1 CANADA S NEW GRADE CROSSING REGULATIONS What do they mean to you? May 2, 2015 Floris van Weelderen, P.Eng., PTOE Becky Lai, EIT

2 THE ACCIDENTAL GRADE CROSSING Gare Montparnasse, Paris October 22,

3 3

4 QUESTIONS THAT WILL BE ANSWERED TODAY Who, What, Where, When, Why, and How Who is responsible for what? What is a public grade crossing? Where do you find the new regulations and standards? When do the regulations come into force? When must the information be shared? When must the existing crossings be upgraded? Why were the regulations enacted? How many public grade crossings are there in BC? How will grade crossings be made safer? 4

5 AGENDA Background Grade Crossing Information Safety Standards Issues and Opportunities 5

6 MMM GROUP LIMITED BACKGROUND

7 SIZE OF EXPOSURE How many public grade crossings are there in BC? 1, > 10 8 Source: Transport Canada's Integrated Railway Information System (IRIS) database (2010) 7

8 CLOSING THE GAP Why were the regulations enacted? The new Regulations are expected to improve crossing safety and reduce the number of collisions, fatalities, injuries and property damage at grade crossings 8

9 POLICY APPROACH How will grade crossings be made safer? 9

10 TIMELINES A Phased-in Approach CIF = November 27,

11 ACT, REGULATIONS, STANDARDS & GUIDELINES Hierarchy of rules Act Regulations Standards Guidelines 11

12 GUIDELINES VS. STANDARDS Guidelines Recommended, non-mandatory requirements that assist the standard when no mandatory control has been specified Standards Specific low level mandatory requirements to ensure and control consistency Considered Best Practice 12

13 GRADE CROSSING REGULATIONS Regulation Details Definitions Sharing of Information Sightlines New Grade Crossings Existing Grade Crossings General Requirements Audible Warning Records 13

14 GRADE CROSSING STANDARDS Table of Contents Part A - Introduction Part B - Existing Grade Crossings Part C - New Standards Part D - Design Calculations Part E - Warning System Design Part F - Interconnected Devices Appendix A Light Emitting Diode (LED) Signal Modules Appendix B - Limited Use Warning Systems And Signs Appendix C - Limited Use Warning System With Walk Light Appendix D Whistling Cessation 14

15 THE INTERNET Where do you find the new regulations and standards? Grade Crossing Regulations Grade Crossing Standards 15

16 DEFINITIONS Grade Crossing Public Grade Crossing Private Grade Crossing Crossing Surface Road Approach Traffic Control Devices Warning System Cross-Product 16

17 GRADE CROSSING a road crossing at grade, or two or more road crossings at grade where the lines of railway are not separated by more than 30 m 17

18 PUBLIC GRADE CROSSING a grade crossing whose road is opened or maintained by a Road Authority and is designed for public use 18

19 PRIVATE GRADE CROSSING a grade crossing that is not a public grade crossing 19

20 CROSSING SURFACE the part of a road that lies between the ends of a railway tie and that has the width shown in Figure 5-1 of the Grade Crossings Standards 20

21 ROAD APPROACH the part of a road, other than the crossing surface, that lies between the point that marks the start of the stopping sight distance (SSD) and the point that marks the front of a design vehicle when it is past the clearance point 21

22 TRAFFIC CONTROL DEVICES STOP sign STOP AHEAD sign RAILWAY CROSSING AHEAD sign ADVISORY SPEED TAB sign PREPARE TO STOP AT RAILWAY CROSSING sign, including the interconnection with the warning system Traffic signal, including the interconnection with the warning system 22

23 WARNING SYSTEM an automated system, other than an interconnected traffic signal, that indicates the approach or presence of railway equipment at a grade crossing and that is composed of any combination of light units, bells, gates, operating mechanisms and circuits 23

24 CROSS-PRODUCT X Average annual daily railway movements Average annual daily traffic 24

25 TYPES OF GRADE CROSSINGS Billups Neon Crossing Signal - Grenada, Mississippi 25

26 TYPES OF GRADE CROSSINGS PASSIVE RAILROAD CROSSING Sign (RCS) ACTIVE Flashing Light Units & Bells (FLB) RCS + STOP Sign (SRCS) Flashing Light Units, Bells & Gates (FLB&G) 26

27 MMM GROUP LIMITED GRADE CROSSING INFORMATION 27

28 INFORMATION SHARING Railway Company precise location number of tracks average annual daily railway movements railway design speed warning system STOP sign on same post as RAILWAY CROSSING sign (yes / no) whistling required (yes / no) 28

29 INFORMATION SHARING Road Authority precise location number of traffic lanes average annual daily traffic road crossing design speed road design specification (classification) width of each traffic lane and shoulder stopping sight distance average gradient crossing angle departure time activation time interconnection time sidewalk, path or trail (yes / no) design vehicle 29

30 RECORDS Information Sharing Railway Company must keep the most recent information Inspection, Testing and Maintenance Railway Company must keep and maintain the records Temporary Protection Measures Railway Company must keep and maintain the records 30

31 MMM GROUP LIMITED COMPREHENSIVE AND ENFORCEABLE SAFETY STANDARDS

32 COMPLIANCE Who is responsible for what? Railway Company RAILWAY CROSSING sign NUMBER OF TRACKS sign EMERGENCY NOTIFICATION sign STOP sign installed on the same post as a RAILWAY CROSSING sign maintenance warning system crossing surface, other than its design Sightlines within the railway right-of-way and over land adjoining the railway right-of-way Road Authority road approach design, construction and maintenance traffic control devices except maintenance of a STOP sign installed on the same post as a RAILWAY CROSSING sign crossing surface design Sightlines within the land on which the road is situated and over land in the vicinity of the grade crossing 32

33 RESPONSIBILITY OF RAILWAY COMPANY Part B - Existing Grade Crossings Crossing Surface RAILWAY CROSSING sign NUMBER OF TRACKS sign 33

34 CROSSING SURFACE Material RUBBER RENFREW STREET - MILE , NEW WESTMINSTER SUB TIMBER - 4 TH AVENUE WEST MILE 0.50, MARPOLE SPUR ASPHALT - JELLICOE STREET MILE 10.21, MARPOLE SPUR CONCRETE PANEL - POWELL STREET MILE 34

35 CROSSING SURFACE Road 35

36 CROSSING SURFACE Sidewalk, path or trail along a Road 36

37 MMM GROUP LIMITED ISSUES AND OPPORTUNITIES 37

38 COMMON ISSUES Sightlines not achieved Warning system requires upgrade Traffic control devices and pavement markings don t meet standards 38

39 SIGHTLINES Minimum Sightlines D Stopped Departure design distance for users stopped at a Grade Crossing SSD Stopping sight distance D SSD Approach design distance for users approaching a Grade Crossing 39

40 SIGHTLINES AT EXISTING CROSSINGS Without a warning system 40

41 SIGHTLINES AT EXISTING CROSSINGS Without a warning system 41

42 SIGHTLINES AT EXISTING CROSSINGS Warning system without a gate 42

43 SIGHTLINES AT EXISTING CROSSINGS Warning system with a gate Requirements respecting sightlines do not apply 43

44 WARNING SYSTEM SPECIFICATIONS Warrants Warning System without Gates Cross-product (>2000) Presence of sidewalk, path or trail Railway design speed Number of rail lines Proximity to an intersection Warning System with Gates Cross-product (>50,000) Presence of sidewalk, path or trail Railway design speed Number of rail lines Proximity to an intersection 44

45 SIGNAGE AND PAVEMENT MARKINGS Figure C1-6 Manual of Uniform Traffic Control Devices of Canada (MUTCDC) 45

46 TRAFFIC CONTROL DEVICES Responsibility of Road Authority STOP sign STOP AHEAD sign RAILWAY CROSSING AHEAD sign ADVISORY SPEED TAB sign PREPARE TO STOP AT RAILWAY CROSSING sign, including the interconnection with the warning system Traffic signal, including the interconnection with the warning system 46

47 SIGNS Responsibility of Railway Company RAILWAY CROSSING Sign NUMBER OF TRACKS Sign EMERGENCY NOTIFICATION Sign 47

48 APPENDIX D WHISTLING CESSATION Table D-1 Requirements for Warning Systems at Public Grade Crossings within an Area without Whistling 48

49 MMM GROUP LIMITED CONCLUDING REMARKS

50 QUESTIONS THAT WERE ANSWERED TODAY Who, What, Where, When, Why, and How Who is responsible for what? What is a public grade crossing? Where do you find the new regulations and standards? When do the regulations come into force? When must the information be shared? When must the existing crossings be upgraded? Why were the regulations enacted? How many public grade crossings are there in BC? How will grade crossings be made safer? 50

51 QUESTIONS? 51

52

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012 Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS

TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS TRANSPORT CANADA RAILWAY SAFETY DIRECTORATE GUIDELINE NO. 1 PROCEDURE AND CONDITIONS FOR ELIMINATING WHISTLING AT PUBLIC CROSSINGS Background Engine whistling requirements are controlled through the Canadian

More information

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission

More information

Quiet Zone Process. Background:

Quiet Zone Process. Background: Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone

More information

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

DATE: February 13, 2012 REPORT NO. EN CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

DATE: February 13, 2012 REPORT NO. EN CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION ENGINEERING & OPERATIONAL SERVICES DATE: February 13, 2012 REPORT NO. EN2012-008 TO: FROM: CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION G. RAE, MBA, P.ENG. GENERAL MANAGER, ENGINEERING

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:

More information

Policy Railway crossings

Policy Railway crossings Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1

More information

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006 of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

FRONT COVER. Derby Quiet Zone Study Cover

FRONT COVER. Derby Quiet Zone Study Cover FRONT COVER Derby Quiet Zone Study Cover DERBY QUIET ZONE STUDY City of Derby April 9 City Council The Mayor and City Council comprise the Governing Body. These elected officials are the political leaders

More information

RE: School Safety Enhancement Options

RE: School Safety Enhancement Options HALDIMAND COUNTY Report PW-ES-11-2014 of the General Manager of Public Works For Consideration by RE: School Safety Enhancement Options OBJECTIVE: To provide Council with options to enhance safety in school

More information

Quiet Zone Evaluation for Huron, Ohio

Quiet Zone Evaluation for Huron, Ohio Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City

More information

Becker County Trail Routing Feasibility Study

Becker County Trail Routing Feasibility Study 2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

Accessible Air Travel : Airport services to disabled and reduced mobility passengers

Accessible Air Travel : Airport services to disabled and reduced mobility passengers Accessible Air Travel : Airport services to disabled and reduced mobility passengers Ref Code: CAA 1 Date of issue: 13 September 2010 Appendix 1 : CAA Questions Service provision (Article 9.1) 1.) Who

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

Train Whistling at Public Grade Crossings

Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train whistling is an important way to keep drivers, cyclists and pedestrians safe The Canadian Rail Operating Rules

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Those with Interest in the City of Cambridge Trail System

Those with Interest in the City of Cambridge Trail System Community Services Department City Hall 50 Dickson Street, P.O. Box 669 Cambridge ON N1R 5W8 Tel: 519-740-4681 July 20, 2010 To: Re: Those with Interest in the City of Cambridge Trail System City of Cambridge

More information

Railroad Safety in the United States. Ian Savage

Railroad Safety in the United States. Ian Savage Railroad Safety in the United States Ian Savage International Comparisons USA GB Ratio Population 320m 63m 5 times Route Miles 140k 10k 14 times Train Miles 766m 355m 2 times Passenger Miles 22 billion

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Safety Operations Overview

Safety Operations Overview IAAPA Asian Expo 2007 Safety Operations Overview Greg Hale, Chief Safety Officer Walt Disney Parks and Resorts June 28, 2007 1 Agenda Disney Introduction World Regulations Summary United States and Canada

More information

IC Chapter 7.7. Railroad Grade Crossings Fund

IC Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7 Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7-1 "Grade crossing" Sec. 1. The term "grade crossing" as used in this chapter means a crossing of any railroad and any public highway, street

More information

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

West Charlotte CORRIDOR STUDY

West Charlotte CORRIDOR STUDY West Charlotte CORRIDOR STUDY EXECUTIVE SUMMARY... 3 A. West Summit Avenue (Crossing # 716 172N)... 5 1. Short-Term... 5 2. Long-Term... 5 B. Berryhill Road (Crossing # 716 176R)... 5 1. Short-Term...

More information

Culpeper District. Albemarle County Monthly Report. September 2012

Culpeper District. Albemarle County Monthly Report. September 2012 Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road

More information

Version TEXAS DEPT OF TRANSPORTATION. Rail Division. TRIMS User s Guide

Version TEXAS DEPT OF TRANSPORTATION. Rail Division. TRIMS User s Guide Version 1 TEXAS DEPT OF TRANSPORTATION Rail Division TRIMS User s Guide TXDOT RAIL DIVISION TRIMS User s Guide Developed by Jacobs Engineering, Inc. 707 17 th Street, Suite 2400 Denver, CO 80211 Last Update:

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System City Council Agenda November 4, 2014 Mayor and Council Agenda Item No. B.01 Reviewed by City Mgr s office: /KLM Memo to: From: Manteca City Council Karen L. McLaughlin, City Manager Date: October 28, 2014

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services Evaluation of the Grade Crossing Closure Program Transport Canada Evaluation and Advisory Services June 8, 2013 Evaluation of the Grade Crossing Closure Program The Grade Crossing Closure Program (GCCP)

More information

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

The Light Rail System Safety & Grade Crossing Equipment

The Light Rail System Safety & Grade Crossing Equipment The Light Rail System Safety & Grade Crossing Equipment A Peer Review Provided by the American Public Transportation Association (APTA) Presented by: Mark Benedict, Director, Light Rail Operations and

More information

MIFACE INVESTIGATION: #02MI106

MIFACE INVESTIGATION: #02MI106 MIFACE INVESTIGATION: #02MI106 SUBJECT: Highway Worker Killed by Passenger Vehicle While Setting Up Highway Work Zone Warning Signal Summary On Friday, August 9, 2002, a 26-year-old technical sales representative

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

Cotton Belt Corridor PE/EIS

Cotton Belt Corridor PE/EIS February 28, 2011 February 28 2011 Prepared by Stantec Consulting, Inc Table of Contents 1.0 INTRODUCTION... 1 2.0 BACKGROUND... 1 3.0 METHODOLOGY... 3 4.0 DOCUMENT REVIEW... 3 5.0 REVIEW OF THE CORRIDOR

More information

STEVENS POINT QUIET ZONE

STEVENS POINT QUIET ZONE STEVENS POINT QUIET ZONE Associate Administrator for Safety Federal Railroad Administration 1200 New Jersey Avenue, SE, MS-25 Washington, DC 20590 Mailed:, 2009 Certified Mail Article# 70000520002247320178

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

Michigan s Engineering Safety Program for Local Roadways

Michigan s Engineering Safety Program for Local Roadways Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More

More information

OPERATIONS MANUAL PART A

OPERATIONS MANUAL PART A PAGE: 1 Table of Contents A.GENERAL /CHAPTER 32. -...3 32. OF THE AIRBORNE COLLISION AVOIDANCE... 3 32.1 ACAS Training Requirements... 3 32.2 Policy and Procedures for the use of ACAS or TCAS (as applicable)...

More information

Appendix 4 St. Charles Basin

Appendix 4 St. Charles Basin Appendix 4 St. Charles Basin The St. Charles hurricane protection system (HPS), shown in Figure 1, was designed as part of the Lake Pontchartrain, LA, and Vicinity Hurricane Protection Project. The St.

More information

Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Maury County Description of Project and Background This project invo

Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Maury County Description of Project and Background This project invo Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Description of Project and Background This project involves an area of concern at the intersection of State Route 245 (Campbellsville

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009

THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL CROSSING) REGULATIONS, 2009 THE RAILWAYS ACT [ NO. 4 OF 2002] REGULATIONS Made under section 28 THE RAILWAY (LEVEL

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

RAILROAD QUIET ZONE PROJECT

RAILROAD QUIET ZONE PROJECT RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

STAFF REPORT TO COUNCIL

STAFF REPORT TO COUNCIL i CITYOF PRINCE GEORGE STAFF REPORT TO COUNCIL 1100 Patricia Blvd. I Prince George, BC, Canada V2L 3V9 I www.pri ncegeorge.ca DATE: January 24, 2017 TO: NAME AND TITLE: SUBJECT: MAYOR AND COUNCIL Dave

More information

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Transportation Advisory Committee Meeting to be held at City of Penticton, Room B 171 Main Street, Penticton, B.C.

Transportation Advisory Committee Meeting to be held at City of Penticton, Room B 171 Main Street, Penticton, B.C. Agenda Transportation Advisory Committee Meeting to be held at City of Penticton, Room B 171 Main Street, Penticton, B.C. 1. Call Regular Committee Meeting to Order 2. Approval of Agenda 3. Adoption of

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

Telephone No. 2:4622495 Telegraphic Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.nic.in Fax : 01124629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR

More information

Chapter 1: Introduction. Manual of Standards Part 139 Aerodromes

Chapter 1: Introduction. Manual of Standards Part 139 Aerodromes Chapter 1: Introduction Manual of Standards Part 139 Aerodromes 1.1.1.3 Under CASR Part 121A, aeroplanes with not more than 30 passenger seats can also conduct air transport operations from uncertified

More information

Runway Incursions 3 Markings

Runway Incursions 3 Markings Session Visual Aids Runway Incursions 3 Markings 3.12.2 A runway-holding position shall be established: a) on the taxiway, at the intersection of a taxiway and a runway; and b) at an intersection of a

More information

Programmable Safety Systems PSS-Range

Programmable Safety Systems PSS-Range Programmable Safety Systems PSS-Range PROFIBUS-DP for Compact 3rd Generation PSS Operating Manual Item No. 20 962-04 All rights to this manual are reserved by Pilz GmbH & Co. KG. Copies may be made for

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of March 12, 2016 DATE: March 1, 2016 SUBJECT: SP-331-U-12-1 USE PERMIT ASSOCIATED WITH A SITE PLAN review for Live Entertainment, Dancing and

More information

Garrecht TRX 1500 Traffic-Sensor

Garrecht TRX 1500 Traffic-Sensor SECTION 9 Pilot s Operating Handbook Supplement Garrecht TRX 1500 Traffic-Sensor This supplement is applicable and must be integrated into the Airplane Flight Manual if a Garrecht Traffic-Sensor is installed

More information

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC 07 DECEMBER 1997 The Transportation Safety Board of Canada

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission STAFF REPORT December 5, 2012 Village of Glenview Appearance Commission TO: Chairman and Appearance Commissioners FROM: Planning and Economic Development Department CASE MANAGER: Tony Repp, Planner SUBJECT:

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

LOOK OUT COLLISION AWARENESS. Our Products Alert Employees Of Dangerous Collisions BEFORE They Occur! LEADERS OF INTERSECTION PROTECTION

LOOK OUT COLLISION AWARENESS. Our Products Alert Employees Of Dangerous Collisions BEFORE They Occur! LEADERS OF INTERSECTION PROTECTION COLLISION AWARENESS LOOK OUT LEADERS OF INTERSECTION PROTECTION MADE in the U.S.A. Our Products Alert Employees Of Dangerous Collisions BEFORE They Occur! KEEP YOUR WORKFORCE PROTECTED! We re the Leader

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

APRON MANAGEMENT SERVICES

APRON MANAGEMENT SERVICES AC-AD-029 APRON MANAGEMENT SERVICES GENERAL The Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain information about standards, practices and procedures

More information

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW!

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! ! Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! Maria Picardi Kuffner! September 2008, updated July

More information