INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

Size: px
Start display at page:

Download "INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP"

Transcription

1 October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31,

2 Agenda Introductions Background Purpose and Objectives Review of Corridor Studies Proposals Workshop Guiding Principals Ideas Workshop Idea Development Summary Presentation to Executives The Stack System Interchange 2

3 Background Interstate 10 Corridor Study Interstate 17 Corridor Study MAG Express Lanes Network Development Strategy (Phase I) Southeast Corridor Major Investment Study Summary of Current Budget Status Proposition 400 Corridor Funding Black Canyon Freeway, Phoenix, AZ. 3

4 Interstate 10 Corridor Study Study Limits: SR-51/SR-202L Mini-Stack to SR-202L Pecos Stack. Began Studied widening the corridor and implementing a localexpress lane system to mitigate weaving issues between SR-143 and US-60. 4

5 Interstate 17 Corridor Study Study Limits: SR-101L North Stack to Interstate 10 Split. Began Studied options for widening the corridor to implement either a local-express lane system or add two general purpose lanes in both directions. Frontage Roads issue. 5

6 Interstates 10 and 17 RTP Funding Interstate 10 widen between 40th St and Pecos Stack... program amount of $648.5 million. Interstate 17 no project specified; awaiting EIS outcome... program amount of $821.6 million. Total RTP Funding of $1.47 billion. 6

7 Managed Lanes are dedicated lanes for one or more user groups. Proactively managed to provide better reliability and/or level-of-service. Primary benefit is travel time savings. Managed Lanes Express Lanes, Orange County, CA. 7

8 Express Lanes Screening for Capacity 2031 MAG Regional Freeway Network Screening for Constructability 2031 MAG Regional 8 Freeway Network

9 Express Lanes Scenario 1 HOT 1 SINGLE LANE SYSTEM Scenario 2 HOT 2 DUAL LANE SYSTEM 9

10 Express Lanes Top Performing Segments YEAR 2031 SINGLE LANE SYSTEM Top Performing Segments YEAR 2031 DUAL LANE SYSTEM 10

11 Southeast Corridor Major Investment Study Recommendation: Managed Lanes. New DHOV Ramps. Exclusive Guideway Transit. Modern Streetcar Extensions. 11

12 Express Lanes Performance Statistics Interstate 10 Before US-60/Superstition Freeway Outbound Traffic, Evening Peak 58.1 mph 46.9 mph 18.7 mph 2031 Regional Transportation Plan 3,200 vehicles 27,400 vehicles 16,100 vehicles 62.3 mph 43.9 mph 30.8 mph SE Corridor MIS Express Lanes 11,100 vehicles 28,500 vehicles 13,300 vehicles 64.2 mph 33.7 mph 33.1 mph SE Corridor MIS Express Lanes, No Toll 8,700 vehicles 32,200 vehicles 13,000 vehicles 12

13 Purpose and Objectives Purpose: Identify a conceptual master plan for the spine. Objectives: Adhere to regional goals. Develop a cost effective solution. Define an achievable prioritized and phased implementation program. Build consensus for the vision and path forward. Pecos Stack System Interchange 13

14 Corridor Studies Proposal for I-10 and I-17 Interstate 17 Southbound Northbound Loop 101/North Stack to Thomas Rd Thomas Rd to Van Buren St Varies Varies Van Buren St to I-10/I-17 Split Existing HOV Lane Existing GP Lane New HOV Lane New GP Lane New C/D Lane 14

15 Corridor Studies Proposal for I-10 and I-17 Interstate 10 Eastbound Westbound I-10/I-17 Split to 40 th St 40 th St to SR-143 SR-143 to US-60 US-60 to Baseline Rd Baseline Rd to Loop 202/Pecos Stack Existing HOV Lane Existing GP Lane New HOV Lane New GP Lane New C/D Lane Convert Existing GP Lane to C/D Lane 15

16 Corridor Studies Proposals for I-10 and I-17 SR-143: Flyover ramps for eastboundnorthbound and southboundeastbound. I-10/I-17 Split: Interchange has airspace conflicts. DHOV s: I-10: US-60 and I-10/I-17 Split. I-17: Central Ave, Jefferson/Adams St, between Greenway Rd and Bell Rd, between CAP and Peoria Rd, and Loop 101 North Stack. The Split System Interchange 16

17 Guiding Principals Public Anticipation and Sensitivity Environmental Performance and Economic Opportunity Funding Feasibility Operations and Maintenance Policy The Split System Interchange 17

18 Public Anticipation and Sensitivity Focus on the customer The public deserves improvements for taxes paid. Proposition 400 expiration is NOT in the distant future. Public skepticism may undermine future revenue initiatives. Drive an implementation plan to ensure timely and expedited project delivery. Brand the initiative and promote it. System Interchange, Tempe AZ. 18

19 Environmental Continue to Ensure Environmental Integrity Build upon findings of current environmental analyses: I-10 and I-17 EIS. SR-202L/South Mountain Freeway EIS. Incorporate remediation strategies: Ensure continuity of approach. Speed project delivery. Black Canyon Freeway, Phoenix, AZ. 19

20 Performance and Economic Opportunity Enhance Network Performance Spine represents linkage to support regional vitality. Optimize roadway safety and performance on improved corridors. Identify derived operational and safety performance on the connected corridors. Provide for travel options: Feasible alternative, reliable travel routes on both corridors and arterials. Other improvement techniques, such as express toll lanes. Include availability for HOV, BRT, and other alternate modes where possible. Maricopa Freeway, Phoenix, AZ. 20

21 Funding Feasibility Optimize Solutions Within Budget Provide solutions with cost/budget integrity. Avoid scope creep that produces marginal benefits and added cost. Extend budget constraints to ensure lowest possible operations and maintenance cost. North Stack System Interchange, Phoenix, AZ. 21

22 Operations and Maintenance Provide for Effective Maintenance and Operations Maintenance - Easy, Efficient, Cost Effective: Provide for maximum service life and lowest maintenance costs. Allow for maintenance with the least traffic disruption. Operations - solutions that can readily incorporate: Dynamic traffic management, ITS, fiber optics, etc. Non-traditional: express toll lanes, active traffic management. HOV lanes and direct access. Black Canyon Freeway, Phoenix, AZ. 22

23 Policy Adhere to existing MAG policies across all elements of transportation, including: Safety Environment Arterial Life Cycle Policies ITS Managed Lanes Development Identify policy gaps or those requiring clarification in order to: Facilitate alternatives evaluation in the current initiative. Provide better guidance for future projects/programs. Maricopa Freeway, Phoenix, AZ. 23

24 Example Corridors I-64/US-40, St. Louis, MO The rebuilding and upgrading of ten-miles of pavement, bridges and interchanges in St. Louis. Initial budget $2.5 billion; final cost $550 million. New connection between I-64 and I-170. Additional lane in each direction between Spoede Road and I-170. Increased traffic flow Elimination of short, tight entrance/exit ramps. Addition of dedicated exit lanes. Enhanced safety with wider shoulders. Interchange, Brentwood, MO 24

25 Example Corridors I-495 Capital Beltway Washington, DC Circumferential route in the Washington, D.C. area, connects many radial routes such as I-270, US-29, I-95, I-295, and US- 50. Virginia DOT... Beltway Maintenance... more than 50 deficient structures. Westside and Southside Mobility. Express Lanes to help offset costs for freeway rehabilitation... in exchange for 85-year concession with P3 operator. Capital Beltway, Northern Virginia. 25

26 Example Corridors I-15 Corridor, Salt Lake City I-15 Reconstruction (16.2 miles): Addition of new general purpose and high-occupancyvehicle (HOV) lanes. 130 bridges, seven urban interchanges, and three major junctions with I-80 and I-215. Extensive region-wide advanced traffic management system. Design-build model was motivated by two factors: Strong public support for completing the project quickly to minimize severe traffic congestion. Need to have the project completed before the 2002 Winter Olympics. Reconstruction, Salt Lake City, UT. 26

27 Example Corridors Interstate 5 Columbia River Crossing Three through-lanes in each direction on a segment of Interstate 5. A phased light rail loop in Clark County. Additional span or a replacement bridge with up to two additional lanes for merging and two light rail tracks. Interchange improvements. Capacity improvements for freight rail. Bi-state coordination of land use and system management to reduce demand. New Columbia River Crossing, Portland, OR and Vancouver, WA. 27

28 Funding feasibility. Runway airspace compatibility. Right-of-way availability. Adjacent development. Sensitive environmental receptors. Corridor Constraints Black Canyon Freeway, Phoenix, AZ. 28

29 Cost Constrained: What can we get for the $1.47 billion programmed for the Spine? Express Lanes: What would this look like in a Spine configuration? Ideas The Stack System Interchange 29

30 Cost Constrained Idea Interstate 17 Southbound Northbound Loop 101 North Stack to I-10/I-17 Stack I-10/I-17 Stack to I-10/I-17 Split Existing HOV Lane Existing GP Lane New HOV Lane New GP Lane New C/D Lane 30

31 Cost Constrained Idea Interstate 10 Eastbound Westbound I-10/I-17 Split to 24 th St 24 th St to 32 nd St 32 nd St to SR-143 SR-143 to US-60 US-60 to Loop 202/Pecos Stack Existing HOV Lane Existing GP Lane New HOV Lane New GP Lane New C/D Lane 31

32 Cost Constrained Idea SR-143: Flyover ramps for eastboundnorthbound and southboundeastbound. I-10/I-17 Split: Depressed I-10 lanes, remove/replace 24 th St alignment and interchange. No Collector/Distributer lanes due to clearance issues associated with Phoenix Sky Harbor runway. SR-143 approaching I-10, Tempe, AZ. 32

33 Cost Constrained Idea Candidate DDI Conversion Locations: I-10 at Chandler Blvd, Ray Rd, Warner Rd, Elliot Rd, and 32 nd St. Candidate DHOV Locations: I-10: Galveston St, Carver Rd, US-60, SR-143 and I-10/I-17 Split. I-17: Central Ave, 15 th Ave, Van Buren St, Mountain View Rd, Paradise Ln, Yorkshire Dr/Utopia Rd and Loop 101 North Stack. Dorsett Rd, Maryland Heights, MO. 33

34 Cost Constrained Idea Candidate Two-Lane (Choice Lane) Exit Ramps: I-10: Westbound at Ray Rd, Warner Rd, Elliot Rd, Broadway Rd, SR-143 and 40 th St. Eastbound at 32 nd St, 40 th St, Elliot Rd, Warner Rd, Ray Rd and Chandler Blvd. I-17: Northbound at Indian School Rd, Camelback Rd, Bethany Home Rd, Peoria Ave and Union Hills Dr. Southbound at Peoria Ave, Bethany Home Rd, Camelback Rd and Thomas Rd. Papago Freeway, Phoenix, AZ. 34

35 Cost Constrained Idea Other Features: ATM Measures Variable speed limits, improved ramp metering. Braided Ramps Westbound Baseline Rd on-ramp and US-60 exit ramp. M1 Motorway, Melbourne, Australia 35

36 Express Lanes Idea Interstate 17 Southbound Northbound Loop 101 North Stack to Thomas Rd Thomas Rd to Van Buren St varies varies Van Buren St to I-10/I-17 Split Existing HOV Lane Existing GP Lane New Express Lane New GP Lane New C/D Lane 36

37 Express Lanes Idea Interstate 10 Eastbound Westbound I-10/I-17 Split to 32 nd St 32 nd St to SR-143 SR-143 to US-60 US-60 to Baseline Rd Baseline Rd to Warner Rd Warner Rd to Loop 202/Pecos Stack Existing HOV Lane Existing GP Lane New Express Lane New GP Lane New C/D Lane Convert Existing GP Lane to C/D Lane 37

38 Express Lanes Idea SR-143: Flyover ramps for eastboundnorthbound and southboundeastbound. I-10/I-17 Split: Depressed I-10 lanes, remove/replace 24 th St alignment and interchange. No C/D due to clearance issues associated with Phoenix Sky Harbor runway. Maricopa Freeway, Phoenix, AZ. 38

39 Express Lanes Idea Candidate DDI Conversion Locations: I-10 at Chandler Blvd, Ray Rd, Warner Rd, Elliot Rd and 32 nd St. Candidate DHOT Locations: I-10: Galveston St, Carver Rd, US-60, SR-143 and I-10/I-17 Split. I-17: Central Ave, 15 th Ave, Van Buren St, Grand Ave, Mountain View Rd, Paradise Ln, Yorkshire Dr/Utopia Rd and Loop 101 North Stack. at 142nd Pl SE, Bellevue WA 39

40 Express Lanes Idea Candidate Two-Lane (Choice Lane) Exit Ramps: I-10: Westbound at Ray Rd, Warner Rd, Baseline Rd, 40 th St and 32 nd St. Eastbound at 32 nd St, 40 th St, Elliot Rd, Warner Rd, Ray Rd and Chandler Blvd. I-17: Northbound at Indian School Rd, Camelback Rd, Bethany Home Rd, Peoria Ave and Union Hills Dr. Southbound at Peoria Ave, Bethany Home Rd, Camelback Rd and Thomas Rd. Papago Freeway, Phoenix, AZ. 40

41 Express Lanes Idea Other Features: ATM Measures Variable speed limits, improved ramp metering. Braided Ramps westbound Baseline Rd on-ramp and US-60 exit ramp. Papago Freeway, Phoenix, AZ. 41

42 What do we do now? Do we simply identify a spot improvement (through 2016) strategy? Do we consider a near-term (through 2026) strategy to spend what is in the Regional Transportation Plan? Do we need a longer-term vision (improvements over a 30 year period) for the Spine? Papago Freeway, Phoenix, AZ. 42

43 Adhere to guiding principals. Develop feasible solutions. Be innovative! What do we do now? Papago Freeway, Phoenix, AZ. 43

44 October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31,

45 What we have... FREEWAY MANAGEMENT SYSTEM 45

46 What do we do now? Do we simply identify a spot improvement (through 2016) strategy? Do we consider a near-term (through 2026) strategy to spend what is in the Regional Transportation Plan? Do we need a longer-term vision (improvements over a 30 year period) for the Spine? Papago Freeway, Phoenix, AZ. 46

47 Guiding Principles Public Anticipation and Sensitivity Environmental Performance Funding Feasibility Operations and Maintenance Policy The Split System Interchange 47

48 Path Forward Institutional Arrangements for Spine Oversight Corridor Charter Executive Working Group Spine Technical Partners Multimodal Coordination Cap the Footprint Peer review of best practices Definition Environmental Streamlining Illustrate benefits Policy recommendation from Regional Council 48

49 Path Forward Segments: Loop 101 to McDowell Rd (I-17) McDowell Rd to Baseline Rd (I-17/I-10) Baseline Rd to Loop 202 (I-10) Potential Improvements: ATM Master Plan and Policy DHOVs and Transit Enhancements SR-143 Interim Ramps Interchange Improvements (e.g. DDI) 2-lane Exits +1 GP, Loop 101 to McDowell Rd and Baseline Rd to Loop 202 Reconfigure SR-143/US-60 Reconstruct I-17/I-10 Split Reconstruct I-17, Split to McDowell Rd 49

50 Next Steps Footprint Definition (4-8 months) Long-term Project Evaluations Spot (2-3 months) Near-term (4-8 months) Environmental Studies (<36 months) Programming Build it! 50

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS National Scenario Planning Peer Exchange July 10, 2012 2012, All Rights Reserved. 1 MAG Transportation

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DOWNTOWN BRT ALTERNATIVE - 19th AVE DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

1750 SOUTH MESA DRIVE Mesa, Arizona 85210

1750 SOUTH MESA DRIVE Mesa, Arizona 85210 1750 SOUTH MESA DRIVE Mesa, Arizona 85210 OWNER USER OPPORTUNITY R. CRAIG COPPOLA 602.954-3762 ccoppola@leearizona.com ANDREW CHENEY 602.954-3769 acheney@leearizona.com GREGG KAFKA CCIM ASSOCIATE 602.954-3777

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

TRANSPORTATION PROGRAMS

TRANSPORTATION PROGRAMS High Speed Transit Corridor Studies Rail/Freight Session 2011 ITE/MSA Spring Conference Black Canyon Conference Center Phoenix, Arizona March 9, 2011 The Maricopa Association of Governments (MAG) is the

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington

More information

MONARK CENTER NORTH GREENWAY HAYDEN LOOP SCOTTSDALE, ARIZONA. Michael Kitlica Senior Director

MONARK CENTER NORTH GREENWAY HAYDEN LOOP SCOTTSDALE, ARIZONA. Michael Kitlica Senior Director Building Features Total Size: ±43,550 Square Feet Total Parcel Size: ±3.48 Acres (±151,647 SF) ±12,039 Square Feet (End Cap Unit) Available for Lease Year Built: 1996 Zoning: I-1, City of Scottsdale Clear

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

Public Informational Meeting

Public Informational Meeting Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

Transform66: Inside the Beltway

Transform66: Inside the Beltway Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a

More information

170,000 MULTI-STORY CLASS A OFFICE DEVELOPMENT EXPOSURE WITH FREEWAY SQ FT IN A CREATIVE CAMPUS. totaling. setting. identity

170,000 MULTI-STORY CLASS A OFFICE DEVELOPMENT EXPOSURE WITH FREEWAY SQ FT IN A CREATIVE CAMPUS. totaling. setting. identity PEORIA MULTI-STORY CLASS A OFFICE DEVELOPMENT totaling 170,000 setting identity SQ FT IN A CREATIVE CAMPUS WITH FREEWAY EXPOSURE 2 PEORIA Lee & Associates Plaza Companies PEORIA Private Public Partnership

More information

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN CALIFORNIA DEPARTMENT OF TRANSPORTATION CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN Prepared by Division of Traffic Operations Office of Traffic Management Submitted to Federal Highway

More information

Our Panelists SPEAKERS MODERATOR

Our Panelists SPEAKERS MODERATOR SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4434-P1 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle GUIDANCE FOR FUTURE DESIGN OF FREEWAYS WITH HIGH- OCCUPANCY VEHICLE (HOV) LANES BASED ON

More information

A VISION FOR I-95. January 12, Delaware Department of Transportation

A VISION FOR I-95. January 12, Delaware Department of Transportation A VISION FOR I-95 January 12, 2011 Delaware Department of Transportation The East Coast s Main Street Along with SR 1, the most significant highway in Delaware 29 miles to I ".', 2 Sponsoring / Cooperating

More information

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Project Deliverable 4.1.3f Individual City Report - City of San Dimas Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Dulles Toll Road Rate Setting Process

Dulles Toll Road Rate Setting Process Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On

More information

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor o U.S. Department Washington Division Suite 501 Evergreen Plaza of Transportation 711 South Capitol Way Olympia, Washington 98501-1284 Federa' Highway (360) 753-9480 Administration (360) 753-9889 (FAX)

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion Darren Henderson, AICP Today s s Discussion How bad is congestion? What has been done about it? What else can be done? How Bad is

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

10.0 Recommendations Methodology Assumptions

10.0 Recommendations Methodology Assumptions 10.0 Recommendations To accommodate the projected growth of the I-526 corridor, this report has summarized potential improvement strategies that were separated into four categories, TDM, Modal, Traffic

More information

LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION INITIATIVE

LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION INITIATIVE One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Tel metro.net 35 REGULAR BOARD MEETING JULY 24, 2008 SUBJECT: ACTION: LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION INITIATIVE AMEND THE

More information

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority

A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority IBTTA Global Tolling Summit; Salzburg, Austria September 6, 2018 The Rise of Managed

More information

I-405 Express Toll Lanes Coming in 2015

I-405 Express Toll Lanes Coming in 2015 I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 Subject: FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY From: VDOT-News To: Time: Tuesday, December 12, 2017 9:05:36 AM -08:00 RELEASE: IMMEDIATE Michelle Holland,

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

Managed Lanes. What s New for Colorado. Parsons Brinckerhoff, 2013.

Managed Lanes. What s New for Colorado. Parsons Brinckerhoff, 2013. Managed Lanes What s New for Colorado Parsons Brinckerhoff, 2013. Understanding the Context for Managed Lanes HOW DID WE GET HERE? Apr 5, 2013 Parsons Brinckerhoff, 2013. 2 Apr 5, 2013 Parsons Brinckerhoff,

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Project Advisory Group. May 23, 2013

Project Advisory Group. May 23, 2013 Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open

More information

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT Washington Metropolitan Area Transit Authority Department of Planning and Joint Development In Association with District of Columbia Department

More information

Transform66 Transportation Management Plan: Transit & TDM Strategies

Transform66 Transportation Management Plan: Transit & TDM Strategies Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp

More information

±2.5 ACRES FOR SALE EXCLUSIVE LISTING APACHE JUNCTION, ARIZONA

±2.5 ACRES FOR SALE EXCLUSIVE LISTING APACHE JUNCTION, ARIZONA ±2.5 ACRES FOR SALE EXCLUSIVE LISTING APACHE JUNCTION, ARIZONA PROPERTY OVERVIEW This ±2.5 acre lot is located at the end of E 34th Avenue and features incredible views of the surrounding mountains. The

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

CENTRAL AND EAST CORRIDORS

CENTRAL AND EAST CORRIDORS HIGH-CAPACITY TRANSIT STUDY CENTRAL AND EAST CORRIDORS SEPTEMBER 2014 CORRIDOR REPORT: UNIVERSITY DISTRICT-KIRKLAND-REDMOND HIGH-CAPACITY TRANSIT CORRIDOR STUDY University District-Kirkland-Redmond Corridor

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

For personal use only

For personal use only asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions

More information

Preferred Provider Listing-Arizona

Preferred Provider Listing-Arizona 1 Preferred Provider Listing-Arizona 10721 W. Indian School Rd. Avondale, AZ 85392 623-772-7748 Avondale Banner Casa Grande Occupational Health Services 1676 E. McMurray Blvd, Suite 2 Casa Grande, AZ 85122

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

This page intentionally left blank

This page intentionally left blank This page intentionally left blank Prepared for: Nevada Department of Transportation Prepared by: July 2015 This page intentionally left blank Table of Contents Executive Summary... ES-1 ES.1. HOV System

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206) CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA 98040-3732 (206) 275-7600 www.mercergov.org August 18, 2016 Mr. Daniel M. Mathis Division Administrator Federal

More information

Director King County Department of Transportation. King County Department of Transportation

Director King County Department of Transportation. King County Department of Transportation Tolling in Washington State t Harold S. Taniguchi Director Why tolling Why Tolling? Gas tax down Electric collection technology Reduce peak demand and greenhouse gas emissions Tolling today in Washington

More information

Alternative Interstate 11 Corridor From Wickenburg to Mexico Border

Alternative Interstate 11 Corridor From Wickenburg to Mexico Border Alternative Interstate 11 Corridor From Wickenburg to Mexico Border Prepared by: Sanjeev Ramchandra, M.Ed. sanjeev_ramchandra@yahoo.com June 2016 Updated: December 2017 Summary / Overview of Proposed I-11

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

Evaluation of High-Occupancy-Vehicle

Evaluation of High-Occupancy-Vehicle TRANSPORTATION RESEARCH RECORD 1446 Evaluation of High-Occupancy-Vehicle Lanes in Phoenix, Arizona MARK J. POPPE, DAVID J.P. HOOK, AND KEN M. HOWELL High-occupancy-vehicle (HOV) lanes were first introduced

More information

Quality of Life Study

Quality of Life Study FasTracks: Quality of Life Study Transportation Systems Performance Measurement Conference May 19, 2011 Overview Quality of Life Study Background/Purpose Study Scope Reporting Example Measures 2 RTD Regional

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on

More information

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905) !" # $ !" # $ Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557 www.itransconsulting.com November 2009 %&'('$&$ 1. West Brampton Road Network...

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

Main Line System Recommendations

Main Line System Recommendations (Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the

More information

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018 Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information