1 Rhode Island DOT Replaces Bridges Over Extended Weekends Using PBES and SPMTs DAVID W. FISH, P.E. ADMINISTRATOR OF PROJECT MANAGEMENT RI DEPARTMENT OF TRANSPORTATION WITOLD H. KLOCZKOWSKI, P.E. PROJECT MANAGER COMMONWEALTH ENGINEERS & CONSULTANTS, INC. EAST SHORE EXPRESSWAY BRIDGE McCORMICK QUARRY BRIDGE 1

2 Opening Remarks Mr. David W. Fish, P.E. Administrator of Project Management RI Department of Transportation 2

3 OWNER: RI DEPARTMENT OF TRANSPORTATION OVERSIGHT: FHWA RI DIVISION DESIGN CONSULTANT: COMMONWEALTH ENGINEERS & CONSULTANTS, INC CONTRACTOR: MANAFORT BROTHERS INC. 3

4 PROJECT LOCATION PROVIDENCE EAST PROVIDENCE BOTH BRIDGES ARE LOCATED IN EAST PROVIDENCE, RHODE ISLAND EAST BAY COMMUNITIES RHODE ISLAND 4

5 PROJECT LOCATION PROVIDENCE EAST SHORE EXPRESSWAY BRIDGE McCORMICK QUARRY BRIDGE N EAST PROVIDENCE EAST SHORE EXPRESSWAY SB EAST SHORE EXPRESSWAY NB TRAFFIC DATA: - US ROUTE 6 (WARREN AVE), 19,000 VPD - EAST SHORE EXPRESSWAY, 38,000 VPD 5

6 PROJECT LOCATION McCORMICK QUARRY BRIDGE RIDOT Maintenance Facility N EAST SHORE EXPRESSWAY BRIDGE 6

7 EXISTING BRIDGES EAST SHORE EXPRESSWAY BRIDGE McCORMICK QUARRY BRIDGE EAST SHORE EXPRESSWAY BRIDGE: - CONSTRUCTED IN SPAN CONTINUOUS T-BEAM - ~ SPANS - 60 DEG SKEW McCORMICK QUARRY BRIDGE: - CONSTRUCTED IN SPAN P/C I-GIRDER - ~ SPANS - 40 DEG SKEW 7

8 GENERAL BRIDGE CONDITION EAST SHORE EXPRESSWAY BRIDGE McCORMICK QUARRY BRIDGE 8

9 WHY ABC? TWO SEASON, TWO PHASE CONVENTIONAL CONSTRUCTION RAISED TRAFFIC CONCERNS FOR THIS MAJOR EXPRESSWAY. RIDOT SUCCESSFULLY EMPLOYED SPMT S FOR A PRIOR CONTRACT. PROJECT SITE IS WELL SUITED TO SPMT S, DUE TO PROXIMITY OF BSA S AND SHORT TRAVEL PATHS. CONSULTED WITH AN SPMT CONTRACTOR. ALL AGREED THE SITE WAS IDEAL. CONSULTANT PROPOSED GEOSYNTHETIC REINFORCED SOIL (GRS) ABUTMENTS, TO BE CONSTRUCTED IN ADVANCE OF THE W/E CLOSURE, UNDER THE EXISTING BRIDGE. PRECAST CONCRETE SUBSTRUCTURE COMPONENTS HELPED TO SPEED UP THE REPLACEMENT. PRECAST COMPONENTS GRS SPMT s 9

10 NEW BRIDGE CONFIGURATIONS EAST SHORE EXPRESSWAY BRIDGE EXISTING BRIDGE NEW BRIDGE 3-SPAN BECOMES SINGLE SPAN 10

11 NEW BRIDGE CONFIGURATIONS McCORMICK QUARRY BRIDGE EXISTING BRIDGE NEW BRIDGE 3-SPAN BECOMES SINGLE SPAN 11

12 NEW BRIDGE CONFIGURATIONS EAST SHORE EXPRESSWAY BRIDGE McCORMICK QUARRY BRIDGE 12

13 TYPICAL GRS DETAIL NO LONG-TERM SETTLEMENT CONCERNS 13

14 SKEW/RACKING ACCOMMODATIONS 14

15 PRECAST ELEMENTS & INTEGRAL BACKWALL TYPICAL FOOTING SEGMENT SIZE = 20 X13 X2, 78,000 LBS. LARGER WALL SEGMENT SIZE = 20 x11 x1-7, 52,000 LBS. 15

16 INCENTIVES & DISINCENTIVES EACH BRIDGE WAS ASSIGNED A DISTINCT 80 HOUR EXTENDED WEEKEND INCENTIVE CLOSURE PERIOD, FROM 9PM FRIDAY TO 5AM TUESDAY (CONTINUOUS DAY/NIGHT). CONTRACT LANGUAGE: 16

17 BRIDGE STAGING AREAS McCORMICK QUARRY BRIDGE BSA RIDOT Maintenance Facility N BSA EAST SHORE EXPRESSWAY BRIDGE 17

18

19

20

21

22

23 ADVANCED UTILITY RELOCATIONS EAST SHORE EXPRESSWAY BRIDGE (McCORMICK QUARRY BRIDGE SIMILAR) 23

24 ADVANCED GRS CONSTRUCTION McCORMICK QUARRY BRIDGE (BRIDGE EAST SHORE EXPRESSWAY SIMILAR) CONSTRUCTING GRS ABUTMENTS UNDER THE EXISTING BRIDGE 24

25 SUPERSTRUCTURE IN THE BSA EAST SHORE EXPRESSWAY BRIDGE (McCORMICK QUARRY BRIDGE SIMILAR) BUILDING THE NEW BRIDGE IN THE BRIDGE STAGING AREA 25

26 CONSTRUCTION EAST SHORE EXPRESSWAY BRIDGE (McCORMICK QUARRY BRIDGE SIMILAR) COMPLETED SUPERSTRUCTURE, WITH BARRIERS INCLUDED 26

27 CONTRACTOR S DEMOLITION SUBMITTAL Demolition equipment, materials, sequence designed by the Contractor to suit his means and methods. Contractor s engineer analyzed the existing bridge members to address their condition, and to accommodate the proposed sequence. Bridge ratings were made available to the Contractor. Demolition was performed entirely during the 80 hour road closure. 27

28 EAST SHORE EXPRESSWAY BRIDGE 28

29 EAST SHORE EXPRESSWAY BRIDGE START OF THE W/E ROAD CLOSURE 29

30 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 30

31 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 31

32 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 32

33 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 33

34 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 34

35 EAST SHORE EXPRESSWAY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 35

36 EAST SHORE EXPRESSWAY BRIDGE SETTING THE PRECAST COMPONENTS 36

37 EAST SHORE EXPRESSWAY BRIDGE SETTING THE PRECAST COMPONENTS 37

38 EAST SHORE EXPRESSWAY BRIDGE SETTING THE PRECAST COMPONENTS 38

39 EAST SHORE EXPRESSWAY BRIDGE MOVING THE BRIDGE ON THE SPMT s 39

40 EAST SHORE EXPRESSWAY BRIDGE MOVING THE BRIDGE ON THE SPMT s 40

41 EAST SHORE EXPRESSWAY BRIDGE MOVING THE BRIDGE ON THE SPMT s 41

42 EAST SHORE EXPRESSWAY BRIDGE FINISHING THE APPROACH FILL & WALLS 42

43 EAST SHORE EXPRESSWAY BRIDGE MOVING THE BRIDGE ON THE SPMT s 43

44 EAST SHORE EXPRESSWAY BRIDGE FINISHING THE APPROACH FILL & WALLS 44

45 EAST SHORE EXPRESSWAY BRIDGE AFTER THE W/E CLOSURE - NEW STRUCTURE OPEN TO TRAFFIC 45

46 McCORMICK QUARRY BRIDGE 46

47 McCORMICK QUARRY BRIDGE START OF THE W/E ROAD CLOSURE 47

48 McCORMICK QUARRY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 48

49 McCORMICK QUARRY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 49

50 McCORMICK QUARRY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 50

51 McCORMICK QUARRY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 51

52 McCORMICK QUARRY BRIDGE DEMOLITION DURING THE WEEKEND ROAD CLOSURE 52

53 McCORMICK QUARRY BRIDGE SETTING THE PRECAST COMPONENTS 53

54 McCORMICK QUARRY BRIDGE SETTING THE PRECAST COMPONENTS 54

55 McCORMICK QUARRY BRIDGE SETTING THE PRECAST COMPONENTS 55

56 McCORMICK QUARRY BRIDGE MOVING THE BRIDGE ON THE SPMT s 56

57 McCORMICK QUARRY BRIDGE MOVING THE BRIDGE ON THE SPMT s 57

58 McCORMICK QUARRY BRIDGE MOVING THE BRIDGE ON THE SPMT s 58

59 McCORMICK QUARRY BRIDGE MOVING THE BRIDGE ON THE SPMT s 59

60 McCORMICK QUARRY BRIDGE FINISHING THE APPROACH FILL & WALLS 60

61 McCORMICK QUARRY BRIDGE AFTER THE W/E CLOSURE - NEW STRUCTURE OPEN TO TRAFFIC 61

62 A PDF OF THIS PRESENTATION, AND WEB-LINKS TO TIME- LAPSE VIDEO S WILL BE PROVIDED BY FIU 62

63 FINAL STRUCTURES - Contract Type: Design/Bid/Build - Total Construction Cost - Bid = $12.7 million, to-date = $11.8 million - Total Construction Duration = 16 months - East Shore Expressway Bridge incentive payment = $ McCormick Quarry Bridge incentive payment = $152k = 19hrs x $8k/hr - Total Incentive Payments - $152k McCORMICK QUARRY BRIDGE EAST SHORE EXPRESSWAY BRIDGE - Contract Closure = 80 hrs per bridge - Actual Closure: - East Shore Expressway Br = 80hrs - McCormick Quarry Bridge = 61 hrs No traffic gridlock! 63

64 Key take-aways: Conducted successful public out-reach, Weekend move = less traffic and short-lived impacts, Lesson learned from 1 st bridge - construct some of the approach fill and wing walls with wrapped-face system before the SPMT move rather than after, Adjustable bearing detail pros/cons. 64

65 THANK YOU FOR WATCHING 65

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Phoenix Sky Harbor transit guideway bridge

Phoenix Sky Harbor transit guideway bridge Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,

More information

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018 ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT June 7, 2018 Dallas District Accelerated Construction Techniques Accelerated Construction Techniques commonly used by the Dallas

More information

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017 Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule

More information

Pre-Construction Public Meeting July 2017

Pre-Construction Public Meeting July 2017 Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City

More information

Outer Banks Bridges Update:

Outer Banks Bridges Update: Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3

More information

Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders

Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders Welcome to Webinar on Accelerated Bridge Construction Colorado Flyover Ramp Showcases Precast Pier Caps and Curved Spliced Precast U-Girders Sponsored by Accelerated Bridge Construction University Transportation

More information

Welcome to Webinar on Accelerated Bridge Construction Milton-Madison Bridge Replacement: the Mega-Lateral Slide

Welcome to Webinar on Accelerated Bridge Construction Milton-Madison Bridge Replacement: the Mega-Lateral Slide Welcome to Webinar on Accelerated Bridge Construction Milton-Madison Bridge Replacement: the Mega-Lateral Slide Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov A daytime lane closure on Mesa all week is needed to complete Sunday s demo

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

I-35 Reconstruction Project

I-35 Reconstruction Project I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City

More information

Deterioration Factors at Girder Ends

Deterioration Factors at Girder Ends Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of

More information

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Milestone: Bridge to Nowhere scheduled for demolition Aug 14 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

APPENDIX F. Structural Design Report

APPENDIX F. Structural Design Report APPENDIX F Structural Design Report CONSULTANT SERVICES FOR AN ENVIRONMENTAL ASSESSMENT (EA) STUDY OF WHARNCLIFFE ROAD WIDENING FROM BECHER STREET TO COMMISSIONERS ROAD CNR SUBWAY BRIDGE REPLACEMENT STRUCTURAL

More information

N. Central St. & W. Jackson Ave. Streetscape Projects

N. Central St. & W. Jackson Ave. Streetscape Projects N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Constructor: Joseph B. Fay

Constructor: Joseph B. Fay 1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:

More information

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed

More information

Neighbourhood Committee NDG - Westmount. September 12, 2016

Neighbourhood Committee NDG - Westmount. September 12, 2016 Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

Project Summary 2009

Project Summary 2009 Project Summary 2009 SB-2009-MN-55360: Lady Slipper Scenic Byway Pedestrian Walkway State Submission Date not submitted Division Submission Date not submitted State Priority 0 This application must be

More information

Main Street Station Upgrades

Main Street Station Upgrades Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar

More information

Airside Construction Safety: The Human Factor

Airside Construction Safety: The Human Factor Airside Construction Safety: The Human Factor Presented by The Massachusetts Port Authority Houssam H. Sleiman, P.E., CCM Director, Capital Programs and Environmental Affairs September 25, 2010 ACI-NA

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction

More information

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017 Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

Exhibit 2. Preconstruction Jan Jun-19

Exhibit 2. Preconstruction Jan Jun-19 Activity ID Activity Name Original Broward Convention Center 1273 02-Jan-17 05-Jan-22 Preconstruction 620 02-Jan-17 10-Jun-19 Pre-Development Agreements 152 02-Jan-17 03-Aug-17 DA Pre-Development Agreement

More information

IRONTON-RUSSELL BRIDGE REPLACEMENT

IRONTON-RUSSELL BRIDGE REPLACEMENT IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing

More information

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E. P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019 Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform

More information

Two townships received top

Two townships received top Awards 35 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Increase Safety on Roads and Bridges Two townships were recognized during PSATS 95 th Annual Educational

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

USERS of EXISTING TOLL FACILITIES in HAMPTON ROADS

USERS of EXISTING TOLL FACILITIES in HAMPTON ROADS USERS of EXISTING TOLL FACILITIES in HAMPTON ROADS PREPARED BY: SEPTEMBER 2012 T12-10 ii REPORT DOCUMENTATION TITLE Users of Existing Toll Facilities in Hampton Roads AUTHOR Robert B. Case, PE, PTOE ABSTRACT

More information

395 Express Lanes Major Closure Advisory

395 Express Lanes Major Closure Advisory 395 Express Lanes Major Closure Advisory 3-Week Schedule Lane Closure And Construction Activities Week of February 26 th 1) Highway/Name & Route #: Braddock Road Bridge Lane/Shoulder Closure: Single Lane

More information

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two

More information

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour www.peachpass.com NOVEMBER 2013 Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour In This Issue GA 400 Tolls End on November 22 Lanes Closures for GA 400/I-85

More information

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of

More information

25 th Avenue Grade Separation. Community Meeting November 13, 2018

25 th Avenue Grade Separation. Community Meeting November 13, 2018 25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Viaduct Demolition at Girard Interchange

Viaduct Demolition at Girard Interchange i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95

More information

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3 FINISHED GRADE 1'-3 3 VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT R "W" PAY LIMITS OF ITEM 601 PAY LIMITS OF ITEM 601 STRUCTURAL CONCRETE STRUCTURAL CONCRETE 1'3" PCBC END SEGMENT B C 1'3" COATING AND STRUCTURAL CONCRETE COATING (ANTIGRAFFITI) 1'3" CURB FINISHED GRADE

More information

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014 LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW Communications Queen/Leslie Intersection Closure Overview Next Steps - Coordination of TTC Track Upgrades (Queen streetcar

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns

More information

RPO AMERICA PEER SYMPOSIUM: SHARING INNOVATIONS IN REGIONAL TRANSPORTATION PLANNING Presented by David Cole, Former Commissioner, Maine DOT

RPO AMERICA PEER SYMPOSIUM: SHARING INNOVATIONS IN REGIONAL TRANSPORTATION PLANNING Presented by David Cole, Former Commissioner, Maine DOT National Rural Transportation Conference August 24 26, 2011 Washington, DC RPO AMERICA PEER SYMPOSIUM: SHARING INNOVATIONS IN REGIONAL TRANSPORTATION PLANNING Presented by David Cole, Former Commissioner,

More information

Little River Trail Feasibility Study

Little River Trail Feasibility Study Final April, 2014 Prepared for the State Coastal Conservancy By the Natural Resources Services Division of Redwood Community Action Agency Table of Contents Executive Summary... 1 1. Project Purpose and

More information

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference

More information

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction

More information

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions City of Buda Accepting Applications For Boards and Commissions The deadline is approaching to submit applications for the City of Buda's various boards and commissions. Deadline to submit a completed application

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov January 18, 2017 Mesa Continuous for 6 weeks The following closures started

More information

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders: Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders

More information

Hazard Identification Questionnaire

Hazard Identification Questionnaire Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda Thursday, May 25, 2017 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201 TWO BALLSTON PLAZA 1110, Arlington, VA 22201 www.brookfieldproperties.com AVAILABLE SPACE Partial 1st Floor Suite GR1-5,201 RSF Available 1/11; first floor exterior entrance, window-line overlooking fountain

More information

AUTHORIZATION TO CONDUCT ETOPS OPERATIONS

AUTHORIZATION TO CONDUCT ETOPS OPERATIONS oi oauu-^.o CHAPTER 4 AUTHORIZATION TO CONDUCT ETOPS OPERATIONS 4.1. ETOPS Authorizations. As stated earlier in this chapter, the DAAO determines the final decision on whether the certificate holder has

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

The Covered Bridges of Preble County. Past, Present and Future By: R. Kyle Cross, P.E., P.S.

The Covered Bridges of Preble County. Past, Present and Future By: R. Kyle Cross, P.E., P.S. The Covered Bridges of Preble County Past, Present and Future By: R. Kyle Cross, P.E., P.S. The History of the 8 Covered Bridges There are 8 covered bridges in Preble County. Only 2 of them are moved for

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

Squint s Ranch and Airport

Squint s Ranch and Airport Squint s Ranch and Airport Lake Arrowhead, CA Airport Project Summary The Lake Arrowhead Airport at The Lost Ranch is a valuable asset to the surrounding communities. Not only does it provide residents

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation

More information

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

22-23 Pavement Marking Items. (Pages 7 & 8 removed) 22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable

More information

14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST DIVISION OPERATIONS AND MAINTENANCE CONTRACT EXTENSION

14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST DIVISION OPERATIONS AND MAINTENANCE CONTRACT EXTENSION Clause No. 14 in Report No. 13 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on September 11, 2014. 14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: IGUS BEARINGS, INC. : DOCKET NO. 4652 PETITION FOR A PRIVATE AT-GRADE CROSSING : REPORT AND ORDER On September 30, 2016,

More information

Trinity River Vision Update

Trinity River Vision Update Trinity River Vision Update Presented to the City Council by: Mark Rauscher, Program Manager Planning & Development Department / Program Management Office August 23, 2011 1 Purpose of the Briefing Overview

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information