LYNNWOOD LINK EXTENSION FI NAL ENV I RO NM ENTA L IM PA C T S TATE M E N T
|
|
- Ruth Burke
- 5 years ago
- Views:
Transcription
1 LYNNWOOD LINK EXTENION FI NAL ENV I RO NM ENTA L IM PA C T TATE M E N T Conceptual Plans U..Department of Transportation Federal Transit Administration AP R IL 2015
2
3 OUND TRANIT LYNNWOOD LINK EXTENION PART 1 CONCEPTUAL PLAN FOR THE PREFERRED ALTERNATIVE APRIL 2015 paula ITO CADD services, llc
4 OUND TRANIT LYNNWOOD LINK EXTENION TITLE PAGE HEET INDEX HEET LAYOUT PREFERRED ALTERNATIVE - EGMENT A - TRACK PLAN & PRILE PREFERRED ALTERNATIVE - EGMENT B2 (MODIFIED) TRACK PLAN & PRILE PREFERRED ALTERNATIVE - EGMENT C3 (MODIFIED) - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT A - NE 130TH TREET TATION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT A - NE 130TH TREET FUTURE TATION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT B (MODIFIED) - 220TH TREET W TATION - OPTION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE TYPICAL ECTION PREFERRED ALTERNATIVE - NE 130TH TREET TATION OPTION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 145TH TREET TATION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 185TH TREET TATION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 185TH TREET TATION - HORELINE TADIUM GARAGE OPTION 1 ITE PLAN ECTION PREFERRED ALTERNATIVE - MOUNTLAKE TERRACE TRANIT CENTER TATION ITE PLAN 38 ECTION 39 PREFERRED ALTERNATIVE - 220TH TREET W TATION OPTION ITE PLAN 40 ECTION 41 PREFERRED ALTERATIVE - LYNNWOOD TRANIT CENTER TATION ITE PLAN 42 ECTION 43 PREFERRED ALTERATIVE - LYNNWOOD TRANIT CENTER TATION OPTION ITE PLAN ECTION PREFERRED ALTERNATIVE TRUCTURE OVER LRT AT NE 130TH T F-RAMP 46 WDOT BRIDGE REPLACEMENT AT NE 130TH T - NO TATION 47 PREFERRED ALTERNATIVE OPTION EGMENT A WDOT BRIDGE REPLACEMENT AT NE 130TH T - WITH TATION 48 PREFERRED ALTERNATIVE WDOT BRIDGE WIDENING AT NE 185TH T WDOT BRIDGE IDEWALK MODIFICATION AT NE 185TH T NEW WDOT PEDETRIAN BRIDGE AT NE 185TH T TRUCTURE OVER LRT AT NE 185TH T WDOT PEDETRIAN BRIDGE REPLACEMENT AT NE 195TH T GUIDEWAY TRUCTURE OVER 1T AVE NE AT NE 107TH T GUIDEWAY TRUCTURE OVER I-5 NEAR 236TH T W GUIDEWAY - TYPICAL ECTION RETAINING WALL - ECTION AND DETAIL HEET 1 RETAINING WALL - ECTION AND DETAIL HEET 2 RETAINING WALL UNDERCROING AT 228TH T W HEET INDEX HEET
5 OUND TRANIT LYNNWOOD LINK EXTENION EGMENT A P PP04 PP 08 PP09 PP 10 PP11 PP12 PP13 PP PP 236TH T W PP07 EGMENT C 220TH T W PP03 PP06 NE 185TH T 2 P05 NE 145TH T PP0 NE 130TH T NE NORTHGATE WAY PP01 EGMENT B 52ND AVE W PP PP 17 PP 44TH AVE W PLAN & PRILE HEET INCLUDED IN DRAWING ET: PREFERRED ALTERNATIVE : PR-PP01 - PR-PP18 (HEET 3-20) PREFERRED ALTERNATIVE OPTION EGMENT A : MD2-PP03 (HEET 21) MD3-PP03 (HEET 22) PREFERRED ALTERNATIVE OPTION EGMENT B (MODIFIED) : MD10-PP13 (HEET 23) MD10-PP14 (HEET 24) HEET LAYOUT HEET 2
6 OUND TRANIT LYNNWOOD LINK EXTENION EXTENION EXTENION R=1950' RETAINING WALL 0 END NORTHGATE LINK 1500 BEGIN LYNNWOOD LINK B TRACK CENTERLINE TRUCTURE 1T/107TH CROING EE HEET 54 T = GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW C = TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL DETENTION POND C = T = REALIGN ROAD RECONTRUCT TRAIL T = C = MATCHLINE C = LVC ' END NORTHGATE LINK EXTENION. BEGIN LYNNWOOD EXTENION LINK PVI EL ' 2.00% PVC EL PVI EL T AVE NE PVT EL NE NORTHGATE WAY TOP RAIL AT NB TRACK NB I-5 RAMP 1T AVE NE ' 1.03% 115TH TRAIL PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
7 OUND TRANIT LYNNWOOD LINK EXTENION C = MATCHLINE C = R=2000' T = T = RECONTRUCT ROAD C = C = R=2000' REBUILD DRIVEWAY ACCE T = T = C = R=2600' 5500 DETENTION POND WATER QUALITY FACILITY RAIE POWER LINE RECONTRUCT RAMP 6000 C = T = RECONTRUCT ROAD (GRADE EPARATED) MATCHLINE T = C = C = B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC ' PVC EL LVC ' PVI EL PVT EL ' 3.22% PVC EL PVI EL.39 PVT EL ' -0.84% % TOP RAIL AT NB TRACK PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
8 242-43AC-127,129 PACIFIC NW BELL D.B. CABLE D.B. CABLE AC-127,129 PACIFIC NW BELL OUND TRANIT LYNNWOOD LINK EXTENION DETENTION POND BIORETENTION POND T = MATCHLINE C = C = RECONTRUCT RAMP R=3' B TRACK CENTERLINE TRUCTURE T = CONTRUCT TRUCTURE OVER LRT AT F-RAMP. EE HEET 46 RECONTRUCT ROAD(GRADE EPARATED) T = C = R=5000' C = GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW T = RECONTRUCT BRIDGE - EE HEET 47 EE NOTE * HIGH RAIL VEHICLE ACCE TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL NOTE: 1. FOR OPTION EGMENT A, NE 130TH TREET TATION, EE HEET FOR OPTION EGMENT A, NE 130TH TREET FUTURE TATION, EE HEET 22. IGNAL/COMM BUNGALOW INFILTRATION FACILITY MATCHLINE LVC ' LVC ' % PVC EL NEW I-5 F RAMP PVI EL PVT EL NB I-5 F RAMP ' 0.75% PVC EL NEW NE 130TH T BRIDGE PVI EL PVT EL TOP RAIL AT NB TRACK HIGH RAIL VEHICLE ACCE ' -2.84% PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
9 OUND TRANIT LYNNWOOD LINK EXTENION MATCHLINE DETENTION VAULT CLOE EXITING TRANIT RAMP R=1000' V=40 MPH MATCHLINE T = GUIDEWAY DIPERION T = DETENTION FACILITY C = C = RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC ' % PVC EL LVC ' PVI EL TOP RAIL AT NB TRACK PVT EL ' 3.23% PVC EL NB I-5 F RAMP PVI EL NE 145TH T PVT EL % PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
10 C = OUND TRANIT LYNNWOOD LINK EXTENION NE 145TH TREET TATION EE HEET 32 & 33 PC = T = MATCHLINE PT = EP = CLOE EXITING TRANIT RAMP T = R=3100' R=3100' TP C = T = T = C = C = NO. 10 DOUBLE CROOVER T = IGNAL/COMM. BUNGALOW RECONTRUCT 30" EWER RAIE POWER LINE T = MATCHLINE C = WATER QUALITY & DETENTION FACILITY DETENTION POND RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC ' NE 145TH TREET TATION NEW I-5 ON RAMP ' -1.25% NO. 10 DOUBLE CROOVER PVC EL TOP RAIL AT NB TRACK LVC ' PVI EL PVT EL ' 3.15% PVC EL NE 155TH T PVI EL PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
11 OUND TRANIT LYNNWOOD LINK EXTENION MATCHLINE T = C = INFILTRATION FACILITY R=2000' RECONTRUCT ROAD C = T = RECONTRUCT ROAD WATER QUALITY & INFILTRATION FACILITY RIDGECRET PARK T = C = RECONTRUCT WALL RAIE POWER LINE R=2500' MATCHLINE B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC ' LVC ' PVT EL ' 1.29% TOP RAIL AT NB TRACK PVC EL PVI EL PVT EL ' 0.73% PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
12 OUND TRANIT LYNNWOOD LINK EXTENION R=2' MATCHLINE R=2500' RAIE POWER LINE B TRACK CENTERLINE TRUCTURE C = T = GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW T = C = IGNAL/COMM BUNGALOW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL RAIE POWER LINE RECONTRUCT ROAD WATER QUALITY & INFILTRATION FACILITY C = EX. WDOT BEAUTIFICATION AREA T = T = C = MATCHLINE TOP RAIL AT NB TRACK 1T AVE NE ' 0.73% PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
13 T = T = C = C = T = T = C = MATCHLINE R=2700' EX. WDOT BEAUTIFICATION AREA EX. WDOT BEAUTIFICATION AREA RAIE POWER LINE R=1500' V=45 MPH RECONTRUCT ROAD NE 175TH T % ' PVC EL PVI EL LVC ' LVC ' 0.73% ' PVC EL PVI EL PVT EL TOP RAIL AT NB TRACK MATCHLI OUND TRANIT LYNNWOOD LINK EXTENION 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
14 C = OUND TRANIT LYNNWOOD LINK EXTENION HORELINE TADIUM GARAGE OPTION EE HEET 36 & 37 CONTRUCT 185TH TREET TATION PARKING GARAGE EE HEET 34 & 35 RECONTRUCT ROAD TA END EGMENT A BEGIN EGMENT B MATCHLI WATER QUALITY & INFILTRATION FACILITY INFILTRATION POND R=1500' V=45 MPH C = T = WIDEN BRIDGE FOR PEDETRIAN ACCE EE HEET 49 FOR OTHER OPTION EE HEET 50 & 51 CONTRUCT TRUCTURE OVER LRT EE HEET 52 NE 185TH TREET TATION CENTER PLATFORM INFILTRATION POND HIGH RAIL VEHICLE ACCE IGNAL/COMM BUNGALOW TP INFILTRATION TRENCHE RAIE POWER LINE INFILTRATION POND T = R=0' EX WDOT BEAUTIFICATION AREA MATCHLINE RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC ' PVI EL PVT EL NE 185TH T NE 185TH TREET TATION HIGH RAIL VEHICLE ACCE ' 0.50% PVC EL LVC.00' PVI EL TA END EGMENT A BEGIN EGMENT B PVT EL TOP RAIL AT NB TRACK ' -0.93% PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET
STRATHCONA COUNTY YELLOWHEAD NORTH ARTERIAL ROAD FUNCTIONAL DESIGN STUDY
STRATHCONA COUNTY Appendix G - Right-of-Way Plans ( TR) TC +65.7 POB +. YELLOW HEAD NORTH 376 MC PIPELINE CORRIDOR.56 HECTARES.7 HECTARES. HECTARES.3 HECTARES LOT B A. TOWNSHIP ROAD 53 JOB RANGE ROAD 3
More informationRiverbend on the St. Johns River DeBa ry, Fl o r i d a March 03,
Copyright 2008. All Rights Reserved. Looney Ricks Kiss Architects, Inc. Canoe/torage uilding Third Entrance Main or econdary Entrance Possible 10 oat Trailer Parking Location Possible oat Ramp Location
More information10 Free Airport Flyer: Santa Clara Transit Center to Metro Airport LRT Station via San Jose International Airport Effective Date 10/9/2017 Route Map
10 Free Airport Flyer: Santa Clara Transit Center to Metro Airport LRT Station via San Jose International Airport Effective Date 10/9/2017 Route Map Eastbound Weekday 5:13A 5:16A 5:22A 5:24A 5:29A 5:42A
More informationSOUTH BELLEVUE PARK AND RIDE
v OUTH BELLEVUE PARK AND RIDE 2700 Bellevue Way E, Bellevue, WA 98004 950 Average weekday transit boardings 519 Parking spaces Owned by WDOT, but will be sold to ound Transit erved by ound Transit and
More informationKENT/JAMES ST. PARK AND RIDE
KENT/JAME T. PARK AND RIDE 902 W James t, Kent, WA 98032 171 Average weekday transit boardings 719 Parking spaces Owned by King County Metro Agreements in place as overflow parking for howare Center and
More informationBonita to Bridgeport January 24, 2019
Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita
More information359 36' 16" 57.592 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD CEDGE Y CONC. SLAB. EL. 1.98M ONC. PAVER STANDARD 2.8Mx5.5M B B B A212"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE EL. FOR CONTINUEATION SEE 3b R
More informationSK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -
SITE STATISTICS SCALE: N.T.S. SK 1.0 2442 PROPOSED APARTMENT BUILDING ERB STREET EAST R6000 R3000 BEFORE ROAD WIDENING AFTER ROAD WIDENING LANDSCAPED AREA T 4216 5000 5.0m MIN. FRONT YARD SETBACK (BY-LAW
More informationWELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION
WELCOME AND AGENDA Welcome At tonight s open house you will have the opportunity to: See updated design plans for the southeast and downtown stations and track Help shape the look and feel of light rail
More informationEast Link Project Update. Maintenance of Traffic During Construction. April 21, 2015
East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationBENEFITS OF YOUR FUTURE RIDE
BENEFITS OF YOUR FUTURE RIDE How long will my trip from Lynnwood take? One train every 4MINUTES during peak weekday commutes EAST 50 MINUTES 60 MINUTES LYNNWOOD 20 MINUTES 28 MINUTES DOWNTOWN BELLEVUE
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationprecincts legend legend Precinct E precincts Figure 1.0: Precinct E in Complete Communities E S M K Kilometers
precinct Precinct D A B C F G H I R Q J P O M K L legend legend 0 2 4 6 8 10 Kilometers precincts Figure 1.0: Precinct in Complete Communities Amber Trails The Maples Pipeline Rd. Mcphillips t. Commercial
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit
More informationMetrolink Service Expansion Program
Rail and Facilities Program Update Metrolink Service Expansion Program Fullerton Turnback Facility 23.90 Laguna Niguel Turnback Facility 28.20 New Control Points & Signals Anaheim Layover Facility 18.30
More informationTravel Time Estimates
Travel Time Estimates Common Assumptions Kirkland - Seattle Kirkland - Bellevue Houghton - Seattle Houghton - Bellevue Common assumptions: I-405 BRT is built with a station at NE 85th St. (Sound Transit
More informationSAN RAFAEL City Council January 20, 2015
SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationDOWNTOWN BRT ALTERNATIVE - 19th AVE
DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing
More informationAirports of the Future Taking the Terminal to the Traveler
Passenger Terminal World Expo 2011 Copenhagen, Denmark Airports of the Future Taking the Terminal to the Traveler Steven B. Cornell Assoc. Vice President Summary Aviation Timeline First Controlled Airplane
More informationEast Link Extension. Redmond stations Open House November 17, 2016
East Link Extension Redmond stations Open House November 17, 2016 Presentation agenda Overview of East Link Extension light rail project and two stations in Redmond s Overlake area Overlake Village Station
More informationAirport Obstruction Standards
Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal
More informationWelcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements
Welcome! Sound Transit is improving access to Station for drivers, pedestrians, bicyclists and bus riders, including construction of a new garage. This open house provides an early look at: Garage layout
More informationPRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP
PREPARED FOR: NW 16TH AVE. PRELIMINARY PLANS INDEX OF DRAWINGS COVER SHEET CITY OF GAINESVILLE PUBLIC WORKS DEPARTMENT END PROJECT NW 16TH AVE NW 8TH AVE. UNIVERSITY OF FLORIDA 0 2000' 4000' NW 13TH ST.
More information1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.
ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationNDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT
NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST
More informationSpecification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE
Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationFY Transportation Improvement Program Funding Summary: Local Match for Federal Funds
CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationAtlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)
Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City
More informationQuiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner
Quiet Zone along FEC Corridor Paul Calvaresi Regional Transportation Planner Calvaresip@browardmpo.org About the Quiet Zone Throughout all of Broward County on the FEC Tracks Deerfield Beach Pompano Beach
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationMaryland Transit Administration. Master Plan Alignment Trail
Maryland Transit Administration Master Plan Alignment Trail Master Plan Alignment Byrne Kelly Concept Trail Analysis - North vs. South Trail Access & Crossings Aesthetics Master Plan Alignment Description
More informationSnohomish County Planning and Development Services Run Date: 03/06/2006
Permits - Issue Date From 2/1/2006 to 2/28/2006 05-128926-000-00-PM Plbg/Mech Permit - 16108 ASH WAY SUITE 202 Applicant - Lyudmila Shur 05-123065-000-00-KM Mechanical Permit - 05-121268-002-00-KM Mechanical
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationSection 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3
Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationElectric System Serving Pierce County Current system and future investments
Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationTechnical Advisory Committee. May 14, 2013
Technical Advisory Committee May 14, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delayed
More informationMEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /"
Texas ~Department _ of Transportation MEMORANDUM TO: District Engineers DATE: February 3,2012 FROM: Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /" SUBJECT: Traffic Control Plan
More informationFlorida East Coast Industries has deep roots in rail transportation dating back to the late 1800 s with American pioneer, Henry Flagler.
1 Florida East Coast Industries has deep roots in rail transportation dating back to the late 1800 s with American pioneer, Henry Flagler. Credited with the development of Florida s east coast, Mr. Flagler
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationURBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East
Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design
More informationGrove Field Airport Environmental Assessment
Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationGrade Crossings in High Speed Rail Corridors
Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
More informationAdditional Economic Development Strategy submissions- Klickitat County
Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of
More informationFY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY
Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationCONFIRMED BENCHMARKS UPDATED JUNE 26, 1991
CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991 1. Chiseled square on southwest side of street light base, in median of Gus Thomasson Rd., 40' northeast of centerline of Jamaica Way. Elevation: 536.49 2. Chiseled
More informationWELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE
PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
REQUEST RECEIVED: January 28, 2014 EVENT CODE 2014-005 C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION EVENT NAME: Canada Day EVENT ORGANIZER CONTACT ORGANIZATION INFORMATION Name:
More informationList of Our Ongoing Noise and Vibration Monitoring Projects
List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Client: Metrolinx-Eglinton Crosstown
More informationSR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5
SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.
More informationFrom personal to mass transit
From personal to mass transit Prof. em. Ingmar Andreasson ingmar@logistikcentrum.se 40 years in transportation Transit network planning - VIPS Taxi fleet management - Taxi80 Multi-discipline PRT research
More informationProject Advisory Group. May 23, 2013
Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationTitle VI Analysis for Route Based Fares
ATTACHMENT 2 Title VI Analysis for Route Based Fares BACKGROUND Title VI policy requires analysis of proposed fare changes to identify disparate or disproportionate impacts to minority and low income populations.
More informationWelcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010
Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final
More informationNorth Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas
A C B 8 BACH TIMON BV SURFSI BV FSPRAY BURSON 5 5 5 4 5 5 BRIGPORT BRAKWATR 5 egend 4 9 0 Single Family etached Multi-Family Single Family Attached 4 5 Hotel/Hospitality Mixed-Use Restaurant/estination
More informationApproval of August 2019 Service Changes
Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationPACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION. Saturday, March 5, :00 p.m. Second Floor Foyer Hilton Hotel Vancouver, Washington
PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION Saturday, March 5, 2011 6:00 p.m. Second Floor Foyer Hilton Hotel Vancouver, Washington TO BE RETAINED BY OPERATORS OF HOTELS MOTELS, AND SIMILAR ACCOMMODATIONS
More informationORDINANCE NO WHEREAS, Marina District Development, LLC is the fee simple owner of the following described real estate, to wit:
SPONSOR: Councilman Kalwinski PETITIONED BY: Marina District Development, LLC ORDINANCE NO. 9304 AN ORDINANCE VACATING A 859 FOOT PORTION OF 5 th AVENUE, MORE OR LESS, LYING BETWEEN 112 th STREET INDIANAPOLIS
More informationHistoric Resources. of Sullivan s Island, South Carolina. Survey Supplement #2. Altered Historic Resources Evaluation September 2007 SCHNEIDER
Historic Resources of Sullivan s Island, South Carolina Survey Supplement #2 Altered Historic Resources Evaluation September 2007 SCHNEIDER Historic Preservation, LLC 411 East 6th Street, Anniston AL 36207
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More information2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,
More informationMain Line System Recommendations
(Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the
More informationQuiet Zone Evaluation for Huron, Ohio
Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City
More informationI-66 Inside the Beltway Feasibility Study
I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation
More informationTown of Danvers Planning Board
Town of Danvers Planning Board Danvers Town Hall One Sylvan Street Danvers, MA 01923 www.danvers.govoffice.com Margaret Zilinsky, Chair Kristine Cheetham William Prentiss Aaron Henry James Sears John Farmer,
More informationMid Region Metropolitan Planning Organization List Date: July 12, Cross Refrence List of TIP Projects by Project Title 1 of 15
96.3 A301522 2nd St SW (Valle de Oro) Trail Phase 2 Prosperity Ave. Rio Bravo Blvd. County of Bernalillo ABQ Ride Bus Stop Facilities 431.5 TA00064 Improvements Wide ABQ Ride Bus Stop Facilities 431.6
More informationStart Time:3:40 pm End Time:4:00 pm Distance:6.57 mi. Driver Sign-Off Time:04:05 pm
9/15/214 7:14:39 AM Issaquah School District 411 Page 1 Bus Stop Locations For 38EDA PCMS EDA OVLD 2 EDA RTS Route:38EDA PCMS EDA OVLD 2 Anchor Abbr:PCMS Start Time:3:4 pm End Time:4: pm Distance:6.57
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
Corporate Services Commission REQUEST RECEIVED: March 10, 2015 EVENT CODE: 2015-005 C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION EVENT NAME: Canada Day EVENT ORGANIZER CONTACT ORGANIZATION
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationLAKEPARK AT TRADITION - PLAT 1 P.B. 70, PG. 35 TRADITION PLAT NO. 19 - TOWNPARK PHASE ONE P.B. 47, PG. 32 SOUTHERN GROVE PLAT NO. 4 P.B. 56, PG. 18 SOUTHERN GROVE PLAT NO. 4 P.B. 56, PG. 18 EMERGENCY ACCESS
More informationI-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make
More informationThreats to possible orbital light-rail in outer London from the current Brent Cross planning application...
Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:
More informationTRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712
TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda Thursday, May 25, 2017 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,
More information