1 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #2 May 4, 2017

2 Today s Agenda o Progress update o Summary of existing facilities o Preliminary forecasts o Intro to facility requirement o Stakeholder input & ideas o Next steps

3 Assignment Using your note cards, write down two top take aways from today discussion: o Things that are most important to you to include in the master plan o Something new you didn t know o Questions you hope the master plan will address We will collect and read at the end of the meeting

4 PAC #5 PAC #1 PAC #2 PAC #3 PAC #4 Airport Master Plan Process We are Here Aerial Survey & Mapping Notes: Study Introduction working paper (WP) on the website. Inventory and Environmental Setting WPs will be up shortly. Draft activity forecasts are being prepared and evaluation of facility requirements (airside and landside) has begun. Implementation Plan Pre-Planning, Study Design, Secure Grants Inventory Existing Conditions Activity & Demand Forecasting Capacity Analysis & Facility Requirements Alternative Concepts & Environmental Overview Financial Plan Final Documents & Plan Adoption ALP Plan Set Stakeholder Engagement & Planning Advisory Committee Public Workshop # Months Public Workshop #2 Public Workshop #3

5 Inventory of Existing Conditions

6 First a distinction Notes: These represent the airlines, and their aircraft, currently operating at FAT.. Commercial aviation scheduled passenger and cargo airlines Q400 B A320 Embraer 175 B B757 CRJ 200 MD80 CRJ 700 B757

7 First a distinction Military aviation Department of Defense aircraft F-15 Eagle CANG 144 th Fighter Wing C-130 Hercules F/A-18 Hornet Naval Air Station Lemoore CH47 Army Guard TASMG

8 First a distinction General Aviation (GA) everything else Personal, Business & Training Corporate & Charter Emergency Services

9 Where do our passengers come from? o Throughout Central California and the Central Coast Avoiding congestion and cost at other airports Direct to Guadalajara is a draw o Mostly from 6 counties Monterey Fresno, Madera, Mariposa, Merced, Kings, and Tulare

10 2014 Passenger Market Study o Evaluated originating passengers within a 50 mile radius of FAT o Includes 6 counties and 68 towns and cities o 86% of those passengers came from 10 cities o 71% of passengers chose FAT Mariposa Co. o 29% chose other airports mostly LAX (14%) and SFO (8%) Merced Co. Madera Co. Madera Clovis Fresno Co. Fresno Kingsburg Sanger Reedley Hanford Lemoore Visalia Tulare Tulare Co. Kings Co. Source: FAT Market Leakage Analysis, RS&H, Nov.2015

11 Other Commercial Service Airports o FAT 8 airlines, ±780,000 annual enplanements o LAX 66 airlines, ±36M enplanements Legend Fresno Yosemite International Airport SMF Other Commercial Service Airports Previous or Limited Commercial Service SCK OAK SFO 50 mi. reference MOD SJC MCE FAT o SFO 48 airlines, ±24M enplanements MRY VIS o Visalia (VIS) and Modesto (MOD) no longer provide commercial service o Merced (MCE) provides very limited commercial service (Boutique Air) SBP SBA BFL LAX BUR LGB ONT SAN

12 Enplanements Where do our passengers go? o Anywhere in the world via 11 non-stop destinations o On 8 airlines SEA PDX 11 non-stop destinations Alaska AeroMexico Allegiant Delta SkyWest United Express SLC DEN American Volaris SFO FAT LAS 800, , , , , , , , , ,000 Historical Annual Enplanements 778, , , , , , Year LAX SAN PHX GDL DFW

13 Regional GA Airports 14 airports w/in 50 miles o FAT has the longest runway, best instrument approaches, and the only ATC Tower Notes: ATC = Air Traffic Control.

14 Regional GA Airports 4 w/ runways > 5000 o FAT has the longest runway, best instrument approaches, and the only ATC Tower o 5,000 + jet capable runways at Hanford (HJO), Madera (MAE), Merced (MCE), and Visalia (VIS) Notes: Some models of corporate/business jet type can operate on runways less than 5,000 but for general planning purposes, 5,000 represents a common operational metric for most operators.

15 Regional GA Airports Market of 900 based aircraft o FAT has the longest runway, best instrument approaches, and the only ATC Tower 28 o 5,000 + jet capable runways at Hanford (HJO) Madera (MAE) Merced (MCE) Visalia (VIS) o Total of ±900 based aircraft FAT = 21% FAT+FCH = 35% o Sierra Sky Park (E79) is a fly- 2 in residential community

16 Pilot/Aircraft Owner Surveys o Three different surveys were distributed: FAT Based Aircraft FCH Based Aircraft Transient Pilot Surveys o Common response themes: FAT is attractive to business/corporate aviation because of facilities, services, location and ATC. Business flying will likely be greater in 2017 than FCH is attractive to personal flyers and those looking for a sense of community, avoiding the complexities of ATC and security at FAT, and lower costs. Hangar availability and price, fuel price, and FBO services are highly important to all aircraft owners/operators. Noted deficiency in FAT hangar space for jet aircraft. Costs at FAT and FCH appear higher than some other airports in the region. The condition of the general aviation ramp at FAT is of significant concern o Info is consistent with forecast assumptions and informs the evaluation of facility requirements at FAT.

17 168 / Sierra freeway Chestnut Ave Clovis Ave The Airport o 2,160 acres Groundwater recharge area Leaky Acres California Highway Patrol o Instrument approaches to all runway ends W Dakota Ave GAP Facility o 80-90% of traffic is westerly Commercial development Commercial development Golf Course Rogers Helicopters Air Methods US Forest Service 2,160 public spaces 430 employee spaces CANG N E McKinley Ave 2016 aerial photo Commercial development

18 Passenger Terminal Original Construction 2006

19 Passenger Terminal o ± 161,000 sf of usable space o 21 different use types o Analyzing adequacy of each Concessions Airport Operations Public Circulation Queue Area TSA Screening Hold Room Airline Operations

20 Passenger Terminal Ground Boarding 14 Common-use Gates 2 International Hardstands 14 14B 15B 15 FAA Radio Antennas Boarding bridge to be added in International Aircraft Hardstands Rental Car Ready/Return FIS Employee Parking Cell Lot

21 Primary GA Area o 2 major fixed base operators (FBOs) o ± 202,000 sf of hangar area o 72,000 gallons fuel storage Notes: FBOs are private businesses that provide service to aircraft operators such as hangar rentals, fuel sales, line service, maintenance and concierge services. ARFF = Aircraft Rescue and Fire Fighting facility o Condition of apron pavement is a concern o Narrow apron width for larger wingspans o Limited transient overnight hangars Approx. Airport Boundary ATC Tower ARFF Signature Ross Aviation Office Complex San Joaquin Valley College

22 Preliminary Forecasts of Aviation Activity

23 Why Prepare an Aviation Demand Forecast o Provide the airport a baseline against which to measure the future performance of various airport facilities Airfield facilities evaluated against takeoffs and landings Terminal facilities evaluated against number of peak hour passengers Landside facilities evaluated against passengers and employee demand o Inform the need for new facilities or expanded facilities o Inform the financial capacity of the airport to fund capital improvements and operating expenses

24 What Drives the Forecast Demand o Economic characteristics Regional industries Gross domestic product (GDP) Gross regional product (GRP) o Demographic characteristics Per capita income Employment rates Population o Geographic attributes of the region Proximity to other airports Population centers Tourism attractions o Aviation industry changes Airline profitability Airline consolidation Price of aviation fuel 3.0% 2.5% 2.0% 1.5% 1.0% 0.5% 0.0% Socioeconomic Growth Rates for the Fresno Combined Statistical Area (CSA), the State, and the Nation 1.6% 1.1% 1.0% 1.5% 1.2% 1.3% 1.2% 1.5% 1.6% Population Employment Per Capita Income Source: Woods & Poole, Fresno CSA California United States Notes: The CSA includes Fresno and Madera counties.

25 What is the Methodology for the Forecast Review historic airport traffic and airfares Review historic socioeconomic and demographic data Obtain forecast socioeconomic and demographic data Conduct econometric statistical analysis Develop market and route analysis, including airline interviews Annual passenger and cargo tonnage forecasts Prepare market scenarios Review aircraft operations data: passengers, cargo, general aviation Annual aircraft operations Review aircraft utilization and technology trends Incorporate airline schedule data Planning day flight schedules (peak hour demand) Incorporate airline strategy and air service development Work task Work output

26 Millions of passengers The Passenger Forecast Anticipates 2 Million Passengers in Historic : Annual average rate: +2.5% Projected : Annual average rate: +2.1% Domestic passengers International passengers Connecting passengers Source: InterVISTAS Consulting, Inc.

27 Mail and Freight Tonnage, Thousands of Metric Tonns Tonnage per Movement, Metric Tons Air Cargo Tonnage is Anticipated to Grow Steadily Historic : Average annual rate: -1.6% Projected : Average annual rate: +1.9% Freight & Mail Tonnage Tonnage per Movement Source: InterVISTAS Consulting, Inc.

28 Thousands The Aircraft Operations Forecast Anticipates 115 Thousand Operations in Historic : Average annual rate -5.1% 127 Projected : Average annual rate +0.8% Commuter and Air Taxi Air Carrier - Passenger Air Carrier - Freighter Military General Aviation Source: InterVISTAS Consulting, Inc.

29 Next Steps In The Forecast Process o Review April results when available and refine the forecast estimate for calendar year 2017 o Prepare planning day flight schedules to inform the analysis of facility requirements o Submit the forecast to the Federal Aviation Administration for their review and approval FAA will compare the recommended FAT forecast to their Terminal Area Forecast (TAF)

30 Upcoming Facility Requirements

31 <-- Arriving Passengers -- Departing Passengers --> 0:00 0:40 1:20 2:00 2:40 3:20 4:00 4:40 5:20 6:00 6:40 7:20 8:00 8:40 9:20 10:00 10:40 11:20 12:00 12:40 13:20 14:00 14:40 15:20 16:00 16:40 17:20 18:00 18:40 19:20 20:00 20:40 21:20 22:00 22:40 23:20 Terminal and Parking Facility Requirements will be Based on Peaking Characteristics Rolling Hour Arriving and Departing Passengers: July 2016 Note: this represents the typical time of day when the most passengers will be in the terminal building i.e., both arriving and departing passengers Departing Arriving Source: InterVISTAS Consulting, Inc.

32 <-- Arriving Flights -- Departing Flights --> 0:00 0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30 Aircraft Operational Profiles Inform the Requirement for Gates and Airfield Capacity Notes: Represents passenger airline operations only. 10 Rolling Hour Arriving and Departing Operations: July Departing Arriving Source: InterVISTAS Consulting, Inc.

33 Terminal o Expandability o Gates and boarding bridges o Airline needs o Ticket lobby o Concessions o TSA security screening o US Customs and Border Protection (CBP) Federal Inspection Service (FIS) o Baggage screening and makeup FIS empties into ticketing lobby

34 Surface Transportation o Passenger parking o Employee parking o Rental cars o Transportation network companies (TNC) including Uber and Lyft o Curb front circulation o Roadway access o Transit and multimodal connectivity

35 Airfield Airspace Clearance B Tail Height 41 E-175 Tail Height 32 o FAA standards o Aircraft fleet mix o Runway length o Taxiway geometry o Navigation aids o Airspace protection o Military operations o Air cargo o General aviation ATCT o Air traffic control tower o Aircraft rescue and firefighting (ARFF)

36 Other 2012 ALUCP (being updated in 2017) o Compatible land use FAA standards and guidance CA Airport Land Use Compatibility Plan (ALUCP) Airspace Safety Noise (exposure contours being updated 2017) o Environmental compatibility City and County Zoning (2017) Community resources Natural resources o Utilities Capacity Condition FRESNO COUNTY Residential Commercial Industrial Manufacturing Agriculture, Recreation, Conservation Note: Composite/condensed zoning classifications.

37 Thoughts, questions, comments?

38 Next Steps o Finalize Working Paper #2 Inventory May 2017 o Finalize Working Paper #3 Environmental Setting May 2017 o Submit forecasts to FAA (Working paper #4) May 2017 o Finalize aerial mapping June/July 2017 o Analyze facility requirements o Next PAC meeting July/August

39 Thank You Please contact the following with comments, questions or concerns regarding the Master Plan Study Mark Davis Airports Planning Manager City of Fresno (559) Pam Keidel-Adams Kimley-Horn Kevin Clarke Kimley-Horn

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Airport Master Plan Update Table of Contents Contents

Airport Master Plan Update Table of Contents Contents Working Paper #2 May 2017 Table of Contents Contents 2. Existing Conditions... 2-1 2.1. Local Setting... 2-1 2.1.1. Socioeconomic Trends... 2-1 2.2. Airport Role... 2-5 2.2.1. National Plan of Integrated

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Welcome to the Boise Airport Master Plan Update Open House

Welcome to the Boise Airport Master Plan Update Open House Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

Forecast and Overview

Forecast and Overview Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning

More information

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

SERVING CALIFORNIA S COMMERCIAL AIRPORTS

SERVING CALIFORNIA S COMMERCIAL AIRPORTS SERVING CALIFORNIA S COMMERCIAL AIRPORTS Annual Report 2011 Top Left: Santa Barbara Municipal Airport Top Right: Sacramento International Airport Right: John Wayne Airport, Orange County Introduction The

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Forecast of Aviation Activity

Forecast of Aviation Activity DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

What is an Airport Master Plan?

What is an Airport Master Plan? What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

Recommended Performance Measures

Recommended Performance Measures Recommended Performance Measures January 2009 1 RECOMMENDED PERFORMANCE MEASURES Performance measures are utilized by the North Central Texas Council of Governments (NCTCOG) to monitor the performance

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017

2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017 VOLUME 1 2012 AIRPORT MASTER PLAN 2016 ADDENDUM SUBMITTED ON: SEPTEMBER 22, 2017 VOLUME 1 CONTENTS SECTION 1 - INTRO AND AIRPORT CONTEXT SECTION 2 - FORECAST SECTION 3 - AIRFIELD FACILITIES AND DEMAND/CAPACITY

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Air Carrier and Commuter Airline Forecasts, Methodologies and Assumptions

Air Carrier and Commuter Airline Forecasts, Methodologies and Assumptions Appendix A BACKGROUND TO FORECASTS T he Sonoma County Airport has had a long history of regularly scheduled airline service, but has been without air carrier or commuter airline service since late 2001.

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan

More information

Burke Lakefront Airport (BKL) Master Plan Update

Burke Lakefront Airport (BKL) Master Plan Update Burke Lakefront Airport () Master Plan Update Public Workshop August 2, 2007 City of Cleveland Department of Port Control (DPC) City of Cleveland DPC Studies Currently In Progress Market Assessment & Feasibility

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Air Carrier and Commuter Airline Forecasts, Methodologies and Assumptions

Air Carrier and Commuter Airline Forecasts, Methodologies and Assumptions Appendix A PREFACE TO THE 2011 UPDATE The Airport Master Plan forecasts for the original version of this document were prepared during the years when scheduled passenger service was not available at Sonoma

More information

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR

More information

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

MASTER PLAN UPDATE GRANT NUMBER

MASTER PLAN UPDATE GRANT NUMBER T MASTER PLAN UPDATE D R AF GRANT NUMBER 3-48-0062-42 MAY 2015 1. Introduction... 1-1 1.1 History of Dallas Love Field... 1-1 1.2 Airport Setting... 1-2 1.2.1 DALLAS-FORT WORTH-ARLINGTON METROPOLITAN STATISTICAL

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport Peter O. Knight Airport Public Meeting #1 Peter O. Knight Airport 1 Agenda Welcome and Introductions The Master Plan Update Questions and Comments 2 Hillsborough County Aviation Authority Enabling Legislation

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018 City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents

More information

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT. in association with AirProjects Inc. Conway Consulting Gunda Corporation Quadrant Consultants RdlR Architects Sunland Group DRAFT TECHNICAL REPORT MASTER PLAN Prepared for Houston Airport System Houston,

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #3

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #3 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #3 September 20, 2017 Today s Agenda o Progress update o Summary of forecasts o Preliminary facility requirements

More information

Technical Advisory Committee Briefing #3

Technical Advisory Committee Briefing #3 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Technical Advisory Committee Briefing #3 June 22, 2018 Master Plan Schedule Overview Coordination Review Recommended Remote 5-Gate Facility

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity. Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting

More information

CHAPTER 2 AVIATION ACTIVITY FORECASTS

CHAPTER 2 AVIATION ACTIVITY FORECASTS Chapter 2 Aviation Activity Forecasts One of the objectives of the Stockton Metropolitan Airport Master Plan is to establish development policies that will preserve the long-term growth potential of the

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Mr. Steve Domino began the meeting by introducing the RS&H team, the intent and scope of the project and the agenda for the presentation.

Mr. Steve Domino began the meeting by introducing the RS&H team, the intent and scope of the project and the agenda for the presentation. Meeting Minutes - Advisory Committee Start time 9:00 a.m. The Advisory Committee meeting presentation consisted of an introduction and overview of the project and a discussion of the preliminary inventory

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

EAT Master Plan Planning Advisory Committee (PAC) Meeting #2 Summary (FINAL)

EAT Master Plan Planning Advisory Committee (PAC) Meeting #2 Summary (FINAL) PAC Meeting #2: November 10, 2016 Meeting Participants: Pangborn Airport: Port of Chelan County: Consultant Team: PAC Members: Trent Moyers, Tina Stadther, Ron Russ Mark Urdahl Damon Smith, Jeff Smith,

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18 Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate Operations 5th Working Group Briefing 9/25/18 Meeting Purpose Discuss methodology of Ultimate build scenario operations

More information

Working Paper #5 Facility Requirements

Working Paper #5 Facility Requirements Working Paper #5 March 2018 Table of Contents Contents 5....5-1 5.1. Airfield and Airspace Requirements...5-4 5.1.1. Airfield Capacity...5-4 5.1.2. Approach Capability...5-7 5.1.3. Airspace Protection...5-9

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #2 AGENDA

MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #2 AGENDA MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #2 AGENDA Date/Time: Location: Monday, October 16, 2017 from 2:00-4:00 p.m. Thun Field Airport Office at the Civil Air Patrol building 16915 103rd Ave. E.,

More information