HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

Size: px
Start display at page:

Download "HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak"

Transcription

1 HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI (617) ( FAX watsonw@amtrak.com

2 ABSTRACT Design, installation and impact of Highway/Rail Grade Crossings with 4 Quad Gates The impact of the installation of 4 quadrant gates on Highway/Rail grade Crossings has caused much concern over the last couple of years. It has been the topic of discussion through out the country. Amtrak was required to install a test location as a condition for High Speed Rail. The Federal Railroad Administration ordered the closing, grade separation or full barrier protection for the thirteen crossing along Amtrak s shoreline route, between New Haven and Boston. Since there were no previous requirements or recommended practices existed, Amtrak started from the beginning designing a 4 quad crossing with vehicle presence detection. This paper presents our trial and endeavors to complete the task. We know that not all will agree with the way Amtrak reached their gold, but suggest that most of the stumbling blocks have been removed.

3 This paper will discuss the installation of 4 quadrant gates on Amtrak s main line in and around Mystic, Connecticut. In the early 1990 s, a decision was made to electrify the railroad, between New Haven, Connecticut and Boston, Massachusetts. The Federal Railroad Administration, in their approval of high-speed Rail Passenger Service Improvement Program, mandated that trains will not exceed 80mph over a crossing unless the crossing provides full barrier protection. Where speed is in excess of 95 mph, highway/rail grade crossing must be closed or have grade separation. There were thirteen grade crossings on the railroad between New Haven and Boston. To maintain the proposed schedule, a decision was made to build an overpass or close the majority of these grade crossings. This was not favorable with the local residents and state officials. At this time, local officials approached the FRA requesting assistance in developing an alternative to the building of an overpass or closure of their highway/rail grade crossing. Of the remaining highway/rail grade crossings, seven of these crossings, including School Street, provide the only access to the villages beyond the tracks. The FRA was already looking at various barricade systems in other countries. The 4- quadrant gate system was selected as best. They were looking for a place to test such an installation, for reliability and public acceptance. The estimate cost of the project was to be $1,000,000. The FRA funding assistance was 80%, and the state of Connecticut s share was 20%. The location selected was School Street in Mystic Connecticut on Amtrak s New Haven to Boston main line.

4 At the present time there are no guidelines, recommended practices or standards available for the installation of 4-quadrant highway/rail gate system. A variety of systems are being installed through out the country, with no two installations alike. As we speak, the highway/rail grade crossing committee of both American Railway Engineering and Maintenance of Way Association and the National Committee on Uniform Traffic Control Devices are working to write recommended practices for 4-quadrant gates at highway/rail grade crossings. Decisions that Amtrak had to make during the design of a 4-quadrant gate system was, but not limited to: 1. Should the exit gates fail up? 2. Should vehicle presence detector loops (VPDL) be used? Need or not needed? Vital or redundant? 3. Should exit gate decent be delayed from start of entrance gates? How long of a delay? Start when entrance gates are full horizontal? 4. Should traffic patterns be considered (i.e. school buses, semi-trucks, emergency vehicles, long low boat trailers)? 5. When should exit lights (pole & gates) start and stop flashing? 6. Should exit lights flash when being delayed? 7. How long should exit gates be horizontal prior to arrival of a train? 8. If exit gates does not go full down, does the gate need to be lifted? 9. If entrance gates fail to be full horizontal position, should the exit gates be held up?

5 10. Median barriers vs. traffic island vs. traffic separators? Need or not? 11. Roadway geometry as a factor? The first and most important decision to be made by Amtrak, was the selection of a vehicle presence detection system that would meet the railroad s requirement of failsafe. Many systems were tested, but none could meet the criteria. It was felt that a certain loop system manufactured by Reno A&E could be modified to meet the fail-safe provision. By installation of a test loop before the installation of the active loop, a reliable vehicle presence detection system was incorporated in the crossing circuits. A microprocessor-based system is used to check the loops, by observing vehicle operation of the active loops or by closing (or shorting) the test loops. This causes the loops to indicate as if a vehicle was detected and allows the loops to become a vital part of the system. This reliability allows us to give limited control of the exit gates and railroad signal system, to the vehicle presence detector loops. The operation of the highway/rail grade crossing is programmed similar to an interlocking, interfacing the tracks and the roadway. The east and west approach and island track circuit on each track and the three vehicle presence detector loops on each lane of highway are all interlocked together. In other words, the first to the crossing will have control of the crossing. This may sound like cars will be stopping trains, but in the two plus years of operation, we have stopped only one train due to a vehicle on the tracks. At that time a car had nosed under an exit gate, causing the cab signal to be taken away from the train. At 60mph, the warning time at School Street highway/rail grade crossing is approximately 50 seconds, and with the full barrier system, the

6 traveling public does not seem to mind the additional warning time before the arrival of a train. Full barrier gates take away the option of going around down gates. This removes the frustration of deciding to go or wait for the oncoming train. Amtrak is unique in the fact that its incorporates a continuous cab signal system on their tracks. Only approximately 9% of railroads in the United States have a cab system installed on its tracks. This was a major factor when designing the school street 4- quadrant gate system. The design used at School Street could be used as a typical application at any other highway/rail grade crossing without the cab signal feature. Our design of the 4-quadrant system is that the exit gates fail up. The entrance & exit gates descend and ascend together, and all lights at the crossing start to flash at the same time. All crossing signals are light emitting diodes (led) in 12-inch roundels. With the use of vehicle presence detector loops (VPDL), the need to delay exit gate descent is not required. A vehicle going over the crossing after the warning devices are actuated causes the exit gate in front of the vehicle to return or remain in a vertical position. The loops then have controlled the exit gate until they reach a full horizontal position. Activation of the any loop will cut out the train cab signal system. When a train steps on the approach to the crossing and the vehicle loop(s) shows occupied, the cab signal slowly degrades, causing the train to make a safety stop before occupying the crossing. When the vehicle clears the crossing, the cab signal is restored allowing the train to resume its authorized speed. Once all gates reach the horizontal position, actuation of the vehicle detector

7 loops will no longer have an effect on the gates, but will continue to reduce the train cab signals. A highway-crossing monitor and recorder are installed at the crossing to constantly verify the operation and the health of the system. An automatic dialing system notifies our maintenance dispatch center in Boston, along with local maintenance personal, of failures. The FRA monitors this highway/rail crossing through a closed circuit camera system, from the Volpe center in Cambridge, MA. When an approach is occupied, a picture is sent every 3 seconds to their center. Committee 36 is currently writing a recommended practice for the installation of 4- quadrant gate systems. There has been much discussion within the committee and with the FRA as to how the system should work. There is a flow chart from manual part (recommended guidelines for the application of highway/rail grade crossing warning devices) that we call the decision tree. It is intended as a guide to improve and upgrade warning devices at highway/rail grade crossings. It is our intention that diagnostic teams will use this decision tree when reviewing a highway/rail grade crossing warning system. Manual part recommends the design criteria for operating mechanism for both entrance gates that fail down and exit gates that fail up. Committee 36 is working on recommended design criteria for the installation of vehicle presence detector loops. Amtrak is installing seven more 4-quadrant highway/rail grade crossings in the same area as School Street. Our special concern is that seven of these crossings, including School Street, provide the only access to the villages beyond the tracks. We are

8 currently working on a way for the dispatcher to raise the gates in the event of a failure if an emergency occurs before maintenance personal can arrive. This concludes the installation of the 4-quadrant gate systems on Amtrak.

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References

More information

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

Rockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008

Rockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008 ockland County Safety & Quiet Zone Project Town of Orangetown Public Meeting January 30, 2008 Agenda Welcome and Introductions Project Goals Project Area and ailroad Facts How to Establish a Quiet Zone

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of

More information

Quiet Zone Process. Background:

Quiet Zone Process. Background: Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

Private Crossing Treatments on the North Carolina Sealed Corridor

Private Crossing Treatments on the North Carolina Sealed Corridor Private Crossing Treatments on the North Carolina Sealed Corridor Patrick Bien-aime 2013 National Highway-Rail Grade Crossing Safety Training Conference November 05, 2013 The National Transportation Systems

More information

Quiet Zone Evaluation for Huron, Ohio

Quiet Zone Evaluation for Huron, Ohio Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System City Council Agenda November 4, 2014 Mayor and Council Agenda Item No. B.01 Reviewed by City Mgr s office: /KLM Memo to: From: Manteca City Council Karen L. McLaughlin, City Manager Date: October 28, 2014

More information

What do they mean to you?

What do they mean to you? CANADA S NEW GRADE CROSSING REGULATIONS What do they mean to you? May 2, 2015 Floris van Weelderen, P.Eng., PTOE Becky Lai, EIT THE ACCIDENTAL GRADE CROSSING Gare Montparnasse, Paris October 22, 1895 2

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

IC Chapter 7.7. Railroad Grade Crossings Fund

IC Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7 Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7-1 "Grade crossing" Sec. 1. The term "grade crossing" as used in this chapter means a crossing of any railroad and any public highway, street

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES Alpha Systems AOA Calibration Overview The calibration of the Alpha Systems AOA has 3 simple steps 1.) (On the Ground) Zero calibration 2.) (In-flight) Optimum Alpha Angle (OAA) calibration 3.) (In-flight)

More information

National Highway-Rail Crossing Inventory Rule & GCIS

National Highway-Rail Crossing Inventory Rule & GCIS F E D E R A L R A I L R O A D A D M I N I S T R A T I O N National Highway-Rail Crossing Inventory Rule & GCIS 2015 National Highway-Rail Grade Crossing Safety Training Conference Arlington, TX November

More information

Introduction. The City of Elk Grove

Introduction. The City of Elk Grove The Quiet Zone Application Process: Lessons Learned from Elk Grove, California 8/22/05 By: Dominic Spaethling, PB; Barry Lemke, PB; Gwen Owens, City of Elk Grove, CA Introduction The City of Elk Grove

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

FRONT COVER. Derby Quiet Zone Study Cover

FRONT COVER. Derby Quiet Zone Study Cover FRONT COVER Derby Quiet Zone Study Cover DERBY QUIET ZONE STUDY City of Derby April 9 City Council The Mayor and City Council comprise the Governing Body. These elected officials are the political leaders

More information

Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012

Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012 Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012 AGENDA ITEM 10a Unfinished Business AGENDA TITLE: Discussion of Railroad Quiet Zone DISPOSITION: [ ] Action Required [X] For Discussion

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

The Olathe Quiet Zone

The Olathe Quiet Zone The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL

More information

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS Background Engine whistling requirements are controlled through the Canadian

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Railroad Safety in the United States. Ian Savage

Railroad Safety in the United States. Ian Savage Railroad Safety in the United States Ian Savage International Comparisons USA GB Ratio Population 320m 63m 5 times Route Miles 140k 10k 14 times Train Miles 766m 355m 2 times Passenger Miles 22 billion

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

VAR-501-WECC-3 Power System Stabilizer. A. Introduction A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:

More information

The organisation of the Airbus. A330/340 flight control system. Ian Sommerville 2001 Airbus flight control system Slide 1

The organisation of the Airbus. A330/340 flight control system. Ian Sommerville 2001 Airbus flight control system Slide 1 Airbus flight control system The organisation of the Airbus A330/340 flight control system Ian Sommerville 2001 Airbus flight control system Slide 1 Fly by wire control Conventional aircraft control systems

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018 Page 1 of 5 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-28 May 4, 2018 Effective: 0001 Sunday May 6, 2018 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority: IHB Timetable

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006 of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)

More information

STEVENS POINT QUIET ZONE

STEVENS POINT QUIET ZONE STEVENS POINT QUIET ZONE Associate Administrator for Safety Federal Railroad Administration 1200 New Jersey Avenue, SE, MS-25 Washington, DC 20590 Mailed:, 2009 Certified Mail Article# 70000520002247320178

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

PRATT AND WHITNEY

PRATT AND WHITNEY Page 1 2009-10-08 PRATT AND WHITNEY Amendment 39-15903 Docket No. FAA-2008-1131; Directorate Identifier 2008-NE-37-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective June

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

MEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /"

MEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C / Texas ~Department _ of Transportation MEMORANDUM TO: District Engineers DATE: February 3,2012 FROM: Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /" SUBJECT: Traffic Control Plan

More information

[Docket No. FAA ; Directorate Identifier 2012-NM-206-AD; Amendment

[Docket No. FAA ; Directorate Identifier 2012-NM-206-AD; Amendment This document is scheduled to be published in the Federal Register on 08/06/2013 and available online at http://federalregister.gov/a/2013-18488, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Airworthiness Directive

Airworthiness Directive Airworthiness Directive AD No.: 2017-0237 Issued: 04 December 2017 EASA AD No.: 2017-0237 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) 216/2008 on

More information

Policy Railway crossings

Policy Railway crossings Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Sam Houston State University UAS Use Checklist

Sam Houston State University UAS Use Checklist Sam Houston State University UAS Use Checklist The FAA Part 107 of the Code of Federal Regulations and the Sam Houston State University President s Office Policy PRE-27 determine the minimum requirements

More information

INVESTIGATION REPORT. Incident to ATR registered F-GVZG on 11 September 2011 at Marseille

INVESTIGATION REPORT. Incident to ATR registered F-GVZG on 11 September 2011 at Marseille INVESTIGATION REPORT www.bea.aero (1) Except where otherwise indicated, the times in this report are in Universal Time Coordinated (UTC). (2) Pilot Flying (3) Pilot Monitoring (4) MultiFunction Computer

More information

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA Program Manual EarthCraft House Single Family Program January 1, 2017 Viridiant 1431 West Main Street Richmond, VA 23220 804.225.9843 EarthCraft House Project Process Process Overview All EarthCraft Builders

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

[Docket No. FAA ; Product Identifier 2017-NM-037-AD; Amendment ; AD ]

[Docket No. FAA ; Product Identifier 2017-NM-037-AD; Amendment ; AD ] [Federal Register Volume 82, Number 241 (Monday, December 18, 2017)] [Rules and Regulations] [Pages 59960-59963] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR

More information

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012 Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low PIONEER TRAILS REGIONAL PLANNING COMMISSION TRANSPORTATION NEEDS -- 2015 TRANSPORTATION PLANNING GOALS BY MODOT CATEGORIES Pioneer Trails transportation needs are listed according to MoDOT s two major

More information

IATA Air Carrier Self Audit Checklist Analysis Questionnaire

IATA Air Carrier Self Audit Checklist Analysis Questionnaire IATA Air Carrier Self Audit Checklist Analysis Questionnaire Purpose Runway Excursion Prevention Air Carrier Self Audit Checklist The Flight Safety Foundation (FSF) Reducing the Risk of Runway Excursions

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

COLTS Complementary ADA Paratransit Service. Special Efforts Accessibility Transportation Service (SEATS) SEATS Trip Tips (570)

COLTS Complementary ADA Paratransit Service. Special Efforts Accessibility Transportation Service (SEATS) SEATS Trip Tips (570) COLTS Complementary ADA Paratransit Service Special Efforts Accessibility Transportation Service (SEATS) SEATS Trip Tips (570) 963-6795 June, 2016 1 Welcome to SEATS!!! COLTS provides Complementary ADA

More information

District 3 ITS Project Update

District 3 ITS Project Update District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer Key ITS Projects in District 3 Bay County Advanced Traffic Management System (ATMS) Okaloosa County Computerized Traffic Control

More information

EPM Series Reversing Electric Actuators

EPM Series Reversing Electric Actuators EPM Series Reversing Electric Actuators Innovative Quarter-Turn Actuators that Look the Same on the Outside with the Hayward Difference on the INSIDE! Overview On/Off and Proportional Control Models Designed

More information

Low cost solutions to improve safety at level crossings in Hungary

Low cost solutions to improve safety at level crossings in Hungary 2 nd Session of Group of Experts on Safety at Level Crossings Low cost solutions to improve safety at level crossings in Hungary Alexandru Árpád MOGYORÓS Ministry of National Development - Hungary Transport

More information

1224 Splitter and CTO combo, setup instructions using the Panelview HMI

1224 Splitter and CTO combo, setup instructions using the Panelview HMI Knowledge Base Article Type: Instructions 1224 Splitter and CTO combo, setup instructions using the Panelview 1000+ HMI Description: Instructions on How to properly setup the 1224 Splitter and CTO/Clamp

More information

series airplanes with modification and Model A321 series airplanes with modification

series airplanes with modification and Model A321 series airplanes with modification This document is scheduled to be published in the Federal Register on 10/18/2012 and available online at http://federalregister.gov/a/2012-25605, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

for for HotValley TM TM

for for HotValley TM TM for for HotValley INTRODUCTION The HotValley system holds self-regulating ice melt cable in place on roof valleys and flashings. It can be used in roof valleys (see above), on flashings next to vertical

More information

DOT 3-Hour Rule Master Plan

DOT 3-Hour Rule Master Plan DOT 3-Hour Rule Master Plan DOT 3-Hour Rule Master Plan (continued) Page 2 of 13 Table of Contents A. BACKGROUND... 3 B. COMPASS AIRLINES PLAN AND RESPONSIBILITY... 4 C. SOC PLAN... 5 1. Departure Delays...

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

LINK (5465) N. Robert St., St. Paul, MN 55101

LINK (5465) N. Robert St., St. Paul, MN 55101 651-602-LINK (5465) www.transitlinktc.org 390 N. Robert St., St. Paul, MN 55101 Service Details Customer Guide Table of Contents Customer Guide... page 1 Service Details... page 2 Areas... page 2 Eligibility...

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

Security Queue Management Plan

Security Queue Management Plan 1. Introduction 1.1 Purpose The Queue Management Plan (QMP) describes the process for managing the flow of passengers through the security queue at the CVG Airport Passenger Terminal. In all conditions

More information

Saskatchewan Traffic Control Devices Manual

Saskatchewan Traffic Control Devices Manual Saskatchewan Traffic Control Devices Manual Section: School Bus Stop Ahead Sign Specifications Sign Size: 90 x 90 cm Colour Bus: Black Arrow: Black Figures: Black Lights : Red Background: Yellow Manufacturing

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

RAILROAD QUIET ZONE PROJECT

RAILROAD QUIET ZONE PROJECT RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table

More information

1.231J/16.781J/ESD.224J Airport Systems Fall Security and BHS. Amedeo R. Odoni. Massachusetts Institute of Technology.

1.231J/16.781J/ESD.224J Airport Systems Fall Security and BHS. Amedeo R. Odoni. Massachusetts Institute of Technology. 1.231J/16.781J/ESD.224J Airport Systems Fall 2007 Security and BHS Amedeo R. Odoni Massachusetts Institute of Technology Page 1 Outline Broad impact of security considerations and issues Security tasks

More information

For full product information, visit Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page.

For full product information, visit  Use the SpeedSpec Code or scan the QR Code for quick access to the specific web page. R Safety Interlock Switches TL4024 Safety Interlock Switch with uard Door Locking High locking force of 1,500 N (7 lb.) locks guard door shut until machine is safe to enter IP67 (NEMA 6) enclosure withstands

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Pelican AMR Gateway User Guide

Pelican AMR Gateway User Guide Pelican AMR Gateway User Guide Document Reference: 8194 June 2016 Version: 2 Version Date Author Changes Number 1 Feb 2014 Bettina Rubek-Slater 2 Jun 2016 Sam Smith Branding updated API section updated

More information

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR 501 WECC 2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

HIGHWAY OPERATIONS I-95 DIVERSION ROUTE PLANS OLD LYME TO RHODE ISLAND STATE LINE

HIGHWAY OPERATIONS I-95 DIVERSION ROUTE PLANS OLD LYME TO RHODE ISLAND STATE LINE HIGHWAY OPERATIONS I-95 DIVERSION ROUTE PLANS OLD LYME TO RHODE ISLAND STATE LINE DEVELOPED IN COOPERATION WITH THE SOUTHEASTERN CONNECTICUT COUNCIL OF GOVERNMENTS, STATE POLICE TROOP E AND LOCAL POLICE

More information

NiteRide. Passenger s Guide I. REGISTRATION PROCESS

NiteRide. Passenger s Guide I. REGISTRATION PROCESS NiteRide Passenger s Guide Effective January 17, 2011 POLICY STATEMENT NiteRide is a curb-to-curb evening service provided by Citibus and funded by federal, state and local grants to facilitate the needs

More information

Harcourt - Golden Square

Harcourt - Golden Square Harcourt - Golden Square BARKERS CREEK SIDING (80 3/4 MILES) 15.04.1887 Contract gazetted for earthworks etc. Let to T.F. Hutchinson for 82/10/0 (Government Gazette, 2784/87) 28.09.1887 Opened for outwards

More information