AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
|
|
- Florence George
- 5 years ago
- Views:
Transcription
1
2 AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents reflect the views of Coffman Associates, Inc., which is responsible for the parts and accuracy of the data contained herein. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of these documents by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted herein nor does it indicate that the proposed development is environmentally acceptable in accordance with Public Laws ,91-190,91-258, , and/or " This document has been adopted by the City of Kansas City, Missouri under Resolution No (attached).
3 RESOLUTION NO Adopting the 2003 Charles B. Wheeler Downtown Airport Master Plan as the official guide for development of Charles B. Wheeler Downtown Airport. WHEREAS. Kansas City has completed a study of Charles B. Wheeler Downtown Airport (MKC) following guidelines of the Federal Aviation Administration (FAA); and WHEREAS, Kansas City in conjunction with the consulting finn of Coffman Associates, has developed projected activity levels at ~KC for the next 20 years; and WHEREAS, improvements necessary to meet the projected aviation activity levels and FAA design standards have been identified~ and WHEREAS. alternative methods of providing these improvements have been reviewed with federal. regional and local officials, airport t;na.nts and users, community representatives and interested citizens through four planning advisory committee meetings and four public meetings; and WHEREAS, the annual economic impact of the airport on the Kansas City region has been determined to be $2890 million~ and WHEREAS, a recommended development program has been established including a preliminary capital funding plan~ and WHEREAS, the above-mentioned analysis and recommendations for development are presented in the 2003 Charles B. Wheeler Downtown Airport Master Plan; NOW. THEREFORE. BE 1 T RESOLVED BY THE COUNCIL OF KANSAS CITY: That the 2003 Charles B. Wheeler Downtown Airport Master Plan be adopted by Kansas City, Missouri, as the official guide for development at Charles B. Wheeler Downtown Airport. Authenticated as Passed DATE PASSED JAN G't
4 entents Kansas City Downtown Airport Kansas City, Missouri AIRPORT MASTER PLAN INTRODUCTION AND summary AIRPORT ROLE... ii DEMAND-BASED PLANNING... iii AIRPORT PLANS iii Airfield Recommendation iv Landside Improvements... v CAPITAL NEEDS FINANCING vi AIRPORT ECONOMIC VALUE... vii PLANNING ADVISORY COMMITTEE ix Chapter One INVENTORY REGIONAL SETTING Climate HISTORICAL PERSPECTIVE THE AIRPORT'S SYSTEM ROLE Development History Previous Master Plan Regional Planning National Planning AIRPORT ADMINISTRATION AIRPORT FACILITIES Airside Facilities Landside Facilities
5 Chapter One (Continued) Airport Utilities General Aviation Services VICINITY AIRSPACE, NAVIGATIONAL AIDS, AIR TRAFFIC CONTROL, AND AIRPORTS Vicinity Airspace Tenninal Area And Enroute Navigational Aids Air Traffic Control Area Airports AREA LAND USE ENVIRONMENTAL INVENTORY Wetlands Biotic Resources Air And Water Quality Flooding And Floodplain Data Geology And Soils Solid And Hazardous Waste Historic And Cultural Resources Storm Water Permit SWPpp And SPCC Plans Aboveground Storage Tanks Underground Storage Tanks (USTs) Baseline Conditions And Potential Sensitivities SOCIOECONOMIC CHARACTERISTICS Population Employment Per Capita Personal Income SUMMARy DOCUMENT SOURCES Chapter Two FORECASTS NATIONAL AVIATION TRENDS FORECASTING APPROACH BASED AIRCRAFT Registered Aircraft Forecasts Based Aircraft Forecast Based Aircraft Fleet Mix AIRCRAFT OPERATIONS General Aviation Operations Air Carrier And Air Taxi Operations Military Operations Operational Aircraft Mix
6 Chapter Two (Continued) PEAKING characteristics ANNUAL INSTRUMENT APPROACHES summary Chapter Three FACILITY REQUIREMENTS planning HORIZONS AIRFIELD CAPACITY Airfield Layout Meteorology Runway Use Aircraft Mix Percent Arrivals Touch-and-Go Operations Exit Taxiways Capacity Analysis AIRFIELD REQUIREMENTS Critical Aircraft Runways Taxiways Navigational Aids and Lighting LANDSIDE REQUIREMENTS General Aviation Facilities SUMMARY Chapter Four ALTERNATIVES REVIEW OF 1982 LAND USE AND DEVELOPMENT PLAN ISSUE CONSIDERATIONS NON-DEVELOPMENT ALTERNATNES No Action Alternative Service From Another Airport AIRFIELD ALTERNATNES Runway 1-19 Safety Area Determination Runway 3-21 Safety Area Determination Taxiway Considerations LANDSIDE ALTERNATNES Landside Alternative Landside Alternative Landside Summary
7 Chapter Five AIRPORT PLANs DESIGN STANDARDs AIRFIELD RECOMMENDATIONS Runway Runway Taxiway Improvements Landside Improvements CAPITAL IMPROVEMENT PROGRAM ENVIRONMENTAL OVERVIEW Chapter Six FINANCIAL IMPLEMENTATION ANALYSIS FINANCIAL ANALYSIS OBJECTIVES OVERALL APPROACH Capital Funding Sources Rates & Charges/Leasing Practices Review Financial Analysis And Implementation Plan For The Master Plan Capital Improvement Program Financial Analysis Exhibits EXHIBITS A PROPOSED PLAN after page iv 1A LOCATION MAP after page 1-2 lb EXISTING FACILITIES... after page 1-6 1C LANDSIDE FACILITIES... after page 1-12 ld AIRSPACE CLASSIFICATION... after page 1-18 IE AREA AIRSPACE after page 1-18 IF KANSAS CITY METROPOLITAN 2A SYSTEM OF AIRPORTS... after page 1-22 U.S. ACTIVE GENERAL AVIATION AIRCRAFT FORECASTS... after page 2-4 2B REGISTERED AIRCRAFT FORECAST after page 2-6 2C BASED AIRCRAFT FORECAST after page D GENERAL AVIATION OPERATIONS FORECAST.. after page E TOTAL OPERATIONS FORECASTS... after page A AIRFIELD CAPACITY FACTORS after page 3-4 3B RUNWAY IN USE SCENARIOS HOURLY CAPACITY. after page 3-6
8 EXHIBITS (Continued) 3C DEMAND VS. CAPACITY... after page D AIRPORT REFERENCE CODES after page E WIND ROSES after page F RUNWAY SAFETY AREA AND OBJECT FREE AREA REQUIREMENTS after page G AIRFIELD FACILITY REQUIREMENTS after page H LANDSIDE REQUIREMENTS after page A DEVELOPMENT CONSIDERATIONS after page 4-4 4B RUNWAY 1-19 BASELINE CONDITION PREVIOUSLY APPROVED ALP... after page C ALTERNATIVE 1 PROVIDE FULL SAFETY AREAS after page D ALTERNATIVE 2 REALIGN RUNWAY after page E NORTH SAFETY AREA GRADING PLAN after page F ALTERNATIVE 3 MAXIMIZE SAFETY AREA... after page G ALTERNATIVE 4 RUNWAY EXTENSIONS after page H UNDERSHOOT/OVERRUN DISTANCES APPROACH CATEGORY C/D AIRCRAFT after page J PROPOSED SAFETY AREA DETERMINATION.... after page K EMAS FOR AIRCRAFT OVERRUNS after page L ALP APPROVED RUNWAY after page M DESIGN FOR ARC B-II STANDARDS after page N PARALLEL TAXIWAY ALTERNATIVES... after page P TAXIWAY ALTERNATIVE after page Q TAXIWAY ALTERNATIVE 2... after page R TAXIWAY/LAND USE ALTERNATIVES... after page S TAXIWAY/LAND USE ALTERNATIVES WITH CLOSURE OF CROSSWIND RUNWAY... after page A PROPOSED PLAN after page 5-4 5B EXISTING AIRCRAFT NOISE EXPOSURE after page 5-8 5C LONG-RANGE AIRCRAFT NOISE EXPOSURE after page 5-8 6A-1 ESTIMATED PROJECT COSTS AND DEVELOPMENT SCHEDULE WITH MODERATE FMV RENT ESCALATION... after page A-2 CAPITAL FUNDING SOURCES WITH MODERATE FMV RENT ESCALATION... after page A-3 ACTUAL, BUDGETED AND PROJECT OPERATIONS & EXPENSES WITH MODERATE FMV RENT ESCALATION after page A-4 ACTUAL, ESTIMATED AND PROJECTED OPERATING REVENUES WITH MODERATE FMV RENT ESCALATION... after page 6-12
9 EXHIBITS (Continued) 6A-5 FINANCIAL PLAN SUMMARY- BUDGETED AND PROJECTED NET REVENUES, CAPITAL FUNDING AND CAPITAL EXPENDITURES- MODERATE FMV RENT ESCALATION after page B-l ESTIMATED PROJECT COSTS AND DEVELOPMENT SCHEDULE WITH AGGRESSIVE FMV RENT ESCALATION after page B-2 CAPITAL FUNDING SOURCES WITH AGGRESSIVE FMV RENT ESCALATION after page B-3 ACTUAL, BUDGETED AND PROJECT OPERATIONS & EXPENSES WITH AGGRESSIVE FMV RENT ESCALATION after page B-4 ACTUAL, BUDGETED AND PROJECT OPERATING REVENUES WITH AGGRESSIVE FMV RENT ESCALATION after page B-5 FINANCIAL PLAN SUMMARY- BUDGETED AND PROJECTED NET REVENUES, CAPITAL FUNDING AND CAPITAL Appendix A EXPENDITUREs after page 6-20 GLOSSARY AND ABBREVIATIONS AppendixB AIRPORT LAYOUT PLANs AppendixC ECONOMIC BENEFIT ANALYSIS
Airport Master Plan Update
Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationAustin-Bergstrom International Airport Master Plan Update
FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationCity of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport
City of Monett, Missouri Airport Master Plan Update for the Monett Municipal Airport Pride and Progress Airport Inventory Monett Municipal Airport (HFJ) Master Plan Update MoDOT Project Number: 08-098B-1
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationPublic Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California
Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationAIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA
AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationElement 640 State of Rhode Island Airport System Plan - Overview
Element 640 State of Rhode Island Airport System Plan - Overview This document represents the Rhode Island Airport Corporation s (RIAC) plan for the state airport system (ASP). The plan establishes state
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationPlanning, Development and Environment Committee
Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY
More informationGeneral Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport
Peter O. Knight Airport Public Meeting #1 Peter O. Knight Airport 1 Agenda Welcome and Introductions The Master Plan Update Questions and Comments 2 Hillsborough County Aviation Authority Enabling Legislation
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationMASTER PLAN UPDATE GRANT NUMBER
T MASTER PLAN UPDATE D R AF GRANT NUMBER 3-48-0062-42 MAY 2015 1. Introduction... 1-1 1.1 History of Dallas Love Field... 1-1 1.2 Airport Setting... 1-2 1.2.1 DALLAS-FORT WORTH-ARLINGTON METROPOLITAN STATISTICAL
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationChapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS
Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS The forecast of aeronautical activity at the (GED) during the 20-year planning period (2002-2021) is a key element of the Master
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationChapter 1 Introduction and Project Overview
EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal
More informationChapter 1 Introduction and Project Overview
Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationHartford-Brainard Airport Potential Runway Closure White Paper
Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationCurrent Airport Roles
Chapter Four: Current Airport Roles Introduction Current airport roles are defined differently from national, state, and local perspectives. The Federal Aviation Administration (FAA) has established two
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationPULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project
PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February
More informationII. Purpose and Need. 2.1 Background
II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationNew Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together
Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationForecast of Aviation Activity
DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationEXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS
EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS INTRODUCTION The Lawrence Municipal Airport Master Plan
More informationEXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #
EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationCHAPTER 4 DEMAND/CAPACITY ANALYSIS
CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationChapter 2 FINDINGS & CONCLUSIONS
Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationSTAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D
STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings
More information1. Background and Proposed Action
1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationPUBLIC MEETING 2. Airport Master Plan Update. March 2019
PUBLIC MEETING 2 Airport Master Plan Update March 2019 Airport Overview MASTER PLAN MISSION: How do we modernize the airport to enhance the student experience, aerospace research & the central Ohio region?
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationMASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.
in association with AirProjects Inc. Conway Consulting Gunda Corporation Quadrant Consultants RdlR Architects Sunland Group DRAFT TECHNICAL REPORT MASTER PLAN Prepared for Houston Airport System Houston,
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationMASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013
MASTER PLAN UPDATE WORKING PAPER NO. 3 Demand/Capacity Analysis and Facility Requirements March 18, 2013 Contents 4 Demand/Capacity Analysis and Facility Requirements... 4 1 4.1 Summary of Aviation Demand
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationNantucket Memorial Airport Master Plan Update
Nantucket Memorial Airport Master Plan Update CHAPTER 1 - INTRODUCTION & PUBLIC OUTREACH PROGRAM REVIEW DRAFT SUBJECT TO CHANGE Prepared for: Nantucket Memorial Airport Commission 14 Airport Road Nantucket,
More informationDraft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005
Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning
More information~ s: Memorandum
Memorandum CITY OF DALLAS DATe November 13, 2015 ro sva..rc~ Members of the Economic Development Committee: Rickey D. Callahan (Chair), Casey Thomas, II (Vice Chair), Lee M. Kleinman, Adam Medrano, Carolyn
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationC > Capacity Analysis and Facility Requirements
Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal
More informationand Forecast Review and Approval Process
LONG BEACH, CALIFORNIA FAA Terminal Area Forecast (TAF) Overview and Forecast Review and Approval Process Paul Devoti Airport Planner Federal Aviation Administration paul.devoti@faa.gov 1 TAF Overview
More information6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT
6.C.1 AIRPORT NOISE The existing land uses are described in Chapter Five, Affected Environment. The methodologies used to develop the Geographic Information System (GIS) land use database, the estimated
More informationGeneral Aviation Land Use Planning
Our team. General Aviation Land Use Planning PURDUE ROAD SCHOOL - 2017 Presented by: Maria Muia, Ph.D., Senior Aviation Planner Woolpert, Inc. Brian Payne, Director Columbus Airport Nick Isenberg, Project
More informationFinance and Implementation
5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter