Tierrasanta 5K Runners Route & Traffic Blocks along Clairemont Mesa Blvd in Tierrasanta plus projected road block and control points
|
|
- Marilyn Burns
- 5 years ago
- Views:
Transcription
1 Tierrasanta 5K 2016 Runners Route & Traffic Blocks along Clairemont Mesa Blvd in Tierrasanta plus projected road block and control points contact: Lisa Leonard
2 De Portola Middle School Rec Center Fun Run Route: CMB from Rec Center to Santo CMB from Santo to Rec Center Loop around De Portola M.S. MTRP De Portola Middle School Rec Center Event Summary: Roads closed 7:30AM Starting gun 8AM on CMB below Rec Ctr Finish line on the Rec Ctr ballfield Race done 9:30AM Roads open 10AM Course is measured at 5,000 meters MTRP
3 De Portola Middle School Joint-Use Fields Rec Center Required traffic blockages: 1. CMB at Santo Rd 2. CMB at Mollendo 3. CMB at La Cuenta 4. CMB at Promesa Ct MTRP De Portola Middle School Rec Center Required traffic alignments: 1. CMB westbound lanes: West of Promesa: blocked to all traffic during the run. East of Promesa: open to all traffic. 2. CMB eastbound lanes left undivided to support only e/b traffic during the run. 3. CMB westbound traffic along route must divert north to Via Valarta or south (various paths) to Tierrasanta Bl.
4 Traffic Block: CMB at Santo Road % traffic block of westbound lanes of CMB at Santo Road; blockage extends from Santo Rd eastward. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward to Via Valarta.
5 Traffic Block: CMB at Mollendo % traffic block to prevent left turn from Mollendo to westbound lanes of CMB. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.
6 Traffic Blocks: CMB at La Cuenta Dr and CMB at Marigot Pl % traffic block to prevent left turn from La Cuenta northbound to CMB westbound, and from La Cuenta southbound to CMB. Closure from 7:30AM to approx 9:30AM. 2. CMB eastbound lane supports 1 way traffic eastbound. 3. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.
7 Traffic Block: CMB at DePortola % traffic block to prevent all traffic into De Portola athletic fields. Closure from 7:30AM to approx 9:30AM. 2. Require managed traffic block to control access to De Portola parking lots from CMB. Traffic control required from 7:30AM to approx 9:30AM 3. CMB eastbound lane supports 1 way traffic eastbound. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.
8 Traffic Block: CMB at Rec Center Event Area Event Parking 1. Require managed traffic block at entrance to Rec Center to separate runners from cars. Required from 7:30AM to approx 9:30AM. 2. Require managed traffic block to control access to Rec Center from CMB eastbound lanes. Traffic control required 7:30AM to approx 9:30AM. 3. CMB eastbound lane supports 1 way traffic eastbound. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.
9 Traffic Block: CMB at Promesa Ct. Event Parking Event Parking % traffic block to CMB westbound lanes at Promesa Ct. Closure from 7:30AM to approx 9:30AM. 2. CMB west from Promesa: WB lanes closed, EB lanes unaffected. Required from 7:30AM to approx 9:30AM. 3. CMB eastbound lane eastward from Promesa: unrestricted traffic in both directions. 4. Traffic heading westbound on CMB divert southward to Tierrasanta Blvd or northward on Via Valarta.
10 Traffic Diversions for CMB Eastbound 1. Traffic desiring to head eastbound on CMB may use the eastbound lane as usual. 2. Traffic desiring to head westbound on CMB must divert northward or southward along alternate paths: North of CMB: from Barbados to Remora and thence to Santo Rd. North of CMB: from Dominique to Via Valarta and thence to Antigua or Portobelo. South of CMB: from Portofino to internal roads either to Santo Rd or Tierrasanta Blvd. South of CMB: from Martinique west on CMB to Seda/CdeV/Rueda to Tierrasanta Blvd. South of CMB: from Trinidad to Calle de Vida and/or Rueda to Tierrasanta Blvd.
Section 3.6 Recreation
3.6 RECREATION This section evaluates the potential impacts of the proposed project on recreation within MTRP. The evaluation is based on field observations, a review of maps of MTRP and the MTRP Master
More informationStreet Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren
ROAD CLOSURES Sunday, December 9 th 2018 Street Affected Delayed/ Closed From To Time Closed Time Open Quarry Ln 58th Lake Cahuilla Pilot Car 6:30AM 58th ( Closed) Lake Cahuilla/ 58 EB 6:30AM Pilot Car
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More information77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &
77 McDonnell- - Monday thru Friday NORTHBOUND Effective: March 18, 2019 & Valley Industries 4:53A 4:59A 5:10A 5:18A 5:27A 5:39A 5:33A 5:39A 5:50A 5:58A 6:07A 6:19A 6:13A 6:19A 6:31A 6:39A 6:49A 7:02A 6:53A
More information2016 RACES AND EVENTS CITY OF LAKEWOOD
2016 RACES AND EVENTS CITY OF LAKEWOOD Sat. 4/16 EAGLES ON FOOT RUN Sat. 4/23 HERMES 10 MILER 8am- 11am Saturday April 23, 2016, at 0830 hours. The first runners should be arriving in Lakewood at about
More informationWelcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO
Welcome to the Business Owners Task Force Perry Leonard Blagg Tire and Service President/COO Safety: West Nile Virus Alyssa Tenorio NorthGate Constructors Public Information Manager West Nile Virus Carried
More informationI-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 9/14/2018 10:00:05 PM ROUTE Hwy100 15 22 7 Mi W of Ainsworth St Park Closure Information Westbound (Right
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
Corporate Services Commission Event Code: 2016-039 C O U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION Event Name: Shoppers Drug art Run for Women Client will hire Race Kit Services Contractor
More information#North. Westminster SEE BOULDER DETAIL. Arapahoe. Hwy 72. Interlocken Loop. 120th Ave. 104th Ave. 92nd Ave US 36 I-70
Route FF1 All s Effective: 14 January 2018 Map Revised: 14 January 2018 SEE BOULDER DETAIL p Hwy 7 & Table Mesa Hwy 93 & Hwy 72 FlatIron Crossing Mall & Broomfield Interlocken Loop Northwest Pkwy AB &
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationNDG-Westmount Neighbourhood Committee. November 16, 2015
NDG-Westmount Neighbourhood Committee November 16, 2015 2 Feedback on previous questions Order-in-Council 890-2010 - condition 8 The ministère des Transports must : Establish a buffer zone at the foot
More informationOctober Business Owner Task Force. Matt Sanman Public Information Coordinator
October Business Owner Task Force Matt Sanman Public Information Coordinator Trick-or-Treating Safety Tips for Children Plan a route in advance and have emergency plan if lost. Wear reflective clothing
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov A daytime lane closure on Mesa all week is needed to complete Sunday s demo
More informationExposition Corridor Transit Project Phase 2
Exposition Metro Line Construction Authority Final Environmental Impact Report Technical Background Report FINAL Ridership Results Version 0.4 December 2009 Prepared for: Exposition Metro Line Construction
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 9/5/2018 2:12:06 PM ROUTE ORE99EB 2 3 @ Salem, Hyacinth/Verda Hwy100 15 22 7 Mi W of Ainsworth St Park Southbound
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 10/11/2018 5:24:09 PM ROUTE Hwy100 15 22 7 Mi W of Ainsworth St Park Closure Information Westbound (Right
More informationOcean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED
More informationTraffic Guide. February 18 th, 2018, 6 AM to 3 PM. Pre-Race Day Closures. General Tips. How to Use This Guide
Race Date: Pre-Race Day Closures Traffic Guide February 18 th, 2018, 6 AM to 3 PM Friday, Feb. 16 th : E. 9th St. between Congress Ave. & Brazos St. Saturday, Feb. 17 th : Congress Ave. between Cesar Chavez
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant
More informationThe following describes each route change. Each route is subject to minor adjustments prior and during implementation.
Chapter 6 Final Route Recommendations This chapter describes Part 2 route recommendations reflecting increased coordination between the City of Lawrence transit system (The T) and University of Kansas
More informationMetrobus Service Evaluation Study Bowie Lines Bowie State University (B21, 22) Bowie-Belair (B24, B25) Final Report June 2013
Metrobus Service Evaluation Study Bowie Lines Bowie State University (B21, 22) Bowie-Belair (B24, B25) Final Report June 2013 Bowie-New Carrollton (B27) Crofton-New Carrollton (B29, B31) Study Purpose
More informationEXTENSION OF OPERATING HOURS FOR TRAINS AND BUS SERVICES ON CHRISTMAS EVE AND NEW YEAR S EVE
CRN: 198703583Z NEWS RELEASE IMMEDIATE RELEASE EXTENSION OF OPERATING HOURS FOR TRAINS AND BUS SERVICES ON CHRISTMAS EVE AND NEW YEAR S EVE SINGAPORE Commuters have more reasons to celebrate this festive
More informationGO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.
GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. I-10 & Mesa Continuous Until further notice The right turn-only
More informationBICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report
BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report TABLE OF CONTENTS A Message from the Mayor... 4 Data Count Reports... 5 Count Locations... 6 Count Locations Map... 7 Trail Data... 8 International
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationdiagrammatic-of-proposed-improvements-grandparkway-sh99-segment-i2 2/25/ of 1
Grand Parkway SH99 H&I Website PROGRAM DOCUMENTS TABLE OF CONTENTS No. Title/Number Date Pg x of y Rev # 1 Market Valuation Waiver Agreement market-valuation-waiver-agreement-for-sh99-grandparkway 3/25/2009
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationMEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018
MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School
More informationQEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.
SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by
More informationCity advises public of road closures for Opening of Parliament
City advises public of road closures for Opening of Parliament The Opening of Parliament takes place on at 19:00. There will be rehearsals on Monday 11 and. Parliament has requested that various road closures
More informationSANTA CLARA COUNTY I-280 CORRIDOR STUDY
SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: February 23, 2015 To: From: All Bidders FDOT Procurement Office Subject: Bid Sheet Revision LED Open/Closed Blank-Out Signage Insert: ITB-DOT-14/15-9031-GH
More information2013 El Paso County Comprehensive Mobility Plan. December 16, 2013
2013 El Paso County Comprehensive Mobility Plan December 16, 2013 2013 El Paso County Comprehensive Mobility Plan Map No. Project Name 01 I-10 COLLECTOR DISTRIBUTOR LANES 02 I-10/BORDER HIGHWAY CONNECTORS
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationI-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make
More informationCTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus
CTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus lanes CTPS examined the average rates of weekday bus passenger
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of
More informationConstructor: Joseph B. Fay
1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:
More informationINTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP
October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose
More informationTraffic Management Plan Open Streets Mitchells Plain. Full closure of Eisleben Road between Wespoort Drive and Spine Road 2 April h00-17h30
Traffic Management Plan Open Streets Mitchells Plain Full closure of Eisleben Road between Wespoort Drive and Spine Road 2 April 2017 11h00-17h30 Footprint layout Wespoort Drive KEY The Cedars Avenue ROCKLANDS
More informationGeorgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour
www.peachpass.com NOVEMBER 2013 Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour In This Issue GA 400 Tolls End on November 22 Lanes Closures for GA 400/I-85
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationAll closures this week happen at night, including full closures of Mesa and I-10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each
More informationRoute 2 - Ponce de Leon Ave/Druid Hills. Route 3 - Martin Luther King Jr Dr/Auburn Ave
Route 2 - Ponce de Leon Ave/Druid Hills Route 2 will be detoured to Civic Center Station and will board passengers on the east side of West Peachtree St. It will not operate to North Ave Station, and will
More informationRoad widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED
More informationNEW TRAFFIC SEPARATION SCHEMES
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 NEW TRAFFIC SEPARATION SCHEMES COLREG.2/Circ.65 23 May 2014 1 The Maritime Safety Committee, at its ninety-third
More information100 7: Chatsworth, Granada Hills, CA : Burbank Blvd., Woodland Hills, CA Northrup Grumann parking lot
Date Event Organization EST. ASMB Time 2/20/2016 NAGS Opening Day Ceremonies Northridge Girls Softball Association Assembly Location START END Route Area 100 7:00 18010 Chatsworth, Granada Hills, CA -
More informationNEW TRAFFIC SEPARATION SCHEMES
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 NEW TRAFFIC SEPARATION SCHEMES COLREG.2/Circ.65 23 May 2014 1 The Maritime Safety Committee, at its ninety-third
More informationAttachment 2: Analysis of Map Content in the RTA Ride Guide Page 1. Route 3:
Attachment 2: Analysis of Map Content in the RTA Ride Guide Page 1 The Transit Coalition has analyzed the graphical layout and design of the published bus route maps in the RTA Ride Guide. RTA should consider
More informationMain Street Station Upgrades
Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar
More informationSeptember 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov September 1, 2017 I-10 night closures scheduled for September 5-7. 27-hour full
More informationAppendix H1 Traffic Study Hill St Obispo Ave Obispo Ave Student Drop-off & Pick-up Area Parking Lot Plaza Level Hill St Fire Lane Access Service Lane Access Redondo Ave Redondo Ave Parking Lot N No
More informationMilestone: Bridge to Nowhere scheduled for demolition Aug 14
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationMISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF March 4, 2014
MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF March 4, 2014 ATTENDANCE Members Present Dorothy Leonard, Chair, Member at Large Dick Murphy, Vice Chair, Special Member
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationNortheast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015
Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationAlternate Access Routes to/from:
Alternate Access Routes to/from: Centennial Medical Center... 2 Downtown... 2 Farmer s Market... 3 Frist Center... 3 Germantown... 4 HCA Buildings on Park Plaza between 31 st and 25 th... 4 HCA Building
More informationNORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY
NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.
More informationNotice of Road Closures & Parking Restrictions
Notice of & To the residents and businesses of GLASGOW Please find enclosed in this booklet details of all road closures and parking restrictions for the Men s 10K which takes place on Sunday 17th June
More informationSan Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center
San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center Committee Members Present: Alex Amoroso Al Boro John Dupar Phil Frank Steve Kinsey Joan Lundstrom for Larry
More informationTransform66: Inside the Beltway
Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a
More informationMINUTES OF THE MEETING OF THE MARCH 17, 2016 MISSION TRAILS REGIONAL PARK TASK FORCE
TIME AND PLACE MINUTES OF THE MEETING OF THE MARCH 17, 2016 MISSION TRAILS REGIONAL PARK TASK FORCE The meeting of the Mission Trails Regional Park Task Force was held on Thursday, March 17, 2016 at the
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationFUTURE FOR DOMINICAN REPUBLIC AS LNG HUB IN THE CARIBBEAN
FUTURE FOR DOMINICAN REPUBLIC AS LNG HUB IN THE CARIBBEAN LNG gc AMERICAS June 2 nd 2017 Houston, Texas by Fernando Gonzalez 1 AGENDA 1./ DOMINICAN REPUBLIC A SUITABLE GEOGRAPHICAL POSITION 2./ DRIVERS
More informationThe HOP Offers Route Refinements
The HOP Offers Route Refinements Hill Country Transit District, operator of The HOP, Central Texas regional public transit system, frequently reviews fixed routes in efforts to ensure the routes are able
More informationREQUEST FOR INFORMATION (RFI) Bottled Water and Dispensers
California Highway Patrol DUE DATE: December 1, 2011 Business Services Section Bottled Water RFI #076-0001 REQUEST FOR INFORMATION (RFI) Bottled Water and Dispensers The California Highway Patrol (CHP)
More informationDesign and Construction of the Lake St. Martin Emergency Outlet
Design and Construction of the Lake St. Martin Emergency Outlet Background 2011 was the largest flood event experienced in the last 200 years Flood Fighting required some difficult decisions by the Manitoba
More informationINTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016
INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City
More informationImportant Lane Closures March 1 5, 2010
February 26, 2010 CONTACT: Marcia McAllister 703 572 0506 marcia.mcallister@dullesmetro.com Important Lane Closures March 1 5, 2010 C aisson Load Test Scheduled for Mar. 3 Crews will perform another load
More informationThe Newsletter of the Canadian R.P.O. Study Group (B.N.A.P.S.)
The Newsletter of the Canadian R.P.O. Study Group (B.N.A.P.S) Volume 37 - No. 4 Whole No. 201 March - April, 2009 The Napanee, Tamworth & Quebec Railway was incorporated in 1879, to build from Napanee
More informationBE VE R LY HILLS CITY OF BEVERLY HILLS HUMAN SERVICES DIVISION MEMORANDUM TO: Human Relations Commission FROM:
October October November November4-5, November Metro 2017-18 BE VE R LY HILLS C CITY OF BEVERLY HILLS HUMAN SERVICES DIVISION MEMORANDUM TO: FROM: DATE: SUBJECT: ATTACHMENT: Human Relations Commission
More information2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017
2017 Work and Launch of the Next Phase Information meeting, Montréal-Ouest September 14, 2017 2 Presentation Outline Work progress Launch of the next phase Mitigation measures Dismantling Communications
More informationREPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number
REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationNotice of Road Closures & Parking Restrictions
Notice of & To the residents and businesses of GLASGOW Please find enclosed in this booklet details of all road closures and parking restrictions for the Men s 10K which takes place on Sunday 17th June
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationWork in 2015 and Annual Mobility- Management Plan
Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationReplace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure
Ramp Removed By Others Roadway Improvements By Others Ramp Improvements By Others Install ew Sign Structure Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Close
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationMaryland Route 36 (Mount Savage Road) and Maryland Route 35 (Ellerslie Road) Intersection Study. Cumberland Area Metropolitan Planning Organization
Maryland Route 36 (Mount Savage Road) and Maryland Route 35 (Ellerslie Road) Intersection Study Cumberland Area Metropolitan Planning Organization July 2009 1 Table of Contents Table of Contents... 2 Purpose
More informationNeighbourdhood Committee NDG-Westmount. October 16, 2017
Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase
More informationSierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS
Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640
More informationColombia Venezuela Service COVE PUERTO CABELLO LOOP*
Colombia Venezuela Service COVE PUER CABELLO LOOP* SERVICE HIGHLIGHTS n Dedicated feeder service from Colombia and Panama to Venezuela n Fast and reliable connection via transhipment hubs in Manzanillo,
More informationService Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission
Service Summary WINTER 2019 CHANGES TRIP LEVEL DETAIL Effective January 2, 2019 This document outlines Winter 2019 seasonal schedule changes for the Victoria Regional Transit System for implementation
More informationConstruction Staging Area 197 Redpath Avenue
REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationElectro-Optical Imaging, Inc Fortune Place, Suite C West Melbourne, FL (321)
Electro-Optical Imaging, Inc. West, FL 32904 (321) 435-8722 WEST MELBOURNE AREA HOTELS Fairfield Inn & Suites by Marriott W. 4355 W. New Haven Ave W., FL 32904 Tel: (321) 722-2220 Fax: (321) 722-2270 1-888-468-4926
More information3529 Souris River Flood Plan (Phase MI-1)
Date: September 28, 2018 To: Derek Hackett, Public Information Officer From: Grant Goldader, Civil Engineering Specialist Re: Traffic Control Report for the week of 10/01/2018 3529 Souris River Flood Plan
More information