1 HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI (617) ( FAX

2 ABSTRACT Design, installation and impact of Highway/Rail Grade Crossings with 4 Quad Gates The impact of the installation of 4 quadrant gates on Highway/Rail grade Crossings has caused much concern over the last couple of years. It has been the topic of discussion through out the country. Amtrak was required to install a test location as a condition for High Speed Rail. The Federal Railroad Administration ordered the closing, grade separation or full barrier protection for the thirteen crossing along Amtrak s shoreline route, between New Haven and Boston. Since there were no previous requirements or recommended practices existed, Amtrak started from the beginning designing a 4 quad crossing with vehicle presence detection. This paper presents our trial and endeavors to complete the task. We know that not all will agree with the way Amtrak reached their gold, but suggest that most of the stumbling blocks have been removed.

3 This paper will discuss the installation of 4 quadrant gates on Amtrak s main line in and around Mystic, Connecticut. In the early 1990 s, a decision was made to electrify the railroad, between New Haven, Connecticut and Boston, Massachusetts. The Federal Railroad Administration, in their approval of high-speed Rail Passenger Service Improvement Program, mandated that trains will not exceed 80mph over a crossing unless the crossing provides full barrier protection. Where speed is in excess of 95 mph, highway/rail grade crossing must be closed or have grade separation. There were thirteen grade crossings on the railroad between New Haven and Boston. To maintain the proposed schedule, a decision was made to build an overpass or close the majority of these grade crossings. This was not favorable with the local residents and state officials. At this time, local officials approached the FRA requesting assistance in developing an alternative to the building of an overpass or closure of their highway/rail grade crossing. Of the remaining highway/rail grade crossings, seven of these crossings, including School Street, provide the only access to the villages beyond the tracks. The FRA was already looking at various barricade systems in other countries. The 4- quadrant gate system was selected as best. They were looking for a place to test such an installation, for reliability and public acceptance. The estimate cost of the project was to be $1,000,000. The FRA funding assistance was 80%, and the state of Connecticut s share was 20%. The location selected was School Street in Mystic Connecticut on Amtrak s New Haven to Boston main line.

4 At the present time there are no guidelines, recommended practices or standards available for the installation of 4-quadrant highway/rail gate system. A variety of systems are being installed through out the country, with no two installations alike. As we speak, the highway/rail grade crossing committee of both American Railway Engineering and Maintenance of Way Association and the National Committee on Uniform Traffic Control Devices are working to write recommended practices for 4-quadrant gates at highway/rail grade crossings. Decisions that Amtrak had to make during the design of a 4-quadrant gate system was, but not limited to: 1. Should the exit gates fail up? 2. Should vehicle presence detector loops (VPDL) be used? Need or not needed? Vital or redundant? 3. Should exit gate decent be delayed from start of entrance gates? How long of a delay? Start when entrance gates are full horizontal? 4. Should traffic patterns be considered (i.e. school buses, semi-trucks, emergency vehicles, long low boat trailers)? 5. When should exit lights (pole & gates) start and stop flashing? 6. Should exit lights flash when being delayed? 7. How long should exit gates be horizontal prior to arrival of a train? 8. If exit gates does not go full down, does the gate need to be lifted? 9. If entrance gates fail to be full horizontal position, should the exit gates be held up?

5 10. Median barriers vs. traffic island vs. traffic separators? Need or not? 11. Roadway geometry as a factor? The first and most important decision to be made by Amtrak, was the selection of a vehicle presence detection system that would meet the railroad s requirement of failsafe. Many systems were tested, but none could meet the criteria. It was felt that a certain loop system manufactured by Reno A&E could be modified to meet the fail-safe provision. By installation of a test loop before the installation of the active loop, a reliable vehicle presence detection system was incorporated in the crossing circuits. A microprocessor-based system is used to check the loops, by observing vehicle operation of the active loops or by closing (or shorting) the test loops. This causes the loops to indicate as if a vehicle was detected and allows the loops to become a vital part of the system. This reliability allows us to give limited control of the exit gates and railroad signal system, to the vehicle presence detector loops. The operation of the highway/rail grade crossing is programmed similar to an interlocking, interfacing the tracks and the roadway. The east and west approach and island track circuit on each track and the three vehicle presence detector loops on each lane of highway are all interlocked together. In other words, the first to the crossing will have control of the crossing. This may sound like cars will be stopping trains, but in the two plus years of operation, we have stopped only one train due to a vehicle on the tracks. At that time a car had nosed under an exit gate, causing the cab signal to be taken away from the train. At 60mph, the warning time at School Street highway/rail grade crossing is approximately 50 seconds, and with the full barrier system, the

6 traveling public does not seem to mind the additional warning time before the arrival of a train. Full barrier gates take away the option of going around down gates. This removes the frustration of deciding to go or wait for the oncoming train. Amtrak is unique in the fact that its incorporates a continuous cab signal system on their tracks. Only approximately 9% of railroads in the United States have a cab system installed on its tracks. This was a major factor when designing the school street 4- quadrant gate system. The design used at School Street could be used as a typical application at any other highway/rail grade crossing without the cab signal feature. Our design of the 4-quadrant system is that the exit gates fail up. The entrance & exit gates descend and ascend together, and all lights at the crossing start to flash at the same time. All crossing signals are light emitting diodes (led) in 12-inch roundels. With the use of vehicle presence detector loops (VPDL), the need to delay exit gate descent is not required. A vehicle going over the crossing after the warning devices are actuated causes the exit gate in front of the vehicle to return or remain in a vertical position. The loops then have controlled the exit gate until they reach a full horizontal position. Activation of the any loop will cut out the train cab signal system. When a train steps on the approach to the crossing and the vehicle loop(s) shows occupied, the cab signal slowly degrades, causing the train to make a safety stop before occupying the crossing. When the vehicle clears the crossing, the cab signal is restored allowing the train to resume its authorized speed. Once all gates reach the horizontal position, actuation of the vehicle detector

7 loops will no longer have an effect on the gates, but will continue to reduce the train cab signals. A highway-crossing monitor and recorder are installed at the crossing to constantly verify the operation and the health of the system. An automatic dialing system notifies our maintenance dispatch center in Boston, along with local maintenance personal, of failures. The FRA monitors this highway/rail crossing through a closed circuit camera system, from the Volpe center in Cambridge, MA. When an approach is occupied, a picture is sent every 3 seconds to their center. Committee 36 is currently writing a recommended practice for the installation of 4- quadrant gate systems. There has been much discussion within the committee and with the FRA as to how the system should work. There is a flow chart from manual part (recommended guidelines for the application of highway/rail grade crossing warning devices) that we call the decision tree. It is intended as a guide to improve and upgrade warning devices at highway/rail grade crossings. It is our intention that diagnostic teams will use this decision tree when reviewing a highway/rail grade crossing warning system. Manual part recommends the design criteria for operating mechanism for both entrance gates that fail down and exit gates that fail up. Committee 36 is working on recommended design criteria for the installation of vehicle presence detector loops. Amtrak is installing seven more 4-quadrant highway/rail grade crossings in the same area as School Street. Our special concern is that seven of these crossings, including School Street, provide the only access to the villages beyond the tracks. We are

8 currently working on a way for the dispatcher to raise the gates in the event of a failure if an emergency occurs before maintenance personal can arrive. This concludes the installation of the 4-quadrant gate systems on Amtrak.

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

Private Crossing Treatments on the North Carolina Sealed Corridor

Private Crossing Treatments on the North Carolina Sealed Corridor Private Crossing Treatments on the North Carolina Sealed Corridor Patrick Bien-aime 2013 National Highway-Rail Grade Crossing Safety Training Conference November 05, 2013 The National Transportation Systems

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

VAR-501-WECC-3 Power System Stabilizer. A. Introduction A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

777X Airport Compatibility

777X Airport Compatibility 777X Airport Compatibility Airport Compatibility Engineering Boeing Commercial Airplanes July 2013 Copyright 2013 Boeing. All rights reserved. ECCN: 9E991 ECCN: 9E991 Overview 777X Airport Discussions

More information

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance NATA Aircraft Maintenance & System Technology Committee Best Practices Reduced Vertical Separation Minimum (RVSM) Airspace reduces the vertical separation above flight level (FL) 290 from 2000-ft minimum

More information

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) A travel description of the Brisbane Airport Domestic Terminal Precinct Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) Brisbane Airport is located approximately 18 kilometres

More information

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS CHAP 5-1 CHAPTER 5 PERFORMANCE OPERATING LIMITATIONS 5.1 GENERAL 5.1.1 Aeroplanes shall be operated in accordance with a comprehensive and detailed code of performance established by the Civil Aviation

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

series airplanes with modification and Model A321 series airplanes with modification

series airplanes with modification and Model A321 series airplanes with modification This document is scheduled to be published in the Federal Register on 10/18/2012 and available online at http://federalregister.gov/a/2012-25605, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

High-Speed Rail Operations in Japan Takao NISHIYAMA

High-Speed Rail Operations in Japan Takao NISHIYAMA High-Speed Rail Operations in Japan Takao NISHIYAMA Director of Japan Railways Group New York Office New York, NY, U.S.A. Introduction Transportation Planning Train Variation and Efficiency Contents Risk

More information

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548 Finding Aid for DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, 1922-1923 Finding Aid Published: June 2011 20900 Oakwood Boulevard Dearborn, MI 48124-5029 USA research.center@thehenryford.org

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

For full product information, visit Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page.

For full product information, visit  Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page. R Safety Interlock Switches TL4024 Safety Interlock Switch with uard Door Locking High locking force of 1,500 N (7 lb.) locks guard door shut until machine is safe to enter IP67 (NEMA 6) enclosure withstands

More information

Mobility Services. Rider s Guide

Mobility Services. Rider s Guide Mobility Services Rider s Guide San Joaquin Regional Transit District (RTD), the regional transit provider for San Joaquin County, provides public transit services in the Stockton Metropolitan Area (SMA),

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

GUIDE TO THE DETERMINATION OF HISTORIC PRECEDENCE FOR INNSBRUCK AIRPORT ON DAYS 6/7 IN A WINTER SEASON. Valid as of Winter period 2016/17

GUIDE TO THE DETERMINATION OF HISTORIC PRECEDENCE FOR INNSBRUCK AIRPORT ON DAYS 6/7 IN A WINTER SEASON. Valid as of Winter period 2016/17 GUIDE TO THE DETERMINATION OF HISTORIC PRECEDENCE FOR INNSBRUCK AIRPORT ON DAYS 6/7 IN A WINTER SEASON Valid as of Winter period 2016/17 1. Introduction 1.1 This document sets out SCA s guidance for the

More information

Runway Status Lights (RWSL) in Japan. July 2015

Runway Status Lights (RWSL) in Japan. July 2015 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4434-P1 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle GUIDANCE FOR FUTURE DESIGN OF FREEWAYS WITH HIGH- OCCUPANCY VEHICLE (HOV) LANES BASED ON

More information

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

4. Proposed Transit Improvements

4. Proposed Transit Improvements 4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well

More information

Road-Rail Interface Safety

Road-Rail Interface Safety Road-Rail Interface Safety A guide to RSSB research in Road-Rail Interface Safety April 2011 RSSB 1 Road-Rail interface safety research 2 RSSB The photographs in the guide appear courtesy of ATOC/Paul

More information

Reno High Sierra Chapter Ninety-Nines Scholarship Qualifications and Eligibility

Reno High Sierra Chapter Ninety-Nines Scholarship Qualifications and Eligibility Reno High Sierra Chapter Ninety-Nines Scholarship Qualifications and Eligibility Our scholarship is open to any female who is (1) a student pilot and has soloed by application deadline, or (2) a licensed

More information

User manual for awning blind AMZ Z-Wave

User manual for awning blind AMZ Z-Wave GB User manual for awning blind AMZ ZWave Contents 1. Safety standards...2 2. Description...3 3. Programming the appliance...4 4. Association Groups...5 5. Compatibility of other producers appliances in

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2016061 Date: 28 Apr 2016 Time: 1135Z Position: 5047N 00314W Location: Exeter (EX) NDB hold PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C17

More information

Capacity kw. Thermal turndown from specified maximum capacity 8:1 8:1

Capacity kw. Thermal turndown from specified maximum capacity 8:1 8:1 3-18.3-5 Specifications of OXY-THERM TITAN burners Typical burner data Fuel: natural gas at 15 C with 10.9 kwh/nm 3 HHV - sg = 0.6 Oxygen: 90-100% purity Stated pressures are indicative. Actual pressures

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

Flight Delays Module (External User)

Flight Delays Module (External User) Flight Delays Module (External User) Table of Contents Flight Delays Module and its Functionalities 3 Access Flight Delay Module 3 Auto-generate Flight Delay Records 4 Manually Create a Flight Delay Record

More information

New ADA Accessibility Standards for the Attractions Industry

New ADA Accessibility Standards for the Attractions Industry New ADA Accessibility Standards for the Attractions Industry 1 New ADA Accessibility Standards for the Attractions Industry 2 INTERNATIONAL ASSOCIATION OF AMUSEMENT PARKS AND ATTRACTIONS WEBINAR DISCLAIMER

More information

6. CARRY-ON BAGGAGE CONTROL PROGRAM

6. CARRY-ON BAGGAGE CONTROL PROGRAM 6. CARRY-ON BAGGAGE CONTROL PROGRAM 6.1 Corporate Policy The Helijet Safety Policy is designed to ensure an organizational and cultural framework that complies with regulations governing the operation

More information

ROLLS-ROYCE DEUTSCHLAND LTD AND CO KG (RRD)

ROLLS-ROYCE DEUTSCHLAND LTD AND CO KG (RRD) Page 1 2009-22-01 ROLLS-ROYCE DEUTSCHLAND LTD AND CO KG (RRD) (FORMERLY ROLLS-ROYCE PLC, DERBY, ENGLAND) Amendment 39-16052 Docket No. FAA-2007-0037; Directorate Identifier 2007-NE-41-AD PREAMBLE Effective

More information

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs

D DAVID PUBLISHING. Development and Achievement of the T-50 Flight Control s Consolidated OFP. 1. Introduction. 2. Consolidated OFP s Needs Journal of Aerospace Science and Technology 1 (2015) 67-72 doi: 10.17265/2332-8258/2015.02.003 D DAVID PUBLISHING Development and Achievement of the T-50 Flight Control s Consolidated OFP Soon Ryong Jang,

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

Raft Island Gig Harbor, Washington

Raft Island Gig Harbor, Washington RIIA Special Committee for the placement of Speed Controls Raft Island Gig Harbor, Washington Speed Control Placement and Road Safety Recommendations Date: September 14, 2017 Prepared for: RIIA Board Members

More information

Lesson Plan Introduction

Lesson Plan Introduction Lesson Plan Introduction The following flight training program has been designed with consideration for the student's comfort level. The advancement is dependent upon the student's ability. The following

More information

RV LOT PROCEDURE. RV1.4 Special circumstances (e.g., hardship, military service) will be addressed on an individual basis.

RV LOT PROCEDURE. RV1.4 Special circumstances (e.g., hardship, military service) will be addressed on an individual basis. RV1. Scope RV LOT PROCEDURE RV1.1 This procedure has been established to provide a methodical approach for assigning parking space in the RV Lot to Fairfield residents for their recreational vehicles only

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888 STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS 89 JEFFERSON BOULEVARD WARWICK, RHODE ISLAND 02888 IN RE: New Uniform Tariff for Limited : Public Motor Vehicles

More information

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017 Liverpool Lime Street station engineering work Experience during October 2017 improvement work November 2017 Overview during the engineering work Between 30 September and 22 October engineering work at

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM)

HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM) HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM) AIRPORT MANAGER S OFFICE Riverside County Economic Development Agency Aviation Division 3403 10 th

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

A Context-Aware Amusement Park

A Context-Aware Amusement Park A Context-Aware Amusement Park Hitesh Maidasani Department of Computer Science University of Maryland College Park, MD 20742, USA hitmai@cs.umd.edu April 24, 2014 1 Introduction When we think of amusement

More information

Read the Directions sheets for specific instructions.

Read the Directions sheets for specific instructions. Read the Directions sheets for specific instructions. Parent Guide, page 1 of 1 SUMMARY In this activity, you and your child will find and explore a local place that is connected to trains, such as a train

More information

Annual Report Accident Investigation Board, Norway Railway Department

Annual Report Accident Investigation Board, Norway Railway Department Annual Report 2010 Accident Investigation Board, Norway Railway Department Accident Investigation Board, Norway Postbox 213 N-2001 Lillestrøm Norway Phone: +47 63 89 63 00 Fax: +47 63 89 63 01 http://www.aibn.no

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Piloting Rail Traffic Procedure Number: 9006 Version 1.0, 31 March 2016 Piloting Rail Traffic Procedure Number: 9006 Document Control Identification Document title

More information

Form 91 Application for Approval of an EFB System

Form 91 Application for Approval of an EFB System Form 91 Application for Approval of an EFB System This form must be completed by the Flight Representative (FOR) or Operator as recorded on the current Form 20. Please refer to RP4 Guidance to Operators

More information

I-3 DFW Extension Public Hearing. June 2, 2011

I-3 DFW Extension Public Hearing. June 2, 2011 1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation

More information

BOMBARDIER, INC.

BOMBARDIER, INC. Page 1 2011-24-03 BOMBARDIER, INC. Amendment 39-16867 Docket No. FAA-2011-0720; Directorate Identifier 2010-NM-252-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective January

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

East of the Rideau Transit Forum

East of the Rideau Transit Forum East of the Rideau Transit Forum Transportation Services Department June 6, 2017 0 What s Coming in 2018 O-Train Network 1 1 O-Train Confederation Line Multi-Modal Transformation The O-Train Confederation

More information

For full product information, visit Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page.

For full product information, visit  Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page. R Courtesy of CMA/Flodyne/Hydradyne Motion Control Hydraulic Pneumatic Electrical Mechanical (800) 6-5480 www.cmafh.com Safety Interlock Switches TL19 Safety Interlock Switch with uard Door Locking High

More information

Policy Transport. Policy highlights. Our plan

Policy Transport. Policy highlights. Our plan Policy 2017 Our plan Policy highlights National is committed to building the world-class infrastructure to ensure New Zealand continues to grow. Record investment in transport Delivering the Roads of National

More information

Couples Cruise, L.L.C.

Couples Cruise, L.L.C. Couples Cruise, L.L.C. Reseller Agreement FULL SHIP CHARTERS The undersigned parties, Couples Cruise, L.L.C., hereinafter CC, and the Reseller Hereinafter RS, (Mailing address) (Phone) (Email) agree to

More information

Baggage Reconciliation System

Baggage Reconciliation System Product Description PD-TS-105 Issue 1.0 Date January 2015 The purpose of this product description is to enable the customer to satisfy himself as to whether or not the product or service would be suitable

More information

National Association of Rocketry Level 3 High Power Certification Requirements

National Association of Rocketry Level 3 High Power Certification Requirements National Association of Rocketry Level 3 High Power Certification Requirements 1.0 Flyer Requirements 1.1 Any individual attempting NAR Level 3 Certification must be a Level 2 high power certified NAR

More information

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC 07 DECEMBER 1997 The Transportation Safety Board of Canada

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

MTA Transit & Bus Committee

MTA Transit & Bus Committee MTA Transit & Bus Committee April 28, 2014 7 Line Extension Inclined Elevators MTA Capital Construction MTA Capital Construction 1 Inclined Elevators MTA Capital Construc1on 2 Paris Eiffel Tower Inclined

More information

FLIGHT ENDURANCE. Participants analyze flight principles with rubber band powered model aircraft.

FLIGHT ENDURANCE. Participants analyze flight principles with rubber band powered model aircraft. Page 1 of 5 OVERVIEW Participants analyze flight principles with rubber band powered model aircraft. PURPOSE The Flight Endurance event requires participants to build, fly, and adjust (trim) a model to

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/310 1 EX/113 9/8/16 ASSEMBLY 39TH SESSION Montréal, 27 September 7 October 2016 EXECUTIVE COMMITTEE Agenda Item 16: Aviation Security Policy

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association Consultation on Radio Teleswitch Broadcasting Provision from 1 January 2018 June 2016 Consultation on Radio Teleswitch Broadcasting Provision from

More information

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services. BRIEFING NOTE FOR BUS OPERATORS Inverclyde statutory Quality Partnership Scheme - 2015 What is an sqps? A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure

More information

TEXT OF AMENDMENT 36 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES OPERATION OF AIRCRAFT

TEXT OF AMENDMENT 36 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES OPERATION OF AIRCRAFT 3 TEXT OF AMENDMENT 36 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES OPERATION OF AIRCRAFT ANNEX 6 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION PART I INTERNATIONAL COMMERCIAL AIR TRANSPORT

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

TOWN TRUST. Bury St Edmunds Railway Station

TOWN TRUST. Bury St Edmunds Railway Station BURY ST EDMUNDS TOWN TRUST conserving buildings of historic interest The future of Bury St Edmunds Railway Station Part I Report October 2015 1 The future of Bury St Edmunds Railway Station NOTE: This

More information

N864 T X T840 T F 863F T F N , 840X, T840, T843, 860F, 863, T863, 864, N864. Route descriptions. Useful information

N864 T X T840 T F 863F T F N , 840X, T840, T843, 860F, 863, T863, 864, N864. Route descriptions. Useful information Route:, 840X, T840, T843, 860F, 863, T863, 864, Effective 25 January 2015 840X 860F 863 864 T843 This timetable covers bus services linking: s Hahndorf Aldgate Stirling City Grenfell Destination: to Cleland

More information

General Terms and Conditions (GTC) of Germania Fluggesellschaft mbh ("Germania")

General Terms and Conditions (GTC) of Germania Fluggesellschaft mbh (Germania) General Terms and Conditions (GTC) of Germania Fluggesellschaft mbh ("Germania") updated: 30 th November 2017 1. Booking The booking can be made via the internet www.flygermania.com, telephone (service

More information

China Airlines Airbus A R (Flight 140) Misses Landing and Goes up in Flame at Nagoya Airport

China Airlines Airbus A R (Flight 140) Misses Landing and Goes up in Flame at Nagoya Airport China Airlines Airbus A300-600R (Flight 140) Misses Landing and Goes up in Flame at Nagoya Airport April 26, 1994 at Nagoya Airport Masayuki Nakao (Institute of Engineering Innovation, School of Engineering,

More information

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City.

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City. Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City. City Manager s Office: Worked with the Lee County School District regarding

More information

Tri-Glide Instruction Manual

Tri-Glide Instruction Manual Tri-Glide Instruction Manual 12 Timber Lane Marlboro NJ 07746 09/09/2011 tel: 732.462.6277 fax:732.462.6355 email: sales@hilmanrollers.com CONTENTS Contents Page Warnings 3 Operating Instructions 4 General

More information

Navitaire GoNow Day-of-departure services

Navitaire GoNow Day-of-departure services Navitaire GoNow: Day-of-Departure Made Smarter GoNow is Navitaire s advanced day-of-departure suite offering today s evolving airlines a comprehensive, scalable solution to support efficient, cost-effective

More information

A Safe Environment is Everybody s Business!

A Safe Environment is Everybody s Business! Sinaloa: A Safe Environment is Everybody s Business! PRESENTATION From the begining of the Mario López Valdez administration, we assumed the responsability and commitment to safeguard the integrity and

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

School Environment Safety Guidelines Abstract

School Environment Safety Guidelines Abstract School Environment Safety Guidelines Sanjay Ram (Senior Engineer (Traffic), Qld Dept. of Main Roads) Renae Moore (Research and Development Officer), Queensland Transport) Abstract In continuing the challenge

More information

Access Statement For The Clarendon Hotel Montpelier Row, Blackheath Village SE3 0RW

Access Statement For The Clarendon Hotel Montpelier Row, Blackheath Village SE3 0RW Montpelier Row, Blackheath Village SE3 0RW Contents: Page 1 Introduction to hotel 1 - Directions from Blackheath Station 1 - Taxi and buses information 2 Arrival and Car Parking information 3 Main entrance

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

LVS BASE VEST OPERATOR S MANUAL

LVS BASE VEST OPERATOR S MANUAL LVS BASE VEST OPERATOR S MANUAL CONTENTS 02 INTRO 04 FITTING 06 ADJUSTING SIDE-STRAPS 10 STORAGE 14 CARE 16 OPTIONAL SIDE ARMOR 20 COVERS AND ACCESSORIES This manual must be carefully read by all persons

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT

VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT AWN VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT AWNING PERMIT APPLICATION Important note regarding Awning Code changes Effective March 4, 2003, awning regulations were modified to

More information

Notification of the Department of Civil Aviation

Notification of the Department of Civil Aviation -1- For convenient use only Notification of the Department of Civil Aviation On flight crew training program By virtue of the authority vested in the Department of Civil Aviation under 7.3 of Clause 7.3

More information

SPECTRUM BUSINESS VOICE SERVICES PRICE GUIDE (EFFECTIVE )

SPECTRUM BUSINESS VOICE SERVICES PRICE GUIDE (EFFECTIVE ) This Price Guide contains prices and descriptions for the Spectrum Business Voice Services ( Service ) and are incorporated into the terms and conditions at www.charter.com, under Terms of Service/Policies.

More information

Single Occupancy HOV Lane

Single Occupancy HOV Lane This does not constitute tax advice. All persons considering use of available incentives should consult with their own tax professional to determine eligibility, specific amount of benefit available, if

More information

[Docket No. FAA ; Directorate Identifier 2013-NM-220-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2013-NM-220-AD; Amendment ; AD ] [Federal Register Volume 79, Number 166 (Wednesday, August 27, 2014)] [Rules and Regulations] [Pages 51074-51077] From the Federal Register Online via the Government Printing Office [www.gpo.gov] [FR Doc

More information

Blue Series Hot Melt Hose with RediFlext II Hanger System

Blue Series Hot Melt Hose with RediFlext II Hanger System Instruction Sheet P/N 1124594_01 Blue Series Hot Melt Hose with RediFlext II Hanger System Safety WARNING! Allow only personnel with appropriate training and experience to operate or service the equipment.

More information

Airspace infringements: review and actions process

Airspace infringements: review and actions process Airspace infringements: review and s process July 2017 Introduction An airspace infringement is the unauthorised entry of an aircraft into notified airspace. This includes controlled airspace, prohibited

More information

Comment response document for Airbus A380 D 04 Crew Rest Compartment

Comment response document for Airbus A380 D 04 Crew Rest Compartment Comment response document for Airbus A380 D 04 Crew Rest Compartment # Commenter Comment EASA position 1 Boeing Specific section of concern Background a. Identification of issue Airbus offer in option

More information

Smart-UPS Installation Guide 750/1000/1500/2200/3000 VA 120/230 Vac 500 VA 100 Vac Tower Important Safety Messages

Smart-UPS Installation Guide 750/1000/1500/2200/3000 VA 120/230 Vac 500 VA 100 Vac Tower Important Safety Messages Smart-UPS Installation Guide 750/1000/1500/2200/3000 VA 120/230 Vac 500 VA 100 Vac Tower Important Safety Messages SAVE THESE INSTUCTIONS - This manuals contains important instructions that should be followed

More information