1 PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th MARCH 2008 GLASGOW February 2008 By order of Director 1 of 13

2 Opening Arrangements The signalling and permanent way arrangements described within this notice and shown in the accompanying diagram will be commissioned on Tuesday 25th March Description of Scheme The Stirling Alloa Railway and Linked Improvements project consists of the re-opening of approximately 13 miles of line, which currently are out of use between Causewayhead and. The re-opening of the line will accommodate coal trains travelling to and from the Longannet West and East triangle into Longannet Power Station and will also introduce a new passenger service between Stirling and Alloa Town. The scheme consists of a single line ( Up/Down Line) between Stirling and Longannet with passing loops at Cambus and Alloa. Cambus Loop will have standage of 697 yards and Alloa Loop standage of 685 yards. A new station, designated ALLOA TOWN, will be opened, located on a spur off the single line and comprised of a single platform with a standage of 155 yards. A friction type buffer stop will be provided. The line will be freight only between the connection to the new station at Alloa and Longannet. The line will be controlled from a new panel located in Stirling Middle signal box (signal prefix SK). At Stirling, the existing Up and Down S&D lines through platforms 6 and 9 will be renamed the Up and Down Lines. Under the new arrangements platform 6 Line) will become bi-directional. The Up and Down lines through the station will continue over the Forth Viaduct to converge into a single line at a new junction location designated CAUSEWAYHEAD JN. on the Alloa side of the viaduct with single line throughout from there to Longannet. A number of level crossings are presently out of use on the existing infrastructure. Several of these level crossings will be upgraded and reinstated to current standards and expected traffic flows. Other level crossings will close as part of this project. Method of Working Absolute Block (AB) regulations will continue to apply between Stirling Middle SB and Stirling North SB, and also between Stirling Middle SB and Plean Junction SB, on the Up and Down main lines. Track Circuit Block (TCB) regulations will apply as follows: on the Up and Down lines through Stirling station and between the north end of Stirling station ( lines) and Stirling North signal box. on the Up and Down lines (double and single) between the north end of Stirling station and Longannet signal box 2 of 13

3 ling Arrangements Signals prefixed by the letters SK are controlled from Stirling- panel at Stirling Middle SB. Signals prefixed by the letters SM are controlled from Stirling Middle SB. Signals prefixed by the letters LG are controlled from Longannet SB. All signals are to the left of the driver, unless otherwise stated. All signal mileage is referenced from Stirling Middle 0MP( lines) unless otherwise stated. All new main signals will be LED single lens searchlight type. All new shunt signals will be 3-aperture LED Red/Red White/White type. The following signals will be commissioned under this scheme: Signal SK6504 Down 654yds Platform 9 SM27/38 PLS Miniature Platform 6 SM64/65 PLS Miniature 9 6 A new LED PLS, with LED miniature route indicator with 2 route indications, where indicator displays 6 = platform 6 9 = Platform 9 3 of 13

4 SK6507 Up 443yds Down Main SN37 PLS Miniature Down SK6519 PLS Miniature D K A new LED PLS with LED miniature route indicator with 2 route indications, where indicator displays D = Down Main, K = Down SK6515 SK6516 SK6518 SK6519 Down Up Down Down 412yds 934yds 934yds 922yds Down Main SN37 Main (R,Y,G) Junction Position 1 Down SK6519 Main (R,Y,G) - - signal with a Position 1 LED Junction above the Down Main. Associated OFF indicator provided on platform 6 suspended from station canopy, 122yds from Platform 9 SM27/38 Main (R,Y,G) - - Platform 9 SM27/38 Main (R,Y,G) Junction Position 1 signal with a Position 1 LED Platform 6 SM64/65 Main (R,Y,G) - - Junction above the Platform 9. Down SK6521 Main (R,Y,G) of 13

5 SK6521 Down SK6522 SK6523 SK6524 SK6525 SK yds 1m + 471yds 1m + 790yds 1m yds 2m + 707yds 2m yds SK6523 Main (R,Y,G) - - Up SK6516 Main (R,Y,G) - - Down SK6518 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Down. SK6525 Main (R,Y,G) - - SK6522 Main (R,Y,G) - - SK6527 Main (R,Y,G) - - The signal is provided with an automatic signal identification plate (Rule Book, Module S1, Section 1.2 refers). SK6524 Main (R,Y,G) - - The signal is provided with an automatic signal identification plate (Rule Book, Module S1, Section 1.2 refers). 5 of 13

6 SK6527 SK6528 SK6531 SK6532 SK6533 SK6534 Cambus Loop 3m + 412yds 3m yds 3m yds 4m + 823yds 4m yds 5m + 31yds Cambus Loop SK6531 Main (R,Y,G) - - SK6526 Main (R,Y,G) - - SK6533 Main (R,Y,G) - - SK6528 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). SK6537 Main (R,Y,G) Junction SK6535 Main (R,Y,G) Position 1 signal with a Position 1 LED Junction above the Down Cambus Loop. SK6528 Main (R,G) - - New 2 aspect LED searchlight signal positioned on the RHS of line. 6 of 13

7 SK6535 SK6536 SK6537 Cambus Loop SK6538 SK6541 SK6542 5m + 527yds 5m + 31yds 5m + 527yds 5m yds 6m + 212yds 6m + 934yds Cambus Loop SK6541 Main (R,Y,G) - - SK6528 Main (R,G) - - New 2 aspect LED searchlight SK6541 Main (R,Y,G) - - SK6536 Main (R,Y,G) - - SK6534 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Up/Down Cambus Loop. SK6543 Main (R,Y,G) - - SK6538 Main (R,Y,G) of 13

8 SK6543 SK6544 Alloa Town Station SK6546 SK6547 SK6548 6m yds 6m yds 7m + 75yds 7m + 684yds 7m yds Alloa Town Station Alloa Town Station Alloa Loop SK6547 Main (R,Y,G) Standard - Main (R,Y,G) Standard - PLS - - M B Standard Fibre Optic above the main aspect which displays M = Main, B = Bay Platform. A position light signal below main aspect for permissive move into Alloa Station. SK6542 Main (R,Y,G) - - SK6542 Main (R,Y,G) - - SK6553 Main (R,Y,G) Junction LG2/ LG7 Main (R,Y,G) (signal can only display R or G for this route) Position signal with a Position 1 LED Junction above the Up/Down Alloa Loop. SK6546 Main (R,Y,G) of 13

9 SK6552 Alloa Loop SK6553 Alloa Loop SK6554 SK6556 LG1 7m yds 7m yds 8m + 221yds 677yds #1 4m yds #1 Alloa Loop direction) SK6546 Main (R,Y,G) - - LG2/ LG7 Main (R,G) - - New 2 aspect LED searchlight NOTE: This signal is only lit when a train is signalled to approach. SK6548 Main (R,Y,G) - - SK6552 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Up/Down Alloa Loop. SK6554 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). LG2/ LG7 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). 9 of 13

10 LG2 LG7 LG27 4m yds #1 4m yds #1 LG3 Main (R,Y,G) West Arrival LG9 PLS - - A position light signal below main aspect for shunt move towards signal LG9. SK6554 Main (R,G) - - New 2 aspect LED searchlight # 1 Denotes signal mileage referenced from former Junction. 10 of 13

11 Permanent Speed Restrictions (PSRs) The existing PSR of 25mph in both directions on the Up and Down lines (Platforms 6 and 9) will be extended to 0m 28ch. A new differential PSR of 30mph / 35mph will apply in the Down direction on the Down line between 0m 28ch and 0m 47ch. A new differential PSR of 40mph / 60mph will apply in the Down direction on the Down line between 0m 47ch and 0m 70ch. A new PSR of 35mph will apply in the Up direction on both the Up and Down lines between 0m 49ch and 0m 28ch. A new Permissible Speed Warning will be provided for these PSRs on the Up and Down single line at 1m 37ch. A new PSR of 60mph will apply in the Down direction on the Down line and the Up and Down single line between 0m 70ch and 1m 60ch (MP 1¾). A new PSR of 60mph will apply in the Up direction from 1m 60ch (MP 1¾) on the Up and Down single line to 0m 49ch on the Up line and to 0m 49ch on the Down line. A new differential PSR of 60mph / 70mph will apply in the both directions on the Up and Down single line between 1m 60ch (MP 1¾) and 6m 52ch. 60mph / 70mph reminder Permissible Speed s will be provided at the exits from the Up and Down Cambus Loop line. A new PSR of 30mph will apply at Cambus loop, in both directions, entering, over, and leaving the loop. A new PSR of 30mph will apply in both directions on the Up and Down single line between 6m 52ch and Level Crossing, including the Up and Down Alloa Loop line. A new reminder Permissible Speed will be provided for trains departing from Alloa Town Station. A new Permissible Speed Warning will be provided for this PSR in the Down direction on the Up and Down single line at 5m 69ch. In the down direction, this new PSR of 30mph will continue from Level Crossing (3m 77ch) to Longannet Signal Box (5m 62ch). These mileages are referenced from the former Junction. The existing PSR of 35mph will continue to apply from Longannet Signal Box to Charlestown Junction. In the up direction, the existing PSR of 35mph from Charlestown Junction to Longannet Signal Box will be extended such that it will apply from Charlestown Junction to Level Crossing. A new PSR of 15mph will be provided in both directions on the Up and Down single line at Alloa Station Junction applying to trains proceeding to and from Alloa Town Station. 11 of 13

12 Buffer Stop Due to its proximity to the Up and Down single line, the new buffer stop at the end of Alloa Town Station will be fitted with white lamps. Reflectorised strips will also be provided. Signs A new reflectorised National Radio Network (NRN) Radio Channel Change Marker exhibiting channel 068 will be provided in the Down direction on the Up & Down line at L.C. A new reflectorised National Radio Network (NRN) Radio Channel Change Marker exhibiting channel 092 will be provided in the Up direction on the Up & Down line at L.C. New 6 car platform stop marker boards will be provided on Platforms 6 and 9 in the Up direction approximately 100 yards on the approach to the platform starting signals and on platform 6 in the Down direction approximately 50 yards on the approach to signal SK6515. A new HST platform stop marker board will be provided in the Down direction on platform 6 approximately 20 yards on the approach to signal SK6515. AWS AWS track equipment will be provided as outlined on the accompanying diagram. The following AWS equipment is positioned less than the standard distance of 196 yards; SK AWS positioned at 137 yards on approach to SK AWS positioned at 137 yards on approach to A new Commencement of AWS Gap indicator will be provided in the Down direction on the Up and Down line at LG8 points. A new Termination of AWS Gap indicator will be provided in the Up direction on the Up and Down line at LG8 points. TPWS TPWS track equipment will be provided as outlined on the accompanying diagram and in accordance with the standard arrangements. Ground Frame A new ground frame associated with Siding will be provided. This will control a connection from the Up and Down single line to the former Power Station Sidings. The ground frame will be out of use until further notice. 12 of 13

13 Telephones Telephones will be provided at all new signals capable of displaying a red aspect. Point Zone telephones connected to Stirling Middle SB will be provided at the following: Stirling Station north, Up cess. Causewayhead Junction, down cess. West end of Cambus Loop, down cess. East end of Cambus Loop, down cess. Alloa Town Station points, down cess. West end of Alloa Loop, down cess. East end of Alloa Loop, up cess. New telephones connected to Stirling Middle SB will be provided at the following user worked crossings: Manor Neuk L.C. Manor Powis L.C. Level Crossings Waterside L.C., previously an Automatic Open Crossing Locally Monitored (AOCL), will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB-CCTV). Manor Neuk L.C. (2m 59ch, not currently mentioned in the Sectional Appendix) will be refurbished and retained as a user worked crossing (UWC). Manor Powis L.C., previously a Traincrew Operated Barrier Crossing (TOB), will be renewed as a User Worked Crossing (UWC). Blackgrange L.C., previously an Automatic Open Crossing Locally Monitored (AOCL), will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB- CCTV). Cambus L.C. (4m 59ch), previously a Remote Manned Barrier Crossing, but not currently mentioned in the Sectional Appendix, will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB-CCTV). UWC (3m 77ch from the former Junction, not currently mentioned in the Sectional Appendix) will be refurbished and provided with Miniature Stop Lights (MSL). The following level crossings have been closed as part of this scheme: Causewayhead L.C. Abbeycraig L.C. New Mills L.C. (4m 39ch, not mentioned in the Sectional Appendix) Alloa West Grange Road L.C. (6m 22ch, not mentioned in the Sectional Appendix) Balfour Road L.C. (7m 18ch, not mentioned in the Sectional Appendix) Hilton Road L.C. (7m 32ch, not mentioned in the Sectional Appendix) Hilton Farm L.C. (7m 72ch, not mentioned in the Sectional Appendix) 13 of 13

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515)

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515) SRS200605336 BR(LM) CL16/83 11/02/1983 MECH Macclesfield - dog chart and locking table Plan also numbered OC3215L SRS200605337 BR(LM) 30/11/1986 SBD Madeley SRS200605338 BR(LM) NS865027/1 01/07/1986 SCHEME

More information

Harcourt - Golden Square

Harcourt - Golden Square Harcourt - Golden Square BARKERS CREEK SIDING (80 3/4 MILES) 15.04.1887 Contract gazetted for earthworks etc. Let to T.F. Hutchinson for 82/10/0 (Government Gazette, 2784/87) 28.09.1887 Opened for outwards

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version

More information

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS)

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS) Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) (31.05.1920) Opened. Points secured by two staff locks one rodded to catch, other rodded to safety points (WN 22/20 extracts, Staff lock register II) (06.09.1921)

More information

LEVEL CROSSING ATTENDANT (AOD LXA)

LEVEL CROSSING ATTENDANT (AOD LXA) KEYPOINTS LEVEL CROSSING ATTENDANT (AOD LXA) Issue seven valid from December 2011 CERTIFICATION REQUIRED: CURRENT SENTINEL CARD ENDORSED WITH PTS, AOD (LXA) AND IWA OR IWA/COSS COMPETENCIES Keypoint Cards

More information

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009) between Athlone and Westport Report 08061401 (issued 11 th of May 2009) Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL

STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM INTRODUCTION 1. This document relates to the Stirling-Alloa-Kincardine Railway and Linked Improvements Bill introduced

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

M&EE Stabling Point Safety Survey

M&EE Stabling Point Safety Survey M&EE Stabling Point Safety Survey Location Southall West Siding Stannox number Date of assessment 27/06/2016 Compiled by Name Company Daniel Crisp Colas Rail Telephone 07753 798016 email address daniel.crisp@colasrail.co.uk

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach It is a domestic level crossing which is located at the station. At CROWLE STATION level crossing the orientation of the road/path

More information

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. It is a public footpath

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

Simplilicalion of layoul and Signalling Cenlral Wales line

Simplilicalion of layoul and Signalling Cenlral Wales line Private and not for Publication Notice No. W.W.213 BRI TI SH RAILWAYS (WESTERN REGION) (For the use of Employees only) Simplilicalion of layoul and Signalling Cenlral Wales line Between.the hours of 22.00

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

Train Operating Data NA_NSP_02.01 R

Train Operating Data NA_NSP_02.01 R 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Sprinter/ Vlocity WERRIBEE and NORTH SHORE 66.513km 130 NORTH SHORE 66.513km and GEELONG 72.190km

More information

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM 13.12.1878 Opened for passenger traffic. Centre line of platform at 51 miles 68 chains 52 links adjacent to level crossing at 51 miles 70 chains

More information

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book GE/RT8000/HB18 Rule Book Uncontrolled When Printed Handbook 18 Duties of a level crossing attendant Handbook 18 Issue 4 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

ScotRail Performance Improvement Plan Making Things Better, Every Single Day.

ScotRail Performance Improvement Plan Making Things Better, Every Single Day. ScotRail Performance Making Things Better, Every Single Day. Page 1 INTRODUCTION Scotland s railway is undergoing enormous change. Right now, engineers here in the UK and in Japan are building our new

More information

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS)

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS) 23.05.1862 Contract gazetted for construction of buildings and other works for passenger station to William Porter for 11157/0/9 (Government Gazette) 06.06.1862 Contract gazetted for manufacture & erection

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

AIRWORTHINESS DIRECTIVE

AIRWORTHINESS DIRECTIVE EASA AIRWORTHINESS DIRECTIVE AD No.: 2014-0014 Date: 14 January 2014 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) No 216/2008 on behalf of the European

More information

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD UP DOWN U/BRIDGE A107 UPPER CLAPTON ROAD CLAPTON STATION Situated on A107 Upper Clapton Road at Junction with Gunton Road E.5 U/BRIDGE SOUTHWOLD ROAD L165 3m 78ch 4MP 4m 03ch TQ 348 866 L164 4m 16ch MOUNT

More information

Multi-storey station car park opens in New Year

Multi-storey station car park opens in New Year Multi-storey station car park opens in New Year Luton s new multi-storey station car park, off Midland Road, will open on 10 January 2011, offering motorists a safer, more secure, convenient and user-friendly

More information

Requirements for Level Crossings

Requirements for Level Crossings Railway Group Standard Requirements for Level Crossings Synopsis This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018 Page 1 of 5 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-28 May 4, 2018 Effective: 0001 Sunday May 6, 2018 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority: IHB Timetable

More information

Ermine Street Environmental Enhancements

Ermine Street Environmental Enhancements Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 7... 7... 7... 9... 9... 9... 10... 11... 12... 12...

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

Delivering a better railway for a better Britain Route Specifications 2016 Wessex

Delivering a better railway for a better Britain Route Specifications 2016 Wessex Delivering a better railway for a better Britain Route Specifications 2016 Wessex Wessex Network Rail Route Specifications: Wessex 02 Route C: Wessex SRS C.01 Waterloo Woking 03 SRS C.02 Woking Basingstoke

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

STAG - Part 1 Appraisal Summary Table

STAG - Part 1 Appraisal Summary Table Proposal Details Proposal Name: Option 1 - Do-minimum Proposal Description: This assumes that the Council only carry out the statutory requirements under the Roads (Scotland) Act 1984. This would include

More information

TRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004

TRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004 TRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004 HSE INTERIM REPORT 9 November 2004 Page 1 of 7 SUMMARY The HSE investigation into the incident at Ufton Automatic

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

Short-Haul Operations Route Support Scheme (RSS)

Short-Haul Operations Route Support Scheme (RSS) Short-Haul Operations Route Support Scheme (RSS) Valid from January 1 st, 2018 1: Introduction: The Shannon Airport Authority is committed to encouraging airlines to operate new routes to/from Shannon

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets

More information

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC UPRR/TPW Crossing in Chenoa, IL Written By Michael R. Garcia, P.E. Chief, Rail Engineering Bureau of Railroads Room 302 Illinois Department of

More information

Highland Mainline Journey Time Improvements Phase 2

Highland Mainline Journey Time Improvements Phase 2 Highland Mainline Journey Time Improvements Phase 2 1 Specified Outputs The objective for the second phase of the HML Improvements project was established in the Scottish Ministers Scotland High Level

More information

Model Crosspoint Matrix

Model Crosspoint Matrix Model 3000 4380 256 Crosspoint Matrix 90401270 Page 1 All technical data and specifications in this publication are subject to change without prior notice and do not represent a commitment on the part

More information

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl

More information

M4 Junctions 3 to 12 Smart motorway

M4 Junctions 3 to 12 Smart motorway Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic

More information

Licence Application Decision ICB Simplified Process

Licence Application Decision ICB Simplified Process Licence Application Decision ICB Simplified Process Application # 2361-18 Applicant Silver City Stagelines Ltd. Principals Address Fritz Keller 1283 Columbia Ave, Trail, BC, V1R 1J3 Current Licence Passenger

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

CASE STUDY. Dubai International Airport. HDL Brings Automated Efficiency to the World s Busiest Airport

CASE STUDY. Dubai International Airport. HDL Brings Automated Efficiency to the World s Busiest Airport CASE STUDY Dubai International Airport HDL Brings Automated Efficiency to the World s Busiest Airport Dubai Airports is the government authority which owns and manages all commercial airports in the United

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

c2c s timetable consultation Passenger Focus report

c2c s timetable consultation Passenger Focus report c2c s timetable consultation Passenger Focus report August 2006 c2c s timetable consultation 16 March 2006 14 April 2006 Introduction Passengers were recently consulted on c2c s plans to make changes to

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

11 Kellywood Crescent, Kincardine, FK10 4PD

11 Kellywood Crescent, Kincardine, FK10 4PD 11 Kellywood Crescent, Kincardine, FK10 4PD ACCOMMODATION Lounge 4.6 x 3.3m Kitchen 3.2 x 2.8m Bedroom 3.5 x 3.4m Shower Room 2.1 x 1.7m Front & Rear Porches Gross internal area 45sqm 11 Kellywood Crescent,

More information

What do they mean to you?

What do they mean to you? CANADA S NEW GRADE CROSSING REGULATIONS What do they mean to you? May 2, 2015 Floris van Weelderen, P.Eng., PTOE Becky Lai, EIT THE ACCIDENTAL GRADE CROSSING Gare Montparnasse, Paris October 22, 1895 2

More information

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE 1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION SA17 SMALL AIRPORT WINTER MAINTENANCE To ensure the Anahim Lake airport is kept open and safe for small airport users. 2. GENERAL PERFORMANCE SPECIFICATIONS

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

Dufferin Truck Monitoring Station Maple Ave, Georgetown. Frequently Asked Questions. July 2017

Dufferin Truck Monitoring Station Maple Ave, Georgetown. Frequently Asked Questions. July 2017 Dufferin Truck Monitoring Station Maple Ave, Georgetown Frequently Asked Questions July 2017 Q1. Where is the camera located? The camera is located over the Eastbound lane of Maple Avenue in front of the

More information

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States Diagram #1: Van Nuys Abatement and Curfew Regulation Page 1 Aircraft Categories: A, B & C / All Runways p. 1 of 20 Diagram #2: Van Nuys Abatement and Curfew Regulation Page 2 p. 2 of 20 Diagram #3: Van

More information

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

Signaling System and Communication System on Shinkansen of JR-EAST

Signaling System and Communication System on Shinkansen of JR-EAST Signaling System and Communication System on Shinkansen of JR-EAST Hiroshi KANEKO Manager, East Japan Railway Company, Japan 12th July, Session: Infrastructure 3 - Power supply & Signaling Contents Outline

More information

NOTE: For the main document, The Traffic Signs Regulations and General Directions 2016 and subsequent amendments visit:

NOTE: For the main document, The Traffic Signs Regulations and General Directions 2016 and subsequent amendments visit: NOTE: For the main document, The Traffic Signs Regulations and General Directions and subsequent amendments visit: http://tsrgd.co.uk/documents/traffic-signs-regulations-and-general-directions DfT Circular

More information

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia 5000 Lodged via email consultation@electranet.com.au. Friday, 21 July 2017 Dear Mr Klingenberg, RE: Eyre Peninsula

More information

AWNING CONTROL KIT 98GCK-33B

AWNING CONTROL KIT 98GCK-33B AWNING CONTROL KIT 98GCK-33B REV.07282015 RV AWNING PRODUCTS 1361 CALLE AVANZADO, SAN CLEMENTE, CA 92673 (800) 382-8442 FAX (949)276-5500 www.girardrv.com AC MOTOR CONTROL MODULE GC274B INSTALLATION and

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT Human Powered Flight Rules and Regulations for THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT THE ROYAL AERONAUTICAL SOCIETY 4 Hamilton Place, London, W1V OBQ Telephone +44 (0)20 7670 4345 Fax +44 (0)20 7670

More information

Department for Transport

Department for Transport Department for Transport Louise Ellman MP Chair, Transport Select Committee House of Commons London SW1AOAA From the Minister of State The Rt. Hon. John Hayes CBE MP Great Minster House 33 Horseferry Road

More information

Vodafone UK Travel to Work Policy

Vodafone UK Travel to Work Policy Vodafone UK Travel to Work Policy Objectives Policy Owner Property Department Across the UK, we ve designed our travel to work policy to support people in their travel arrangements. It provides details

More information

Wessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018

Wessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018 Wessex Route and South Western Railway Transport Focus Meeting Tuesday 9 January 2018 / Agenda 1. Performance 2. T-12: provision of information 3. Compensation process, awareness, resourcing 4. Industrial

More information

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility.

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. Up side crossing approach Down side crossing approach Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. It is an occupation level crossing which is located on Aliwal

More information

OVER 75% LET RG7 4PN. Brand new warehouse development 1,119 sq ft to 9,264 sq ft TO LET

OVER 75% LET RG7 4PN. Brand new warehouse development 1,119 sq ft to 9,264 sq ft TO LET OVER 75% RG7 4PN Brand new warehouse development 1,119 sq ft to 9,264 sq ft TO M4 to Bristol M4 (J12) M4 to London Theale High Street Theale Station A4 to Reading Block C A4 Block D Block B A4 to Newbury

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car Tube and train The nearest stations are Stratford station and Stratford International station and both provide stepfree access from entrance to platform. Stratford station is served by: Docklands Light

More information

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

PCH Hotels and Resorts Delivers State-of-the-Art Guest Experience

PCH Hotels and Resorts Delivers State-of-the-Art Guest Experience PCH Hotels and Resorts Delivers State-of-the-Art Guest Experience Renaissance Montgomery Hotel and Spa Relies on Cisco Network to Return to Grand Tradition of Southern Hospitality EXECUTIVE SUMMARY PCH

More information

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Administration Policies & Procedures Section Commercial Ground Transportation Regulation OBJECTIVE METHOD OF OPERATION Definitions To promote and enhance the quality of Commercial Ground Transportation, the public convenience, the safe and efficient movement of passengers and their luggage

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

CAMBRIAN LINES FRANCHISE 2018

CAMBRIAN LINES FRANCHISE 2018 CAMBRIAN LINES FRANCHISE 2018 For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl Jones - Williams Vice

More information

_210 Refurbished offices TO LET 9,154 sq ft

_210 Refurbished offices TO LET 9,154 sq ft _210 Refurbished offices TO LET 9,154 sq ft OFFICE Exceptional. Every day. Suite B comprises 9,154 sq ft of ground floor accommodation Specification Newly created entrance and lobby Open plan floor plate

More information

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES Dated August 2009 Between HS1 LIMITED and EUROSTAR (U.K.) LIMITED THIS AGREEMENT is made the day of August 2009 BETWEEN: (1) HS1 Limited, a company

More information