Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Size: px
Start display at page:

Download "Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016"

Transcription

1 Page 1 The Future of Wareham Foot Level Crossing Cabinet Date of Meeting 24 February 2016 Cabinet Member(s) Peter Finney Cabinet Member for Environment Colin Jamieson - Cabinet Member for Economy and Growth Local Member(s) Beryl Ezzard County Councillor for Wareham Lead Director(s) Mike Harries Director for the Environment and Economy Subject of Report The Future of Wareham Foot Level Crossing Executive Summary The railway divides large residential areas to the north from Wareham town centre in the south. The crossing is a key link for pedestrians and cyclists between them. A survey carried out in 2009 showed that more than 1,200 people used the crossing on just one day. There is no reason to suggest that this demand has dropped. Alternative pedestrian access is provided by Network Rail in the form of a listed stepped footbridge (not a recorded public right of way) which is not suitable for people with protected characteristics, restricted mobility, wheelchairs and scooters, people with pram/pushchairs, those with heavy baggage and cyclists. Representations made by local residents have suggested that closure of the crossing without adequate provision for those groups would effectively divide the town and isolate communities. Currently there is a flat pedestrian level crossing over which Dorset County Council has permissive rights. It is not a Right of Way but makes up part of the Strategic Cycle Network (National Cycle Route No 2), the Northport Greenway Cycle Route between Wareham and Wareham Forest. In 2009 a notice was served by the Office of Rail Regulation, now known as Office of Rail and Road (ORR) to Dorset County Council and Network Rail to improve safety. As a result of this locking gates were installed and a security company were employed. The costs of this have been borne by Dorset County Council at a cost totalling circa 120k per annum. This was meant to be a short term

2 Page 2 The Future of Wareham Foot Level Crossing measure and in the current economic climate it is becoming increasingly difficult to find the revenue funds to continue operating this crossing in this way. Even with the measures of flashing warning lights, sounding alarms and the presence of the attendants there are still reported incidents of non-compliance and near misses. This gives rise to doubts over the safe operation of this crossing. The ORR consider this risk is too substantial and improvements must be made, or the crossing be closed. The existing pedestrian level crossing is not a right of way and pedestrians only have permissive rights to cross the rail tracks granted in an agreement made between Network Rail and Dorset County Council in In 2013 Dorset County Council gave notice to extend these rights until March After this time Network Rail are under no obligation to allow further pedestrian level crossing at this point. Since 2009 Dorset County Council and Network Rail have been working together to find a long term solution that meets with the approval of the ORR 's requirement to remove the risk of serious and fatal injury occurring at the crossing whilst meeting the needs of the users of the crossing. Other options that have been considered with Network Rail are: lifts at the station; a subway; POGO (manually operated barriers) and automatic barriers; a new footbridge; ramped access to the existing footbridge and a footway/cycleway adjacent to the A351 Wareham By-pass (Appendix 2). There appeared to be only two potentially viable options to provide a permanent crossing within the physical constraints of the site - ramped access to the existing footbridge or a footway/cycleway adjacent to the A351 Wareham By-pass. The listed stepped footbridge is not a recorded public right of way and could be closed off by the train operating company so it is only accessible to railway passengers preventing public access. Dorset County Council has previously considered making improvements to the existing road bridge in 2010/11, but is aware of the extra distance and the inconvenience this would cause Wareham residents. This is why support was given to Network Rail s proposal for ramped access to the existing stepped footbridge as it seemed to be a more convenient and preferred option for the Wareham community rather than a footway/cycleway adjacent to the A351 Wareham By-pass or no alternative when the crossing closes. Wareham residents have indicated on numerous occasions their preference to keep the pedestrian level crossing open.

3 Page 3 The Future of Wareham Foot Level Crossing Dorset County Council has received legal advice that indicates the Council does not have a legal obligation/requirement provide a pedestrian footbridge over the railway at the Sandford Road Level Crossing site because of frustration of impossibilities (i.e. it is impossible to construct a suitable alternative because of physical and planning constraints). The Sandford Road Level Crossing site is where the current foot crossing is, not on the A351 Wareham By-pass. As the second design by Network Rail for ramped access to the existing road bridge was not approved by Purbeck District Council planning committee in September 2015, and the current set up is not considered to be safe enough for the users of the level crossing by the ORR, plus the revenue budget cuts, a decision needs to be made regarding the future of Wareham pedestrian level crossing. Impact Assessment: Equalities Impact Assessment: Closure of the pedestrian level crossing due to withdrawal of the existing safety measures will negatively impact on those with protected characteristics, restricted mobility, wheelchairs and scooters, people with pram/pushchairs, those with heavy baggage and cyclists as the only available crossing point over the rails would be the stepped footbridge. Improvements to the road bridge would also negatively impact on those with protected characteristics compared to what is currently in place because of the extra distance and it would not be flat, although the House of Commons Transport Committee: Safety at level crossings, Eleventh Report of Session states Analysis of Network Rail and Department for Transport data shows that if an average walking trip includes a level crossing, the fatality risk to pedestrian is about double the risk of an average walking trip without a level crossing. Use of Evidence: Wareham By-pass Road Scheme Side Roads Order 1973; Lease of Land at Wareham 1975; Wareham By-pass Works Agreement 1978; Wareham Pedestrian Level Crossing Works Agreement 1988 JE Jacobs feasibility study 2007 commissioned by Dorset County Council; Frankham feasibility study 2012 commissioned by Network Rail; representations made to Purbeck District Council planning committees; public events and meetings held by Network Rail with Dorset County Council representation in advance of planning applications; on-going engagement with Network Rail and the Office of Road and Rail; correspondence from various organisations including representatives of disability groups and Wareham Town Council received since 2009 when there was a possibility of the crossing closing; Annette Brookes MP address to House of Commons 2009

4 Page 4 The Future of Wareham Foot Level Crossing re: Wareham level crossing on-going discussions with the local member, Purbeck Community Rail Partnership; House of Commons Transport Committee: Safety at level crossings, Eleventh Report of Session Budget: The cost to continue with the existing arrangements until 2038 and to make the essential improvements will cost at least 2.6 million (revenue). This price is based on the current running costs of 120k per annum and 40k for the annunciator to be installed. This cost does not take into account future increases in electricity charges; charges for replacement parts for the gates; potential increases in wages or costs charged neither by the security company; retender costs and potential increases nor for servicing and updating the site office for long term use. Improvements to the road bridge have been estimated at 2.4 million (capital) for feasibility study, design and construction fees. This does not include costs for future maintenance or the crossing closure. Network Rail has indicated they would be prepared to make a contribution of 500K towards these costs if it leads to the closure of the existing crossing upon completion of construction. As part of the Works Agreement 1988 Dorset County Council would have to meet the costs incurred for the removal of the crossing, fencing off the approaches and all other works to signalling and other equipment that may be necessary due to the closure and removal of the crossing. There is no capital funding allocated for this option and the capital budget is fully committed to The existing revenue budget ( 120k) could be used to fund the cost of borrowing, equating to around 1.5M capital cost but this would not cover the anticipated scheme costs. Any shortfall would have to be bid for through the normal capital bidding process (PMG/AMG). Risk Assessment: Continuing with the attendants without making improvements - the ORR and Network Rail have identified there is a HIGH risk of fatality or injury because of Inadequate advance notice of trains approaching the crossing; attendants unable to prevent pedestrians from accessing the level crossing; or human error. If improvements were made, whilst the risk would be lowered it is still not considered to be LOW by the ORR and Network Rail. This is in the health and safety risk category.

5 Page 5 The Future of Wareham Foot Level Crossing There is a HIGH risk there will be no revenue funding for attendance, maintenance and operation of gates as well as essential improvements beyond 31 March This is in the financial risk category. There is a HIGH risk if Dorset County Council does not implement the recommended improvements, provide an alternative crossing allowing for the existing crossing to close, or close the crossing the ORR will for commence legal proceedings resulting in fines and prosecutions for the Authority. This is in the financial / health and safety / reputation risk categories. See the Risk Register (Appendix 1). Other Implications: Potential increase in congestion from parents taking and collecting pupils to/from schools if there is no pedestrian access between north and south Wareham. Recommendation That the Cabinet: 1. Considers the viability of maintaining the current 120k per annum funding and providing the safety measures required to keep the crossing operating until 2038 when permissive rights to use the crossing will be withdrawn by Network Rail and advises how it wishes to proceed in the light of high revenue costs. 2. Advises whether to proceed with a corporate bid for capital funding to make improvements to the A351 road bridge allowing for an accessible foot crossing between the north and south of Wareham. 3. Consents that should funding allocation to provide improvements to the A351 road bridge be agreed, and if it is considered a viable way forward, that Dorset County Council should no longer fund current safety measures which would lead to the closure of the existing pedestrian level crossing. A decision would need to be made as to whether or not to continue with the current arrangements, until an alternative is constructed or if the current arrangements cease and the crossing closes. Reason for Recommendation This is highly sensitive issue which will have a serious impact on Wareham residents, particularly for those with protected characteristics. Since 2009 a permanent pedestrian access over the trail tracks has been sought by Dorset County Council and Network Rail but has been unable to be achieved. The current safety measures are no longer considered to be good enough and were only ever meant to be a temporary solution. For this reason and because of the current economic situation drastically reducing

6 Page 6 The Future of Wareham Foot Level Crossing revenue budgets the status quo cannot continue. Appendices Appendix 1 - Risk Register Appendix 2 - Site Plan Appendix 3 - Summary of Options Background Papers None. Officer Contact Name: Kelly Rand Tel: k.a.rand@dorsetcc.gov.uk

7 Page 7 The Future of Wareham Foot Level Crossing 1. Background 1.1 The highway rights over the former Sandford Road Level Crossing were stopped-up as part of the 1973 Side Road Order to allow for of the construction of the Wareham By-pass in This means there is no recorded public right of way at this site. In its place, an agreement was signed with the British Railway Board for a gated pedestrian level crossing facility that provided a footpath link over the railway between Northport and the Town Centre. The new By-pass was constructed without any pedestrian facilities. 1.2 Following the electrification of the railway in 1988, the crossing was changed to an arrangement of staggered pedestrian barriers with red/green crossing warning lights and audible signals. A revised 25 year agreement was signed between Dorset County Council (Dorset County Council) and British Railways that made Dorset County Council wholly responsible for the future costs of maintenance and/or alternative arrangements at the crossing. 1.3 In 2013 Dorset County Council served notice of intent to renew this agreement until The permissive rights to cross at this site will then cease and the crossing will be closed permanently. Clause 11 of this agreement made Dorset County Council wholly responsible for the future costs of maintenance and/or alternative arrangements at the crossing. Network Rail is not prepared to renew the agreement with Dorset County Council beyond In 2009 formal enforcement action in the form of improvement notices were directed at both Dorset County Council and Network Rail by the ORR requiring better protection and safety at the crossing because of the considered high risk of a fatal accident occurring due to those misusing the level crossing. Failure by Dorset County Council and Network Rail to address this Notice would have resulted in closure of the crossing which would produce severe difficulties for cyclists, people with prams and pushchairs and the disabled. This would remove part of the Local Transport Plan Northport Greenway Cycle Route between Wareham and Wareham Forest and the Strategic Cycle Network (National Cycle Route 2) between the Bakers Arms Roundabout and Wareham Town Centre. 1.5 As a result of this notice immediate action taken by the County Council to improve safety was to pay for a British Transport Police patrol during the working day to dissuade people from crossing after the warning lights have changed to red. This was subsequently transferred to a private "rail accredited" security company to provide a short term measure until a permanent solution could be found. 1.6 Attendants operate the crossing on a shift basis , 7 days a week. There is also a red and green light warning system (which pedestrians should check before crossing), audible warning and lockable gates controlled by the attendants. Dorset County Council currently pay circa 120,000 a year for this. Funding is confirmed only until 31 March The County Council and Network Rail have been working together to find a long term solution that meets with the approval of the ORR 's requirement to remove the risk of serious and fatal injury occurring at the crossing caused by the reported continuing abuse of the level crossing. Other options that have been considered with Network Rail are: lifts (rejected as there are concerns over risk

8 Page 8 The Future of Wareham Foot Level Crossing of entrapment and South West Trains would not support them at their station. They would also not be operable when the station is closed); subway (rejected as ground conditions not suitable, utilities including the main gas main would need to be relocated, it is on a flood plain and there is not enough land available without impacting on the adjacent road); and automatic barriers (rejected as these present the greatest risk with regards to non-compliance or trapping someone between them. The Office of Road and Rail would not agree to these being installed as other examples such as Poole High Street are also considered to be high risk). (Appendix A). 1.8 A corporate capital bid was submitted as part of the 2010/11 budget to provide a footway/cycleway adjacent to the Wareham By-pass at an estimated 2.2M as part of a long term strategy to provide cycling facilities between Wareham and Poole. This was not progressed as Dorset County Council supported Network Rail s proposals for ramped access to the existing footbridge believing this would better suit the needs of those with protected characteristics after several meetings between Dorset County Council, Network Rail, local members, town council and residents at public engagement meetings held throughout In August 2013 the planning application submitted by Network Rail Infrastructure Ltd was given approval by Purbeck District Council Planning for ramped access to the existing listed footbridge, but they were unable to find a manufacturer to construct the approved design. Dorset County Council made an offer of contribution of 500,000 for future maintenance costs of this ramped access. These funds are still held specifically to use for ramped access at Wareham footbridge In September 2015 an amended design for ramped access compliant with the 2010 Equalities Act was submitted by Network Rail to Purbeck District Council planning committee which was not approved In November 2015 the ORR advised Dorset County Council of improvements they feel need to be made to improve safety for safety of users of the Wareham pedestrian level crossing as there are still incidents of misuse and near misses. They expect Dorset County Council and Network Rail to work together to implement these improvements; provide an alternative crossing; or close the crossing. If this is not done they will formally write to both parties. If one of these outcomes is not achieved then they will serve an Improvement Notice. If the required improvements are not made after the notice has been served; or an alternative crossing provided; or the crossing is closed at this stage, the Office of Rail and Rail will prosecute and this is likely to result in a personal conviction as well as a financial penalty for the Authority. They do not serve closure notices Dorset County Council has received legal advice that indicates the Council does not have a legal obligation/requirement to fulfil Clause 24 of the agreement made on 1st December 1978 between Dorset County Council and the British Railway Board which states that the Council shall in the future provide a pedestrian footbridge over the railway at the Sandford Road Level Crossing site the provision of which shall be subject of a separate Works Agreement between the Board and the Council because of frustration of impossibilities (i.e. it is impossible to construct a suitable alternative because of physical and planning

9 Page 9 The Future of Wareham Foot Level Crossing constraints). The Sandford Road Level Crossing site is where the current foot crossing is, not on the A351 Wareham By-pass At a meeting between Dorset County Council officers and Network Rail in December 2015, Network Rail said that they would not be submitting an appeal against the decision made by Purbeck District Council Planning Committee s to reject their planning application in September 2015 as it was made for legitimate planning reasons. They did agree to look at the feasibility of installing an alternative barrier at this crossing In January 2016 Network Rail confirmed that they had no other suitable alternative they believed would improve safety enough at this site but would be prepared to make a funding contribution to provide a footway/cycleway adjacent to the A351 Wareham By-pass. 2. Options 2.1 Option 1 - Keep the current crossing open until 2038 when the agreement ends Implications and costs: Minimum 120k per annum running costs. It is reasonable to assume that these costs will increase due to wage increases and increased utility costs. Plus the costs to install, run and maintain a warning bell (annunciator) in the attendants hut (minimum 40k initial costs) and costs for updating and maintaining the site office for long term use. This service would also need to go through a procurement exercise and there will be costs associated with that. Also, the Office of Rail and Road could issue further notices to improve safety. Dorset County Council would have to meet the costs incurred for the removal of the crossing, fencing off the approaches and all other works to signalling and other equipment that may be necessary due to the closure and removal of the crossing in All of these costs would be wholly borne by Dorset County Council This will have an impact on the intended operation of the Swanage to Wareham Amenity Service, which Dorset County Council has financially contributed 3.2 million towards, as the Office of Rail and Road will not authorise further scheduled train movements across the crossing as this will increase the risk to safety and prevent running a full service Wareham residents have indicated on numerous occasions their preference to keep the pedestrian level crossing open There is a high risk the crossing will close in 2038 without a permanent alternative in place when NR withdraws permissive rights. 2.2 Option 2 - Construct a footway/cycleway adjacent to the A351 Wareham By-pass road bridge A corporate capital bid was submitted as part of the 2010/11 budget round to provide a footway/cycleway adjacent to the Wareham By-pass as part of a long term strategy to provide cycling facilities between Wareham and Poole. This was

10 Page 10 The Future of Wareham Foot Level Crossing not progressed as Dorset County Council supported Network Rail s proposals for ramped access to the existing footbridge believing this would better suit the needs of those with protected characteristics after several meetings between Dorset County Council, Network Rail, local members, town council and residents at public engagement meetings held throughout Improvements to the road bridge have been estimated at 2.4 million for feasibility study, design and construction fees. This does not include costs for future maintenance. Revenue funding of 120k per annum would need to continue for the costs to keep the existing crossing open until the end of the construction phase. Dorset County Council would also have to meet the costs incurred for the removal of the crossing, fencing off the approaches and all other works to signalling and other equipment that may be necessary due to the closure and removal of the crossing. Network Rail has indicated they would be prepared to make a contribution of 500k towards the cost of this option if it leads to the closure of the existing crossing upon completion of construction It has been indicated that this solution would not be popular because of the increase in walking distance, adding approximately an additional three minutes to walking journey times between Northmoor Park and Wareham Town Centre, and because it will be alongside a busy trafficked stretch of road There is no other land available for Dorset County Council to provide a permanent pedestrian connection between the north and south of Wareham If this footway/cycleway was constructed then it would allow the closure of the existing crossing whilst providing a permanent pedestrian connection between the north and south of Wareham. 2.3 Option 3 - Close the crossing without providing an alternative If Option 1 is not agreed, the crossing would be considered too unsafe to keep open thus the crossing would have to close. Closing the crossing will eliminate the serious safety concerns of high risk of fatality or injury at the pedestrian level crossing, although without an alternative it may mean an increased risk on the A351 if pedestrians try to use that as an alternative without a footway With half of Wareham s residences to the north of the railway, then closure of the level crossing without an alternative solution will severely disadvantage a significant number of people as there are no footways on the adjacent A351 over-bridge there will be no safe walking routes for anybody other than the existing listed stepped footbridge that cannot be used by people with restricted mobility, wheelchairs and scooters, pram/pushchairs, those with heavy baggage or cyclists As part of the 1988 agreement under Clause 19, Dorset County Council would have to meet the costs incurred for the removal of the crossing, fencing off the approaches and all other works to signalling and other equipment that may be necessary due to the closure and removal of the crossing. Network Rail would not assist with these costs.

11 Page 11 The Future of Wareham Foot Level Crossing There would be a significant financial saving of a minimum 120k per annum running costs plus additional costs for maintenance and improvements until This funding could be used to service borrowing costs equivalent to 1.5M capital expenditure There is a low/medium risk that the train operating company could install barriers or fence off the stepped footbridge for use by their customers only then there would be no pedestrian access between north and south Wareham Dorset County Council has received legal advice that indicates the Council does not have a legal obligation/requirement to fulfil Clause 24 of the agreement made on 1st December 1978 between Dorset County Council and the British Railway Board which states that the Council shall in the future provide a pedestrian footbridge over the railway at the Sandford Road Level Crossing site the provision of which shall be subject of a separate Works Agreement between the Board and the Council because of the frustration of impossibilities (i.e. it is impossible to construct a suitable alternative because of physical and planning constraints). The Sandford Road Level Crossing site is where the current foot crossing is, not on the A351 Wareham By-pass. 3. Conclusion 3.1 In light of the safety concerns and improvements that are required to continue with the current pedestrian crossing, the reduced funding by Central government, the unsuccessful planning application by Network Rail for ramped access to the existing footbridge and funding approval for current operating costs ceasing on 31 March 2017 the future of Wareham foot crossing needs to be considered. 3.2 There are three options to consider attendants plus maintenance and improvements until 2038; footway/cycleway adjacent to A351 Wareham By-pass; and permanent closure of the existing crossing as of 1 April If capital funding could be found for Option 2 - a footway/cycleway adjacent to the A351 Wareham By-pass, whilst not ideal, does provide a permanent pedestrian/cyclist link for all between the north and south of the town. Option 1 would only be temporary until 2038 when the foot level crossing permanently closes and there is a chance that the stepped footbridge, which is not a recorded public right of way, could be made accessible for station users only. Option 3 is the lowest cost option and offers the greatest improvement for safety at the level crossing, however, it may increase safety concerns on the A351 Wareham By-pass. Mike Harries Director for Environment and Economy February 2016

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Ian Saxon Assistant Executive Director, Environmental Services

Ian Saxon Assistant Executive Director, Environmental Services Report To: SPEAKERS PANEL (PLANNING) Date: 14 December 2016 Reporting Officer: Ian Saxon Assistant Executive Director, Environmental Services Subject: OBJECTIONS TO PROPOSED REMOVAL OF LEECH STREET / BACK

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

North West London Hospitals NHS Trust

North West London Hospitals NHS Trust North West London Hospitals NHS Trust Policy Communication Cover Sheet Policy Name: Post Holder Responsible: Approved by: Replaces: PARKING POLICY Philip Sutcliffe, Director of Corporate Services Executive

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

NOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES.

NOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES. NOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES. BRIEF SUMMARY:- A packed meeting at Pershore Town Hall, chaired by the Mayor of Pershore, Councillor Bob Gillmor, heard that Pershore,

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Passive Level Crossings. Crossings where users are in control of their actions

Passive Level Crossings. Crossings where users are in control of their actions 1 Passive Level Crossings Crossings where users are in control of their actions / Level Crossings in your area Over 6,300 level crossings in the UK LNE & EM Route 1,870 level crossings. Gateshead Skiff

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

West Sussex Local Authority Parking Enforcement Agreement

West Sussex Local Authority Parking Enforcement Agreement Report to Cabinet 24 th March 2016 By the Cabinet Member for Local Economy DECISION REQUIRED Not Exempt West Sussex Local Authority Parking Enforcement Agreement Executive Summary The existing Agency Agreement

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

Train Stations are not just arrival and departure locations

Train Stations are not just arrival and departure locations Train Stations are not just arrival and departure locations The Railway Study Association Mike Goggin 31 October 2017 Contents Introduction to Steer Davies Gleave The Passenger The Neighbour & Non-Traveller

More information

FOR CONSIDERATION BY The Executive on 30 October Angus Ross, Executive Member for Environment

FOR CONSIDERATION BY The Executive on 30 October Angus Ross, Executive Member for Environment ITEM NO: 69.00 TITLE Leisure Facility Options Study FOR CONSIDERATION BY The Executive on 30 October 2014 WARD DIRECTOR LEAD MEMBER None specific Heather Thwaites, Director of Environment; Stuart Rowbotham,

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Riverside Heights, Norwich. Travel Plan

Riverside Heights, Norwich. Travel Plan RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE Committee Date: 22/01/2015 Application Number: 2014/05949/PA Accepted: 08/12/2014 Application Type: Full Planning Target Date: 02/02/2015 Ward: Sutton Vesey Bridge School, Longmoor Campus, Coppice View

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

This report recommends that Council approve concept plan 021-CP-001-B (see Attachment 1), for detailed design and delivery this financial year.

This report recommends that Council approve concept plan 021-CP-001-B (see Attachment 1), for detailed design and delivery this financial year. FPOL1711-9 HILTON TOWN CENTRE PROJECT SCOPE Meeting Date: 0 Responsible Officer: Manager Infrastructure Engineering Decision Making Authority: Council Agenda Attachments: 1. Concept Plan no 021-CP-001-B

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public.

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public. HERNE BAY AREA MEMBER PANEL 16 TH JANUARY 2018 Subject: Director/Head of Service: Decision Issues: Classification: CCC Wards: Summary: To Note/Comment: Next stage in process: Proposed Charges and Conditions

More information

9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Name of DSO Jonathan Regal

9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Name of DSO Jonathan Regal DELEGATED POWERS REPORT NO. SUBJECT: Lease of office and St Vitus Hall at St Agnes Parish Centre, Caddington Road, London, NW2 Control sheet All of the following actions MUST be completed at each stage

More information

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used? Report to: Cabinet Date: 27 November 2013 Title: Portfolio Holder(s) Divisions Affected St Mary s and Penzance Harbours Improvements Bert Biscoe CC - Transport and Waste Penzance Central Relevant Scrutiny

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Policy Railway crossings

Policy Railway crossings Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

The Blue Badge Parking Scheme

The Blue Badge Parking Scheme The Blue Badge Parking Scheme As a not for profit charity, we rely on your donations. If you find this factsheet useful, please consider making a donation of 5 to help us to continue to help others. Just

More information

AAIB Safety Study - 1/2016

AAIB Safety Study - 1/2016 Farnborough House Berkshire Copse Road Aldershot, Hants GU11 2HH Tel: 01252 510300 Fax: 01252 376999 www.aaib.gov.uk AAIB Air Accidents Investigation Branch AAIB Safety Study - 1/2016 AIRWORTHINESS OF

More information

Summary of the rights of passengers travelling by bus and coach 1

Summary of the rights of passengers travelling by bus and coach 1 Summary of the rights of passengers travelling by bus and coach 1 Regulation (EU) 181/2011 (hereinafter the Regulation) becomes applicable on 1 March 2013. It provides for a minimum set of rights for passengers

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

22-24 Station Road, Erdington, Birmingham, B23 6UB

22-24 Station Road, Erdington, Birmingham, B23 6UB Committee Date: 16/10/2014 Application Number: 2014/05377/PA Accepted: 24/07/2014 Application Type: Full Planning Target Date: 18/09/2014 Ward: Erdington 22-24 Station Road, Erdington, Birmingham, B23

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January 2016 1. Introduction Cork Airport is committed to encouraging airlines to operate new routes to/from

More information

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board, JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012 Present: Councillor A Walters Chairman. Councillor J Salmon (Uttlesford District Council). Councillors R

More information

Requirement for bonding and other forms of security

Requirement for bonding and other forms of security Consumer Protection Group Air Travel Organisers Licensing Requirement for bonding and other forms of security ATOL Policy and Regulations 2016/02 Contents Contents... 1 1. Introduction... 2 Assessment

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642.

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER In consultation with the Chairman of the Assets Regeneration Committee Title Report of 13 October2015 Brent Cross Cricklewood Regeneration: Thameslink Station

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

TO AGREE TO CONSULT ON SCHOOL TERM DATES CABINET MEMBER FOR CHILDREN S SERVICES

TO AGREE TO CONSULT ON SCHOOL TERM DATES CABINET MEMBER FOR CHILDREN S SERVICES PAPER D Purpose: For Decision Committee CABINET Date 9 NOVEMBER 2017 Title Report to TO AGREE TO CONSULT ON SCHOOL TERM DATES CABINET MEMBER FOR CHILDREN S SERVICES EXECUTIVE SUMMARY 1. Isle of Wight Council

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study Item: 11 Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY Regional Air Service Development Study PURPOSE OF REPORT To introduce the draft Executive Summary of the Regional Air

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Customer consultation

Customer consultation Customer consultation Anglian Waterways navigation charges 2018/19 July 2017 Introduction We need to increase the boat registration charges payable for any boat kept, used or let for hire on our Anglian

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford CHLP1 CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford Chairman: Panel Members: County Councillor Dick Madden Chelmsford City Council Councillors Michael

More information

Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme )

Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme ) Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme ) 1. Scheme Outline An airline that launches a new route from Dublin Airport (the New Route ), in accordance with the Scheme criteria,

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

RCGP Revalidation eportfolio

RCGP Revalidation eportfolio RCGP Revalidation eportfolio Terms and Conditions - version 6.0 (May 2013) 1. General The following terms and conditions and disclaimer apply to the access and use of the RCGP Revalidation eportfolio.

More information

MINUTES SPECIAL MEETING OF COUNCIL. Tuesday, 1 September 2015

MINUTES SPECIAL MEETING OF COUNCIL. Tuesday, 1 September 2015 MINUTES SPECIAL MEETING OF COUNCIL Tuesday, 1 September 2015 Held at the Council Conference and Reception Centre City Hall, Little Malop Street, Geelong commencing at 7.20p.m. COUNCIL: Cr. D. Lyons Mayor

More information

PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY (COUNCILLOR RAMESH PATEL)

PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY (COUNCILLOR RAMESH PATEL) CYNGOR DINAS CAERDYDD CITY OF CARDIFF COUNCIL CABINET: 15 DECEMBER 2016 CARDIFF WEST TRANSPORT INTERCHANGE REPORT OF DIRECTOR CITY OPERATIONS AGENDA ITEM: 9 PORTFOLIO: TRANSPORT, PLANNING AND SUSTAINABILITY

More information

Licensing Sub-Committee 18 July 2018

Licensing Sub-Committee 18 July 2018 This report is PUBLIC [NOT PROTECTIVELY MARKED] Licensing Sub-Committee 18 July 2018 Report title Wards affected Accountable director Originating service Review of the Licence Conditions for Oxley Court

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014. 2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information