1 A PUBLICATION OF THE VIRGIN ISLANDS PORT AUTHORITY Volume 7 Issue 1 April 2011 VIPA Uses $2.9 Million ARRA Grant to Install One of the Largest Solar Power Systems in the Caribbean at CEKA The Virgin Islands Port Authority is proud to be a partner in the territory s efforts to reduce the use of oil-powered energy at its port facilities, and use the power of one the U.S. Virgin Islands most abundantly available natural resources: the sun. VIPA partnered with the Virgin Islands Energy Office and the Virgin Islands Water and Power Authority and received a $2.9 million American Recovery and Reinvestment Act (ARRA) grant via the VI Energy Office. The grant was used to install a photovoltaic solar power generation system to reduce the amount of electricity drawn from WAPA to power the Cyril King Airport terminal and runway lights. URS Corporation, VIPA s CEKA consultant, was awarded $144,530 to provide the design and project specifications. All Rounder Systems, LLC with Veterans General Contracting, LLC was awarded $2,804,470 to build the solar panel system. This project is one of the largest solar panel projects in the Caribbean and the largest in the U.S. Virgin Islands thus far, said Don Buchanan of the VI Energy Office. The array of rectangular panels measure 1,500 feet long by 14 feet wide and was installed over an old drainage system adjacent to the airport taxiway. The panels will generate about 450 kilowatts of power enough to power 100 standard residential homes per day. This is expected to lower the airport s monthly power bill by at continued on page 2 2 Board Officers Elected 3 Runway Resurfacing 4 Doing Business with VIPA 5 Earl Finch Pilot Boat Christening 6 Authority Figures 7 Employee News 8 New Fire Trucks Virgin Islands Port Authority VIRGIN ISLANDS PORT AUTHORITY P.O. Box St. Thomas, VI Tel: (340) / Fax: (340) info@viport.com Internet:

2 THE VIRGIN ISLANDS PORT AUTHORITY P.O , St. Thomas, VI Tel: (340) / Fax: (340) Web site: info@viport.com MR. ROBERT O CONNOR, JR. Chairman of the Board Private Sector Member, St. John THE HONORABLE BEVERLY NICHOLSON-DOTY Vice Chairwoman of the Board Commissioner of Tourism THE HONORABLE DARRYL A. SMALLS, P.E. Secretary of the Board Commissioner of Public Works THE HONORABLE ALBERT BRYAN, JR. Chairman, Economic Development Authority Board and Commissioner of Labor THE HONORABLE VINCENT FRAZER, ESQ. USVI Attorney General MR. CASSAN PANCHAM Private Sector Member, St. Thomas DR. YVONNE E. L. THRAEN Private Sector Member, St. Thomas MR. GORDON A. FINCH Private Sector Member, St. Croix MR. KENN HOBSON Executive Director MR. DAVID W. MAPP Assistant Executive Director VIPA Going Green continued from page 1 least 15 percent, which VIPA Engineering Director Dale Gregory estimates to be about $50,000 to $75,000 in savings. VIPA s board approved the project in Sept and it will be completed by April 30, The Port Authority has initiated several other energy efficiency projects, with advisement from the federal and local Energy Offices and the Energy Development in Island Nations, including: New meter installations at CEKA, HERA and the Crown Bay Center mall to monitor power usage. An energy efficiency audit and day-lighting plan for the HERA Terminal to try to reduce the $4.5 million spent on energy bills in Solar-powered street and parking lot lights at CEKA and the Theovald Moorehead Marine Facility at Enighed Pond, St. John were installed and funded entirely by the Port Authority. All future port developments will be energy-conscious, said VIPA Executive Director Kenn Hobson. The Authority is committed to going green and we will move forward with projects and new operating procedures aimed at reducing energy consumption at all our port facilities. For tips on how you can do your part as a consumer to join the going green campaign, visit New Board Officers Elected Officers of the board are elected by VIPA s board members at the first board meeting of the year. MONIFA A. MARRERO Public Information Officer Editor & Layout ASSISTANT EDITORS Gail Chinnery, Byron Todman Denise Mills & Julice Harley-Powell VIRGIN ISLANDS PORT Robert O Connor Jr. Board Chairman Private Citizen, St. John Beverly Nicholson-Doty Board Vice Chairwoman Tourism Commissioner Darryl A. Smalls, P.E. Board Secretary Public Works Commissioner 2 VIPA Portfolio, Volume 8, No. 1, Spring 2011

3 CEKA Resurfacing Completed, HERA Resurfacing Begins CYRIL E. KING AIRPORT, ST. THOMAS The Virgin Islands Port Authority has made it a priority to upgrade the territory s airport runways. Paving of the Cyril E. King Airport Runway on St. Thomas which began in March 2010 is substantially completed, and VIPA has already begun the paving of the Henry E. Rohlsen Airport Runway on St. Croix. VIPA Executive Director Kenn Hobson said that Federal Aviation Administration (FAA) inspectors found several areas of pavement failure on the runway at the HERA during an annual certification inspection last year. "The majority of the runway that is being repaired was last resurfaced in the 1970's. The repairs are necessary to ensure the safety of travelers and aircraft using the Rohlsen airport," said Hobson. The HERA runway paving project was started on Jan. 20th and should take about 270 days to complete. The Port Authority hired VI Paving, Inc. to perform the work which will be done six days a week from 10 p.m. through 5 a.m. Mondays thru Saturdays. VIPA was awarded a $7.1 million Airport Improvement Project (AIP) grant from the FAA to fund the design and construction phases of the project. The FAA will fund 95 percent of the project and VIPA will fund five percent from its HENRY E. ROHLSEN AIRPORT, ST. CROIX fiscal year 2011 capital improvements budget. VI Paving also performed the repairs of the Cyril E. King Airport runway and will close out the project after completion of some minor electrical work. The entire project costs about $15 million and was also funded through an FAA AIP grant in which the FAA paid 95 percent of the costs and VIPA paid the remainder. Hobson said the agency has more plans for improvement of its St. Thomas airport. VIPA is using an $819,851 FAA grant received in March 2010 to conduct a passenger terminal study and pavement management plan for CEKA. The pavement management plan will identify shortterm and long-range maintenance and rehabilitation requirements, along with maintenance policies and a budget for maintenance costs. Hobson said the pavement program will provide VIPA with a maintenance schedule for the King runway and maximize the consistency and reliability of the runway pavement for another 20 years. The grant also provides funding for a terminal study to examine the entire CEKA terminal foot print and recommend a reorganization/expansion plan to include expansion in phases and a financial program to fund the improvements. Virgin Islands Port Authority 3

4 Doing Business With VIPA January 2011 Board Actions Meeting was canceled due to a lack of a quorum. February 2011 Board Actions Board officers elected-chair: Robert O'Connor Jr.; Vice Chair: Beverly Nicholson-Doty; Secretary: Darryl A. Smalls. Approved the alteration of the UV Fredericks Marine Terminal parking lot to build a bus stop. VI Water & Power Authority: Approved request to waive $1,600 of rent for repairs to parking lot in the past and to pay remaining outstanding rents in installments; approved tenant's request to reverse finance charges on delayed reimbursement of repairs to roof leaks and parking lot repairs; and denied request to waive remaining finance charges for late payment of rent and/or non-payment of rent. Approved Seaflight lease of hangar and office space at HERA for three years with one three-year option. Reaffirmed intention to uphold its Nov. 17, 2010 decision to evict residents of the Bournefield. Notices to Quit will be issued on March 31, Awarded $243,100 contract to URS Corp. for design work to repair the CEKA terminal roof. Awarded $625,000 contract to HCS Consulting & Marine Construction to dredge the East Gregorie Channel to -10 meters to accommodate Princess Cruise Line ships. Directed that no lease to be assigned to VI Waste Management Authority until approved by FAA. Approved marine tariff terminology changes: Facility Use Fee (formerly wharfage) and Harbor Use Fee (formerly tonnage) Adhere to arbitration order of ARFF, Law Enforcement Officers and Aviation unions to increase salaries to step from 2007 through February 2011 Special Board Meeting Actions Forestalled Bournefield evictions by 60 days. Formed board ad-hoc committee to develop procedure for possible merger of VIPA and the West Indian Company, Ltd. Postponed discussions of marine tariff changes with Florida-Caribbean Association officials. March 2011 Board Actions Accept CH2M Hill Marine Rates study with the exception of the St. Croix cruise ship fee. Bournefield Housing: Rescinded eviction notices issued in Nov. 2010; establish a policy to include: (1) the gradual & eventual conversion of Bournefield from residential use to a use compatible with airport infrastructure support; (2) establish operational & maintenance procedures to ensure that units at Bournefield are maintained by established USVI housing standards; and (3) to provide relocation guideline assistance for residents of Bournefield where possible. Changed terms of UVF Marine Terminal food vendor's rent increase to be adjusted via CPI. Crown Bay Center: Established guidelines and rates for special events, and market Bldg. H as "Crown Bay Expo Center;" established overnight parking policy and fees; and authorized developing a security plan to provide additional security overnight and for ship days. Approved kiosk agreement renewals for Joann Warner and Ana C. Ortiz. All kiosks agreement terms changed from one year to two-year terms and tenants required to provide sales reports. Approved office space for VI Board of Elections at Crown Bay Center. Awarded $88,695 contract to PBS&J for the design of the Container Port General Cargo Bldg. fire protection system. Approved three change orders for public parking lot project at Enighed Pond; contract amount changed to $1,178, Approved $387, CEKA Runway Rehabilitation project s only and final change order to complete additional work as required by FAA. Approved Container Port change order to repair apron to include fuel fill station. Approved St. Croix Navigational Aids replacement project change order #1 to increase contract to $255,220. Approved hiring a governing board administrative officer. 4 VIPA Portfolio, Volume 8, No. 1, Spring 2011

5 New Pilot Boat Named in Honor of Former St. Croix Marine Manager VIPA officials and employees, family and friends of Earl Larry Finch attended the March 3rd christening ceremony of VIPA s newest pilot boat to service the ports of St. Croix - named in honor of Finch who served as VIPA s St. Croix marine manager for 13 years. Finch is a native of St. Thomas and a graduate of Charlotte Amalie High School Class of He attended college, then served in the US military from in Vicenza, Italy as a ballistic missile repair man. Finch was employed by VIPA on St. Thomas in January 1969 and worked as an engineering draftsman, assistant surveyor and construction inspector. In 1975 he transferred to St. Croix to be the inspector on the restoration of the Henry E. Rohlsen Airport west taxiway. In 1986 Finch was promoted to the position of St. Croix marine manager. He was responsible for overseeing the operations of all public seaport facilities owned by the Port Authority on St. Croix. Finch s extensive aviation knowledge also allowed him to serve as the acting airport manager on St. Croix on many occasions. He retired in November 1999 after 30 years and 10 months of dedicated service. A Timely Gift Cyril E. King Airport Manager Jose Nazario represented the VI Port Authority at a ceremony to accept the donation of a four-dial clock at the St. Thomas airport to commemorate Rotary International s centennial celebration. The clock costs $25,000 and was paid for by Rotary fundraisers and donations. USVI Showcased at 2011 Seatrade Convention The Virgin Islands Port Authority and the Virgin Islands Department of Tourism partnered again to promote the U.S. Virgin Islands as a premier cruise destination at the annual Seatrade Cruise Shipping Convention. The event was held March 15th through March 17th at the Miami Beach Convention Center in Miami Beach, Fla. The USVI booth was located in the Caribbean Village area of the exhibit floor in the front row amongst other Caribbean ports. Visitors were able to collect brochures and DVD s about the territory s ports, things to do and off-ship excursions while visiting the U.S. Virgin Islands. Entertainment included mocko jumbie dancers, live steel pan music and Cruzan Rum tasting. Virgin Islands Port Authority 5

6 Milton Potter is the VI Port Authority s Director of Human Resources. Potter supervises the VIPA personnel office which serves Port Authority employees on St. Thomas, St. Croix and St. John. He is responsible for recruiting qualified candidates for employment and manages existing human resources of the Authority. As director of human resources, Potter also plans and executes all internal, local and federal personnel polices. He represents the Authority in matters concerning federal and local employee laws, contracts and union grievances, as well as all community programs related to VIPA s employees. Potter reports to the executive director. Vickeé Armstrong, CSM, CMD is the General Manager of the Crown Bay District on St. Thomas. Armstrong is the property manager for the surrounding areas of the Crown Bay district, including the 55,000 square feet mall known as the Crown Bay Center at the Austin Babe Monsanto Marine Terminal. She supervises a staff of five employees and implements operating policies, budgets and manages tenant relations. She also develops marketing programs in conjunction with VIPA s long term goals of enhancing the value of the properties in the Crown Bay district and promoting the Crown Bay Center mall. Armstrong reports to the executive director. Alpheaus Lindsey is the VI Port Authority s Information Systems Manager. Lindsey, more commonly known as Rush, directs all information systems operations including computer systems and provides technical support, analysis and programming. He also directs database management, telecommunications, all technical training programs and microcomputer equipment acquisition for the Port Authority. Lindsey has one assistant and together they provide technical assistance for all VIPA offices on St. Thomas, St. Croix and St. John. He reports to the director of administration and finance. Arnold Payne, St. Croix Airport Rescue and Fire Fighter Chief, commands all aircraft related incidents at the Henry E. Rohlsen Airport and within a three-mile perimeter of the airport. He is also charged with developing new policies and changes as it relates to ARFF operations, and monitors fire prevention programs at the airport. Payne oversees a staff of 14 firefighters which is divided into three shifts supervised by two crew chiefs and one acting crew chief. He is responsible for ensuring his staff is trained according to Federal Aviation Administration regulations He also supervises two airfield ramp controllers. Airport fire fighters perform fire safety inspections of aviation-related leased tenant facilities, and also serve as the airport s emergency first responders. Payne reports to the assistant executive director. 6 VIPA Portfolio, Volume 8, No. 1, Spring 2011

7 Personnel changes from January 2010 through March 2011 CONGRATULATIONS ON YOUR PROMOTIONS Marcus J. Compton, from harbor pilot trainee to harbor pilot, STT Rueben Jennings, from senior bookkeeper to accountant II Michelle M. Johnson, from administrative secretary to management assistant Arnold Payne, from acting airport rescue fighter (ARFF) chief to ARFF chief Queen Ivory Jahmi Rhasba, from senior bookkeeper to accountant Aisha de Parrilla-Rhymer, from airport fire fighter trainee to airport rescue fire fighter Russell E. Smith, from acting lieutenant to lieutenant law enforcement officer, STT Marisa R. Turnbull-Smith, from airport operations clerk to administrative assistant NEW EMPLOYEES Milton Potter, human resources director Veronica Vickeé Armstrong, Crown Bay general manager Alpheaus Lindsey, information systems officer Peter D Abreau, senior bookkeeper, accounting Herle Carol Howe, senior bookkeeper, accounting Lelia Christopher, law enforcement officer, STT Jalaunie George, law enforcement officer, STT Rudolph Hyndman, law enforcement officer, STT Natalie Joseph, law enforcement officer, STT Quianah Molyneaux, law enforcement officer, STT Ryan Thomas, law enforcement officer, STT Keith Reed, law enforcement officer, STT Jarmel Rubaine, law enforcement officer, STT Victor Graham, law enforcement officer, STX Robert Tonachel, harbor pilot, STT/STJ Gregory George, dockmaster, STT Eric Mollah, dockmaster, STT Lornette Elaine Penn, dockmaster, STJ Wilfred Fuentes Santos, coxswain, STX Rudolph Dunlop Jr., marine facilities caretaker, STT Elton Jones, marine facilities caretaker, STT Shandel Edwards, marine facilities caretaker, STJ Rodney Gumbs, maintenance assistant, STT Omari Randolph, ramp controller, CEKA Shawn Sutton, ramp controller, HERA Kareem McKenzie, airport security clerk, CEKA Charlene Claxton, airport security monitor, CEKA Sherifa Gumbs, airport security monitor CEKA Carla Marsham, airport security monitor, CEKA Samuel Rodriguez, custodian, CEKA Claudette Christian, custodian, CEKA Glynn Theodore, custodian, HERA Kenny John, general maintenance worker, STX Clement Magloire, electrician, maintenance, STX RESIGNATIONS Andrea Penn, federal projects coordinator Fernando Cabret Jr., equipment dispatcher, maintenance, STX George Richards, refrigeration helper, STT Dorian Foster, law enforcement officer, STT *deceased Steve Miller, airport security monitor, STT RETIREES Joseph Cranston Sr., special assistant to the executive director Thomas Richards, maintenance painter, STT DECEASED Lisa Gumbs Penn, dockmaster, STT VIRGIN ISLANDS PORT Virgin Islands Port Authority 7

8 Three New Airport Fire Trucks The Virgin Islands Port Authority purchased three new 1,500- gallon Oshkosh Striker fire trucks for its airport rescue and fire fighting departments on St. Thomas and St. Croix. The fire fighters at the Cyril E. King Airport received one of the trucks plus a Ford Danko F-550 quick dash truck. The Henry E. Rohlsen Airport fire squad has two new Striker trucks and a quick dash. St. Croix now has three trucks and one quick dash, and St. Thomas has four trucks and one quick dash. VIPA must update its fire trucks based on the Federal Aviation Administration s Code of Federal Regulations Part 139 requirements. Trucks typically last 10 years, said VIPA ARFF Chief Derek Smith. VIPA awarded a $2,372,367 contract in August 2009 to Oshkosh to purchase the three new 1,500-gallon trucks. The trucks were custom-built and delivered to the territory in late The FAA paid 95 percent of the cost for the trucks and VIPA paid the balance. Since 2009, the Virgin Islands Port Authority and its employees have been committed to assisting the American Cancer Society via fundraising activities and participation in the Relay For Life cancer benefits on St. Thomas and St. Croix. VIPA has signed on this year as a gold sponsor of the St. Thomas event and has contributed $1,275 to sponsor the benefit. Relay For Life walkathons will be held May 14th and 15th at the Educational Complex on St. Croix, and at the Charlotte Amalie High School track on St. Thomas on June 25th and 26th. EMERGENCY PREPAREDNESS ARE YOU READY? Emergencies and natural disasters usually occur when least expected. Be prepared for the unexpected by preparing a disaster supply kit. Assemble supplies you might need in an evacuation. Store them in an easy-to-carry container and include: A supply of water (one gallon per person per day). Store water in sealed, unbreakable containers. Identify the storage date and replace every six months. A supply of non-perishable packaged or canned food and a non-electric can opener. A change of clothing, rain gear and sturdy shoes. Blankets or sleeping bags. A first aid kit and prescription medications. An extra pair of glasses. A battery-powered radio, flashlight & extra batteries. Credit cards and cash. An extra set of car keys. A list of family physicians. A list of important family information. The style and serial number of medical devices such as pacemakers. Special items for infants, elderly or disabled family members. A complete checklist is provided by the Federal Emergency Management Agency (FEMA) at 8 VIPA Portfolio, Volume 8, No. 1, Spring 2011

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing V I R G I N I S L A N D S P O R T A U T H O R I T Y S T. C R O I X S T. T H O M A S S T. J O H N U N I T E D S

More information

Roberto Cintron of St. Croix Confirmed to VIPA Board

Roberto Cintron of St. Croix Confirmed to VIPA Board A PUBLICATION OF THE VIRGIN ISLANDS PORT AUTHORITY Volume 10 Issue 2 www.viport.com 2014 Spring/Summer Edition Roberto Cintron of St. Croix Confirmed to VIPA Board Roberto C. Cintron was confirmed by the

More information

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018 Virgin Islands Port Authority Hurricane Recovery Update March 2018 VIRGIN I SLANDS PORT AUTHORITY UNITED STAT ES VIRGIN I SLAND S Hurricanes Irma & Maria s Impact on the USVI s Ports On September 6 and

More information

CEKA Roof & Baggage Claim Renovations Begin

CEKA Roof & Baggage Claim Renovations Begin A PUBLICATION OF THE VIRGIN ISLANDS PORT AUTHORITY Volume 9 Issue 2 www.viport.com 2013 Summer/Fall Edition CEKA Roof & Baggage Claim Renovations Begin Major repairs to the roof of the Cyril E. King Airport

More information

Kenneth Hobson Interim Executive Director

Kenneth Hobson Interim Executive Director Kenneth Hobson Interim Executive Director Judith V. James Director of Administration & Finance Approved: September 17, 2008 (By: VIPA Board of Directors) OPERATING AND CAPITAL IMPROVEMENT BUDGET TABLE

More information

Virgin Islands Port Authority

Virgin Islands Port Authority Virgin Islands Port Authority 1 Virgin Islands Port Authority, Marine Revenue Bonds, C (Federally Taxable), $4,920,000 Dated: October 23, 2014 2 Virgin Islands Port Authority, Marine Revenue and Refunding

More information

VIRGI ISLA DS PORT AUTHORITY

VIRGI ISLA DS PORT AUTHORITY VIRGI ISLA DS PORT AUTHORITY AVIATIO DIVISIO RATES Effective 10/01/05-1 - AVIATIO RATE SCHEDULE By virtue of authority granted under Title 29, Section 543 (12) of the Virgin Islands Code, the Virgin Islands

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July VIRGIN ISLANDS PORT! July AUTHORITY (VIPA) 2016 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE FINANCIAL OPERATIONS VIPA AVIATION DIVISION VIRGIN ISLANDS PORT AUTHORITY 2 5-YEAR INCOME STATEMENT SNAPSHOT-

More information

Virgin Islands Port Authority

Virgin Islands Port Authority Virgin Islands Port Authority 1 Virgin Islands Port Authority, Marine Revenue Bonds, Series 2014C (Federally Taxable), $4,920,000 Dated: October 23, 2014 2 Virgin Islands Port Authority, Marine Revenue

More information

Virgin Islands Port Authority, VI

Virgin Islands Port Authority, VI Virgin Islands Port Authority, VI 1 Virgin Islands Port Authority, Marine Revenue Bonds, Series 2014C (Federally Taxable), $4,920,000 Dated: October 23, 2014 2 Virgin Islands Port Authority, Marine Revenue

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

KLHQ Fairfield County Emergency Response Plan (August 13, 2012)

KLHQ Fairfield County Emergency Response Plan (August 13, 2012) (August 13, 2012) Purpose The purpose of this plan is to ensure the safe and efficient handling of emergency situations that may arise at the Fairfield County (KLHQ) Lancaster, Ohio Airport. It is intended

More information

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AUTHORITY MEMBERS Larry Morelock-Chair, Alvin Osborn-Vice-Chair, John Sundgren, Rodrigo Flores, Ryan Smith, and Michael Bodine.

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES Gail Farber Director of Public Works COUNTY OF LOS ANGELES AVIATION COMMISSION "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone:

More information

SEARCH AND RESCUE DEPARTMENT

SEARCH AND RESCUE DEPARTMENT SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

SEARCH AND RESCUE DEPARTMENT

SEARCH AND RESCUE DEPARTMENT SEARCH AND RESCUE DEPARTMENT I. Mission The Critical mission of Search and Rescue Department (SAR) is to maintain the wellbeing of all North Slope Borough residents. SAR provides safe, efficient and reliable

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

TPA Emergency Planning and Response

TPA Emergency Planning and Response TPA Emergency Planning and Response Tampa Bay Area Contingency Planners Agenda Airport Emergency Planning Federal Aviation Regulations Plans and Procedures Airport Emergency Plan Hurricane Plan Wildlife

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

DISASTER RECOVERY GUIDE

DISASTER RECOVERY GUIDE DISASTER RECOVERY GUIDE DISASTER RECOVERY GUIDE You never know when it may happen: disasters happen without warning. Depending on the size of the event, there is a chance emergency responders may not be

More information

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

DEPARTMENT OF CIVIL AVIATION

DEPARTMENT OF CIVIL AVIATION DEPARTMENT OF CIVIL AVIATION MISSION The Mission of the Department of Civil Aviation is to ensure safety of civil air navigation, to develop and operate a national civil air infrastructure and services,

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

Irregular Operations (IROPS)

Irregular Operations (IROPS) Irregular Operations (IROPS) Introduction The Passenger Bill of Rights prohibits domestic flights from remaining on the tarmac for more than three hours. International flights may remain on the tarmac

More information

Aviation Operating Administration/Executive

Aviation Operating Administration/Executive Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness, and compliance with

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information

DISCUSSION ITEMS. Five Year Joint Airport Capital Improvement Program (JACIP) Review Airport Passenger Facility Charge (PFC) INFORMATION ITEMS

DISCUSSION ITEMS. Five Year Joint Airport Capital Improvement Program (JACIP) Review Airport Passenger Facility Charge (PFC) INFORMATION ITEMS A G E N D A TO FROM RE Chairman - Members Melbourne Airport Authority Executive Director AGENDA for Wednesday, November 19, 2014, 8:30 am Regular Meeting of the Airport Authority To be held at the new

More information

Friedman Memorial Airport Seeks Airport ARFF/Operations Specialists. Posted Date: 08/09/2017. Deadline to Apply: 09/18/2017

Friedman Memorial Airport Seeks Airport ARFF/Operations Specialists. Posted Date: 08/09/2017. Deadline to Apply: 09/18/2017 Friedman Memorial Airport Seeks Airport ARFF/Operations Specialists Posted Date: 08/09/2017 Deadline to Apply: 09/18/2017 Salary Range: $55,000.00 $75,000.00 Supervisor: Airport ARFF/Operations Manager

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

AIRPORT FUND. Description. Summary

AIRPORT FUND. Description. Summary Description In March 1941 construction started for the airport at its present site. After Pearl Harbor, the airport, known as Pinellas Army Airfield, was used as a military flight-training base. After

More information

COMMONWEALTH PORTS AUTHORITY

COMMONWEALTH PORTS AUTHORITY REPORT ON COMPLIANCE AND INTERNAL CONTROL OVER COMPLIANCE WITH REQUIREMENTS APPLICABLE TO THE PASSENGER FACILITY CHARGE PROGRAM YEAR ENDED SEPTEMBER 30, 2015 Deloitte & Touche LLC P.O. Box 500308 Saipan,

More information

SEARCH AND RESCUE DEPARTMENT

SEARCH AND RESCUE DEPARTMENT SEARCH AND RESCUE DEPARTMENT I. Mission The critical mission of Search and Rescue Department (SAR) is to maintain the well being of all North Slope Borough residents. SAR provides safe, efficient and reliable

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

SALT LAKE CITY DEPARTMENT OF AIRPORTS MINUTES OF ADVISORY BOARD MEETING

SALT LAKE CITY DEPARTMENT OF AIRPORTS MINUTES OF ADVISORY BOARD MEETING SALT LAKE CITY DEPARTMENT OF AIRPORTS MINUTES OF ADVISORY BOARD MEETING 21 October - 2015 Members Present: Excused: Mayor s Office: Department of Airports: Mickey Gallivan Chair Igor Best-Devereux Christine

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

L O U I S V I L L E I N T E R N AT I O N A L A I R P O R T B O W M A N F I E L D. Facilities Manager

L O U I S V I L L E I N T E R N AT I O N A L A I R P O R T B O W M A N F I E L D. Facilities Manager Facilities Manager About Louisville, Kentucky Powering the Regional Economy Louisville International Airport and Bowman Field comprise the largest employment center in Louisville Metro. Growth at the airports

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

Bend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC

Bend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC Bend Municipal Airport Urban Renewal Plan Tashman Johnson LLC Elaine Howard Consulting LLC Urban Renewal Background The purpose of urban renewal is to improve certain areas that are poorly developed or

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Huronia/Midland Airport, CYEE

Huronia/Midland Airport, CYEE Huronia/Midland Airport, CYEE HURONIA MUNICIPAL AIRPORT- 2016 TO 2020 1. INTRODUCTION In 2010, The Huronia Municipal Airport Commission (HMAC) developed a five-year business plan to increase activity levels

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

THE DIABLO AVIATOR. Buchanan Field, Live Training. Winter What s Inside: Entering a Secure Area: Tenant Gate Access

THE DIABLO AVIATOR. Buchanan Field, Live Training. Winter What s Inside: Entering a Secure Area: Tenant Gate Access Contra Costa County Airports Buchanan Field & Byron THE DIABLO AVIATOR Buchanan Field, Live Training What s Inside: Entering a Secure Area: Tenant Gate Access 2 The County s Office of Emergency Services

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

REGULAR WORK SESSION OF THE FARMVILLE TOWN COUNCIL HELD ON MAY 2, 2018

REGULAR WORK SESSION OF THE FARMVILLE TOWN COUNCIL HELD ON MAY 2, 2018 REGULAR WORK SESSION OF THE FARMVILLE TOWN COUNCIL HELD ON MAY 2, 2018 Vice-Mayor Reid called to order the regular work session of the Farmville Town Council held on Wednesday, May 2, 2018, at 11:00 a.m.

More information

The Airport. p a g e 2

The Airport. p a g e 2 The Airport Telluride Regional Airport (TEX) with a runway altitude of 9,070 feet MSL is the highest airport in North America with commercial service in light of the fact that, after a two-year hiatus,

More information

Andres Lainoja Eesti Lennuakadeemia

Andres Lainoja Eesti Lennuakadeemia Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began

More information

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL STATE OF FLORIDA Report No. 95-05 James L. Carpenter Interim Director Office of Program Policy Analysis And Government Accountability September 14, 1995 REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL PURPOSE

More information

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported Financial Analysis 4.0 Overview The 2011 State of Texas Airport System Economic Impact Study calculated that H.H. Coffield Regional Airport has annual local economic impact of $187,293. This value places

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

EAGL E CO U NT Y REGI O NAL AIRP ORT REP O RT

EAGL E CO U NT Y REGI O NAL AIRP ORT REP O RT EAGL E CO U NT Y REGI O NAL AIRP ORT 2018 A NNU A L REP O RT WELCOME Welcome to the 2018 Annual Report for Eagle County Regional Airport (EGE). I am pleased to share that EGE continues to experience strong

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

2017 Accomplishments

2017 Accomplishments CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017

More information

2018 Accomplishments

2018 Accomplishments CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community

More information

Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport

Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport Exhibit 1 Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport Robert Melton, CPA, CIA, CFE, CIG County Auditor Audit Conducted by: Jenny Jiang, CPA, Audit Manager

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MAY 19, 2016

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MAY 19, 2016 A regular meeting of the Wilkes-Barre/Scranton International Airport Joint Board of Control was held Thursday, May 19, 2016 in the Terminal Building Conference Room at the Airport. The meeting was called

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS The Tanzania Civil Aviation Authority, (TCAA) was established by the enactment

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Manistee County Blacker Airport Authority. MINUTES Monday, April 13, 2009 DRAFT. Manistee County Blacker Airport 12:00 Noon Conference Room

Manistee County Blacker Airport Authority. MINUTES Monday, April 13, 2009 DRAFT. Manistee County Blacker Airport 12:00 Noon Conference Room Manistee County Blacker Airport Authority DRAFT MINUTES Monday, April 13, 2009 Manistee County Blacker Airport 12:00 Noon Conference Room Members Present: Members Absent: Others Present: Ervin Kowalski,

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday October 15, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday October 15, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday October 15, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, October

More information

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport AIRPORT COMMITTEE MEETING AGENDA September 06, 2017-4:00 PM Moorhead Municipal Airport 1. Call to Order 2. Agenda Amendments 3. Approval of Minutes A June 14, 2017 4. Citizens to be Heard 5. Airport Capital

More information

City of Naples Airport Authority 2017 ANNUAL REPORT

City of Naples Airport Authority 2017 ANNUAL REPORT City of Naples Airport Authority 2017 ANNUAL REPORT NAA BOARD OF COMMISSIONERS Donna M. Messer Chair Dick Evans Vice Chair Ted Brousseau Commissioner Michael Lenhard Commissioner James Rideoutte Commissioner

More information

CEDAR CITY REGIONAL AIRPORT BOARD MEETING JUNE 11, 2015

CEDAR CITY REGIONAL AIRPORT BOARD MEETING JUNE 11, 2015 CEDAR CITY REGIONAL AIRPORT BOARD MEETING A regular meeting of the Cedar City Regional Airport Board was held on Thursday, June 11, 2015 at 8:15 AM in the Conference Room at the Airport located at 2560

More information

Aircraft Management Comprehensive Ownership, Operation and Maintenance Management Services

Aircraft Management Comprehensive Ownership, Operation and Maintenance Management Services Aircraft Management Comprehensive Ownership, Operation and Maintenance Management Services Aircraft Management Founded upon a heritage of service, Jet Aviation has a unique perspective that has developed

More information

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA SPECIAL MEETING

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA SPECIAL MEETING WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AUTHORITY MEMBERS John Sundgren - Chair, Alvin Osborn - Vice-Chair, Michael Bodine, Desmond Johnston, and Ryan Smith AGENDA SPECIAL

More information

Aviation Tax Report. June 30, 2016

Aviation Tax Report. June 30, 2016 Aviation Tax Report June 30, 2016 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774 TTY, Voice

More information

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting 10.27.16 Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Agenda Welcome / Introductions DFW

More information

BOARD OF AIRPORT COMMISSIONERS -

BOARD OF AIRPORT COMMISSIONERS - 0 OF1 Los Angeks World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS - Meeting Date: O'IAA.A.)1.Alk-Tort/uQA212J`s-- Approved by: Samantha Bricker - Deputy Executive Director 11/16/2017 11-Pleviewed

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize

More information

WICOMICO COUNTY AIRPORT COMMISSION MAY 8, 2017

WICOMICO COUNTY AIRPORT COMMISSION MAY 8, 2017 WICOMICO COUNTY AIRPORT COMMISSION MAY 8, 2017 Present: Staff: Other: John Hall, Chairman; Matthew E. Creamer, Vice Chairman; Nola Arnold; James Brooke; Gerard DiCairano; Calvin Peacock Dawn Veatch; David

More information

Others in Attendance: Airport Manager, Billie Jo Grafton, Airport Clerk, Claudia Chavarria.

Others in Attendance: Airport Manager, Billie Jo Grafton, Airport Clerk, Claudia Chavarria. International Airport Commission Meeting Minutes Airport Terminal Building City of Del Rio, Texas 1104 West 10 th St. Del Rio, Texas 78840 Wednesday August 24, 2011 6:00 P.M. ************************************************************************

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

Aviation Operating Administration/Executive

Aviation Operating Administration/Executive Aviation Operating Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness,

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

THE RENTER PILOT UNDERSTANDS AND AGREES TO COMPLY WITH THE FOLLOWING:

THE RENTER PILOT UNDERSTANDS AND AGREES TO COMPLY WITH THE FOLLOWING: THE RENTER PILOT UNDERSTANDS AND AGREES TO COMPLY WITH THE FOLLOWING: RENTAL TERMS o I agree to pay the posted and prevailing rental rates for the aircraft being rented, including any fuel surcharges or

More information

How to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield

How to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield How to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield David Decoteau, A.A.E., C.A.E. Hayward Executive Airport Job of Airport Operations Commercial vs GA Airfield

More information

Five of 78, or six percent, of the training hours were incorrectly calculated in the FAA Forms (three calculations resulted in under-

Five of 78, or six percent, of the training hours were incorrectly calculated in the FAA Forms (three calculations resulted in under- Memorandum CITY OF DALLAS (Report No. A14-004) DATE: December 6, 2013 TO: Honorable Mayor and Members of the City Council SUBJECT: Audit of the City of Dallas Aircraft Rescue and Firefighting Unit 1 The

More information