Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Size: px
Start display at page:

Download "Chapter 6 Route Window NE5 Seven Kings station. Transport for London"

Transcription

1 Chapter 6 Route Window NE5 Seven Kings station Transport

2

3 SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated with platform and minor refurbishment works at Seven Kings station, where it is necessary to lengthen platforms to accommodate Crossrail trains. 6.2 The Crossrail project will enhance public transport capacity between Seven Kings and Stratford, the City and West End. New and faster direct travel opportunities will be available from the City, West End, and points west to Maidenhead and Heathrow. Table 6.1 gives typical journey time improvements. 6.3 One construction worksite is proposed for the works in this route window. It is expected that most materials and plant will be transported by rail from the storage depot at the Chadwell Heath Station Worksite. Only platform equipment and station equipment will be transported to site by road. The worksite is shown on Map NE5 (iv). 6.4 The construction programme for the station works is expected to take about five months, during which time rail passengers using the station will be unaffected. 6.5 The drawings provided at the end of this chapter present the main features of the route window, construction lorry routes assessed, existing facilities in the vicinity of Seven Kings station and transport linkages. Baseline conditions 6.6 This route window is in the London Borough of Redbridge and is in Travelcard zone 4. Seven Kings station is a local commuter station. The station stands on the railway bridge at the junction of A118 High Road and Cameron Road. The station entrance is shown in fig Figure 6.1 tation entrance, High Road 6.7 The area immediately around the station is predominantly railway land and operations and commercial premises. The wider area surrounding the station is residential, with small retail outlets along the High Road close to the station. There are a number of larger commercial developments further away, including a supermarket. 6.8 Seven Kings station has limited provision for vehicular access. All access to it is from a one-way section of road. There is a roundabout that has a dedicated slip road for traffic turning left from the High Road on to Cameron Road. Traffic volumes on High Road are generally high in both directions at all times, particularly during the morning and evening peak hours. 6.9 Seven Kings is on the Liverpool Street to Shenfield Line (the Great Eastern Main Line). The fastest travel time to Liverpool Street is approximately 14 minutes while stopping services take 20 minutes. There are currently seven trains per hour to Liverpool Street in the peak period High Road is on several bus routes and has bus stops on both sides of the road. There are currently ten buses per hour in each direction during the morning peak period Although there is no formal taxi rank or drop-off area outside the station, the parking restriction directly outside the station entrance provides an informal facility for drop-off by cars and taxis Parking on High Road and Cameron Road is restricted. A controlled parking zone operates along High Road and along Cameron Road for about 30 m from the junction. It restricts parking and loading in the area around the junction between 0800 to 1830 hours, Monday to Saturday. The lane outside the station for traffic turning left maintains this restriction and thus forms an informal drop-off area. An extended CPZ is due to be implemented in the surrounding residential areas shortly. The nature of the restrictions prevent these parking facilities from being a realistic option for commuters, so the extent to which it is used were not investigated. NE5 page 3

4 ROUTE WINDOW NE Close to the station there are about 15 metered parking bays on Cameron Road. Further east of the station along High Road there is a council-operated car park with 170 spaces. Monthly season tickets are available, so this car park is suitable for commuters wanting a park-and-ride facility The station has no dedicated cycle parking, but there are three cycle loops on the island. Being separated by the highway, with no crossing facility, the cycle parking is not ideally located and does not provide a safe or secure place for passengers to store cycles, but during a recent survey, three cycles occupied the ranks throughout the morning peak. There are several signposted cycle routes in the area including Cameron Road, Seven Kings Road and High Road, west of Cameron Road There are pedestrian crossings located outside the station which allow pedestrians to cross via a large centre island. A pedestrian refuge assists pedestrians to cross Cameron Road. Footway widths are adequate There is no mobility impaired passenger access at Seven Kings station. The permanent works 6.17 The works at this station will be carried out from the existing fenced boundary of the railway on platforms 4 and 2/ To accommodate 10-car Crossrail trains, platform 4 and platform face 3 of the island platform 2/3 will be extended. The track layout will be adjusted to accommodate the platform extensions, and the railway signalling and overhead line equipment will be altered to suit New platform canopies and additional lighting will be provided, to extend over the whole length of the extended platforms. The platform furniture will be upgraded, with new seats and/or waiting shelters, as appropriate, and upgraded platform signs and CCTV coverage. There will be no demolition The main construction plant to be used at the worksite will include cranes, excavators, piling rigs and mechanical breakers The construction works will take about five months to complete. During the peak period of construction (about one month), the number of lorry movements to and from the worksites will be approximately four per day. Worksite assessment Seven Kings worksite 6.22 The proposed worksite is located within the grounds of Canon Palmer Catholic School, in an area of land between the school building and the railway line (north of platform 4). Access to this worksite will be from Lombard Avenue off Aldborough Road South (see fig. 6.2). The access arrangements through the school grounds will be agreed with the school authorities. The worksite will be acquired temporarily and given back to the school once construction has been completed. Figure 6.2 Lombard Avenue, looking towards Canon Palmer School 6.23 This worksite does not give rise to any significant traffic impacts. Lorry routes assessment 6.24 It is unlikely that construction works at this worksite will necessitate many deliveries by road, since large plant and materials for platform construction will be delivered and removed by rail. Access to the site will be from the TLRN via A118 High Road, Cameron Road, Aldborough Road South, and Lombard Avenue, which is a cul-de-sac at its eastern end Lombard Avenue is heavily parked with cars on both side of the street (see fig. 6.2). Parking restrictions may be required to allow free movement of construction traffic during site operational hours. These restrictions and any other local traffic management measures will be agreed with the London Borough of Redbridge The total number of lorry movements associated with works for Seven Kings station is about 100. It is predicted that there will be around four two-way lorry movements a day for the estimated one month peak construction period, and two lorry movements a day at other times The use of this access route by construction traffic is predicted not to give rise to any significant impacts on road users, pedestrians or cyclists. Mitigation and temporary impacts 6.28 There are no significant construction impacts to note in this Route Window NE5, hence no mitigation is required. It is recommended, however, that local traffic management measures should be discussed with the London Borough of Redbridge. NE5 page 4

5 SEVEN KINGS STATION Mitigation and permanent impacts 6.29 There are no adverse operational traffic impacts to note in Route Window NE The significant operational impacts and mitigation measures are indicated in Table There is one significant operational impact to note at Seven Kings relating to public transport Passenger numbers with Crossrail are expected to increase by about 300 passengers entering and 50 passengers leaving the station in the morning peak period (a 30 per cent increase on the without Crossrail scenario). The 2016 with Crossrail flows predicted at the station are about 1500 two-way between 0700 and The existing station building will provide sufficient capacity for the forecast passengers. There are sufficient traffic and transport facilities in the vicinity of this station to cater for the forecast passengers Significant impacts on rail users at Seven Kings are forecast. Rail passengers are forecast to experience significant journey time benefits. These are discussed below. Impact on rail journey times 6.34 Table 6.1 sets out representative journey time savings between Seven Kings and selected stations during the morning peak period. They are typical of the journey time benefits to many of the stations on Crossrail. Table 6.1 Journey time savings (platform-to-platform) to and from Seven Kings station From/to Heathrow Tottenham Court Road From Seven Kings To Seven Kings Farringdon Without Crossrail With Crossrail Saving (minutes) Canary Wharf Difference (%) 9% 21% 29% 12% Without Crossrail With Crossrail Saving (minutes) Difference (%) 3% 31% 30% 21% Table 6.2 Route Window NE5 Permanent impacts Potential impact Significance Committed mitigation Public transport OT2c Improved journey time see journey times table Residual impact Description Significance Significant N/a N/a Significant NE5 page 5

6

7

8

9 Transport Transport Transport

10

11 Transport Transport Transport

12

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London Chapter 13 Route Window NE12 Harold Wood station HAROLD WOOD STATION 13 Route Window NE12 Harold Wood station 13.8 Harold Wood station is on Gubbins Lane close to the junction of A12 Colchester Road and

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London Chapter 9 Route Window C8 Whitechapel station Transport for London WHITECHAPEL STATION 9 Route Window C8 Whitechapel station Pedley Street Worksite Pedley Street to Mile End (Devonshire Street) sidings

More information

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Chapter 26 Route Window SE6A Manor Wharf. Transport for London Chapter 26 Route Window SE6A Manor Wharf Transport MANOR WHARF 26 Route Window SE6A Manor Wharf Transport Introduction 26.1 The route window lies within the London Borough of Bexley. The works in the

More information

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London Chapter 12 Route window W15 DOG KENNEL BRIDGE 12 Route window W15 12.6 southwards to North Park Road and Richings Park Golf Course. To the west side of this route window is the built-up edge of Slough

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY MOVING AHEAD ISSUE 34 MARCH 2015 WELCOME FROM ANDREW WOLSTENHOLME It s an exciting time for Crossrail, as we continue to build a new railway for London and the South East; safely, on time, and on budget.

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd ISSUE 40 OCTOBER 2016 MOVING AHEAD PROJECT OCTOBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd PROGRAMME 77% 60% The project is more than 75% complete. There is a huge amount of work underway to complete

More information

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002 2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

H1: BIRMINGHAM CURZON STREET STATION

H1: BIRMINGHAM CURZON STREET STATION HIGH SPEED TWO INFORMATION PAPER H1: BIRMINGHAM CURZON STREET STATION This paper outlines the proposals for Curzon Street Station. It will be of particular interest to those potentially affected by the

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON. 16 June pm

Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON. 16 June pm Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON 16 June 2015 7.00-8.40 pm PRESENT Committee Members Councillor Eddie Johnson, Essex County Council (Chairman) Councillor Mike Danvers,

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Crossrail: Socio-Economic Technical Report

Crossrail: Socio-Economic Technical Report Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,

More information

AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5

AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5 AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5 WHY BUY A HOME FROM ST GEORGE? St George is proud to be part of the Berkeley Group. For 40 years, the group has

More information

CROSSRAIL Moving London Forward

CROSSRAIL Moving London Forward CROSSRAIL Moving London Forward XX Crossrail: Header here The Project max 30 characters Cost 14.8bn Net benefit 42bn Length 118km Stations 40 (10 new) Jobs supported 55,000 Business opportunities Trains

More information

Business Forum. 16 March 2016

Business Forum. 16 March 2016 Business Forum 16 March 2 Rebuilding London Bridge: An update Mary Jordan Business Change Manager, Network Rail London Bridge station update 2015 Platforms 4 to 9 are currently closed for redevelopment,

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

4.1.1 Improved facilities and layout cont.

4.1.1 Improved facilities and layout cont. . Improved facilities and layout The MSF scheme to develop the land adjoining the station involves creating two substantial new ticket halls to replace the existing ones. These new ticket halls will be

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Scotchbarn Lane, Prescot Accessibility Statement

Scotchbarn Lane, Prescot Accessibility Statement Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

RUSTINGTON PARISH COUNCIL PLANNING COMMITTEE

RUSTINGTON PARISH COUNCIL PLANNING COMMITTEE MINUTES: of the Meeting held on 26 June 2017 RUSTINGTON PARISH COUNCIL PLANNING COMMITTEE PRESENT: Councillors R Grevett (Chairman), J Bennett, Mrs A Cooper, T Field, A Jones, J Street and P Warren 58/17

More information

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Welcome. Great Yarmouth Third River Crossing.  Norfolk County Council Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage

More information

I211. Viaduct Harbour Precinct

I211. Viaduct Harbour Precinct I211. Viaduct Harbour Precinct I211.1. Precinct description The Viaduct Harbour precinct incorporates Viaduct Harbour and the land fronting the harbour (including Hobson Wharf), and the adjacent coastal

More information

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:

More information

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre Crossrail Bulletin www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 20 Mar 2010 Crossing the Capital Connecting the UK Jobcentre Plus - at the Visitor Information Centre Crossrail is committed

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT ISSUE 42 MAY 2017 MOVING AHEAD PROJECT MAY UPDATE Howard Smith, Operations Director PROGRAMME 83% 60% In May this year, the Crossrail project will achieve a major milestone. The first of the new trains

More information

INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES

INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES Harmondsworth Proposed north west runway Sipson Harlington Cranford Cross Longford All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Multi-storey station car park opens in New Year

Multi-storey station car park opens in New Year Multi-storey station car park opens in New Year Luton s new multi-storey station car park, off Midland Road, will open on 10 January 2011, offering motorists a safer, more secure, convenient and user-friendly

More information

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION CITY OF EDINBURGH COUNCIL Summary WRITTEN SUBMISSION Waverley and Haymarket are significant stations for Scotland as well as Edinburgh. The number of passengers using them has grown substantially in recent

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Context. Site Development. Brassington Avenue

Context. Site Development. Brassington Avenue 1 Context This public exhibition is being held to present NEW proposals for the development of the Brassington Ave site in Sutton Coldfield town centre. NEW Come and see proposals for We would very much

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

TRANSPORT AND WORKS ACT Proof of Evidence. Andrew Wright Planning and Design Manager Taylor Wimpey East Anglia

TRANSPORT AND WORKS ACT Proof of Evidence. Andrew Wright Planning and Design Manager Taylor Wimpey East Anglia TRANSPORT AND WORKS ACT 1992 Proof of Evidence Andrew Wright Planning and Design Manager Taylor Wimpey East Anglia The Network Rail (Suffolk Level Crossing Reduction Order) Site at Elmswell Development

More information

Railway Upgrade Plan Western 2017/18

Railway Upgrade Plan Western 2017/18 2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB Committee Date: 27/11/2014 Application Number: 2014/06477/PA Accepted: 09/09/2014 Application Type: Variation of Condition Target Date: 09/12/2014 Ward: Brandwood Tesco Express, 281-289 Alcester Road South,

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

APP/P4.1 Eddie Mellor Transport Planning Main Proof of Evidence

APP/P4.1 Eddie Mellor Transport Planning Main Proof of Evidence Eddie Mellor Transport Planning Main Proof of Evidence APP/P4.1 TRANSPORT AND WORKS ACT 1992 PROPOSED MIDLAND METRO (BIRMINGHAM EASTSIDE EXTENSION) ORDER 201[x] PROOF OF EVIDENCE OF Eddie Mellor Transport

More information

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017 traffic engineering and transport planning Arcadis LLP Proposed Secondary School () June 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NW 01482 679 911 info@local-transport-projects.co.uk

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

24/28 QUEEN VICTORIA STREET READING RG1 1TG

24/28 QUEEN VICTORIA STREET READING RG1 1TG 24/28 QUEEN VICTORIA STREET READING RG1 1TG INVESTMENT SUMMARY Reading is an important and affluent, regional retail centre with an extensive primary catchment population of 692,000 and total catchment

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council Senior Executive Officer, Planning Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8. 25 th February 2016 BY HAND Re: No 6 St. Mary s Road, Ballsbridge Dublin 4 Planning application for

More information

Thames Valley Branch Lines Notes of Meeting

Thames Valley Branch Lines Notes of Meeting Thames Valley Branch Lines Notes of Meeting Date: Time: Venue: Attendees: 05 December 2016 10.00am 4 Marlow Road, Maidenhead Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes,

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

BRENT CROSS THAMESLINK

BRENT CROSS THAMESLINK INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE. ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd CROSSRAIL PROGRAMME 67% 60% The programme to build the new railway for London and the South

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan. Addendum to Guildford Borough Proposed Submission Local Plan June 2016 Strategic Highway Assessment Report: High level review of potential of key changes in the Guildford borough Proposed Submission Local

More information

AIRPORT SURFACE ACCESS STRATEGY

AIRPORT SURFACE ACCESS STRATEGY AIRPORT SURFACE ACCESS STRATEGY August 2006 SOUTHEND AIRPORT AIRPORT SURFACE ACCESS STRATEGY July 2006 CONTENTS Page Introduction 3 National, Regional and Local Transport Policies 3 The Airport Transport

More information

Station Improvement Proposals. Clapham Junction Action Group

Station Improvement Proposals. Clapham Junction Action Group Station Improvement Proposals Clapham Junction Action Group 1 Station improvement proposals CONTENTS 1. INTRODUCTION 2. EXISTING LAYOUT AND IMPROVEMENTS 1. The current layout 2. Access for All scheme &

More information