TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER

Size: px
Start display at page:

Download "TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER"

Transcription

1 Suffolk (Level Crossing Reduction) Order Statement of Case TRANSPORT AND WORKS ACT 992 THE TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 THE NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER STATEMENT OF CASE FOR THE APPLICANT NETWORK RAIL Statement of Case Document Reference Author Regulation 5 (2)(q) NR26 Network Rail Date 0 July 207 Revision number

2 Suffolk (Level Crossing Reduction) Order Statement of Case

3 Table of Contents Table of Contents... 3 Introduction... 6 Purpose of this Statement... 6 Level Crossings and Safety... 8 Risk... Consequences of a Fatality or a Collision... 2 Measurement of Level Crossing Risk... 4 Incidents and Accidents... 6 Operational Issues of Level Crossings... 7 Level Crossing Managers, Inspections, and Risk Assessment Frequency... 7 Closures and Mitigations... 8 Temporarily Closed Level Crossings... 8 Temporary Speed Restrictions (TSRs)... 9 User Worked Public Level Crossings... 9 Sleeping Dogs... 9 Inclusive Design and Accessibility Responding to Incidents: Reliability Track Maintenance Installation and Renewal Costs of Assets Cost of Incidents at Level Crossings Capacity and Network Development Conclusion Project Context Use of Transport and Works Act Order Funding The Draft Development of the Scheme Environmental Statement Planning Permission Land and Property Page 3 of 23

4 Objections and Representations... 4 Objection Period... 4 In Principle Objections to the Order... 4 Representations in Relation to the Order Support for the Order Level Crossings Affected by the Order S0 Sea Wall S02 Brantham High Bridge S03 Buxton Wood... 5 S04 Island S05 Pannington Hall S07 Broomfield S08 Stacpool... 6 S Leggetts S2 Gooderhams S3 Fords Green S6 Gislingham S7 Paynes S8 Cowpasture Lane S2 Abbotts (Mellis) S22 Weatherby S23 Higham S24 Higham Ground Frame S25 Cattishall... 9 S27 Barrell s S28 Grove Farm S29 Hawk End Lane S30 Lords No S3 Mutton Hall S69 Bacton Conclusion... 0 Appendix A: List of Core Documents... Page 4 of 23

5 Appendix B: Locations where Core Documents may be Inspected Prior to the Public Inquiry 3 Appendix C: Level Crossing Equipment... 5 Appendix D: Level Crossing Renewal and Enhancement Costs... 9 Appendix E: Maintenance Costs Appendix F: Design Guide Drawings Page 5 of 23

6 Introduction Purpose of this Statement. On 24 March 207, Network Rail Infrastructure Limited (Network Rail) submitted an application for the Network Rail (Suffolk Level Crossing Reduction Order) (the Order) to the Secretary of State for Transport. Through this Order, it is proposed to close or downgrade a number of level crossings across the county as part of a Network Rail programme to reduce risk on the railway. The proposals include the acquisition and use of land in connection with these changes, the construction of works, the extinguishment of existing public and private rights of way across the track and the creation of alternative public rights of way and other rights in land. 2. Network Rail owns and operates the national rail infrastructure of Great Britain (the network). Network Rail therefore has a key role to play in railway safety and improving railway performance and efficiency. Network Rail s purpose is described in its Network Licence: to secure the operation and maintenance of the network; the renewal and replacement of the network; and the improvement, enhancement and development of the network; in each case in accordance with best practice and in a timely, efficient and economical manner so as to satisfy the reasonable requirements of persons providing services relating to railways and funders, including potential providers or potential funders, in respect of the quality and capability of the network; and the facilitation of railway service performance in respect of services for the carriage of passengers and goods by railway operating on the network. 3. This application for the Order was made under sections and 5 of the Transport and Works Act 992. A copy of the application and the documents submitted with it, including the associated request for deemed planning permission, are listed in Appendix A, numbered NR0 to NR2 inclusive. The application was the subject of publicity and notices as required by the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 ( the 2006 Rules ). 4. As summarised above, the purpose of the Order is to close or redesignate the status of a number of level crossings in the County of Suffolk. The Order authorises Network Rail to construct a number of Scheduled works comprising the construction of footbridges to carry new public rights of way over drains or watercourses. The Order also authorises the carrying out of other works including the removal of the crossings as well as the redesignation of the status of a byway open to all traffic and the creation of new rights of way in substitution. The Order would permit Network Rail to acquire interests in land including its temporary occupation, in connection with the construction of the works. Page 6 of 23

7 5. Objections to, and representations about, the proposed Order were invited to be made to the Secretary of State until 5 May 207. The Department for Transport (DfT) received 3 letters of support, 3 representations and 62 objections. As a consequence, and in accordance with the Transport and Works (Inquiries Procedure) Rules 2004 (the Inquiries Rules), the Secretary of State for Transport announced on June 207 his intention to hold a public local inquiry into the application. The Inquiry is proposed to take place in February The Inquiries Rules require Network Rail to provide a Statement of Case. This document is Network Rail s Statement of Case for the purpose of the Order application and it contains full particulars of the case Network Rail intends to make at Inquiry in support of its application. It will describe the risk, cost, and operational ramifications of different kinds of level crossings, the consequences of incidents, and the case for their removal from the network. It will then take each site in turn, describing current usage of the crossing, the proposal, the impact on users, and the risk. 7. In Appendix A is a list of the documents to which Network Rail intends to refer or submit in evidence at the Inquiry. These documents will be available for public inspection at the locations and times set out in Appendix B. 8. In this Statement of Case, references to documents included in Appendix A are shown in bold. 9. This Statement of Case is arranged as follows: An introduction to level crossings and safety Operational issues relating to level crossings Project context, Transport and Works Act Orders, and funding Objections and Representations Level crossings affected by the Order and consideration of objections Conclusions Page 7 of 23

8 Level Crossings and Safety 0. This section will describe the risks arising from level crossings; the different types of crossing; some of the processes, staff and costs involved in managing crossings; and the cost of maintaining them. It will also consider the general impact of level crossings on proposed enhancements to services.. Network Rail is legally responsible for safety on and around the railway, including at level crossings. This means that where the highway and rail networks interface, Network Rail is required to protect both the public using roads or public rights of way from the dangers of the railway, and users of the railway network, so far as reasonably practicable. 2. As is recognised by the Office of Rail and Road (ORR), Great Britain s level crossing safety record is among the best in the world, but every incident has the potential for significant human and economic loss. Level crossings are the single biggest source of catastrophic risk on the railway. The ORR agrees with Network Rail that the closure of level crossings is the most effective way of reducing this risk, removing the interface between trains and highway users entirely. It has set itself the objective of reducing level crossing risk by 25% by The ORR s strategy for regulation of health and safety risks at level crossings (NR4) makes clear that it will encourage crossing closure, and ensure that all risk assessments consider this first, in line with the principles of prevention enacted in legislation through the Management of Health at Safety at Work Regulations 999 (NR3). 4. In accordance with its objective, Network Rail has established a long term strategy to reduce level crossing risk (NR7). Whilst closure of level crossings has been proven to be the most effective way of removing risk from the network, reduction in level crossing risk may also be achieved by enhancing level crossings, or by limiting those who are entitled to use them. Level crossing closures may also result in the reduction of operating costs and assist the scope for enhancement of rail capacity faster and more frequent trains in association with other schemes, furthering Network Rail s statutory duties in these respects. 5. Anglia route has 773 level crossings. That is to say, there are 773 locations where the public, landowners, contractors, passengers and/or statutory undertakers cross, or could cross, the railway on the level. As some level crossings comprise more than one set of gates or stiles, separating vehicular and pedestrian usage, and each set of gates is risk assessed separately, there are 844 level crossings recorded on the All Level Crossing Risk Model (ALRCM) system for Anglia route. 6. The risk that exists at level crossings is quantified as a Fatalities and Weighted Injures (FWI) figure. A FWI of.0 equates to the risk of death, or Page 8 of 23

9 0 major injuries, or 200 RIDDOR reportable minor injuries and class shock/trauma, or 000 non-riddor reportable minor injuries and class 2 shock/trauma per year. The total FWI attributable to the level crossings on Anglia route is 2.92, which is 25% of national level crossing risk. 7. The furniture and technology at level crossings varies. Private vehicular crossings (occupation or accommodation crossings, depending on whether a road pre-existed the railway s construction) will tend to comprise latched vehicular gates and a deck to enable passage across the railway. There may also be telephones to contact the signaller and/or miniature stop lights to warn of an approaching train. Signage at the crossing provides basic instructions. The user is expected to use reasonable vigilance to satisfy themselves that no trains are approaching before they start to cross the railway. They are responsible for following instructions and for closing the gates after use. These crossings are collectively known as User Worked Crossings or UWCs. Those with telephones are known as UWCTs, or with Miniature Stop Lights, UWCMs. If there is a public right of way scheduled over the private level crossing, separate wicket gates or stiles are often provided adjacent to the vehicular gates. There are 267 UWCs (of all types) on the Anglia route. 8. Restricted byway and byway open to all traffic crossings tend to be the same as UWCs. However, they may lawfully be used by the public with vehicles, not just landowners and their invitees. 9. Public footpath and bridleway level crossings tend to have stiles, kissing gates, or self-closing gates in the railway boundary. All bridleway crossings have decks, as do most, but not all, footpaths. Telephones are occasionally provided at bridleway crossings, but only exceptionally at footpaths. Miniature stop lights may also be present. Some footpath and bridleway crossings are protected by whistle boards: train drivers are instructed to sound their horn at a set distance from the crossing to warn potential crossing users of their train s approach. Steps or ramps may be provided on railway land if there is a cutting or embankment to ascend or descend. Signage at the crossing provides instructions to users relevant to the type of crossing. Users must observe the available information at the decision point before deciding whether to cross the railway. These types of crossings are generally known as FPS (footpath with stile), FPK (footpath with kissing gate) or FPG/FPW (footpath or bridleway with gate/wicket gate). There are 353 footpath and bridleway crossings on the Anglia route. 20. The majority pf public road crossings have road traffic lights and barriers. The safest level crossings fence the entire road and are proved clear before a train may proceed; the protecting signal cannot be set to proceed unless the level crossing is clear. There are 57 crossings on Anglia Route which are proved clear by a signaller via CCTV and 8 which are proved clear by object The decision point is usually defined as 2m from the nearest running rail. However, at bridleway and vehicular crossings, it is defined as 3m. Page 9 of 23

10 detection technology. There are also 93 automatic half barrier crossings, which do not include such proving. A few crossings have traditional gates across the road and are operated by a crossing keeper. Some public road crossings are UWCs. 2. Trains take a long distance to come to a stop. They cannot decelerate before reaching a level crossing should a driver see an obstruction. This means that being in the path of a train is an inherently dangerous place to be. It therefore follows that the highest level of protection is obtained at crossings which are interlocked with the signalling system such that a train cannot proceed towards the level crossing until a crossing keeper, a signaller, or an object detection system confirms that the level crossing is clear of users. 22. The majority of level crossings in this Order are passive 2 crossings, at which users decide for themselves whether it is safe to cross the railway. Such crossings require sufficient warning of an approaching train to allow users to cross the railway and reach a position of safety on the other side. The warning is often as simple as ensuring that the sighting of an approaching train is sufficient. This requires the measurement of the available sighting from the decision point, and the calculation of the time taken for a user to reach the position of safety on the opposite side of the railway. The type of user has a bearing on the calculation of what constitutes sufficient sighting. ORR Guidance in relation to the safe use of public footpath and bridleway level crossings considers a walking speed of.2m/s should be used where the surface is at or near to rail level and m/s where the surface is at the standard profile of the ballast. The calculated time in traversing the crossing should be increased to take account of foreseeable circumstances such as impaired mobility of users, numbers of prams and bicycles or where there is a slope or step up from the decision point. A longer crossing time means that the minimum sighting of trains must be greater. 23. Crossings that rely on the sighting of approaching trains by the user can be affected by vegetation, track curvature, earthworks, mist and fog, and sun glare. They are also not suitable for those with sight loss. Additionally, for pedestrians more attuned to cars travelling at 30 40MPH in residential areas, able to brake easily, it is possible to misjudge the arrival time of a train travelling at up to 00MPH which would take half a mile to come to a standstill. Where sighting of approaching trains is insufficient, warning of their approach may be given by trains sounding their horns. 24. As a complex system which has developed over nearly two centuries, there are many combinations of public and private rights of way crossing the railway, and the furniture and technology associated with them. Details for each crossing in the project are provided on a site-by-site basis in the part of this Statement of Case entitled Level Crossings Affected by the Order. 2 'Passive', means that there is no direct method of warning people using the level crossing of approaching trains and it is not controlled, equipped with lights, audible warnings or barriers interlocked with signals. Page 0 of 23

11 Risk Appendix C contains a description of the furniture and equipment which is found at level crossings. 25. Level crossings are the largest contributor to train accident risk on the network. That is to say, almost half of non-suicide deaths (or injury equivalents) on the railway network are attributable to level crossings (excluding workforce safety risks). Figure shows the fatalities and injuries on level crossings. Year Fatalities (nationally inc. Anglia route) Fatalities on Anglia route (all pedestrians) Major Injuries (nationally) 206/207 6 (4 pedestrians) TBC TBC 205/206 4 (4 pedestrians) /205 0 (8 pedestrians) /204 8 (6 pedestrians) FIGURE : FATALITY AND INJURY FREQUENCY AT LEVEL CROSSINGS 3 Minor Injuries (nationally) 26. It is widely acknowledged that closure of level crossings is the most effective way to remove the risk. This is consistent with the General Principles of Prevention, set out in Schedule of the Management of Health and Safety at Work Regulations 999 (NR3), in particular the following: (a) avoiding risks; (c) combating the risks at source; (f) replacing the dangerous by the non-dangerous or the less dangerous 27. It is therefore Network Rail policy to close level crossings where possible, and this is set out in the document Transforming Level Crossings (NR7). It is Network Rail s objective to reduce level crossing risk by 25% over CP5, including through closure of crossings. The Office for Rail and Road s (ORR s) Final Determination of Network Rail s funding for describes the requirement to maximise level crossing risk reduction. (NR5). 28. In the nineteenth century, when the railways in Suffolk were constructed, many level crossings were provided because they were the easiest form of making good the interruptions in land and public highways that resulted. The flat ground made bridges an expensive proposition. 29. Level crossings were acceptable on a low speed steam-powered railway, but, as trains have become faster, quieter, and more frequent, there is no longer 3 Following a coroner s verdict, a fourth fatality which was originally believed to be a suicide was identified at Cannon s Mill Lane level crossing in Bishop s Stortford in 205/206. This is reflected in the figures above. Page of 23

12 the relative safety of the 800s and the way the public use level crossings has fundamentally changed. The law and society has rightly become more concerned with safety. 30. Consistently, level crossings are not permitted on new railway infrastructure, such as HS. The ORR s level crossing policy makes clear that no new level crossings should be authorised other than in exceptional circumstances (NR4). 3. Figure 2 shows the FWI on the network for railway passengers. It can be seen that over a third of the risk is attributable to level crossings. FIGURE 2: FWI PER YEAR ACROSS DISCIPLINES Depending on the type of crossing, the risks that exist are to those on the train, those crossing the railway, and those working on the railway, either operating crossings or maintaining them. Consequences of a Fatality or a Collision 33. When someone dies at a level crossing, the emotional impacts on those directly and indirectly involved can be far reaching. Those affected include the friends and families of the victim, the train crews, emergency services, Network Rail operations and maintenance staff, and passengers on the train. 4 Source: RSSB Annual Safety Performance Report 205/6. Page 2 of 23

13 Network Rail has worked with the Samaritans to discourage suicides on the railway network, but the distress of an accidental fatality at a level crossing can be even greater. 34. In the event of a collision at a level crossing, the affected train will stop and, if the driver is able to, they will contact the signaller to request all services in the area be stopped through the signals being turned to red. If the incident involves loss of life, the scene will be declared a crime scene and it will not be possible to move any trains until the police have attended site. This can lead to delays in services of several hours. If it is not possible to move the train to its destination, there can be a need to arrange substitute road transport for passengers, which can take several hours to put in place. 35. After a collision at a level crossing, there will often be a report written by the Rail Accident Investigation Branch, with the involvement of Network Rail staff. These reports are written to establish the cause and make recommendations for the future reduction of risks. Figure 3 lists the RAIB reports since 2005 on level crossing incidents on the Anglia route: Crossing Date Incident Dock Lane 4/06/206 Near miss Hockham Road 0/04/206 Collision with tractor Trinity Lane 29//206 Near miss with a pedestrian Grimston Lane 23/02/206 Fatal accident Jetty Avenue 4/07/203 Collision with car Motts Lane 24/0/203 Fatal accident Johnson s 28/0/202 Fatal accident Gipsy Lane 24/08/20 Fatal accident Hatson (White House Farm) 25/09/20 Collision with tractor Sewage Works Lane 7/08/200 Collision with tanker Poplar Farm (Attleborough) 0/07/2008 Near miss Croxton 2/09/2006 Derailment Bratts Blackhouse 22/05/2006 Collision with car Elsenham (and station pedestrian 2 fatalities at station 03/2/2005 crossings generally) passenger crossing Collision with agricultural Black Horse Drove 9/0/2005 vehicle FIGURE 3: LIST OF RAIB INVESTIGATION REPORTS ON ANGLIA ROUTE 36. Through its programme of risk assessment and maintenance, Network Rail aims to ensure all its level crossings are compliant with railway standards (NR20, NR2, NR22, and NR23) and the risk at each is as low as reasonably practicable. However, on occasions when Network Rail has failed to Page 3 of 23

14 discharge its duty appropriately, fines imposed by courts have been severe. The largest fine to date relates to a fatality at Gipsy Lane level crossing in Needham Market, Suffolk, where an 82 year old pedestrian was crossing the line and misjudged the speed of an approaching train. Network Rail had previously undertaken a risk assessment and identified that vulnerable users were using the level crossing, but had not acted on this information by imposing a speed restriction on trains. As this was held to be the cause of the fatality, Network Rail was fined 4,000,000 by Ipswich Crown Court in 206. The case also illustrates the inherent tension that exists in ensuring the safety of the public at interfaces between the railway and public highways, and the operational needs of a 2 st century railway network. 37. By designing the risks that exist at level crossings out of the network, mistakes like this need never be made again. Measurement of Level Crossing Risk 38. Risks are not equally distributed amongst level crossings. The risk at each crossing is quantified using the All Level Crossing Risk Model (ALCRM). This is a system that ranks level crossings based on factors including usage, linespeed, frequency of train service, the environment, the technology installed, and the history of incidents and accidents. It calculates the likelihood of a fatality (or injury equivalent) every year and expresses it as a Fatalities and Weighted Injuries (FWI) value. 39. Relative level crossing risk is expressed by ALCRM as a letter and a number. 40. The letter represents the individual risk with A being the highest and M being the lowest. Individual risk is the annualised probability of a fatality to a regular user, being taken as a person making a daily return trip over the crossing, assumed to be 500 traverses per year. It applies to crossing users only and not to train staff and passengers. Individual risk does not increase with the number of users. 4. The number represents the collective risk, being the risk to crossing users, rail staff, and passengers. is the highest and 3 is the lowest. Collective risk considers the total risk for the crossing, including users (pedestrian and/or vehicle), plus train staff, plus passengers. Crossings ranked to 3, or with an individual risk score of A to C with a collective risk of 4 or 5, are considered particularly high risk. 42. Level crossings which are currently closed or completely inaccessible are assigned a rating of M3, the lowest category of risk. 43. Figures 4 and 5, extracted from the Network Rail ALCRM User Guide (202), describe the categorisations on Individual and Collective risk: Page 4 of 23

15 FIGURE 4: INDIVIDUAL RISK RANKINGS FIGURE 5: COLLECTIVE RISK RANKINGS Page 5 of 23

16 Incidents and Accidents 44. Incidents and accidents in the use or operation of level crossings are logged, and inform the risk assessment process. Incidents generally fall into the following categories: Deliberate misuse User human error Rail operator human error Rail equipment failure External causes 45. Incidents at level crossings have previously been categorised generally as misuse, near misses, and accidents. Whilst Network Rail has adopted the new terminology, which is more descriptive, it does require a greater level of investigation of each incident in order to correctly ascertain the chain of causation. It is not always possible to establish this level of understanding from the records of events that occurred in previous years. 46. Across Anglia route in 206 7, there were 567 recorded incidents of deliberate misuse/user human error, 79 near misses and 29 incidents of users not calling the signaller back when requested. Page 6 of 23

17 Operational Issues of Level Crossings Level Crossing Managers, Inspections, and Risk Assessment Frequency 47. Details of the requirements for level crossing risk assessments are described in documents NR22 (Network Rail Operations Manual 5-6 Risk Assessing Level Crossings) and NR23 (Network Rail Level Crossing Guidance 0). 48. Management of level crossings imposes a significant staffing cost. Anglia route is divided into 4 Level Crossing Manager zones. Each Level Crossing Manager is based at the appropriate maintenance delivery unit and is responsible for the assessment, inspection, and basic maintenance of the level crossings in their zone. Their duties include maintaining a relationship with the authorised users of private crossings to ensure they understand safe operation. They also have a role in raising public awareness of level crossing risk. Each zone has just over 50 level crossings on average. 49. The frequency of inspection varies by the type of level crossing. Figure 6 (extracted from NR22) describes the maximum interval between inspections: FIGURE 6: MAXIMUM INSPECTION INTERVALS 50. The frequency of risk assessment at level crossings varies with the present risk score of the level crossing, and is specified in the ALCRM system for Page 7 of 23

18 each crossing. The minimum frequency for any crossing is once every 3.25 years (unless the crossing is out of use), although many crossings are assessed more frequently. 5. Additionally, level crossings receive unplanned risk assessments following a trigger. The triggers are described in section 5.3 of document NR22. Closures and Mitigations 52. After each risk assessment, the Level Crossing Manager will complete optioneering, looking at ways of eliminating or reducing the risks that have been measured, to make the risk as low as reasonably practicable. Whilst outside the scope of this Order, Network Rail has a wider programme of gateto-gate enhancements 5 and installation of technology to reduce the risk at level crossings. The rolling programme of risk mitigation sometimes means that level crossings where closure is foreseeable may be fitted with technology until closure can be arranged; the risk is reduced until it can be removed altogether Enhancement of level crossings usually entails works that Network Rail can deliver unilaterally, for which it already has powers. 7 However, permanent closure of level crossings and hence elimination of risk on the network requires public and private rights of way to be changed, for which Network Rail must apply for powers. Temporarily Closed Level Crossings 54. There are a number of level crossings that Network Rail has temporarily closed due to the crossing having non-compliant sighting, or because the furniture at the level crossing does not allow safe ascent and descent of the embankment or cutting necessary to reach the crossing. 55. In such cases, Network Rail will usually apply to the relevant highway authority to arrange a Temporary Traffic Regulation Order, authorising temporary closure of the public right of way (or highway) across the level crossing. These Orders may last for up to 6 months at public right of way level crossings, but may be extended on application by the highway authority to the Secretary of State. 56. Network Rail will also apply for a Temporary Traffic Regulation Order when level crossings are being maintained, which precludes the level crossing being available for public use. 5 Renewing all elements of the level crossing. 6 Many elements of level crossings need not be scrapped, but can be redeployed at other crossings. 7 Note that changes to level crossings on roads to which the public have access may require the involvement of the ORR and the amendment of Level Crossing Orders. Page 8 of 23

19 57. Fees are payable for each temporary closure to be advertised. These vary by highway authority. Temporary Speed Restrictions (TSRs) 58. If a level crossing has insufficient sighting, Network Rail may consider implementation of a TSR. These speed restrictions affect the efficient running of train services, delaying passengers and requiring compensation to be paid to operators. 59. TSRs may have further-reaching effects on the safety of users: 59.. They may have an adverse effect on the operation of active level crossings, which are calibrated to be triggered when the train passes a certain point. This may increase the risk at these crossings Trains may become out of sequence, causing network congestion and increasing signaller workload, increasing the risk of mistakes being made TSRs are only effective if the driver observes the local instructions. The more TSRs on a route, the greater the chance of one being accidentally missed by a driver. 60. For these reasons, TSRs are only applied where absolutely necessary and where there will be negligible transference of risk. User Worked Public Level Crossings 6. Under British Rail, on lightly used railway lines and roads, necessary economies sometimes led to the demanning of public road level crossings to reduce staffing costs. In their place, a telephone connected to the controlling signalbox was provided, and the gates were altered to open away from the railway, rather than to fence it when the crossing was in use by road vehicles. This left the railway network with level crossings which all road users are entitled to use, but with a form of protection that would now only be deemed suitable for private users, where Network Rail can engage with specific individuals to ensure they understand how to use the crossing correctly. Sleeping Dogs 62. A number of level crossings on the network are not currently in use, the infrastructure having been removed, but rights of way technically remain. This may be because a way is obstructed or because it is simply no longer required and has fallen out of use. These are known as sleeping dog level crossings and although no usage or risk currently exists, use of the right of way might be revived in the future, restoring risk to the network. Page 9 of 23

20 Inclusive Design and Accessibility 63. Prima facie a level crossing may be viewed as the shortest and flattest possible route across the railway, and thus the most inclusive. However, this is not the case. 64. Many level crossings, and most of the crossings in this Order, require users to judge for themselves when it is safe to cross. Those with impaired vision may be unable to see approaching trains, leading to them making the wrong decision to cross, which could prove fatal. 65. The nature of the railway is such that trains take a substantial distance to stop, even at low speeds. By the time a train driver has seen a person on a level crossing and established that they have crossed in the path of an approaching train or are having difficulty moving, it will usually be too late to brake successfully. This is distinguishable from road vehicles in urban environments, where drivers are able to adapt their driving to accommodate vulnerable users, and to swerve and/or stop quickly if a pedestrian walks in front of their vehicle. 66. Some level crossings are located on or near curves in the railway, where approaching trains cannot be seen, and the warning of an approaching train is therefore sounded by the train s horn. There is a risk that a person with hearing loss could miss a train horn, and seek to cross in front of an approaching train. 8 The nature of the warning of approaching trains is not advertised at each level crossing, so those with reduced hearing may not appreciate that the crossing is not safe to use unless one can hear sufficiently Passive level crossings rely on a gate or stile in the boundary fence to alert users that they are entering the railway environment, and prevent animals straying onto the railway. Such features constitute a barrier to access for some users. Stiles can theoretically be replaced by wicket gates to improve accessibility. However, this may lead to a level crossing being used by slowermoving users, for whom there may be insufficient warning of an approaching train. 68. Where the railway is in a cutting or on an embankment, steps are provided to facilitate passage. Replacement of lineside steps with ramps is often not practical owing to constraints of space. 69. Active level crossings have visual and audible warnings, which tell users when they are able to cross the railway. These are therefore more suitable for use by those who are less able to detect the approach of a train audibly or 8 The Night Time Quiet Period (NTQP) between the hours of 23:59 and 06:00 has further meant that some level crossings do not provide appropriate warning of approaching trains between these hours. 9 The use of personal audio equipment can also lead to people making themselves deaf to the outside world. Page 20 of 23

21 visually. Crossings with full barriers across the road provide a physical block to those who may not be able to detect warnings. However, there remain several factors that can cause accessibility problems at active level crossings: 69.. It is not possible to have a kerb that segregates the footway from the carriageway. Only a white line is possible If the visual and audible warning starts, users may panic On curves, the outer rail is raised above the inner rail, to account for the differential between the rail wheels. This means that a level crossing cannot be flat if it is located on a significant curve, resulting in an unavoidable trip hazard Pedestrians may be struck by descending barriers, especially if they have not heard or seen the warning of their descent At half-barrier crossings, pedestrians might approach the railway on the right-hand side of the road, where there is no barrier. This means pedestrians have no physical barrier across their path, although they do still have the benefit of visible and audible warnings Some pedestrians move too slowly to reach the other side of the level crossing before the barrier has descended. If warning times at level crossings are extended to accommodate slower-moving users, misuse by other users may increase by reason of their impatience It is not generally possible to grit level crossings or their approaches to combat snow or ice, even if the surrounding highway network is gritted. This is because of the likelihood of track circuits failing, 0 and the corrosion that can result to rails. 70. In assessing the compliance of a level crossing for pedestrians, Network Rail assumes a walking speed of.2m/s. The distance across the level crossing is measured from the decision point, to a point 2m clear of the furthest running rail. The decision point is 2m from the nearest running rail for footpaths, and 3m for bridleways. Where vulnerable users are identified, the speed of traversing the crossing is reduced. This can mean that level crossings which are compliant for users moving at.2m/s are non-compliant for those who move more slowly. 7. Level crossings can cause difficulties for people who move slowly, and are not suitable for users who are unable to see or hear approaching trains or warning devices, as necessary at each crossing. This may mean that some 0 Track circuits are a way of detecting the presence of a train. When a train is in section, it completes an electrical circuit between the rails, which allows a current to flow between them. In some locations, it is possible to isolate track circuits at level crossings, so that salt water will not complete a circuit. Corrosion remains an issue. Page 2 of 23

22 users with a disability avoid routes with level crossings, or use them at increased risk over those without such disabilities. Those with mental impairments or young children may also not understand the importance of the decision they are being required to make when crossing the railway. 72. In this Order, we have sought to improve accessibility on our diversionary routes where feasible, and have proposed routes which are free of steps and stiles in the majority of cases. We have discharged our public sector duty at all levels of decision making, and have undertaken a Diversity Impact Assessment Scoping Report for all level crossings in the Order as well as preparing several site specific Diversity Impact Assessments where possible issues have been identified. Responding to Incidents: Reliability 73. In the event that an asset inspection results in a defect or non-compliance issue arising at a level crossing, there is an additional workload on Section Managers, Section Planners, the Infrastructure Maintenance Engineer and those staff that then carry out any repair works required to bring the level crossing back up to a safe standard. 74. In the event of reported incidents, e.g. a gate left open, it will be for a Mobile Operations Manager to attend a level crossing in the first instance. Attendance times vary based on staff locations and workload. If a crossing user fails to follow the signaller s instructions to call back and declare the line clear after crossing, or if the signaller becomes aware of an incident, trains will be stopped or cautioned 2 until the incident is resolved. In some instances, a train driver will be instructed to shut the gate at a level crossing when he reaches it. The cautioning or stopping of trains impacts on performance and reliability. 75. Figure 7 shows the delay minutes have been attributed to level crossing failures on Anglia route: 2 i.e. told to proceed at reduced speed. Page 22 of 23

23 Delay code and reason XD (Level Crossing Incidents) ID (Level crossing failure) 2009/ /20 20/ / / / / / /208 (to end P2),82 3,92 5,897 7,964 2,89 8,532 8,78 4,52 2,769 8,503 4,963 5,687 6,938 6,659,78 6,903 3,042 3,240 Total 30,35 28,884 3,584 24,902 29,550 20,33 25,08 27,563 6,009 FIGURE 7: DELAY MINUTES ATTRIBUTABLE TO LEVEL CROSSINGS Track Maintenance 76. When certain track maintenance operations are performed, it is necessary to remove level crossing decks, and arrange a temporary closure of the level crossing while this is done. Each closure of a public crossing requires an application to the highway authority for a temporary closure and payment of its fee for processing and advertising the order (often 000 per crossing). It also requires gangs to attend to remove the deck, then to reinstate it after works are completed. This means that railway maintenance interrupts rights of way, impacting local communities. Diversion to grade-separated routes eliminates many of the occasions when temporary closure is required. Whilst bridges still need to be closed occasionally for maintenance or renewal, maintenance of the permanent way does not usually necessitate any interference with grade-separated crossings of the railway. 77. Avoidance of the need to close rights of way and lift crossing decks can lead to the track not being tamped across level crossings. This can impact adversely on ride quality and require speed restrictions. An untamped section of railway may cause a bounce which will create a decreasing ripple effect of wear away from the level crossing due to the train weight not being evenly loaded on the track. 78. Some areas of Anglia route require tamping several times a year, owing to ground conditions. Installation and Renewal Costs of Assets 79. The table presented in Appendix D illustrates the renewal cost of different types of level crossings. It also shows the costs of installing additional warning devices. These are the cost estimates on which Network Rail is basing its CP6 funding application. 80. Appendix E quotes real world costs of some common level crossing maintenance items. As each level crossing can be in a different setting and Page 23 of 23

24 have different requirements, there is scope for costs to vary considerably. Similarly, the lifetime of the components of a level crossing will vary depending on usage and environmental factors. 8. Where the railway is built at a higher level than the surrounding land, the raised approaches to a vehicular level crossing must be assessed and maintained so that vehicles do not become grounded on the level crossing. As many of these earthworks date from the Victorian era, before the modern understanding of geotechnics was developed, and weather is becoming more extreme, this has the potential to be a worsening problem. An estimate of 0 20k per crossing is not unrealistic where significant earthworks are required. 82. Where the railway is not level with the surrounding land, it is necessary to maintain steps (and sometimes handrails) to allow pedestrians to negotiate embankment or cutting slopes. This furniture is often built of wood and requires regular renewal. A typical crossing with steps can cost almost 20k for renewal (based on Higham level crossing, S23), in addition to all other maintenance costs 83. The future strategy for level crossings, and the desire to reduce risks that cannot be eliminated, will lead to more technology being installed at passive level crossings. This is described in Transforming Level Crossings (NR7). However, an increased level of warning equipment at level crossings leads to a railway which is more complex and hence more expensive to operate and maintain. There will be more signalling equipment to inspect, maintain and renew, and more failure points to investigate and rectify. As level crossings may share some technology, say for train detection, failures may impact on several level crossings simultaneously. Elimination rather than mitigation of the risk remains a preferred solution, in line with the ORR approach set out in NR4. Cost of Incidents at Level Crossings 84. When incidents at level crossings happen, the result can be a fatality, a lifechanging injury or trauma. The effect may be limited to road and rail vehicle damage and delayed services. 85. Figure 8 gives some examples of the compensation paid to train operators for delays following incidents that occurred at level crossings. Page 24 of 23

25 Crossing Date Incident Cost Nairns 2/08/206 Collision with Land Rover 202,743.7 Hockham Road 0/04/206 Collision with tractor 7, Maltings (St 24//206 No call back following vehicle, Margaret s) usage: trains cautioned Grimston Lane 0/09/206 Pedestrian fatality 3, Cattishall 24/03/204 Pedestrian fatality 30, Weatherby 06/08/205 Suicide 5,72.6 FIGURE 8: COMPENSATION FOR DELAYS PAID FOLLOWING LEVEL CROSSING INCIDENTS 83. The costs above do not include compensation paid to train operators in respect of damage to their rolling stock and other costs incurred. Some examples of such costs are shown in Figure 9. Note that, if the user of a level crossing is found to be at fault, it may be possible for the compensation to be recovered from the user s insurers. Crossing Date Incident Compensation claimed from Network Rail Hatson September 20 Collision with farm 950,653 vehicle Oakwood [not May 205 Collision with 8,000 Anglia route] tractor Hockham Road 0/04/206 Collision with tractor,595,93 FIGURE 9: COMPENSATION FOR DAMAGE SUSTAINED IN LEVEL CROSSING COLLISIONS Capacity and Network Development 84. Developing the capacity of the railway requires, as a minimum, a suitable and sufficient risk assessment of every level crossing on the affected route under the proposed new conditions. The general effects of increasing the speed and/or frequency of trains are: 84.. Increased risk of a collision at level crossings; Worse consequences in the event of a collision at a level crossing, owing to higher velocity of impact and/or a greater chance of a second train coming; Reduction of sighting of approaching trains, reducing the available time to cross; A requirement to move existing whistle boards further away, such that they may no longer be effective; Page 25 of 23

26 84.5. Longer closure time of crossings to vehicles (public and private) and pedestrians Movement of strike-in points for active level crossings. 85. Mitigation of the additional risks may require upgrades to level crossings. For example, automatic half barrier crossings may be replaced by full barrier crossings with object detection technology. These are a much safer type of crossing as they must be proved clear before a train can proceed across them, but there is a pronounced increase in road closure time, and also operational expense. For example, a typical automatic half barrier (AHB) level crossing may be closed for less than a minute per train, whereas the minimum closure for an object detection level crossing is 3 minutes. 86. Fewer level crossings on a stretch of line means fewer sites requiring risk assessments, and fewer crossings requiring potential upgrades or closures to accommodate enhancements. 87. Document NR24 is the Anglia Route Study. This is part of the Long Term Planning Process and considers the potential outputs required by the railway network within the Anglia Route, both in CP6, and ahead to Details on the relevant enhancement schemes that fall within the Suffolk Order area are outlined below. East West Rail (Central Section) 89. This is a project to establish a railway connecting East Anglia with Central, Southern and Western England to improve journey times and increase capacity for passenger and freight services. 90. The Central Section requires further assessment works for the business case to be developed by Network Rail. Great Eastern Main Line Enhancements ( Norwich in 90 ) 9. There is a desire to increase linespeed on the Great Eastern main line (LTN) from 00 to 0mph. In the shorter term, more trains will be running from London to Norwich with fewer stops. Felixstowe to Nuneaton freight corridor 92. There are proposals to increase the number of freight paths through the county. A Transport and Works Act Order is currently progressing to enable double tracking of the Felixstowe branch, to accommodate the growth aspirations of the port and encourage modal shift of freight from the A4 to Page 26 of 23

27 the railway. In terms of this Order, this could mean more freight on the LTN line between Ipswich and Stowmarket, and the CCH line. Conclusion 93. This section has demonstrated the benefits of and need for the Order. The proposed scheme can deliver real safety benefits to users, reduce Network Rail s maintenance burden, improve reliability and facilitate future railway enhancement schemes. 94. A successful Order would lead to a rationalisation of the level crossings across the network and allow Network Rail to focus resources on the remaining level crossings. At a time when funding is becoming increasingly difficult to secure, this project can help reduce funding demands to deal with level crossings. Page 27 of 23

28 Project Context 95. This section will describe previous initiatives to remove level crossings from the network, and current initiatives to reduce level crossing risk. 96. In Control Period 4 (CP4) 3 from April 2009 to March 204, Network Rail invested funding and commenced projects that would improve safety at level crossings. This included a focus on closing level crossings as well as asset enhancement schemes, installing technology to assist users in the safe use of level crossings. 97. Closures in CP4 were focused on closing some of the highest risk public right of way crossings through the construction of significant infrastructure, such as bridges and subways. In the case of private level crossings, the release of rights of way across the railway was agreed by negotiation where landowners were willing to agree terms. 98. Network Rail s long term strategy to improve safety at level crossings is outlined in Transforming Level Crossings (NR7). This strategy has a vision for no accidents at level crossings and emphasises the continuing priority to close level crossings as the most robust form of risk reduction. 99. At the start of CP4, the rail network had around 7500 level crossings. Funding was made available from the ORR to pursue level crossing closures nationally. This project was more successful than initially anticipated, delivering 070 closures and downgrades within CP4. Nationally, level crossing risk was reduced by 3%, measured by the reduction in FWI (NR7). 00. Figure 0 shows the number of level crossings on Anglia route closed or downgraded by year of legal completion, back to the year ending 3 March 970. As a result of the CP4 funding, it can be seen that the number of closures and downgrades achieved in y/e 200 and 20 is much higher than at any time since y/e Network Rail receives funding from the Government in 5 year Control Periods. CP4 commenced in April 2009 and ended in March 204. CP5 started in April 204 and finishes in March An incident where a farmer became grounded across the railway at Nairns level crossing in Scotland in the early 990s revealed a nationwide issue with the profiles of crossings. This necessitated heavy investment by British Rail to reprofile crossings and/or install telephones to mitigate against the risk of grounding. In view of the cost of remedial works, funding was made available to close private level crossings by negotiation. This explains the spike in the number of closures and downgrades achieved. Page 28 of 23

29 40 Downgrades Closures FIGURE 0: LEVEL CROSSINGS CLOSURES/DOWNGRADES ON ANGLIA ROUTE BY YEAR 0. By the beginning of CP5 5 the rail network in Great Britain had 629 level crossings with a collective FWI of approx. 3 as calculated by the All Level Crossing Risk Model (ALCRM) (NR7). Over a third of this level crossing risk sat with Anglia route. 02. At the time of writing, 6 the total level crossing FWI on the network is.79, and Anglia route has 25% of this, with FWI of 2.95, despite having just 3% of the crossings. 03. The CP5 strategy on Anglia route for reducing level crossing risk is: 03.. Close level crossings where reasonably practicable Install new equipment at level crossings to reduce risk where closure cannot be achieved Proceed with construction of bridges or alternative access routes at identified high risk sites to secure closure and removal of a level crossing. 04. Historically those public level crossings with the highest risk ratings and FWI were selected for closure. This would typically involve construction of bridges and/or significant levels of compensation to third parties. 5 0/04/204 3/03/209 6 May 207 Page 29 of 23

30 05. On the commencement of CP5 and with a renewed focus on trying to achieve further level crossing closures, Anglia Route considered a new approach to closing level crossings. 06. All level crossings across Anglia Route were assessed using in-house knowledge and put into 5 phases: 06.. Phase mainline level crossings that could be diverted and removed through the utilisation of existing nearby infrastructure and those that could be closed or downgraded due to extremely low usage; Phase 2 branch line level crossings that could be diverted and removed through the utilisation of existing nearby infrastructure and those that could be closed or downgraded due to extremely low usage Phase 3 non-vehicular level crossings closure of which requires new infrastructure for an alternative means of crossing the railway; Phase 4 vehicular level crossings requiring diversionary roads to existing infrastructure; Phase 5 vehicular level crossings requiring the construction of a vehicular bridge. 07. This Order progresses level crossings that fall within phases, 2 and 4. These phases are being progressed first due to the minimal infrastructure investment required. 08. This phased strategy is further outlined within the Client Requirements Document (NR8). This document sets out a high-level strategy for systematically closing level crossings on Anglia route, including initial proposals for each crossing. The strategy was planned to be applied in phases. It also outlines a switch away from utilising the Highways Act to gain the consents needed to close level crossings and instead proposes the use of the Transport and Works Act. Use of Transport and Works Act Order 09. This section sets out the justification for using Transport and Works Act Orders for level crossing closures. 0. The level crossings closures and downgrades completed in CP4 and CP5 to date have primarily been delivered through negotiation, in respect of private rights, and through Rail Crossing Diversion or Extinguishment Orders under the Highways Act 980 in respect of public rights. The success of the closure programmes delivered in CP4 and early CP5 has depleted the opportunities for proceeding by negotiation. Page 30 of 23

31 . Network Rail has chosen to apply for a Transport and Works Act Order for the level crossings within this scheme for a number of reasons. 2. In the case of level crossing closures, the Highways Act 980 includes arrangements under sections 8A and 9A for the stopping up and/or diversion of footpaths and bridleways crossing railways. However these apply only where it appears to the relevant council to be expedient in the interests of the safety of members of the public using or likely to use such crossings, and not for wider railway purposes. In the case of the crossings with which this Order is concerned, the justifications for closure relate not only to the safety test as set out in those sections of the Highways Act, but more widely to enable improved efficiency, network reliability, and the potential for capacity or linespeed enhancements. 3. The principle of closing or amending the status of level crossings by means of Transport and Works Act Orders is not new. See for example the Railtrack (Swinedyke Level Crossing) Order 995 (SI995/388), the Network Rail (Seaham Level Crossing) Order 203 (SI 203/533), and the Network Rail (Northumberland Park and Coppermill Lane Level Crossing Closure) Order 207 (SI 207/257). 4. An Order under the Transport and Works Act provides the means for Network Rail to address comprehensively and holistically the purposes and effects of its national and regional level crossing strategies where multiple closures are proposed and which cannot be achieved through the relevant procedures within the Highways Act. The Highways Act 980 does not contain any provision for multiple applications for level crossing closures and it is likely that even if the closures and changes to status of crossings could be effected by multiple individual applications under sections 8A and 9A of that Act this would completely overburden a local highway authority and take a considerable time to determine. 5. The Order includes a number of matters (which fall firmly within the ambit of Schedule to the Transport and Works Act) such as, the carrying out of certain Scheduled works, such as bridges over watercourses; the carrying out of surveys and the payment of compensation. A Transport and Works Act Order will grant Network Rail powers to create diversionary rights of way, public or private, on private land, or compulsorily acquire private land to enable closure of private level crossings. 7 It will also allow Network Rail to make alterations to highways on diversionary routes, such as the installation of traffic calming measures or segregated footways. 6. There is also no restriction on the status of level crossing which may be altered. Rail Crossing Diversion and Extinguishment Orders cannot be used 7 In the past, requests to highway authorities for them to use the compulsory powers vested in them to create diversionary public rights of way have been unsuccessful, even where Network Rail has undertaken to cover the costs. Page 3 of 23

32 on cycle tracks, byways open to all traffic or public carriageways. Private level crossings may also be closed. 7. A Transport and Works Act Order also permits the downgrade or upgrade of the status of certain highways and authorises certain public and or private rights over a crossing to be extinguished, where appropriate, in place of outright closure. The Order contains provisions to allow Network Rail to temporarily stop up the highway and for traffic regulation associated with the proposed works and diversionary routes. Furthermore, the repeal of former railway legislation relating to level crossings and the modification of existing statutory regimes and provisions for the protection of statutory undertakers in relation to the works proposed can only be achieved through a Transport and Works Act Order. 8 Funding 8. The Funding Statement submitted with the application for the Order sets out Network Rail s proposals for funding the cost of implementation (NR06). The project has secured funding in CP5 from the Level Crossing Risk Reduction Fund (LCRRF), which was established by the ORR and is overseen by the Safety, Technical and Engineering (STE) directorate in Network Rail, to enable Network Rail to maximise level crossing risk reduction in CP5. The guidelines for the funding outlined that it could be used for crossings that had a high certainty of closure within CP5 and that had an opportunity for closure (NR9). 9. The ORR Final Determination for CP5 (NR5) specifies that the required output of the LCRRF is () to maximise the reduction in the risk of accidents at level crossings, and (2) to enable the closure of level crossings. Network Rail has set a target of a 25% reduction in level crossing FWI against the LCRRF to demonstrate compliance. 20. Further funding in CP5 has been provided by Anglia Route from its signalling budget, which is utilised for asset management purposes, to enable a greater number of level crossing closures and downgrades to be completed in CP5. 2. As part of its application to the ORR for the CP6 funding settlement in December 207, Anglia route will be seeking funding to implement level crossing closure works for which consent has been obtained in CP It is also part of the wider Anglia Level Crossing Reduction Strategy that has seen the deposition of similar Orders for Cambridgeshire, and Essex and Others. The Funding Statement in the Order states that the Suffolk Level Crossing Reduction project has an anticipated final cost of 2.204m (NR06). 8 Although in the case of public rights of way closed by Rail Crossing Orders, the Transport and Works Act grants repeal of any specific legislation requiring a level crossing to be maintained (s. 47(2)). Page 32 of 23

33 23. The authorised funds in CP5 and the funds applied for in CP6 will meet the capital cost of implementing the Network Rail (Suffolk Level Crossing Reduction) Order inclusive of compensation. Page 33 of 23

34 The Draft Network Rail (Suffolk Level Crossing Reduction) Order 24. This section will provide an overview of the Order being applied for. 25. The level crossings in this Order are located throughout the county. Figure shows the location of each of the level crossings with a black triangle (the black lines are railway lines). FIGURE : SUFFOLK ORDER LEVEL CROSSING LOCATION MAP 26. As described in Schedule of the draft Order (NR02), the proposed Order will allow Network Rail to close 23 level crossings and to redesignate the status of level crossing. In connection with these powers, the Order includes powers to Network Rail to undertake the following works: 26.. Creation of Public Rights of Way (PRoW) as diversionary routes; Improvement of existing PRoWs to provide safe and accessible routes; Provision of 7 footbridges to carry PRoWs over watercourses; Page 34 of 23

35 26.4. Removal of level crossing assets and installation of boundary fencing; Provision of steps, mounting blocks, signage and other highway infrastructure Construction of new PRoWs on Network Rail and outside party land; Construction of steps to carry pedestrians at three level crossings; Construction of gates, signage and fencing as appropriate. 27. The Proposed Order will also permit compulsory acquisition of rights over third party land for the proposed works and ancillary purposes, including worksites; temporary use of land in connection with the authorised project; and the extinction and creation of private rights. 28. The Proposed Order also contains provisions which would authorise the operation and use of the railway; temporary and permanent stopping up of highways; and contains provisions relating to streets. Page 35 of 23

36 Development of the Scheme 29. This section describes the evolution of the scheme from conception, through consultation and design, to final proposals. More details on other alternatives considered may be found in the Statement of Consultation (NR05). 30. Governance for Railway Investment Projects (GRIP) is Network Rail s project management and control process for delivering projects on the operational railway. It is mandatory for all projects. The approach is based on industrywide best practice. The GRIP stages are: GRIP : Output definition GRIP 2: Pre-feasibility GRIP 3: Option selection GRIP 4: Single option development GRIP 5: Detailed design GRIP 6: Construction test & commission GRIP 7: Scheme hand back GRIP 8: Project close out 3. The sections below outline the development of the project and the output from each GRIP stage. GRIP 32. At GRIP stage in 205, Network Rail, with the support of design consultants Mott MacDonald, assessed the suitability of each of the level crossings that were initially placed in phases, 2 and 4 of the strategy. 33. There were 22 level crossings across multiple counties. 34. As well as providing detailed feasibility reports for each county and all relevant level crossings within it, the following outputs were delivered: 34.. Site visits undertaken where physically possible; General Arrangement plans for each level crossing proposal; Initial batch of Stage Road Safety Audits (NR6); A Diversity Impact Assessment Scoping Report covering all level crossings; Page 36 of 23

37 34.5. Anticipated Final Cost estimates for LA, broken down to a cost per level crossing; Consultation with strategic stakeholders with a series of workshops across the counties with representation from relevant offices from each County Council; Initial series of meetings with wider statutory bodies to outline the scheme and selected level crossings; Limited number of landowners consulted; Access and User Groups contacted with a questionnaire to gain feedback in regards to the strategy approach; Desktop study into bridge structure examination reports held by Network Rail, environmental constraints, OS and Land Registry data. 35. Following the completion of GRIP, the County of Norfolk and the branch lines (phase 2) in Suffolk were de-scoped from the project due to the overall estimated cost exceeding available funding. The GRIP estimates were used and those parts of the project that delivered the lowest potential FWI reduction per pound were removed. 9 This resulted in 33 level crossings being progressed into the next GRIP stage, with 34 of those being within the Suffolk Order. GRIP In April 206 Network Rail and our selected design consultants continued the development of the level crossing proposals. 37. In preparation for the informal rounds of public consultation, the following activities were carried out: 37.. Usage data were collected for each crossing; Consultation with County Councils continued and comments were considered in the plans for each level crossing; Environmental surveys/appraisals were undertaken on the multiple diversion routes and work areas; A further round of Stage Road Safety Audits was carried out (NR6); Road traffic counts and surveys on any diversion routes next to roads; 9 Network Rail intends to revisit these proposals when future funding or network development permits. Page 37 of 23

38 GRIP Drafting of Diversity Impact Assessment reports for those crossings identified as having a potential significant impact on users with protected characteristics; Consultation with all landowners that have land directly affected by diverted rights of way or that have rights affected at private level crossings. 38. Information obtained through GRIP and 2 was used to prepare for the first round of public consultations in June 206. A total of 2 exhibition venues were chosen with representation from Network Rail, its key contractors and technical leads. The venues chosen were accessible and generally located a maximum of 0 miles from any of the level crossings being consulted upon. 39. The relevant consultation event was advertised at every level crossing, together with a link to the project website. 40. Each exhibition event provided summary boards and route maps, as well as detailed site plans displaying the various diversion routes for each site. Where multiple diversion routes were available for a particular level crossing, colour coding was used to show the options. 4. County, District, and Parish/Town Councils were invited to attend the events an hour before they opened to the public. The plans for each event went live on the website on the morning of each consultation event. 42. Questionnaire responses were invited from those that attended the events. The details on display at the event were also made available online, and questionnaires could be electronically submitted regardless of whether one attended an event questionnaire responses were received. These, along with other letters, sand telephone calls, were used in refining the options. 44. Follow up workshops were subsequently held with the County and District Councils to review the responses received. 45. Along with the considered consultation responses other factors including engineering constraints, costs, environmental impact, user safety, landowner impacts and constructability were all considered in an internal workshop. The information was summarised on Assessment Summary Tables (ASTs) and in the majority of cases a single preferred option was selected. 46. The second round of public consultation commenced in September 206 and included the previous 2 venues with one extra venue in Thurrock to improve the distance and spread of level crossings from their respective venue. Page 38 of 23

39 47. A further 254 questionnaire responses were received, which again were reviewed with the County and District Councils. 48. A second round of internal workshops was held and a preferred option was selected for each level crossing. 49. A third round of information was released to the public on those crossings that had seen significant changes from what had been presented at the round 2 consultation events. 50. Consultation with private landowners affected directly or indirectly by the plans continued through to deposition crossings were de-scoped from the project prior to deposition of the Suffolk Level Crossing Reduction Order due to consultation feedback, the cost associated with the individual closures, or other reasons. 52. The Order was deposited on 24 March 207 requesting powers to implement changes at 24 crossings. The consultation described above, and as required by the 2006 Rules is further described in the Statement of Consultation (NR05) submitted as part of the application for the Order. Environmental Statement 53. No Environmental Statement was required, following a decision from the Secretary of State (NR). Planning Permission 54. A request to the Secretary of State for deemed planning permission for the Scheduled works accompanied the application for this Order, including details for the bridges to be constructed over watercourses. Initial high level conversations have been held with the highway authority regarding the typical design for bridges. 55. Prior to the public inquiry Network Rail will discuss with the local planning authorities and seek to agree the form of the draft planning conditions submitted with the request for deemed planning permission. Land and Property 56. Land and property will be used in the following ways: 56.. temporary access over land; temporary occupation of land and property; permanent acquisition of rights over land. Page 39 of 23

40 57. All of the areas of land and property rights sought in the draft Order are necessary to implement the Order scheme and/or to maintain access to the operational railway when the right of way to it is extinguished. No rights will be acquired either permanently or temporarily unless required for these purposes. 58. Network Rail is seeking to acquire the necessary rights by negotiation. All references to Plots are to be read in conjunction with the Order Plans that accompanied the draft Order (NR08). Temporary Access 59. Powers of temporary access or occupation are required in relation to land which is needed for construction and access purposes, but which is not required for the future operation or maintenance of the scheme. Existing Compensation Code 60. Those who have land or an interest in land acquired from them temporarily will be entitled to compensation. The Order applies Part of the Compulsory Purchase Act 965 which, through its application, has the effect of requiring Network Rail to pay compensation to qualifying parties under what is known as the Statutory Compensation Code (the Code). 6. The Code as it now stands is an amalgamation of numerous Acts of Parliament and legal precedents that have evolved over 50 years. 62. Landowners whose land will become subject to new public rights of way will be entitled to compensation in line with that payable under s. 28 Highways Act 980. Page 40 of 23

41 Objections and Representations Objection Period 63. After the Order application was submitted, the Department for Transport invited objections and representations. The period for this was 42 days from the application date. 64. During that objection period, 62 objections, 3 representations and 3 letters of support were received. In Principle Objections to the Order 65. There have been a number of objections which raise general concerns in relation to the proposed closures of level crossings in Suffolk. 66. The Ramblers (OBJ/36) make a number of crossing specific representations as well as general objections to the Order. They state that in places the proposed closures stand to sever the path network and provide unacceptable alternatives. They question the adequacy of alternative routes and the need for the closure of crossings. They also object to the diversion of pedestrian safety risk from rail to road. The improvements to the safety of users are considered elsewhere in this Statement of Case Road Safety Audits have been undertaken (NR6) and, where appropriate, Network Rail is seeking powers to alter the layout of the roads concerned, carry out other street works and/or to regulate traffic. Network Rail is satisfied that the diversionary routes proposed are suitable and convenient. The Ramblers also object to the use of the TWA procedure for the closures (as does OBJ/), the justification for which is dealt with elsewhere in this Statement of Case. The Ramblers also object that notification was inadequate. Network Rail followed the correct notification procedure under the 2006 Rules. 67. Suffolk Local Access Forum (SLAF) (OBJ/23) makes a number of crossing specific objections as well as a number of general objections to the Order. They state that little attention has been paid by Network Rail to those who participated in Phase and Phase 2 consultations, including Suffolk County Council. Network Rail s consultation is described elsewhere in this Statement of Case. It complied with the legislative requirements of the 2006 Rules and took account of feedback from a variety of interested parties, including the highway authority. SLAF also raise issues with some of the proposed alternative routes, on the basis that they use narrow country roads with overgrown verges, which may contain drainage grips, poor visibility on bends and narrow bridges over the railway. The diversions proposed for specific crossings are addressed below, but Network Rail would emphasise that all diversions must be completed to the reasonable satisfaction of the highway authority. They also object to use of a.8m high chain link fence where it is proposed, as visually intrusive in a rural setting, and suggest that a more Page 4 of 23

42 traditional.35m post and wire fence would be better. Network Rail is required, under the Railway Safety (Miscellaneous Provisions) Regulations 997, to prevent unauthorised access to its infrastructure so far as is reasonably practicable. A.35m post and wire fence will not generally be appropriate in locations where the public have access to the railway boundary, especially where they have previously crossed the railway and it is necessary to emphasise that the level crossing has now closed. 68. Suffolk County Council (SCC) (OBJ/29) makes a number of crossing specific objections as well as representations regarding the effects of the Order on the Definitive Map and Statement requesting modification of the Order to include Ordnance Survey grid references. The Council intends to seek a commuted sum to offset future maintenance costs of the new network.. Network Rail will continue to work with the Council to agree details of designs of PRoWs and road safety improvements, and commuted sums in recognition of the maintenance cost of new or altered highways which would be transferred to the highway authority once completed. 69. The Environment Agency (OBJ/5) was concerned about the content and scope of the protective provisions in the draft Order for the protection of drainage authorities and the Environment Agency. It is concerned that some works are proposed within flood plains and may affect flood flow routes or result in the loss of floodplain. Network Rail will consult the Environment Agency to better understand its concerns about the proposed protective provisions, noting that the form in which they are expressed in the draft order has recent precedent in other legislation. 70. The NFU (OBJ/32) has objected generally to the proposals on grounds of potential impacts on access to land and implications for farming businesses. It is also concerned about the increase of the length of the diversions. Where Network Rail is proposing an alternative route on farmland, it is considered that the route is required, suitable and convenient. Network Rail will continue to engage with affected landowners to discuss how their concerns can be mitigated. It has also questioned the use of the procedure under the TWA which is addressed elsewhere in this Statement of Case. 7. The Royal Mail (OBJ/52) make a general objection that they think that the proposals may impact on their statutory duties, but add that they cannot determine at this stage what impact there will be. They also list a number of sites where they are concerned about temporary stopping up of roads during the construction period. Network Rail will engage with Royal Mail to discuss their concerns. Representations in Relation to the Order 72. REP/ (Essex and Suffolk Water) does not object to the Order provided that its infrastructure is protected, in particular a group of mains it considers to be Page 42 of 23

43 affected by the proposed works. Network Rail will continue to liaise with Essex and Suffolk Water regarding the matters set out in its representation. 73. REP/2 (Tarmac Aggregates Ltd) made reference to crossing S08 only. 74. REP/3 (Historic England) states that there would be no impact upon any highly graded designated heritage asset (scheduled monuments, grade I or II* listed buildings or grade I or II* registered parks and gardens) and does not object to the proposed closures or downgrading of footpaths, but recommends that Network Rail consult with the relevant local authority officers in respect of impact upon grade II listed buildings, non-designated heritage and historic landscape, and non-designated archaeology. Support for the Order 75. SUPP/ (Lorna Lowe) supports the closure of the crossings, especially those without a signal to warn people of an approaching train. Page 43 of 23

44 Level Crossings Affected by the Order 76. Descriptions of the existing crossings and the public rights of way and private rights associated with them together with the changes proposed by Network Rail were described in the Design Guide submitted alongside the application documents (NR2). Plans showing the existing routes and proposed changes were included at Part 4 of Volume 2 to the Design Guide, the relevant extract of which is included at Appendix F to this Statement of Case. 77. Road Safety Audits are presented in document NR Summaries of the censuses of usage undertaken are presented in document NR25. Page 44 of 23

45 S0 Sea Wall Location This footpath crossing is located in Brantham Parish and has a post code CO NL. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN), 60 miles 46 chains from Liverpool Street. Where it can be found on deposited plans It is shown on sheets 36, 37 and 38 of the deposited plans. Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 20, 22, 23, 24, 24A, 24B, 24C, 25, 29, 30, 3 and 32 (b) Powers Limited to Rights: 6, 8, 28 and 33 (c) Powers Limited to Extinguishment of Rights: 2 all in the Parish of Brantham Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). As the railway is on an embankment, steps up to the crossing are provided. It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The ALCRM score of the level crossing is C5. A 24-hour, 9-day camera census was undertaken in January 207 (which had notably good weather). This recorded 7 users per day. Whilst sighting of approaching trains is sufficient, this can be impacted by overgrown vegetation and/or mist. Therefore an additional warning of approaching trains is given by whistle boards. Whistle boards are only effective between the hours of because of the Night Time Quiet Period (NTQP), during which train drivers are not allowed to sound their horns. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. Page 45 of 23

46 Rights affected There are no private rights of way at this level crossing. The public footpath over the level crossing will be extinguished. Alternative/diversion provided for in the Order The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP3 Brantham would be diverted onto a new footpath, approximately 700m in length, on the south east side of the railway connecting to FP2 Brantham. Users would then use the existing overbridge to cross the railway to connect onto RB4 Brantham. 20 This new footpath would be 2m wide and unsurfaced. A timber footbridge would be provided at the diversion of FP3 Brantham to allow users to cross a ditch and connect to the new footpath. A second timber footbridge (up to 5m in length) would also be required along the new footpath to allow users to cross a drainage ditch. FP3 on the north side of the railway leading from RB4 Brantham to Sea Wall level crossing would be extinguished (approximately 300m in length). Approximately 300m of FP3 Brantham heading south from Sea Wall level crossing would also be extinguished. The diversion route adds up to an additional approximate 400m to the route Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are 23, 24, 24B, 24C and 3 Specific considerations The maintenance of sighting at this crossing requires significant vegetation management. This crossing has previously been closed temporarily for an extended period owing to insufficient sighting. The height of the railway embankment requires significant furniture to be maintained at the level crossing, and is a barrier to usage by people with reduced mobility. There are aspirations to run some additional train services on this line between London and Norwich, and longer term aspirations to increase the linespeed from 00 to 0mph. Greater Anglia is constructing a depot on land immediately north of this level crossing. Whilst this may not result in additional train movements over the level 20 Restricted byway Page 46 of 23

47 crossing, the noise of standing trains and works might distract users of the level crossing. Relevant objections There have been seven objections to the proposed closure of this level crossing: The objectors are OBJ/7 (Roger Wolfe), OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum), OBJ/29 (G Dobson on behalf of Suffolk County Council), OBJ/36 (E Suggett on behalf of the Ramblers Association), OBJ/44 (Ed Keeble on behalf of John R Keeble & Son Limited), OBJ/49 (Cllr Joop van der Toorn) and OBJ/54 (Gillian Forsyth) Nature of the objections OBJ/7 does not object to the closure of the level crossing but objects that the alternative route provided is not adequate. OBJ/29 also objects to the adequacy of the alternative route. Network Rail considers that the alternative route is suitable and convenient. OBJ/23 considers that the alternative route is acceptable but objects to the extinguishment of existing footpath along the sea wall. OBJ/7, OBJ/29, OBJ/54 and OBJ/36 also object to the extinguishment of the existing footpath along the sea wall. OBJ/44 has some concerns about agricultural security along the proposed new footpath. Following feedback from earlier proposals, Network Rail chose the proposed alternative route (and closure of the cul-de-sac path on the sea wall that would remain) to avoid a route adjacent to the Stour and Orwell Estuaries, which are designated as a SSSI, a Special Protection Area, and a Ramsar Wetland of International Significance. Network Rail considers that the alternative route is suitable and convenient. OBJ/49 objects that notice and consultation were inadequate. Network Rail complied with the relevant legislative requirements of the 2006 Rules in relation to giving notice of the application and objection period. Network Rail will liaise with Brantham Parish Council to discuss their concerns in relation to the temporary closure of Rectory Lane/BR05; this will only be required while connections to the new PRoW will be provided, so is not expected to cause significant disruption. Page 47 of 23

48 S02 Brantham High Bridge Location This footpath crossing is located in Brantham Parish and has a post code CO PL. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 6 miles 74 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 35 of the deposited plans. Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 02, 03, 04, 05, 06, 09, 0, 2 and 4 (b) Powers Limited to Rights: 0 and 3 (c) Powers Limited to Extinguishment of Rights:. all in the parish of Brantham. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway is on an embankment and there are several steps on the upside of the line. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has insufficient sighting and warning of an approaching train is given by whistle boards. Whistle boards are only effective between the hours of because of the NTQP. The level crossing has a current ALCRM score of M3, as it is closed under a Temporary Traffic Regulation Order. Before this closure, the ALCRM score was C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. Two users were recorded, both of whom were adult pedestrians. Page 48 of 23

49 Rights affected There are no private rights of way at this level crossing. FP06 Branham would be extinguished over crossing along with a short length of this path to the west of railway. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP06 Brantham would be diverted onto a new 2m wide footpath along an existing road (Jimmy s Lane), approximately 200m in length, heading south to connect to Ipswich Road. The section of FP06 Brantham that runs east of the woodland up to the level crossing would be extinguished. Users would then use existing footway on Ipswich Road, heading east to cross the railway via the existing footbridge adjacent to the road bridge on Ipswich Road. Users would then be diverted north by using an existing private road (The Street), that lies to the west of Hill Farm. A new footbridge (up to 5m long) would be provided for users to cross from the existing private road into a field to the west, whence the new footpath would continue north as a 2m wide unsurfaced path along the field margin. This new footpath would connect into existing FP06 Brantham to the east of the railway. A short section of asphalt footway approximately 80m long would be provided within the highway verge along the A37 to link the northern end of FP06 Brantham to FP00 Bentley (that heads northwest) and FP034 Tattingstone (that heads east). The proposed diversion route adds approximately 450m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 0, 05, 06, 09 and 3 Specific considerations This level crossing has been closed under a Temporary Traffic Regulation Order since September 206. This is due to the risk of a train passing the crossing masking the sound of a second train approaching the crossing from the opposite direction, with the result that a user might step into the path of the second train after the first has cleared the crossing. Page 49 of 23

50 Relevant objections There have been seven objections to the proposed closure of this level crossing. The objectors are OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum), OBJ/29 (G Dobson on behalf of Suffolk County Council), OBJ/36 (E Suggett on behalf of the Ramblers Association), OBJ/44 (Ed Keeble on behalf of John R Keeble & Son Limited), OBJ/52 (BNP Paribas on behalf of Royal Mail Group), OBJ/54 (Gillian Forsyth) and OBJ/62 (Anthony Taylor) Nature of objections OBJ/23 and OBJ/29 seek information on the adequacy of the alternative route provided over private land. OBJ/36 and OBJ/54 object to a loss of amenity to walkers. OBJ/23 supports the linking path footpath alongside the A37 to Brantham Bridge. Obj/29 notes that the proposed footpath link on the A37 will require the agreement of Suffolk Highways and will have to meet any specifications they may require. The Ramblers (OBJ/36) object to the adequacy of the alternative route provided but recognise the improvements made to the proposals during the consultation process and the provision of new useful links in the PRoW network. OBJ/44 objects that the footpath diversions may result in a risk to agricultural security on their land. OBJ/62 also objects to the impact of the diversion route on their land and has concerns about the adequacy of consultation. Consultation has been conducted appropriately taking feedback into consideration and complying with the legislative requirements of the 2006 Rules. Network Rail will continue to engage with affected landowners to discuss their concerns. Network Rail considers that the proposed route is required, suitable and convenient. Network Rail will continue to work with the Council to agree details of designs of PRoWs, and notes that diversion within the public highway must be constructed and completed to the reasonable satisfaction of the local highway authority. The Royal Mail Group (OBJ/52) has concerns about the proposed temporary stopping up of the A37. Network Rail will engage with Royal Mail to discuss their concerns. Network Rail may require a temporary single lane closure during its works but does not envisage closing the road completely at any time. Page 50 of 23

51 S03 Buxton Wood Location This footpath crossing is located in Bentley Parish and has a post code IP9 2DB. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 63 miles 24 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheets 33 and 34 of the deposited plans. Affected land The parcels of land affected are as follows: (a) Powers Limited to Temporary Use of Land:, 2,3,5,6 and 7 (b) Powers Limited to Extinguishment of Rights: 4 all in the parish of Bentley. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C7. A 9 day camera census was undertaken between 24 September 206 and 2 October 206 with survey hours 00:00 to 24:00. adult pedestrians were recorded, with no visible disabilities. Rights affected There are no private rights of way at this level crossing. The public footpath over the level crossing will be extinguished. Page 5 of 23

52 Order Proposal The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. The entirety of FP22 Bentley lying to the west of Buxton Wood level crossing and leading up to FP2 Bentley (approximately 450m) would be extinguished. Users would be required to use existing FP2 Bentley up to Falstaff level crossing to cross the railway. Users would then continue east on FP9 Bentley or head south via a new footpath. The new footpath would be 2m wide and unsurfaced (approximately 550m in length) and connect to existing FP22 Bentley to the east of Buxton Wood level crossing. The proposed diversion route adds approximately 220 m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 7. Relevant objections There has been one objection to the proposed closure of this level crossing, OBJ/60 (Birketts LLP on behalf of David Caldwell of Rookery Farm). Nature of the objections OBJ/60 objects to the use of their land for the new footpath and has concerns about the adequacy of consultation. Network Rail consulted on the proposals in accordance with the 2006 Rules and has taken into account the responses received in deciding to proceed with the proposed Order. Network Rail considers that the alternative route is required, suitable and convenient, and will engage with the landowner to discuss how the concerns raised in his objection, relating to the proposed diversionary route, can be addressed or mitigated. Page 52 of 23

53 S04 Island Location This footpath crossing is located in Bentley Parish and has a post code IP9 2LP. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 64 miles 4 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 32 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 03, 04 05, 06, 08 and 09 (b) Powers Limited to Extinguishment of Rights: 0 all in the parish of Bentley. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway is in a cutting and steps are provided for users to reach track level. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. Warning of an approaching train is given by whistle boards. Whistle boards are only effective between the hours of because of the NTQP. Covtec equipment is also installed at the crossing, which provides warning of approaching trains, 24 hours a day, albeit it is not 00% reliable. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: users were recorded, all of whom were adult pedestrians. Rights affected There are no private rights of way at this level crossing. The public footpath rights would be extinguished. Page 53 of 23

54 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP8 Bentley to the west of the railway would be diverted onto a new 2m wide, unsurfaced footpath (approximately 500m in length) heading north parallel to the railway connecting onto the existing highway. Users would make use of the existing footway, heading east over Bentley Bridge to cross the railway. To the east of the railway, users would be diverted onto a new 2m wide unsurfaced footpath approximately 290m in length, heading south to connect to existing FP8 Bentley. It would be necessary to use the private field margin to complete the last 50m section of the footpath to the existing level crossing. The proposed diversion route adds approximately 440m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 03, 05, 06 and 08 Relevant objections There have been four objections to the proposed closure of this level crossing. The objectors are OBJ/6 (W King); OBJ/2 (Thomas Hill QC); and OBJ/23 (Barry Hill on behalf of the Suffolk Local Access Forum) and OBJ/52 (BNP Paribas on behalf of Royal Mail Group). Nature of the objections OBJ/6 objects to the closure of the crossing. Network Rail addresses the general case for closure earlier in this Statement of Case. OBJ/2 supports the principle of the crossing closure but objects to an element of the alternative route to be provided. Network Rail considers that the proposed route is suitable and convenient. OBJ/23 objects that the proposed diversion of the existing road bridge is inadequate for pedestrians. Network Rail considers that the proposed route is suitable and convenient. An objective Road Safety Audit has identified no safety issues with the proposed diversion to the road and the diversion must be constructed and completed to the reasonable satisfaction of the local highway authority The Royal Mail Group (OBJ/52) has concerns about the temporary stopping up of Church Road/Bentley Bridge. Network Rail will engage with Royal Mail to discuss their concerns. It may be necessary to reduce the road to single file traffic flows whilst the new PRoW is being created. It is not envisaged that there would be a full road closure at any time. Page 54 of 23

55 S05 Pannington Hall Location This footpath crossing is located in Wherstead Parish and has a post code IP9 2AR. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 65 miles 69 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheets 30 and 3 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 03, 04, 05, 06, 07, 08, 09, 0,, 2, 3, 5 and 6 (b) Powers Limited to Rights: 0 (c) Powers Limited to Extinguishment of Rights: 4 all in the parish of Wherstead. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway is in a cutting and steps are provided to enable users to reach track level. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. Covtec equipment is also installed at the crossing, which provides warning of approaching trains, 24 hours a day, albeit it is not 00% reliable. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom two were unaccompanied children and the remainder were adults. Rights affected There are no private rights of way at this level crossing. The public footpath over the level crossing will be extinguished. Page 55 of 23

56 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP34 Wherstead would be extinguished on both the north and south sides of the railway (approximately 675m in length). South of the railway, users who would have used FP34 Wherstead to head north towards Pannington Hall (Broomhaughton) level crossing would be diverted northwest via a new 2m wide unsurfaced footpath approximately 500m in length. A timber footbridge (up to 5m in length) would be required to cross a drainage ditch along the route of the new footpath. Users would either continue west onto BR29 Wherstead or make use of a further new 2m wide unsurfaced footpath, approximately 550m in length, to connect to the existing road bridge, which is where users would cross the railway. On the north east side of the railway bridge, a new 2m wide unsurfaced footpath (approximately 00m in length) would be created to connect on to existing FP33 Wherstead. The proposed diversion route adds approximately 480m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 03, 04, 05, 06, 07, 09, and 2 Page 56 of 23

57 Relevant objections There have been five objections to the proposed closure of this level crossing. The objectors are OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/36 (E Suggett on behalf of the Ramblers Association); OBJ/52 (BNP Paribas on behalf of Royal Mail Group); and OBJ/56 (Simon Aldous on behalf of Pannington Hall Estate). Nature of the objections OBJ/23 and OBJ/36 object to the adequacy of the alternative route. In particular, OBJ/23 accepts the proposals but objects to the safety of the use of the public highway. OBJ/23 and OBJ/29 also object that the new footpath should be designated as a bridleway. OBJ/56 objects to an element of the use of their land for the creation of the new footpath. Network Rail considers that the alternative route is required, suitable and convenient. An objective Road Safety Audit has identified no safety issues with the proposed diversion to the road and any diversion on the highway must be completed to the reasonable satisfaction of the local highway authority. Network Rail does not consider it is necessary or appropriate to replace the footpaths which are affected by the Proposed Order with a bridleway in this location. Network Rail will continue to engage with affected landowners to discuss their concerns. The Royal Mail Group (OBJ/52) has concerns about the temporary stopping up of The Street. Network Rail will engage with Royal Mail to discuss their concerns. In order to carry out some of the vegetation management and verge clearance it may be necessary to have a lane closure and reduce the road to single file traffic flows for a temporary period. It is not envisaged that the road would be fully closed at any time. Page 57 of 23

58 S07 Broomfield Location This footpath crossing is located in Barham Parish and has a post code IP6 0NJ. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 74 miles 4 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 28 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 03, 05, 06, 08, 09, 2, 3 and 4 (b) Powers Limited to Rights: 0A, 02 and 07 (c) Powers Limited to Extinguishment of Rights: 04 all in the parish of Barham. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. There is also a third line, which is the shunt neck of an adjacent freight yard, temporarily taken out of use to shorten the level crossing length and make the level crossing compliant for crossing time. The level crossing has an ALCRM score of C5. Between March 203 and February 207 there was one near miss and one instance of misuse recorded at the crossing. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. 4 pedestrian users were recorded, of whom eight were accompanied children, eleven were unaccompanied children and the remainder were adults. Eight bicycles were recorded as being walked over the crossing. Page 58 of 23

59 Rights affected There are no private rights of way at this level crossing. The public footpath over the level crossing will be extinguished. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. To the west of the railway, users of FP2 Barham who currently use the level crossing would be diverted east onto a new 2m wide footpath (approximately 75m in length) set slightly north of existing riverside portion of FP2 Barham. The new route would join the existing FP2 where it crosses the railway beneath the underbridge. FP2 Barham would be extinguished on the west side of the railway between the level crossing and the underbridge (approximately 445m in length). Users would use the existing underbridge approximately 320m south of Broomfield level crossing to cross the railway heading east. Users would then continue north east along FP to connect into a new 2m wide footpath on an existing private track (approximately 280m in length). This new footpath would connect into existing FP2 Barham east of the railway. The proposed diversion adds approximately 24m to the route. Land permanently affected by proposals The parcels of land affected by the proposed diversion and associated works are: 0, 08,, 2 and 3 Specific considerations This level crossing crosses three lines of rails. The third is a shunt neck for the freight yard and this has been temporarily taken out of use. The crossing is compliant with safety standards with two tracks operational, but would not be compliant with safety standards if the 3 tracks remained operational. Page 59 of 23

60 Relevant objection One objection has been received in relation to this crossing, this being OBJ/36 (E Suggett on behalf of the Ramblers Association). Nature of the objection The Ramblers (OBJ/36) objects that the alternative route is less convenient than the existing route but do acknowledge that the re-siting of the path onto drier ground is a benefit and there is merit in retaining the apparent cul-de-sac section east of the railway crossing, as there is a track to the bridge. Network Rail considers that the alternative route is suitable and convenient. Page 60 of 23

61 S08 Stacpool Location This footpath crossing is located in Needham Market Parish and has a post code IP6 8LJ. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 75 miles 70 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 27 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 04, 06, 07, 09 and 0 (b) Powers Limited to Rights: 0, 02, 03, 05 and (c) Powers Limited to Extinguishment of rights: 08 all in the parish of Needham Market. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C5. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, all of whom were adult pedestrians. Rights affected There are no private rights of way at this level crossing. The existing public footpath rights would be extinguished. Page 6 of 23

62 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. Users of FP33 Needham Market heading west towards the railway would be diverted onto a new 2m wide unsurfaced footpath running parallel to the railway. This new footpath would be approximately 400m in length and head northwest to connect into existing FP3 Needham Market. Users would make use of the existing overbridge approximately 400m north of the Stacpool level crossing. The existing footpath to the west and leading up to Stacpool level crossing would be extinguished (approximately 00m in length). The proposed diversion route adds approximately 840m to the route. Land permanently affected by proposals The parcels of land affected by the proposed diversion and associated works are: 04 and 06 Specific considerations The proposed diversionary route involves use of an overbridge approximately 400m north of the crossing. That overbridge is currently used by vehicles associated with the Tarmac gravel extraction site. By the time of implementation of this proposal, it is anticipated that gravel extraction, and its associated intensive vehicular movements, will have ceased. Page 62 of 23

63 Relevant objections There have been two objections to the proposed closure of this level crossing. The objectors are OBJ/34 (G Crosby) and OBJ/36 (E Suggett on behalf of the Ramblers) Nature of the objections OBJ/34 objects to the diversionary route as it poses highway safety risks to pedestrians. Network Rail has undertaken a Road Safety Audit for pedestrians approaching along Lower Street from the north, but this objector identified that users of the footpath park in a layby on Lower Street south of FP33, and if they walk along Lower Street, he alleges that they will be exposed to additional risk. Network Rail will engage with the objector and the highway authority to understand the scale of the potential issue and options for mitigating any highway safety issues. Representations REP/2 (Tarmac Trading) does not object to the proposals in respect of this crossing. It made the following observations: () additional signage may be needed for footpath users over the railway bridge to ensure that they are aware the railway bridge will be used by vehicles, and (2) an underground LV power line is shortly to be installed parallel to the railway line and close to the route of the footpath (Plot 06) therefore any supports for fencing should avoid the power cable. Network Rail will have regard to the matters raised by Tarmac Trading during the detail design of the proposed works at this location. Page 63 of 23

64 S Leggetts Location This vehicular and footpath crossing is located in Old Newton with Dagworth Parish and has a post code IP4 4EY. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 84 miles 27 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 6 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 03 and 04 (b) Powers Limited to Extinguishment of Rights: 02; all in the Parish of Bacton (a) Powers Limited to Temporary Use of Land: 03 and 04 (b) Powers Limited to Rights: 0 and 02; all in the Parish of Haughley (a) Powers Limited to Temporary Use of Land: 0,02, 04, 05 and 06 (b) Powers Limited to Rights: 07 (c) Powers Limited to Extinguishment of Rights: 03; all in the Parish of Old Newton and Dagworth Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C7. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. No users were recorded. Page 64 of 23

65 Rights affected There are no private rights of way at this level crossing. Public rights of way over the crossing would be extinguished. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. The entirety of FP2 Haughley and FP06 Old Newton with Dagworth (approximately 300m in length) would be extinguished. Users on the west of the railway would be diverted south towards Wassicks Lane, along RB3 Haughley. Users would cross the railway using Wassicks level crossing, which is an automatic half barrier level crossing with ALCRM score C4, located approximately 580m south of Leggetts crossing. After crossing the railway, users would head north along the east side of the railway via FP48 Haughley and FP6 Old Newton with Dagworth. These footpaths join FP33 Bacton which heads east from the railway. The proposed diversion route adds approximately 900m to the route. Land permanently affected by the proposals None Relevant objection One objection has been received in relation to this crossing, being OBJ/36 (E Suggett on behalf of the Ramblers Association). Nature of the objection OBJ/36 objects to the closure of the crossing due to a loss of amenity to walkers and object that the crossing is safe and therefore closure is not justified. Network Rail considers that the alternative route is suitable and convenient. Network Rail addresses the need to close the crossing and safety issues at level crossings earlier in this Statement of Case. Support for the order SUPP/3 (Old Newton with Dagworth & Gipping Parish Council). No objection to the rerouting of the single footpath affecting the parish. No parishioner comments were received either supporting or opposing the proposals. Page 65 of 23

66 S2 Gooderhams Location This footpath crossing is located in Bacton Parish and has a post code IP4 4HH. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 84 miles 77 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheets 7 and 8 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Rights: 06 and 07 (b) Powers Limited to Extinguishment of Rights: 05 all in the parish of Bacton. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. There is an adjacent vehicular crossing (UWCT) (ALCRM score C5) which would not be affected by the Order. The level crossing has an ALCRM score of C7. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. Eight users were recorded, all of whom were adult pedestrians. Rights affected Private rights of way over the crossing are to be retained. The public footpath rights would be extinguished. Page 66 of 23

67 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP9 Bacton would be extinguished on both the west and east sides of the railway approximately.08 km in length. Consequently, users on the west of the railway would be diverted north east along existing FP8 Bacton (approximately.08 km in length). Users would use the existing Cow Creek level crossing, located approximately 530m northeast of Gooderhams crossing, and continue east along the existing footpath on Kerrys Farm Lane to join the existing carriageway. The proposed diversion route adds approximately 800m to the route. Land permanently affected by the proposals None Specific considerations FP9 Bacton is a cul-de-sac on the definitive map. There is no link to other highways on the east side of the railway. Relevant objections There have been three objections to the proposed closure of this level crossing: OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/25 (Ben Crossman on behalf of Orwell Settlement Trustees); and OBJ/26 (E, M and P Baker) Page 67 of 23

68 Nature of the objections OBJ/23 does not object to the closure but asks that the replacement of the stiles at Cow Creek level crossing with kissing gates be considered, in view of the intensification of usage. As the current public footpath at the level crossing to be closed has stiles, Network Rail s view is that the diversionary route via Cow Creek is suitable and convenient for existing users. OBJ/25 objects to the creation of a new footpath on its land. No new rights are being created as part of this proposal. OBJ/26 objects on the basis of reduced access and the effect this may have on their farming business. The rights for private vehicles to cross the railway are unaffected by this proposal. They also object on the basis of a potential reduction in agricultural security. The extinguishment of a public right of way will lead to improved agricultural security at this location. Network Rail considers that the alternative route is suitable and convenient and will continue to engage with the landowners to discuss their concerns. Page 68 of 23

69 S3 Fords Green Location This footpath crossing is located in Bacton Parish and has a post code IP4 4HN. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 85 miles 5 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 9 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0,, 2, 4, 5 and 7 (b) Powers Limited to Rights: 08 (c) Powers Limited to Extinguishment of Rights: 3 all in the parish of Bacton. Nature of level crossing This footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C9. One instance of misuse was recorded at the crossing in March A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. Six users were recorded, all of whom were adult pedestrians. Rights affected There are no private rights of way at this level crossing. The public footpath at this level crossing would be extinguished. Page 69 of 23

70 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. On the west side of the railway line, users would be diverted either north along FP4 Bacton, or south along a new 2m wide unsurfaced public footpath in the field margin which runs parallel with and adjacent to the railway. The new footpath would be approximately 550m long and join existing FP8 Bacton which crosses the railway at the Cow Creek level crossing, located approximately 570m to the south east of Fords Green level crossing. On the east side of the railway, users would be diverted either east along FP4 Bacton and then south to Cow Creek level crossing via FP20 Bacton, or north along a new 2m wide unsurfaced public footpath in the field margin which runs parallel with and adjacent to the railway. The new footpath would be approximately 670m long and would join existing FP3 Bacton at its northern end. The proposed diversion route adds approximately.km to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are (in conjunction with S69 Bacton): 0,, 4, 5, 7, 8 and 9 Specific considerations Network Rail is seeking to rationalize the level crossings along this stretch of railway line, and also to enhance north-south routes to maintain connectivity for walking in the area. Page 70 of 23

71 Relevant objections There have been five objections to the proposed closure of this level crossing. The objectors are: OBJ/22 (John Finbow on behalf of Finbows Bacton 99 Ltd); OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/26 (E, M and P Baker); OBJ/36 (E Suggett on behalf of the Rambler s Association); and OBJ/37 (Colin and Judith Hull) Nature of the objections OBJ/22, OBJ/26 and OBJ/37 object to the use of their land for the new footpath. Network Rail considers that the alternative route is required, suitable and convenient. OBJ/22 has concerns about the adequacy of consultation. Consultation has been conducted appropriately taking feedback into consideration and complying with the legislative requirements of the 2006 Rules. Network Rail will continue to engage with the affected landowners to discuss their concerns. OBJ/23 states that crossings S3 and S69 should be considered together and that a proper footway should be established along Broad Road for safety reasons. Network Rail has considered the effects of closure of S2, S3, and S69 together and is creating a substantial length of off-road walking. Pedestrians who would previously have used Fords Green level crossing are diverted across the railway at Cow Creek level crossing as the nearest crossing point to the south, and not onto a public road. OBJ/36 object due to a loss of connectivity resulting from the closure. Network Rail considers that the alternative route is required, suitable and convenient and considers that the diversion proposed will enhance north-south routes to maintain connectivity for off-road walking in the area. The Ramblers also object to the safety justification for the closure of the crossing. Network Rail addresses the need to close the crossing and safety issues at level crossings earlier in this Statement of Case. Page 7 of 23

72 S6 Gislingham Location This bridleway crossing is located in Finningham Parish and has a post code IP4 4HX. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 88 miles 4 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 22 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 02, 09, 0, and 2 (b) Powers Limited to Rights: 05 (c) Powers limited to temporary use of land and rights: 07 (d) Powers Limited to Extinguishment of Rights: 03 all in the parish of Finningham. Nature of level crossing The bridleway level crossing has gates in the railway boundary fence and telephones to enable those in charge of animals to contact the signaller before crossing (FPGT). Other users are instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. Equestrians are instructed to dismount, although mounting blocks are not provided. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C8. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. Three users were recorded, all of whom were adult pedestrians. No equestrian users were recorded. Rights affected There are no private rights of way at this level crossing. The public bridleway over the crossing would be extinguished. Page 72 of 23

73 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. Approximately 50m in length of public BR23 Gislingham heading north from Gislingham level crossing would be extinguished. Consequently, users of BR23 Gislingham would be diverted southwest along a new 3m unsurfaced public bridleway which would connect with existing BOAT22 Finningham. 2 The new bridleway would follow the field boundary and be approximately 550m in length. Users would head east towards the railway along BOAT22 Finningham and use the existing underbridge to cross the railway, located approximately 400m south west of the Gislingham level crossing. Users would continue eastwards along the BOAT and join Eastlands Lane, which then heads north to Eastland Farm where Gislingham crossing is located. For the users coming from the north wishing to head west along BOAT22 Finningham, distances would be reduced by approximately 325m. Users coming from the north and wishing to access the junction of Wickham Road/Eastland Lane would have an additional journey of approximately 250m. Users from Eastland Farm wishing to use the bridleway north of the level crossing would have an additional length of approximately.2km to walk/ride on the diverted route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 0, 09, 0 and. 2 Byway open to all traffic. Page 73 of 23

74 Relevant objections There have been two objections to the proposed closure of this level crossing. The objectors are: OBJ/ (James Black on behalf of David Black & Sons Ltd) and OBJ/36 (E Suggett on behalf of the Ramblers Association). Nature of the objections OBJ/ objects to compulsory acquisition under the Order. The Order does not authorise acquisition of land but seeks to acquire rights over land for the purpose of maintenance. Network Rail will engage with the landowner to discuss his concerns. OBJ/36 is a holding objection which the objector states will be withdrawn provided the alternative route is constructed as a bridleway. The proposed new right of way to be constructed is a 3m wide bridleway. Network Rail considers that the alternative route is required, suitable and convenient. Page 74 of 23

75 S7 Paynes Location This footpath crossing is located in Gislingham Parish and has a post code IP23 8JE. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 88 miles 72 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheets 23 and 24 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 04, 05, 06, 07, 0,, 2 and 4 (b) Powers limited to rights: 02, 08 and 09 (b) Powers Limited to Extinguishment of Rights: 3 all in the parish of Gislingham. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C8. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. 4 users were recorded, all of whom were adult pedestrians. Rights affected There are no private rights of way at this level crossing. The Public footpath over the crossing would be extinguished. Page 75 of 23

76 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP22 Gislingham would be extinguished on both the west and east sides of the railway (approximately 50m to the west and 500m to the east). To the west of the railway, users would be diverted north along FP22 Gislingham to join FP29 Gislingham, which heads east towards the railway. Users would cross at an existing bridge, approximately 350m north east of Paynes level crossing, and continue east along FP2 Gislingham. Users would then head south along a new 2m wide unsurfaced public footpath in a field margin. The new footpath would be approximately 700m in length and would join FP04 Wickham Skeith. The proposed diversion adds approximately km to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: and 2 Relevant objection There has been one objection to the proposed closure of this level crossing, being OBJ/36 (E Suggett on behalf of the Ramblers Association). Nature of the objection OBJ/36 objects on the basis of a reduction in connectivity. Network Rail considers that the alternative route is suitable and convenient. Page 76 of 23

77 S8 Cowpasture Lane Location This bridleway crossing is located in Mellis Parish and has a post code IP23 8EF. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 90 miles 60 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 25 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0 and 03 (b) Powers Limited to Extinguishment of Rights: 02 all in the parish of Mellis. Nature of level crossing This level crossing is a byway open to all traffic, with a Prohibition of Driving Order restricting usage to that equivalent to a public bridleway. The level crossing is therefore set out as a public bridleway level crossing (FPG). Equestrians are instructed to dismount, although no mounting blocks are provided. It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C6. On 3 February 207 a London to Norwich express passenger train (P42) struck and fatally injured a person at the crossing. The death appears to have been accidental. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: users were recorded, all of whom were adult pedestrians. Six bicycles were recorded as being walked over the crossing. There were no equestrians. Page 77 of 23

78 Rights affected There are no private rights of way at this level crossing. Public rights of way would be reduced by downgrading the existing BOAT (subject to Prohibition of Driving Order) to a public bridleway. Order proposals The Order would confer powers to downgrade BOAT Mellis to a public bridleway. There is no need for a diversion as the current usage would not change, and therefore there will be no change in distance for users. Mounting blocks would be provided for the convenience of equestrians. 22 Land permanently affected by the proposals None Relevant objections There have been six objections to the proposed closure of this level crossing: OBJ/30 (Philip Butler); OBJ/3 (Hilary Butler); OBJ/33 (Mr and Mrs Mellor); OBJ/46 (Dr J B H Box); OBJ/50 (Julie Wicks); and OBJ/59 (Mrs C S Box). Nature of the objections OBJ/33 objects to the downgrading of the crossing to a bridleway. Network Rail views this as making permanent the existing Prohibition of Driving Order. If the current Prohibition of Driving Order were revoked, vehicles would be entitled to use Cowpasture Lane, causing damage to the environment, and increased risk at the level crossing. OBJ/30, OBJ/3, OBJ/46, OBJ50 and OBJ/59 object to Network Rail accessing the crossing over Mellis Common for the purposes of carrying out works. Network Rail will engage with the objectors to discuss their concerns. The Ramblers, OBJ/36, support the change of status from BOAT to bridleway. 22 Note that some versions of the Design Freeze plans refer to the rights of way being in Burgate parish rather than Mellis. This is an error and should be disregarded. Page 78 of 23

79 S2 Abbotts (Mellis) Location This footpath crossing is located in Mellis Parish and has a post code IP23 8DN. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 9 miles 20 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheet 26 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 04, 05 (b) Powers Limited to Rights: 07 (c) Powers Limited to Extinguishment of Rights: 06 all in the parish of Mellis. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom two were accompanied children and the remainder were adults. Rights affected Private rights of way would be extinguished over the crossing. There are no recorded public rights of way at this level crossing. Page 79 of 23

80 Order proposals The Order would confer powers to close the level crossing to all users and extinguish all rights of way over the crossing. To the west of the railway, users would be diverted along the private carriageway, join Mellis Road (with verge walking) and head northeast along FP Mellis which rejoins Mellis Road at its northern end. Users would cross the railway at the Mellis automatic half barrier road level crossing (ALCRM score D2), approximately 280m north east of Abbotts level crossing, and continue east along Mellis Road. To the east of the railway, users would head south along Earlsford Road. 23 The proposed diversion adds approximately 620m to the route. Land permanently affected by the proposals None Relevant objections There have been eleven objections to the proposed closure of this level crossing. The objectors are: OBJ/30 (P Butler); OBJ/3 (H Butler); OBJ/33 (Mr and Mrs Mellor);OBJ/35 (Graham MacLellan on behalf of Mellis Common Rightholders Association); OBJ/45 (Fiona Cadham); OBJ/46 (Dr J B H Box); OBJ/47 (Colin Joyce); OBJ/50 (Julie Wicks); OBJ/55 (M and J Spence); OBJ/57 (Nigel Battell); OBJ/59 (Mrs C S Box) 23 Note that some versions of the Design Freeze plans refer to the rights of way being in Burgate parish rather than Mellis. This is an error and should be disregarded. Page 80 of 23

81 Nature of the objections OBJ/30, OBJ/3, OBJ/35, OBJ/45, OBJ/46, OBJ/47, OBJ/50, OBJ/57 and OBJ59 seek confirmation of compensation for the extinguishment of private rights over the crossing and further information on compulsory acquisition. Compensation for loss of private rights is addressed earlier in this Statement of Case. In respect of land required for carrying out of the scheduled works, Network Rail requires only temporary occupation and/or rights over land whilst it is undertaking the necessary works to remove the infrastructure associated with the level crossing, which will be of limited duration. Compensation for any loss or damage resulting from the exercise of the powers of temporary occupation or use is payable in accordance with Article 22(5) of the Proposed Order. Network Rail will continue to engage with affected landowners to discuss their likely entitlement to compensation. OBJ/33 objects to the closure of the level crossing. OBJ/55 object to a loss of amenity to pedestrians due to the crossing closure. No public rights of way are being extinguished at this crossing. Network Rail considers that the alternative route is suitable and convenient. The need for the closure of crossings is addressed earlier in this Statement of Case. Page 8 of 23

82 S22 Weatherby Location This footpath crossing is located in Newmarket Parish and has a post code CB8 8BT. It is on the Cambridge to Ipswich railway line (CCH) 4 miles 5 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 02, 03 and 04 (b) Powers Limited to Extinguishment of Rights: 05 all in the parish of Newmarket. Nature of level crossing This permissive footpath level crossing has wicket gates in the railway boundary fence (FPW). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises one line of rails and carries passengers with a line speed of up to 40mph. The level crossing has an ALCRM score of D2. On 6 August 205 a Cambridge to Ipswich passenger train (2W29) struck and fatally injured a person on the crossing. The cause of death was recorded as suicide. Between March 2006 and November 206 there were six near misses and two instances of misuse recorded at the crossing. On May 207, at 45, the driver of 2W6 reported a near miss. A young male was texting and not looking. The driver sounded his horn and started to brake when the male looked up and stepped back. The driver reports he was 20m from the crossing. On 29 June 207, at 522, the driver of 2W8 (420 Ipswich Cambridge), reported a near miss at the crossing, with a child who ran out onto the crossing in front of the approaching train. The child was pulled back off the crossing by a parent. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom 285 were accompanied children, 9 were unaccompanied children, six were Page 82 of 23

83 elderly, 7 were impaired, one was in a wheelchair, 9 were in pushchairs or prams, five were on mobility scooters and the remainder were unimpaired adults. 87 bicycles were recorded as being ridden across the crossing and 355 bicycles walked across the crossing. Rights affected There are no private rights of way at this level crossing. There are no public rights of way at this level crossing. The permissive footpath would be closed to all users. Order proposals The Order would extinguish all existing rights over the crossing. Users would be diverted along public highways on both sides of the railway. To the west of the railway, users would head southwest along Granary Road, parallel to the railway, and then south east along New Cheveley Road, crossing the railway using the underbridge. To the east of the railway, users would continue eastwards along New Cheveley Road and head back towards Weatherby along Cricket Field Road. If users are walking to/from the intersection Willow Crescent and Cricket Field Road from/to Granary Road on the opposite side of this crossing, the new route would add 870m to a journey. A journey from the junction of New Cheveley Road and Cricket Field Road, to the junction of High Street with Sun Lane, would be 337m longer. Land permanently affected by the proposals None Relevant objections There have been twenty three objections to the proposed closure of this level crossing. The objectors are: OBJ/ (Guy Bettley-Cooke); OBJ/2 (J D Curtiss); OBJ/3 (Hilary Gurner on behalf of Newmarket Town Council); OBJ/4 (Maureen Hunt); OBJ/9 (Peter Hunt); OBJ/0 (Ruth Kent); OBJ/2 (Oonagh Bowler); OBJ/3 (Philip Hodson); OBJ/4 (Sabine Deering); OBJ/5 (Stephen Whiting); OBJ/6 (M Smy); OBJ/7 (Dan Wright); OBJ/8 (Ann Dunning on behalf of Newmarket Ladies Open Door Club); OBJ/9 (Pat Collins); OBJ/20 (Chris Abbott); OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/27 (Cllr L Stanbury on behalf Forest Heath District Council); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/38 (Sharon Wall); OBJ/4 (Matt Hancock MP); OBJ/52 (BNP Paribas on behalf of Royal Mail Group); OBJ/58 (Sara Beckett on behalf of Newmarket Neighbourhood Plan Steering Group); OBJ/6 (Camilla Rhodes on behalf of Cambridgeshire County Council). Page 83 of 23

84 Nature of the objections The majority of objections in relation to the closure of this crossing relate to the need to close a heavily used crossing which is considered safe. Network Rail addresses the need to close the crossing and safety issues at level crossings earlier in this Statement of Case and would highlight the recorded incidents. The majority of objections raise concerns that closure will result in a loss of amenity to residents and a number raise concerns on accessibility of the diversion route due to length and steep inclines on the route. Consideration was given as to whether the diversion route could be shortened by providing an additional diversion route but this was not feasible due to impact on third party land (including private gardens) and suitability of Network Rail land. Gradients vary over the diversion route but are within the preferred maximum gradient of 5% and are not considered to be a significant barrier. Network Rail considers that the alternative route is suitable and convenient. A number of objections also object to the diversion of pedestrians along a public road. The diversion route uses the existing publicly adopted footway network and no safety improvement schemes have been identified as being required. Suffolk County Council objects to the closure on the grounds of strong local opposition and high usage. Network Rail will continue to engage with the relevant stakeholders to discuss their concerns and consider potential mitigation along the diversion route. A number of objections also questioned the adequacy of consultation. Network Rail s consultation is described earlier in this Statement of Case. Consultation has been conducted appropriately taking feedback into consideration and complying with the legislative requirements of the 2006 Rules. Two public consultation events were held in June and September 206 across a range of times in Bury St Edmunds as the event covered 6 local level crossings to the east and west and hence the town was considered to be an appropriate centralised location with good transport links. The Royal Mail Group (OBJ/52) has concerns about the temporary stopping up of Granary Road. Network Rail will engage with Royal Mail to discuss their concerns. There is a dropped kerb to be removed in Granary Road; in order to do this there would need to be a lane closure and traffic control. It is not intended to fully close the road at any time. Page 84 of 23

85 S23 Higham Location This footpath crossing is located in Higham Parish and has a post code IP28 6NJ. It is on the Cambridge to Ipswich railway line (CCH) 2 miles 56 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 2 of the deposited plans. Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 03, 04, 06 and 07 (b) Powers Limited to Extinguishment of Rights: 02 all in the parish of Higham. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). The railway is in a cutting and steps are required to reach rail level. The level crossing is currently closed under a Temporary Traffic Regulation Order for safety reasons, owing to the absence of steps on the cutting face. It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of M3. Prior to closure, its ALCRM score was C9, although ALCRM does not take into account the risk of slips on noncompliant cutting slopes. As temporary closure of the level crossing coincided with the camera census, it is not possible to gauge demand for usage of this crossing accurately. Cameras were placed in an effort to detect potential users walking up to the crossing then turning back, but no such users were recorded over the 9-day period of the census (03/07/206 03/07/206 inclusive). An ALCRM assessment in 204 estimated usage as zero. Page 85 of 23

86 Rights affected There are no private rights of way at this level crossing. Public rights of way over the crossing would be extinguished. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP0 Higham to the north of the railway (approximately 30m in length) and to the south of the railway (approximately 200m in length) would be extinguished. On the south of the railway users would be diverted along Higham Road, crossing the railway at the road bridge located approximately 300m east of Higham level crossing. Pedestrians would make use of existing verges and carriageways up to the point where Higham Road meets the A4 slip road. The journey from the junction of Higham Road and FP0, to the junction of Higham Road with the westbound A4 slip road, is approximately 200m shorter than the equivalent journey via the level crossing. A Stage Road Safety Audit (NR6) did not identify any issues with using these highways as part of the diversionary route. A new.5m footway will be provided in the highway verge (between The Tavern and Coalpit Lane) to improve connectivity for walkers heading east from the end of Higham Road. Land permanently affected by the proposals None Specific considerations Reopening of this level crossing would entail substantial expenditure ( 20,000) on the installation of steps on the cutting slope (plus their ongoing maintenance cost), and the risk of an accident on the crossing would remain. It should be noted that there is no provision to the north for this footpath to cross the busy A4 road. Page 86 of 23

87 Relevant objections There have been four objections to the proposed closure of this level crossing. The objectors are OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/29 (G Dobson on behalf of Suffolk County Council; OBJ/36 (E Suggett on behalf of the Ramblers Association); and OBJ/52 (BNP Paribas on behalf of Royal Mail Group). Nature of the objections OBJ/23 and OBJ/29 object that the alternative route is inadequate with road safety issues and the highway authority highlights vegetation clearance is required along the existing verges. An objective Road Safety Audit has identified no safety issues with the proposed diversion to the road and Network Rail considers that the alternative route is suitable and convenient. Network Rail will continue to engage with Suffolk County Council noting any diversion on the highway must be completed to the reasonable satisfaction of the local highway authority. The Ramblers (OBJ/36) make a holding objection, and state that a condition of agreement to the closure, for road safety reasons, is the provision of a safe footway alongside the former A45 between the road bridge and the Round House to link the rights of way on both sides of A4. Under the Order, Network Rail is proposing to provide a new footpath in this location. The Royal Mail Group (OBJ/52) has concerns about the temporary stopping up of A4 onslip westbound, Higham Road and Coalpit Lane. Network Rail will engage with Royal Mail to discuss their concerns. There are connections to be made to the road, and footways to be provided along the road, where a lane closure will be required for workforce safety. It is not proposed to fully close the roads at any time. Page 87 of 23

88 S24 Higham Ground Frame Location This footpath crossing is located in Barrow Parish and has a post code IP28 6NS. It is on the Cambridge to Ipswich railway line (CCH), 22 miles 49 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheets 3, 4, 5, 6, 7, 8 and 9 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 09 (Sheet 3) in the Parish of Higham (a) Powers Limited to Temporary Use of Land: 0, 0A, 02, 03, 04, 09 (Sheet 3); 0, 05, 06, 07, 09, 0,, 6, 7 and 8 (Sheet 4);, 5, 6 and 7 (Sheet 7);, 2, 2, 22, 23, 24, 25 and 26 (Sheet 8); and 24, 25 and 26 (Sheet 9) (b) Powers Limited to Extinguishment of Rights: 08 (Sheet 4) all in the Parish of Barrow Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: users were recorded, all of whom were adult pedestrians. Page 88 of 23

89 Rights affected There are no private rights of way at this level crossing. The public footpath over the crossing would be extinguished. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP02, FP03 and FP04 Higham, and FP06 Barrow, to the north of the railway, would be extinguished. To the south of Higham Ground Frame level crossing, a new eastwest route would be created, running parallel to the railway. Users heading east would pass along a new 2m wide unsurfaced footpath to a point south of Needle s Eye road bridge. Users could then head south to continue on the existing lightly-trafficked road and other onward rights of way. Users heading under the railway at Needle s Eye underbridge would continue east along a proposed 3m unsurfaced bridleway, which would provide a link to the road bridge over the railway approximately 2500m east of Higham Ground Frame level crossing. An additional 2m wide footpath in field margin would be created between FP06 Barrow and BR8 Barrow, to provide a circular walk and give users the option to walk further away from the railway and A4 corridor. To the west, users would pass along a new 2m wide unsurfaced footpath in the field margin to Coalpit Lane. Users would then use field margins to walk south to a point opposite FP05 Higham. A new footbridge (up to 5m long) and steps or a ramp would be provided to cross a ditch and gain access to Coalpit Lane. Users would cross Coalpit Lane and follow FP05 Higham and then make use of the existing bridge on Higham Road to cross the railway. The diversionary route along FP06 Barrow from its junction with the A4 slip road to a point south of the railway via Coalpit Lane would be approximately.5km longer, but the impact on journeys will in this case be highly dependent on the particular journey being made. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 0, 0A, 02, 03, 04, 07,, 5, 6, 7, 8, 2, 22 and 25 Page 89 of 23

90 Relevant objections There have been two objections to the proposed closure of this level crossing, being OBJ/36 (E Suggett on behalf of the Ramblers Association) and OBJ/42 (Mairi Jean Johnston). Nature of the objections OBJ/42 objects to the proposed diversion route on her land and impacts of the same. Network Rail considers the alternative route is required, suitable and convenient. Network Rail will continue to consider how the concerns of the landowner could be addressed or mitigated. The Ramblers have made a holding objection on the basis that they are concerned that landowner agreement will be required to create the proposed new footpaths. Network Rail will continue to engage with the affected landowners to create the diversionary rights of way without the need for the powers to be exercised. If this is not possible, the Order would provide powers to do so compulsorily. Page 90 of 23

91 S25 Cattishall Location This footpath crossing is located in Great Barton Parish and has a post code IP3 2QU. It is on the Cambridge to Ipswich railway line (CCH) 30 miles 49 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 0 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land and Acquisition of Rights: 0; in the Parish of Bury St Edmunds (a) Powers Limited to Temporary Use of Land and Acquisition of Rights: 0, 02, 03 and 05 (b) Powers Limited to Temporary Use of Land: 04, 0 and 2 (c) Powers Limited to Extinguishment of Rights: 06 and 09; all in the Parish of Great Barton. Nature of level crossing The footpath level crossing has pedestrian gates in the railway boundary fence (FPG). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. On 24 March 204 a Cambridge to Ipswich passenger train struck and fatally injured a person at the crossing. The death was recorded as accidental. Between November 2005 and May 204 there were four near misses recorded at the crossing. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom six were accompanied children, four were in pushchairs or prams and the remainder were adults. 2 bicycles were recorded as being ridden over the crossing and 32 bicycles walked over the crossing. Page 9 of 23

92 Whilst the route either side of the level crossing is signed as National Cycle Route 3, the level crossing is of public footpath status only. Cyclists are required to dismount and walk across. Rights affected There are no private rights of way at this level crossing. The public footpath over the crossing would be extinguished. Order Proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. North of the railway, users would be diverted along a new 3m wide tarmac planings surfaced bridleway which would form part of the National Cycle Route. The new track would be approximately 420m in length and would run parallel to the railway. Users would cross the railway using the existing underpass, approximately 420m west of the Cattishall level crossing. To the south of the railway, users would head south along the highway and turn eastwards along the unnamed road, making use of the existing footpath and cycle track. A user starting on Green Lane and being diverted through the underbridge, then heading east when they reach Mount Road, would have a maximum diversion of approximately 880m. A user starting on Green Lane and being diverted through the underbridge, then continuing their journey west along Mount Road, would have approximately an additional 40m to travel. The proposed diversion will improve connectivity to an established residential area. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are (in respect of the Parish of Bury St Edmunds): 0 The parcels of land affected by the proposed diversion and associated works are (in respect of the Parish of Great Barton): 0, 02, 03 and 05 Specific considerations The land to the south west of the level crossing, and the north west of the level crossing/north of the underbridge, is allocated for residential development in the Local Plan. Development south of the railway is underway, and an application for planning permission for the land north of the railway is anticipated to be made by the end of 207. The rights of way to be constructed as part of the latter will, when complete, provide connectivity to the underbridge to better accommodate users travelling from north west of the site to the cycle way. Also as part of the northern Page 92 of 23

93 development, it is proposed to provide a pedestrian footbridge at the site of this level crossing. Relevant objections There have been six objections to the proposed closure of this level crossing. The objectors are: OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/28 (Cllr Alaric Pugh on behalf of St Edmundsbury Borough Council); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/36 (E Suggett on behalf of the Ramblers Association); OBJ/39 (Robin Leeks); OBJ/43 (P Reeve on behalf of Great Barton Parish Council). Nature of the objections The majority of objections object to the closure of this crossing before construction of a new footbridge, which is subject to negotiation and the future grant of planning permission for a local housing development. Network Rail addresses the need to close the crossing and safety issues at level crossings earlier in this Statement of Case. Network Rail is satisfied that its proposed diversionary route is a convenient and suitable replacement for existing users, and considers that closure of this crossing should not be made dependent on the bringing forward of a footbridge as part of a potential application for planning permission by a third party. Network Rail will continue to liaise with local authorities and local developers on future schemes as they develop. OBJ/28, OBJ/ 29 and OBJ/43 object to the closure particularly in the light of access for residents of a proposed development. An aspect of Network Rail managing the risk associated with the potential increase in users of the footpath network is to direct users to a grade separated crossing of the railway. Were the development to proceed without closure of this crossing, usage, and hence risk, at the level crossing would be expected to increase. OBJ/36 also objects to the adequacy of the alternative route. OBJ/39 objects to the diversion of pedestrians and cyclists onto the public road. Network Rail considers that the alternative route is suitable and convenient, and much of it is segregated from motor vehicles. Network Rail will continue to engage with the relevant stakeholders to mitigate any highway safety issues. Page 93 of 23

94 S27 Barrell s Location This footpath crossing is located in Thurston Parish and has a post code IP3 3RJ. It is on the Cambridge to Ipswich railway line (CCH), 33 miles 6 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 02, 03, 04, 05, 06, 09, 0,, 2, 4, 8, 9 and 20 (b) Powers Limited to Extinguishment of Rights: 07 all in the parish of Thurston. Nature of level crossing This footpath level crossing has stiles in the railway boundary fence (FPS). Owing to the railway being is a small cutting there is a flight of steps on either side of the railway to get down to the level crossing. It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded at the crossing, one of whom was recorded as elderly and the remainder were recorded as adults. Rights affected There are no private rights of way at this level crossing. The public footpath over the crossing would be extinguished. Page 94 of 23

95 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. FP05 Thurston to the north of the railway (approximately 200m in length) and south of the railway (approximately 00m in length) would be extinguished. To the north of the railway, users heading west would be diverted along Barrell s Road where they would use the verge. Barrell s Road, which is lightly trafficked, crosses over the railway by means of a bridge, approximately 360m west of Barrell s level crossing. Users heading east would be diverted briefly along Barrell s Road and then south along a new 2m wide unsurfaced public footpath. A new footbridge (6m span) would be provided over a ditch that runs parallel to Barrell s Road. Users would then turn east along another new.5m wide unsurfaced footpath which runs parallel to and adjacent to the railway and joins existing FP Thurston, which in turn joins an existing carriageway which crosses over the railway at an existing bridge approximately 670m east of Barrell s level crossing. Pedestrian users would utilise the carriageway. The total length of new footpath to the north of the railway would be approximately 400m. South of the railway, users heading west would follow Birds Road and head north along Barrell s Road, crossing the railway at the existing Barrell s Road bridge. Users heading east would be diverted along existing FP Thurston and then make use of the proposed new footpath forming part of the proposed work for S28 Grove Farm. If users are travelling to/from the intersection between FP05 Barrell s Road from/to the intersection between Bird s Road and FO05 the Barrell s Road bridge diversion would add approximately 950m to the route. If users are traveling to/from the intersection between Bird s Road and FP05 from/to the eastern end of FP05, the diversion over the road bridge to the east of Grove Farm level crossing would add approximately 230m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are (in conjunction with S28 Grove Farm) are: 02, 04, 08, 09, 6 and 7 Relevant objections There have been six objections to the proposed closure of this level crossing. The objectors are: OBJ/8 (Alan / Linda Noble); OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/36 (E Suggett on behalf of the Ramblers Association); and OBJ/48 (Mr/Mrs P Brace); OBJ/52 (BNP Paribas on behalf of Royal Mail Group) Page 95 of 23

96 Nature of the objections OBJ/23 and OBJ/29 object to the diversion of pedestrians onto the public highway. An objective Road Safety Audit has identified no safety issues with the proposed diversion to the road and Network Rail considers that the proposed alternative route is suitable and convenient. Page 3 of the Design Guide (NR2) describes proposed improvements to road markings and verges. Network Rail will continue to engage with Suffolk County Council noting any diversion must be completed to the reasonable satisfaction of the local highway authority. OBJ/36 objects to a loss of amenity to walkers. Network Rail considers that the alternative route is suitable and convenient. OBJ/48 objects to a loss of security and privacy as a result of the diverted right of way. Network Rail considers that the alternative route is required, suitable and convenient but will continue to engage with affected stakeholders to discuss their concerns. OBJ/8 raise concerns about the temporary stopping up of the highway and access to their property. The Royal Mail Group (OBJ/52) has concerns about the temporary stopping up of Barrell s Road. Network Rail will engage with Royal Mail and other objectors to discuss their concerns. It will be necessary to have traffic control in place while the verges are cut back and white lining takes place. Whilst this will restrict traffic flows it will not close the road completely. OBJ/23 raises concerns on adequacy of consultation with landowners. Consultation has been conducted appropriately taking feedback into consideration and complying with the legislative requirements of the 2006 Rules. Network Rail will continue to engage with affected landowners to discuss their concerns. Representations and letters of support SUPP/2 (Stephen Rogers) supports the closure of FP005 Thurston from points P023 to P024 in favour of the new right of way from points P034 to P035. He contends would reduce use of the new right of way along the railway embankment, thereby limiting disturbance to habitats. Page 96 of 23

97 S28 Grove Farm Location This footpath crossing is located in Thurston Parish and has a post code IP3 3SF. It is on the Cambridge to Ipswich railway line (CCH) 33 miles 70 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 2 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 4, 5, 6, 7 (b) Powers Limited to Extinguishment of Rights: 08 all in the parish of Thurston. Nature of level crossing This footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24:00. 3 users were recorded, all of whom were adult pedestrians. Rights affected There are no private rights of way at this crossing. Public rights of way over the crossing would be extinguished. Page 97 of 23

98 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. To the north of the railway, users heading both west and east would use the proposed new footpath and diversion routes forming part of the proposed works for S27 Barrell s described above. On the south side of the railway users heading east would be diverted along a new 2m wide unsurfaced public footpath parallel to and adjacent to the railway. The new footpath would be approximately 480m in length and would join an existing highway at its eastern end. Users would cross the railway using the existing highway bridge. If users are travelling to/from the intersection between FP05 and Barrell s Road from/to the intersection between Bird s Road and FP05 the Barrel s Road bridge diversion would add approximately 950m to the route. If users are traveling to/from the intersection between Bird s Road and FP05 from/to the eastern end of FP05, the diversion over the road bridge to the east of Grove Farm level crossing would add approximately 230m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are (in conjunction with S27 Barrell s) are: 02, 04, 08, 09, 6 and 7 Relevant objections There have been three objections to the proposed closure of this level crossing: OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/36 (E Suggett on behalf of the Ramblers Association); and OBJ/48 (Mr/Mrs P Brace) Page 98 of 23

99 Nature of the objections OBJ/36 objects to a loss of amenity to walkers and is concerned that the new proposed footpath will not be created. The alternative routes must be constructed and completed to the reasonable satisfaction of the local highway authority before closure of the level crossing under the Order. OBJ/23 objects to the diversion of pedestrians to walk alongside the highway. An objective Road Safety Audit has identified no safety issues with the proposed diversion to the road and Network Rail considers that the alternative route is suitable and convenient. OBJ/48 objects to a loss of security and privacy as a result of the diverted right of way. Network Rail considers that the alternative route is required, suitable and convenient but will continue to engage with affected stakeholders to discuss their concerns. OBJ/23 raises concerns on adequacy of consultation with landowners. Consultation has been conducted appropriately taking feedback into consideration and complying with the legislative requirements of the 2006 Rules. Network Rail will continue to engage with the landowners to discuss their concerns. Page 99 of 23

100 S29 Hawk End Lane Location This footpath crossing is located in Elmswell Parish and has a post code IP30 9ED. It is on the Cambridge to Ipswich railway line (CCH) 37 miles 0 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 3 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 0, 04, 05, 06, 08, and 2 (b) Powers Limited to Rights: 3 (c) Powers Limited to Extinguishment of Rights: 07 all in the parish of Elmswell. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. As the railway is in a slight cutting, there are steps to reach rail level. The level crossing has an ALCRM score of C6. As the level crossing is currently closed under a Temporary Traffic Regulation Order, owing to the ongoing development of the land to the north of the railway, it has not been possible to undertake a census of usage. However, in 205, before the closure was implemented, a 7 day census was undertaken by Arup on behalf of Harrow Estates plc. This concluded that Hawk End Lane level crossing was on average used by 2 people daily, although this included at least 4 uses by railway workers over that period. Page 00 of 23

101 Rights affected There are no private rights of way over this crossing. The public footpath over the crossing would be extinguished. Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. South of the railway, approximately 30m of FP2 Elmswell between the railway and Hawk End Lane would be extinguished. North of the railway, a new 2m wide unsurfaced public footpath parallel with and adjacent to the railway, between the level crossing and Hall Farm would be created. This would join to FP3 Elmswell by way of steps. FP3 crosses the railway by means of an underbridge, which also carries private vehicle rights. The total length of new footpath would be approximately 430m. After crossing the railway, users heading east would be diverted along FP3 Elmswell, Hawk End and Station Road. Station Road crosses the railway at Elmswell level crossing, a CCTV protected level crossing with an ALCRM score of G4, approximately 270m east of Hawk End Lane level crossing. The maximum diversion for a user from the north side of the railway to the south adds approximately 860m to their journey. However, there should be no significant additional distance for those north of the railway heading west towards the wider network of PRoWs, and current and additional linkages between the new housing estate and the public roads east of the development will provide a more direct route to the amenities on Station Road. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 0, 04, 05 and 06 Page 0 of 23

102 Specific considerations The development of the Grampian Harris bacon factory site (situated to the north of the railway) for housing has the potential to significantly increase usage of the level crossing were it to remain open. Whilst little used when last open, the presence of housing and improved accessibility north of the railway would be likely to make the crossing an attractive route to the local supermarket and for circular walks. Discussions with the Parish council concerning the likely increased risk resulting from the development identified diversion to the Parnell Lane underbridge (the current proposal) as the preferred solution. Relevant objections There have been two objections to the proposed closure of this level crossing: OBJ/36 (E Suggett on behalf of the Ramblers Association) and OBJ/53 (C J Hewett on behalf of Taylor Wimpey). Nature of the objections OBJ/36 object to the closure, particularly in the light of the crossing providing a means of access for residents of a proposed development. An aspect of Network Rail managing the risk associated with the potential increase in users is to divert users of the passive level crossing either to a grade separated crossing (Parnell Lane), or a CCTV controlled level crossing (Elmswell, ALCRM score G4). Network Rail is satisfied that its proposed diversionary routes are a convenient and suitable replacement, and also provide superior access to the countryside for those heading west. OBJ/53 objects that they did not correctly receive notice. Network Rail complied with the relevant legislative requirements of the 2006 Rules in relation to giving notice of the application and objection period. OBJ/53 also request further information. Network Rail will engage further with the landowner and seek to provide the information requested. Page 02 of 23

103 S30 Lords No 29 Location This footpath crossing is located in Elmswell Parish and has a post code IP30 9UD. It is on the Cambridge to Ipswich railway line (CCH) 37 miles 58 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 4 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 4, 7, 8, 26, 27, 28, 29, 3, 32, 33 and 34 (b) Powers Limited to Rights: 5, 6, 9, 20, 2, 22, 23, 24 and 25 (c) Powers Limited to Extinguishment of Rights: 30 all in the parish of Elmswell Nature of level crossing This footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom four were accompanied children, one was an unaccompanied child and the remainder were adults. Rights affected There are no private rights of way over this crossing Public rights of way over the crossing would be extinguished. Page 03 of 23

104 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. Users would be diverted along two new 2m wide unsurfaced public footpaths running parallel with and adjacent to the railway, one on the north side and one on the south side. Both footpaths would run eastwards from existing FP25 which crosses over the railway with a footbridge, approximately 230m to the west of Lords No. 29 level crossing. The new footpaths would each be approximately 230m long, and join existing FP09 which runs perpendicular to the railway at Lords No. 29. No additional length would be added to the route as a result of the diversion. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 7 and 8 Relevant objections There are no objections to the closure of this level crossing. Page 04 of 23

105 S3 Mutton Hall Location This footpath crossing is located in Wetherden Parish and has a post code IP4 3LS. It is on the Cambridge to Ipswich railway line (CCH) 38 miles 53 chains from Cambridge. Where it can be found on deposited plans It is shown on Sheet 5 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 02, 03, 04, 05, 06, 07, 08 and 09 (b) Powers Limited to Extinguishment of Rights: 0 all in the parish of Wetherden. Nature of level crossing This footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 75mph. The level crossing has an ALCRM score of C6. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom two were accompanied children, two were impaired and the remainder were unimpaired adults. Rights affected There are no private rights of way over this crossing. Public rights of way over the crossing would be extinguished. Page 05 of 23

106 Order proposals The Order would confer powers to close the level crossing to all users and extinguish the public rights of way over the crossing. To the north of the railway, users would be diverted along existing FP36 Wetherden and FP20 Wetherden, which join the unnamed road to the east of the level crossing. Uses would head south along the carriageway and cross over the railway using the existing road bridge, approximately 20m east of Mutton Hall level crossing. To the south of the railway, users would be diverted along a new 2m wide unsurfaced public footpath in the field margin which would run parallel with and adjacent to the railway, joining the existing carriageway at its eastern end. The new footpath would be approximately 200m long. If travelling between FP36 and FP35 either side of Mutton Hall level crossing the diversion would add 50m to the journey. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 02 Relevant objections There have been four objections to the proposed closure of this level crossing. The objectors are: OBJ/7 (Roger Wolfe); OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/36 (E Suggett on behalf of the Ramblers Association). Nature of the objections All objectors are concerned that the proposed diversion to the road bridge is unsafe for pedestrians. Page 3 of the Design Guide (NR2) describes proposed improvements to road markings and verges. Network Rail considers that, once these improvements have been implemented, the alternative route will be suitable and convenient. Network Rail will continue to engage with the relevant stakeholders to mitigate any highway safety issues, noting that any diversion must be constructed and completed to the reasonable satisfaction of the local highway authority. The Ramblers (OBJ/36) object to the need to close the crossing, Network Rail addresses the need to close the crossing and safety issues at level crossings earlier in this Statement of Case. Page 06 of 23

107 S69 Bacton Location This footpath crossing is located in Bacton Parish and has a post code IP4 4NS. It is on the Liverpool Street to Norwich via Ipswich railway line (LTN) 86 miles 6 chains from Liverpool Street. Where it can be found on deposited plans It is shown on Sheets 20 and 2 of the deposited plans Affected land The parcels of land affected are as follows (a) Powers Limited to Temporary Use of Land: 7, 8, 9, 20, 2, 22, 24, 25, 27, 28, 29, 30, 3, 32, 33, 34, 35, 36, 37, 38 and 39 (b) Powers Limited to Extinguishment of Rights: 26 all in the parish of Bacton. Nature of level crossing The footpath level crossing has stiles in the railway boundary fence (FPS). It is a passive level crossing where the user is instructed to stop, look and listen: beware of trains, and must make their own decision whether it is safe to cross. The railway at this crossing comprises two lines of rails and carries passengers and freight with a line speed of up to 00mph. The level crossing has an ALCRM score of C8. A 9 day camera census was undertaken between 25 June 206 and 03 July 206 with survey hours 00:00 to 24: pedestrian users were recorded, of whom 22 were unaccompanied children and five were adults. Rights affected There are no private rights over this crossing. Public rights of way over the crossing would be extinguished. Page 07 of 23

108 Order proposals The Order would confer powers to close the level crossing to all users and extinguish public rights of way over the crossing. The existing right of way to the west of the level crossing FP3 Bacton (approximately 90m in length) would be extinguished. Users on the east of the railway would be diverted to the existing underbridge on Pound Hill, via the B3 Broad Road (along the verge). After crossing the railway, they would then be diverted along Birch Avenue (existing footway) and connect to existing FP4 Bacton via an existing track and the addition of a new 2m wide public footpath (approximately 225m in length) and proposed wooden bridge (less than 5m in length) over the existing ditch. Alternatively, users on the east of S69 Bacton level crossing would be diverted along a new 2m wide unsurfaced public footpath (approximately 650m in length) running down the east side of the railway to connect to S3 Fords Green. If users are travelling to/from the intersection of FP3 and Broad Road from/to the intersection between Birch Road and FP3 the diversion would add approximately 450m to the route. Land permanently affected by the proposals The parcels of land affected by the proposed diversion and associated works are: 0,, 4, 5, 7, 8, 9, 32, 33, 34 and 35 Specific considerations This level crossing is located close to youth football pitches. Anecdotal evidence suggests that it is the entry point of trespass onto the railway to retrieve stray balls. Relevant objections There have been 9 objections to the proposed closure of this level crossing. OBJ/5 (Martin Feaveryear on behalf of Bacton Untied 89 FC); OBJ/23 (Barry Hall on behalf of Suffolk Local Access Forum); OBJ/24 (Karen Hall-Price on behalf of Bacton Parish Council); OBJ/25 (Ben Crossman on behalf of Orwell Settlement Trustees); OBJ/26 (E, M and P Baker); OBJ/29 (G Dobson on behalf of Suffolk County Council); OBJ/36 (E Suggett on behalf of the Ramblers Association); OBJ/37 (Colin/ Judith Hull); OBJ/40 (S Gooderham as executor for John Creasey). Page 08 of 23

109 Nature of the objections OBJ/5 object to their property being used as a means of access to the proposed works. Network Rail will continue to engage with affected landowners to seek to address their concerns. OBJ/23 OBJ/24, OBJ/29, OBJ/40 object to the diversion of pedestrians onto the public highway. OBJ/40 also supports the creation of the new footpath on the basis that it will provide an important new pedestrian link between residents and amenities. Network Rail considers that the proposed route, once upgraded as proposed, will be suitable and convenient. Page 32 of the Design Guide (NR2) describes the proposed improvements to the highway verge. Network Rail will continue to engage with the relevant stakeholders to mitigate any highway safety issues, noting that any diversion must be constructed and completed to the reasonable satisfaction of the highway authority. OBJ/26 and OBJ/37 object to the use of their property for the alternative footpath. Network Rail considers that the alternative footpath is required, suitable and convenient and will continue to engage with affected landowners to discuss their concerns. OBJ/36 and OBJ/40 objects to the loss of amenity. Network Rail considers that the alternative route provided is suitable and convenient. Representations and letters of support OBJ/40 is supportive of the creation of a footpath between points P070, P07, P072 and P073 shown on Sheet 2. Page 09 of 23

110 Conclusion 79. Network Rail recognises that the Suffolk Level Crossing Reduction proposals will have an impact on adjacent properties, local communities and those that use the level crossings affected by them. 80. It is Network Rail s considered view that its proposals are sensitive to the needs of the various stakeholders concerned and that, where alternative routes are provided, they are suitably accessible, safe, and convenient. 8. Network Rail has taken on board comments from third party landowners and, as the proposals have developed, diversionary routes have been amended to reduce impacts on interested parties. 82. Network Rail considers that the any adverse impacts found to exist from the closures are demonstrably outweighed by the substantial public and railway benefits that the Scheme will bring. Page 0 of 23

111 Appendix A: List of Core Documents NR0 Application NR02 Draft NR03 Explanatory Memorandum NR04 Statement of Aims NR05 Statement of Consultation NR06 Funding Statement NR07 Estimate of Costs NR08 Order plans and sections NR09 Book of Reference NR0 Planning Statement, which provides a description of the scope and purpose of the Application in relation to relevant legislative requirements, and planning policy NR Screening Decision Letter, which confirms that under the EIA Regulations the scheme has been deemed as having no significant impact on the environment and therefore does not require an Environmental Statement NR2 Design Guide which outlines the design proposal principles and components, including drawings for each level crossing NR3 Management of Health and Safety at Work Regulations 999 (tab ) NR4 ORR: Strategy for regulation of health and safety risks 4: Level crossings (tab 2) NR5 ORR: Periodic Review 203: Final determination of Network Rail s output funding for Extracts relevant to level crossings the entire document is available at regulation/regulation-of-network-rail/price-controls/periodic-review- 203/pr3-publications/final-determination (tab 3) NR6 Road Safety Audits for Suffolk (tab 4) NR7 Transforming Level Crossings (tab 5) NR8 Client Requirements Document Anglia CP5 Level Crossing Reduction Strategy (tab 6) Page of 23

112 NR9 CP5 Level Crossing Risk Reduction Fund Criteria, Governance and Reporting (tab 7) NR20 Network Rail Standard NR/L/XNG/00: Level crossing asset management policy (tab 8) NR2 Network Rail Standard NR/L2/SIG/9608: Level crossing asset inspection and implementation of minimum actions codes (tab 9) NR22 Network Rail Operations Manual NR_L3_OCS_04_5-6: Risk Assessing Level Crossings (tab 0) NR23 Network Rail Level Crossing Guidance 0: Completion of Site Visit and Census Forms (tab ) NR24 Anglia Route Study (March 206) (tab 2) NR25 Censuses of Suffolk sites (tab 3) NR26 Network Rail Statement of Case (this document) Page 2 of 23

113 Appendix B: Locations where Core Documents may be Inspected Prior to the Public Inquiry In accordance with Rule 7 of the Transport and Works (Inquiries Procedures) Rules 2004, a copy of every document or the relevant part of any document which Network Rail intends to refer to or put in evidence, together with a copy of every Statement of Case served by every other party and of every document served with them (once received and copied by Network Rail) may be inspected free of charge and, where practicable and subject to the payment of a reasonable charge, copied, at the following locations at the following times: Location Days Times Mondays 9:30am 2.30pm Broomhill Library Tuesdays to Thursdays 9:30am 5pm Sherrington Road Fridays 9:30am 6:30pm Ipswich Saturdays 0am 5pm IP 4HT Sundays am 4pm Co-op Supermarket Riverside Avenue East Manningtree CO US Mondays to Saturdays Sundays 7am 9pm 0am 4pm Mondays Closed Capel St. Mary Library Village Hall The Street Capel St Mary IP9 2EP Chantry Library Hawthorn Drive Ipswich IP2 0QY Elmswell Library Memorial Library Cooks Road Elmswell IP30 9BX Tuesdays Wednesdays and Thursdays Fridays Saturdays Sundays Mondays Tuesdays Wednesdays Thursdays Fridays Saturdays Sundays Mondays Tuesdays Wednesdays and Fridays Thursdays Saturdays Sundays 9:30am 2:30pm & 2pm 5:30pm 9:30am 2:30pm 2pm 5pm & 5:30pm 7:30pm 9am 3pm 0am 3pm 2pm 5pm 0am pm & 2pm 6pm 0am pm 0am pm & 2pm 6pm 0am pm & 2pm 5pm 9:30am pm & 2pm 5pm 0am 4pm Closed 0am pm & 2pm 7pm 2pm 5pm 0am pm & 2pm 7pm 0am pm 0am 3pm Page 3 of 23

114 Location Days Times Lamberts Service Station Mondays to Fridays 8:30am 5pm Shop Green Saturdays 8:30am 2:30pm Bacton Stowmarket IP4 4LG Sundays Closed Mondays Closed Tuesdays 9:30am pm Eye Library 9:30am pm & Wednesdays Buckshorn Lane 2pm 5:30pm Eye Thursdays 2pm 5:30pm IP23 7AZ Fridays 9:30am pm & 2pm 7pm Saturdays 9:30am pm Sundays 0am 3pm Mondays Closed Tuesdays 0am 3pm Needham Market Library 2pm 5pm & Wednesdays School Street 5:30pm 7:30pm Needham Market Thursdays 0am pm & 2pm 5pm IP6 8BB Fridays 2pm 5pm Saturdays 0am 5pm Sundays am 4pm Thurston Library Mondays Closed Thurston Community Tuesdays 3pm 7pm College Wednesdays and Fridays 0am pm Thurston Thursdays 2pm 6pm Bury St Edmunds IP3 3PB Saturdays and Sundays 0am 3pm Barrow Post Office Mondays to Fridays 8:30am 5pm Church Rd Saturdays 9am pm Bury St Edmunds IP29 5AX Sundays Closed Copies of all documents are also available to view and download at Page 4 of 23

115 Appendix C: Level Crossing Equipment Gates 83. Gates at level crossings may be for pedestrians, equestrians, or vehicles. They should be spring-loaded, gravity closed or may have catches to keep them closed. Some gates are operated by crossing keepers and are designed to fence the railway when open to road vehicles, but the majority of gates open away from the railway. Stiles 84. Stiles are commonly used at footpath level crossings to enable a user to cross the fence that marks the railway boundary. Kissing gates may also be provided. Decks 85. Decks are usually provided at crossings. They should feature a non-slip surface, although some are older timber types. Some are marked with blue edge lights to aid users during darkness. Signage 86. Signage depends on the crossing type, whether a public road, footpath, private right of way etc. The minimum signage at a footpath level crossing is a white sign with a red edge stating Stop Look Listen, Beware of Trains. Signs instruct the safe method of use, warn against trespassing on the railway and the specific dangers from electrification, or advise that a level crossing does not carry public rights. Signage to deter suicide is also commonly displayed. Whistle boards 87. Where there is insufficient sighting of approaching trains due to curvature of the line or a lineside structure for example, whistle boards are often provided. These are only effective at distances up to 400m from the crossing they are protecting. 88. There are sometimes complaints about train horn noise from neighbours. Network Rail considers that it is within its statutory powers to operate the railway with whistle boards, but our long-term strategy is to remove them, replacing them with novel warning systems. 89. The effectiveness of this form of protection is limited if the user of a crossing is wearing headphones and/or suffering from hearing loss. The sound is also susceptible to background noise, or being obscured by the noise of another passing train. Page 5 of 23

116 90. As the horn is manually operated by the train driver, there is always the possibility that, on occasion, a train may not sound its horn when necessary. 9. In 2007, as a result of significant neighbour and political concern after newer trains were fitted with louder horns, a Night Time Quiet Period (NTQP) was introduced. During this period, , trains did not sound their horn on approach to whistle-board protected crossings. In the same change, train drivers were instructed only to use the low tone horn rather than the traditional two tones. In 206, the NTQP was reduced to enable greater protection for users. It now applies between 2359 and Whilst noise impact on neighbours is reduced by the NTQP, it of course leaves these level crossings with less warning of approaching trains early in the morning and late at night, both times at which people may, for example, be going running or taking their dogs for a walk. Public rights of way are open 24 hours a day. Supplementary Audible Warning System (SAWD) 92. Whistle board crossings may be enhanced by the Covtec SAWD system. This is a radar-activated device that sounds a horn located at the level crossing. The horn s proximity to the user means the volume can be lower, reducing the impact on surrounding residents. However, the device does not have an established Safety Integrity Level so although a useful device to help a user decide whether it is safe to cross, Covtec can only be used to supplement whistle boards rather than replace them. Telephones 93. These are provided to allow communication between users of level crossings and the signaller. They are found in the following situations: 93.. User-worked vehicular crossings where the crossing time greater than the sighting time, where there are long or slow-moving vehicles, where animal are herded over the crossing or where there is a risk of grounding Public bridleway (and rarely footpath) crossings where the sighting time is inadequate Public road half barrier or full barrier crossings for the use of drivers of large or slow vehicles, or in emergency. 94. The use of telephones can create a workload and ergonomics issue for signallers at busy times. If a signaller is unable to answer a call owing to other demands on their time, this may lead to user frustration, and possibly crossing misuse. Page 6 of 23

117 95. On some lines, the signaller does not know exactly where a train is located. 24 This can lead to a signaller requesting users wait a significant length of time, as the only information they can give is that it will be safe once the train has passed. 96. If a signaller requests users to call back after crossing, and they fail to do so or cannot get through, this will be recorded as deliberate misuse and trains will be cautioned before they are allowed to proceed at line speed across the crossing in question. 97. Signallers have, on occasion, mistakenly given users permission to cross in front of a train. For this reason, it is important to consider the overall operational risk created by installing telephones, not just the local benefits at a particular crossing. Miniature Stop Lights (MSLs) 98. These lights display a green light when it is safe to cross the railway and a red light when it is not. There may also be an audible warning. 99. They may be installed at level crossings where sighting is insufficient, or as a measure to reduce the risk at crossings with sufficient sighting. They can also be installed to reduce the number of telephone calls to signalboxes The lights are triggered by approaching trains, and are linked to the signalling system. They are therefore an expensive item to install and maintain. 20. The warning time can be adjusted depending on the likely usage of the crossing. Too short a warning time could lead to a collision; too long a time could drive poor user behaviour There have been several fatalities at MSL-protected crossings in Anglia route. These include Elsenham, Black Horse Drove, Johnson s, Cannon s Mill Lane, and Motts Lane. Overlay MSLs 203. This is a cheaper system of MSLs that is not integrated with the signalling system. Two models are used on the mainline (Ebigate200 and VaMoS). The system may be always on or activated by the user pressing a button, e.g. where the power supply is from a local renewable source. A telephone will be provided should the system not display any lights. 24 For example, the Marks Tey to Sudbury branch operates a one train on line policy; there are no track circuits to show the signaller the train s progress. Page 7 of 23

118 Spoken Warnings 204. At some level crossings, a movement-activated spoken warning device has been installed to raise awareness of safety issues at level crossings Spoken warnings may also be added to AHB crossings. For example, Waterbeach level crossing has a spoken warning announcing that a second train is approaching. Page 8 of 23

119 Appendix D: Level Crossing Renewal and Enhancement Costs Network Rail CP6 cost model (extract): Work Type Description of work Cost Additional protection for user operated crossing Convert FP(any) to FP(any)-MSL Convert FP(any) to FP(any)-OMSL Convert MCB to ABCL+ Safety upgrade by addition of dependable audible train approaching system for user operated crossing New MSL system for existing FP of any type for non-motorised use, inc. train detection and new interface in control centre New OMSL system for existing FP of any type for non-motorised use, inc. train detection and new interface in control centre Convert MCB-any to ABCL+ by replacing protecting signals with DCIs and adding extra protection equipment TBD inc. barrier skirts, red standing men, barrier protection etc. as required mainly intended for MCB-TCOs 40, , , , Convert MCB to MCB- CCTV Convert MCB to MCB- OD New CCTV system for existing MCB inc. new interface in control centre 356, New OD system for existing MCB inc. new interface in control centre 320, Convert MCB-CCTV to MCB-OD Convert user operated crossing to xxx(t) New OD system for existing MCB-CCTV, recover CCTV system inc. new interface in control centre New telephone system for existing FP or UWC inc. new interface in control centre 420, , Convert UWC to UWC(P) New power operated gates system for any existing UWC 50, Convert UWC(any) to UWC(any)-MSL Convert UWC(any) to UWC(any)-OMSL Supplementary protection for user operated crossing Recontrol crossing telephones Automatic Half Barrier Automatic Half Barrier with additional protection Automatic Open Crossing (Locally) Monitored New MSL system for existing UWC of any type for vehicle use, inc. train detection and new interface in control centre New OMSL system for existing UWC of any type for vehicle use, inc. train detection and new interface in control centre Safety upgrade by addition of supplementary audible train approaching system for user operated crossing E.G. Covtec New interface in control centre for telephones for crossing. Use when crossing with only telephones is recontrolled or new interface in control centre Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, barriers, barrier control system, barrier machines, road traffic lights, road markings, road surface between 'stop' lines, along with alarm transmission and terminal equipment at control centre Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, barriers, barrier control system, barrier machines, road traffic lights, road markings, road surface between 'stop' lines, along with alarm transmission and terminal equipment at control centre, plus additional protection equipment TBD inc. barrier skirts, red standing men, active signs, etc. Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, control system, road traffic lights, road markings, road surface between 'stop' lines. 452, , , ,544.00,433,705.07,623,900.00,337, Page 9 of 23

120 Work Type Description of work Cost Footpath or Bridleway Bridleway with Telephone Footpath or Bridleway with Miniature Stop Lights Footpath or Bridleway with Overlay Miniature Stop Lights Manually Controlled Barrier with CCTV Controlled Barrier with Obstacle Detection Manually Controlled Barrier User Worked Crossing (UWC) User Worked Crossing with telephone (UWCT) User Worked Crossing with Miniature Stop Lights (UWCM) User Worked Crossing with Overlay Miniature Stop Lights Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, road markings, crossing surface between railway boundaries, 'stop' lines Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, road markings, crossing surface between railway boundaries, 'stop' lines, telephone Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, surface markings, approach surfaces between railway boundaries along with user warning lights, signs and train detection equipment Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, surface markings, approach surfaces between railway boundaries along with user warning lights, signs and train detection equipment Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, barriers, barrier control system, barrier skirts, barrier machines, road traffic lights, road markings, road surface between 'stop' lines, along with CCTV cameras, camera column, floodlights, CCTV transmission, CCTV monitor and control equipment, [protecting signals excluded] Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, barriers, barrier control system, barrier skirts, barrier machines, road traffic lights, road markings, road surface between 'stop' lines, along with obstacle detection RADAR/LIDAR equipment and associated control equipment. [protecting signals excluded] Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, equipment protection barriers as required, cattle-cumtrespass guards, signs, barriers, barrier control system, barrier skirts, barrier machines, road traffic lights, road markings, road surface between 'stop' lines. [protecting signals excluded] Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, road markings, road surface between 'stop' lines Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, road markings, road surface between 'stop' lines, telephone Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, road markings, road surface between 'stop' lines along with user warning lights, signs and train detection equipment Renewal of all parts of the crossing including deck, fencing 0 metres each corner of crossing, cattle-cum-trespass guards, signs, gates and gate posts inc. latching mechanism, lights, surface markings, approach surfaces between railway boundaries along with user warning lights, signs and train detection equipment 89, , , ,000.00,843, ,008,985.74,294, , , , , External renewal for AHB Renew barriers, barrier machines, road traffic lights,340, External renewal for AHB+ Renew barriers, barrier machines, road traffic lights, plus existing additional protection equipment e.g. barrier skirts, red standing men, etc.,503, External CCTV renewal for MCB- Renew CCTV cameras, camera column, floodlights, CCTV transmission 332, Page 20 of 23

121 Work Type Description of work Cost CCTV External renewal for FP(any) External renewal for FP(L) Renew gates + fencing 0 metres each corner of crossing & between railway boundaries inc. style replacement Renew locking gates + fencing 0 metres each corner of crossing & between railway boundaries, exc. any MSL equipment 20, , External renewal for MCB-any exc CCTV/OD equipment Renew barriers, barrier skirts, barrier machines, road traffic lights 209, External renewal for (any)-msl External renewal for (any)-omsl External renewal for UWC(x/T) exc MSL External renewal for UWC(P) exc MSL Non-motorised approach surfaces for FP(any) Vehicle approach surfaces for UWC(any) Renew MSL external equipment only (otherwise use SU-any+MSL WT for full MSL system renewal) Renew OMSL external equipment only (otherwise use +OMSL WT for full OMSL system renewal) Renew gates + fencing 0 metres each corner of crossing & between railway boundaries. Can be used where MSL is present, but excludes MSL equipment (Use X-MSL) Renew power operated gates/barrier system (non-interlocked) + fencing 0 metres each corner of crossing & between railway boundaries. Can be used where MSL is present. New approach surfaces for non-motorised traffic e.g. steps/ramps on both sides of crossing, inc. high grip surface, flangeway filler if required New approach surfaces for vehicles e.g. hard standing 'take-off and landing' areas at User Worked Vehicle Crossings inc. high grip surface, flangeway filler if required, enabling works - excavations/filling to alter crossing profile 49, , , , , , Equipment protection crash barriers New vehicle protection barriers to protect equipment where risk identified 7, Deck, Approaches and Lineside - renew fixed assets Renew all passive assets at crossing inc. fencing 0 metres each corner of crossing & between railway boundaries, equipment protection barriers as required, decking, approach surfaces, signage, furniture, access gates; clear vegetation [needs different sizes OR remove deck] 62, Deck - large New deck for large vehicular crossing (e.g. skew crossing) 5, Deck - medium New deck for medium vehicular crossing (e.g. typical crossing) 5, Deck - small New deck for small vehicular crossing (e.g. UWC / minor road) 58, Deck - non motorised traffic New deck for foot or bridleway crossing 37, Fencing Renew fencing 0 metres each corner of crossing; MW 5, Additional signals associated with manually controlled crossings 4x signals to protect a manually controlled crossing, as add on to any MCBcrossing if required 70, Video recording equipment fitment Standalone video system for recording/reviewing near misses 85, OMSL (Overlay Miniature Stop Lights) is Vamos or Ebigate. Note that technological developments may lead to some of the costs above reducing in future. Page 2 of 23

122 Appendix E: Maintenance Costs Real world maintenance costs from the Route Level Crossing Manager (Great Eastern): A footpath deck costs approx to renew, a bridleway deck approx. 6000, and a road crossing deck approx. 0,000. We have estimated the cost to remove and reinstate a crossing (e.g. to allow tamping) to be around 5000 on average, including Traffic Regulation Order costs. Gates/stiles: 2000 per 5 years to maintain/renew. Risk assessments: time taken to visit, inspect and risk assess each crossing: around 000 per year. Page 22 of 23

123 Appendix F: Design Guide Drawings Extracts from the Design Guide (document NR2) follow this page. (Note that the following pages do not continue the page numbering.) Page 23 of 23

124 B R O O K L A N D S R O A D B ridleway 05, Brantham Route of the restricted byway on the ground (shown here) differs from the Defintive Map. Adjustment is not required as part of these proposals Proposed fencing along new footpath:type F4 Se wage W orks Tanks Bridleway 0, Brantham Use of existing footbridge SECTION : LEVEL CROSSINGS # Ñ # Ñ Rightstobe m od ifie d aspartof thisproje c t Right snotm od ifie d aspartof thisproje c t The above sym bolsin d ic ate e xisting le ve lc rossing loc ations. The ring c oloursar e aspe rse c tion 4be low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad opte d highway) " " Footpath (public ) G G G Byway ope n toalltraffic (public ) Brid le way (public ) Re stric te d byway (public ) Road /Trac k (private ) The line style sabove illustrate the type of rightof waye xtantorpropose d. The c olourispe rse c tion 4be low. Me m orial W orks Tanks W orks ETL Tank Tank Tanks Tank Restricted Byway 04, Brantham Trac k Proposed fence:type F7 Pa th (um ) Path (um ) Proposed G0 gate Trac k Sluic e Valve Proposed fencing along new footpath: Type F7 ETL Proposed 2m wide in field margin footpath: Type P Proposed timber footbridge: Type S-B Footpath 03, Brantham Proposed footbridge: Type S-B Footpath 02, Brantham Footpath SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailable ^ ^ ^ ^ Mot or ise d O nly Dive rsion Route < < < < Ve rge Available (NoFootway) ( ( ( ( Cariage wayavailable (NoFootway orve rge ) W he re the proposalsm ay d ive rtuse rsontoan ad opte d highway,the above sym bolsd e note whe re afootway isavailable,ave rge only,orif ne ithe rafootway orve rge isavailable and pe d e strianswould ne e d towalk in the c ariage way. SECTION 4: PROPOSED STATUS CHANGE Noc hange and notpart of d ive rsion Use of e xisting rightof way aspartof d ive rsion Change of statustoe xisting rightof way Closure of e xisting rightof way Cre ation of ne w rightof way The above c oloursapplytose c tions,2and 3above. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Fe nc ing!!! (tie intoe xisting) Gate s ú Brid ge s # # # # Footway Future d e ve lopm e ntsbythird Partyproje c tswhe re planning d e tailsare available Railway S0 - Sea Wall.The layoutshown on thisd rawing isin d ic ative and m aybe subje c tt o c hange atd e taile d d e sign. 2.Thisd rawing should be re ad in c onjunc tion with the Suffolk De sign Guid e (Re f:36756/rpt023)whic h c ontains d e tailsot f he infr astuc r tur e type srf e e re d toin this d rawing. AngliaLe ve lcrossing Re d uc tion Strate gy De sign Fre e ze Proposals W orks Crown c opyrightand d atabase rights207o rd nanc e Surve y Land Thisd ing Stage at amust not be passe d ont oany c ontac r t orsort / hir d part ie sw ithout permission from Ne twor k Rail s O SMap Te am an d / orw ithout yourc ontac r t ors / d uly signe d -up tot he O SFCDCContac r torlic e nc e.se nd ing an d /orsharing of O Sd at at o/with e xt e rnalthir- d part ie ssuc h asne twor k Rail scontac r tor s,the ir d e le gatd e age ntsand / orr e pre se ntive at s,withoutprope rgove rnanc e will putthe Contr ac tor( an d Ne twor k Railbye xte nsion)in bre ac h ot f he O SContac r tor S0 Sea Wall Proposal Private:Noe xisting orpropose d rights Public:Existing footpath rightsre m ove d,use rsd ive rttoad jac e ntbrid ge tonorthe ast Infrastructure:Propose d fe nc ing m axim um 0m atthe le ve lc rossing north sid e of the railway:type F4 Propose d fe nc ing 0m atthe le ve lc rossing south sid e of the railway:type F7 P3A Mar207 Re v Date S0-Se aw al Suffolk -Brantham CP PostCod e CO NL ForInform ation De sc ription W C Dwn SRP EChk SJT Ch'k'd JAS App'd MotMac Donald Ltd. Thisd oc um e ntisissue d forthe partywhic h c om m issione d itand forspe c ific purpose sc onne c te d with the c aptione d proje c tonly.itshould notbe re lie d upon byanyothe rpartyoruse d foranyothe rpurpose. W e ac c e ptnore sponsibility forthe c onse q ue nc e sof thisd oc um e ntbe ing re lie d upon by any othe rparty,orbe ing use d forany othe rpurpose,orc ontaining any e rororom ission whic h isd ue toan e rororom ission in d atasupplie d touse by othe rpartie s Kilom e te rs Sc ale ata3 NTS Drawing No. MMD S0-GEN-005 P:\ Le e d seast \ e r\ n GRIP24-AngliaLe - ve lcrossingsjasgisde. \ \ sign \ De sign Fre e ze Plans04M \ X DsNe \ wform atdfp3suf \ \ f olk \ 36756De sign Fre e ze ProposalPlans-Alt e rnat ive Form atsuf f olk. m xd

125 ETL 4 2 Footpath 045, Tattingstone Pa th (um ) Footpath 00, Bentley SECTION : LEVEL CROSSINGS # Ñ # Ñ Right stb o e m odified a spa rtofthisprojec t Rightsn otm odified a spa rtofthisprojec t The a b ove sym b olsin dic a te existin g levelc rossin g loc a tion s. The rin g c olour sa re a spersec tion 4b elow. SECTION 2: TYPE OF RIGHT OF WAY (exc ludin g a dopted highwa y) " " Footpa th (pub lic ) G G G Bywa y open toa lltra ffic (pub lic ) Bridlewa y (pub lic ) Roa d /Tra c k (priva te) Da m LowerM ea dows Tra c k Bra n tha m Footpath 034, Tattingstone Footpath 007, Brantham Restric ted b ywa y (pub lic ) The lin e stylesa b ove ilustra te the type ofrightofwa yexta n torproposed. The c olourispersec tion 4b elow. ETL Pa th (um ) A37 Proposed new footway: Type P7 SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M otor ised On ly Diversion Rout e < < < < V erge Ava ila b le (NoFootwa y) ( ( ( ( Ca ria gewa yava ila b le (NoFootwa yorv erge) W here the proposa lsm a ydivertuserson toa n a dopted highwa y,the a b ove sym b olsden ote where a footwa y isa va ila b le,a verge on ly,orifn eithera footwa yorverge isa va ila b le a n d pedestria n swould n eed towa lk in the c a ria gewa y. S02 - Brantham High Bridge SECTION 4: PROPOSED STATUS CHANGE Remove existing pedestrian access feature and replace with boundary fence: Type F Pa th (um ) Proposed 2m wide footpath in field margin: Type P Noc ha n ge a n d n otpa rt ofdiversion U se ofexistin g rightofwa y a spa rtofdiversion Cha n ge ofsta tust oexistin g rightofwa y Closure ofexistin g rightofwa y Crea tion ofn ew rightofwa y The a b ove c oloursa pplyt osec tion s,2a n d 3a b ove. SECTION 5: ASSOCIATED INFRASTRUCTURE (In dic a tive fea tur es) Footpath 006, Brantham Cha se Bun ga low Proposed 2m wide footpath over existing track. No improvements La y-b y Use of existing footbridge adjacent to roadbridge THECHASE V ic toria Cota ge RioV ista M e ry W ea ther W ellcota ge Newla n ds Bridge Cota ge Stour V iew House A37 The Forge StreetFa rm W in gfields Am b erley Tudors Street THESTREET Crown c opyrighta n d da ta b a se rights207ordn a n c e Survey Thisda ta must not b e pa ssed on toa n y c on ta rc t orsort / hird pa rt iesw ithout permission from Net work Ra il sos M a ptea m a n d/ orw ithout yourc on ta rc t ors / duly sign ed-uptot he OSFCDCCon ta rc torlic en c e.sen din g a n d/orsha rin g ofosda ta to/with ext ern a lthird-pa rt iessuc h a snet wor k Ra il scon ta rc tor s,their delega ted a gen tsa n d/ orr epresen tives,withoutpropergover a t n a n c e will putthe Con ta rc tor(a n d Net wor k Ra il b yexten sion )in b rea c h ofthe OSCon ta rc tor A37 2 Bridleway 0, Brantham Dodn a sh Cota ge Orc ha rd House Oa k Lea HillFa rm La n dooze In n isfa llen Spin n erslodge Alfresc o Restricted Byway 009, Brantham TCB GP La y-b y BullIn n Rose Cota ge B080 CourtFa rm Gurdon s Proposed footbridge: Type S-B Proposed footpath over existing private road. No improvements S02 Brantham High Bridge Proposal Private:Noexistin g orproposed rights Public:Existin g footpa th rightsrem oved,usersdiverttoa dja c en ta37 footb ridge tothe south via a priva te roa d (The Street) Infrastructur e :Proposed fen c in g tothe westofthe ra ilwa y0m a tthe level c rossin g:type F7 Fen c in g!!! (tie in toexistin g) Ga tes ú Bridges # # # # Footwa y Future developm en tsb ythird Pa rtyprojec tswhere pla n n in g deta ilsa re a va ila b le Ra ilwa y.the la youtshown on thisdra win g isin dic a tive a n d m a yb e sub jec tt o c ha n ge a tdeta iled design. 2.Thisdra win g should b e rea d in c on jun c tion with the Suffolk Design Guide (Ref:36756/RPT023)whic h c on ta in s deta ilsofthe in fra str uc tur e typesrefe red toin thisdra win g. An glia LevelCrossin g Reduc tion Stra tegy Design Freeze Proposa ls S02-Bra n tha m High Bridge Suffolk -Bra n tha m CP PostCode COPL P3A M a r207 ForIn form a tion W C SRP SJT JAS Rev Da te Desc ription Dwn EChk Ch'k'd App'd M otm a c Don a ld Ltd. Thisdoc um en tisissued forthe pa rty whic h c om m ission ed ita n d forspec ific purposesc on n ec ted with the c a ption ed projec ton ly.itshould n otb e relied upon b y a n y otherpa rty orused fora n y otherpurpose. W e a c c eptn orespon sib ility forthe c on sequen c esofthisdoc um en tb ein g relied upon b y a n y otherpa rty,orb ein g used fora n y otherpurpose,orc on ta in in g a n y e rororom ission whic h isdue toa n e rororom ission in da ta supplied touse b y otherpa rties Kilom eters Sc a le a ta3 Dra win g No. NTS M M D S02-GEN-005 P:\Leeds\Ea ster n \36756-GRIP24-An - glia LevelCrossin gsjas\gis\design. \Design Freeze Pla n s\04 M XDs\New Form a tdf\p3\suffolk\36756design Freeze Proposa lpla n s- Altn era tive Form a tsuffolk_ RD.m xd

126 Tk POTASH LANE Footpath 02, Bentley ETL Footpath 022, Bentley Path (um ) Use of existing footpath level crossing (Falstaff) to cross the railway Falstaff Footpath 09, Bentley SECTION : LEVEL CROSSINGS # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Brid le way(p ub lic ) Re stric te d b yway(p ub lic ) Road /Trac k (p rivate ) The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. C H U R C H R O A D Trac k Proposed 2m wide in field margin footpath: Type P SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d Only Dive rsionrout e < < < < V e rge Availab le (N o Footway) ( ( ( ( Cariage wayavailab le (N o FootwayorV e rge ) W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE S03 - Buxton Wood Mast N o c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Path (um ) Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. Footpath 029, Bentley S TAT IO N R O A D The Alje n Be e hive Hillsid e South Bank Dingle De ll W ind e rm e re Arie l Co tage s Trac k De lp his Gate 2 Station Co tage s 4 3 Bentley Tave rnhouse LB n Avilo Foo tp ath 045, Tat tin gstone StationFarm Crownc op yrightand d atab ase rights207ord nanc e Surve y Thisd at amust not b e p asse d ont o anyc ontac r t orsort / hir d p art ie sw ithout permission fr om N e twor k Rail sosmap Te am an/ d orw ithout yourc ontac r t ors / d uly signe d -up to the OSFCDCContac r torlic e nc e.se ning d an d /orsharing ofosd at ato/with e xt e rnalthir- d p art ie ssuc h as N e twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d N e twor k Rail b ye xte nsion)in b re ac h ofthe OSContac r tor S03 Buxton Wood Proposal Private:N o e xisting orp rop ose d rights Bridleway 037, Tattingstone Public:Existing footp ath rightsre m ove d,use rsd ive rtto alte rnative Falstafffootp ath le ve lc rossing to the north Infrastructure:Prop ose d fe nc ing 0m atthe le ve lc rossing onb oth sid e softhe railway:typ e F7 P3A Mar207 Re v Date S03-Buxt onw ood Suffolk -Be ntle ycp PostCod e IP92DB ForInform ation De sc rip tion AngliaLe ve lcrossing Re d uc tionstrate gy De signfre e ze Prop osals W C SRP Dwn EChk SJT Ch'k'd JAS Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s Kilom e te rs 0. 5 Sc ale ata3 Drawing N o. N TS MMD S03-GEN -005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\e N w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd

127 Use of existing highway bridge SECTION : LEVEL CROSSINGS LB C A P E L S T M A R Y Be ntle y Brid ge ETL Proposed footpath aligned around vehicle restraint barriers on each side of the bridge (to be implemented by Suffolk County Council) # Ñ # Ñ Rightstobe m od ifie d aspartof thisproje c t Right snotm od ifie d aspartof thisproje c t The above sym bolsin d ic ate e xisting le ve lc rossing loc ations. The ring c oloursar e aspe rse c tion 4be low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad opte d highway) " " Footpath (public ) G G G Byway ope n toalltraffic (public ) CHAPEL ST MARY Proposed 2m wide footpath in Network Rail land: Type P Brid le way (public ) Re stric te d byway (public ) Road /Trac k (private ) Footpath 036, Bentley Pit (d isuse d ) Proposed 2m wide in field margin footpath: Type P Proposed Type F4 fence length 290m The line style sabove illustrate the type of rightof waye xtantorpropose d. The c olourispe rse c tion 4be low. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailable ^ ^ ^ ^ Mot or ise d O nly Dive rsion Route < < < < Ve rge Available (NoFootway) ( ( ( ( Cariage wayavailable (NoFootway orve rge ) S04 Island W he re the proposalsm ay d ive rtuse rsontoan ad opte d highway,the above sym bolsd e note whe re afootway isavailable,ave rge only,orif ne ithe rafootway orve rge isavailable and pe d e strianswould ne e d towalk in the c ariage way. C H U R C H R O A D THE ISLAND ETL ETL Footpath 08, Bentley SECTION 4: PROPOSED STATUS CHANGE Noc hange and notpart of d ive rsion Use of e xisting rightof way aspartof d ive rsion Change of statustoe xisting rightof way Closure of e xisting rightof way Cre ation of ne w rightof way UPLANDS FRUIT FARM The above c oloursapplytose c tions,2and 3above. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Trac k Upland s FruitFarm Dism antle d Railway RAILWAY Fe nc ing!!! (tie intoe xisting) Gate s ú Brid ge s # # # # Footway Future d e ve lopm e ntsbythird Partyproje c tswhe re planning d e tailsare available Railway.The layoutshown on thisd rawing isin d ic ative and m aybe subje c tt o c hange atd e taile d d e sign. 2.Thisd rawing should be re ad in c onjunc tion with the Suffolk De sign Guid e (Re f:36756/rpt023)whic h c ontains d e tailsot f he infr astuc r tur e type srf e e re d toin this d rawing. Dism td Rly AngliaLe ve lcrossing Re d uc tion Strate gy S04 Island Proposal Private:Noe xisting orpropose d rights De sign Fre e ze Proposals Public:Existin g footath p ri ghtsre m ove d, use rsd ive rtto ad jac e ntcape lstmaryroad brid ge tothe north Infrastructur e:propose d Typ e F7fe nc e tore plac e gate son we stof the railway. Crown c opyrightand d atabase rights207o rd nanc e Surve y Propose d fe nc in g on the e astsid e of the le ve l Thisd at amust not be passe d ont oany c ontac r t orsort / hir d part ie sw ithout permission from Ne twor k Rail s O SMap Te am an d / orw ithout yourc ontac r t ors / P3A Mar207 c rossing north toroad brid ge :Type F4 d uly signe d -up tot he O SFCDCContac r torlic e nc e.se nd ing an d /orsharing of O Sd at at o/with e xt e rnalthir- d part ie ssuc h asne twor k Rail scontac r tor s,the ir d e le gatd e age ntsand / orr e pre se ntive at s,withoutprope rgove rnanc e will putthe Contr ac tor( an d Ne twor k Railbye xte nsion)in bre ac h ot f he O SContac r tor Re v Date S04-Island Suffolk -Be ntle y CP PostCod e IP92LP ForInform ation W C De sc ription Dwn SRP EChk SJT Ch'k'd JAS App'd MotMac Donald Ltd. Thisd oc um e ntisissue d forthe partywhic h c om m issione d itand forspe c ific purpose sc onne c te d with the c aptione d proje c tonly.itshould notbe re lie d upon byanyothe rpartyoruse d foranyothe rpurpose. W e ac c e ptnore sponsibility forthe c onse q ue nc e sof thisd oc um e ntbe ing re lie d upon by any othe rparty,orbe ing use d forany othe rpurpose,orc ontaining any e rororom ission whic h isd ue toan e rororom ission in d atasupplie d touse by othe rpartie s Kilom e te rs 0. 5 Sc ale ata3 NTS Drawing No. MMD S04-GEN-005 P:\ Le e d seast \ e r\ n GRIP24-AngliaLe - ve lcrossingsjasgisde. \ \ sign \ De sign Fre e ze Plans04M \ X DsNe \ wform atdfp3suf \ \ f olk \ 36756De sign Fre e ze ProposalPlans-Alt e rnat ive Form atsuf f olk. m xd

128 Footpath 03, Belstead Trac k Trac k Footpath 05, Belstead Trac k Footpat h 00 5, Wherstead Footpath 004, Wherstead THE ST Proposed 2m wide in field margin footpath: Type P Footpath 003, Wherstead Use of existing bridge Footpath 03, Wherstead Footpath 033, Wherstead Footpath 002, Wherstead Trac k Footpath 032, Wherstead ETL Footpath 00, Wherstead S05 - Pannington Hall (Broomhaughton) Trac k S05 Pannington Hall ( Broomhaughton) Proposal Privat e:n o e xisting orp rop ose d rights Public:Existing footp ath rightsre m ove d,use rsd ive rtto ad jac e ntthe Stre e tb rid ge to the we st Infrastructur e :Prop ose d fe nc ing 0m atthe le ve lc ro ssing onb oth sid e softhe railway:typ e F7 Footpath route shown from definative map does not correspond with to the on the ground position (definitive map route shown) Footpath 034, Wherstead Vegetation removal and hard standing surface to be provided as per Suffolk Design Guide reference 36756/RPT023 ETL Hall Path (um ) SECTION : LEVEL CROSSINGS # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Brid le way(p ub lic ) Re stric te d b yway(p ub lic ) Road /Trac k (p rivate ) The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d Only Dive rsionrout e < < < < V e rge Availab le (N o Footway) ( ( ( ( Cariage wayavailab le (N o FootwayorV e rge ) W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE N o c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway Mast Trac k Trac k Proposed 2m wide in field margin footpath: Type P Bridleway 04, Wherstead PA N N IN G T O N H A L L L A N E The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway Footpath 08, Belstead B ri d le w ay 02 8, Wh e rs te ad S Proposed 2m wide in field margin footpath: Type P TH E. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. Bridleway 029, Wherstead TREET Bridleway 030, Wherstead AngliaLe ve lcrossing Re d uc tionstrate gy Trac k 27, Wherstead way 0 Trac k Proposed timber footbridge over ditch only: Type S-B Crownc op yrightand d atab ase rights207ord nanc e Surve y Thisd at amust not b e p asse d ont o anyc ontac r t orsort / hir d p art ie sw ithout permission fr om N e twor k Rail sosmap Te am an/ d orw ithout yourc ontac r t ors / d uly signe d -up to the OSFCDCContac r torlic e nc e.se ning d an d /orsharing ofosd at ato/with e xt e rnalthir- d p art ie ssuc h as N e twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d N e twor k Rail b ye xte nsion)in b re ac h ofthe OSContac r tor d le Bri Footpath 024, Wherstead De signfre e ze Prop osals S05-PanningtonHal(Broom haughton) Suffolk -W he rst e ad CP PostCod e IP92AR P3A Mar207 ForInform ation W C SRP SJT JAS Re v Date De sc rip tion Dwn EChk Ch'k'd Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s Kilom e te rs Sc ale ata3 Drawing N o. N TS MMD S05-GEN -005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\e N w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd

129 The Fern s LB STOW M ARKETROAD Hoppers Con veyors W B Pa th (um ) Footpath 035, Barham Con veyor S07 Broomfield Proposal Private:Noexistin g orproposed rights Public:Existin g foota pth rightsrem oved,usersdiverttoa dja c en t un derb ridge tothe south Infrastructur e:proosed p fen c in g 0m a tthe levelc rossin g on the south side ofthe ra ilwa y:t yp e F7 Proposed fen c in g 0m a tthe levelc rossin g on the n orth side ofthe ra ilwa y:type F4 SECTION : LEVEL CROSSINGS # Ñ # Ñ Right stb o e m odified a spa rtofthisprojec t Rightsn otm odified a spa rtofthisprojec t The a b ove sym b olsin dic a te existin g levelc rossin g loc a tion s. The rin g c olour sa re a spersec tion 4b elow. SECTION 2: TYPE OF RIGHT OF WAY (exc ludin g a dopted highwa y) " " Footpa th (pub lic ) G G G Bywa y open toa lltra ffic (pub lic ) Bridlewa y (pub lic ) Roa d /Tra c k (priva te) Restric ted b ywa y (pub lic ) M ea dow Side The lin e stylesa b ove illustra te the type ofrightofwa yexta n torproposed. The c olourispersec tion 4b elow. Footpath 006, Great Blakenham Tra c k Tra c k Proposed 2m wide footpath on existing track - no changes to surfacing Footpath 032, Barham SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M ot or ised On ly Diversion Rout e < < < < V erge Ava ila b le (NoFootwa y) ( ( ( ( Ca ria gewa yava ila b le (NoFootwa y orv erge) W here the proposa lsm a y divertuserson toa n a dopted highwa y,the a b ove sym b olsden ote where a footwa y isa va ila b le,a verge on ly,orifn eithera footwa y orverge isa va ila b le a n d pedestria n swould n eed towa lk in the c a ria gewa y. Footpath 024, Great Blakenham S T O W M A R K E T R O A D S07 - Broomfield Network Rail pedestrian access gate to be provided Tra c k FB FB Footpath 02, Barham Tra c k Pa th (um ) SECTION 4: PROPOSED STATUS CHANGE Noc ha n ge a n d n otpa rt ofdiversion U se ofexistin g rightofwa y a spa rtofdiversion Cha n ge ofsta tustoexistin g rightofwa y Closure ofexistin g rightofwa y Crea tion ofn ew rightofwa y Tra c k FB Footpath 0, Barham The a b ove c oloursa pplytosec tion s,2a n d 3a b ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(In dic a tive fea tures) Fen c in g Futur e developm en tb s ythird!!! (tie in toexistin g) Pa rtyprojec tswhere pla n n in g Ga tes deta ilsa re a va ila b le ú Bridges Ra ilwa y # # # # Footwa y Proposed 2m wide footpath to be made of compacted stone material (Footpath type P3).To be set to the north of existing public right of way and vegetation. Pa th (um ) Footpath 007, Great Blakenham Pa th (um ) Pa th (um ) Footpath 030, Barham.The la youtshown on thisdra win g isin dic a tive a n d m a yb e sub jec tt o c ha n ge a tdeta iled design. 2.Thisdra win g should b e rea d in c on jun c tion with the Suffolk Design Guide (Ref:36756/RPT023)whic h c on ta in s deta ilsofthe in fra str uc tur e typesrefe red toin thisdra win g. Bridleway 022, Great Blaken ham R IS E C H E Q U E R S K IN G F IS H E R D R IV E Herb Cota ge Footpath 008, Great Blakenham M IL L L A N E M ill Cota ge M ILLLANE Bridgewa ter Gippin g W eir Ca rera Rose GREAT BLAKENHAM Crown c opyrighta n d da ta b a se rights207ordn a n c e Survey Thisda ta must not b e pa ssed on toa n y c on ta rc t orsort / hird pa rt iesw ithout permission from Net wor k Ra il sosm a ptea m a n d/ orw ithout yourc on ta rc t ors / duly sign ed-uptot he OSFCDCCon ta rc torlic en c e.sen din g a n d/orsha rin g ofosda ta to/with ext ern a lthird-pa rt iessuc h a snet wor k Ra il scon ta rc tor s,their delega ted a gen tsa n d/orrepr esen tives,withoutpropergover a t n a n c e will putthe Con tr a c tor(a n d Net wor k Ra il b yexten sion )in b rea c h ofthe OSCon ta rc tor Footpath 023, Great Blakenham Ha ll M U LBERRY Use of existing underbridge W a rehouse 08 W a rehouse 06 P3A M a r207 Rev Da te S07-Broom field Suffolk -Ba rha m CP PostCode IP60NJ ForIn form a tion Desc ription An glia LevelCrossin g Reduc tion Stra tegy Design Freeze Proposa ls W C Dwn SRP EChk SJT Ch'k'd JAS App'd M otm a c Don a ld Ltd. Thisdoc um en tisissued forthe pa rty whic h c om m ission ed ita n d forspec ific purposesc on n ec ted with the c a ption ed projec ton ly.itshould n otb e relied upon b y a n y otherpa rty orused fora n y otherpurpose. W e a c c eptn orespon sib ility forthe c on sequen c esofthisdoc um en tb ein g relied upon b y a n y otherpa rty,orb ein g used fora n y otherpurpose,orc on ta in in g a n y e rororom ission whic h isdue toa n e rororom ission in da ta supplied touse b y otherpa rties Kilom eters 0. 5 Sc a le a ta3 Dra win g No. NTS M M D S07-GEN-005 P:\Leeds \Ea stn er\ GRIP24-An - glia LevelCrossin gsjasgisdesign. \ \ \ Design Freeze Pla n s04 \ M XDsNew \ Form a tdf \P3 \Suffolk \36756Design Freeze Proposa lpla n s-alt ern a tive Form a tsuffolk.m xd

130 2 4 Deb tra c 3d 3 4 Tra c k Footpath 027, Coddenham B3 B3 Tra c k ETL Quarry to be discontinued in the next few years and site landscaped as a nature reserve Tra c k Footpath 03, Needham Market Footpath 032, Needham Market SECTION : LEVEL CROSSINGS # Right st o b e m o d ifie d a spa rto fthispro jec t Ñ # Ñ Rightsno tm o d ified a spa rto fthispro jec t The a b o ve sym b o lsind ic a te existing levelc ro ssing lo c a tio ns. The ring c o lo ur sa re a spersec tio n 4b elo w. Footpath 035, Dormsden GP Ga llo wshill La nd fillsite Use of existing bridge Existing wire mesh fence on the railway boundary to be removed and replaced with F4 type fence Proposed fence between new footpath and quarry access road: Type F Footpath 034, Dormsden Tra c k Tum ulus Proposed 2m wide footpath between railway and existing access road: Type P Footpath 033, Needham Market RAILWAY Tra c k S08 - Stacpool Footpath 037, Needham Market Pa th (um ) Footpath 028, Coddenham Footpath 034, Coddenham SECTION 2: TYPE OF RIGHT OF WAY (exc lud ing a d o pted highwa y) " " Fo o tpa th (pub lic ) G G G Bywa yo pen to a lltra ffic (pub lic ) Brid lewa y(pub lic ) Restric ted b ywa y(pub lic ) Ro a d /Tra c k (priva te) The line stylesa b o ve illustra te the type o frighto fwa yexta nto rpro po sed. The c o lo urispersec tio n 4b elo w. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Fo o twa yava ila b le ^ ^ ^ ^ M o to rise d Only Diversio n Ro ut e < < < < V erge Ava ila b le (No Fo o twa y) ( ( ( ( Ca ria gewa yava ila b le (No Fo o twa yo rv erge) W here the pro po sa lsm a yd ivertuserso nto a n a d o pted highwa y,the a b o ve sym b o lsd eno te where a fo o twa yisa va ila b le,a verge o nly,o rifneithera fo o twa yo rverge isa va ila b le a nd ped estria nswo uld need to wa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE No c ha nge a nd no tpa rt o fd iversio n U se o fexisting righto fwa y a spa rto fd iversio n Cha nge o fsta tusto existing righto fwa y Clo sure o fexisting righto fwa y Crea tio n o fnew righto fwa y The a b o ve c o lo ursa pplyto sec tio ns,2a nd 3a b o ve. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic a tive fea tures) La y-b y Fenc ing Futur e d evelo pm entb s ythir d!!! (tie into existing) Pa rtypro jec tswhere pla nning Ga tes d eta ilsa re a va ila b le ú Brid ges Ra ilwa y # # # # Fo o twa y Footpath 036, Dormsden Cro wn c o pyrighta nd d a ta b a se rights207ord na nc e Survey Thisd a ta must not b e pa ssed o nto a ny c o nta rc t o rso / rt hir d pa rt iesw ithout permission fro m Net wo rk Ra il sosm a ptea m a n d / o rw ithout yo urc o nta rc t o rs / d uly signed -upt o the OSFCDCCo nta rc to rlic enc e.sen d ing a n d /o rsha ring o fosd a ta to /with ext erna lthir- d pa rt iessuc h a snet wo rk Ra il sco nta rc to rs,their d elega td e a gentsa nd / o rr epr esentives,witho a t utpro pergo ver na nc e will putthe Co ntr a c to r( a nd Net wo rk Ra il b yextensio n)in b rea c h o fthe OSCo nta rc to r B3 La y-b y Footpath 00, Baylham Footpath 02, Baylham S08 Stacpool Proposal Proposed Private:No existing o rpro po sed rights Public:Existing fo o tpa th rightsrem o ved,usersd ivertto a d ja c ent ro a d b rid ge to the no rth Infrastructure:Pro po sed fenc ing 0m a tthe levelc ro ssing o n westsid e o fthe ra ilwa y:type F7 Pro po sed fenc e to extend 50m so uth o flevelc ro ssing a nd extend no rth a lo ng ra ilwa yto existing b rid ge o n ea stsid e:type F4.The la yo utsho wn o n thisd ra wing isind ic a tive a nd m a yb e sub jec tto c ha nge a td eta iled d esign. 2.Thisd ra wing sho uld b e rea d in c o njunc tio n with the Suffo lk Design Guid e (Ref:36756/RPT023)whic h c o nta ins d eta ilso fthe infra stuc r tur e typesrefe rd e to in this d ra wing. P3A M a r207 Rev Da te S08-Sta c po o l Suffo lk -Need ha m M a rketcp Po stco d e IP68LJ Fo rinfo rm a tio n Desc riptio n Anglia LevelCro ssing Red uc tio n Stra tegy Design Freeze Pro po sa ls W C Dwn SRP EChk SJT Ch'k'd JAS App'd M o tm a c Do na ld Ltd. Thisd o c um entisissued fo rthe pa rtywhic h c o m m issio ned ita nd fo rspec ific purpo sesc o nnec ted with the c a ptio ned pro jec to nly.itsho uld no tb e relied upo n b y a nyo therpa rtyo rused fo ra nyo therpurpo se. W e a c c eptno respo nsib ility fo rthe c o nsequenc eso fthisd o c um entb eing relied upo n b ya ny o therpa rty,o rb eing used fo ra nyo therpurpo se,o rc o nta ining a nye ro ro ro m issio n whic h isd ue to a n e ro ro ro m issio n in d a ta supplied to use b yo therpa rties Kilo m eters Sc a le a ta3 Dra wing No. NTS M M D S08-GEN-005 P:\Leed s\ea st ern\36756-grip24-anglia - LevelCro ssingsjas\gis\design\design. Freeze Pla ns\04 M XDs\New Fo rm a tdf\p3\suffo lk\36756design Freeze Pro po sa lpla ns-alt erna tive Fo rm a tsuffo lk. m xd

131 Footpath 024, Bacton SECTION : LEVEL CROSSINGS # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. Restricted Byway 00, Haughley Trac k SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Brid le way(p ub lic ) Re stric te d b yway(p ub lic ) Road /Trac k (p rivate ) Restricted Byway 0, Haughley O ld Be llsfarm Silo The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d O nly Dive rsionroute < < < < Ve rge Availab le (No Footway) ( ( ( ( Cariage wayavailab le (No FootwayorVe rge ) Footpath 02, Haughley RAILWAY Footpath 006, Old Newton with Dagworth Footpath 06, Old Newton with Dagworth S - Leggetts Footpath 033, Bacton BOAT 029, Bacton W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE No c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway Restricted Byway 04, Haughley Restricted Byway 05, Haughley Restricted Byway 03, Haughley Footpath 062, Old Newton with Dagworth Footpath 048, Haughley Wassicks Fo otp ath 063, Ol d N ewton w ith Dagworth Use of existing road level crossing W ASSICKSLANE Crownc op yrightand d atab ase rights207o rd nanc e Surve y Thisd at amust not b e p asse d ont o any c ontac r t orsort / hir d p art ie sw ithout permission from Ne twork Rail s O SMap Te am an/ d orw ithout yourc ontac r t ors / d uly signe d -up to the O SFCDCContac r torlic e nc e.se ning d an d /orsharing ofo Sd at ato/with e xt e rnalthir- d p art ie ssuc h asne twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d Ne twor k Rail b ye xte nsion)in b re ac h ofthe O SContac r tor Footpath 007, Old Newton with Dagworth S Leggetts Proposal Private:No e xisting orp rop ose d rights Public:Existin g footath p ri ghtsre m ove d,use rsd ive rtto alte rnative W assic ksroad le ve lc rossing to the south Infrastructur e:prop ose d fe nc in g onthe e astofthe railwa yto run from 50m north ofthe le ve lc rossin g along Ne twork Railsb ound ary to W assic ksle ve lc rossin g:t yp e F4 Prop ose d fe nc in g 0m totalatthe le ve lc rossing onthe we stsid e ofthe railway:typ e F7. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. P3A Mar207 Re v S-Le gge ts Suffolk -O ld Ne wtonwith Dagworth CP PostCod e IP44EY Date ForInform ation De sc rip tion AngliaLe ve lcrossing Re d uc tionstrate gy De signfre e ze Prop osals W C SRP Dwn EChk SJT Ch'k'd JAS Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s Kilom e te rs Sc ale ata3 NTS Drawing No. MMD S-GEN-005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\Ne w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd

132 B3 Footpath 028, Bacton Footpath 08, Bacton Bacton Footpath 022, Use of existing Cow Creek level crossing for public users Cow Creek ETL Cow Creek RAILWAY Footpath 020, Bacton SECTION : LEVEL CROSSINGS # Right st o b e mo d ifie d a spa rto fthispro jec t Ñ # Ñ Rightsno tmo d ified a spa rto fthispro jec t The a b o ve symb o lsind ic a te existing levelc ro ssing lo c a tio ns. The ring c o lo ur sa re a spersec tio n 4b elo w. SECTION 2: TYPE OF RIGHT OF WAY (exc lud ing a d o pted highwa y) " " Fo o tpa th (pub lic ) G G G Bywa yo pen to a lltra ffic (pub lic ) Brid lewa y(pub lic ) Ro a d /Tra c k (priva te) Restric ted b ywa y(pub lic ) Ke ry'sco ta ges The line stylesa b o ve illustra te the type o frighto fwa yexta nto rpro po sed. The c o lo urispersec tio n 4b elo w. S2 - Gooderhams Tra c k KERRYSFARMLAN E KERRYS FARM LANE Public users to use existing carriageway SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Fo o twa yava ila b le ^ ^ ^ ^ Mo to rise d Only Diversio n Ro ut e < < < < V erge Ava ila b le (N o Fo o twa y) ( ( ( ( Ca ria gewa yava ila b le (N o Fo o twa yo rv erge) W here the pro po sa lsma yd ivertuserso nto a n a d o pted highwa y,the a b o ve symb o lsd eno te where a fo o twa yisa va ila b le,a verge o nly,o rifneithera fo o twa yo rverge isa va ila b le a nd ped estria nswo uld need to wa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE Alleged right of way not on definative map N o c ha nge a nd no tpa rt o fd iversio n Use o fexisting righto fwa y a spa rto fd iversio n Cha nge o fsta tusto existing righto fwa y Clo sure o fexisting righto fwa y Crea tio n o fnew righto fwa y Footpath 09, Bacton Tra c k BOAT 034, Bacton BOAT 06, Bacton The a b o ve c o lo ursa pplyto sec tio ns,2a nd 3a b o ve. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic a tive fea tures) Fenc ing Futur e d evelo pmentb s ythir d!!! (tie into existing) Pa rtypro jec tswhere pla nning Ga tes d eta ilsa re a va ila b le ú Brid ges Ra ilwa y # # # # Fo o twa y.the la yo utsho wn o n thisd ra wing isind ic a tive a nd ma yb e sub jec tto c ha nge a td eta iled d esign. 2.Thisd ra wing sho uld b e rea d in c o njunc tio n with the Suffo lk Design Guid e (Ref:36756/RPT023)whic h c o nta ins d eta ilso fthe infra stuc r tur e typesrefe rd e to in this d ra wing. Footpath 07, Bacton Anglia LevelCro ssing Red uc tio n Stra tegy Design Freeze Pro po sa ls Footpath 024, Bacton Cro wn c o pyrighta nd d a ta b a se rights207ord na nc e Survey Thisd a ta must not b e pa ssed o nto a ny c o nta rc t o rso / rt hir d pa rt iesw ithout permission fr o m N etwo rk Ra il sosma ptea m a n d / o rw ithout yo urc o nta rc t o rs / d uly signed -upt o the OSFCDCCo nta rc to rlic enc e.sen d ing a n d /o rsha ring o fosd a ta to /with ext erna lthir- d pa rt iessuc h a sn etwo rk Ra il sco nta rc to rs,their d elega td e a gentsa nd / o rr epr esentives,witho a t utpro pergo ver na nc e will putthe Co ntr a c to r( a nd N etwo rk Ra il b yextensio n)in b rea c h o fthe OSCo nta rc to r S2 Gooderhams Proposal Private:existing priva te rightsreta ined Public:Existing fo o ta p th rightsremo ved,usersd ivertto a lterna tive Co w Creek levelc ro ssing to the no rth Infrastructure:N o a d d itio na lfenc ing required P3A Ma r207 Rev Da te S2-Go o d erha ms Suffo lk -Ba c to n CP Po stco d e IP44HH Fo rinfo rma tio n Desc riptio n W C Dwn SRP EChk SJT Ch'k'd JAS App'd Mo tma c Do na ld Ltd. Thisd o c umentisissued fo rthe pa rtywhic h c o mmissio ned ita nd fo rspec ific purpo sesc o nnec ted with the c a ptio ned pro jec to nly.itsho uld no tb e relied upo n b y a nyo therpa rtyo rused fo ra nyo therpurpo se. W e a c c eptno respo nsib ility fo rthe c o nsequenc eso fthisd o c umentb eing relied upo n b ya ny o therpa rty,o rb eing used fo ra nyo therpurpo se,o rc o nta ining a nye ro ro ro missio n whic h isd ue to a n e ro ro ro missio n in d a ta supplied to use b yo therpa rties Kilo meters Sc a le a ta3 Dra wing N o. N TS MMD S2-GEN -005 P:\Leed s\ea st ern\36756-grip24-anglia - LevelCro ssingsjas\gis\design\design. Freeze Pla ns\04m X Ds\ew N Fo rma tdf\p3\suffo lk\36756design Freeze Pro po sa lpla ns-alt erna tive Fo rma tsuffo lk. mxd

133 Proposed 2m wide field boundary footpath: Type P Proposed footbridge over ditch: Type S-B 60 PlayAre a 29 Footpath 03, Bacton House Fie ld Bram are Broad land s V and e r Dragons The Oaks B3 Long Me ad ow Guid e Post PA R K E R S R O A D Club House S69 - Bacton Ball stop netting to be installed to match existing length 0m Proposed 2m wide field boundary footpath: Type P Bric kwallbarn SECTION : LEVEL CROSSINGS # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) Footpath 023, Bacton " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Moat Brid le way(p ub lic ) Re stric te d b yway(p ub lic ) Road /Trac k (p rivate ) The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d Only Dive rsionrout e < < < < V e rge Availab le (N o Footway) S3 - Fords Green Footpath 044, Cotton ( ( ( ( Cariage wayavailab le (N o FootwayorV e rge ) W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE Footpath 022, Bacton Proposed 2m wide in field margin footpath: Type P Footpath 04, Bacton RAILWAY N o c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway ETL B3 L A N E S W IL LT U B. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. Footpath 08, Bacton Cow Creek Cow Creek Use of existing Cow Creek level crossing Trac k Footpath 020, Bacton S3 Fords Green Proposal Privat e:n o e xisting orp rop ose d rights Public:Existing footp ath rightsre m ove d,use rsd ive rtto alte rnative Cow Cre e k le ve lc rossing to the south Infrastructure:Prop ose d fe nc ing typ e F4to go north to S69 Bac tonle ve lc rossing and 50m south ofle ve lc rossing onthe e ast sid e ofthe railway Prop ose d fe nc ing onthe we stsid e ofthe railwayto runsouth along N e twork Railb ound aryto Cow Cre e k le ve lc rossing and 50m north le ve lc rossing:typ e F4 Ke ry'sco tage s Crownc op yrightand d atab ase rights207ord nanc e Surve y Thisd at amust not b e p asse d ont o anyc ontac r t orsort / hir d p art ie sw ithout permission fr om N e twor k Rail sosmap Te am an/ d orw ithout yourc ontac r t ors / P3A Mar207 d uly signe d -up to the OSFCDCContac r torlic e nc e.se ning d an d /orsharing ofosd at ato/with e xt e rnalthir- d p art ie ssuc h as N e twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d N e twor k Rail b ye xte nsion)in b re ac h ofthe OSContac r tor Re v Date AngliaLe ve lcrossing Re d uc tionstrate gy De signfre e ze Prop osals S3-Ford sgre e n Suffolk -Bac toncp PostCod e IP44HN ForInform ation De sc rip tion W C SRP Dwn EChk SJT Ch'k'd JAS Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s Kilom e te rs Sc ale ata3 Drawing N o. N TS MMD S3-GEN -005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\e N w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd

134 Bridleway 023, Gislingham Mast SECTION : LEVEL CROSSINGS GISLINGHAM ROAD Bridleway S6 - Gislingham # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Brid le way(p ub lic ) Road /Trac k (p rivate ) Re stric te d b yway(p ub lic ) Trac k The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. Gate House Network Rail vehicular access gate for access to the railway Eastland sfarm SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d Only Dive rsionrout e < < < < V e rge Availab le (N o Footway) ( ( ( ( Cariage wayavailab le (N o FootwayorV e rge ) W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE Proposed 3m wide bridleway: Type P2 RAILWAY N o c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) BOAT 022, Finningham Use of existing underbridge EASTLAN DSLAN E EASTLANDS LANE Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. FB AngliaLe ve lcrossing Re d uc tionstrate gy FB Footpath De signfre e ze Prop osals Finningham Crownc op yrightand d atab ase rights207ord nanc e Surve y Thisd at amust not b e p asse d ont o anyc ontac r t orsort / hir d p art ie sw ithout permission fr om N e twor k Rail sosmap Te am an/ d orw ithout yourc ontac r t ors / d uly signe d -up to the OSFCDCContac r torlic e nc e.se ning d an d /orsharing ofosd at ato/with e xt e rnalthir- d p art ie ssuc h as N e twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d N e twor k Rail b ye xte nsion)in b re ac h ofthe OSContac r tor WICKHAM ROAD S6 Gislingham Proposal Privat e:n o e xisting orp rop ose d rights Public:Existing b rid le wayrightsre m ove d,use rsd ive rtto ad jac e nt und e rp assto the south Infrastructure:Pro p ose d fe nc ing 20m totalatthe le ve lc rossing on b oth sid e softhe railway:typ e F4 P3A Mar207 Re v Date S6-Gislingham Suffolk -Finningham CP PostCo d e IP44HX ForInform ation De sc rip tion W C SRP Dwn EChk SJT Ch'k'd JAS Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s. Sc ale ata3 Drawing N o. N TS MMD S6-GEN -005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\e N w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd Kilom e te rs

135 The Pho enix Fa rm S7 Paynes Proposal Private:No existing o rpro po sed rights Public:Existing fo o tpa th rightsrem o ved,usersd ivertto a d ja c entb rid ge to the no rth Footpath 039, Gislingham Footpath 027, Gislingham Footpath 030, Gislingham Footpath 029, Gislingham COLDHAM LANE (Tra c k) Infrastructure:Pro po sed fenc ing 20m to ta la tthe levelc ro ssing o n ea stsid e o fthe c ro ssing:type F7 Pro po sed fenc ing 50m eithersid e o fthe levelc ro ssing o n the westsid e o fthe ra ilwa y:type F4 Footpath 02, Gislingham Tra c k SECTION : LEVEL CROSSINGS # Right st o b e m o d ifie d a spa rto fthispro jec t Ñ # Ñ Rightsno tm o d ified a spa rto fthispro jec t The a b o ve sym b o lsind ic a te existing levelc ro ssing lo c a tio ns. The ring c o lo ur sa re a spersec tio n 4b elo w. SECTION 2: TYPE OF RIGHT OF WAY (exc lud ing a d o pted highwa y) " " Fo o tpa th (pub lic ) G G G Bywa yo pen to a lltra ffic (pub lic ) Brid lewa y(pub lic ) Ro a d /Tra c k (priva te) Restric ted b ywa y(pub lic ) The line stylesa b o ve illustra te the type o frighto fwa yexta nto rpro po sed. The c o lo urispersec tio n 4b elo w. Footpath 025, Gislingham Footpath 028, Gislingham SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Fo o twa yava ila b le ^ ^ ^ ^ M o to rise d Only Diversio n Ro ut e < < < < V erge Ava ila b le (No Fo o twa y) ( ( ( ( Ca ria gewa yava ila b le (No Fo o twa yo rv erge) W here the pro po sa lsm a yd ivertuserso nto a n a d o pted highwa y,the a b o ve sym b o lsd eno te where a fo o twa yisa va ila b le,a verge o nly,o rifneithera fo o twa yo rverge isa va ila b le a nd ped estria nswo uld need to wa lk in the c a ria gewa y. Footpath 026, Gislingham Proposed 2m wide footpath in field margin: Type P SECTION 4: PROPOSED STATUS CHANGE No c ha nge a nd no tpa rt o fd iversio n U se o fexisting righto fwa y a spa rto fd iversio n Cha nge o fsta tusto existing righto fwa y Clo sure o fexisting righto fwa y Crea tio n o fnew righto fwa y The a b o ve c o lo ursa pplyto sec tio ns,2a nd 3a b o ve. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic a tive fea tures) S7 - Paynes Footpath 022, Gislingham Fenc ing Futur e d evelo pm entb s ythir d!!! (tie into existing) Pa rtypro jec tswhere pla nning Ga tes d eta ilsa re a va ila b le ú Brid ges Ra ilwa y # # # # Fo o twa y Footpath 024, Gislingham.The la yo utsho wn o n thisd ra wing isind ic a tive a nd m a yb e sub jec tto c ha nge a td eta iled d esign. 2.Thisd ra wing sho uld b e rea d in c o njunc tio n with the Suffo lk Design Guid e (Ref:36756/RPT023)whic h c o nta ins d eta ilso fthe infra stuc r tur e typesrefe rd e to in this d ra wing. Anglia LevelCro ssing Red uc tio n Stra tegy Design Freeze Pro po sa ls Footpath 004, Wickham Skeith Bridleway 023, Gislingham Cro wn c o pyrighta nd d a ta b a se rights207ord na nc e Survey Thisd a ta must not b e pa ssed o nto a ny c o nta rc t o rso / rt hir d pa rt iesw ithout permission fro m Net wo rk Ra il sosm a ptea m a n d / o rw ithout yo urc o nta rc t o rs / d uly signed -upt o the OSFCDCCo nta rc to rlic enc e.sen d ing a n d /o rsha ring o fosd a ta to /with ext erna lthir- d pa rt iessuc h a snet wo rk Ra il sco nta rc to rs,their d elega td e a gentsa nd / o rr epr esentives,witho a t utpro pergo ver na nc e will putthe Co ntr a c to r( a nd Net wo rk Ra il b yextensio n)in b rea c h o fthe OSCo nta rc to r P3A M a r207 Rev Da te S7-Pa ynes Suffo lk -Gislingha m CP Po stco d e IP238JE Fo rinfo rm a tio n Desc riptio n W C Dwn SRP EChk SJT Ch'k'd JAS App'd M o tm a c Do na ld Ltd. Thisd o c um entisissued fo rthe pa rtywhic h c o m m issio ned ita nd fo rspec ific purpo sesc o nnec ted with the c a ptio ned pro jec to nly.itsho uld no tb e relied upo n b y a nyo therpa rtyo rused fo ra nyo therpurpo se. W e a c c eptno respo nsib ility fo rthe c o nsequenc eso fthisd o c um entb eing relied upo n b ya ny o therpa rty,o rb eing used fo ra nyo therpurpo se,o rc o nta ining a nye ro ro ro m issio n whic h isd ue to a n e ro ro ro m issio n in d a ta supplied to use b yo therpa rties. P:\Leed s\ea st ern\36756-grip24-anglia - LevelCro ssingsjas\gis\design\design. Freeze Pla ns\04 M XDs\New Fo rm a tdf\p3\suffo lk\36756design Freeze Pro po sa lpla ns-alt erna tive Fo rm a tsuffo lk. m xd Kilo m eters Sc a le a ta3 Dra wing No. NTS M M D S7-GEN-005

136 Tra ck Pa ddock Trotters KingfisherBa rn Pa sture Crooked Footpath 00, Mellis 9 Tra ck Tra ck Pa rsona ge RectoryFa rm Oa k Lodge Footpath 008, Mellis Rectory Road The Gra na ry Tra ck M a nor Lodge Crossing Ashtree Fa rm RECTORY Pa th (um) Tha tch Elmroyd M ea dix Orcha rd Cotta ge Tea zles Sa ddlers M erlinhouse W hite House Fa rm Ea sterba rn Sunnyside W heelwrights Footpath 00, Mellis The Ca rnser M oa t 3 to 6 Ha ll 9 4 The Pyghtle Bullocks Fa rm 6 Ea rlsford House Sylva n House M ellis OrionHouse Beecroft Kessa ria ni Chestnut Poultry Houses Chestnut Breccles Mellis W oodside ROBINSONSM ILL Bullocks Fa rm LB 7 6 Old Ra ilwa y Ra ilwa y Ta vern Z odia chouse GP Sta tionhotel Junction ROBINSONSCLOSE The Old Rectory EARLSFORDROAD Footpath 004, Mellis The Old Limes Sta nford House Chestnuts S2 - Abbotts Lockwood Cotta ge Ga rneys La urels Tra ck W hitega tes Christma s The Cotta ge Fa lcon W illow Coa ch Footpath 006, Mellis S8 Cow Pasture Lane Private:Noexisting orproposed rights Public:Existing Bywa yopentoa ll Tra ffic to be downgra ded toa bridlewa y. Infrastructure:Noa dditiona l fencing required Additiona l bridlewa yinfra structure tobe provided Footpath 003, Yaxley SECTION : LEVEL CROSSINGS # Ñ # Ñ Rights tobe modified a s pa rtofthis project Rights notmodified a s pa rtofthis project The a bove symbols indica te existing level crossing loca tions. The ring colours a re a s persection4below. SECTION 2: TYPE OF RIGHT OF WAY (excluding a dopted highwa y) Footpa th (public) Bridlewa y(public) Restricted bywa y(public)!!!! Footwa yava ila ble " " G G G The line styles a bove illustra te the type ofrightofwa y exta ntorproposed. The colouris persection4below. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY ^ ^ ^ ^ < < < < V erge Ava ila ble (NoFootwa y) ( ( ( ( Ca ria gewa yava ila ble (NoFootwa yorv erge) Bywa yopentoa ll tra ffic (public) Roa d /Tra ck (priva te) M otorised Only DiversionRoute W here the proposa ls ma ydivertusers ontoa na dopted highwa y,the a bove symbols denote where a footwa y is a va ila ble,a verge only,orifneithera footwa yorverge is a va ila ble a nd pedestria ns would need towa lk inthe ca ria gewa y. SECTION 4: PROPOSED STATUS CHANGE Nocha nge a nd notpa rt ofdiversion U se ofexisting rightofwa y a s pa rtofdiversion Cha nge ofsta tus toexisting rightofwa y Closure ofexisting rightofwa y Crea tionofnew rightofwa y The a bove colours a pplytosections,2a nd 3a bove. SECTION 5: ASSOCIATED INFRASTRUCTURE (Indica tive fea tures) S8 - Cow Pasture Lane Pa th (um) BOAT 0, Mellis Footpath 00, Thornham Parva!!! ú # # # # Fencing (tie intoexisting) Ga tes Bridges Footwa y Future developments bythird Pa rtyprojects where pla nning deta ils a re a va ila ble Ra ilwa y Footpath 007, Mellis Footpath 004, Thornham Parva Footpath 005, Thornham Parva Footpath 002, Thornham Parva.The la youtshownonthis dra wing is indica tive a nd ma ybe subjectto cha nge a tdeta iled design. 2.This dra wing should be rea d inconjunctionwith the Suffolk DesignGuide (Ref:36756/RPT023)which conta ins deta ils ofthe infra structure types refe red tointhis dra wing. Anglia Level Crossing ReductionStra tegy DesignFreeze Proposa ls BOAT 006, Thornham Parva Crowncopyrighta nd da ta ba se rights 207Ordna nce Survey This da ta must not be pa ssed ontoa nycontra ctor/s orthird pa rties without permission from Network Ra il s OSM a ptea m a nd/orwithout yourcontra ctor/s dulysigned-uptothe OSFCDCContra ctorlicence.sending a nd/orsha ring of OSda ta to/with externa l third-pa rties such a s Network Ra il s Contra ctors,their delega ted a gents a nd/orrepresenta tives,withoutpropergoverna nce will putthe Contra ctor(a nd Network Ra il byextension)inbrea ch ofthe OSContra ctor Footpath 003, Thornham Parva P3A M a r207 Rev Da te S8-Cow Pa sture La ne Suffolk -M ellis CP PostCode IP238EF ForInforma tion Description W C SRP Dwn EChk SJT Ch'k'd JAS App'd M otm a cdona ld Ltd. This documentis issued forthe pa rtywhich commissioned ita nd forspecific purposes connected with the ca ptioned projectonly.itshould notbe relied uponby a nyotherpa rtyorused fora nyotherpurpose. W e a cceptnoresponsibility forthe consequences ofthis documentbeing relied uponby a nyotherpa rty,orbeing used fora nyotherpurpose,orconta ining a ny e rororomissionwhich is due toa ne rororomissioninda ta supplied touse by otherpa rties. Kilometers Sca le a ta3 NTS Dra wing No. M M D S8-GEN-005 P:\Leeds\Ea stern\36756-grip2-4-anglia Level Crossings.JAS\GIS\Design\DesignFreeze Pla ns\04m XDs\New Forma tdf\p3\suffolk\36756designfreeze Proposa l Pla ns -Alterna tive Forma tsuffolk_ RD.mxd

137 The Gra na ry Ashtree Fa rm The Old Forge Forge Ba rn FB W heelwrights Ba rn Orcha rd Cotta ge W hite House Fa rm Fa rm Ba rn Ea sterba rn Footpath 004, Mellis Tea zles Sa ddlers Cotta ge W hite House Cotta ge Evergreen M erlinhouse 7 Sunnyside 6 The Ja ys Frida y Cotta ge Peregrine Cotta ge W hite Fria rs Heron House Ga rneys House The La urels The Cotta ge Christma s Fa lcon House Coa ch House Tra ck Ha ll Mellis Old Ra ilwa y Sta bles Ra ilwa y Ta vern TCB Z odia c House GP Old Sta tionhotel (PH) SECTION : LEVEL CROSSINGS # Ñ # Ñ Rights tobe modified a s pa rtofthis project Rights notmodified a s pa rtofthis project The a bove symbols indica te existing level crossing loca tions. The ring colours a re a s persection4below. The Ca rnser Pa th (um) Footpath 00, Mellis to ROBINSONSM ILL The Old M ill W oodside M ea dow Green Red House W ilverleyhouse ROBINSONSCLOSE 7 6 M ellis Junction The Chestnuts KilnRoya l Forge LB The Old Cha pel The Limes Sta nford House Pea rtree Cotta ge Lockwood Tra ck W hitega tes Fa rm SECTION 2: TYPE OF RIGHT OF WAY (excluding a dopted highwa y) Footpa th (public) Bridlewa y(public) Restricted bywa y(public)!!!! Footwa yava ila ble " " G G G The line styles a bove illustra te the type ofrightofwa y exta ntorproposed. The colouris persection4below. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY ^ ^ ^ ^ < < < < V erge Ava ila ble (NoFootwa y) ( ( ( ( Ca ria gewa yava ila ble (NoFootwa yorv erge) Bywa yopentoa ll tra ffic (public) Roa d /Tra ck (priva te) M otorised Only DiversionRoute Crooked The Old Rectory S2 - Abbotts W here the proposa ls ma ydivertusers ontoa na dopted highwa y,the a bove symbols denote where a footwa y is a va ila ble,a verge only,orifneithera footwa yorverge is a va ila ble a nd pedestria ns would need towa lk inthe ca ria gewa y. Cow Pa sture KingfisherBa rn Fa rm a nd 2 Tra ck Pa ddock House The Trotters Cow Pa sture Ba rn 9 Footpath 00, Mellis Oa k Lodge Tra ck RectoryFa rm Footpath 008, Mellis Tra ck The Old Pa rsona ge Crossing Cotta ge ROAD New House Sylva n The Pyghtle M etles House Chestnut Lodge Chestnut V illa s Breccles Crowncopyrighta nd da ta ba se rights 207Ordna nce Survey Tha tch This da ta must not be pa ssed ontoa nycontra ctor/s orthird pa rties without permission from Network Ra il s OSM a ptea m a nd/orwithout yourcontra ctor/s Elmroyd dulysigned-uptothe OSFCDCContra ctorlicence.sending a nd/orsha ring of OSda ta to/with externa l third-pa rties such a s Network Ra il s Contra ctors,their delega ted a gents a nd/orrepresenta tives,withoutpropergoverna nce will putthe Contra ctor(a nd Network Ra il byextension)inbrea ch ofthe OSContra ctor M a nor Lodge M oa t Rectory Road RECTORY Beecroft M ea dix Poultry Houses OrionHouse Kessa ria ni Ba nbury Ha rtwell House ChestnutCotta ge Bullocks Fa rm Bullocks Fa rm 7 Ea rlsford House 4 EARLSFORD ROAD 3 M ellis S2 Abbotts Proposal Private:existing priva te footpa th rights removed, users diverttoa lterna tive M ellis Roa d level crossing tothe north Public:noexisting public rights Infrastructure:F4fence ma ximum of50m either side ofthe level crossing a nd onboth sides ofthe ra ilwa y SECTION 4: PROPOSED STATUS CHANGE The a bove colours a pplytosections,2a nd 3a bove. P3A M a r207 Rev Nocha nge a nd notpa rt ofdiversion U se ofexisting rightofwa y a s pa rtofdiversion Cha nge ofsta tus toexisting rightofwa y Fencing (tie intoexisting) Ga tes Da te ForInforma tion Description Closure ofexisting rightofwa y Crea tionofnew rightofwa y SECTION 5: ASSOCIATED INFRASTRUCTURE (Indica tive fea tures)!!! ú # # # # Bridges Footwa y Future developments bythird Pa rtyprojects where pla nning deta ils a re a va ila ble Ra ilwa y.the la youtshownonthis dra wing is indica tive a nd ma ybe subjectto cha nge a tdeta iled design. 2.This dra wing should be rea d inconjunctionwith the Suffolk DesignGuide (Ref:36756/RPT023)which conta ins deta ils ofthe infra structure types refe red tointhis dra wing. Anglia Level Crossing ReductionStra tegy DesignFreeze Proposa ls S2-Abbotts Suffolk -M ellis CP PostCode IP238DN W C SRP Dwn EChk SJT Ch'k'd JAS App'd M otm a cdona ld Ltd. This documentis issued forthe pa rtywhich commissioned ita nd forspecific purposes connected with the ca ptioned projectonly.itshould notbe relied uponby a nyotherpa rtyorused fora nyotherpurpose. W e a cceptnoresponsibility forthe consequences ofthis documentbeing relied uponby a nyotherpa rty,orbeing used fora nyotherpurpose,orconta ining a ny e rororomissionwhich is due toa ne rororomissioninda ta supplied touse by otherpa rties. Kilometers Sca le a ta3 NTS Dra wing No. M M D S2-GEN-005 P:\Leeds\Ea stern\36756-grip2-4-anglia Level Crossings.JAS\GIS\Design\DesignFreeze Pla ns\04m XDs\New Forma tdf\p3\suffolk\36756designfreeze Proposa l Pla ns -Alterna tive Forma tsuffolk_ RD.mxd

138 8 3 2 to 7 9 to 4 3b a 26 2 Ñ HEA T HB ELL ROA D 24 Ñ 27 GRE ENF I ELD S ALL ( um ) Footwa yava ila b le ^ ^ ^ ^ M otor ised Only V er ge Ava ila b le ( NoFootwa y) Diver sionroute Ca r r ia gewa y Ava ila b le ( NoFootwa y orv er ge)!! Closur e ofexisting r ightofwa y Cr ea tionofnew r ightofwa y ú 2 ST JOHNS 5 5 Ra ilwa y Br idges # # # # Footwa y.t he la youtshownonthisdr a wing isindica tive a nd m a y b e sub jectto cha nge a tdeta iled design. 2.T hisdr a wing should b e r ea d inconjunctionwith the Suffolk DesignGuide ( Ref:36756/RPT 023)which conta ins r ed tointhisdr a wing. deta ilsofthe infr as tr uctur e typesr efer Anglia LevelCr os s ing ReductionStr a tegy Des ignfr eeze Pr opos a ls Public:Noexis ting orpr opos ed r ights S22-Wea ther by Suffolk -Newm a r ketcp PostCode CB88BT Permissive:Exis ting per m is s ive r ightsr em oved,us er s diver ttoa dja centnew Cheveley Roa d under br idge tothe wes t 7 Infrastructure:Pr opos ed fencing tor epla ce a cces sga te ofthe levelcr os s ing onb oth s idesofthe r a ilwa y:t ype F M ottm a cdona ld Ltd. T hisdocum entisiss ued forthe pa r ty which com m iss ioned ita nd fors pecific pur posesconnected with the ca ptioned pr ojectonly.i ts hould notb e r elied uponb y a ny otherpa r ty orused fora ny otherpur pos e. We a cceptnor es pons ib ility forthe cons equencesofthisdocum entb eing r elied uponb y a ny otherpa r ty,orb eing used fora ny otherpur pos e,orconta ining a ny er r ororom is s ionwhich isdue toa ner r ororom iss ioninda ta s upplied touse b y otherpa r ties. Futur e developm entsb y T hir d Pa r ty pr ojectswher e pla nning deta ilsa r e a va ila b le Fencing ( tie intoexis ting) Ga tes S22 Weatherby Proposal Private:Noexis ting orpr opos ed r ights AR M S T R ON GC LO SE 83 SAI 7 NT S 73 RO AD Pa th 8 55 RO AD CR O CK FO RD S 0 CL 3 AR E PL AC 92 E Pa th < < < <! VI CAR AGE ROA D Gr a nb y 3 Cott 5 a ge 7 25 M ALT CLO SE 7 30!!!! SECTION 5: ASSOCIATED INFRASTRUCTURE ( I ndica tive fea tur es) Pedestrian Network Rail access gate SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY T he a b ove colour sa pply tosections,2a nd 3a b ove. 37 T CB a T un ne l V ic ar a ge BAR 9 LEY 7 5 CR ES CE NT St an d P av ilio n 24 W I LL O W Cot t Rug by 27 GRA 25 NBY ST R 23 EET a 3a a 28 b 20 QU E 6 ENS 2 T RE ET 44 Co tta ge a to 2 02 ST 2 R EE T W AR R I N G TO N o6 t \\U KLEEDDC0P \ r ojectsl \ eeds\ea s ter\ n36756-gri P24- Anglia LevelCr oss ings. JASGI \ SD \ es ignd \ esignfr eeze Pla ns \04M XDs\New For m a tdfp \ 3S \ uffolk\36756designfr eeze Pr opos a lpla ns-alter na tive For m a tsuffolk. m xd " T he line stylesa b ove illus tr a te the type ofr ightofwa y exta ntorpr oposed. T he colourispers ection4b elow RO AD DS to CR to O 50 CK FO 42 R 72 T hr e ew a ys 72a b 76a RO AD 43 EV ELEY NEW CH Roa d /T r a ck ( pr iva te) Cha nge ofsta tustoexisting r ightofwa y Cr owncopyr ighta nd da ta b a se r ights207or dnarhn ur vey O ce S U SE Pr iion m ar yfs cho l et T hisda ta must not b e pa ss ed ontoa ny contr a ctor / so thir d pa r tieswithout permiss r o m on wor k Ra il sosm a pt ea m a nd/ orwithout yourcontr a ctor / s Dr R IV uptothe OSFCDCContr a ctorlicence.sen ng a nd/ orsha r ing ofosda ta to/ with exter na lthir dpa r tiess uch a snetwor k Ra il scontr a ctor s,their duly s ignededi t delega ted a gentsa nd/ orr epr esen a tives,withoutpr opergover na nce will putthe Contr a ctor( a nd Networ k Ra ilb y extension)inb r ea ch ofthe OSContr a ctor to to to a 34a to E 26to to un ica tio n Br idlewa y ( pub lic) " Nocha nge a nd notpa r t ofdiver sion U se ofexisting r ightofwa y a spa r tofdiver sion PA D D O C KS D R I V AD RO 33 m FI EL D a ffic ( pub lic) G G G Bywa y opentoa lltr SECTION 4: PROPOSED STATUS CHANGE EY EL EV CH 23 CR I CK ET le co m Footpa th ( pub lic) Restr icted b ywa y ( pub lic) ( ( ( ( Te 37 VE I DR 35 PE TE 9to 20 to 8 Br yntir ioncour t excluding a dopted highwa y) SECTION 2: TYPE OF RIGHT OF WAY ( LB 2 TY NI I TR LT wr ESS FB WH I T EG AT E S Rightsnotm odified a spa r tofthispr oject T he a b ove s ym b olsindica te existing levelcr oss ing loca tions. T he r ing colour sa r e a spersection4b elow. Remove 30m of existing 2.25m wide tarmac footway and provide grass reinstatement LT wr 6 LB Newm a r ket 5 7 PE M B RO KE PeelHous e 37 Rightstob e m odified a spa r tofthispr oject # # to5 6to3 4to2 Wher e the pr opos a lsm a y diver tuser sontoa na dopted highwa y,the a b ove s ym b olsdenote wher e a footwa y isa va ila b le,a ver ge only,orifneithera footwa y orver ge isa va ila b le a nd pedestr ia nswould need towa lk inthe ca r r ia gewa y. LT wr AD RO SECTION : LEVEL CROSSINGS 9 E OS CL 2 Y AR AN GR ns b T UR CO GN I RE VE SO Footb a llgr ound Cor ona tion AD O R N 22 8 E E R G 49 ona tion Cor Cor ona tion T he Old a Begga r s 20 FB 2 Use of existing underbridge with provision of new handrails to be discussed further with Suffolk County Council 46 FB FB Pa r k La ne 43a T he Old PH Gr a nb y Ga r de S22 - Weatherby Sub Sta El T a tter sa llscr escent Pos t NAT FLA 39 T M A NST REE T T CB Gr 3 a nb ym e ws 74 a Pos t Remove 4.5m of existing 2m wide tarmac footway and provide grass reinstatement 2 5 5c 35 Co tts Remove tactile paving and add tarmac footway T PA R K LA 4 N E King Witnd om Ha e sse ll s 4 ts otdic K onc PE t to RR p 0 YM am r AN C C O 8 U R C JA 23 5a 9 a 23 3 O CL 5 to RV IS 2 KJA 32 b 3 2 U E AV EN PARK Cott a ge 25 As hb our ne Cr es cent PH to 69 SE Ditto n Cott 27 5 T CB ALL SAI B NT S L ROA 03 D 83 b Cotta ges 2a StGa tien StG a tien Cotta ge T he T ea cher s 9 67 He 6 a th co He a te P th c la ce LBOLD ote ST A T I Pla ON ce RO Ga sgov AD M AC HEL LPL ACE Sta tion 55 V illa s 0 9 M a gistr a tes' AllS a int sc hur ch o f He a th 48 Sur ger y Pla ce 0 6 Oa kfie ld 8 M em or ia l Cotta ges Kilom eter s 0. 5 P3A M a r207 Rev Da te Sca le a ta3 NT S ForI nfor m a tion WC Descr iption d k' d App' Dwn EChk Ch' Dr a wing No. SRP 36756S22GEN005 M M D- SJ T J AS

139 Footpath 00, Higham Footpath 03, Higham SECTION : LEVEL CROSSINGS Footpath 002, Higham # Ñ # Ñ Right stb o e m odified a spa rtofthisprojec t Rightsn otm odified a spa rtofthisprojec t The a b ove sym b olsin dic a te existin g levelc rossin g loc a tion s. The rin g c olour sa re a spersec tion 4b elow. S23 - Higham La y-b y SECTION 2: TYPE OF RIGHT OF WAY (exc ludin g a dopted highwa y) " " Footpa th (pub lic ) G G G Bywa y open toa lltra ffic (pub lic ) Bridlewa y (pub lic ) Restric ted b ywa y (pub lic ) Roa d /Tra c k (priva te) The lin e stylesa b ove ilustra te the type ofrightofwa yexta n torproposed. The c olourispersec tion 4b elow. A4 Creation of new.5m wide footway within highway verge: Type P8 A4 SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M otor ised On ly Diversion Rout e < < < < V erge Ava ila b le (NoFootwa y) M S ( ( ( ( Ca ria gewa yava ila b le (NoFootwa yorv erge) Forge The Roun d House to5 U n it3 U n it The Ta vern COALPITLANE Oa k House W here the proposa lsm a ydivertuserson toa n a dopted highwa y,the a b ove sym b olsden ote where a footwa y isa va ila b le,a verge on ly,orifn eithera footwa yorverge isa va ila b le a n d pedestria n swould n eed towa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE The Cota ge LB The Old Sta tion Use of existing bridge 6 5 Noc ha n ge a n d n otpa rt ofdiversion U se ofexistin g rightofwa y a spa rtofdiversion Cha n ge ofsta tust oexistin g rightofwa y Closure ofexistin g rightofwa y Crea tion ofn ew rightofwa y The a b ove c oloursa pplyt osec tion s,2a n d 3a b ove GP W a rm em oria l Footpath 005, Higham Proposed steps/ramps with footbridge over ditch: Type S-B SECTION 5: ASSOCIATED INFRASTRUCTURE (In dic a tive fea tur es) Fen c in g!!! (tie in toexistin g) Ga tes ú Bridges # # # # Footwa y Future developm en tsb ythird Pa rtyprojec tswhere pla n n in g deta ilsa re a va ila b le Ra ilwa y.the la youtshown on thisdra win g isin dic a tive a n d m a yb e sub jec tt o c ha n ge a tdeta iled design. 2.Thisdra win g should b e rea d in c on jun c tion with the Suffolk Design Guide (Ref:36756/RPT023)whic h c on ta in s deta ilsofthe in fra str uc tur e typesrefe red toin thisdra win g. Footpath 006, Higham Footpath 007, Higham An glia LevelCrossin g Reduc tion Stra tegy Crown c opyrighta n d da ta b a se rights207ordn a n c e Survey Thisda ta must not b e pa ssed on toa n y c on ta rc t orsort / hird pa rt iesw ithout permission from Net work Ra il sos M a ptea m a n d/ orw ithout yourc on ta rc t ors / duly sign ed-uptot he OSFCDCCon ta rc torlic en c e.sen din g a n d/orsha rin g ofosda ta to/with ext ern a lthird-pa rt iessuc h a snet wor k Ra il scon ta rc tor s,their delega ted a gen tsa n d/ orr epresen tives,withoutpropergover a t n a n c e will putthe Con ta rc tor(a n d Net wor k Ra il b yexten sion )in b rea c h ofthe OSCon ta rc tor Footpath 008, Higham S23 Higham Proposal Privat e:noexistin g orproposed rights Public:Existin g footpa th rightsrem oved,usersdiverttoa dja c en t Higha m Roa d b ridge tothe ea st Infrastructur e:f7fen c e m a xim um of0m tota l a tthe levelc rossin g on b oth sidesofthe ra ilwa y Design Freeze Proposa ls S23-Higha m Suffolk -Higha m CP PostCode IP286NJ P3A M a r207 ForIn form a tion W C SRP SJT JAS Rev Da te Desc ription Dwn EChk Ch'k'd App'd M otm a c Don a ld Ltd. Thisdoc um en tisissued forthe pa rty whic h c om m ission ed ita n d forspec ific purposesc on n ec ted with the c a ption ed projec ton ly.itshould n otb e relied upon b y a n y otherpa rty orused fora n y otherpurpose. W e a c c eptn orespon sib ility forthe c on sequen c esofthisdoc um en tb ein g relied upon b y a n y otherpa rty,orb ein g used fora n y otherpurpose,orc on ta in in g a n y e rororom ission whic h isdue toa n e rororom ission in da ta supplied touse b y otherpa rties Kilom eters Sc a le a ta3 Dra win g No. NTS M M D S23-GEN-005 P:\Leeds\Ea ster n \36756-GRIP24-An - glia LevelCrossin gsjas\gis\design. \Design Freeze Pla n s\04 M XDs\New Form a tdf\p3\suffolk\36756design Freeze Proposa lpla n s- Altn era tive Form a tsuffolk_ RD.m xd

140 Foo tpath 00, Caven ham Footpath 00, Higham Footpath 03, Higham SECTION : LEVEL CROSSINGS # Right st o b e m o d ifie d a spa rto fthispro jec t Ñ # Ñ Rightsno tm o d ified a spa rto fthispro jec t The a b o ve sym b o lsind ic a te existing levelc ro ssing lo c a tio ns. The ring c o lo ur sa re a spersec tio n 4b elo w. SECTION 2: TYPE OF RIGHT OF WAY (exc lud ing a d o pted highwa y) " " Fo o tpa th (pub lic ) G G G Bywa yo pen to a lltra ffic (pub lic ) Brid lewa y(pub lic ) Restric ted b ywa y(pub lic ) Ro a d /Tra c k (priva te) Use of existing bridge The line stylesa b o ve ilustra te the type o frighto fwa yexta nto rpro po sed. The c o lo urispersec tio n 4b elo w. Footpath 002, Higham Footpath 003, Higham S24 - Higham Ground Frame Footpath 009, Risby SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Fo o twa yava ila b le ^ ^ ^ ^ M o to rised Only Diversio n Ro ut e < < < < V erge Ava ila b le (No Fo o twa y) S23 Higham Footpath 007, Higham Fo rge The Co ta ge W a rm em o ria l Footpath 006, Higham M S The Ta vern The Old Sta tio n Footpath 005, Higham A4 Oa k Ho use Creation of new.5m wide footway within highway verge: Type P8 A4 Proposed 2m wide field margin footpath: Type P Need le'seye Use of existing underbridge Tra c k La y-b y Proposed 3m wide field margin bridleway: Type P2 Tra c k Ba ro w Hea th ( ( ( ( Ca ria gewa yava ila b le (No Fo o twa yo rv erge) W here the pro po sa lsm a yd ivertuserso nto a n a d o pted highwa y,the a b o ve sym b o lsd eno te where a fo o twa yisa va ila b le,a verge o nly,o rifneithera fo o twa yo rverge isa va ila b le a nd ped estria nswo uld need to wa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE No c ha nge a nd no tpa rt o fd iversio n U se o fexisting righto fwa y a spa rto fd iversio n Cha nge o fsta tust o existing righto fwa y Clo sure o fexisting righto fwa y Crea tio n o fnew righto fwa y The a b o ve c o lo ursa pplyt o sec tio ns,2a nd 3a b o ve. SECTION 5: ASSOCIATED I NFRASTRUCTURE (Id n ic a tive fea tur es) Proposed steps/ramps with footbridge over ditch: Type S-B Footpath 006, Barrow Footpath 008, Higham Proposed 2m wide field margin footpath: Type P Fenc ing!!! (tie into existing) Ga tes ú Brid ges # # # # Fo o twa y Future d evelo pm entsb ythird Pa rtypro jec tswhere pla nning d eta ilsa re a va ila b le Ra ilwa y Footpath 009, Higham Bridleway 00, Higham Footpath 0, Higham Footpath 00, Barrow Proposed 2m wide field margin footpath: Type P Restricted Byway 005, Barrow Footpath 002, Barrow Footpath 004, Barrow M o tm a c Do na ld Ltd. Thisd o c um entisissued fo rthe pa rtywhic h c o m m issio ned ita nd fo rspec ific purpo sesc o nnec ted with the c a ptio ned pro jec to nly.itsho uld no tb e relied upo n b y a nyo therpa rtyo rused fo ra nyo therpurpo se. W e a c c eptno respo nsib ility fo rthe c o nsequenc eso fthisd o c um entb eing relied upo n b y a nyo therpa rty,o rb eing used fo ra nyo therpurpo se,o rc o nta ining a nye ro ro ro m issio n whic h isd ue to a n e ro ro ro m issio n in d a ta supplied to use b y o therpa rties. \U KLEEDDC0\Pro jec ts\leed s\ea st ern\36756-grip24-anglia - LevelCro ssingsjas\gis\design\design. Freeze Pla ns\04 M XDs\New Fo rm a tdf\p3\suffo lk\36756design Freeze Pro po sa lpla ns- Alt erna tive Fo rm a tsuffo lk. m xd Footpath 007, Barrow Footpath 009, Barrow Cro wn c o pyrighta nd d a tb a a se rights207orna d nc e Survey Thisd a ta must not b e pa ssed o nto a ny c o nta rc t o rso / rt hir d pa rt iesw ithout permission fro m Net wo rk Ra il sos M a ptea m a n d / o rw ithout yo urc o nta rc t o rs / d uly signed -upt o the OSFCDCCo nta rc to rlic enc e.send ing a nd /o rsha ring o fosd a ta to /with ext erna lthir- d pa rt iessuc h a snet wo rk Ra il sco nta rc to rs,their d elega td e a gentsa nd / o rr epresent a tives,witho utpro pergo ver na nc e will putthe Co nta rc to r( a nd Net wo rk Ra il b yextensio n)in b rea c h o fthe OSCo nta rc to r Bridleway 08, Barrow S24 Higham Ground Private: No existing o rpro po sed rights Bridleway 09, Barrow Public: Existing fo o tpa th rightsrem o ved,usersd ivert to a d ja c enthigha m Ro a d b rid ge to the westo r The Need leseye und erb rid ge to the ea st Infrastructure: F4fenc e to run westto the existing b rid ge a lo ng Netwo rk Ra ilb o und a rya nd to run ea st a lo ng Netwo rk ra ilb o und a ryto Need le'seye und erb rid ge F7fenc e fo ra m a xim um o f0m a tthe levelc ro ssing o n the no rth sid e o fthe ra ilwa y Kilo m eters The la yo utsho wn o n thisd ra wing isind ic a tive a nd m a yb e sub jec tto c ha nge a td eta iled d esign. 2.Thisd ra wing sho uld b e rea d in c o njunc tio n with the Suffo lk Design Guid e (Ref:36756/RPT023)whic h c o nta ins d eta ilso fthe infra stuc r tur e typesrefe rd e to in this d ra wing. Anglia LevelCro ssing Red uc tio n Stra tegy Design Freeze Pro po sa ls S24-Higha m Gro und Fra m e Suffo lk -Ba ro w CP Po stco d e IP286NS P3A M a r207 Fo rinfo rm a tio n W C SRP SJT JAS Rev Da te Desc riptio n Dwn EChk Ch'd k' Sc a le a ta3 Dra wing No. NTS M M D S24-GEN-005 App'd

141 Restricted Byway 004, Great Barton SECTION : LEVEL CROSSINGS #Ñ #Ñ Rights tobe modified as partofthis project Rights notmodified as partofthis project T he above symbols indicate existing levelcrossing locations. T he ring colours are as persection4below. Proposed housing development in this area Use of existing underpass. Existing fence to be removed (and reused) to allow access and new cycle path to be constructed beneath underpass Ca tisha l Proposed 3m wide surfaced tarmac bridleway: Type P5 T rack Ca tisha l Ca tisha l S25 - Cattishall SECTION 2: TYPE OF RIGHT OF WAY (excluding adopted highway) Footpath (public) Bridlew ay (public) Restricted byway (public)!!!! Footw ay Available " " G G G T he line styles above ilustrate the type ofrightofway extantorproposed. T he colouris persection4below. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY ^ ^ ^ ^ < < < < Verge Available (NoFootway) ( ( ( ( Carriageway Available (NoFootway orverge) Byway opentoa ltraffic (public) Road /T rack (private) Motorised Only DiversionRoute Where the proposals may divertusers ontoanadopted highway,the above symbols denote where a footway is available,a verge only,orifneithera footw ay orverge is available and pedestrians would need towalk inthe carriageway. SECTION 4: PROPOSED STATUS CHANGE RICHARD BRADBROOK CL OS E WREN S KY L ARKCL OS E BL ACKBIRD BRADBROOKCL OS E 49&5 26 Nochange and notpart ofdiversion U se ofexisting rightofway as partofdiversion Change ofstatus toexisting rightofw ay Closure ofexisting rightofw ay Creationofnew rightofw ay T he above colours apply tosections,2and 3above ElS ub S ta BRADBROOKCL OS E 9 43 WAGTAIL DRIVE KINGFIS HER ROAD ElS ub S ta CHAFFINCHROAD T U RNS T ONEDRIVE HU MMINGBIRDCL OS E Posts KINGBIRDROAD Ambleside Cherry T rees Network Rail vehicular access gate to be provided SECTION 5: ASSOCIATED INFRASTRUCTURE (Indicative features)!!! ú # # # # Fencing (tie intoexisting) Gates Bridges Footw ay Future developments by T hird Party projects where planning details are available Railw ay Bridleway 03, Bury St. Edmunds Use of existing footpath/cycle lane.t he layoutshownonthis drawing is indicative and may be subjectto change atdetailed design. 2.T his drawing should be read inconjunctionwith the S uffolk DesignGuide (Ref:36756/RPT 023)w hich contains details ofthe infrastructure types referred tointhis drawing. Anglia L evelcrossing ReductionS trategy S25 Cattishall Proposal Private: Noexisting orproposed rights DesignFreez e Proposals Footpath 03, Rushbrooke with Rougham Crowncopyrightand database rights 207Ordnance S urvey T his data must not be passed ontoany contractor/s orthird parties without permission from Network Rail s OS MapT eam and/or without yourcontractor/s duly signed-uptothe OS FCDCContractorL icence.s ending and/orsharing ofos data to/w ith externalthird-parties such as Network Rail s Contractors,their delegated agents and/orrepresentatives,withoutpropergovernance will putthe Contractor(and Network Railby extension)inbreach ofthe OS Contractor Public: Existing footpath rights removed,users diverttoadjacentunderpass tothe w est Infrastructure: F4fence 50m eastofthe levelcrossing and tothe existing underpass w est, both along Network Railboundary north ofthe levelcrossing F4fence maximum 50m eitherside ofthe levelcrossing onthe south side P3A Mar207 Rev Date S 25-Ca tisha l S uffolk -GreatBartonCP PostCode IP32QU ForInformation Description WC S RP Dwn EChk S JT Ch'k 'd JAS App'd MottMacDonald L td. T his documentis issued forthe party w hich commissioned itand forspecific purposes connected w ith the captioned projectonly.itshould notbe relied uponby any otherparty orused forany otherpurpose. We acceptnoresponsibility forthe consequences ofthis documentbeing relied uponby any otherparty,orbeing used forany otherpurpose,orcontaining any errororomissionw hich is due toanerrororomissionindata supplied touse by otherparties. Kilometers S cale ata3 NT S Drawing No. MMD S 25-GEN-005 P:\L eeds\eastern\36756-grip2-4-anglia L evelcrossings.jas \GIS \Design\DesignFreez e Plans\04MX Ds\New FormatDF\P3\S uffolk \36756DesignFreeze ProposalPlans -Alternative FormatS uffolk _ RD.mxd

142 Footpath 06, Thurston BOAT 023, Thurston Ho use Hill Ñ Ha ll Churc h V iew The La urels GP W a lnuttree Co t Proposed footbridge over track: Type S-B Ma gno lia Ho use SECTION : LEVEL CROSSINGS Footpath 07, Thurston # Right st o b e mo d ifie d a spa rto fthispro jec t # Ñ Rightsno tmo d ified a spa rto fthispro jec t The a b o ve symb o lsind ic a te existing levelc ro ssing lo c a tio ns. The ring c o lo ur sa re a spersec tio n 4b elo w. SECTION 2: TYPE OF RIGHT OF WAY (exc lud ing a d o pted highwa y) " " Fo o tpa th (pub lic ) G G G Bywa yo pen to a lltra ffic (pub lic ) TCB Co ta ge Arnd a le Silver 3 7 Use of existing bridge with pedestrian improvement measures 2 Co ta ge Ja sperco ta ge CHURCHROAD The Firs Old Po stoffic e La ne The Green Fa rm W illo w Dene Green Fa rm Ho use Sto c kho ld Green Sto c kho ld GP Melro se Bunga lo w Pa rb ury Sto c kho ld Green STON EYLAN E S27 - Barrells Brid lewa y(pub lic ) Restric ted b ywa y(pub lic ) Ro a d /Tra c k (priva te) The line stylesa b o ve illustra te the type o frighto fwa yexta nto rpro po sed. The c o lo urispersec tio n 4b elo w Cro ftbunga lo w BARRELL'SROAD ButerflyCo ta ge MillV iew Tra c k Co ta ge Brid ge Mo fleyco ta ge Ta nk BIRD'SROAD Po pples W o o d la nd s Footpath 005, Thurston Tra c k Proposed fence along Network Rail boundary on the south side of the railway extending 50m past the level crossing to the west : Type F4 and upto overbridge to the east Pa th (um) The W illo ws Pa th (um) Proposed 2m wide footpath: Type P Proposed gate: Type G Proposed.5m wide footpath in Network Rail land: Type P Ho ur Id le Sa rum Lo d ge S28 - Grove Farm W estco ta ge Pa th (um) Footpath 0, Thurston Use of existing bridge Proposed 2m wide footpath in field margin: Type P Ea stco ta ge Gro ve Fa rm SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Fo o twa yava ila b le ^ ^ ^ ^ Mo to rise d Only Diversio n Ro ut e < < < < V erge Ava ila b le (N o Fo o twa y) ( ( ( ( Ca ria gewa yava ila b le (N o Fo o twa yo rv erge) W here the pro po sa lsma yd ivertuserso nto a n a d o pted highwa y,the a b o ve symb o lsd eno te where a fo o twa yisa va ila b le,a verge o nly,o rifneithera fo o twa yo rverge isa va ila b le a nd ped estria nswo uld need to wa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE N o c ha nge a nd no tpa rt o fd iversio n Use o fexisting righto fwa y a spa rto fd iversio n Cha nge o fsta tusto existing righto fwa y Clo sure o fexisting righto fwa y Crea tio n o fnew righto fwa y The a b o ve c o lo ursa pplyto sec tio ns,2a nd 3a b o ve. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic a tive fea tures) Fenc ing Futur e d evelo pmentb s ythir d!!! (tie into existing) Pa rtypro jec tswhere pla nning Ga tes d eta ilsa re a va ila b le ú Brid ges Ra ilwa y # # # # Fo o twa y.the la yo utsho wn o n thisd ra wing isind ic a tive a nd ma yb e sub jec tto c ha nge a td eta iled d esign. 2.Thisd ra wing sho uld b e rea d in c o njunc tio n with the Suffo lk Design Guid e (Ref:36756/RPT023)whic h c o nta ins d eta ilso fthe infra stuc r tur e typesrefe rd e to in this d ra wing. Footpath 025, Thurston Anglia LevelCro ssing Red uc tio n Stra tegy Footpath 0, Tostock Design Freeze Pro po sa ls Cro wn c o pyrighta nd d a ta b a se rights207ord na nc e Survey Thisd a ta must not b e pa ssed o nto a ny c o nta rc t o rso / rt hir d pa rt iesw ithout permission fr o m N etwo rk Ra il sosma ptea m a n d / o rw ithout yo urc o nta rc t o rs / d uly signed -upt o the OSFCDCCo nta rc to rlic enc e.sen d ing a n d /o rsha ring o fosd a ta to /with ext erna lthir- d pa rt iessuc h a sn etwo rk Ra il sco nta rc to rs,their d elega td e a gentsa nd / o rr epr esentives,witho a t utpro pergo ver na nc e will putthe Co ntr a c to r( a nd N etwo rk Ra il b yextensio n)in b rea c h o fthe OSCo nta rc to r S27 Barrells Proposal Private: N o existing o rpro po sed rights Public: Existing fo o tpa th rightsremo ved,usersd ivert to a d ja c entba re l'sro a d b rid gesto the ea sta nd west Infrastructure: F7fenc ing ma ximum0m eithersid e a tthe levelc ro ssing o n b o th sid eso fthe ra ilwa y P3A Ma r207 Rev Da te S27-Ba re ls Suffo lk -Thursto n CP Po stco d e IP33RJ Fo rinfo rma tio n Desc riptio n W C Dwn SRP EChk SJT Ch'k'd JAS App'd Mo tma c Do na ld Ltd. Thisd o c umentisissued fo rthe pa rtywhic h c o mmissio ned ita nd fo rspec ific purpo sesc o nnec ted with the c a ptio ned pro jec to nly.itsho uld no tb e relied upo n b y a nyo therpa rtyo rused fo ra nyo therpurpo se. W e a c c eptno respo nsib ility fo rthe c o nsequenc eso fthisd o c umentb eing relied upo n b ya ny o therpa rty,o rb eing used fo ra nyo therpurpo se,o rc o nta ining a nye ro ro ro missio n whic h isd ue to a n e ro ro ro missio n in d a ta supplied to use b yo therpa rties Kilo meters Sc a le a ta3 Dra wing N o. N TS MMD S27-GEN -005 P:\Leed s\ea st ern\36756-grip24-anglia - LevelCro ssingsjas\gis\design\design. Freeze Pla ns\04m X Ds\ew N Fo rma tdf\p3\suffo lk\36756design Freeze Pro po sa lpla ns-alt erna tive Fo rma tsuffo lk. mxd

143 Footpath 06, Thurston BOAT 023, Thurston House Hill Ha ll Churc h V iew The La urels GP TCB Cota ge 75 The Firs Arn da le Silver 3 7 Use of existing bridge with pedestrian improvement measures 2 Ja spercota ge CHU RCHROAD 5 Old PostOffic e La n e The Green Fa rm Cota ge W illow Den e Green Fa rm House Stoc khold Green Stoc khold GP M elrose Bun ga low Pa rb ury Stoc khold Green W a ln uttree Cot STONEYLANE CroftBun ga low BARRELL'SROAD Footpath 07, Thurston Bu terfly Cota ge M illv iew Tra c k Cota ge Bridge M ofleycota ge Ta n k BIRD'SROAD S27 - Barrells Popples W oodla n ds Footpath 005, Thurston Tra c k Proposed fence along Network Rail boundary on the south side of the railway extending 50m past the level crossing to the west : Type F4 and upto overbridge to the east Pa th (um ) The W illows Proposed footbridge over track: Type S-B Pa th (um ) Proposed 2m wide footpath: Type P M a gn olia House Proposed gate: Type G Proposed.5m wide footpath in Network Rail land: Type P Hour Idle Sa rum Lodge S28 - Grove Farm W estcota ge Footpath 0, Thurston Pa th (um ) Use of existing bridge Proposed 2m wide footpath in field margin: Type P Ea stcota ge Grove Fa rm SECTION : LEVEL CROSSINGS # Ñ # Ñ Right stb o e m odified a spa rtofthisprojec t Rightsn otm odified a spa rtofthisprojec t The a b ove sym b olsin dic a te existin g levelc rossin g loc a tion s. The rin g c olour sa re a spersec tion 4b elow. SECTION 2: TYPE OF RIGHT OF WAY (exc ludin g a dopted highwa y) " " Footpa th (pub lic ) G G G Bywa y open toa lltra ffic (pub lic ) Bridlewa y (pub lic ) Restric ted b ywa y (pub lic ) Roa d /Tra c k (priva te) The lin e stylesa b ove illustra te the type ofrightofwa yexta n torproposed. The c olourispersec tion 4b elow. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M ot or ised On ly Diversion Rout e < < < < V erge Ava ila b le (NoFootwa y) ( ( ( ( Ca ria gewa yava ila b le (NoFootwa y orv erge) W here the proposa lsm a y divertuserson toa n a dopted highwa y,the a b ove sym b olsden ote where a footwa y isa va ila b le,a verge on ly,orifn eithera footwa y orverge isa va ila b le a n d pedestria n swould n eed towa lk in the c a ria gewa y. SECTION 4: PROPOSED STATUS CHANGE Noc ha n ge a n d n otpa rt ofdiversion U se ofexistin g rightofwa y a spa rtofdiversion Cha n ge ofsta tustoexistin g rightofwa y Closure ofexistin g rightofwa y Crea tion ofn ew rightofwa y The a b ove c oloursa pplytosec tion s,2a n d 3a b ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(In dic a tive fea tures) Fen c in g Futur e developm en tb s ythird!!! (tie in toexistin g) Pa rtyprojec tswhere pla n n in g Ga tes deta ilsa re a va ila b le ú Bridges Ra ilwa y # # # # Footwa y 025, Footpath Footpath 0, Tostock Thurston.The la youtshown on thisdra win g isin dic a tive a n d m a yb e sub jec tt o c ha n ge a tdeta iled design. 2.Thisdra win g should b e rea d in c on jun c tion with the Suffolk Design Guide (Ref:36756/RPT023)whic h c on ta in s deta ilsofthe in fra str uc tur e typesrefe red toin thisdra win g. An glia LevelCrossin g Reduc tion Stra tegy S28 Grove Farm Proposal Private: Noexistin g orproposed rights Design Freeze Proposa ls Crown c opyrighta n d da ta b a se rights207ordn a n c e Survey Thisda ta must not b e pa ssed on toa n y c on ta rc t orsort / hird pa rt iesw ithout permission from Net wor k Ra il sosm a ptea m a n d/ orw ithout yourc on ta rc t ors / duly sign ed-uptot he OSFCDCCon ta rc torlic en c e.sen din g a n d/orsha rin g ofosda ta to/with ext ern a lthird-pa rt iessuc h a snet wor k Ra il scon ta rc tor s,their delega ted a gen tsa n d/orrepr esen tives,withoutpropergover a t n a n c e will putthe Con tr a c tor(a n d Net wor k Ra il b yexten sion )in b rea c h ofthe OSCon ta rc tor Public: Existin g footpa th rightsrem oved,users diverttoa dja c en tba re l'sroa d b ridgestothe ea sta n d west Infrastructure: Proposed fen c e a lon g Network Ra ilb oun da ry on n orth side ofthe ra ilwa yexten din g 50m pa ston b oth sides:type F4 Proposed ga te:type G P3A M a r207 Rev Da te S28-Grove Fa rm Suffolk -Thurston CP PostCode IP33SF ForIn form a tion Desc ription W C Dwn SRP EChk SJT Ch'k'd JAS App'd M otm a c Don a ld Ltd. Thisdoc um en tisissued forthe pa rty whic h c om m ission ed ita n d forspec ific purposesc on n ec ted with the c a ption ed projec ton ly.itshould n otb e relied upon b y a n y otherpa rty orused fora n y otherpurpose. W e a c c eptn orespon sib ility forthe c on sequen c esofthisdoc um en tb ein g relied upon b y a n y otherpa rty,orb ein g used fora n y otherpurpose,orc on ta in in g a n y e rororom ission whic h isdue toa n e rororom ission in da ta supplied touse b y otherpa rties Kilom eters Sc a le a ta3 Dra win g No. NTS M M D S28-GEN-005 P:\Leeds \Ea stn er\ GRIP24-An - glia LevelCrossin gsjasgisdesign. \ \ \ Design Freeze Pla n s04 \ M XDsNew \ Form a tdf \P3 \Suffolk \36756Design Freeze Proposa lpla n s-alt ern a tive Form a tsuffolk.m xd

144 Foo t pa th 0 07, N or ton a th 002,E SECTION 2: TYPE OF RIGHT OF WAY lms w Footpa th ( pub lic) ell ( um ) Pa t h 42 ST AT I ON r ds 20 M ine va 8 r 20 RO AD Fo xi nn BO RLE 2a YC RES CEN T Pa t h Pa th Bu ild ing Str ee tf ar m M a lla 6 3 C LO SE EL LI ST O N AR M S TR ON G S BE NN ET T Th eo ld M CR AB TR 7 EE no rh ou se Ro Cot se ta g Co e tt Co tta ge a 234 ST AT 2 I ON RO AD! ú Kilom eter s Ra ilwa y Br idges # # # # Footwa y.the la youtshownonthisdr a wing isindica tive a nd m a y b e sub jectto cha nge a tdeta iled design. 2.Thisdr a wing should b e r ea d inconjunctionwith the Suffolk DesignGuide ( Ref:36756/RPT023)which conta ins deta ilsofthe infr a str uctur e typesr efer r ed tointhisdr a wing. Anglia LevelCr ossing ReductionStr a tegy DesignFr eeze Pr oposa ls Public:Existing footpa th r ightsr em oved,user sdiver ttoa dja cent under pa sstothe west Infrastructure:Pr oposed. 8m high cha inlink fence fr om the levelcr ossing tothe under pa sstothe westonthe nor th side ofthe r a ilwa y:type F4 Pr oposed. 8m high cha inlink fence totie intoexisting fea tur es form onthe south side:type F4 Pr oposed woodenposta nd r a ilfence ( tob e m a inta ined b y la ndowner ) tob e pr ovided a long nor ther nfield b oundies:type F6 Futur e developm entsb y Thir d Pa r ty pr ojectswher e pla nning deta ilsa r e a va ila b le Fencing ( tie intoexisting) Ga tes Sp in dr 2 ift Bu ng W oodla al r k Helvellyn ow a SCHOOL AV ENU E AN ROW 23 HuisBuildi ng 3 5 W il low Ho use 33 7 GR AN 8 GE M E AD OW 20! , Elm swell 23 2 Footpath 8 Foo t pa 06, th Elm swe ll 5 ell 20 0 lm sw 2 5 6, E ! a th 38 SECTION 5: ASSOCIATED INFRASTRUCTURE ( I ndica tive fea tur es) 6 33 Closur e ofexisting r ightofwa y Cr ea tionofnew r ightofwa y The a b ove colour sa pply tosections,2a nd 3a b ove Diver sionroute Ca r r ia gewa y Ava ila b le ( NoFootwa y orv er ge) Cha nge ofsta tustoexisting r ightofwa y 2 P: \Leeds\Ea ster n\36756-gri P24-Anglia LevelCr ossings. JAS\GI S\Des ign\designfr eeze Pla ns\04m XDs\New For m a tdf\p3\suffolk\36756designfr eeze Pr oposa lpla ns-alter na tive For m a tsuffolk_ RD. m xd S29 Hawk End Lane Proposal Private:Noexisting orpr oposed r ights 27 SE CLO V er ge Ava ila b le ( NoFootwa y) Nocha nge a nd notpa r t ofdiver sion U se ofexisting r ightofwa y a spa r tofdiver sion 7 67 R OXE ^ ^ ^ ^ M otor ised Only SECTION 4: PROPOSED STATUS CHANGE W ellhouse 6 The Gr a nge M ottm a cdona ld Ltd. Thisdocum entisissued forthe pa r ty which com m issioned ita nd forspecific pur posesconnected with the ca ptioned pr ojectonly.i tshould notb e r elied uponb y a ny otherpa r ty orused fora ny otherpur pos e. W e a cceptnor esponsib ility forthe consequencesofthisdocum entb eing r elied uponb y a ny otherpa r ty,orb eing used fora ny otherpur pose,orconta ining a ny er r ororom issionwhich isdue toa ner r ororom issioninda ta supplied touse b y otherpa r ties La ngha m Cr owncopyr ighta nd da ta b a se r ights207or dna nce Sur vey Thisda ta must not b e pa ssed ontoa ny contr a ctor / sorthir d pa r tieswithout permission fr om Networ k Ra il sosm a ptea m a nd/ orwithout yourcontr a ctor / s duly signeduptothe OSFCDCContr a ctorlicence.sending a nd/ orsha r ing ofosda ta to/ with exter na lthir dpa r tiessuch a snetwor k Ra il scontr a ctor s,their a ctor( a nd Networ k Ra ilb y extension)inb r ea ch ofthe OSContr a ctor delega ted a gentsa nd/ orr epr esenta tives,withoutpr opergover na nce will putthe Contr Tr ac k 3 E N LA OLDS CHOO LSCO U RT 7 D EN K House Lynfield ot p Tr a ck 2 0 8a 6a 6 2 The M 9 AW H 7 W ADO M E V ict or Ter 4 Elm ia C r a 6 ce 3 ha s w a ltins OW g snellst 9 e AD a E ew P Y E S t i o M Hou n W se Linden Va len Elmswell E t Foot p Gem cot Ba ines lsub Ha wk a th 0 nk Sta Ho BA 0, E K lmsw I v y E Bloom s Sta tion RS House ell 20 M I The LL Ha ll L i l a cs Cotta ge Fir e Sta tion 8 0 CRO Cha pelrow Sunnyside W N The M illstones M I Cotta ges 76 LL Ra ilwa y Gr a ntr ose Elm 2 T he S t a b l es for Chur ch d Elm swell TCB GP Cot PO ta g 46 e Ha ll Hall Farm user worked private level crossing to remain open..8m high type F4 wire mesh fence to be installed to replace.2m wire fence Fo 24 The Old Ba nk House ElSub Sta 5 Footwa y Ava ila b le W her e the pr oposa lsm a y diver tuser sontoa na dopted highwa y,the a b ove sym b olsdenote wher e a footwa y isa va ila b le,a ver ge only,orifneithera footwa y orver ge isa va ila b le a nd pedes tr ia nswould need towa lk inthe ca r r ia gewa y. 0 Tucked Awa y The Beeches M i F tfo AI R M E AD r d Hom esta ll BL AC 43 KB OU RN ER OA D ( ( ( ( ell 6 e lm sw Or cha r d Co tta g 6to 8 5 Ospr ey Sum m er 6 L ee Tr ew Y r be um Ha wk n no ot 8 9, E < < < < 3 87 EL RN NE LA Proposed.2m high wooden fence for 320m: Type F6 La sthouse Rose Field Ha lycon Kem pley House The Cotta ge Cotta ge 00 7 W a Alm a lnu Cotta ge tt r ee 8 PA Ha wk End COU RT!!!! well Elm tr ee Business Pa r k Sta tionroa d Esta te 2, 0 Ta nks th ll a p e w ot Fo lms E ND O ' S ak wo od Ar ydi Ev en tide W int er tho r ne 4 2 a Fa ctor y Sewa ge W or ks ST EDM U a th 22 Elms S29 - Hawk End Lane ot p Pa th ( um ) Roa d /Tr a ck ( pr iva te) SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY 8 03, Fo 4 pa t h " Restr icted b ywa y ( pub lic) Foot " Br idlewa y ( pub lic) 4a Hall Farm lmsw ell ( excluding a dopted highwa y) a ffic ( pub lic) G G G Bywa y opentoa lltr The line stylesa b ove illustr a te the type ofr ightofwa y exta ntorpr opos ed. The colourispersection4b elow. M oa t Proposed 2m wide footpath: Type P Ñ ell lms w 00,E a th ot p ot p k ac Tr ) um th ( Pa 4, E The a b ove sym b olsindica te exis ting levelcr os sing loca tions. The r ing colour sa r e a spersection4b elow. Ruin Steps to be provided on embankment: Type S2 a th 0 swellha ll Rightsnotm odified a spa r tofthispr oject # # Fo a ck Tr Elm Use of existing underbridge Foot p Fo Rightstob e m odified a spa r tofthispr oject Ñ SECTION : LEVEL CROSSINGS S29-Ha wk End La ne Suffolk -Elm swellcp PostCode I P309ED P3A M a r207 Rev Da te Sca le a ta3 NTS ForI nfor m a tion W C Descr iption d k' d App' Dwn EChk Ch' Dr a wing No. SRP 36756S29GEN005 M M D- SJT JAS

145 Footpath 006, Elmswell SECTION : LEVEL CROSSINGS # Ñ # Ñ Right stb o e m odified a spa rtofthisprojec t Rightsn otm odified a spa rtofthisprojec t The a b ove sym b olsin dic a te existin g levelc rossin g loc a tion s. The rin g c olour sa re a spersec tion 4b elow. Footpath 025, Elmswell Footpath 009, Elmswell SECTION 2: TYPE OF RIGHT OF WAY (exc ludin g a dopted highwa y) " " Footpa th (pub lic ) G G G Bywa y open toa lltra ffic (pub lic ) Bridlewa y (pub lic ) Restric ted b ywa y (pub lic ) Roa d /Tra c k (priva te) Tra c k Proposed 2m wide footpath: Type P S30 - Lords No.29 The lin e stylesa b ove illustra te the type ofrightofwa yexta n torproposed. The c olourispersec tion 4b elow. SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M ot or ised On ly Diversion Rout e < < < < V erge Ava ila b le (NoFootwa y) Footpath 023, Elmswell ( ( ( ( Ca ria gewa yava ila b le (NoFootwa y orv erge) W here the proposa lsm a y divertuserson toa n a dopted highwa y,the a b ove sym b olsden ote where a footwa y isa va ila b le,a verge on ly,orifn eithera footwa y orverge isa va ila b le a n d pedestria n swould n eed towa lk in the c a ria gewa y ELLISTONCLOSE Use of existing footbridge Proposed 2m wide footpath: Type P SECTION 4: PROPOSED STATUS CHANGE Noc ha n ge a n d n otpa rt ofdiversion U se ofexistin g rightofwa y a spa rtofdiversion Cha n ge ofsta tustoexistin g rightofwa y Closure ofexistin g rightofwa y Crea tion ofn ew rightofwa y 22 ROW AN GREEN The a b ove c oloursa pplytosec tion s,2a n d 3a b ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(In dic a tive fea tures) EASTERNW AY 50 Fen c in g Futur e developm en tb s ythird!!! (tie in toexistin g) Pa rtyprojec tswhere pla n n in g Ga tes deta ilsa re a va ila b le ú Bridges Ra ilwa y # # # # Footwa y 55.The la youtshown on thisdra win g isin dic a tive a n d m a yb e sub jec tt o c ha n ge a tdeta iled design. 2.Thisdra win g should b e rea d in c on jun c tion with the Suffolk Design Guide (Ref:36756/RPT023)whic h c on ta in s deta ilsofthe in fra str uc tur e typesrefe red toin thisdra win g. M u ton Ha ll An glia LevelCrossin g Reduc tion Stra tegy S30 Lords No.29 Proposal Privat e:noexistin g orproposed rights Design Freeze Proposa ls Crown c opyrighta n d da ta b a se rights207ordn a n c e Survey Thisda ta must not b e pa ssed on toa n y c on ta rc t orsort / hird pa rt iesw ithout permission from Net wor k Ra il sosm a ptea m a n d/ orw ithout yourc on ta rc t ors / duly sign ed-uptot he OSFCDCCon ta rc torlic en c e.sen din g a n d/orsha rin g ofosda ta to/with ext ern a lthird-pa rt iessuc h a snet wor k Ra il scon ta rc tor s,their delega ted a gen tsa n d/orrepr esen tives,withoutpropergover a t n a n c e will putthe Con tr a c tor(a n d Net wor k Ra il b yexten sion )in b rea c h ofthe OSCon ta rc tor Public:Existin g foota p th ri ghtsrem oved,usersdivertto a ltern a tive footb ridge tothe west Infrastructur e:pro posed fen c in g torun from 0m pa stthe levelc rossin g tothe ea sta lon g Network Ra ilb oun da ry to the the footb ridge tothe weston b oth sidesofthe ra ilwa y:type F4 P3A M a r207 Rev Da te S30-LordsNo.29 Suffolk -Elm swe lcp PostCode IP309U D ForIn form a tion Desc ription W C Dwn SRP EChk SJT Ch'k'd JAS App'd M otm a c Don a ld Ltd. Thisdoc um en tisissued forthe pa rty whic h c om m ission ed ita n d forspec ific purposesc on n ec ted with the c a ption ed projec ton ly.itshould n otb e relied upon b y a n y otherpa rty orused fora n y otherpurpose. W e a c c eptn orespon sib ility forthe c on sequen c esofthisdoc um en tb ein g relied upon b y a n y otherpa rty,orb ein g used fora n y otherpurpose,orc on ta in in g a n y e rororom ission whic h isdue toa n e rororom ission in da ta supplied touse b y otherpa rties Kilom eters 0. 5 Sc a le a ta3 Dra win g No. NTS M M D S30-GEN-005 P:\Leeds \Ea stn er\ GRIP24-An - glia LevelCrossin gsjasgisdesign. \ \ \ Design Freeze Pla n s04 \ M XDsNew \ Form a tdf \P3 \Suffolk \36756Design Freeze Proposa lpla n s-alt ern a tive Form a tsuffolk.m xd

146 Footpath 00, Wetherden Footpath 049, Wetherden Footpath 09, Wetherden SECTION : LEVEL CROSSINGS # Ñ # Ñ Right st o b e m od ifie d asp artofthisp roje c t Right snotm od ifie d asp artofthisp roje c t The ab ove sym b olsind ic ate e xisting le ve lcrossing loc ations. The ring c olour sar e asp e rse c tion4b e low. SECTION 2: TYPE OF RIGHT OF WAY (e xc lud ing ad op te d highway) " " Footp ath (p ub lic ) G G G Bywayop e nto alltraffic (p ub lic ) Brid le way(p ub lic ) Re stric te d b yway(p ub lic ) Road /Trac k (p rivate ) The line style sab ove illustrate the typ e ofrightofwaye xtantorp rop ose d. The c olourisp e rse c tion4b e low. Approx 5m length of carriageway widening to be provided on south side of bridge as per Suffolk Design Guide reference 36756/RPT023 Footpath 036, Wetherden Path (um ) Tank Me ad ow Croft Rushford Base Gre e n Co tage LB Proposed 2m wide footpath in field margin: Type P Hunte rs Lod ge Path (um ) SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! FootwayAvailab le ^ ^ ^ ^ Mot orise d Only Dive rsionrout e < < < < V e rge Availab le (N o Footway) S3 - Mutton Hall Footpath 020, Wetherden BatsFarm Base Gre e n ( ( ( ( Cariage wayavailab le (N o FootwayorV e rge ) W he re the p rop osalsm ayd ive rtuse rsonto anad op te d highway,the ab ove sym b olsd e note whe re afootwayisavailab le,ave rge only,orifne ithe rafootwayorve rge isavailab le and p e d e strianswould ne e d to walk inthe c ariage way. SECTION 4: PROPOSED STATUS CHANGE N o c hange and notp art ofd ive rsion Use ofe xisting rightofway asp artofd ive rsion Change ofstatusto e xisting rightofway Closure ofe xisting rightofway Cre ationofne w rightofway Footpath 035, Wetherden The ab ove c oloursap p lyto se c tions,2and 3ab ove. SECTION 5: ASSOCIATED INFRASTRUCTURE(Ind ic ative fe ature s) Use of existing road bridge, users on carriageway. Improvement measure to be implemented. Refer to Suffolk Design Guide 36756/RPT023 Fe nc ing Futur e d e ve lop m e ntb s ythir d!!! (tie into e xisting) Partyp roje c tswhe re p lanning Gate s d e tailsare availab le ú Brid ge s Railway # # # # Footway Crownc op yrightand d atab ase rights207ord nanc e Surve y Thisd at amust not b e p asse d ont o anyc ontac r t orsort / hir d p art ie sw ithout permission fr om N e twor k Rail sosmap Te am an/ d orw ithout yourc ontac r t ors / d uly signe d -up to the OSFCDCContac r torlic e nc e.se ning d an d /orsharing ofosd at ato/with e xt e rnalthir- d p art ie ssuc h as N e twor k Rail scontac r tor s,the ir d e le gatd e age nt san/ d orr e p re se ntive at s,withoutp rop e rgove rnanc e will p utthe Contr ac tor( an d N e twor k Rail b ye xte nsion)in b re ac h ofthe OSContac r tor Rookyard Farm Pum p S3 Mutton Hall Proposal Privat e :N o e xisting orp rop ose d rights Public:Existing footp ath rightsre m ove d,use rsd ive rtto ad jac e ntw e the rd e nstre e tb rid ge to the e ast Infrastructure:Prop ose d fe nc ing 0m atthe le ve lc rossing onthe north sid e ofrailway:typ e F7 Prop ose d fe nc ing 50m we stp astthe le ve lc rossin g to the south ofthe railway.to the e astto fo low N e twork Rail b ound aryto the road b rid ge :Typ e F4. The layoutshownonthis d rawing isinic d ative an d m ay b e suje b c tt o c hange atd e taile d d e sign. 2.Thisd rawing should b e re ad inc onjunc tionwith the Suffolk De signguid e (Re f:36756/rpt023)whic h c ontains d e tailsofthe infrastuc r tur e typ e sre fe rd e to inthis d rawing. P3A Mar207 Re v Date S3-MutonHal Suffolk -W e the rd e ncp PostCod e IP43LS ForInform ation De sc rip tion AngliaLe ve lcrossing Re d uc tionstrate gy De signfre e ze Prop osals W C SRP Dwn EChk SJT Ch'k'd JAS Ap p 'd Mo tmac Donald Ltd. Thisd oc um e ntisissue d forthe p artywhic h c om m issione d itand forsp e c ific p urp ose sc onne c te d with the c ap tione d p roje c tonly.itshould notb e re lie d up onb y anyothe rp artyoruse d foranyothe rp urp ose. W e ac c e p tno re sp onsib ility forthe c onse que nc e softhisd oc um e ntb e ing re lie d up onb yany othe rp arty,orb e ing use d foranyothe rp urp ose,orc ontaining anye rororom issionwhic h isd ue to ane rororom issionind atasup p lie d to use b yothe rp artie s Kilom e te rs 0. 5 Sc ale ata3 Drawing N o. N TS MMD S3-GEN -005 P:\Le e d s\east e rn\36756-grip24-angliale - ve lcrossingsjas\gis\de. sign\de signfre e ze Plans\04M X Ds\e N w Form atdf\p3\suffolk\36756de signfre e ze Prop osalplans-alt e rnat ive Form atsuffolk. m xd

147 ootpath 009, F Footpath 008, Wyverstone Wyverstone Use of Pound Hill, users on footway on south side Footpath 007, Bacton Proposed 2m wide field boundary footpath: Type P Bridleway 009, Bacton POU NDHILLCLOSE Green Ga tes 6 Ga b les Pla yarea 7 LB 5 Use of existing underbridge The Bunga low ASHCLOSE NORTHCLOSE 23 9 CEDARCLOSE Tra ck STM ARY'S Rosetta Byb ridge Proposed tarmac footway: P7 Spring Cotta ge M izpa h Sunnyside StHelier TCB FirstFootings House Eb enezer CotonM ethodistchurch Hillside Post Guide M a lla rds Gra na ry Ionia n Alpenrose Broa d V iew Hom ela nd Ha wthorns Little Grove House Broa dla nds V a nder Long M ea dow OAKFIELDROAD 2 M ea dowcroft The Oa ks Broa dwa y LetterBox Pa ddock Lodge Broa dwa y Chriswa ys Fa irla nds Fuchsia Cotta ge 6 Bla cksm ith Kim b erley House Footpath 004, Cotton M useum Footpath 005, Cotton Footpath 002, Cotton Footpath 007, Cotton Footpath 003, Cotton SECTION : LEVEL CROSSINGS # Ñ # Ñ Rightstob e m odified a spa rtofthisproject Rightsnotm odified a spa rtofthisproject The a b ove sym b olsindica te existing levelcrossing loca tions. The ring colour sa re a spersection4b elow. SECTION 2: TYPE OF RIGHT OF WAY (excluding a dopted highwa y) Footpa th (pub lic) Bridlewa y (pub lic) Restricted b ywa y (pub lic) " " G G G Bywa y opentoa lltra ffic (pub lic) Roa d /Tra ck (priva te) The line stylesa b ove ilustra te the type ofrightofwa y exta ntorproposed. The colourispersection4b elow. S69 - Bacton Footpath 03, Bacton Club House Guide Post PA R K E R S R O A D SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY!!!! Footwa yava ila b le ^ ^ ^ ^ M otor ised Only DiversionRoute < < < < V erge Ava ila b le (NoFootwa y) Proposed footbridge over ditch: Type S-B Ball stop netting to be installed to match existing length 0m Brickwa llba rn ( ( ( ( Ca ria gewa y Ava ila b le (NoFootwa y orv erge) W here the proposa lsm a y divertusersontoa na dopted highwa y,the a b ove sym b olsdenote where a footwa y isa va ila b le,a verge only,orifneithera footwa y orverge isa va ila b le a nd pedestria nswould need towa lk inthe ca ria gewa y. Footpath 023, Bacton Footpath 04, Bacton M oa t Proposed 2m wide field boundary footpath: Type P S3 - Fords Green Footpath 044, Cotton SECTION 4: PROPOSED STATUS CHANGE Nocha nge a nd notpa rt ofdiversion U se ofexisting rightofwa y a spa rtofdiversion Cha nge ofsta tustoexisting rightofwa y Closure ofexisting rightofwa y Crea tionofnew rightofwa y The a b ove coloursa pply tosections,2a nd 3a b ove. SECTION 5: ASSOCIATED INFRASTRUCTURE (Indica tive fea tures) F ootpath 028, Bacton Footpath 022, Bacton Footpath 08, Bacton Use of existing Cow Creek level crossing Proposed 2m wide in field margin footpath: Type P ETL Cow Creek RAI Cow Creek Tra ck LWAY Ke ry'scotta ges F o o tpath 020, Bacton Crowncopyrighta nd da ta b a se rights207ordna nce Survey Thisda ta must not b e pa ssed ontoa ny contr a ctor /sorthird pa rtiesw ithout permiss ion from Network Ra ilsos M a ptea m a nd/ orw ithout yourcontra ctor/ s duly signed-uptothe OSFCDCContra ctorlicence.sending a nd/orsha ring ofosda ta to/with externa lthird-pa rtiessuch a snetwork Ra il scontra ctors,their delega ted a gentsa nd/orrepresenta tives,withoutpropergoverna nce will putthe Contra ctor(a nd Network Ra ilb y extension)inb rea ch ofthe OSContra ctor KERRYSFARM LANE B3 L A N E S W IL LT U B S69 Bacton Proposal Private: Noexisting orproposed rights Footpath 04, Cotton Public:Existin g foot pa th rightsrem oved,usersdivertto a dja centpound Hillunderb ridge tothe north Infraststructure:Proosed p fencin g onea stside ofthe ra ilwa y m a xim um 0m north a nd thensouth to S3:Type F4 Proposed fencing westside ofthe ra ilwa y,0m m a xim um a tthe levelcrossing:type F7 Fencing!!! (tie intoexisting) Ga tes ú Bridges # # # # Footwa y Future developm entsb y Third Pa rty projectswhere pla nning deta ilsa re a va ila b le Ra ilwa y.the la youtshownonthisdra wing isindica tive a nd m a y b e sub jectto cha nge a tdeta iled design. 2.Thisdra wing should b e rea d inconjunctionwith the Suffolk DesignGuide (Ref:36756/RPT023)which conta ins deta ilsofthe infra structure typesrefe red tointhisdra wing. P3A M a r207 Rev Da te ForInform a tion Description Anglia LevelCr ossing ReductionStra tegy DesignFreeze Proposa ls S69-Ba cton Suffolk -Ba ctoncp PostCode IP44NS W C SRP Dwn EChk SJT Ch'k'd JAS App'd M otm a cdona ld Ltd. Thisdocum entisissued forthe pa rtywhich com m issioned ita nd forspecific purposesconnected with the ca ptioned projectonly.itshould notb e relied uponb y a nyotherpa rtyorused fora nyotherpurpose. W e a cceptnoresponsib ility forthe consequencesofthisdocum entb eing relied uponb y a ny otherpa rty,orb eing used fora ny otherpurpose,orconta ining a ny e rororom issionwhich isdue toa ne rororom issioninda ta supplied touse b y otherpa rties Kilom eters Sca le a ta3 Dra wing No. NTS M M D S69-GEN-005 P:\Leeds\Ea stern\36756-grip2-4-anglia LevelCrossings.JAS\GIS\Design\DesignFreeze Pla ns\04m XDs\New Form a tdf\p3\suffolk\36756designfreeze Proposa lpla ns-alterna tive Form a tsuffolk_ RD.m xd

All queries and paragraph references, as set out in red below, relate to Mark Brunnen s Proof of Evidence (NR27/1).

All queries and paragraph references, as set out in red below, relate to Mark Brunnen s Proof of Evidence (NR27/1). This note summarises the information requested by Cambridgeshire County Council at Public Inquiry for the Network Rail (Cambridgeshire Level Crossing Reduction) Order, together with Network Rail s responses.

More information

The Network Rail (Suffolk Level Crossing Reduction) Order

The Network Rail (Suffolk Level Crossing Reduction) Order Aidan Dunn Interim Director of Resource Management Suffolk County Council Endeavour House 8 Russell Road Ipswich IP1 2BX Network Rail James Forbes House 27 Great Suffolk St London SE1 0NS 27 July 2017

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Suffolk Local Access Forum s (SLAF) response to Network Rail s consultation on level crossing closures.

Suffolk Local Access Forum s (SLAF) response to Network Rail s consultation on level crossing closures. SLAF Suffolk Local Access Forum SLAF PO Box 872 Ipswich Suffolk IP1 9JW Network Rail Anglia Level Crossings Tel: 01473 264452 Fax: 01473 216877 Email: slaf@suffolk.gov.uk Web: http://publicrightsofway.onesuffolk.net/suffolk

More information

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. It is a public footpath

More information

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014. 2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016 Page 1 The Future of Wareham Foot Level Crossing Cabinet Date of Meeting 24 February 2016 Cabinet Member(s) Peter Finney Cabinet Member for Environment Colin Jamieson - Cabinet Member for Economy and Growth

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach It is a domestic level crossing which is located at the station. At CROWLE STATION level crossing the orientation of the road/path

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Policy Railway crossings

Policy Railway crossings Policy Railway crossings Title of the document National Rail Safety Regulator Page1of12 Document reference number: A453375 Version No. Approved by Publication date 1.0 Chief Executive 24 June 2016 1.1

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference. East West Rail Consortium 14 th June 2018 Agenda Item 3: Terms of Reference Recommendation: It is recommended that the meeting consider and agree subject to any amendment agreed by the meeting the revised

More information

ADVICE ON Cattle Grids

ADVICE ON Cattle Grids ADVICE ON 2 Definition A cattle grid, for highway purposes, is a device designed to prevent the passage of animals, or animals of any particular description, but to allow the passage of all or some other

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Community Highways Volunteering Cambridge City Information Pack 2017/18

Community Highways Volunteering Cambridge City Information Pack 2017/18 Community Highways Volunteering Cambridge City Information Pack 2017/18 Chief Executive Gillian Beasley www.cambridgeshire.gov.uk Contents Welcome to the Community Highways Volunteering Scheme... 2 How

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

Passive Level Crossings. Crossings where users are in control of their actions

Passive Level Crossings. Crossings where users are in control of their actions 1 Passive Level Crossings Crossings where users are in control of their actions / Level Crossings in your area Over 6,300 level crossings in the UK LNE & EM Route 1,870 level crossings. Gateshead Skiff

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Thank you for your of 1st June You requested the following information:

Thank you for your  of 1st June You requested the following information: By email: d Network Rail Freedom of Information The Quadrant Elder Gate Milton Keynes MK9 1EN T 01908 782405 E FOI@networkrail.co.uk 26 th June 2018 Dear, Information request Reference number: FOI2018/00689

More information

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Response from the Aviation Environment Federation 18.3.10 The Aviation Environment

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

BHS ADVICE ON Dimensions of Width, Area and Height

BHS ADVICE ON Dimensions of Width, Area and Height BHS ADVICE ON Dimensions of Width, Area and Height 2 In providing specifications for equestrian ways and facilities, The British Horse Society considers all equestrian users, which may result in a high

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

National Rail Performance Report - Quarter /14

National Rail Performance Report - Quarter /14 A London TravelWatch report The voice of transport users National Rail Performance Report - July 2014 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling

More information

Requirements for Level Crossings

Requirements for Level Crossings Railway Group Standard Requirements for Level Crossings Synopsis This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.

More information

Rail passengers priorities for improvement November 2017

Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Foreword We asked more than 12,800 passengers across the country to rank 31 possible improvements

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009) between Athlone and Westport Report 08061401 (issued 11 th of May 2009) Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility.

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. Up side crossing approach Down side crossing approach Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility. It is an occupation level crossing which is located on Aliwal

More information

Conditions of Carriage

Conditions of Carriage Conditions of Carriage These Conditions of Carriage provide information about us and set out the legal terms and conditions on which we contract with you in relation to the booking by you of air taxi services

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012 Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. Civil Aviation 1 GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. REGULATIONS ARRANGEMENT OF REGULATIONS 1. Citation. 2. Interpretation. 3. Applicability of Regulations. PART A GENERAL REQUIREMENTS

More information

SBA Communications Corporation suas Policy

SBA Communications Corporation suas Policy SBA Communications Corporation suas Policy 1 Change and Issue Record Date of Issue Issue Changes 9/30/2016 01 Initial Release 11/3/2016 02 Updated Insurance Requirements 11/15/16 03 Updated Avetta Status

More information

TOWN TRUST. Bury St Edmunds Railway Station

TOWN TRUST. Bury St Edmunds Railway Station BURY ST EDMUNDS TOWN TRUST conserving buildings of historic interest The future of Bury St Edmunds Railway Station Part I Report October 2015 1 The future of Bury St Edmunds Railway Station NOTE: This

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND October 2017 Version 2 1. BACKGROUND 1.1 Article 14.5 of Council Regulation (EEC) No 95/93, as amended by Regulation (EC) No

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Telephone No. 2:4622495 Telegraphic Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.nic.in Fax : 01124629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

ICAO Policy on Assistance to Aircraft Accident Victims and their Families

ICAO Policy on Assistance to Aircraft Accident Victims and their Families Doc 9998 AN/499 ICAO Policy on Assistance to Aircraft Accident Victims and their Families Approved by the Council and published by its decision First Edition 2013 International Civil Aviation Organization

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Summary of the rights of passengers travelling by bus and coach 1

Summary of the rights of passengers travelling by bus and coach 1 Summary of the rights of passengers travelling by bus and coach 1 Regulation (EU) 181/2011 (hereinafter the Regulation) becomes applicable on 1 March 2013. It provides for a minimum set of rights for passengers

More information

Short-Haul Operations Route Support Scheme (RSS)

Short-Haul Operations Route Support Scheme (RSS) Short-Haul Operations Route Support Scheme (RSS) Valid from January 1 st, 2018 1: Introduction: The Shannon Airport Authority is committed to encouraging airlines to operate new routes to/from Shannon

More information

AAIB Safety Study - 1/2016

AAIB Safety Study - 1/2016 Farnborough House Berkshire Copse Road Aldershot, Hants GU11 2HH Tel: 01252 510300 Fax: 01252 376999 www.aaib.gov.uk AAIB Air Accidents Investigation Branch AAIB Safety Study - 1/2016 AIRWORTHINESS OF

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information