1 WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new Beech Hollow Connector is expected to open next spring. No impacts to S.R. 980, S.R. 22 and Quicksilver Road are anticipated. Truck deliveries may be accessing the project onto S.R. 980 from the new Beech Hollow Connector. 3. Earthwork All blasting is complete for Section 55A1. 4. Roadway and Bridge Work No work will be taking place that could impact traffic. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55A1. 6. Noise/Dust/Runoff Control Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55A1 TARGET COMPLETION DATE MAY 2019
2 Section: 55A1 Pictured: Grading mounds at SB 217 and 218 Abutment 1 SECTION 55A1 TARGET COMPLETION DATE MAY 2019
3 WEEK ENDING FEBRUARY 1, 2019 SECTION 55A2 ROBINSON AND MOUNT PLEASANT TOWNSHIPS IN WASHINGTON COUNTY Contractor: Trumbull Corp. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic Temporary flagging continues on Noblestown Road and Johns Avenue as needed for deliveries. A notice for a 30-day closure of Noblestown Road beginning Feb. 11 was issued. The closure is for work associated with acid mine drainage mitigation. 3. Earthwork Pre-blast survey notifications continue to be mailed for properties within 1,000 feet of proposed blasting areas. 4. Roadway and Bridge Work Roadway and bridge work is planned to begin in early Gas/Oil Wells Plugging of gas/oil wells within the 55A2 project will be necessary. This work has not yet been scheduled. 6. Noise/Dust/Runoff Control Preliminary clearing is ongoing to prepare for access and mobilization. Erosion and sedimentation control measures are being installed. SECTION 55A2 TARGET COMPLETION DATE JUNE 2019
4 Section: 55A2 Pictured: Crane at Access Road 1 off Cooks Road SECTION 55A2 TARGET COMPLETION DATE JUNE 2019
5 WEEK ENDING FEBRUARY 1, 2019 SECTION 55B CECIL AND SOUTH FAYETTE TOWNSHIPS IN WASHINGTON AND ALLEGHENY COUNTIES Contractor: Fay 1. Work Shift Double shifts, five days per week (M-F), ending at 10 p.m., with Saturday as a makeup day. 2. Traffic Upper Laurel Hill Road will remain closed until paving can take place in the spring. 3. Earthwork Major excavation work will continue at the eastern end of the project near Laurel Hill Road. This activity will take place during day and evening shifts. Work is proceeding on grading the waste area on the western side of the project. Also, grading of the slope under the bridge on the west side of S.R. 980 is proceeding. Blasting for the bulk excavation is complete. There remains a possibility that blasting will be required for the excavation of Pond 3B along the east side of S.R The contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. 4. Roadway and Bridge Work Concrete pavement is not anticipated to start again until spring. No concrete placement on the bridge deck is planned until spring. It was determined that paving Laurel Hill Road during this time of year may be detrimental to the quality of the future township road. The contractor will be responsible for maintaining access through the winter for residents affected by the work. 5. Gas/Oil Wells Well capping continues. Noise levels are being monitored. SECTION 55B TARGET COMPLETION DATE FALL 2019
6 6. Noise/Dust/Runoff Control Two water trucks are working throughout the project area to control dust during dry periods. A street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. Section: 55B Pictured: Fill placement in front of abutment SECTION 55B TARGET COMPLETION DATE FALL 2019
7 WEEK ENDING FEBRUARY 1, 2019 SECTION 55C1-1 CECIL AND SOUTH FAYETTE TOWNSHIPS IN WASHINGTON AND ALLEGHENY COUNTIES Contractor: Beaver Excavating Co. 1. Work Shift Single 10-hour shift (M-F) with Saturday as a makeup day through the remainder of the project, except for the large fill at Millers Run Road (S.R. 3001). Work will be two 10-hour shifts (M-F) to place embankment at this location. 2. Traffic Millers Run Road, Cecil-Sturgeon Road (T-842) and Cecil-Reissing Road (T-840) are closed. S.R. 50 has a long-term single-lane closure that will be in effect for motorists traveling east between S.R. 978 and S.R.1001 (Reissing Road) for approximately 0.4 miles. The right lane will be closed. 3. Earthwork Excavation continues between Cecil-Reissing Road and Cecil-Sturgeon Road, along with embankment construction west of Millers Run Road. Blasting continues between Cecil-Reissing and Cecil-Sturgeon roads, as well as between Cecil-Sturgeon and Millers Run roads. The contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. Mine grouting operations are occurring east of S.R Roadway and Bridge Work Substructure work continues for the bridges that will span Millers Run Road and S.R. 50. Substructure work started at bridge SB-253, which spans the new S.R. 576 roadway at the S.R. 50 connector road. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55C1-1. SECTION 55C1-1 TARGET COMPLETION DATE NOVEMBER 2019
8 6. Noise/Dust/Runoff Control A contained street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. Section: 55C1-1 Pictured: 42-inch pipe installation at Cecil-Reissing Road SECTION 55C1-1 TARGET COMPLETION DATE NOVEMBER 2019
9 WEEK ENDING FEBRUARY 1, 2019 SECTION 55C1-2 SOUTH FAYETTE TOWNSHIP IN ALLEGHENY COUNTY Contractor: Trumbull Corp. 1. Work Shift Day shift work hours of 7 a.m. to 5:30 p.m. Night shift work hours of 7 p.m. to 5:30 a.m. 2. Traffic Hickory Grade Road is closed, and traffic is being detoured. Construction vehicles access the work site between S.R. 50 up Parks Road and onto Hickory Grade Road. Construction vehicles also use Bowman Road to access two work-site entrances. 3. Earthwork Earthwork is ongoing at the far east end of the project between old Coal Pit Run Road and County Line Road. Large-scale earthwork continues on the hilltop adjacent to S.R. 50, in the valley adjacent to Parks Road and at Hickory Grade Road. Blasting will continue on the hilltop adjacent to S.R. 50, as well as at Hickory Grade Road. For all blasts, the contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. 4. Roadway and Bridge Work Bridge work will begin in early winter. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55C Noise/Dust/Runoff Control A street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55C1-2 TARGET COMPLETION DATE MAY 2020
10 Section: 55C1-2 Pictured: Coal Run stream relocation excavation SECTION 55C1-2 TARGET COMPLETION DATE MAY 2020
11 WEEK ENDING FEBRUARY 1, 2019 SECTION 55C2-2 CECIL TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F) 10 hours, with Saturday as a makeup day. 2. Traffic Long-term shoulder restrictions began Jan. 28. Preliminary maintenance and protection of traffic devices are being placed on I-79 accordingly. Morgan Road is closed to traffic between Morganza Road and I-79. Traffic is being detoured using County Line Road. Intermittent traffic stoppages and/or single-lane closures of Morganza Road may occur as the contractor performs work. Flagging is provided for these elements and will be provided when construction vehicles cross Morganza Road. 3. Earthwork Construction of erosion and sedimentation basins and ponds is taking place. Construction of the future Morganza Road embankment is ongoing. 4. Roadway and Bridge Work Preparations for roadwork are beginning. 5. Gas/Oil Wells Gas well capping/plugging is nearing completion. 6. Noise/Dust/Runoff Control Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55C2-2 TARGET COMPLETION DATE JUNE 2020
12 Section: 55C2-2 Pictured: Temporary stream SECTION 55C2-2 TARGET COMPLETION DATE JUNE 2020
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationConstructor: Joseph B. Fay
1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69
FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationSouthern Beltway Projects Summary
Southern Beltway Projects Summary The Pennsylvania Turnpike Commission is proposing the construction of a 30-mile, tolled fourlane limited-access highway, known as the Southern Beltway that will be located
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationTRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationRegional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017
Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationBINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016
BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationWEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.
WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1
More informationWEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.
NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationPublic Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019
APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR
More informationBUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019
BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationMEMORANDUM VILLAGE OF NORTHBROOK
MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April
More informationOhio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.
Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationCommonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017
Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationKentucky Lock Project Update Inland Waterways Users Board Meeting No. 84
Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 MR. DON GETTY PROJECT MANAGER Kentucky Lock Addition Nashville District 19 July 2017 The views, opinions and findings contained
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationSpencer Environmental Appendix A: Alternative Analysis for Construction Access Route
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationProject Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3
More informationAtlantic Street Bridge Project CTDOT Project Nos & (Phase 2)
Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford
More informationSandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationAbandoned Mine Sites Policy
SUBJECT: Abandoned Mine Sites Policy Policy Number: MRE 006 2004 C. R. File Number: 565 00 0002 Effective Date: September 1, 2004 To Be Reviewed: September 1, 2008 Approval: Original signed by W. David
More informationPennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20
PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20 DUNMORE (June 13, 2008) PennDOT announces its work schedule for June 14-20. Be alert for
More informationAll closures this week happen at night, including full closures of Mesa and I-10
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each
More informationI-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD
Florida Department of TRANSPORTATION I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD From North of State Road (SR) 44 to North of US 92 (International Speedway Boulevard) Volusia
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationThe Holes Creek Bridge Replacement By Bradley McClelland
The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More information25 th Avenue Grade Separation. Community Meeting November 13, 2018
25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationNorthern Rail Extension, Phase One
General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR AUGUST 2005 CAPTION TYPE
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationNeighbourhood Committee NDG - Westmount. September 12, 2016
Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry
More informationImportant Lane Closures, April 3 9, 2011
March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationRural Rustic Road Program
Virginia Department of Transportation s Rural Rustic Road Program Prepared by the Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Michael
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationSOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY
SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY Section 1 Purple Alternative (Revised: January 2007) I-79 to Mon/Fayette Expressway Purple Alternative Section 1 Photo Presentation Photo Presentation The
More informationFlorida Department of Transportation MIKE DEW SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY July 5, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #27 FOR WEEK OF
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationOFFICE OF THE CITY MANAGER
OFFICE OF THE CITY MANAGER August 28, 2015 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager General Information AT Good News The California High-Speed Rail Authority held a
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More informationG Street Undercrossing. City Council Meeting Date: November 3, 2008
G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan
More informationSierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS
Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationReport to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018
Report to the Strategic Development Committee Ronald Reagan Washington National Airport Project Journey June 2018 Secure National Hall Secure National Hall Project Cost Summary Prior Month Expenditures
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More information