1 Edition Number : Edition Validity Date : 18/5/216

2 Edition Validity Date: 18/5/216 Edition: Status: Final i DOCUMENT CHARACTERISTICS Document Title ANNUAL NETWORK OPERATIONS REPORT Document Subtitle (optional) Annex II - ACC - Final Edition Abstract Edition Number Edition Validity Date 18/5/216 Author(s) Contact Person(s) Tel/ Unit STATUS AND ACCESSIBILITY Status Accessible via Working Draft Intranet Draft Extranet Proposed Issue Internet ( Released Issue TLP STATUS Intended for Detail Red Highly sensitive, non-disclosable information Amber Sensitive information with limited disclosure Green rmal business information White Public information 216 The European Organisation for the Safety of Air Navigation (EUROCONTROL). This document is published by EUROCONTROL for information purposes. It may be copied in whole or in part, provided that EUROCONTROL is mentioned as the source and the extent justified by the noncommercial use (not for sale). The information in this document may not be modified without prior written permission from EUROCONTROL.

3 Edition Validity Date: 18/5/216 Edition: Status: Final ii Edition History The following table records the complete history of the successive editions of the present document. Edition History Edition. Edition Validity Date Author 11/4/216 [free text] [free text] Reason

4 Edition Validity Date: 18/5/216 Edition: Status: Final iii Table of Contents DOCUMENT CHARACTERISTICS... I EDITION HISTORY... II TABLE OF CONTENTS... III 1 INTRODUCTION TRAFFIC & DELAY REALISATION OF CAPACITY PLAN ALLOCATION OF AND REASONS FOR EN-ROUTE DELAY ALBANIA - TIRANA ACC ARMENIA - YEREVAN ACC AUSTRIA - VIENNA ACC AZERBAIJAN - BAKU ACC BELGIUM - BRUSSELS ACC BOSNIA & HERZEGOVINA - SARAJEVO ACC BULGARIA - SOFIA ACC CROATIA - ZAGREB ACC CYPRUS - NICOSIA ACC CZECH REPUBLIC - PRAGUE ACC DENMARK - COPENHAGEN ACC ESTONIA - TALLINN ACC EUROCONTROL - MAASTRICHT ACC FINLAND - TAMPERE ACC FRANCE BORDEAUX ACC FRANCE BREST ACC FRANCE MARSEILLE ACC FRANCE PARIS ACC FRANCE - REIMS ACC FYROM - SKOPJE ACC GEORGIA - TBILISI ACC GERMANY - BREMEN ACC GERMANY - KARLSRUHE ACC GERMANY - LANGEN ACC GERMANY - MUNICH ACC GREECE - ATHENS ACC GREECE - MAKEDONIA ACC HUNGARY - BUDAPEST ACC IRELAND - DUBLIN ACC IRELAND - SHANNON ACC ITALY - BRINDISI ACC ITALY - MILAN ACC ITALY - PADOVA ACC ITALY - ROME ACC LATVIA - RIGA ACC LITHUANIA - VILNIUS ACC MALTA - MALTA ACC MOLDOVA - CHISINAU ACC... 44

5 Edition Validity Date: 18/5/216 Edition: Status: Final iv 39 THE NETHERLANDS - AMSTERDAM ACC NORWAY - BODO ACC NORWAY OSLO ACC NORWAY STAVANGER ACC POLAND WARSAW ACC PORTUGAL - LISBON ACC ROMANIA - BUCHAREST ACC SERBIA & MONTENEGRO - BELGRADE ACC SLOVAK REPUBLIC - BRATISLAVA ACC SLOVENIA - LJUBLJANA ACC SPAIN - BARCELONA ACC SPAIN - CANARIAS ACC SPAIN - MADRID ACC SPAIN - PALMA ACC SPAIN - SEVILLA ACC SWEDEN - MALMO ACC SWEDEN - STOCKHOLM ACC SWITZERLAND - GENEVA ACC SWITZERLAND - ZURICH ACC TURKEY - ANKARA /ISTANBUL ACC UKRAINE - DNIPROPRETROVSK ACC UKRAINE - KYIV ACC UKRAINE - L VIV ACC UKRAINE - ODESA ACC UNITED KINGDOM - LONDON ACC UNITED KINGDOM - LONDON TC UNITED KINGDOM - PRESTWICK ACC... 72

6 Edition Validity Date: 18/5/216 Edition: Status: Final 5 1 INTRODUCTION 1.1 The following annex provides a detailed analysis of ATC capacity evolution in for ACCs within the ECAC States for which data is available. The source of statistics is the NMOC unless otherwise indicated. The analysis covers: The chart and data table provide comprehensive information concerning the evolution of traffic and delay from 21 to (where data is available). It includes the following values: Peak day traffic is the number of flight entries to the ACC on the peak day of each year. Summer & ly is the daily average number of flight entries during the summer season (May to October inclusive) and over the whole year (January to December). Summer & ly En-route Delay is the average en-route delay per flight (including weather and special events e.g. industrial action), attributed to the ACC during the summer season (May to October inclusive) and over the whole year (January to December). 1.2 Realisation of Plan Evolution gives the percentage difference between the total traffic (number of flight entries) in compared to 214, for the summer and the full year. En-route Delay gives the number of minutes per flight of enroute delay attributed to all causes and also excluding delays attributed to weather and special events. s are provided for the summer and the full year. value per ACC is the delay breakdown to achieve the European delay target of min/flight for the full year, and min/flight in the Summer season, as published in the Network Operations Plan ACC Baseline Offered: ACCESS or Reverse CASA was used to measure the capacity actually offered by the ACC during the reference periods (8-21 June 214, 6-19 July 214). This is calculated from actual delay (Reverse CASA) or from projected delay (ACCESS). Projected delay is obtained by increasing the traffic and creating a regulation scheme for the studied ACC using traffic volume capacities and configuration data (sector opening schemes) provided by ANSPs. Plan (increase for Summer ) is the percentage value provided by ANSPs in the Network Operations Plan This figure represents the ANSP commitment to increasing ACC capacity for Summer, when compared to Summer 214. enhancement: planned enablers This information was taken from the local capacity plan in the Network Operations Plan An indication is given as to whether each measure was implemented as planned. Summer Performance Assessment This provides an analysis of the observed performance and of the achievement of the planned capacity increase. ACC performance has been assessed by analysing traffic

7 Edition Validity Date: 18/5/216 Edition: Status: Final 6 and delay statistics for each ACC and the evolution of the capacity baseline. Where relevant, other significant factors were also taken into account, such as industrial action or planned major events that resulted in a temporary reduction in capacity. 1.3 Allocation of and reasons for En-route delay The table lists the reference locations (sectors) causing most of the ACC delay, the number of minutes of en-route delay attributed to each location and the percentage of the total ACC en-route delay. The graph shows the total ATFM en-route delay generated by each ACC, broken down into the 5 most significant reasons given for the delay in compared to 214. te: The scale on all graphs varies from ACC to ACC - graphs should not be directly compared.

8 Edition Validity Date: 18/5/216 Edition: Status: Final 7 1 ALBANIA - TIRANA ACC LAAAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes)... Realisation of Plan Tirana LAAA ACC Evolution ( v 214) H: 1% Summer B: 1% L: 8.8% -1% The average en-route delay per flight remained at zero minutes per flight during Summer. Plan 2% Achieved Comments Free route airspace Planed for winter 216/17 ATS route network improvements specific requirements during Standby and flexible shifts Expected summer 217 Implementation of enhanced Mode S radar system It will be MLAT and planned for 217 Maximum configuration: 3/4 ENR + 1 APP sectors 4 ENR + 1 APP sectors were opened Summer performance assessment Enroute Delay (min. per flight) +1.8%. ACC Baseline (% difference v 214) +1.9% (%) The ACC capacity baseline was estimated at 65, the same level as last year. During the measured period, the average peak 1 hour demand was 57 and the average peak 3 hour demand was 5.

9 Edition Validity Date: 18/5/216 Edition: Status: Final 8 2 ARMENIA - YEREVAN ACC UDDDACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Yerevan UDDD ACC Evolution ( v 214) H: -3.8% Summer B: -5.6% L: -8.2% sig. Enroute Delay (min. per flight) -16.5%..1 The average en-route delay per flight remained at zero minutes per flight during Summer. ACC Baseline (% difference v 214) -13.9%..1 4 (%) Plan: Sufficient to meet demand Comments Summer 214 performance assessment The ACC capacity baseline was estimated at 4. During the measured period, the average peak 1 hour demand was 11 and the average peak 3 hour demand was 8.

10 Edition Validity Date: 18/5/216 Edition: Status: Final 9 3 AUSTRIA - VIENNA ACC 35 3 LOVVACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes). ly enroute delay (all causes).. Realisation of Plan Vienna LOVV ACC The average en-route delay per flight increased from.4 minutes per flight during Summer 214 to 5 minutes per flight during Summer. 69% of the delays were due to Weather, 22% due to staffing and 8% due to ATC capacity Plan 5% Achieved Comments DCTs H24/ in parallel ops with ATS routes Improved ATFCM techniques, including STAM Participation in FABCE STAM Live Trial 9/ Enhanced sectorisation according to the FAB CE Airspace Plan Stepped improved sectorisation according to on-going projects Additional layer top sector Improved operational procedures including FMP/AMC Data link (Oct 214) Recruitment to maintain staff level SYSCO with neighbouring units Additional sectors as required, depending on traffic demand levels Maximum configuration: 13 sectors Maximum 12 sectors needed Summer performance assessment The ACC capacity baseline was measured with ACCESS at 194, 3% higher than in 214. During the measured period, the average peak 1 hour demand was 187 and the average peak 3 hour demand was 17. observed peak was higher. H: 2.8% Summer B: 1.7% L: % Reference Evolution ( v 214) +7% ER Delays ACC ER Delay LOVVSC35 1 % LOVVE13 1 % LOVVWB15 2 % LOVVW % LOVVWB % LOVVNE % Enroute Delay (min. per flight) +1.7%.9 1 Vienna ACC en-route delays in ACC Baseline (% difference v 214) +% (+3%)

11 Edition Validity Date: 18/5/216 Edition: Status: Final 1 4 AZERBAIJAN - BAKU ACC UBBAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Data Source: STATFOR Realisation of Plan Evolution ( v 214) Baku UBBA ACC ACC Baseline (% difference v 214) H: % Summer B: % L: -% significant -3.1%..1-5.% (%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan: Sufficient to meet demand Achieved Comments ATS route network optimisation - an on-going process in co-operation with neighboring States Upgrade of UBBB (Baku/Heydar Aliyev Int'i) SIDs and STARs. Implementation on May 28,. Integration into EUROCONTROL IFPS (start of operations from May 28, ) It has been implemented since April 3, Integration has been postponed. Start of operations from January 7, 216. All appropriate actions are in place (publications, training, NM applications installation, etc) Maximum configuration: 5 + 3APP 1 sector opened Summer performance assessment The ACC capacity baseline was estimated at 65. During the measured period, the average peak 1 hour demand was 33 and the average peak 3 hour demand was 19.

12 Edition Validity Date: 18/5/216 Edition: Status: Final 11 5 BELGIUM - BRUSSELS ACC 25 EBBUACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).. ly enroute delay (all causes).... Realisation of Plan Evolution ( v 214) Brussels EBBU ACC H: 2.8% Summer B: 2.1% L: % The average en-route delay per flight increased from.3 minutes per flight during Summer 214 to 2 minutes per flight during Summer. 73% of the delays were due to ATC equipment and 26% due to ATC staffing. Plan 1% Achieved Comments Implementation of occupancy counts Postponed to 217 Minor upgrades of CANAC2 system -6% Dynamic use of sector configurations Maximum configuration: 7 sectors 6 sectors were sufficient Summer performance assessment +5.% 4.5 The ACC capacity baseline was estimated to be at 134 in summer. During the measured period, the average peak 1 hour demand was 128 and the average peak 3 hour demand was 114. ACC Baseline (% difference v 214) +4.6% (+2%) Reference ER Delays ACC ER Delay EBBULUS 1 % EBBUHUS 2 % EBBUELS 2 % EBBUWHS 3 1.3% EBBUNLS 3 1.4% EBBUEHS 4 2.% Brussels ACC en-route delays in

13 Edition Validity Date: 18/5/216 Edition: Status: Final 12 6 BOSNIA & HERZEGOVINA - SARAJEVO ACC LQSBACC - and en-route ATFM delays Peak Day Summer 121 ly Summer enroute delay (all causes). ly enroute delay (all causes)... Realisation of Plan Evolution ( v 214) Sarajevo LQSB CTA The en-route delay per flight remained at zero minutes per flight during Summer. Planned capacity increase: sufficient capacity Achieved Comments Maximum configuration: 1 sector Maximum configuration: 1 sectors was sufficient Summer performance assessment ACC Baseline N/A. N/A N/A N/A Summer N/A The capacity baseline was estimated with ACCESS at 25. During the measured period, the average peak 1 hour demand was 14 and the average peak 3 hour demand was 11.

14 Edition Validity Date: 18/5/216 Edition: Status: Final 13 7 BULGARIA - SOFIA ACC 35 3 LBSRACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes)..... Realisation of Plan Evolution ( v 214) Sofia LBSR ACC The en-route delay per flight remained at zero minutes per flight during Summer. Planned capacity increase: 5% Achieved Comments Lower level limit of FRA with Danube FAB Improved ATFCM, including use of occupancy counts and STAM ATS route network development New sector boundaries for Varna and Sofia Further evaluations required for the minimum altitude Airspace changes at interface with Turkey Partially Full implementation scheduled in spring 216 Cross border sectorisation within Danube FAB (Dec 14) Updated LoAs with Istanbul ACC Cross sector training Additional ATCOs Upgrade of SATCAS system H: 1% Summer B: 9.1% L: 7.3% Additional control working positions -5% Increase of maximum sector configurations available Maximum configuration: 12 sectors 1 sectors were opened Summer performance assessment +12.3%.1.5 The ACC capacity baseline was measured with ACCESS and was assessed to be at 186. During the period June/July, the average peak 1 hour demand was 177 flights and the average peak 3 hour demand was 162 flights. ACC Baseline (% difference v 214) +6.7% (+8%)

15 Edition Validity Date: 18/5/216 Edition: Status: Final 14 8 CROATIA - ZAGREB ACC 3 25 LDZOACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Zagreb LDZO ACC The average en-route delay per flight increased from 9 minutes per flight during Summer 214 to 9 minutes per flight during Summer. 63% of the delays were for the reason ATC, 29% for weather and 8% for ATC Staffing. plan: 4% Achieved Comments Further cross-border FRA evolutions Night FRA cross border Additional DCTs H24 Enhanced ATFM techniques through cooperative traffic management (STAM) Enhanced sectorisation according to the FAB CE Airspace Plan Further optimisation of ATS route network Reorganisation of lower airspace (up to 325) in line with BH ACCs Implementation of 4th lateral sector (Central) Implementation of Mode S DAP Optimization of manpower planning Additional ATCOs as required (~6 per year) Dynamic DFL rth SG DFL Improved sector opening times Maximum configuration: 1 sectors Evolution ( v 214) H: 6.6% Summer B: 5.6% L: 4.2% Summer performance assessment Partially On-going The capacity baseline was measured using ACCESS at 138. During the measured period, the average peak 1 hour demand was 139, and the average peak 3 hour demand was 127. Reference +8% ER Delays ACC ER Delay LDZOHS.% LDZOTH.% LDZOGACC.% LDZOH % LDZOS 1 % LDZOULN 1 % % 7 6 Zagreb ACC en-route delays in ACC Baseline (% difference v 214) -1.6% (-3%)

16 Edition Validity Date: 18/5/216 Edition: Status: Final 15 9 CYPRUS - NICOSIA ACC LCCCACC - and en-route ATFM delays Realisation of Plan Nicosia LCCC ACC The average en-route delay per flight increased from 1.38 minutes per flight during Summer 214 to 2.77 minutes per flight during Summer. 55% of the delays were due to ATC staffing, 37% of delays were due to ATC capacity, 4% due to ATC equipment and 3% due to airspace management Plan 9% Achieved Comments FTS for +FL285 - Application of FRA +FL285 for specific N/X points Improved ATFCM, including STAM Continuous improvement of ATS route network New SIDs and STARs LCLK Partially Reduce Nicosia FIR separation standard from 1 to 5 NM Postponed to 218 Reduce radar transfer separation with LGGG from 2 to 15 NM Implementation of Approach Radar function at LCLK and LCPH airports MTCD OLDI with Athens Benefits from CPR exchange with NM FTS started in October, expected results early 216. Some DCTs published in January 216 AIRAC cycle Updated capacity figures, use of occupancy counts from July External factors limiting ATS route network expansion and improvement Postponed to 217 More flexibility in sector configuration openings Depending on staffing Improve Civil-Military cooperation in the South-East part of the FIR Operation of a 5th en-route sector Limited due to staffing Revision of sector capacities Since July average increase of 15% Maximum configuration: 5 sectors Summer performance assessment Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Evolution ( v 214) H: 9.% Summer B: 7.5% L: 5.5% +3% The ACC capacity baseline was measured with ACCESS/Reverse CASA at 52, 5% lower than in 214. During the measured period, the average peak 1 hour demand was 6 and the average peak 3 hour demand was % ACC Baseline (% difference v 214) +5.% (-5%) Reference ER Delays ACC ER Delay LCCCS2W.% LCCCES1 1.% LCCCES 1.% LCCCE 1 % LCCCEW 1 % LCCCWLOW 4 % 15 5 Nicosia ACC en-route delays in

17 Edition Validity Date: 18/5/216 Edition: Status: Final 16 1 CZECH REPUBLIC - PRAGUE ACC 3 25 LKAAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes) Realisation of Plan Prague LKAA ACC The average en-route delay per flight decreased from.2 minutes per flight during Summer 214 to.1 minutes per flight during Summer. Plan: +2% Achieved Comments Stepped implementation of FRA Improved flow and capacity management techniques, including STAM Improved ATS route network Enhanced sectorisation according to the FAB CE Airspace Plan Additional controllers Minor improvements of system functionalities Datalink Evolution ( v 214) H: 1.6% Summer B: % L: -% -11% Adaptation of sector opening times depending on available staff Maximum configuration: 9/1 sectors Summer performance assessment +6.9%.1.9 ACC Baseline (% difference v 214) +7.5% (+8%) Unsuccessful training, 5% below expectations/plan. Postponed due to new implementation date set by EC Regulation, and technical problems. The ACC capacity baseline was measured with ACCESS and was assessed to be at 175. The peak 1 hour demand was 172 flights and the peak 3 hour demand was 157 flights. Reference ER Delays ACC ER Delay LKAAWM % LKAASL 1.4% LKAANM 1.6% LKAAWL 2.6% LKAANL 3.2% LKAASM 1 4.2% Prague ACC en-route delays in

18 Edition Validity Date: 18/5/216 Edition: Status: Final DENMARK - COPENHAGEN ACC EKDKACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Copenhagen EKDK ACC Evolution ( v 214) Enroute Delay (min. per flight) ACC Baseline (% difference v 214) H: % Summer B: -% L: -1.1% significant +1.7% % (+2%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan +2 % Achieved Comments Possible alignment with FRA within NEFAB Optimizing the use of FRA when military areas are active Improved ATFCM, working with occupancy counts Continuous improvements on the ATS route network Possible DFL change to 35 and 355 Postponed UFN. current need for the measure. CPDLC (Feb ) Sector configurations adapted to traffic demand Maintain appropriate level of staffing to open up to 8 sectors Minor updates of COOPANS Maximum configuration: 4/5 (E) + 3 (W) 3E + 2W, sufficient to meet traffic demand. Summer performance assessment The ACC capacity baseline was measured with ACCESS at 127, 2% higher than in 214. During the measured period, the average peak 1 hour demand was 119 and the average peak 3 hour demand was 11.

19 Edition Validity Date: 18/5/216 Edition: Status: Final ESTONIA - TALLINN ACC EETTACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes).... Realisation of Plan Evolution ( v 214) Tallinn EETT ACC H: % Summer B: -% L: -2.2% The average en-route delay per flight remained at almost zero minutes per flight during Summer. Plan: Sufficient capacity to meet demand Achieved Comments NEFRA NO NEFAB FRA - Additional staff and controller rating Adaptation of sector opening times sig. Maximum configuration: 2 (+1 FEEDER) Summer performance assessment +1.7%.1.3 The capacity baseline was estimated to be 63. During the measured period, the average peak 1 hour demand was 54 and the average peak 3 hour demand was 46. ACC Baseline (% difference v 214) +% (%) Reference ER Delays ACC ER Delay EETTFED % EETTFEEDER % EETTEST 4 68.% Tallinn ACC en-route delays in

20 Edition Validity Date: 18/5/216 Edition: Status: Final EUROCONTROL - MAASTRICHT ACC 6 5 EDYYUAC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes). ly enroute delay (all causes)... Realisation of Plan Evolution ( v 214) Maastricht EDYY UAC The average en-route delay per flight increased from 5 minutes per flight during Summer 214 to 3 minutes per flight during. 53% of the delays were for the reason ATC, 32% for Weather, 11% for Airspace Management, 2% for ATC Staffing and 2% for Other. The majority of the delay was caused in the Brussels Sector Group which was challenged by changes in the traffic patterns resulting in traffic growth higher than expected. Plan +1% Achieved Comments Improved ATFCM including STAM FABEC AD South-East Phase 1: EUC25 Project frozen Advanced tactical ATFCM measures Cross training of ATCOs H: 2.7% Summer B: 1.8% L: 1.1% +4% ifmp (integrated Flow Management Position) Fielded with basic capabilities Stepped implementation of XMAN (possible negative on capacity) 2 out of 13 expected implementations done Maximum configuration: 2 sectors (Possible if required according to traffic levels) 17 sectors were opened Summer performance assessment The capacity baseline was measured with ACCESS/Reverse CASA at 322. During the same period, the peak 3 hour demand was 316 and the peak 1 hour was % 4 8 ACC Baseline (% difference v 214) +1.1% (-2%) Reference ER Delays ACC ER Delay EDYYH5WH.% EDYYBALL.% EDYYH5SL.% EDYYH5ML 1.% EDYYH5RL 1 % EDYYHRHR 2 % 8 6 Maastricht UAC en-route delays in

21 Edition Validity Date: 18/5/216 Edition: Status: Final 2 14 FINLAND - TAMPERE ACC 8 7 EFINCTA - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes) Realisation of Plan Tampere EFIN CTA The average en-route delay per remained at zero minutes per flight during Summer. Plan: Sufficient capacity to meet demand Achieved Comments Airspace re-structurisation (v 214) Maintain number of controllers Starting 8.1. part of staff located in EFHK WAM impl.in Western Finland (Q4 214) Evolution ( v 214) H:.% Summer B: -1.3% L: -2.5% significant Partial move of ACC functions to new ACC at EFHK (1 ATCOs) Maximum configuration: feeders 5 sectors were opened Summer performance assessment -3.%.3 ACC Baseline (% difference v 214) -2.7% (%) WAM project Postponed UFN due problems with supplier The capacity baseline was estimated at the same level as last year. During the measured period, the average peak 1 hour demand was 39 and the average peak 3 hour demand was 32.. Reference ER Delays ACC ER Delay EFINKLMN 1.1% EFIN7GN 1 4.3% EFIN7AG 1 5.4% EFINHJKLMN 1.57 EFINGKLMN 1.64 EFINEFG Tampere ACC en-route delays in

22 Edition Validity Date: 18/5/216 Edition: Status: Final FRANCE BORDEAUX ACC 35 3 LFBBALL - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Bordeaux LFBB ACC The average en-route delay per flight remained at 4 minutes per flight during Summer. 62% of the delays were due to ATC, 28% due to Weather and 6% due to Special Events. Plan % Achieved Comments FABEC FRA Step 1 : WE DCTs Improved Airspace Management / FUA Improved ATFCM Procedures and STAM Staff deployment / Flexible rostering Datalink IOC Evolution ( v 214) H: 3.1% Summer B: 2.3% L: % +4% Maximum configuration: 21 UCESO 21 sectors Summer performance assessment +3.% 4 2 The ACC capacity baseline was assessed with ACCESS to be at the same level as in Summer 214. During the measured period, the average peak 1 hour demand was and the average peak 3 hour demand was 187. ACC Baseline (% difference v 214) +2.9% 4 21 (%) Referenc e ER Delays ACC ER Delay LFBPFIS.% LFBBT4.% LFBBPZ.% LFBBX3.% LFBBNH2.% LFBBUS1.% 3 1 Bordeaux ACC en-route delays in

23 Edition Validity Date: 18/5/216 Edition: Status: Final FRANCE BREST ACC 35 LFRRACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Realisation of Plan Brest LFRR ACC The average en-route delay increased from 3 minutes per flight during Summer 214 to 4 minutes per flight during Summer. 73% of the delays were due to the reason ATC and 13% due to Special Events. Plan % Achieved Comments FABEC FRA Step 1 : WE DCTs Improved airspace management / FUA Improvement of ATFCM procedures and STAM Reorganisation of airspace below FL145 (2 nd & final step) Implementation planned for 216 IBP Staff redeployment / flexible rostering Datalink IOC Upgraded ops room and new simulation room Maximum configuration: 19 UCESO (July & August) Summer performance assessment Partiallyy Plan developed in, implementation expected in December. Maximum configuration: 15/16 UCESO (July & August) The ACC capacity baseline was measured with ACCESS/Reverse CASA at 198, 5% lower than in 214. During the measured period, the average peak 1 hour demand was 218 and the average peak 3 hour demand was 23. Evolution ( v 214) Referenc e H: 3.6% Summer B: 2.6% L: 1.2% ER Delays significant ACC ER Delay LFRSSIVE.% LFRRNIU.% LFRRQSI.% LFRRKWS.% LFRRQXS.% LFRRGU.% % Brest ACC en-route delays in ACC Baseline (% difference v 214) -% (-5%)

24 Edition Validity Date: 18/5/216 Edition: Status: Final FRANCE MARSEILLE ACC 45 LFMMACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Marseille LFMM ACC The average en-route delay decreased from 6 minutes per flight during Summer 214 to 9 minutes per flight during Summer. 66% of the delays were due to the reason ATC, and 3% due to Weather. Plan +2% Achieved Comments FABEC FRA Step 1 : WE DCTs In addition, comprehensive tests of DCTs in sector D and Z Improved airspace management / FUA Improved airspace availability in D54 area. Improvement of ATFCM procedures and STAM CDM Procedures New DFL D and Z sectors New upper level of sectors LO and LS Reorganisation of lower airspace and delegation of ATS to APP units below FL145 Staff redeployment / flexible rostering Datalink IOC Evolution ( v 214) H: 2.4% Summer B: 1.7% L: % Reorganisation of the sector groups (transfer of 1 sector from E to W) Postponed until December 217 t required at present, retained as an option if needed Maximum configuration: 28 UCESO Maximum configuration: 28 UCESO Summer performance assessment The ACC capacity baseline was assessed with ACCESS to be at 242, 2% higher compared to Summer 214. During the measured period, the average peak 1 hour demand was 246 and the average peak 3 hour demand was 233. Reference significant ER Delays ACC ER Delay LFMMRAES.% LFMMW2.% LFMMLE.% LFMMMNST.% LFMMGYAB.% LFMMMM.% 8 6 % 5 Marseille ACC en-route delays in ACC Baseline (% difference v 214).% (+2%)

25 Edition Validity Date: 18/5/216 Edition: Status: Final FRANCE PARIS ACC 45 LFFFALL - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Paris LFFF ACC The average en-route delay slightly decreased from minutes per flight during Summer 214 to 7 minutes per flight during Summer. 51% of the delays were due to the reason Weather, 39% due to ATC, 4% due to Industrial Action (ATC), and 4% due to Special Events. Plan +1% Achieved Comments FABEC FRA Step 1 : WE DCTs Improved airspace management / FUA Improved ATFCM procedures and STAM / GF project* FABEC AD South-East Phase 1 (EUC25) New sectorisation HP KZ IBP Reorganisation of lower airspace and delegation of ATS to APP units below FL145 (for relevant airspace) Staff redeployment / flexible rostering Datalink IOC Maximum configuration: 22 UCESO Evolution ( v 214) H: 2.% Summer B: 1.4% L: % Summer performance assessment Implementation of CDM processes and procedures started already in. GF included now in the wider istream Project. Maximum configuration: 21 sectors, higher configuration not required. The ACC capacity baseline was assessed with ACCESS to be at 276, 3% higher than in Summer 214. During the measured period, the average peak 1 hour demand was 271 and the average peak 3 hour demand was 245. Reference -3% ER ACC ER Delay Delays LFFFMPT.% LFQQTMA.% LFFFAO.% LFFFORGYS.% LFFFDOGS.% LFFFAOML.% % 4 3 Paris ACC en-route delays in ACC Baseline (% difference v 214) +4.4% (+3%)

26 Edition Validity Date: 18/5/216 Edition: Status: Final FRANCE - REIMS ACC 35 3 LFEEACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Reims LFEE ACC The average en-route delay slightly increased from minutes per flight during Summer 214 to 6 minutes per flight during Summer. 75% of the delays were due to ATC, and 2% due to Weather. Plan +1% Achieved Comments FABEC FRA Step 1: WE DCTs Improved airspace management / FUA FABEC XMAN Step 1 : Basic Improved ATFCM procedures and STAM FABEC AD South-East Phase 1 (EUC25) UL1 +LAMP trial Staff redeployment / Flexible rostering Datalink IOC Implementation of CDM processes and procedures started already in. Maximum configuration: 19 UCESO Maximum configuration: 18 UCESO Summer performance assessment The ACC capacity baseline was measured with ACCESS at 19. During the measured period, the average peak 1 hour demand was and the average peak 3 hour demand was 189. Referenc e Evolution ( v 214) H: 2.4% Summer B: 1.6% L: % ER Delays +12% ACC ER Delay LFEESEUH.% LFEEXE.% LFSBALL.% LFEE5H.% LFEE5E.% LFEEXKHH.% % 5 Reims ACC en-route delays in ACC Baseline (% difference v 214) +2.4% (+2%)

27 Edition Validity Date: 18/5/216 Edition: Status: Final 26 2 FYROM - SKOPJE ACC 9 8 LWSSACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Skopje LWSS ACC ACC Baseline (% difference v 214) H: 9.1% Summer B: 8.4% L: 7.8% +34% +3.1%.1 9 +% (%) The delays slightly increased from zero minutes for flight during Summer 214 to.2 minutes per flight during Summer. Plan 5% Achieved Comments Free route airspace Planned June 216 Maximum configuration: 3 sectors 3 sectors Summer performance assessment The ACC capacity baseline was estimated to be at the same level as in Summer 214. During the measured period the average peak 1 hour was 48 and the average peak 3 hour was 42.

28 Edition Validity Date: 18/5/216 Edition: Status: Final GEORGIA - TBILISI ACC 35 UGGGACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Tbilisi UGGG ACC ACC Baseline (% difference v 214) H: -% Summer B: -2.1% L: -4.% significant +5.5% %..1 4 (%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan : Sufficient capacity to meet demand Comments Free route airspace Planned June 216 Maximum configuration: 3 sectors 3 sectors Summer performance assessment The ACC capacity baseline was estimated to be 4. During the measured period, the average peak 1 hour demand was 39 and the average peak 3 hour demand was 23.

29 Edition Validity Date: 18/5/216 Edition: Status: Final GERMANY - BREMEN ACC 25 EDWWACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Bremen EDWW ACC Plan: % Evolution ( v 214) H: 1.6% Summer B: % L: -% significant Summer performance assessment +2.2%.8.6 Comments ACC Baseline (% difference v 213) +1.4% (%) The summer traffic increased by 1.4%. The Average ATFM Delay En-route per Movement was stable at min/flight in Summer. The delays were mainly due to ATC (39%), ATC Staffing (6%) and Weather (27%). The offered capacity was the same as in 214. The ADM Summer is close to the EU reference value. There, no capacity deficit was observed. A maximum configuration of 17+4 consists of 14 en-route sectors and 3 en-route/app- sectors (Hamburg, Hannover) and 4 APP/TMAsectors (Berlin). The offered configuration of 14+4 with 11 en-route sectors was opened during the whole year. The sectors EIDER EAST and MÜRITZ LOW were only open for military exercises. Reference ER Delays ACC ER Delay EDWWNORDB % EDWWHEI % EDWWALEH % EDWWCTA % EDWWDBAN % EDWWHEIC 1 % Bremen ACC en-route delays in

30 Edition Validity Date: 18/5/216 Edition: Status: Final GERMANY - KARLSRUHE ACC EDUUUAC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Realisation of Plan Karlsruhe EDUU ACC Plan +6% Evolution ( v 214) H: 2.8% Summer B: 1.7% L: % Summer performance assessment significant +1.9% 8 6 ACC Baseline (% difference v 214) +1.1% (+3%) The summer traffic growth reaches 1.1% and is higher than expected. The Average ATFM Delay en-route per Movement decreased slightly to 6 min./flight compare to the previous summer period. The delays were mainly due to ATC Staffing (13%), ATC (18%) and Weather (57%). The summer delay was generated primarily by Weather. capacity deficit was observed The offered capacity increased continuously in. Two sectors were split. A maximum configuration of 42 en-route sectors was available; the OSTSEE, CHIEM and ISA sectors was mostly combined (offered configuration of 39 sectors). Reference ER Delays ACC ER Delay EDUULK13.% EDUUALCH12.% EDUUHVL12.% EDUUHVL22 % EDUUDON13 1 % EDUUDI13 1 % Karlsruhe UAC en-route delays in

31 Edition Validity Date: 18/5/216 Edition: Status: Final 3 24 GERMANY - LANGEN ACC 45 EDGGACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) 1.4 ly enroute delay (all causes) Realisation of Plan Langen EDGG ACC Evolution ( v 214) H: 1.2% Summer B: % L: -% significant Plan -1% Achieved Comments Upgrade of P1/ATCAS system (PSS) EBG5/6 NEX 6 +% 4 3 ACC Baseline (% difference v 214) +% 5 26 (+2%) The realisation was completed successfully on Sep/Dec 214 New structure EBG 1 (APP FRA) NEX 9 The realisation was completed successfully on 3.4. FABEC AD South-East Phase 1 : EUC25 EX 12 Summer performance assessment The realisation was completed successfully on 5.3. The summer traffic increased in compared to 214 by %. The Average ATFM Delay en-route per Movement was significant decreased to 5 min/flight in Summer compared to the last year. The delays were mainly due to ATC Staffing (19%), ATC (35%) and Weather (4%). The offered capacity was also stable in. The ADM in summer is lower than the reference value. capacity deficit was observed. A maximum configuration of consists of 23 en-route sectors (including 3 sectors with predominantly military traffic) and 2 en-route /APPsectors (Stuttgart) and 11 APP/TMA- sectors (Düsseldorf, Frankfurt, Cologne/Bonn 2 sectors always combined). The offered configuration is sectors. Reference ER Delays ACC ER Delay EDGGPFEI.% EDGGHMMM.% EDGGNLH.% EDGGLBU.% EDGGDLDS % EDGGRUMO 1 % Langen ACC en-route delays in

32 Edition Validity Date: 18/5/216 Edition: Status: Final GERMANY - MUNICH ACC 6 5 EDMMACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes). ly enroute delay (all causes)... Realisation of Plan Evolution ( v 214) Munich EDMM ACC H: 1.5% Summer B: % L: -% -1% Plan % Achieved Comments Implementation FMTP REV/MAC EX 17 Upgrade of P1/ATCAS system (PSS) EBG APP EX 2 Summer performance assessment +2.7%.4 9 ACC Baseline (% difference v 214) +3.4% (+2%) The realisation was completed successfully. The realisation was completed successfully on 23./24.5. The Average ATFM Delay En-route per Movement is nearly. minutes/flight, as in the previous summer period. The delays were mainly due to Weather (48%), ATC and ATC Staffing (2%). Approximately 48% of ATFM delays caused by the implementation of PSS. The ADM summer was below the reference value. The maximum configuration of 17+4 sectors consists of 14 en-route sectors and 3 en-route /APP- sectors (Nuremberg, Dresden and Leipzig) and 4 APP/TMA- sectors (Munich). The offered configuration has 14+4 sectors three en-route sectors (FRANKEN Upper/High, NÖRDLINGEN/WALDA and SACHSEN Low/ High) are mostly combined. Reference ER Delays ACC ER Delay EDMMSOUTH.% EDMMNORTH.% EDMMRDG % EDMMFRKL 1 % EDMMRDEG 1 % EDMMTRGHN 1 % Munich ACC en-route delays in

33 Edition Validity Date: 18/5/216 Edition: Status: Final GREECE - ATHENS ACC 3 25 LGGGACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Realisation of Plan Athens LGGG ACC The average en-route delay per flight increased from 7 minutes per flight during Summer 214 to 1.46 minutes per flight during Summer. 6% of delays were due to the reason ATC capacity and 39% due ATC staffing. Plan -5% Achieved Comments Improved civil/military coordination Improved ATFCM, including STAM Improved ATS route network and airspace management Reduction in number of ATCOs ATM system upgrade FDPS upgrade including FPL 212 OLDI with Nicosia Maximum configuration: 4/5 sectors Evolution ( v 214) H: 15.4% Summer B: 14.2% L: 12.3% +6% Summer performance assessment Reduction of active ATCOs continued in with on the number of sectors being made available 6 sectors used for a limited period of time and even 7 sectors during some days of the peak season. The ACC capacity baseline was measured with ACCESS/Reverse CASA at 118, same as in 214. During the measured period, the average peak 1 hour demand was 133 and the average peak 3 hour demand was % 6 ACC Baseline (% difference v 214) +3.5% (%) Reference ER ACC ER Delay Delays LMMMCTA.% LGGGRDSU.% LAAACTA 1 % LIBBCTA 2 % LGGGMILU 5 % LGGGRDKA 9 % 8 6 Athens ACC en-route delays in

34 Edition Validity Date: 18/5/216 Edition: Status: Final GREECE - MAKEDONIA ACC 25 LGMDACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) 1.9. ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Makedonia LGMD ACC The average en-route delay increased from 4 minutes per flight during Summer 214 to 5 minutes per flight during Summer. 62% of delays were due to the reason ATC staffing, and 37% due ATC capacity. Plan -5% Achieved Comments Improved civil/military coordination Improved ATFCM, including STAM Improved ATS route network and airspace management Reduction in number of ATCOs ATM system upgrade H: 13.% Summer B: 12.2% L: 1% FDPS upgrade including FPL 212 significant / / / / / / Maximum configuration: 4/3 sectors / 4 sectors Summer performance assessment +4.2% 1 6 ACC Baseline (% difference v 214) +2.8% (%) The ACC capacity baseline was measured with ACCESS/Reverse CASA at 1, same value as in 214. During the measured period, the average peak 1 hour demand was 16 and the average peak 3 hour demand was 96. Reference ER ACC ER Delay Delays LGMDKVL.% LGMDWLSK % LGMDKVLU % LGMDTSLU 1 % LGMDWU 2 % LGMDLMOML 2 % 3 1 Makedonia ACC en-route delays in

35 Edition Validity Date: 18/5/216 Edition: Status: Final HUNGARY - BUDAPEST ACC 35 3 LHCCACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Budapest LHCC ACC Evolution ( v 214) H: 8.7% Summer B: 7.6% L: 5.9% -16% The average en-route delay per flight slightly increased from zero minutes per flight during Summer 214 to.4 minutes per flight during Summer. Plan +2.5% Achieved Comments FRA.2.5 Fully implemented, H24, whole FIR Optimization of airspace structure Ongoing Recruitment and training of controllers 3 ACC trainees will start OJT early 216 Maximum configuration: 1 sectors Max 8 sector configuration needed in Summer performance assessment +11.3%.3.6 ACC Baseline (% difference v 214) +1% (+16%) The ACC capacity baseline was measured with ACCESS at 25, 16% higher than in 214. During the measured period, the average peak 1 hour demand was 193 and the average peak 3 hour demand was 17. Reference ER ACC ER Delay Delays LHCCWESTM % LHCCWESTH % LHCCWESTL % LHCCWHT 2 3.5% LHCCWESTU 4 7.% LHCCWLM % Budapest ACC en-route delays in

36 Edition Validity Date: 18/5/216 Edition: Status: Final IRELAND - DUBLIN ACC 8 7 EIDWACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Dublin EIDW ACC ACC Baseline (% difference v 214) H: 4.4% Summer B: 3.6% L: 2.5% significant +7.8% % (%) Average enroute delay per flight remained at zero minutes per flight in Summer. Plan: +3% Achieved Comments A-CDM at Dublin airport Ongoing Planned implementation 216 Improved ATFCM, including STAM UK / Ireland FAB initiatives Point merge RWY 1 On-going recruitment to maintain staff levels Cross rating training Maximum configuration: 4 sectors Summer performance assessment The capacity baseline was estimated at the same level as last year. The peak 1 hour demand was 51 and the peak 3 hour demand was 44.

37 Edition Validity Date: 18/5/216 Edition: Status: Final 36 3 IRELAND - SHANNON ACC EISNACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Shannon EISN ACC ACC Baseline (% difference v 214) H: 2.% Summer B: 1.6% L: % significant +3.7% % (%) Average enroute delay per flight remained at zero minutes per flight in Summer. Plan: +2% Achieved Comments Improved ATFCM, including STAM UK / Ireland FAB initiatives CPDLC Developing Queue Management programme On-going recruitment to maintain staff levels FAB dynamic sectorisation - Trials Extra sectors as required Dynamic sectorisation available Maximum configuration: 12 sectors Summer performance assessment The ACCESS measured baseline of 124 indicates the capacity available during the measured period. The peak 1 hour demand was 15 and the peak 3 hour demand was 94.

38 Edition Validity Date: 18/5/216 Edition: Status: Final ITALY - BRINDISI ACC 16 1 LIBBACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Brindisi LIBB ACC Evolution ( v 214) Enroute Delay (min. per flight) ACC Baseline (% difference v 214) H: 7.5% Summer B: 6.6% L: 5.1% significant -4.5% % (+5%) Average en-route delay per flight remained at zero minutes per flight during Summer. Plan:: 5% Achieved Comments Free-route implementation program Improved airspace management PBN Program Improved ATFCM, including STAM Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users expectations, ENAV s Flight Efficiency Plan and BLUEMED FAB implementation Additional capacity benefits from VDL Mode 2 implementation by all stakeholders Postponed to 216 Flexible opening scheme according to traffic demand and system enablers implementation Maximum configuration: 5 sectors Summer performance assessment The ACC capacity baseline was measured at 86. During the measured period (June and July), the average peak 1 hour demand was 68 and the average peak 3 hour demand was 61.

39 Edition Validity Date: 18/5/216 Edition: Status: Final ITALY - MILAN ACC 35 3 LIMMACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Milan LIMM ACC Average en-route delay per flight remained at zero minutes per flight during Summer. Plan: 5% Achieved Comments Free-route implementation program Improved airspace management PBN Program Improved ATFCM including STAM Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Airspace and configuration re-organization Additional ATCOs (from TWRs to ACC) Additional capacity benefits from VDL Mode 2 implementation by all stakeholders Flexible opening scheme according to traffic demand and system enablers implementation Maximum configuration: 2 sectors Evolution ( v 214) H: 3.2% (+1%)* Summer B: 2.2% (+1%)* L: % (+1%)* significant Summer performance assessment Enroute Delay (min. per flight) +9.8%..8 Postponed to 217 The ACC capacity baseline was measured with ACCESS at 192. During the measured period (June and July), the average peak 1 hour demand was 184 and the average peak 3 hour demand was 174. ACC Baseline (% difference v 214) +2.3% (+2%)

40 Edition Validity Date: 18/5/216 Edition: Status: Final ITALY - PADOVA ACC 35 3 LIPPACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Padova LIPP ACC ACC Baseline (% difference v 214) H: 3.8% (-5%)* Summer B: 3.% (-5%)* L: 1.3% (-5%)* significant -4.9%..8-6.% (%) Average en-route delay per flight remained at zero minutes per flight during Summer. : 183 Achieved Comments Free-route implementation program Improved airspace management PBN Program Improved ATFCM including STAM Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users expectations, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Airspace and configuration re-organization Additional capacity benefits from VDL Mode 2 implementation by all stakeholders Flexible opening scheme according to traffic demand and system enablers implementation Maximum configuration: 13 sectors Postponed to end 216 Summer performance assessment The ACC capacity baseline was measured at 193. During the measured period (June and July) the average peak 1 hour demand was 173 and the average peak 3 hour demand was 162.

41 Edition Validity Date: 18/5/216 Edition: Status: Final 4 34 ITALY - ROME ACC 35 LIRRACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Rome LIRR ACC Average en-route delay per flight slightly increased from zero minutes per flight in Summer 214 to.3 minutes per flight in Summer. : 213 Achieved Comments Free-route implementation program Improved airspace management PBN Program Improved ATFCM including STAM Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users expectations, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Airspace and configuration re-organization TMA reorganisation Evolution ( v 214) H: 2.3% (+9%)* Summer B: 1.4% (+9%)* L: -% (+9%)* Additional capacity benefits from VDL Mode 2 implementation by all stakeholders Flexible opening scheme according to traffic demand and system enablers implementation Maximum configuration: 2/21 sectors significant Summer performance assessment Postponed to 217 The ACC capacity baseline was assessed measured at 214. During the measured period (June and July), the average peak 1 hour demand was 197 and the average peak 3 hour demand was 185. Enroute Delay (min. per flight) -4.3%.2.4 ACC Baseline (% difference v 214) +1.4% Referenc e ER Delays ACC ER Delay LIRRNE % LIRRALL 1 3.8% LIRRES 2 5.% LIRRARR 2 5.7% LIRRNNW 2 6.2% LIRRDPNS 3 7.3% Roma ACC en-route delays in

42 Edition Validity Date: 18/5/216 Edition: Status: Final LATVIA - RIGA ACC 9 8 EVRRACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Riga EVRR ACC ACC Baseline (% difference v 214) H: % Summer B: -% L: -1.9% significant +%..4 +% (%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan Sufficient capacity to meet demand Achieved Comments Various ATM system improvements Maximum configuration: APP 4 sectors were opened Summer performance assessment The capacity baseline was estimated at the same level as in 214. The average peak 1 hour demand was 64 and the peak 3 hour demand was 58 flights during the measured period, indicating that the ACC offered sufficient capacity to meet the demand. The average en-route delay per flight remained at zero minutes per flight in Summer 214.

43 Edition Validity Date: 18/5/216 Edition: Status: Final LITHUANIA - VILNIUS ACC 9 8 EYVCACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Vilnius EYVC ACC ACC Baseline (% difference v 214) H: % Summer B: -1.7% L: -3.4% significant +% % (%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan Sufficient capacity to meet demand Achieved Comments Free route airspace concept implementation in Vilnius FIR Maximum configuration: 3 sectors Summer performance assessment The ACC capacity baseline was assessed to be at the same level as in Summer 214. The peak 1 hour demand was 55 and the peak 3 hour demand was 51 during the measured period.

44 Edition Validity Date: 18/5/216 Edition: Status: Final MALTA - MALTA ACC 45 LMMMACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Malta LMMM ACC ACC Baseline (% difference v 214) H: -8.4% Summer B: -9.5% L: -11.2% significant +% % (+8%) The average en-route delay per flight remained at zero minutes per flight during Summer. Plan Sufficient capacity to meet demand Achieved Comments Maximum configuration: 2 sectors 2 sectors Summer performance assessment The ACC capacity baseline was measured with ACCESS. During June and July, the average peak 1 hour demand was 26 flights and the peak 3 hour demand was 22 flights per hour..

45 Edition Validity Date: 18/5/216 Edition: Status: Final MOLDOVA - CHISINAU ACC 35 3 LUUUACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Chisinau LUUU ACC ACC Baseline (% difference v 214) H: -9.4% Summer B: -1% L: -13.% +49% -2.% %..3 4 (%) Average enroute delay per flight remained at zero minutes per flightduring Summer. Plan: Sufficient capacity to meet demand Achieved Comments WAM / MLAT systems Final Implementation during 216 Update of sector capacity following CAPAN study Maximum configuration: 3 sectors Summer performance assessment Maximum configuration: 2 sectors Sufficient to meet the traffic demand The ACC capacity baseline was estimated at 4. The peak 1 hour demand was 14 flights and the peak 3 hour demand was 12.

46 Edition Validity Date: 18/5/216 Edition: Status: Final THE NETHERLANDS - AMSTERDAM ACC EHAAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Realisation of Plan Amsterdam EHAA ACC The average en-route delay per flight slightly decreased from 7 minutes per flight during Summer 214 to 3 minutes per flight in Summer. 46% of the delays were for the reason ATC, and 28% for reason Weather. Plan % Achieved Comments Maximum configuration: 5 sectors Evolution ( v 214) H: 1.1% Summer B: % L: % significant Summer performance assessment +4.1% 4 The ACC capacity baseline was measured with ACCESS at 143, representing the delivered capacity. This was sufficient to accommodate the traffic demand, with an average peak 1 hour of 127 during the measured period and an average peak 3 hour of 113. ACC Baseline (% difference v 214) +4.3% (+4%) Reference ER Delays ACC ER Delay EHAASECT % EHAASECT3 9 6.% EHAACBAS % Amsterdam ACC en-route delays in

47 Edition Validity Date: 18/5/216 Edition: Status: Final 46 4 NORWAY - BODO ACC 9 8 ENBDACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Bodo ENBD ACC Average enroute delay per flight slightly decreased from.2 minutes per flight during Summer 214 to zero minutes per flight during Summer. Plan: Sufficient capacity to meet expected demand Achieved Comments SNAP (Southern rway Airspace Project) Flexible rostering of ATC staff Recruitment and training to maintain number of air traffic controllers New ATM system in Bodo Oceanic Evolution ( v 214) H: -1.9% Summer B: -2.3% L: -2.9% significant Impact Maximum configuration: oceanic Summer performance assessment +%. The ACC capacity baseline was assessed to be at the same level as in Summer 214. During the measured period, the average peak hour demand was 5 and the average peak 3 hour demand was 45. ACC Baseline (% difference v 214) +% (%) Reference ACC ER ER Delays Delay ENOBOA8 3 1.% Bodo ACC en-route delays in

48 Edition Validity Date: 18/5/216 Edition: Status: Final NORWAY OSLO ACC 16 1 ENOSACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)... ly enroute delay (all causes).... Realisation of Plan Oslo ENOS ACC Average enroute delay per flight increased from.1 minutes per flight during Summer 214 to minutes per flight during Summer. Planned Increase: sufficient to meet demand Achieved Comments Additional controllers Flexible rostering of ATC staff Evolution ( v 214) H: -2.3% Summer B: -2.9% L: -3.8% significant Maximum configuration: 7 sectors Maximum 8 available Summer performance assessment +%.6 3 The capacity offered was measured with ACCESS at a level of 88, for an average peak demand of 78 (peak 1 hour) and 73 (peak 3 hour ACC Baseline (% difference v 214) -4.2% 3 88 (-3%) Reference ER Delays ACC ER Delay ENOS5 % ENOS34 % ENOS % ENOSEFAR 1 2.% ENOS % ENOSW % Oslo ACC en-route delays in

49 Edition Validity Date: 18/5/216 Edition: Status: Final NORWAY STAVANGER ACC ENSVACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes). ly enroute delay (all causes)... Realisation of Plan Evolution ( v 214) Stavanger ENSV ACC H: -3.3% Summer B: -3.8% L: -4.4% significant -2.3%.3 1 ACC Baseline (% difference v 214) -1.5% (+2%) Average enroute delay per flight slightly decreased from.8 minutes per flight during Summer 214 to.6 minutes per flight during Summer. Plan 1% Achieved Comments SNAP (Southern rway Airspace Project) Flexible rostering of ATC staff Recruitment and training to maintain number of air traffic controllers Re-assessment of sector capacities with CAPAN Planned now for 216 Maximum configuration: helicopter Summer performance assessment The capacity baseline of 64 was measured with ACCESS, indicating the capacity actually offered. During the measured period, the average peak demand was 59 (peak 1 hour) and 53 (peak 3 hour). Reference ER Delays ACC ER Delay ENSVALL % ENSV567 % ENSV % ENSV912EB % ENSV92EB % ENSV % Stavanger ACC en-route delays in

50 Edition Validity Date: 18/5/216 Edition: Status: Final POLAND WARSAW ACC 3 25 EPWWACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) 1.1 ly enroute delay (all causes) Realisation of Plan Warsaw EPWW ACC The average en-route delay per flight decreased from 1.14 minutes per flight during Summer 214 to 7 minutes per flight during Summer. 84% of delays were for the reason ATC, 6% for Weather and 4% ATC Staffing Plan +3% Achieved Comments Improved ATFCM techniques, including STAM YES New sector s occupancy reference values Additional controllers YES 125 ATCOs available Improved sector configurations and management (additional measure to the plan) Introduction of Manager position (additional measure to the plan) YES YES Increased number of effective configurations (up to total of 87) D-1 and tactical planning, EU restrictions and scenarios applied during Summer Minimizing ATC Staffing cause of delays (additional measure to the plan) YES Achieved ( decrease from 13% on 214) Maximum configuration: 9 sectors YES 9 sectors Summer performance assessment Evolution ( v 214) H: 1.7% Summer B:.% L: -1.5% -7% -% 9 3 ACC Baseline (% difference v 214) -1.6% (+5%) The ACC capacity baseline was measured with ACCESS/Reverse CASA at 142, 5% higher than in 214. During the measured period, the average peak 1 hour demand was 149 and the average peak 3 hour demand was 14. Reference ER Delays ACC ER Delay EPWWSE.% EPWWC.% EPWANS 1 % EPWWJR 1 % EPWWR 1 % EPWWDTC 2 % 8 6 Warsaw ACC en-route delays in

51 Edition Validity Date: 18/5/216 Edition: Status: Final 5 44 PORTUGAL - LISBON ACC LPPCACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Lisbon LPPC ACC The average en-route delay per flight increased from 9 minutes per flight during Summer 214 to 4 minutes per flight during Summer. 68% of the delays were for the reason ATC, 12% for Special events, 11% for ATC Staffing, 8% for ATC equipment and 2% for Weather. Plan 3% Achieved Comments Enhanced ATFCM procedures, including STAM New DFL 365 West Sector Partially Reduction of separation minima from 8 to 5 NM Implemented on 2 October Flexible rostering Partially Maintain appropriate level of staffing to open up to 9 sectors Partially t at all times when required Area Proximity warning (APW) Planned for 216 Flexible sector opening schemes Evolution ( v 214) H: 4.7% Summer B: 3.8% L: 2.2% significant Partially Maximum configuration: 9 (7 ENR+2 TMA) 9 sectors were opened Summer performance assessment +5.1% 1 2 ACC Baseline (% difference v 214) +4.4% (%) The ACC capacity baseline was measured with ACCESS / Reverse CASA at 94 same as in 214. During the measured period (June and July AIRAC cycles), the average peak 1 hour demand was 1 and the average peak 3 hour demand was 9. Reference ER Delays ACC ER Delay LPPCWU345.% LPPCAPP 1 % LPPCWL365 1 % LPPCMAD 1 % LPPRTA 2 % CCS 3 % Lisbon ACC en-route delays in

52 Edition Validity Date: 18/5/216 Edition: Status: Final ROMANIA - BUCHAREST ACC 3 25 LRBBACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Bucharest LRBB ACC ACC Baseline (% difference v 214) H: 7.7% Summer B: 6.3% L: 4.7% significant +6.2% % (%) Average enroute ATFM delay per flight slightly increased from zero minutes per flight during Summer 214 to.5 minutes per flight during Summer. 82% of the delays were for the reason Equipment (ATC) and 17% for Industrial action (ATC). Plan Sufficient capacity to meet demand Achieved Comments : Free Route extension study through Real Time Simulation at DANUBE FAB level, with EUROCONTROL support (project co-financed by European Union, according to the Decision C(213) 7573 / ) ATS route network and sectorisation improvements : ATS procedures will be revisited with the occasion of the FRA extension study through RTS planned at DANUBE FAB level (project cofinanced by European Union, according to the Decision C(213) 7573 / ) BUCURESTI ACC sectorisation & capacity optimisation will be studied with the occasion of the Real Time Simulation for Free Route Airspace extension at DANUBE FAB level planned in (project co-financed by European Union, according to the Decision C(213) 7573 / ) Maximum configuration: 14 sectors 14 sectors opened Summer performance assessment The ACC capacity baseline was assessed to be at 183 the same level as in Summer 214. During the measured period, the peak 1 hour demand was 15 flights and the peak 3 hour demand was 14.

53 Edition Validity Date: 18/5/216 Edition: Status: Final SERBIA & MONTENEGRO - BELGRADE ACC 35 3 LYBAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes)..... Realisation of Plan Belgrade LYBA ACC En-route delay slightly increased from zero minutes per flight during Summer 214 to.4 minutes per flight during Summer. Plan 1% Achieved Comments Night Free Route. Night Cross border FRA with Croatia. LARA/CIMACT Public procurement procedure issues Lower sector DFL change CCAMS Maximum configuration: 12 sectors Evolution ( v 214) H: 8.4% Summer B: 7.2% L: 5.8% +8% Summer performance assessment +8.7%.3 ACC Baseline (% difference v 214) +7.8% (+1%) 9 sectors were opened and sufficient to cope with the traffic demand The ACC capacity baseline was measured with ACCESS at 181. The peak 1 hour demand was 159 and the peak 3 hour demand was 146 during the measurement period. Reference ER Delays ACC ER Delay LYBAUWES % LYBAUE % LYBATE % LYBAT % LYBALU 1.1% LYBAUW 1 1.3% Belgrade ACC en-route delays in

54 Edition Validity Date: 18/5/216 Edition: Status: Final SLOVAK REPUBLIC - BRATISLAVA ACC 25 LZBBACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)... ly enroute delay (all causes).... Realisation of Plan Evolution ( v 214) Bratislava LZBB ACC The average en-route delay per flight decreased from 3 minutes per flight in Summer 214 to 2 minutes per flight in Summer. 75% of the delays were for the reason ATC, and 22% for weather. Plan +3% Achieved Comments Improve accuracy of airspace booking From ANSP perspective no influence on this Improved ATFCM techniques, including STAM STAM trial completed Continuous improvements of the route network and sectorisation Enhanced sectorisation according to the FABCE SYSCO Continuous recruitment to increase staff level Mode S Optimisation of sector opening times New sector configurations H: 4.5% Summer B: 3.% L: 1.2% -23% Maximum configuration: 5 sectors 5 sectors Summer performance assessment +7.%.8 The ACC capacity baseline was measured with ACCESS at 13, 9% higher than in 214. During the measured period, the average peak 1 hour demand was 128 and the average peak 3 hour demand was 111. ACC Baseline (% difference v 214) +5.7% (+9%)

55 Edition Validity Date: 18/5/216 Edition: Status: Final SLOVENIA - LJUBLJANA ACC 16 1 LJLAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Ljubljana LJLA ACC ACC Baseline (% difference v 214) H: 3.5% Summer B: 2.5% L: % +28% -2.5%. 1-5.% (%) The average en-route delay per flight remained zero minutes per flight during Summer. Plan 5% to 15% Achieved Comments Stepped implementation of FRA according to the FAB CE Airspace Plan Enhanced ATFCM techniques, including STAM ATS route network and traffic organisation changes Enhanced sectorization according to the FAB CE Airspace Plan In addition Slovenia Control entered into cross border FRA project with Austro Control, implementation date NOV216 (project SAXFRA). Mode S New implementation date April additional ATCOs Minor system upgrades as necessary Reassessment of sector capacities (CAPAN) Flexible sector configurations Maximum configuration: 5 sectors 4 sectors were opened The capacity baseline was estimated at the same level as last year. The peak 1 hour demand was 71 and the peak 3 hour demand was 65 during the measurement period

56 Edition Validity Date: 18/5/216 Edition: Status: Final SPAIN - BARCELONA ACC 35 3 LECBACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) 1.9 ly enroute delay (all causes) Realisation of Plan Barcelona LECB ACC Average en-route delay per flight increased from 5 minutes per flight during Summer 214 to minutes per flight during Summer. 75% of the delays were for the reason ATC, 18% for Weather, 3% for Industrial Action, 2% for ATC Equipment and 2% for Staffing. Plan: 3% Achieved Comments A-CDM at LEBL airport Improved ATFCM, including STAM Partially TMA-resectorisation (sectors TGR and XAL) Vertical split of central sector Safety nets (STCA) April 216 Optimised sector configurations Evolution ( v 214) H: 5.5% Summer B: 4.8% L: 2.5% significant Flexible sectorisation for BALSE and MED sectors +2.1% 6 3 increase in some en-route sectors (specially P1U) Partially Maximum configuration: 11/12 sectors 12 sectors ACC Baseline (% difference v 214) +1.1% (%) Summer performance assessment The ACC capacity baseline was measured with ACCESS/Reverse CASA at 144. During the measured period, the peak 1 hour demand was 146 and the peak 3 hour demand was 139. Referenc e ER Delays ACC ER Delay LEBLFER.% LEBLT4E.% LECBCBM.% LECBLVL.% LEBL3FN % LEBL14E 1 % 8 6 Barcelona ACC en-route delays in

57 Edition Validity Date: 18/5/216 Edition: Status: Final 56 5 SPAIN - CANARIAS ACC GCCCACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes) Realisation of Plan Canarias GCCC ACC Average en-route delay per flight decreased from 9 minutes per flight during Summer 214 to 7 minutes per flight durin Summer. 66% of the delays were for the reason ATC, 24% for Weather, 6% for Industrial Action and 3% for ATC Equipment Plan: 1% Achieved Comments RNAV structure for Canarias TMA Phase 1 (procedures in GCRR and GCFV) Improved ATFCM, including STAM Partially Minor ATC system upgrades Safety Nets (STCA) April 216 Optimised sector configurations Evolution ( v 214) H: 4.7% Summer B: 3.6% L: 1.7% significant Maximum configuration: 9/1 (5 APP/4+1ENR) 1 sectors (5 APP + 5 ENR) Summer performance assessment -% 6 8 The ACC capacity baseline was measured with ACCESS at 68. During the measured period, the peak 1 hour demand was 64 and the peak 3 hour demand was 58. ACC Baseline (% difference v 214) -1.4% (%) Referenc e ER Delays ACC ER Delay GCCCRU6 1 % GCCCIGC 2 1.1% GCCCD % GCCCRCE 2 1.2% GCCCAAC 6 2.9% GCCCRC % Canarias ACC en-route delays in

58 Edition Validity Date: 18/5/216 Edition: Status: Final SPAIN - MADRID ACC 35 3 LECMALL - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) 1.6 ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Madrid LECM ACC H: 5.% Summer B: 4.1% L: 2.% Average en-route delay per flight slightly increased from.9 minutes per flight during Summer 214 to 1 minutes per flight during Summer. 74% of the delays were for the reason ATC, 11% for the reason Other, 8% for Weather, 6% for Special Events, 1% for ATC Staffing and 1% for Industrial Action. Plan: % Achieved Comments Improved ATFCM including STAM Partially Full implementation of SACTA CF2 version - (Feb ) Safety nets (STCA) April 216 Optimised sector configurations significant Maximum configuration: 17 sectors 17 sectors Summer performance assessment +4.% 4 The ACC capacity baseline was measured with ACCESS at 24. During the measured period, the peak 1 hour demand was and the peak 3 hour demand was 183. ACC Baseline (% difference v 214) +4.4% (+3%) Referenc e ER Delays ACC ER Delay LEMDWDN.% LECMSAI % LECMZTI % LECMR1I % LECGTA % PRADO 1 % Madrid ACC en-route delays in

59 Edition Validity Date: 18/5/216 Edition: Status: Final SPAIN - PALMA ACC LECPACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Evolution ( v 214) Palma LECP ACC H: 6.3% Summer B: 5.5% L: 3.3% Average enroute delay per flight increased from 5 minutes during Summer 214 to 3 minutes per flight during Summer. 94% of the delays were for the reason ATC and 6% were due to Weather Plan: 2% Achieved Comments Improved ATFCM, including STAM Partially Safety nets (STCA) April 216 Optimised sector configurations significant Increase of capacity in sectors GXX and IRX July Increase of capacity in one of Palma APP configurations June 216 Maximum configuration: 7/8 (3/4 APP + 4 ENR) 8 sectors Summer performance assessment +3.7% 7 8 The ACC capacity baseline was measured with ACCESS at 94. During the measured period, the peak 1 hour demand was 97, the peak 3 hour demand was 84. ACC Baseline (% difference v 214) +2.4% (+2%) Referenc e ER Delays ACC ER Delay LECPIXX 1 % LECPGIX 1 % LECP12O 1 % LECPIAX 1 % LECPAPO 3 2.1% LECPGMX % Palma ACC en-route delays in

60 Edition Validity Date: 18/5/216 Edition: Status: Final SPAIN - SEVILLA ACC LECSACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).. ly enroute delay (all causes)... Realisation of Plan Sevilla LECS ACC Average enroute delay slightly increased from.2 minutes per flight during Summer 214 to.5 minutes per flight during Summer. 38% of the delays were for the reason ATC, 24% for Special event, 21% for Airspace management, and 1% for industrial action. Plan: % Achieved Comments Improved ATFCM including STAM Partially Full implementation of SACTA CF2 version (Dec 214) Safety nets (STCA) April 216 Optimised sector configurations Evolution ( v 214) H: 5.7% Summer B: 4.2% L: 1.1% +6% TLP European military activity (every 2 months) Maximum configuration: 7 (5 ACC+2 APP) 7 sectors Summer performance assessment +%.4 1 The ACC capacity baseline was measured with ACCESS at 89. During the measured period, the peak 1 hour demand was 77 and the peak 3 hour demand was 69. ACC Baseline (% difference v 214) +1.7% (%) Referenc e ER Delays ACC ER Delay LECSRTA 1 2.3% LECSNCS 1 2.5% LECSAPNN 1 3.4% LECSAPT 1 3.6% LECSSEV 1 3.8% LECSSUR 2 4.3% Seville ACC en-route delays in

61 Edition Validity Date: 18/5/216 Edition: Status: Final 6 54 SWEDEN - MALMO ACC ESMMACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes) Realisation of Plan Malmo ESMM ACC The average en-route delay per flight remained at zero minutes per flight during Summer. Plan +2 % Achieved Comments Possible alignment with FRA within NEFAB Optimizing the use of FRA when military areas are active Improved ATFCM, working with occupancy counts Continuous improvements on the ATS route network DFL change to 35 Postponed UFN. current need for the measure. CPDLC Maintain appropriate level of staffing to open up to 11 sectors Training for 3 to 2 sector groups controller ratings Sector configurations adapted to traffic demand Minor updates of COOPANS Maximum configuration: 4/5 (E) + 3/4 (W) +2 (L) 4E + 3W +2L, sufficient to meet traffic demand. Summer performance assessment The ACC capacity baseline was estimated to be at the same level as in Summer 214. During the measured period, the average peak 1 hour demand was 117 and the average peak 3 hour demand was 18. Reference Evolution ( v 214) H: % Summer B: -% L: -1.4% significant ER Delays ACC ER Delay ESMM6Y % ESMM89 % ESMMY 2.6% ESMMALL 4.5% ESMM % ESMM2W % Enroute Delay (min. per flight) +1.2%..7 Malmo ACC en-route delays in ACC Baseline (% difference v 214) +%. 124 (%)

62 Edition Validity Date: 18/5/216 Edition: Status: Final SWEDEN - STOCKHOLM ACC 16 1 ESOSACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)... ly enroute delay (all causes).... Realisation of Plan Stockholm ESOS ACC The average en-route delay per flight decreased from.9 minutes per flight during Summer 214 to.2 minutes per flight during Summer. Plan 2% Achieved Comments Possible alignment with FRA within NEFAB Optimizing the use of FRA when military areas are active Airport CDM at ESSA To be implemented in January 216. Improved ATFCM, working with occupancy counts Continuous improvements on the ATS route network CPDLC Maintain appropriate level of staffing to open up to 11 sectors Training for 3 to 2 sector groups controller ratings Sector configurations adapted to traffic demand Minor updates of COOPANS Maximum configuration: 3 (M) + 4 (N) + 4 (S) 2M + 2N + 4S, sufficient to meet traffic demand. Summer performance assessment The ACC capacity baseline was estimated to be at the same level as in Summer 214. During the measured period, the average peak 1 hour demand was 83 and the average peak 3 hour demand was 77. Reference Evolution ( v 214) H: % Summer B: -% L: -2.1% significant ER Delays ACC ER Delay ESOS3 % ESOS19 % ESOSF 1.1% ESOSF4 1.5% ESOS4 1.7% ESOS % Enroute Delay (min. per flight) -%.3.7 Stockholm ACC en-route delays in ACC Baseline (% difference v 214) +% (%)

63 Edition Validity Date: 18/5/216 Edition: Status: Final SWITZERLAND - GENEVA ACC 25 LSAGACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes). ly enroute delay (all causes). Realisation of Plan Geneva LSAG ACC The average en-route delay per flight decreased from 5 minutes per flight during Summer 214 to.9 minutes per flight during Summer. 55% of delays were for the reason Weather, 33% for ATC, 7% for ATC Staffing, 3% for Airspace Management and 2% for ATC Equipment Plan 1% Achieved Comments Improved ATFCM Procedures and STAM STAM measures implemented (MCP) Crystal and complexity prediction tool B2B connection, configuration plan and capacity modifications sent automatically Flight Plan adherence Improvement in intruders detection and reporting FABEC AD South-East Phase 1 : EUC25 Successfully implemented Cross qualification of ATCOs (Upper/Lower) Nearly all ATCOs now have both licences Recruitment as necessary to maintain the staffing levels Still overstaffing Stripless step 3 (New Lower Upgrade Upper) Successfully implemented and Step 4 as well Maximum configuration: 8/9 sectors (5/6 + 3) sectors Summer performance assessment The capacity baseline was measured using ACCESS at 154, which represents the capacity delivered during the Summer season in the ACC. During the measured period, the peak 1 hour demand was 147, and the peak 3 hour demand was 138. Evolution ( v 214) H: 1.3% Summer B: % L: -% Reference significant ER Delays ACC ER Delay LSAGE % LSAGNE 1 % LSAGS 1 % SALEV 1 % LSAGL % LSAGL6 2 2.% %.6 8 Geveva ACC en-route delays in ACC Baseline (% difference v 214) +% (+2%)

64 Edition Validity Date: 18/5/216 Edition: Status: Final SWITZERLAND - ZURICH ACC 3 25 LSAZACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). Realisation of Plan Evolution ( v 214) Zurich LSAZ ACC H: 1.3% Summer B: % L: -% The average en-route delay per flight remained at 1 minutes per flight during Summer. 67% of delays were for the reason ATC, 27% for Weather, 4% for ATC Staffing and 1% for ATC Equipment. Plan 2% Achieved Comments Improved ATFCM Procedures and STAM STAM measures implemented (MCP) Crystal and complexity prediction tool B2B connection, configuration plan and capacity modifications sent automatically Flight Plan adherence Improvement in intruders detection and reporting Recruitment as necessary to maintain the staffing levels Still overstaffing Stripless step 3 Successfully implemented Maximum configuration: 9 sectors +8% Summer performance assessment +% 8 ACC Baseline (% difference v 214) +% (+2%) 9 sectors The capacity baseline was measured using ACCESS at 177. During the period June/July, the peak 1 hour demand was 17, and the peak 3 hour demand was 159. Reference ER Delays ACC ER Delay LSAZSW 1 % LSAZWSL 3 1.3% LSAZM % LSAZM % LSAZFTMA 9 4.7% LSAZM % Zurich ACC en-route delays in

65 Edition Validity Date: 18/5/216 Edition: Status: Final TURKEY - ANKARA /ISTANBUL ACC 35 LTAAACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes) ly enroute delay (all causes). 35 LTBBACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes).... ly enroute delay (all causes)..... Realisation of Plan

66 Edition Validity Date: 18/5/216 Edition: Status: Final 65 Evolution ( v 214) Ankara LTAA ACC Summer Average enroute delay per flight in Ankara ACC remained at minutes per flight during Summer. 6% of the delays were for the reason ATC and 4% for the reason Other. Plan 237 Achieved Comments Improved civil/military coordination AMAN/DMAN at LTBA Ongoing Implementation in 216 CDM will be operational before the end of year at LTBA Ongoing Implementation in 216 Improved ATFCM, including STAM ATS route structure development Reconfiguration of ACC/APP with DFL 235 and 335 Improved route structure and sectorisation in the N & NE sectors to adapt to the new traffic flows New LoA with Teheran H: 5.7% B: 4.3% L: 2.5% significant New interface alternatives with Sofia Additional controllers (45 per year for en-route) New Ankara ACC (Max 25 physical sectors + 5 optional) - Implementation of SMART system Ongoing Maximum configuration: 2 sectors 5 additional sectors available Summer performance assessment Ankara: +11.8% Istanbul: +2.7% Ankara: +1% Istanbul: +7.5% Ankara: 2 Istanbul:. Ankara: 2 Istanbul:. ACC Reference Ankara: The capacity baseline of 167 was calculated with ACCESS, representing 4% more capacity than the previous year 214. During the same period, the average peak 1 hour demand was 16 and the peak 3 hour demand was 147. A maximum configuration of 11 sectors was opened. Istanbul: The capacity baseline of 166 was calculated with ACCESS, representing 8% more capacity than the previous year 214. During the same period, the average peak 1 hour demand was 162 and the peak 3 hour demand was 15. A maximum configuration of 3 sectors was opened. Izmir: The ACC capacity baseline of 75 was calculated with ACCESS, representing 1% more than the previous year 214. During the same period, the average peak 1 hour demand was 68 and the peak 3 hour demand was 6. A maximum configuration of 6 sectors was opened, including APP sectors. 6 ACC Baseline (% difference v 214) 3 Ankara: 167 (+4%) Reference ER Delays ACC ER Delay LTAASOW.% LTAANOU 5 1.4% ODERO % 3 1 Ankara ACC en-route delays in

67 Edition Validity Date: 18/5/216 Edition: Status: Final UKRAINE - DNIPROPRETROVSK ACC 8 7 UKDVACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Dnipropetrovsk UKDV ACC Evolution ( v 214) ACC Baseline (% difference v 214) H: -44.2% Summer B: -45.3% L: -46.9% significant -81.6% % (%) Average enroute ATFM delay remained at zero minutes per flight during Summer. Planned Increase: sufficient to meet demand Achieved Comments Free Route Airspace Implementation (FRAU Ukraine, Scenarios 1A Night operations) Implementation of Advanced Airspace Management (LSSIP AOM19) Implementation of enhanced tactical flow management services (LSSIP FCM1) and collaborative flight planning (LSSIP FCM3) Sector configurations management, ATFCM measures development Maximum configuration: 6 sectors Summer performance assessment It is expected to be implemented by the end of 216 FCM3 is ready to be implemented, FCM1 is partially implemented The ACC capacity baseline was estimated at 54, the same level as last year. During the measured period, the average peak 1 hour demand was 6 and the average peak 3 hour demand was 4.

68 Edition Validity Date: 18/5/216 Edition: Status: Final 67 6 UKRAINE - KYIV ACC 1 UKBVACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) Kyiv UKBV ACC ACC Baseline (% difference v 214) H: -23.5% Summer B: -25.1% L: -27.1% +35% -24.6% % (%) Average enroute ATFM delay remained at zero minutes per flight during Summer. Planned Increase: sufficient to meet demand Achieved Comments Free Route Airspace Implementation (FRAU Ukraine, Scenarios 1A/1B Night operations) Implementation of Advanced Airspace Management (LSSIP AOM19) Implementation of enhanced tactical flow management services (LSSIP FCM1) and collaborative flight planning (LSSIP FCM3) Sector configurations management, ATFCM measures development Maximum configuration: 7 sectors Summer performance assessment Partially It is expected to be implemented by the end of 216 FCM1 is implemented FCM3 is ready to be implemented The ACC capacity baseline was estimated at 73, the same level as last year. During the measured period, the average peak 1 hour demand was 41 and the average peak 3 hour demand was 35.

69 Edition Validity Date: 18/5/216 Edition: Status: Final UKRAINE - L VIV ACC 9 8 UKLVACC - and en-route ATFM delays Peak Day Summer ly Summer enroute delay (all causes)..... ly enroute delay (all causes) Realisation of Plan Evolution ( v 214) L viv UKLV ACC ACC Baseline (% difference v 214) H: -24.2% Summer B: -25.2% L: -26.5% +35% -34.% % (%) Average enroute ATFM delay remained at zero minutes per flight during Summer. Planned Increase: sufficient to meet demand Achieved Comments Free Route Airspace Implementation (FRAU Ukraine, Scenarios 1A/1B Night operations) Implementation of Advanced Airspace Management (LSSIP AOM19) Implementation of enhanced tactical flow management services (LSSIP FCM1) and collaborative flight planning (LSSIP FCM3) Installation of new ATM system Sector configurations management, ATFCM measures development Maximum configuration: 4 sectors Summer performance assessment It is expected to be implemented by the end of 216 FCM1/FCM3 is expected to be implemented during 216 The new ATM system is expected to be operational in 216 The ACC capacity baseline was estimated at 72, the same level as last year. The peak 1 hour demand was 27 flights, and the peak 3 hour demand was 23 flights.

ANNUAL NETWORK OPERATIONS REPORT 2016 ANNEX II - ACC

ANNUAL NETWORK OPERATIONS REPORT 2016 ANNEX II - ACC ANNUAL NETWORK OPERATIONS REPORT 216 ANNEX II - ACC NETWORK OPERATIONS REPORT 216 ANNEX II: ACC CAPACITY EVOLUTION INTRODUCTION... 3 1. ALBANIA - TIRANA ACC... 5 2. ARMENIA - YEREVAN ACC... 6 3. AUSTRIA

More information

NETWORK OPERATIONS REPORT 2017 ANNEX II - ACC

NETWORK OPERATIONS REPORT 2017 ANNEX II - ACC NETWORK OPERATIONS REPORT 217 ANNEX II - ACC NETWORK OPERATIONS REPORT 217 ANNEX I: ACC ACC VIEW ON PERFORMANCE... 4 ACC CAPACITY EVOLUTION... 6 1. ALBANIA - TIRANA ACC... 7 2. ARMENIA - YEREVAN ACC...

More information

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL EUROCONTROL Visit of the Transport Attachés 10 April 2015 Frank Brenner Director General EUROCONTROL One day s traffic EUROCONTROL - Visit of the Transport Attachés - 10 April 2015 2 ATM Today Air Transport

More information

Network Management, building on our experience of flow management and network planning.

Network Management, building on our experience of flow management and network planning. Network Management, building on our experience of flow management and network planning. Giovanni Lenti Head of Network Operation Services The European Organisation for the Safety of Air Navigation Air

More information

Conditions of Application of the Route Charges System and Conditions of Payment

Conditions of Application of the Route Charges System and Conditions of Payment European Organisation for the safety of air navigation Central route charges office Conditions of Application of the Route Charges System and Conditions of Payment December 2018 (EN) EUROPEAN ORGANISATION

More information

CCBE LAWYERS STATISTICS 2016

CCBE LAWYERS STATISTICS 2016 Austria 31/12/2015 6.057 1.242 Belgium (OBFG) How many s are 81-2 Bulgaria - 2 Croatia - 5 Czech Republic - 40 Germany - 1 Greece - 3 Hungary - 6 Italy - 1 Liechtenstein - 1 Lithuania - 2 The Netherlands

More information

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 4/8/03 English, French, Russian and Spanish only * ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 3: 3.1 : Air traffic management (ATM) performance targets for

More information

Introduction. European Airspace Concept Workshops for PBN Implementation

Introduction. European Airspace Concept Workshops for PBN Implementation Introduction European Airspace Concept Workshops for PBN Implementation OBJECTIVES The objective of this workshop is to provide an overview of the development of a PBN Airspace Concept, To introduce the

More information

Legal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL

Legal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL Legal and Institutional Aspects of ATM in Europe Roderick D. van Dam Head of Legal Service EUROCONTROL EUROCONTROL: European Organisation for the Safety of Air Navigation Coordination and integration -

More information

European Performance Scheme

European Performance Scheme European Performance Scheme Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 12 February 2015 Rolf TUCHHARDT European Commission, DG MOVE The SES policy

More information

Free Route Airspace Workshop Conclusions and Future Projects Outlook

Free Route Airspace Workshop Conclusions and Future Projects Outlook Free Route Airspace Workshop Conclusions and Future Projects Outlook FRA Workshop EUROCONTROL HQ, Brussels 24-25 May 2018 Razvan Bucuroiu Head of Network Strategy and Development & Operations Planning

More information

DMEAN. Dynamic Management of the European Airspace Network. European Medium-Term ATM Network Capacity Plan Assessment

DMEAN. Dynamic Management of the European Airspace Network. European Medium-Term ATM Network Capacity Plan Assessment DMEAN Dynamic Management of the European Airspace Network European Medium-Term ATM Network Capacity Plan Assessment 2009-2012 Edition May 2008 INTENTIONALLY BLANK CONTENTS 1. INTRODUCTION... 1 2. REVIEW

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization ATConf/6-WP/52 15/2/13 WORKING PAPER WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key

More information

ATFM delay report December Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report December Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report December 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe December 2018 December 2017 Trend 18/17 Total flights 799.102 759.600

More information

ATFM delay report October Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report October Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report October 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe October 2018 October 2017 Trend 18/17 Total flights 985.198 946.694

More information

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016 InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management World ATM Congress Madrid, 8 March 2016 FABEC XMAN Project Dr Frank Zetsche, DFS Agenda Overview Traffic Flows XMAN Roadmap

More information

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report November 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe November 2018 November 2017 Trend 18/17 Total flights 819.421 786.090

More information

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report February 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe February 2018 February 2017 Trend 18/17 Total flights 718.307 693.565

More information

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SECTORIZATION AND ITS INFLUENCE ON FAB CE Valentina Barta, student Department of Aeronautics, Faculty of Transport and Traffic Sciences, University of Zagreb,

More information

ATFM delay report January Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report January Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report January 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe January 2018 January 2017 Trend 18/17 Total flights 766.330 731.128

More information

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report November 2017 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe November 2017 November 2016 Trend 17/16 Total flights 786.090 754.311

More information

ATFM delay report July Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report July Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report July 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe July 2018 July 2017 Trend 18/17 Total flights 1.083.678 1.045.361 3,7%

More information

ATFM delay report August Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report August Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report August 2018 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe August 2018 August 2017 Trend 18/17 Total flights 1.076.340 1.039.773

More information

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics) LIZ Situation and Information Centre ATFM delay report February 2019 Air Traffic Flow Management (ATFM) delay ATFM measures in Europe February 2019 February 2018 Trend 19/18 Total flights 739.524 718.307

More information

ATFM delay report April 2018

ATFM delay report April 2018 LIZ Situation and Information Centre ATFM delay report April 2018 Due to technical issues on April 3, the flight data of this day are not available. Eurocontrol is investigating the situation. A new report

More information

EUROCONTROL Low-Cost Carrier Market Update

EUROCONTROL Low-Cost Carrier Market Update EUROCONTROL Low-Cost Carrier Market Update June 2007 EUROCONTROL/STATFOR/Doc257 v1.0 12/09/07 EUROCONTROL Low-Cost Carrier Market Update June 2007 Summary: The market share of low-cost carriers in Europe

More information

PERFORMANCE REPORT CAPACITY

PERFORMANCE REPORT CAPACITY PERFORMANCE REPORT 2015-2019 CAPACITY January 2019 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled

More information

PERFORMANCE REPORT CAPACITY

PERFORMANCE REPORT CAPACITY PERFORMANCE REPORT 2015-2019 CAPACITY December 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled

More information

SES Performance Scheme

SES Performance Scheme SES Performance Scheme 12 th Florence Rail Forum 2 May 2016 Rolf TUCHHARDT European Commission, DG MOVE The Single European Sky policy initiative to improve the overall performance of air traffic management

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization WORKING PAPER 23/8/18 (Information Paper) English only THIRTEENTH AIR NAVIGATION CONFERENCE Montréal, Canada, 9 to 19 October 2018 COMMITTEE A Agenda Item 3: Enhancing

More information

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics)

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics) LIZ Situation and Information Centre Annual ATFM delay report 2014 Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe 2014 2013 Trend 13/14 Total Flights 9.740.029 9.568.399 1,8% Regulated

More information

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics)

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics) LIZ Situation and Information Centre Annual ATFM delay report 2015 Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe 2015 2014 Trend 15/14 Total Flights 9.889.452 9.740.029 1,5% Regulated

More information

PERFORMANCE REPORT CAPACITY

PERFORMANCE REPORT CAPACITY PERFORMANCE REPORT 2015-2019 CAPACITY June 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled

More information

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics)

Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe (Data Source: CFMU statistics) LIZ Situation and Information Centre Annual ATFM delay report 2017 Air Traffic Flow Management Delay (ATFM) ATFM measures in Europe 2017 2016 Trend 17/16 Total Flights 10.605.946 10.190.900 4,1% Regulated

More information

Monthly Network Operations Report

Monthly Network Operations Report Monthly Network Operations Report Analysis - February 2014 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. EN-ROUTE ATFM DELAYS... 6 4. AIRPORT/TMA ATFM DELAYS... 10 5. DAILY

More information

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017 BUSINESS AVIATION TRAFFIC TRACKER EUROPE April 2017 DEPARTURES, ARRIVALS, INTERNALS AND OVERFLIGHTS (DAIO) REPORT TOTAL FLIGHTS Business Aviation (Single European Sky Area) Month Previous Arrival Departure

More information

European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016

European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016 European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2016 March 2017 TABLE OF CONTENTS EUROCONTROL CHARGING

More information

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018 BUSINESS AVIATION TRAFFIC TRACKER EUROPE September 2018 EXECUTIVE SUMMARY September 2018 Back to Business With 66.133 flights, September 2018 marks a slight slow down (-0,7%) compared with September 2017

More information

Network Manager Adding value to the Network 29 September 2011

Network Manager Adding value to the Network 29 September 2011 Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

INVEST WITH US! Discover vibrant cities with MEININGER Hotels. Europe

INVEST WITH US! Discover vibrant cities with MEININGER Hotels. Europe INVEST WITH US! Discover vibrant cities with MEININGER Hotels Europe Since MEININGER opened its first property in 1999 in Berlin on Meininger Street, it has become a key player within the hybrid hotel

More information

NETWORK OPERATIONS REPORT September 2011

NETWORK OPERATIONS REPORT September 2011 September 20. TRAFFIC TOTAL FLIGHTS 32000 Last 3 months average daily traffic 30000 28000 Traffic increased by 2.7% compared to September 200. 26000 24000 22000 Compared to August 20, the traffic was 2.%

More information

Directorate Network Management Monthly Network Operations Report Analysis - March 2012

Directorate Network Management Monthly Network Operations Report Analysis - March 2012 Directorate Network Management Monthly Network Operations Report Analysis - March 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 1 2. ATFM DELAY AND ATTRIBUTIONS... 4 3. EN-ROUTE ATFM DELAYS... 5 3.1. EN-ROUTE

More information

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018 BUSINESS AVIATION TRAFFIC TRACKER EUROPE June 2018 EXECUTIVE SUMMARY June 2018 traffic figures stable With in average 280 additional daily flights compared with May 2018, June 2018 marks the traditional

More information

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018 BUSINESS AVIATION TRAFFIC TRACKER EUROPE January 2018 EXECUTIVE SUMMARY January starts a 2018 with the continuation of traffic growth AMAC Insurance Subcommittee Meeting Milano, 1 st of February January

More information

European Network Operations Plan

European Network Operations Plan Network Manager nominated by the European Commission EUROCONTROL European Network Operations Plan 2013-2015 Transition Plan for Major Projects in Europe Winter 2013/2014 Edition November 2013 DOCUMENT

More information

NETWORK OPERATIONS REPORT OCTOBER 2011

NETWORK OPERATIONS REPORT OCTOBER 2011 OBER. TRAFFIC TOTAL FLIGHTS Last months average daily traffic 8 6 4 8 6 79 5 97 44 5684 694 8786 4 4 9974 589 84 Traffic increased by.% compared to October. Compared to September, the traffic was 8. lower.

More information

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018 BUSINESS AVIATION TRAFFIC TRACKER EUROPE May 2018 EXECUTIVE SUMMARY May 2018 traffic figures stable With in average 320 additional daily flights compared with April 2018, May 2018 marks the traditional

More information

OFT 2008 Prel. Comp. UEFA Results and Standings

OFT 2008 Prel. Comp. UEFA Results and Standings OFT 2008 Prel. Comp. UEFA Results and Standings (as after matches on 23.06.2007) OFT > 2008 > Preliminary Round UEFA - Preliminary Round 12.04.2006 Malta - Georgia 1:2 (0:2) TA'QALI 18:00 12.04.2006 Liechtenstein

More information

Free Route Airspace Maastricht (FRAM)

Free Route Airspace Maastricht (FRAM) Free Route Airspace Maastricht (FRAM) Maastricht Upper Area Control Centre Dirk De Herdt Airspace and Network Planning 24 th 25 th May 2018 MUAC implements FRA on behalf of four countries MUAC FRA is laterally

More information

An overview of Tallinn tourism trends

An overview of Tallinn tourism trends An overview of Tallinn tourism trends August 2015 The data is collected from Statistics Estonia, Tallinn Airport and Port of Tallinn. In August 2015, 179,338 stayed overnight in Tallinn s accommodation

More information

User Forum FPL adherence campaign Lessons learned & discussion. Chris BOUMAN, Head of Network Development Unit EUROCONTROL Network Management

User Forum FPL adherence campaign Lessons learned & discussion. Chris BOUMAN, Head of Network Development Unit EUROCONTROL Network Management User Forum 2011 FPL adherence campaign Lessons learned & discussion Chris BOUMAN, Head of Network Development Unit EUROCONTROL Network Management The European Organisation for the Safety of Air Navigation

More information

Directorate Network Management Monthly Network Operations Report Analysis - May 2012

Directorate Network Management Monthly Network Operations Report Analysis - May 2012 Directorate Network Management Monthly Network Operations Report Analysis - May 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC 1 2. ATFM DELAY AND ATTRIBUTIONS 4 3. EN-ROUTE ATFM DELAYS 5 4. AIRPORT/TMA ATFM DELAYS

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/42 9/10/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 2: Aerodrome operations improving airport

More information

TRIPS OF BULGARIAN RESIDENTS IN ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2011

TRIPS OF BULGARIAN RESIDENTS IN ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2011 TRIPS OF BULGARIAN RESIDENTS IN ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2011 In February 2011, the number of the trips of Bulgarian residents in abroad was 246.2 thousand or

More information

March 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28

March 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28 03-2006 06-2006 09-2006 12-2006 03-2007 06-2007 09-2007 12-2007 03-2008 06-2008 09-2008 12-2008 03-2009 06-2009 09-2009 12-2009 03-2010 06-2010 09-2010 12-2010 03-2011 06-2011 09-2011 12-2011 03-2012 06-2012

More information

ANNUAL NETWORK OPERATIONS REPORT Main Report Final Edition

ANNUAL NETWORK OPERATIONS REPORT Main Report Final Edition Edition Number: 1.0 Edition Validity Date: 18/05/2016 DOCUMENT CHARACTERISTICS Document Title ANNUAL NETWORK OPERATIONS REPORT Document Subtitle (optional) Main Report Final Edition Abstract Edition Number

More information

LOCATION LIST 2017 Note: Updates compared to 2016 are visible with Track Changes

LOCATION LIST 2017 Note: Updates compared to 2016 are visible with Track Changes EURAIL AID OFFICES LOCATION LIST 2017 Note: Updates compared to 2016 are visible with Track Changes 1 Austria Innsbruck Hauptbahnhof: ÖBB Lounge Mon-Fri: 5:45am - 9:40pm Sat-Sun: 6:15am - 9:40pm Salzburg

More information

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014 NEFAB Programme Office organised customer consultation days on

More information

Report on the Operation of the Route Charges System in Central Route Charges Office (CRCO)

Report on the Operation of the Route Charges System in Central Route Charges Office (CRCO) European Organisation for the Safety of Air Navigation Central Route Charges Office (CRCO) Report on the Operation of the Route Charges System in 2010 March 2011 - 3 - TABLE OF CONTENTS TABLE OF CONTENTS...

More information

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018 TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2018 In November 2018, the number of the trips of Bulgarian residents abroad was 426.3 thousand (Annex,

More information

Please find attached a copy of JAR-66 Amendment 2 dated February 2007.

Please find attached a copy of JAR-66 Amendment 2 dated February 2007. oint Aviation Authorities Postal Address: P.O. Box 3000 2130 KA Hoofddorp Visiting Address: Saturnusstraat 50 The Netherlands Tel.: 31 (0)23-5679700 Fax: 31 (0)23-5621714 Our reference number: 01106evd

More information

MAASTRICHT UPPER AREA CONTROL CENTRE

MAASTRICHT UPPER AREA CONTROL CENTRE FEB 2018 MAASTRICHT UPPER AREA CONTROL CENTRE PERFORMANCE THROUGH INNOVATION FOR SEVERAL YEARS RUNNING, MUAC S PERFORMANCE HAS BEEN ACKNOWLEDGED AS BEST IN CLASS IN INDEPENDENT BENCHMARKS For 46 years,

More information

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018 TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN FEBRUARY 2018 In February 2018, the number of the trips of Bulgarian residents abroad was 379.5 thousand (Annex,

More information

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017 TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN OCTOBER 2017 In October 2017, the number of the trips of Bulgarian residents abroad was 439.0 thousand (Annex, Table

More information

Yoram Shiftan Transportation Research Institute, Technion - Israel Institute of Technology. Brno May 2016

Yoram Shiftan Transportation Research Institute, Technion - Israel Institute of Technology. Brno May 2016 Yoram Shiftan Transportation Research Institute, Technion - Israel Institute of Technology Brno May 2016 Improving accessibility of non auto modes public transportation Auto restrain policies (parking

More information

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017 TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN NOVEMBER 2017 In November 2017, the number of the trips of Bulgarian residents abroad was 417.6 thousand (Annex,

More information

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018

TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018 TRIPS OF BULGARIAN RESIDENTS ABROAD AND ARRIVALS OF VISITORS FROM ABROAD TO BULGARIA IN JANUARY 2018 In January 2018, the number of the trips of Bulgarian residents abroad was 387.6 thousand (Annex, Table

More information

JAR-147: APPROVED MAINTENANCE TRAINING/EXAMINATIONS. Please find attached a copy of JAR-147 Amendment 3 dated February 2007.

JAR-147: APPROVED MAINTENANCE TRAINING/EXAMINATIONS. Please find attached a copy of JAR-147 Amendment 3 dated February 2007. oint Aviation Authorities Postal Address: P.O. Box 3000 2130 KA Hoofddorp Visiting Address: Saturnusstraat 50 The Netherlands Tel.: 31 (0)23-5679700 Fax: 31 (0)23-5621714 Our reference number: 01406evd

More information

Monthly Network Operations Report

Monthly Network Operations Report Monthly Network Operations Report Analysis March 213 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. ATFM DELAYS... 6 4. AIRPORT/TMA ATFM DELAYS... 1 5. DAILY EVOLUTION...

More information

ATFM Update - EUROCONTROL Day 1-16h45

ATFM Update - EUROCONTROL Day 1-16h45 ATFM Update - EUROCONTROL Day 1-16h45 Brian Flynn Head Performance Forecasts Relations Network Manager Directorate EUROCONTROL A Historical perspective From CFMU to Network Manager Initial database of

More information

Passenger Flows Zurich Airport. July to November 2011

Passenger Flows Zurich Airport. July to November 2011 Passenger Flows Zurich Airport July to November 2011 Table of Contents Preface 3 Spatial distribution of passenger types 4 Graphics 5 Detailed information on gates 9 1.1. Bus Gates A01 - A10 9 1.2. Bus

More information

ANNUAL NETWORK OPERATIONS REPORT Main Report

ANNUAL NETWORK OPERATIONS REPORT Main Report ANNUAL NETWORK OPERATIONS REPORT Edition Number: 1.0 08/05/2017 DOCUMENT CHARACTERISTICS Document Title Document Subtitle Edition Number Edition Validity Date ANNUAL NETWORK 1.0 08/05/2017 OPERATIONS REPORT

More information

Network Preparations Re-opening of Airspace over Kosovo

Network Preparations Re-opening of Airspace over Kosovo FMP Exchange 12 November 2013 Network Preparations Re-opening of Airspace over Kosovo Presented by the Network Manager Directorate European Organisation for the Safgety of Air Navigation Confirmed agreements

More information

Directorate Network Management Monthly Network Operations Report Analysis - June 2012

Directorate Network Management Monthly Network Operations Report Analysis - June 2012 Directorate Network Management Monthly Network Operations Report Analysis - June 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC 1 2. ATFM DELAY AND ATTRIBUTIONS 4 3. EN-ROUTE ATFM DELAYS 5 4. AIRPORT/TMA ATFM

More information

JAR-21: CERTIFICATION PROCEDURES FOR AIRCRAFT AND RELATED PRODUCTS AND PARTS. Please find attached a copy of JAR-21 Amendment 7 dated February 2007.

JAR-21: CERTIFICATION PROCEDURES FOR AIRCRAFT AND RELATED PRODUCTS AND PARTS. Please find attached a copy of JAR-21 Amendment 7 dated February 2007. oint Aviation Authorities Postal Address: P.O. Box 3000 2130 KA Hoofddorp Visiting Address: Saturnusstraat 50 The Netherlands Tel.: 31 (0)23-5679700 Fax: 31 (0)23-5621714 Our reference number: 00106evd

More information

EUROCONTROL Short- and Medium-Term Forecast of Service Units: February 2011 Update

EUROCONTROL Short- and Medium-Term Forecast of Service Units: February 2011 Update Summary: This document presents the forecast of total service units in Europe 1 for 2011-2015 prepared by EUROCONTROL\STATFOR (Statistics and Service of EUROCONTROL). This forecast aims principally to

More information

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS Report commissioned by the Performance Review Commission December 2016 Background This report has been produced by the Performance

More information

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016 ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow

More information

Directorate Network Management Monthly Network Operations Report Analysis November 2012

Directorate Network Management Monthly Network Operations Report Analysis November 2012 Directorate Network Management Monthly Network Operations Report Analysis November 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 1 2. ATFM DELAY AND ATTRIBUTIONS... 4 3. EN-ROUTE ATFM DELAYS... 5 4. AIRPORT/TMA

More information

Directorate Network Management Monthly Network Operations Report Analysis February 2013

Directorate Network Management Monthly Network Operations Report Analysis February 2013 Directorate Network Management Monthly Network Operations Report Analysis February 213 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. ATFM DELAYS... 6 4. AIRPORT/TMA ATFM

More information

Monthly Network Operations Report

Monthly Network Operations Report Monthly Network Operations Report Analysis - November 213 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. EN-ROUTE ATFM DELAYS... 6 4. AIRPORT/TMA ATFM DELAYS... 1 5. DAILY

More information

Table I. General questions

Table I. General questions UNECE 1 04/03/2003 Replies to the on visa s Table I. General questions The numbers in brackets correspond to question numbers of the Andorra Armenia Azerbaijan Belarus for drivers is In general, no visas

More information

Traffic Development Policy

Traffic Development Policy 2017-2018 Guidelines Strategy The aims at attracting incremental traffic to Genoa airport through: Point to point connections: development of new direct routes to domestic and international airports, including

More information

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application) Single European Sky Awards 2016 Submission by the COOPANS Alliance 27 th January 2016 Draft vfinal Short description of the project (Required for website application) The COOPANS Alliance is an international

More information

Capacity Planning and Assessment Network Operations Planning

Capacity Planning and Assessment Network Operations Planning Capacity Planning and Assessment Network Operations Planning Air Traffic Services System Capacity Seminar/Workshop Nairobi, Kenya, 8 10 June 2016 Raffaele Russo EUROCONTROL Operations Planning Introduction

More information

irport atchment rea atabase

irport atchment rea atabase irport atchment rea atabase Examples 539 Airports Four range sizes 50, 75, 100 and 150 km. Time series 00-015 30+ variables About ACAD The database contains catchment area information for 539 European

More information

FABEC Operations. From a project-driven approach to continuous operational improvements

FABEC Operations. From a project-driven approach to continuous operational improvements FABEC Operations From a project-driven approach to continuous operational improvements Andreas Pötzsch Chairman FABEC Operations and DFS Director En-route and Approach. Madrid, 07 March 2017 0 FABEC at

More information

Country (A - C) Local Number Toll-Free Premium Rates

Country (A - C) Local Number Toll-Free Premium Rates Choose a number from the provided list based on the country that you re calling from. Numbers with Premium Rates are only available to Enterprise Groups that are subscribed to the BlueJeans Premium Calling

More information

Europe What Could, Might and Will Happen to Your Operation Here

Europe What Could, Might and Will Happen to Your Operation Here Europe What Could, Might and Will Happen to Your Operation Here February 9, 2017 8:45 am 10:00 am PRESENTED BY: Terry Yoemans, IS-BAH Manager IBAC, Luton, England Henry LeDuc, Regional Operations Manager

More information

European General Aviation Conference Schonhagen Airport. Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe Berlin 15 th May 2006

European General Aviation Conference Schonhagen Airport. Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe Berlin 15 th May 2006 European General Aviation Conference Schonhagen Airport Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe Berlin 15 th May 2006 Content What is General Aviation & Aerial Work Operations? Who

More information

Please find attached a copy of JAR-25 Amendment 20 dated December 2007.

Please find attached a copy of JAR-25 Amendment 20 dated December 2007. oint Aviation Authorities Postal Address: P.O. Box 3000 2130 KA Hoofddorp Visiting Address: Saturnusstraat 40-44 The Netherlands Tel.: 31 (0)23-5679790 Fax: 31 (0)23 5657731 www.jaa.nl January 2008 JAR-25

More information

Monthly Network Operations Report

Monthly Network Operations Report Monthly Network Operations Report Analysis - November 215 TABLE OF CONTENTS Table of Contents 1 Notice 1 1. TOTAL TRAFFIC 2 2. ATFM DELAY AND ATTRIBUTIONS 5 3. EN-ROUTE ATFM DELAYS 6 EN-ROUTE ATFM DELAY

More information

Hosted by General Civil Aviation Authority (GCAA)

Hosted by General Civil Aviation Authority (GCAA) ICAO ATFM Seminar Hosted by General Civil Aviation Authority (GCAA) DFS experience related to ATFM from an individual state point of view Integration with the Network Manager Operation Center (NMOC, former

More information

Monthly Network Operations Report Analysis January 2019

Monthly Network Operations Report Analysis January 2019 Monthly Network Operations Report Analysis January 219 NM Monthly Network Operations Report - Analysis January 219 TLP: WHITE Page 1 TABLE OF CONTENTS TABLE OF CONTENTS 2 NOTICE 2 TOTAL TRAFFIC 3 ATFM

More information

JAR-145: APPROVED MAINTENANCE ORGANISATIONS. Please find attached a copy of Amendment 6 to JAR-145, effective 1 November 2004.

JAR-145: APPROVED MAINTENANCE ORGANISATIONS. Please find attached a copy of Amendment 6 to JAR-145, effective 1 November 2004. oint Aviation Authorities Postal Address: P.O. Box 3000 2130 KA Hoofddorp Visiting Address: Saturnusstraat 8-10 The Netherlands Tel.: 31 (0)23-5679700 Fax: 31 (0)23-5621714 Our reference number: 07/03-11

More information

Monthly Network Operations Report Analysis December 2015

Monthly Network Operations Report Analysis December 2015 Monthly Network Operations Report Analysis December 215 NM Monthly Network Operations Report - Analysis - December 215 Page 1 TABLE OF CONTENTS TABLE OF CONTENTS 2 NOTICE 2 1. TOTAL TRAFFIC 3 2. ATFM DELAY

More information

assists in the development of airport capacity to meet growing demand supports the development of improved ground access to airports

assists in the development of airport capacity to meet growing demand supports the development of improved ground access to airports ATAG The Air Transport Action Group (ATAG) is a coalition of organisations from throughout the air transport industry, formed to press for economically beneficial aviation capacity improvements in an environmentally

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

Directorate Network Management Monthly Network Operations Report Analysis - April 2012

Directorate Network Management Monthly Network Operations Report Analysis - April 2012 Directorate Network Management Monthly Network Operations Report Analysis - April 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC 1 2. ATFM DELAY AND ATTRIBUTIONS 4 3. EN-ROUTE ATFM DELAYS 5 4. AIRPORT/TMA ATFM

More information