to open and maintain public roads. e.g.: provinces, municipalities and band councils Unrestricted Are RESPONSIBLE AUTHORITIES. Operate a line of railway at a grade crossing. e.g.: CN Rail, CP Rail Restricted Beneficiaries Are not RESPONSIBLE AUTHORITIES. Are the persons or organizations for whom or which the railway company provides the private grade crossing. e.g.: farm, business and home owners Public grade crossings are always unrestricted. Private unrestricted grade crossings allow unrestricted public access. e.g.: private roads of commercial or industrial establishments; private roads that serve 3+ principal residences Restricted grade crossings are always private. e.g.: any road, path or trail having restricted public access LEGEND: Crossing Types Stakeholders Item Descriptions 16

17 ROLES AND RESPONSIBILITIES POLICY (SS.3-12): PUBLIC GRADE CROSSINGS PRIVATE GRADE CROSSINGS Railway Company Road Authority Railway Company Beneficiary 1 Share information with road authorities and beneficiaries as required Share information with railway companies, other road authorities and beneficiaries as required Share information with the beneficiary upon request Share information with the railway company upon request 2 Grade crossing safety documentation and safety reviews Safety reviews 3 Crossing surface Road approaches Grade crossing safety documentation and safety reviews All aspects of a crossing (within railway right-of-way) excluding aspects for which the beneficiary is responsible Standard of construction of road approaches (outside railway right-of-way up to safe stopping distance) Maintenance of road approaches (outside of railway right-of-way) 4 Drainage (within railway right-of-way) Drainage (within road right-ofway) Standard of construction of road approaches (from edge of railway right-of-way to safe stopping distance). Drainage (outside railway right-ofway) 5 Sightlines (within railway right-of-way) Sightlines (within road right-ofway) Sightlines (railway right-of-way & over land outside right-of-way due to track curvature) Sightlines (outside right-of-way over their land). Landowners are responsible for their own sightlines if they are not the beneficiary. 6 Railway crossing signs, number of tracks, emergency notification and prohibitive stored and standing equipment signs Traffic control devices including interconnected devices (on road approaches) Notifying landowners of sightline requirements over the owner s land Traffic control devices (outside railway right-of-way) 7 Grade crossing warning systems Stop signs Snow removal (crossing surface & railway right-of-way) Snow removal (road approaches) 8 Snow removal (within crossing surface & railway right-of-way) 9 10 Co-ordinating the movement of trains, engines and other railway equipment Notifying landowners of sightline requirements over the owner s land Snow removal (on road approaches) Co-ordinating the movement of road traffic Notifying landowners of sightline requirements over the owner s land NOTE: If a public road intersects the road approach to a private grade crossing, this road authority has similar responsibilities applicable to the intersecting road and the associated sightlines. 17

18 TIMELINES PHASED-IN APPROACH: 18

19 SHARING OF INFORMATION POLICY (SS.7-8): Within the Policy, 2 years after the coming-into-force (CIF) as a Regulation, each responsible authority must share the information listed in Appendix D of the CRRGCS with other responsible authorities for public grade crossings. At any point after CIF, each responsible authority must share the same list of information should any of the following circumstances occur: A new construction of a grade crossing; or An alteration of operational change is implemented. At any point after CIF, each responsible authority must update and share the same list of information should any of the following circumstances occur: A grade crossing warning system, a prepare to stop at railway crossing sign, a traffic signal or other traffic control device is installed or altered; The use of the whistle on railway equipment is ceased; The maximum rail or road operating speed decreases by more than 16 km/h; There is a road closure or a transfer of road authority; The operation of a line of railway is suspended, abandoned or transferred; or The grade crossing is closed or converted to a grade separation. Upon request, any beneficiary or responsible authority must provide information to any other responsible authority or beneficiary regarding their operations on a road or line of railway. 19

20 SHARING OF INFORMATION CRRGCS (TABLES D1 & D2): Information to be gathered and shared, at a minimum, and as applicable, as per Appendix D of the CRRGCS: Road Authorities Railway Companies All Responsible Authorities 1 Number of Traffic Lanes Over Crossing Surface Train Whistling (Y/N)? 2 Road Classification (Urban/Rural) Number of Tracks 3 Road Sub-Classification (Expressway/Freeway) Crossing Angle 4 Grade Crossing Design Vehicle (including any special vehicles) 5 Average Annual Daily Traffic (AADT) (estimated or measured) (include intersecting roads as required) 6 Maximum Road Operating Speed 7 Safe Stopping Distance, Clearance Distance and Departure Time Average Daily Total Train Movements (ADTT) (Passenger/Freight) Maximum Rail Operating Speed (Passenger/Freight) Is there any track within D20 seconds of the crossing where it is possible to store railway equipment? Location data (i.e. road name, latitude, longitude, subdivision, etc.) Warning system interconnections and preemptions to highway traffic control Signals. Includes advance preemption time 8 Maximum Gradient under design vehicle stopped 2m in advance of crossing sign or warning signal mast 9 Grade crossing road approach conditions ("K") 10 Existing "STOP" signs 11 Crossing usage by pedestrians, cyclists and persons using assistive devices 12 Frequently occurring adverse local conditions which obscure grade crossing warning signal visibility NOTE: Railway companies or beneficiaries may, upon request, gather information from other crossing owners. The existence and activation of "Prepare to Stop at Railway Crossing" signs with relation to the flashing light units of grade crossing warning systems. Includes advance activation time and delayed turnoff time. 12 Distance from the "Prepare to Stop at Railway Crossing" Sign to the closest warning signal 20

21 GRADE CROSSING SAFETY DOCUMENTATION Grade crossing safety documentation evaluates, documents and notifies other parties whether the conditions necessary for adequate warning of the approach of railway equipment have been met under the RSA. Safety documentation is the responsibility of railway companies. The evaluation, documentation and notification of sightline requirements is the key measure when determining if railway equipment has right-of-way at a grade crossing. Grade crossing safety documentation must account for all the factors listed in s.3.1 of the CRRGCS. 21

22 GRADE CROSSING SAFETY DOCUMENTATION POLICY (SS.14-23) / CRRGCS (S.3): Grade crossing safety documentation would have to be completed as follows: Initial: Within 3 years after CIF for all grade crossings. Situational: Prior to the construction of a grade crossing. Prior to an alteration or operational change at or in the vicinity of a grade crossing as follows: A significant change in the road or railway infrastructure or traffic patterns; A significant change in the location of the meeting or passing points of trains on sidings or passing tracks; A significant change in the switching of railway equipment; A significant increase in the speed or volume of traffic on the road or line of rail; A significant change in the types of vehicles passing over the grade crossing; or Any other action that might cause a significant change in road or railway operations. Before a railway company ceases the use of the whistle on railway equipment at or in the vicinity of a grade crossing. Before a railway company resumes the use of a grade crossing after a period of 3+ years of closure. 22

23 SAFETY REVIEWS POLICY(SS.25-27): A safety review is a review of a particular incident, including the factors that could have had an impact on that occurrence, including any necessary remedial actions. The review focuses only on the incident that occurred and must be conducted within a reasonable time by a responsible authority after being aware of such an occurrence. Safety reviews are required when any of the following events occur: Vehicles frequently enter a crossing when the lights are flashing; Vehicles frequently block a crossing; Vehicles frequently strike or are struck by gates, signs, signals, or supporting structures or systems; A collision occurs between a train and a vehicle, pedestrian, cyclist or person using an assistive device; or The front, rear or underside of a vehicle regularly makes contact with a crossing surface or road approach within 30 m of a rail. 23

24 CANADIAN RAILWAY-ROADWAY GRADE CROSSING STANDARDS (CRRGCS) The CRRGCS is a document to be incorporated by reference to the Regulations, at CIF, that provides best engineering practices for the safety oversight of grade crossings. The Policy and the CRRGCS impose clear standards that meet the safety goals of the RSA and provide an enforcement tool for inspection purposes to improve consistency and safety at grade crossings. All public grade crossings will be maintained to existing Regulations (Railway- Highway Crossing at Grade Regulations and Highway Crossings Protective Devices Regulations) as specified in CRRGCS Appendix E until an operational change or alteration change is made or the basic standards begin. Basic standards will bring all existing crossings up to an acceptable safety standard. This will require these crossings to be upgraded to specified provisions of the CRRGCS that are essential for safety and are practical to meet. Circumstance dependent standards will exist for new crossings, alterations, operational changes, etc. and are considered a comparably higher acceptable safety standard due to that circumstance. 24

25 COMPONENTS OF THE CRRGCS POLICY(SS.29-38) : Basic Standards (all existing crossings) Circumstance Dependent Standards Timeline Description CRRGCS provision(s) to be met Timeline Circumstance CRRGCS provision(s) to be met Previous standards to be met at CIF Existing Regulations ( and E-6) Appendix E Construction of a new grade crossing Parts B and C Crossing surface ss. 6.1, 6.2, and Alterations or operational Changes Part B (crossing angle, location and gradient to be met as practicable) and the warning times of Part C. Condition of the road approaches s.7.8 Installation and alteration of signs, signals, systems, components and equipment Installed or altered part meets Parts B and C Basic Standards to be met at year 5 (public) or year 7 (private) after CIF Sightlines s.8 Signs, road markings and traffic control devices Number, location and alignment of light units of grade crossing warning systems ss. 9.1 to 9.1.3, 9.3 to 9.8, 9.11 to 9.18, 14 ss. 13, 19.4 to 19.9 Best practices to be met when a circumstance occurs Alteration of grade crossing geometry Sightline requirement s.8 Cessation of train whistling Must take into account (but not meet) Part B s.16 Preemption of traffic signals by grade crossing warning systems s.15.3 Maintenance, testing and inspection requirement Part D Operating control circuits ss.19.10(a), 19.10(b), 19.10(c), 19.12(b), 19.13, Resumption of use (Unrestricted grade crossings) Parts B and C (crossing angle, location and gradient to be met as practicable) 25

26 OTHER TECHNICAL COMPONENTS Maintenance, Testing and Inspection: Policy (ss.40-45) The safety parameters established at each grade crossing must be monitored, tested, maintained and documented by railway and road personnel, as it is important that responsible parties be aware of changes in circumstances that could adversely affect grade crossing safety. Temporary Protection Measures: Policy (ss.47-54) The Policy requires that safety measures be implemented when there is work, testing, or system failures that jeopardize the safety at a grade crossing. A sufficient number of persons with appropriate training and equipment are required to be stationed at the crossing to advise persons using the road or rail whether it is safe to use the grade crossing. No Demand for Services and Discontinuance: Policy (s.11) Grade crossing signs and signals must be removed or covered when it is forecast that there will be no demand for railway services on the railway tracks at the crossing within the next 12 months or when a railway company discontinues use of a rail line. This eliminates interruptions of road traffic and improves efficiency by removing the requirement for road users to be aware of trains when there is no possibility of a train passing over the crossing. Resumption of Use of Railway Tracks: Policy (ss.12 & 36) A railway company or road authority that decides to resume the use of a grade crossing must replace or uncover the grade crossing signs and signals and ensure that the crossing meets the appropriate standards while also conducting grade crossing safety documentation. 26

27 OTHER TECHNICAL COMPONENTS Train Whistling: Policy s.35/crrgcs s.16 The Policy outlines enforceable anti-whistling requirements. When the Regulations come-into-force, it will be prohibited to enact anti-whistling at grade crossings that do not meet the following requirements: The applicable grade crossing safety documentation has been completed; Public crossings shall have FLB, FLBG, Z-barriers and guide fencing (as required) (similar to Guideline No. 1); All crossings shall meet the standards applicable to them under the Policy prior to anti-whistling being enacted; Operating control circuits of grade crossing warning systems must be upgraded to CRRGCS s.20; Additional signage on road approaches may be required to provide for the orderly flow of traffic over the crossing; Traffic signals on the road approaches shall be preempted, as required, as per CRRGCS s.15.1 There is no recurrent failure by grade crossing users to observe the grade crossing warning systems in the area; and There is no recurrent unauthorized access to the line of railway in the area. Train Operations: Policy (ss.37-38) It will be prohibited for railway equipment (when road users require passage): to stand or switch on a public grade crossing for a period longer than 5 minutes; to obstruct the public grade crossing, or cause it to be obstructed, for a period longer than ten minutes; to stand so as to cause the unnecessary operation of a grade crossing warning device; to stand so as to unnecessarily interfere with the sightlines of a train approaching the public grade crossing on another track; and to be left unattended while interfering with the sightlines of a train approaching the public grade crossing on another track. Employees of the railway company must clear any grade crossing when an emergency vehicle requires passage. 27

28 NEXT STEPS Complete external consultations Review results of consultations Summary Report Review and update the Railway-Roadway Grade Crossings Policy Pre-publication in Canada Gazette, Part I the Policy becomes a regulatory proposal 90-day consultation period Publication in Canada Gazette, Part II the regulatory proposal comes-into-force as a regulation 28

29 THANK YOU Thank you for your continued support in the development of the Railway-Roadway Grade Crossings Regulations. Keep an eye on our website for updates at: 29

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

What do they mean to you?

What do they mean to you? CANADA S NEW GRADE CROSSING REGULATIONS What do they mean to you? May 2, 2015 Floris van Weelderen, P.Eng., PTOE Becky Lai, EIT THE ACCIDENTAL GRADE CROSSING Gare Montparnasse, Paris October 22, 1895 2

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services Evaluation of the Grade Crossing Closure Program Transport Canada Evaluation and Advisory Services June 8, 2013 Evaluation of the Grade Crossing Closure Program The Grade Crossing Closure Program (GCCP)

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Policy Railway crossings

Policy Railway crossings Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1

More information

University of Connecticut Division of Student Affairs Unit Review. What is Unit Review? Purpose. Guiding Principles of Unit Review

University of Connecticut Division of Student Affairs Unit Review. What is Unit Review? Purpose. Guiding Principles of Unit Review University of Connecticut Division of Student Affairs Unit Review What is Unit Review? Unit review is a collaborative process designed to provide an in-depth, comprehensive study of a unit/department.

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS Background Engine whistling requirements are controlled through the Canadian

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

DATE: February 13, 2012 REPORT NO. EN CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

DATE: February 13, 2012 REPORT NO. EN CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION ENGINEERING & OPERATIONAL SERVICES DATE: February 13, 2012 REPORT NO. EN2012-008 TO: FROM: CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION G. RAE, MBA, P.ENG. GENERAL MANAGER, ENGINEERING

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Quiet Zone Process. Background:

Quiet Zone Process. Background: Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Train Whistling at Public Grade Crossings

Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train whistling is an important way to keep drivers, cyclists and pedestrians safe The Canadian Rail Operating Rules

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder

More information

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Administration Policies & Procedures Section Commercial Ground Transportation Regulation OBJECTIVE METHOD OF OPERATION Definitions To promote and enhance the quality of Commercial Ground Transportation, the public convenience, the safe and efficient movement of passengers and their luggage

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

WELCOME to the Iditarod Dog Sledding Historic District (IDSHD) Workshop. January 11, Houston Middle School Houston, Alaska

WELCOME to the Iditarod Dog Sledding Historic District (IDSHD) Workshop. January 11, Houston Middle School Houston, Alaska WELCOME to the Iditarod Dog Sledding Historic District (IDSHD) Workshop January 11, 2012 Houston Middle School Houston, Alaska Workshop Purpose: Present/discuss proposed resolutions to comments received

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Guide for Permits Development adjacent to Provincial Highways

Guide for Permits Development adjacent to Provincial Highways Guide for Permits Development adjacent to Provincial Highways Engineering & Operations Division Highway Planning and Design Branch January 2019 TABLE OF CONTENTS 1 Introduction... 1 1.1 The Traffic and

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

This report recommends that Council approve concept plan 021-CP-001-B (see Attachment 1), for detailed design and delivery this financial year.

This report recommends that Council approve concept plan 021-CP-001-B (see Attachment 1), for detailed design and delivery this financial year. FPOL1711-9 HILTON TOWN CENTRE PROJECT SCOPE Meeting Date: 0 Responsible Officer: Manager Infrastructure Engineering Decision Making Authority: Council Agenda Attachments: 1. Concept Plan no 021-CP-001-B

More information

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA December 1, 2008 Public Hearing TOWN CENTER PARKING TIME LIMITS (FIRST READING) Proposed Council Action: Conduct public hearing and first reading

More information

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION Manitoba Wildands December 2008 Discussions about the establishment of protected lands need to be clear about the definition of protection. We will

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL

More information

Quiet Zone Evaluation for Huron, Ohio

Quiet Zone Evaluation for Huron, Ohio Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 SAFETY ELEMENT 4.2.3 - TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Administration Policies & Procedures Section Commercial Ground Transportation Regulation OBJECTIVE METHOD OF OPERATION Definitions To promote and enhance the quality of Commercial Ground Transportation, the public convenience, the safe and efficient movement of passengers and their luggage

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Council Policy Tourist Oriented Destination Signs

Council Policy Tourist Oriented Destination Signs POLICY 373 APPROVED @ City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 250 469-8500 kelowna.ca Council Policy Tourist Oriented Destination Signs Contact Department: Civic Operations Traffic Operations

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management

More information

Service Guidelines. Operated By:

Service Guidelines. Operated By: Service Guidelines Operated By: Effective Date: November 26, 2018 Table of Contents 1. SERVICE PARAMETERS... 2 1.1 Passenger Program Qualifications... 2 1.2 Service Hours... 2 2. SCHEDULING A TRIP... 2

More information

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses Office of the Clerk John D. Leach Director of Customer and Legislative Servicesffown Clerk 905-727-3123 ext. 4771 jleach@aurora.ca Town of Aurora 100 John West Way, Box 1000 Aurora, ON L4G 6J1 August 14,

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS L 133/12 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 452/2014 of 29 April 2014 laying down technical requirements and administrative procedures related to air operations of third

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/9 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships: Monitoring and assessing risk from operation

More information

Audit and Advisory Services Integrity, Innovation and Quality

Audit and Advisory Services Integrity, Innovation and Quality Audit and Advisory Services Integrity, Innovation and Quality Audit of Special Flight Operations Certificate Processes Related to Special Aviation Events - Air Shows November 2015 File Number: A 1577-15/16-107

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Transportation Working Group Proposed Work Plan for 2018

Transportation Working Group Proposed Work Plan for 2018 2018/SOM2/SCE/006 Agenda Item: 3.3 Transportation Working Group Proposed Work Plan for 2018 Purpose: Consideration Submitted by: TPTWG Lead Shepherd Second SOM Steering Committee on Economic and Technical

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

Railway Passenger Handling Safety Rules. March 31st, 2000 (TC O-0-16)

Railway Passenger Handling Safety Rules. March 31st, 2000 (TC O-0-16) Railway Passenger Handling Safety Rules March 31st, 2000 (TC O-0-16) RAILWAY PASSENGER HANDLING SAFETY RULES CONTENTS 1. SHORT TITLE 2. SCOPE 3. DEFINITIONS 4. PASSENGER HANDLING SAFETY PLANS 5. TRAINING

More information

Kenyon College. Policy Statement

Kenyon College. Policy Statement Kenyon College Unmanned Aircraft System Policy Scope This policy applies to: Any Kenyon College employees operating unmanned aircraft systems in any location as part of their College employment or as part

More information

Abandoned Mine Sites Policy

Abandoned Mine Sites Policy SUBJECT: Abandoned Mine Sites Policy Policy Number: MRE 006 2004 C. R. File Number: 565 00 0002 Effective Date: September 1, 2004 To Be Reviewed: September 1, 2008 Approval: Original signed by W. David

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information