Avionics manufacturers bet heavily on SBAS

Size: px
Start display at page:

Download "Avionics manufacturers bet heavily on SBAS"

Transcription

1 Avionics manufacturers bet heavily on SBAS Alejandro Fransoy ESSP SAS AEE Conference Munich, June 2018 ESSP-MOM-22107

2 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

3 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

4 EGNOS was born for Aviation EGNOS is the European SBAS augmenting GPS L1 signal over the ECAC area. EGNOS designed to meet the ICAO Aviation requirements for all flight phases. EGNOS is fully interoperable with all other SBAS worldwide. 27/06/2018 4

5 SoL Service: Status NPA Non Precision Approach NPA APCH The Safety of Life service offers three different Service Levels APV-I Approach with Vertical Guidance RNP APCH operations down to LPV minima 250 LPV-200 Precision Approach RNP APCH operations down to LPV minima 200 ILS CAT-I look alike Current SoL SDD commitment Maps (SoL SDD v3.1, Sept 2016)

6 Localiser Performance with Vertical guidance (LPV) GPS + EGNOS GPS + Baro GPS + RAIM

7 DH example for LNAV Approach

8 DH example for LPVApproach

9 EGNOS SoL Benefits for Operators Safety, Operational / Cost Savings Economic benefits o Increased accessibility to airports - Minima reduction (down to 200 ft) Reduction in Delays, Diversions & Cancelations -> improvement in service regularity Regional airports and decongesting main hubs o Closer alternates allow for less fuel at departure o ILS decommissioning Navaids Rationalization can be translated into lower route /landing fees Operational benefits o ILS Look-Alike procedures Best quality back-up for ILS CAT-I (556 RWYE / 419 Airports in Europe) o No RAIM prediction needed at dispatch o No temperature restrictions o Easier transitions from TERM to APCH phases Safety benefits (CFIT reduction) o No QNH mis-setting o Avoidance of capturing ILS secondary lobes o More stabilized approach (geometric guidance): not impacted by pressure oscillations 9

10 ESSP, the EGNOS Service Provider Our mission is to deliver precise and safe satellite positioning services deliver EGNOS services 24/7 operate and maintain EGNOS system promote EGNOS and its applications support and interface with users monitor & analyse EGNOS performance support in the development of EGNOS-based applications

11 AVIATION Traffic assessments Bits and pieces of what we do 5% 11% 11% 73% Published Ongoing Planned N/A Free on-line access to all tools and docs at the EGNOS USER SUPPORT WEBSITE Cost benefit Analysis for: Operators TRAFFIC ASESSMENTS and CBAs under request at Airports

12 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

13 EGNOS Remarks 294 unique destinations, 542 approaches by Jun 2018, with: 294 LPV, 133 LPV200, 107 LNAV/VNAV, 8 HEL Continuous implementation of new LPV approach procedures (~80/year) EU Member States continue planning for new LPVs LPV implementation status by June 2018

14 WAAS (USA & Canada) WAAS: As of May 24, 2018 in USA & Canada: 3,909 LPV APCH proc. serving 1,900 airports 1,138 of these airports are Non-ILS airports 1,020 LPV 200 (200 HAT) 661 LP APCH. proc. serving 495 airports ± 73% of total airports served with LPV FAA target is to implement LPV in all qualified airports 157 Canadian airports 14

15 GAGAN RNP-01 since December 2013 and APV-1 since April 2015 There are studies for expansion to the Indo- China and the Australian FIRs. First LPVs at 6 airports ongoing (12 LPVs). Inspection aircraft retrofitted and under certification. Obstacle surveyance completed at 45 airports GAGAN Service APV Mandate: The National Civil Aviation Policy (NCAP- 2016), announced by the government in June, makes it mandatory for all aircraft registered in India to be GAGAN-enabled by Jan. 1, 2019.

16 MSAS MTSAT GEO delivering NPA en-route since September 27th It supports en-route, terminal and NPA MSAS v1 ( ): 1xMTSAT GEO, 2MCS and 6 GMS MSAS v2 ( ): QZS-3 GEO swap, 2MCS and 13 GMS (new) MSAS v3 (>2023): >2x GEO and newer software: LPV service MSAS v4 (>2017): DFMC validation phase for LPV200 MSAS V1(Now) MSAS V3(After 2023) Legend Availability Requirement for LPV

17 Other SBAS SDCM (Russia) In development with plans for horizontal and vertical guidance Network deployment: Ground control development: Spacecraft segment development: SDCM certification: BDSBAS, BeiDou SBAS (China): L1/L5 BDSBAS will augment BeiDou and GPS signals. Galieo & Glonass if recommended by ICAO SARPs First GEO for integration and test planned by: 2018 Ground based monitoring network: more GEO satellites with SBAS capability by 2020 Preliminary Single and Dual Frequency tests by 2020 KASS (South Korea) 1 st phase from 2014 to 2017 (design/definition) 2 nd phase from 2017 to 2019 (integration & evaluation) 3 rd phase from 2020 to 2022 (operation & certification) Open service: APV-I SoL service: 2022 ASECNA plans (18 States in Africa & Indian Ocean) In development with plans for en-route, terminal and APCH: Early SBAS services (L1) to Cat-1 by 2021/2022 Full SBAS services (DFMC) beyond the horizon 2028/2030

18 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

19 SBAS certified avionics for General Aviation AMLs available GNS 430W / 530W GTN 6XX / 7XX TS G1000, G2000, G3000, G5000 AMLs available KSN 765/770 TS IFD510 TS IFD540 & IFD440 TS Entegra Release 9 19

20 SBAS certified avionics for Rotorcraft, Business and Commercial Aviation SBAS+GBAS ILS GPS SBAS VOR GBAS GPS-4000S GLU-2100 MMR CMA 5024 GLSSU CMA 6024 GLSSU KGS 200 (Primus Apex /Easy II) 3 rd gen. IMMR ILS GPS SBAS VOR GBAS UNS-1Ew, -1Lw, -1Fw Topstar 200 LPV MMR ILS GPS SBAS MLS GBAS

21 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

22 Most common SBAS ready units: Rotorcraft AW109SP, AW119Kx, AW139, AW169, AW189 Bell 412, 429, 505,650 H135, H145, H175, H225, EC135, EC145 S-76D, S-92

23 Most common SBAS ready units: General Aviation Citation, Caravan and Single Engine Pilatus PC6, PC24 and PC12/47E (SB) DA20, 40XLT, 40CS, D-Jet,42 and 50 Meridian, Seminole, Mirage, Matrix, Archer, Seneca V and Arrow SR20, SR22, SR22T and Vision SF50 23

24 Most common SBAS ready units: Busines Aviation Challenger 300/350, Learjet 70/75/60XR Citation Mustang, M2, CJ2+, CJ3+, CJ4, XLS+, Latitude, Sovereign+, X+ and Longitude Legacy 500/600/650 & Phenoms G650 and G280, SB G150/G550/G450/G350 King Air, Baron, Bonanza, Hawker 400XPR/800XPR SB Falcon 900LX/5X/ 7X/2000LXS/2000S;

25 REGIONAL OEMs highlights EMBRAER ERJ family ATR -600 series Bombardier C-series Embraer ERJ-135/140/145 FMS 6.1 Enhanced retrofit package (FMS S/W, GNSSU, Antennas, Displays S/W) E-Jets family Baseline and the preferred approach Dash-8 Q400 Embraer E-170/175/190/195 Honeywell Epic Load 27.1 and NG FMS E1 Service Bulletin available Standard 2 basic package and MPC (DMU & FDAU) upgrade. Second Thales Topstar 200 receiver installation and new wiring for alerts. Customer Option Dual Universal UNS-1Ew

26 AIRLINERS OEMs highlights AIRBUS BOEING Wide-body family 777X Customer Option in A350 Under development for A330 Narrow-body family Customer Option Under development <2 years 737MAX Under development (2020) Forward and retrofit Honeywell and RC MMRs Customer Option Under development, after 777X

27 Retrofitting costs: example 1 FMS Software upgrade + antennas Bombardier CRJ-1000, Rockwell Collins equipment: 2x Flight Computer 562A-5M5 ( ) 10k 2x FMC-4000S upgrade to v4.2 (P/N ) 22K 2x Options Control Module OCM-4100 ( ) 28k 60K GPS-4000S Embraer E-170/175/190/195, Honeywell equipment NGFMS upgrade to v k SBAS/WAAS GPS sensor and Antenna 8k 80K NGFMS 27

28 Retrofitting costs: example 2 FMS + antennas + LoS annunciator Bombardier Dash8 Q400, Universal Avionics Existing STC (Canard): 30k Universal equipment: 84k 2x UNS-1Ew 2x antennas 2x LoS annunciators Installation costs: 7k 121K UNS-1Ew 28

29 Retrofitting costs: example 3 GPS sensor + Control Panel + antennas ATR-42/500, Esterline CMC equipment *Similar solution for ATR-72, B737/757/767 and A300/310 2x CMA-5024 GPS Landing System SensorUnits(GLSSU) 2x CMA-5025 GPS Landing System Control Panels (SGLS CP) 87k 2x Active GPS Antennas Kit: 2x switches (ILS/SLS), annunciators (LoS) and connectors 13k Average STC development cost per aircraft: (depends on number of units) 30k 130K 29

30 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

31 Pioneer operators in the use of EGNOS 291 operational units from 45 different operators in 18 countries approved and certified to fly LPV by June 2018 Microsoft Excel Worksheet Aviodetachment 31

32 Table of Contents Introduction EGNOS System, Applications and Benefits ESSP, the EGNOS Service Provider SBAS implementation status across the world Main SBAS avionics products SBAS solutions and manufacturer plans for: Rotorcraft General Aviation Business Aviation Regional Aviation Commercial Aviation Pioneer operators in the use of EGNOS CBA example

33 Cost Benefit Analysis Methodology Objective: assess the pros and cons for the LPV upgrade of the XXX fleet operated by airline ZZZ - Combination of real traffic data + list of airports with LPV + historical meteorological data Methodology - Decision Height/Altitude vs cloud ceiling - Required visibility vs reported visibility Taking into account - Runway in service (winds) - Approach Lighting System/s - ILS unavailabilities - Existing Instrument Approach Procedures - Others: mission savings, cost-sharing...

34 Cost Benefit Analysis LOT example Largest airline in Poland 10 Dash8 Q400 90% 10 destinations 6 of them served by 1 ILS Costs: 129K per aircraft (20% shared with ADSB+CPDLC installation) Avoided disruptions (lower DH): 124 per year (0.45% total landings): 684, savings from 2020 Mission savings not computed in this CBA (e.g. avoided DME arcs, shorter RNAV routes, etc) Results: No funding: Breakeven 1.92y 60% funds: Breakeven 1.53y

35 THANK YOU! Try our online LPV simulator: (H24/7)

36 Avoided disruptions examples Location: Northern Europe ILS: None Avoided DDCs: 8.45% % of total APCHs Sveg airport, Sweden (ESND): RWY09 (88% time): LOC (390 ) vs LPV (200 ) RWY27(12% time): Visual (500 ) vs LPV (250 ) Location: Southern Europe ILS: None Avoided DDCs : 2.44% Gibraltar airport, UK (LXGB): RWY09 (70% time): Radar (905 ) vs LPV (200 ): RWY27 (30% time): Radar (905 ) vs LPV (200 ) Location: Northern Europe ILS: One Avoided DDCs : 1.38% Krakov airport, Poland (EPKK): RWY25 (90% time): ILS (218 ) + LOC (471 ) vs LPV (263 ) RWY07 (10% time): VOR (699 ) vs LPV (287 ) Location: Northern Europe ILS: Two or more Avoided DDCs : 0.028% Dublin airport, Ireland (EIDW): RWY28 (73% time): ILS-CAT I (200 ) + VOR (428 ) vs LPV (342 ) RWY10 (27% time): ILS-CAT I (200 ) + VOR (440 ) vs LPV (340 ) 36

37 Avoided disruptions summary 60 airports analysed: 44 Northern EU 16 Southern EU % avoided DDCs (N/S) No ILS: 9.38 / 3.00 % 1 ILS: 0.90 / 0.09 % 37

38 EGNOS Safety of Life (SoL) Services NPA EGNOS SoL SERVICE LEVELS ICAO ANNEX 10 Vol I SiS PERFORMANCE REQUIREMENTS ` ACCURACY INTEGRITY En-route (oceanic/cont low density) En-route, continental En-route, Terminal Initial/Interm ediate App / NPA / Departure HNSE (95%) VNSE (95%) Integrity 3.7 km Time To Alert (2.0 NM) N/A 1 1x10 7 /h 5 min 0.74 km (0.4 NM) 220 m (720 ft) N/A 1 1x10 7 /h 15 s N/A 1 1x10 7 /h 10 s Horizontal Alert Limit 7.4 km (4 NM) 3.7 km (2 NM) 1.85 km (1 NM) 556 m (0.3 NM) Vertical Alert Limit N/A N/A N/A N/A CONTINUITY 1 1x10 4 /h to 1 1x10 8 /h 1 1x10 4 /h to 1 1x10 8 /h 1 1x10 4 /h to 1 1x10 8 /h AVAILABILITY 0.99 to to to ICAO PBN Manual (NAV SPEC) RNAV 10* RNP 4* RNP 2 (*non sbas receivers) RNAV 5, 2, 1 RNP 0,3 RNP 1 RNAV 1 RNP 0,3 APV-1 APV-I 16.0 m (52 ft) 20 m (66 ft) 1 2x10 7 in any approach 10 s 40 m (130 ft) 50 m (164 ft) 1 8x10 6 per 15 s 0.99 to RNP APCH down to LP / LPV (DH >250 ) LPV-200 Category I precision approach 16.0 m (52 ft) 6.0 to 4.0 m (52 ft) 1 2x10 7 in any approach 6 s 40 m (130 ft) 35.0 to 10.0 m ( ft) 1 8x10 6 per 15 s 0.99 to RNP APCH down to LPV (DH >200 ) 38

39 ICAO IAp Classification & SBAS/EGNOS ICAO Approach Classifications Type A Minima 250 ft Type B Minima < 250 ft Lateral (2D) Lateral and Vertical (3D) Lateral and Vertical (3D) NPA (Non Precision Approaches) EGNOS/SBAS APV (Approaches with vertical Guidance) PA (Precision Approaches) Conventional Procedure RNP APCH RNP APCH RNP AR APCH RNP APCH (SBAS CAT I) Conventional Procedure GLS VOR/DME NDB LOC GPS (either ABAS or SBAS) GPS (ABAS) & Barometric Altimetry GPS & SBAS GPS (ABAS) & Barometric Altimetry GPS & SBAS ILS MLS GLS SCAT 1 MDA/MDH LNAV Minimum LP Minimum LNAV/VNAV Minimum LPV Minimum RNP Minimum LPV (d. to 200ft.) CAT I CAT II/III GLS CAT II/III 39

40 ICAO new RWY classification EGNOS SoL Service Levels NPA APV-I LPV-200 APV-I Service Level: Operation : Type A (DH 250ft), 3D RWY: Non-instrument Non-precision approach LPV-200 Service Level: Operation: Type A (DH 250ft), 3D Type B Cat I (DH 200ft), 3D RWY: Non-instrument Non-precision approach Precision approach Cat I New Approach Classification as described in ICAO State Letter AN 11/1.1-12/40 June

41 Equipping with EGNOS Forward-fit, retrofit solutions for GA (ii) Comp Air (SB) Daher Socata TBM900 Piaggio Avanti I & II (SB) Eclipse 500 MD (SB) Remos (SB) Robin Tecnam MMA Zlin (SB) Aeropro (SB) Aiming Aquila A211 (SB) Extra 500 JMB (SB) ESSP-MOM

42 SBAS solutions for regional and comercial fleets Embraer E170/175/190/195, RJ135/145 and EMB110/550 Bombardier DCH-6/8-Q400, CRJ700/900/1000, CS100/300 Boeing s to 500s ATR s to 600s ATR 72-1/2/5/600s Airbus A300, A350 DCH-8-Q100/200/300 B737MAX, B737NG B777X A320neo family Fokker 50 Saab 340 Avro 146 Britten Norman BN-2A L-410 Turbolet Sukhoi Superjet 100 SAAB 2000 Ready Ongoing 42

43 SBAS equipment classes

44 Retrofitting costs: example 4 Glass cockpit: FMS + Flight Displays + GPS sensor + Antennas Bae ATP + Universal Avionics Before New STC development + equipment: EFI-890 shipset ( 200k): 5 x EFI-890 screens, 6 x control panels, 2 x DCUs, 1 x vision 1 computer, 2 x VIUs, 1 x EIU & TWR-850 UNS-1Lw FMS (x1), LPV monitor (x1), GPS Antennas (x2) 260K LPV monitor 180K Full retrofit LPV only retrofit 44

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal Carmen Aguilera, Aviation & H2020 Coordinator 21 st September, Lisbon E GNSS applications in

More information

E-GNSS systems for GA

E-GNSS systems for GA E-GNSS systems for GA Workshop voor de general aviation Dufourmont Tim 9 November 2018 LVNL Amsterdam Netherlands GSA in a nutshell What? Gateway to Services Galileo & EGNOS Operations and Service Provision

More information

LPV implementation to non instrument runways

LPV implementation to non instrument runways LPV implementation to non instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, November 3 rd 2017 Table of Contents 1.

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

15 years of experience of GNSS approach procedures implementation: where are we now?

15 years of experience of GNSS approach procedures implementation: where are we now? 15 years of experience of GNSS approach procedures implementation: where are we now? Benoit Roturier DSNA ITSNT Nov 17 - ENAC 1 - Introduction Why talking of 15 years of approaches implementation? This

More information

SBAS as a solution for safe approaches in New Zealand and Australia

SBAS as a solution for safe approaches in New Zealand and Australia SBAS as a solution for safe approaches in New Zealand and Australia Ian Andrews President AOPA NZ 18 th Feb 2015 Greg Perris Manager Procedure Design GroupEAD GPS GLONASS GALILEO They all mean the same

More information

SBAS Frequently Asked Questions

SBAS Frequently Asked Questions SBAS Frequently Asked Questions 1. What is SBAS? 2. Where are SBAS networks in operation or under development? 3. What are the benefits of SBAS? 4. What is SBAS interoperability? 5. Will SBAS provide a

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

Aviation Augmentation Systems Update

Aviation Augmentation Systems Update Aviation Augmentation Systems Update ICG-5 Working Group B Leo Eldredge GNSS Program Manager FAA Navigation Services GNSS is a Key Enabler for NextGen Capabilities Arrivals and Departures At High Density

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation

More information

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Presented to: By: Date: CGSIC Leo Eldredge, FAA September 24, 2008 Agenda WAAS Architecture WAAS Services Overview

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Jordan national workshop Euromed GNSS II national workshop, Amman, 11 December 2013 1 Index EGNOS SoL operation in

More information

SBAS IS the only effective solution for safe approaches at every airport in Australia and New Zealand NZ Airports Assn 10 th Sept 2015

SBAS IS the only effective solution for safe approaches at every airport in Australia and New Zealand NZ Airports Assn 10 th Sept 2015 SBAS IS the only effective solution for safe approaches at every airport in Australia and New Zealand NZ Airports Assn 10 th Sept 2015 Ian Andrews President AOPA New Zealand What is SBAS? Satellite Based

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN) Pat Reines (pat.reines@honeywell.com)) Avionics Support for GBAS and Performance Based Navigation (PBN) Honeywell.com 26 ILS Approaches = 26 Localizers and Glide Slopes 2 Honeywell.com 26 ILS Approaches

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

EGNOS History, Status and Plans

EGNOS History, Status and Plans EGNOS History, Status and Plans Reinhard Blasi Market Development Officer European GNSS Agency, GSA March 2015 Navigation solutions powered by Europe EGNOS Services European Commission commitment to ICAO

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information

LPV implementation to non-instrument runways

LPV implementation to non-instrument runways LPV implementation to non-instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, June 1 st 2017 Table of Contents 1. The

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000, DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :

More information

SPREADING THE USE OF EGNSS

SPREADING THE USE OF EGNSS SPREADING THE USE OF EGNSS Jakub Kraus 1 Summary: This article focuses on spreading the use of European satellite navigation systems in aviation. Development of satellite navigation systems and their applications

More information

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION. CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS

More information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 EGNOS based Operations Implementation Status and Plans for 2016 EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 Table of Contents Drivers for APV Implementation LPV Implementations:

More information

Septentrio EGNOS An overview

Septentrio EGNOS An overview Septentrio EGNOS An overview Dirk Werquin Program Manager Aerospace & Defence, Septentrio Information on EGNOS in this presentation is using elements from documents from ESSP and/or GSA. 1 Septentrio Group

More information

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Pro Line 21 King Air upgrades Baseline package includes the latest AFD version 10.4 and FMS software

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

GBAS implementation status: international context and situation in France

GBAS implementation status: international context and situation in France Workshop PBN-GNSS Lima August, 2016 GBAS implementation status: international context and situation in France Prepared by Pierre Ladoux DSNA/DTI/CNS/NAV Direction générale de l Aviation civile Ministère

More information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Israel national workshop Euromed GNSS II national workshop, Tel Aviv, 6 May 2013 1 Index EGNOS (European Geostationary

More information

Universal Avionics Presents

Universal Avionics Presents Universal Avionics Presents Introduction to Universal Cockpit Solutions SBAS FMS - LPV / APV Solid-State SSDTU UL801 Unilink Datalink Displays EFI 890 and Insight CVR/FDR MEMS AHRS Ross Dickey What Happened

More information

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 Overview > Your presenter > easyjet > Opportunities > Benefits Examples > Training > Operations > Summary Who am I? > Not a pilot! > easyjet

More information

SBAS-ASECNA Programme Status

SBAS-ASECNA Programme Status EGNOS Annual Workshop, 34 Oct. 2017, Athens, SBAS-ASECNA Programme Status 1/15 SBAS-ASECNA Programme Status EGNOS Annual Workshop SBAS in the world agenda item 3-4 October 2017 Athens, Greece EGNOS Annual

More information

ENAV experience on LPV implementation

ENAV experience on LPV implementation ENAV experience on LPV implementation Patrizio Vanni GNSS and SES expert International Strategies Office enav.it Tunisi, 23-10-2013 Main topics Company profile ENAV role in MEDUSA ENAV role in GNSS GNSS

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

Poland Ground Based Augmentation System (GBAS) Seminar AGENDA. GBAS Overview (Honeywell: Pat Reines)

Poland Ground Based Augmentation System (GBAS) Seminar AGENDA. GBAS Overview (Honeywell: Pat Reines) Poland Ground Based Augmentation System (GBAS) Seminar AGENDA 0900-0915 0915-0930 0930-1030 1030-1045 1045-1115 1115-1145 1145-1245 1245-1345 1345-1445 1445-1515 Welcome (PANSA) Introductions (All) GBAS

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3. Your all-in-one approach for airspace modernization and situational awareness.

PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3. Your all-in-one approach for airspace modernization and situational awareness. PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3 Your all-in-one approach for airspace modernization and situational awareness. A fully loaded package of baseline features that enable enviable options ADS-B

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

FAA Satellite. Navigation Update. Federal Aviation Administration. May 2014

FAA Satellite. Navigation Update. Federal Aviation Administration. May 2014 FAA Satellite Navigation Update Wide Area Augmentation System (WAAS) Update Ground Based Augmentation System Update (GBAS) Alternative Positioning, Navigation & Timing (APNT) Update Questions Topics 2

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 GLS Product Offerings Overview Airborne Architecture Product Offerings By Market Air Transport (AT) Business, Regional (BR)

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

TERPS vs PANS-Ops Procedure Design and Operational Differences

TERPS vs PANS-Ops Procedure Design and Operational Differences Procedure Design and Operational Differences Monday, March 17, 2014 10:30 a.m. 12:00 p.m. PRESENTED BY: Guy Gribble General Manager, International Flight Resources International Operators Conference Tampa,

More information

Welcome to WAAS Defined. New Product News. October 1, 2009

Welcome to WAAS Defined. New Product News. October 1, 2009 October 1, 2009 Volume 2, Issue 4 Welcome to WAAS Defined Welcome to this special expanded issue of The Universal Flyer featuring a four-page report exploring the many facets of the Wide Area Augmentation

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

The Control Display Unit is the pilot s interface with the various functions of the FMS-3000 system.

The Control Display Unit is the pilot s interface with the various functions of the FMS-3000 system. 2.32. The FMS-3000 Flight Management System (FMS) consists of: one CDU-3000 Control Display Unit (on the central control pedestal), one FMC-3000 Flight Management Computer (inside the IAPS) one DBU-4100

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

General Aviation Airplane Shipment Report. End-of-Year 2008

General Aviation Airplane Shipment Report. End-of-Year 2008 General Aviation Airplane Shipment Report General Aviation Manufacturers Association 1400 K Street NW, Suite 801 Washington, DC 20005 End-of-Year 2008 February 8, 2012 Make and Model QI QII QIII QIV YTD

More information

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace.

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace. PRO LINE 21 FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 King Air upgrade options SVS package 1 SVS package 2 SVS package 3 Comment Display Update The AFD 3010 update

More information

Surveillance Manufacturer Model # Approved Position Source(s) Aircraft Approval Date AML Approved Exelis / FreeFlight

Surveillance Manufacturer Model # Approved Position Source(s) Aircraft Approval Date AML Approved Exelis / FreeFlight FAA-Approved V2 ADS-B Out Avionics, 1 of 3 Manufacturer Model # Approved Position Source(s) Aircraft Approval Date AML Approved Exelis / FDL-978- TXG ACSS XS-950 RCI GLU-920, RCI GLU-925 XS-852 CMC CMA-4024-1

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Aircraft Systems and 4D Trajectory Management

Aircraft Systems and 4D Trajectory Management Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation Aircraft Operators for LPV The following document provides a set of generic guidelines for Air Navigation Service Providers (ANSPs), Airport Operators and Aircraft Operators within the European Civil Aviation

More information

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

Advisory Circular. Required Navigation Performance Approach (RNP APCH) Advisory Circular Subject: Required Navigation Performance Approach (RNP APCH) Issuing Office: Standards Document No.: AC 700-023 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7550326-V23

More information

Performance-Based Navigation Implementation Roadmap

Performance-Based Navigation Implementation Roadmap CAAC CHINA CIVIL AVIATION Performance-Based Navigation Implementation Roadmap 中国民用航空局 Civil Aviation Administration of China Version 1.0 OCTOBER 2009 CHINA CIVIL AVIATION Performance-Based Navigation

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS)

Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS) Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS) Emily Q. Calle S.V. Massimini, DSc H. Leslie Crane Frederick A. Niles 21 May 2003 The contents of this material reflect

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

EUROCAE ED-250: ROAAS MOPS

EUROCAE ED-250: ROAAS MOPS EUROCAE ED-250: ROAAS MOPS Runway Overrun Alerting and Awareness System Minimum Operational Performance Specifications GRSS 2017 Lima, Peru Pierre GEORGES Safety Strategy, DGT, Dassault Aviation WG-101

More information

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations White Paper Doc No.: WHTP-2013-16-10 May 2018 Safely guiding pilots and their passengers worldwide for over 35 years

More information

EGNOS in aviation: strategy and implementation status

EGNOS in aviation: strategy and implementation status EGNOS in aviation: strategy and implementation status EGNOS Service Provision Workshop 2017 Athens, 3 rd October 2017 Carmen Aguilera, GSA Jose Maria Lorenzo, ESSP EGNOS applications in aviation Performance

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011) ESSP EGNOS Service Provider ICAO APV Workshop ESSP Introduction AENA DFS DGAC ENAV NATS SKYGUIDE NAV European Satellite Services Provider ESSP Creation ESSP EEIG founded in 2001 Mission: Operation of EGNOS

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

Flight Inspection Services

Flight Inspection Services Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures OCP-WG-WP 4.18 OBSTACLE CLEARANCE PANEL WORKING GROUP AS A WHOLE MEETING ST. PETERSBURG, RUSSIA 10-20 SEPTEMBER 1996 Agenda Item 4: PANS-OPS Implementation CFIT-Procedure Design Considerations Use of VNAV

More information

Yellowstone Regional Airport Operational Capability Assessment

Yellowstone Regional Airport Operational Capability Assessment Yellowstone Regional Airport Operational Capability Assessment Agenda Introductions Project Review Geographic & Operational Challenges Current Approach Baseline & Test Flight Procedures Safety and Operational

More information