Transportation Supporting Dulles Airport

Size: px
Start display at page:

Download "Transportation Supporting Dulles Airport"

Transcription

1 Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County

2 Multiple Transportation Improvements Silver Line Status Report Herndon and Innovation Center Garage Adjacent Roadway Improvements Pedestrian and Bicycle Connections Reston Metrorail Assess Group Herndon Metrorail Station Access and Mobility Study Transit Service Adjustments Improvements to Route 28 Reston Area Transportation Projects Innovation Area Transportation Project I-66 Express Lanes I-66 Construction Mitigation Future I-66 Transit Service 2

3 Phase 1 Punchlist Ongoing Old Meadow Road Realignment at Route 123 completion: End of 2018 Remaining VDOT items being addressed Work underway at Tysons stations Phase 2 Overall Project Status ~ 83% complete Highlights All stations under construction Mechanical/electrical/plumbing Stormwater facilities Pavilions; pedestrian bridges Aerial Guideway at Dulles Airport nearly finished Traction Power Substations in progress Sections of third rail have been energized Rail yard at Dulles Airport ~ 84% complete Herndon and Innovation Center garages under construction Budget - $2.778B Total Contingency - $551 M (Remaining ~$350 M)

4 Silver Line Phase 2 Garages Herndon Station 2,006 parking spaces; Cost: $44.5 M; 87% Complete Pedestrian and vehicular connections to the existing parking garage Pedestrian and bicycle amenities, including a bike room Road widening and improvements on site and on Sunrise Valley Drive New access road from Sunrise Valley Drive to the existing garage Existing garage modifications to accommodate the bridge connections from the new garage, new pedestrian path to Metro elevator, accessible parking spaces, and addition of revenue collection system Future Transit Oriented Development (TOD) on the west side 4

5 Herndon Station Garage Bridge erection and precast work completed Ongoing coordination with MWAA for construction interface on garage, Metrorail facilities, road improvements, bus and vehicular operations during construction Completion in Spring 2019 Upgrades to the existing garage follow 5

6 Silver Line Phase 2 Garages Innovation Center 2,070 spaces; Cost: $52 M; 62% complete Pedestrian and bicycle amenities Real estate exchange and development agreement with Rocks Engineering Integration with the overall site with the private development Shared infrastructure design and construction for the garage, retail, residential and office development The overall partnership project includes the design and construction of roads, stormwater management, plaza, and other amenities for the 15-acre Transit Oriented Development 6

7 Innovation Center Station Garage Precast erection underway Completion in Spring 2019 Onsite coordination and cooperation continues as MWAA is working on County parcel and Nugget is neighboring parcels and roads 7

8 Adjacent Roadway Improvements As part of the Silver Line project numerous intersections and roadways will be improved: Reston Town Center Station Sunrise Valley Drive and Reston Parkway Sunrise Valley Drive and Edmund Halley Drive Sunset Hills Road and the future Reston Town Center Station, Herndon Station Sunrise Valley Drive and Fairfax County Parkway, and Sunrise Valley Drive and the Herndon-Monroe Park-and-Ride Lot/Herndon Metrorail Station Innovation Center Station Innovation Avenue Sunrise Valley Drive Carta Way Extension 8

9 Pedestrian and Bicycle Connections Reston Metrorail Access Group Recommendation Prepared in 2 Phases Phase I (Wiehle-Reston East Station) - $20 M allocated 25 Phase I recommendations: 19 complete 1 in utility relocation and construction 1 in design 1 will be completed with Phase II 3 under discussion with developers Includes W&OD Bridge over Wiehle 9

10 Pedestrian and Bicycle Connections Reston Metrorail Access Group Phase II (Reston Town Center Station) - $25 M allocated 22 Phase II recommendations, 1 in utility relocation and construction, 5 in land acquisition, 9 in design, and 7 in project initiation or on hold, due to adjacent land development activity. 10

11 Pedestrian and Bicycle Connections Herndon Metrorail Station Access Management Study Area around Herndon and Innovation Center Metrorail Stations Multimodal challenges and possibilities around stations identified Missing links and needed pedestrian and bicycle connections $21 M allocated 14 priority projects approved 6 projects in design 2 projects being studied 6 project being initiated 11

12 Transit Service Adjustments Fairfax Connector service reconfigured as part the Silver Phase 1 implementation. Tysons Circulator service implemented; RIBS revised Service reoriented to feed Wiehle-Reston East Station $4 million in new service (annually) added Increased frequencies Service to new areas Additional late night and weekend service Additional service changes will be implemented with Phase 2 Outreach efforts beginning in Fall 2018 Service concepts to be refined during 2019 Herndon bus garage renovation nearly complete Anticipate new service and more frequent service to all three new Fairfax County stations 12

13 Improvements to Route 28 Northern Virginia Transportation Authority allocated funding to multiple projects in the Route 28 corridor with HB 2313 revenues FY 2014 priorities included two construction projects on Route 28 Widen from 6 to 8 Lanes SB (Dulles Toll Road to Route 50) completed Widen from 6 to 8 Lanes NB (McLearen Road to Dulles Toll Road) completed FY priorities included design funds for widening Route 28 from the Prince William line to New Braddock Road. Design, environmental and traffic work underway Additional funding approved on 6/14 Design build procurement to begin in late 2018 Other projects in Loudoun and Prince William Cos. 13

14 Improvements to Route 28 Remaining segment in Fairfax County north of Route 50. NVTA did not allocate funding to this project in their FY 2018 to FY 2023 program County staff will be submitting the project to the Commonwealth s SmartScale funding competition on August 1,

15 Reston Transportation Projects Since February 2014: Network analysis/prioritization completed Board adopted Funding Plan Board adopted a Comprehensive Plan realignment of Sunset Hills Road Route 7 widening (Reston to Tysons) design-build contract scheduled to be awarded on July 17 Soapstone Connector (Sunset Hills to Sunrise Valley Drive) Preliminary engineering underway Environment document nearly complete Historical assessment underway Board approved $500,000 for Sunrise Valley/Fairfax County Parkway intersection improvements - W&OD Bridge over Wiehle advancing to land acquisition by end of

16 Innovation Transportation Project Davis Drive/Rock Hill Road Extension New crossing of the Dulles Toll Road from Center for Innovative Technology to Sunrise Valley Drive 4 lanes + bike and pedestrian facilities Estimated cost: $100 M Fairfax and Loudoun have each approved $500,000 for preliminary engineering VDOT advancing preliminary engineering NVTA approved an additional $20 M for this project on June 14 Fairfax County requesting an additional $30 M through Smart Scale 16

17 I-66 Express Lanes VDOT awarded a design-build contract to Express Mobility Partners Two express lanes in each direction (Gainesville to Beltway) Construction Underway Early Deliverable: I-66/Route 28 Interchange Eliminate four traffic signals on Route 28 north of Route 29 Significantly enhance access to Dulles Airport from the south Target Date: 2020 Remainder of the project due to be completed in

18 I-66 Construction Mitigation Inside the Beltway and Outside the Beltway Route 699 (Government Center to Foggy Bottom) Implemented in December 2017 Ridership has grown from 130 per day to 305 per day, continues to increase NVTC has approved funding for Route 698 (Vienna Metrorail Station to Pentagon) Implementation plan and timing being developed Outside the Beltway Fairfax Connector Bus Fare Buy Down began May 5, 2018 All feeder routes to the Vienna Metrorail Station now $1 VDOT offering vanpool and telework incentives; County providing commuter assistance. 18

19 Future I-66 Transit Service A portion of tolls collected will support future transit service in the I- 66 corridor. Funding for additional transit service during construction Upfront capital funding for on-going service: $36.5 million On-going annual operating funding beginning in 2023 Inflationary increases; Funding continuing through 2046 Both PRTC and Fairfax Connector will be adding service Fairfax Connector service additions planned: Centreville - Tysons Centreville - Wahington DC Fairfax Center - Washington DC Westfields - Vienna Stringfellow - Vienna Stringfellow - Mark Center via Pentagon 19

20 Questions?

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

A New Era of Transportation Solutions

A New Era of Transportation Solutions A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

Silver Line Rail Project Update

Silver Line Rail Project Update Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Dulles Toll Road Rate Setting Process

Dulles Toll Road Rate Setting Process Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On

More information

Transform66 Transportation Management Plan: Transit & TDM Strategies

Transform66 Transportation Management Plan: Transit & TDM Strategies Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

Dulles Corridor Improvements. Drive to Ride

Dulles Corridor Improvements. Drive to Ride Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform

More information

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section Leesburg Streets and Highways Tom Brandon Manager, Office of Capital Projects Potomac Section About Leesburg Accessible 35 miles from DC On the W&OD Trail On the Potomac River 15 miles from the Appalachian

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Silver Line Operating Plan

Silver Line Operating Plan Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects

More information

Performance Measure Summary

Performance Measure Summary Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

The following items were handed out at the January 4, 2018 NVTC Meeting.

The following items were handed out at the January 4, 2018 NVTC Meeting. The following items were handed out at the January 4, 2018 NVTC Meeting. Blue Item #3D 2018 NVTC COMMITTEE AND BOARD APPOINTMENTS NVTC EXECUTIVE COMMITTEE Paul Smedberg, Chairman/WMATA Board* Matt Letourneau,

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

TRANSPORTATION. Reston Market Profile

TRANSPORTATION. Reston Market Profile Reston Market Profile TRANSPORTATION Fairfax County Background A recent TIME Magazine featured rapidly growing Fairfax County as one of four "megacounties" in the nation-suburban counties that have outgrown

More information

Update on Route 1 Efforts

Update on Route 1 Efforts County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section

More information

Fairfax County / Washington DC Transit Bus Advertising

Fairfax County / Washington DC Transit Bus Advertising GET ON THE BUS! Gateway Outdoor, through its partnership with Fairfax Connector, is the exclusive provider for Transit Advertising in Fairfax County, VA. Fairfax Commuter Fleet 290 Transit Buses 1,152,87

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Proposed Dulles Toll Road Rate Adjustments

Proposed Dulles Toll Road Rate Adjustments Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Transform66: Inside the Beltway

Transform66: Inside the Beltway Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a

More information

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix D FINAL MAY 2016 D. EXISTING TRANSIT/TDM PROVIDER OVERVIEWS Transit Service Providers Information about the type, frequency,

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Our Panelists SPEAKERS MODERATOR

Our Panelists SPEAKERS MODERATOR SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation

More information

Appendix 1: Phase I Strategies

Appendix 1: Phase I Strategies Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030

More information

Understanding Your I-66 Trip

Understanding Your I-66 Trip Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan

More information

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor

More information

Design Public Hearing

Design Public Hearing Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: November

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: January

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

ACI LEGAL COMMITTEE MEETING

ACI LEGAL COMMITTEE MEETING ACI LEGAL COMMITTEE MEETING MWAA S RAIL TO DULLES PROJECT: WHAT IS IT AND HOW DOES IT FIT WITH THE PRINCIPLES OF REVENUE DIVERSION PHIL SUNDERLAND MWAA GENERAL COUNSEL TWO GOALS FOR THE NEXT TEN MINUTES

More information

REAL ESTATE TRANSACTION ADVISORY SERVICES

REAL ESTATE TRANSACTION ADVISORY SERVICES REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station

More information

Reston Association Board of Directors Meeting September 13, 2012 REVISED AGENDA Regular Meeting of the Board of Directors Thursday, September 13, 2012, 6:00 pm NOTE: Times listed for Agenda Items are estimates

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004 Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 24 Potomac and Rappahannock Transportation Commission Fairfax Connector Omni Ride Omni

More information

2411 Dulles Corner Park Herndon, VA

2411 Dulles Corner Park Herndon, VA 2411 Dulles Corner Park Herndon, VA Building Highlights Award winning premier office building located in the center of Dulles Corner Minutes from Dulles International Airport, with quick access to the

More information

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission is seeking an EXECUTIVE DIRECTOR ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency that

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests

More information

MMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA

MMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA MMHP INVESTMENT SALES OPPORTUNITY 9009 & 9011 Centreville Road Manassas, VA Investment Highlights Centrally located, 100% leased mobile home park in the strong-performing City of Manassas, VA The 10.02-acre

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route

More information

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO Committee for Dulles June 9, 2016 Jack Potter, MWAA President & CEO Dulles International is the Premier International Gateway to the Capital Region Dom Intl Total Mainline Airlines 10 29 37* Destinations

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation

More information

3 ASSESSMENT OF THE CORRIDOR

3 ASSESSMENT OF THE CORRIDOR 3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information

Brentsville Courthouse

Brentsville Courthouse 46 Prince William County Proposed FY 2014-2019 Capital Improvement Program Brentsville Courthouse Existing budget will complete the jail restoration. There is no additional funding allocated to projects

More information

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION Washington Metropolitan Area Transit Authority Board Action/Information Summary @Action O Information

More information

CHAPTER 5: Operations Plan

CHAPTER 5: Operations Plan CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...

More information

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA RELATED SANTA CLARA SANTA CLARA, CALIFORNIA RELATED SANTA CLARA Santa Clara, CA JUNE 2016 APPROVAL TIMELINE RELATED SANTA CLARA Santa Clara, CA 1 ACRES PARKS & OPEN SPACE (40% OF TOTAL SITE) PARCEL 3 PARK

More information

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office TECHNICAL ADVISORY COMMITTEE Wednesday, April 20, 2016, 7:00pm NVTA Office 3040 Williams Drive, Suite 200 Fairfax, Virginia 22031 AGENDA I. Call to Order/Welcome Chairman Boice II. Meeting Summary of March

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Public Informational Meeting

Public Informational Meeting Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives

More information

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: October 28, 2015 Item Number: 8.B.1.b. Subject: Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities

More information

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles

More information

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic# CHULA VISTA DEVELOPMENT OPPORTUNITY For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 Image TAVA Third Avenue Village is the heart of Chula Vista s historic downtown.

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Table of Contents. List of Tables

Table of Contents. List of Tables Table of Contents 1. Introduction... 1 2. Service Recommendations... 1 A. Extend Service on Fort Belvoir to New Post Exchange/Commissary Complex... 1 B. Improve Service Frequencies on Sunday from Current

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic# For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 CHULA VISTA DEVELOPMENT OPPORTUNITY Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: March

More information

230 CHURCH AVENUE CHULA VISTA, CA 91910

230 CHURCH AVENUE CHULA VISTA, CA 91910 Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building Height up to 45 Lot size of 11,326 sqft Flat/Graded Lot Ease of Access to Utility Hookups Multiple Allowed Uses For Additional

More information

Multimodal Planning Studies

Multimodal Planning Studies Multimodal Planning Studies Commuter Park and Ride Study Steering Committee Meeting June 6, 2013 Agenda 1. Update on Project Schedule 2. Update on Online Interactive Mapping 3. Key Themes from the Open

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information