precincts legend legend Precinct E precincts Figure 1.0: Precinct E in Complete Communities E S M K Kilometers
|
|
- Jack Lambert
- 5 years ago
- Views:
Transcription
1 precinct Precinct D A B C F G H I R Q J P O M K L legend legend Kilometers precincts Figure 1.0: Precinct in Complete Communities
2 Amber Trails The Maples Pipeline Rd. Mcphillips t. Commercial ode Parkway Village Figure 2.0: Precinct Municipal Context
3 Precinct Amber Trails Pipeline Rd. Mcphillips t. The Maples Figure 3.0: Precinct Location
4 . Rd UB-ARA C al-mart UB-ARA D Mcphillips t. ne eli Pip UB-ARA B UB-ARA A even Oaks Hospital Figure 4.0: Precinct ub-areas
5 22.006m 18m m m 3.643m 18m ft ft ft ft m 116ft 115.8ft 109.7ft 342.1ft 100ft 341.5ft 27.04ft ft ft 226.5ft ft ft 247.5ft 495ft 495ft 58.75ft 51.25ft m m m m ft 64.24ft 82.48ft 341.6ft ft m ft 113.4ft 63.75ft 25ft 41.8ft 96ft 66ft 7.53ft 127ft 60.96m Court Avenue 60.96m Court Avenue Power Transmission Line Power Transmission Line 60.96m Power Transmission Line 96ft 127ft m ft 3.78m 6.096m m m m 11.42m 60ft ft m 60.96m ft m m 550ft 74.03ft 89.69ft ft m ft 295ft 130.8m PRCICT RVICIG PLA cale 1:5000 July 3, ft ft McPhillips treet 600LD m ft 129.6ft Chief Peguis Trail Chief Peguis Trail 750LD 250 M Block 3 Amber Trail Block 2 Amber Trail Pipeline Road Amber Trail Mike Ruta Court Block 3 Altamont treet Amber Trail yree Cove 375 LD 375 LD 300 LD Block 2 Ambergate Drive Vistula ay 300 M Pipeline Road Leila Avenue 450 LD 600 LD 300 M Court Avenue Pipeline Road m 750 LD 750 LD 250 M 250 M m Templeton Avenue m m m m LD 250 M Alternative LD route ft m ft ft ft 82.48ft ft PT LOT 16 O.T.M. 89.5ft 42.98ft OLD KILDOA 600 FDRMAI m m m m 82.48ft ft X. LAK LD 400 M OFFTAK 250 M LD 750 LD 750 LD 200 M 200 M 2700LD LD 150 M 1500 LD m 60.34m m 11.42m m 900 LD 150 M 900 LD m Court Avenue Leila Avenue 250 M 150 M 300 M M 250 M 300 M LD 750LD 525LD 1200LD McPhillips treet 250 M LD 250 M 250 M 250 M 250 M 200 M M 2700LD M V:\1168\active\ \drawing\401_predesign\Genstar-Precinct_\Precinct -RVIC-April2014.dwg, 7/3/2014 9:59:55 AM ote: Lake locations are conceptual only and may be combined or revised based on accepted engineering analysis. Figure 5.0: Precinct xisting and Proposed ervicing Infrastructure
6 ne eli Pip. Rd Lower Density Residential Retention Pond (locations conceptual only) Medium Density Residential Park (Conceptual) Higher Density Residential (Outside of Precinct) Figure 6.0: Precinct Land Use Plan
7 Pipeline Rd. Mcphillips t. xisting idewalks Proposed Pathway Proposed idewalks/pathways Future Potential Pathway Public Reserve (concept only) ote: Lake and trail locations are conceptual only and may be revised based on accepted planning and engineering analysis. Figure 7.0: Precinct Parks and Pedestrian Routes
8 DRAIAG ARA A Pipeline Rd. DRAIAG ARA B DRAIAG ARA C-D al-mart even Oaks Hospital ee Figure 5.0 for Directional Flow Figure 8.0: Precinct Drainage Areas
URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East
Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design
More informationLAND FOR SALE ±20 FULLY IMPROVED ACRES GREENFIELD NORTH INDUSTRIAL PARK
$00,000/Acre WHITE OAKS SHOPPING CENTER 00 GOLDEN STATE FOODS NORTH GREENFIELD PARKWAY 600 0 800 900 000 20.56 ACRES NORFOLK SOUTHERN RAILROAD ±20 FULLY IMPROVED ACRES INDUSTRIAL PARK Garner, North Carolina
More informationPresentation to Planning Panel
Presentation to Planning Panel Amendment C207 & C208 to the Hume Planning Scheme Lancefield Road PSP & Sunbury South PSP August 2017 1 Historical Planning Context Sunbury has long been identified as a
More informationThe purpose of this Open House is to share the third draft of the Area Concept Plan and supporting studies before the drafts are finalized.
Welcome The purpose of this Open House is to share the third draft of the Area Concept Plan and supporting studies before the drafts are finalized. We want your input! Do you have any questions? Our project
More information12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization
REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationRFTA REGIONAL BICYCLE, PEDESTRIAN AND TRANSIT ACCESS PLAN. Map A.7: El Jebel/Willits Existing Conditions Map. A-8 Exisiting Conditions Maps
I F GIO ICYC, I I CC HIGH issouri Heights ew multi-use trail connects north l Jebel to general store and H- underpass G egional icycle, edestrian and ransit ccess lan eighborhood trail connects residents
More informationMemo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network
Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR
More informationThe District of North Vancouver FACT SHEET
The District of North Vancouver Community Planning Dept. 355 West Queens Road North Vancouver British Columbia, V7N 4N5 COMMUNITY PLANNING FACT SHEET APPLICANT: THE SITE: Musson Cattell Mackey Partnership
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationYou re home at Riverstone Oasis
You re home at Oasis NJOY TH MO LVATD POSITION IN RIVRON WITH DIRICT VIWS AND CLOS PROXIMITY TO SCHOOLS AND AMNITIS PRMIUM HOUS & LAND LOTS NOW SLLING ROUS HILL TOWN CNTR WINDSOR SCHOFILDS TRAIN ATION
More informationLIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham
LIVE. WORK. PLAY. STATUS OF DEVELOPMENT Produced for information by the Town of Markham Community TOWN OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD Completed in 1989. East of Town Centre Boulevard,
More informationSOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014
Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood
More informationRequest for Proposals
Request for Proposals RFP# 2008-001 Proposal for: The City of Salida ( the City ) owns approximately 145 acres south of Poncha Springs, CO commonly known as Poncha Hot Springs (the Property). The City
More informationSANDSTONE. Celebrating the Diversity of Coastal Life POWELL RIVER REGIONAL DISTRICT PLANNING COMMITTEE MEETING - 15 AUG 2017
SANDSTONE Celebrating the Diversity of Coastal Life PLANNING COMMITTEE MEETING 15 AUG 2017 REGIONAL CONTEXT POWELL LAKE HASLIM LAKE HORSESHOE LAKE POWELL RIVER DUCK LAKE CANOE ROUTE TO COMOX TO TEXEDA
More informationCommunity Development Department Council Chambers, 7:30 PM, December 20, 2012
STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationTOWN OF WHITBOURNE MUNICIPAL PLAN
TOWN OF WHITBOURNE MUNICIPAL PLAN 2013-2023 "Amendment to Condition 4 of the Mixed Development Land Use Zone Table" "Residential Medium Density (R1)" to "Mixed Development (MD)" Whitbourne Avenue Extension
More informationDraft Planning Controls Planning Scheme Amendment GC81
Draft Planning Controls Planning Scheme Amendment GC81 Peita Tapper Senior Planner, Planning Services What the planning controls do? The draft planning controls translate the objectives and strategies
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More information2016 Development Cost Charges (DCC) UPDATE
2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated
More informationCITY COUNCIL. Monday, October 29, :30 PM. Henry Baker Hall, Main Floor, City Hall
CITY COUNCIL Monday, October 29, 2018 5:30 PM Henry Baker Hall, Main Floor, City Hall 2 This meeting is being broadcast live by Access Communications for airing on Access Channel 7. By remaining in the
More informationKAP Lot 3. Lot 3. Lot Lot 5. Lot 6. Lot 7. Lot 8. Lot KAP 81153
Public Notice April 26, 2018 Subject Property: 249 Westminster Ave W Lot A, District Lot 4, Group 7, Similkameen Division Yale (Formerly Yale Lytton) District, KAP92015 Application: Rezone PL2018-8201
More information2013 Regional Water System Improvements Program Public Hearing March 14, 2013
In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:
More information401, and 415 King Street West - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 401, 407-409 and 415 King Street West - Zoning Amendment Application - Preliminary Report Date: January 27, 2011 To: From: Wards: Reference Number: Toronto and East York Community
More informationTo subscribe, unsubscribe or comment, send an message to
Volume 17, Issue 05, To subscribe, unsubscribe or comment, send an email message to planning@clarington.net Inside this issue Page 1 Page 3 Page 5 Page 6 Page 6 Public Meetings New Applications Recent
More informationLYNNWOOD LINK EXTENSION FI NAL ENV I RO NM ENTA L IM PA C T S TATE M E N T
LYNNWOOD LINK EXTENION FI NAL ENV I RO NM ENTA L IM PA C T TATE M E N T Conceptual Plans U..Department of Transportation Federal Transit Administration AP R IL 2015 OUND TRANIT LYNNWOOD LINK EXTENION
More informationNEW YORK AVENUE TOWN HOME SITE
NEW YOR AVENUE TOWN HOME SITE EXCLUSIVE LISTING DELAND, FLORIDA LOCATION The Property is located in DeLand, FL on the south side of New York Avenue (SR 44) between Frankfort Avenue on the east, Fairview
More information±20 ACRES AT THE ENTRANCE TO PRESCOTT LAKES
±20 ACRES AT THE ENTRANCE TO PRESCOTT LAKES EXCLUSIVE LISTING PRESCOTT, ARIZONA LOCATION The property is located at the NWC of Hwy 89 and Lakes Parkway,, AZ PRICE $1,195,000 ($1.36 per sq. ft.) SIZE ±20.11
More informationBUILD-TO-SUIT 100, ,000 SF FOR LEASE OR SALE Garner, North Carolina
00,000-300,000 SF FOR LEASE OR SALE Garner, North Carolina Norfolk Southern Railroad 45 Trailer Spaces ±24,300 SF ±,800 SF 000 GREENFIELD 900 GREENFIELD 800 GREENFIELD ±250,000 SF 000 GREENFIELD 900 GREENFIELD
More informationAECOM City of London Pedestrian Pathway Connection Across CNR Lands in Kiwanis Park Municipal Class Environmental Assessment Screening Report
ity of ondon Pedestrian Pathway onnection cross ands unicipal lass nvironmental ssessment creening eport xecutive ummary Introduction he ity of ondon (ity) initiated a unicipal lass nvironmental ssessment
More informationTo apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and
Corporate NO: R243 Report COUNCIL DATE: November 20, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: November 15, 2006 FROM: Acting General Manager, Planning and Development FILE: 0850-20 (CF) SUBJECT:
More informationGREATER LAUNCESTON PLAN SUMMARY REPORT
GREATER LAUNCESTON PLAN SUMMARY REPORT January 2014 Prepared for the municipalities of: George Town, Launceston, Meander Valley, Northern Midlands and West Tamar ii Contents What is the Greater Launceston
More information46 PLAT READY LOTS IN MOUNTAIN GREEN
46 PLAT READY LOTS IN MOUNTAIN GREEN EXCLUSIVE LISTING MORGAN, UTAH SIZE ±50.86 acres LOTS 46 lots PARCELS 00-0003-3330, 00-0005- 3056, 00-0075-2244 ZONING R1-20 DENSITY 0.97 Units/Acre COMMENTS Snowbasin
More informationDirector, Community Planning, Toronto and East York District
STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524
More informationState Environmental Planning Policy (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013
New South Wales (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor, with the advice of the Executive
More informationULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011
ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011 Development Context & Approvals Background The Region Strategic Location Single Ownership
More informationGreen Fields Leppington
Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationFOR SALE OR LEASE. Industrial / Office / Warehouse Building. McCartney Cabinet Building 1330 Burlington, North Kansas City, Missouri
FOR SALE OR LEASE Industrial / Office / Warehouse Building McCartney Cabinet Building 40,000 sq ft, two-story, brick building 20,000 sq ft of office and 20,000 sq ft of warehouse Estimated Population 13,299
More informationADDENDUM 2 APPENDIX D STANDARD DRAWINGS
ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.
More informationANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY
ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS
More informationNEW TOURISM OPPORTUNITIES IN REGIONAL VICTORIA
NEW TOURISM OPPORTUNITIES IN REGIONAL VICTORIA Brad Ostermeyer, Executive Director Infrastructure Stan Liacos, Regional Director Loddon Mallee Regional Victoria s Economy Some macro statistics Regional
More informationRalph C. Wilson, Jr. Centennial Park Ralph C. Wilson, Jr. Foundation University at Buffalo Regional Institute 17 January 2019
Ralph C. Wilson, Jr. Centennial Park Ralph C. Wilson, Jr. Foundation University at Buffalo Regional Institute 17 January 2019 Michael Van Valkenburgh Associates Inc. Who is MVVA? Brooklyn Bridge Park,
More informationPUBLIC DRAF MISSION TRAILS REGIONAL PARK Mission Gorge 5-27
5.4. Mission Gorge MISSION TRAILS REGIONAL PARK The goal for the Mission Gorge area is to provide a variety of sustainable trails and other park amenities that can accommodate the high number of visitors
More informationWashington Township MASTER PLAN. Addendum: Washington Township Master Plan
Washington Township MASTER PLAN Addendum: Washington Township Master Plan CHAPTER XI RECREATION CORE DISTRICT Introduction The Recreation Core District generally encompasses the areas north of 30 Mile
More informationNorth Forty Area ( area bounded by Lark Avenue, Los Gatos Boulevard, Highway 85 and
RESOLUTION 2015-056 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING GENERAL PLAN AMENDMENTS NECESSARY FOR THE NORTH FORTY SPECIFIC PLAN. THE PLAN AREA COMPRISES APPROXIMATELY 44 ACRES
More informationGRAND OPENING FALL the art of shopping, the joy of dining
GRAND OPENING FALL 2020 the art of shopping, the joy of dining the art of shopping, the joy of dining ROHNERT PARK S NEW DOWNTOWN NOW LEASING 120,000 SF OF RETAIL SPACE A 32 acre mixed-use urban village,
More informationISTRIO MUNICIPALITY OF MUSKOK
ISTRIO MUNICIPALITY OF MUSKOK.- -..-.. -.-... -- PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT 70 PINE STREET, BRACEBRIDGE, ONTARIO PI L 1 N3 Telephone (705) 645-2231 OR 1-800-461-4210 (705 area code) Fax
More information4.0 Context for the Crossing Project
4.0 Context for the Crossing Project This section provides background information about key features of the North Douglas Crossing project area, and opportunities and constraints. This information is important
More informationDISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera
1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT Derick Fluker* 604 638 2125 dfluker@form.ca *Personal Real Estate Corporation Jack Allpress* 604 638 1975 jallpress@form.ca Layla Vera 604 398 4352 lvera@form.ca
More informationPROJECT UPDATE PARKS MASTER PLAN UPDATE
ISSUE V JULY 2016 What s New for Everything in PLAY! CITY OF DORAL PARKS & RECREATION DEPARTMENT PROJECT UPDATE PAGE 2 PAGE 3 PAGE 4 DORAL LEGACY PARK DORAL GLADES PARK AQUATIC FACILITY PARKS MASTER PLAN
More informationSlum Situation Analysis
Slum Situation Analysis Components of a slum upgrading programme 1. SLUM SITUATION ANALYSIS 2. REVIEW OF POLICIES AFFECTING SLUM AREAS 3. SLUM UPGRADING AND PREVENTION STRATEGY 4. RESOURCE MOBILISATION
More informationS i t e A n a ly s i s
S i t e A n a ly s i s 11 SECTION B SITE ANALYSIS Existing Conditions TRANSPORTATION CONTEXT: The Ohlone Greenway site, paralleling San Pablo Avenue to the west, is centrally located within the City of
More informationNOTICE OF A PUBLIC HEARING
NOTICE OF A PUBLIC HEARING A public hearing to receive input on the following planning applications will be held on: COMMITTEE OF THE WHOLE (PUBLIC HEARING) at 7:00 pm at VAUGHAN CITY HALL, COUNCIL CHAMBER
More information900 N FLAGLER FOR LEASE FORT LAUDERDALE FL 33304
FLAGLER VILLAGE ARTISTIC RENDERING The HIVE is Fort Lauderdale s first MICRO retail and office development, offering ground floor exposure, on-site parking, and thousands of unique visitors from the monthly
More informationTriMet Core Capacity Concepts. TriMet Board January 25, 2017
1 TriMet Core Capacity Concepts TriMet Board January 25, 2017 1 2 Regional Growth 400,000 more people and 260,000 more jobs in less than 20 years Concentrated in Regional Centers, Town Centers, Station
More informationFair Oaks Ranch Homeowners Association Parks and Trails Master Plan Survey Results
Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan Survey Results Survey Analysis Process Team of professionals developed, administered & analyzed 1 web administrator with 14 years relevant
More informationCreating a Vision for the Future
Glendale Niagara District Plan Visioning & Conceptual Development Plan Public Workshop #2 August 16, 2018 Welland Canal Airport Rd Taylor Rd Concession 7 Rd Concession 6 Rd Creating a Vision for the Future
More informationOrlando Loch Haven Park (Conditional Use Permit) Project Overview (updated 5/31/2018)
Orlando Ballet @ Loch Haven Park (Conditional Use Permit) Project Overview (updated 5/31/2018) NOTE: The information presented in this project overview is based on staff s preliminary review of the submitted
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 16, 2005 DATE: March 28, 2005 SUBJECTS: A. Adoption of the Fort Myer Heights North Plan. B. GP-300-04-1 Adoption of the following General
More informationNEW PROPOSED WESTPORT DEVELOPMENT
NEW PROPOSED WESTPORT DEVELOPMENT Build-To-Suit 2,400 Sq Ft Building plus Patio & Deck 4114 Broadway Boulevard, Kansas City, Missouri Premier restaurant location Estimated Population 273,992 Average Household
More informationUNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
II xhibit -40, udget Item ustification heet: 2014 avy ate: pril 2013 ppropriation / udget ctivity / udget ub ctivity: 1508: rocurement of mmo, avy & / 01: roc mmo, avy / 1: avy mmunition -1 ine Item omenclature:
More informationROYAL VIEW DEVELOPMENT
GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00
More informationBest Western Site Plan
Best Western Site Plan Major Site Plan Amendment #233 1501 Arlington Blvd. & 1523 N. Fairfax Dr. Department of Community Planning, Housing & Development Site Plan Review Committee #1 September 17, 2018
More informationSan Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009
Expansion SDCCC Presentation to Mayor s Task Force June 2, 2009 Agenda The TSA/HNTB Team Experience and Lessons Learned Project Methodology Issues and Opportunities Alternative Masterplan Concepts Under
More informationWHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.
WELCOME WELCOME TO THE SECOD CETRE I THE PARK PUBLIC OPE HOUSE WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WHAT IS THE PROJECT? The Centre in the Park Area Redevelopment Plan
More informationToronto and East York Community Council. Director, Community Planning, Toronto and East York District
STAFF REPORT ACTION REQUIRED 440, 444, 450 and 462 Front Street; 425, 439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - Zoning and Official Plan Amendment Application
More informationMarkham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.
Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) January 27, 2015 Development Services Committee Mark Schollen Schollen & Company Inc. Purpose of Presentation Update Council on
More informationDowntown to Defiance Trolley Key Messages Jan. 2017
Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationI508. Devonport Peninsula Precinct
I508. Devonport Peninsula Precinct I508.1. Precinct description The purpose of the Devonport Peninsula precinct is to provide for the comprehensive residential development of the former Navy housing land
More informationFOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY
TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces
More informationPARTICIPATORY ARCHITECTURE AND URBANISM
FEED, PUNE 23 RD JUNE, 2011 PARTICIPATORY ARCHITECTURE AND URBANISM P K Das, Architect - Activist, Mumbai 1 RECLAIMING PUBLIC SPACES - MUMBAI S SEAFRONTS DEVELOPMENT 2 THE NEIGHBOURHOOD WAY FORWARD - VISION
More information275kV CABLE ROUTE SWANSEA BAY SWANSEA WALES TIDAL LAGOON (SWANSEA BAY) PLC LOCATION PLAN SW SE. App'd. Description. Chk'd. Suitability.
275kV CABL ROUT Rev. Description By Drawing tatus Chk'd uitability AA BAY AA AL TIDAL LAGOO (AA BAY) PLC 275kV COCTIO CABLIG ROUT LOCATIO PLA cale Original ize 0 1000M 2000M Drawn Checked Authorised Drawing
More informationBloor Street West Rezoning Application for a Temporary Use By-law Final Report
STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council
More information21.07 ECONOMIC DEVELOPMENT AND EMPLOYMENT 19/03/2015 C323 Proposed C Key issues and influences. Economic Role and Function
21.07 ECONOMIC DEVELOPMENT AND EMPLOYMENT 19/03/2015 C323 Proposed C347 21.07-1 Key issues and influences 14/10/2010 C168 Economic Role and Function Geelong is the largest regional city in Victoria and
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationLIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham
LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING 2013 Produced for information by the City of Markham Community CITY OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD East side of Town Centre Boulevard,
More informationPre-Leasing. 3 Highland Park Green NE. State of the Art Distribution Facility for Lease. Airdrie, Alberta. Now Available for Pre-Lease
Pre-Leasing Now Available for Pre-Lease > No business tax in Airdrie > > Bays from 20,530 sq. ft. > ESFR sprinkler system > T5 HO fluorescent lighting Airdrie, Alberta State of the Art Distribution Facility
More informationPerth and Kinross Council Development Management Committee 30 August 2017 Report of Handling by Interim Head of Planning
Perth and Kinross Council Development Management Committee 30 August 2017 Report of Handling by Interim Head of Planning 5(2)(ii) 17/270 Siting of 12 caravans/chalets, 3 show caravans/chalets and associated
More informationLA TROBE UNIVERSITY MELBOURNE CAMPUS MASTER PLAN 2014 AUGUST 2014 MASTER PLAN PREPARED BY MGS ARCHITECTS
LA TROBE UNIVERSITY MELBOURNE CAMPUS 2014 AUGUST 2014 PREPARED BY MGS ARCHITECTS ACKNOWLEDGEMENTS La Trobe University proudly acknowledges the Wurundjeri, the traditional custodians of the land upon which
More informationChapter 2: Entire US287 Corridor
Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps
More informationTOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON
TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS
More informationCambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,
THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees
More informationRoute:140-AM-2 ST ISABELLA Driver:FIRST STUDENT, ( )
8/9/2018 1:41:30 PM Route:140-AM-2 ST ISABELLA Driver:FIRST STUDENT, (403-531-3900) End Time:8:45 am EFFECTIVE DATE: September 4, 2018 Route Updated: August 15, 2018 8:33 am (1) INVERNESS PA SE@MCKENZIE
More informationAll renderings are for conceptual purposes only POPLAR STREET 1960 MANDELA PARKWAY 1391 WEST GRAND AVENUE
All renderings are for conceptual purposes only. 1901 POPLAR STREET 1960 MANDELA PARKWAY 1391 WEST GRAND AVENUE 580 Richmond 25 minute BART ride to Walnut Creek San Rafael Walnut Creek 101 7 minute BART
More informationUnion Station Rail Corridor East Enhancements Project
Union Station Rail Corridor East Enhancements Project Transit Project Assessment Process Public Meeting #1 Presentation Wednesday June 28, 2017 GRIDLOCK COSTS OUR ECONONY REGIONAL TRANSFORMATION GO EXPANSION
More informationEXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report
II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three
More informationWaterfront Concept Plan: Community Survey Summary
Waterfront Concept Plan: Community Survey Summary Published April 20, 2016 #1100085 Introduction The survey was one component of the public consultation process endorsed by Council in October, 2015. This
More informationPALM JUMEIRAH. 1 The Palm Tower
DUBAI Dubai, one of seven emirates that make up the United Arab Emirates, is a cosmopolitan city that combines innovation and a modern lifestyle with traditional Arabian values. The multicultural city
More informationCOMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.
COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the
More informationFY Candidate Sidewalk Projects. Sidewalk Advisory Committee
FY 18-19 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee December 2017 FY 18-19 Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway
More informationAIRD & BERLIS LLP. Barristers and Solicitors. Kim M. Kovar Direct:
Kim M. Kovar Direct: 416.865.7769 E-mail: kkovar@airdberlis.com November 18, 2013 BY EMAIL Councillor Peter Milczyn, Chair c/o Nancy Martins Secretarial Contact, Planning and Growth Management Committee
More information4 York Region 2017 Vacant Employment Land Inventory
Clause 4 in Report No. 5 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 29, 2018. 4 York Region 2017 Vacant Employment
More informationDavid acts an Independent Hearing Commissioner and has considered plan changes, resource consents and notices of requirements.
Director David is a Director with Hill Young Cooper Ltd, a resource management, environmental policy and planning consultancy with offices in Auckland and Wellington. David has over 25 years experience
More informationCouncil Briefing Minutes
1 Council Briefing Minutes Date: Time: Location: In Attendance Not in Attendance Wednesday, 24 October, 2018 2:30 p.m. Council Chamber Forum North, Rust Avenue Whangarei Cr Greg Innes (Chairperson) Cr
More informationSouthwest LRT Alignment Video Narration
Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
More informationDARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:
OUR VISION Our shared vision We are creating an iconic tropical hotel. A hotel that is uniquely Darwin. A hotel that embodies the rich natural and cultural heritage of the Top End. A gateway to the natural
More information