1 LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING 2013 Produced for information by the City of Markham

2 Community CITY OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD East side of Town Centre Boulevard, west of Warden Avenue, north of Highway 7 East, and south of Apple Creek Boulevard Municipal Office completed in 1989 Outdoor ice surface approximately 25,000-sq-ft with accessory building completed in hectares GFA 14,607.5m² FLATO MARKHAM THEATRE FOR THE PERFORMING ARTS 171 TOWN CENTRE BOULEVARD East side of Town Centre Boulevard, west of Warden Avenue, north of Highway 7 East, and south of Apple Creek Boulevard d in 1985 Theatre seating: 528 available seats Committed to the presentation of award-winning, professional entertainment and educational programs celebrating Canadian talent YMCA MARKHAM 101 YMCA BOULEVARD Facilities: West of Kennedy Road, east of the GO rail line, south side of YMCA Boulevard, and north of Highway 407 Facility opened May hectares combined GFA 5,620m² Pool, gym, rock-climbing wall SPRING 2013 For more information, visit 2

3 Community UNIONVILLE HIGH SCHOOL FOR THE ARTS 201 TOWN CENTRE BOULEVARD East side of Town Centre Boulevard, west of Warden Avenue, north of Highway 7 East, and south of Apple Creek Boulevard d in Addition added in hectares Programme: Attended by students throughout York Region for its Arts program BILL CROTHERS SECONDARY SCHOOL 44 MAIN STREET West side of Main Street South (Unionville), south of Highway 7, and north of Enterprise Boulevard Phase I completed Fall hectares (including valley land) GFA approximately 21,000m² Approximately 1,500 students at capacity Programme: Emphasis on healthy, active living for students across York Region, includes three fields and outdoor running track ST. MAURICE AND VERENA COPTIC ORTHODOX CHURCH 1050 RODICK ROAD Northwest corner of Highway 7 and Rodick Road Site Plan Application endorsed by Development Services Committee, June hectares A place of worship including a church, Sunday school classrooms, a community centre, day care and gymnasium GFA approximately 6,717-square-metres, church accommodates seating for 800 parishioners At grade and partial below grade parking SPRING 2013 For more information, visit 3

4 Community VIVANext TRANSIT STATION Northeast corner of Enterprise Boulevard and Warden Avenue Development: Station elements include: Kiosk Real time tracking of buses Enclosed and heated waiting area First in York Region PAN AM/PARAPAN AM TORONTO MARKHAM AQUATICS AND FIELD HOUSE 16 MAIN STREET, UNIONVILLE Southwest corner of Enterprise Boulevard and Main Street Unionville Under construction 3.2 hectares Aquatics and recreational facility comprising an Olympic-size pool, badminton courts, warm up and spectator areas MARKHAM SPORTS, ENTERTAINMENT & CULTURAL CENTRE 311 ENTERPRISE BOULEVARD South side of Enterprise Boulevard, east of Birchmount Road and west of the Unionville GO Station Site plan application endorsed by Council, January 2013 Approximately 2.7 hectares (arena component.) A multi-purpose sports, entertainment and cultural venue Total floor area approximately 65,000 square metres Includes 20,000 seat arena, 1,200 square metres associated retail and 5,600 square metres office space SPRING 2013 For more information, visit 4

5 Community MARKHAM CENTRE URBAN PARK North of Enterprise Boulevard, south of the Rouge River and west of re-aligned Tributary 4 Design Charette/Workshop held April Winning Design Concept selected, May Design unveiled on-site, June The winning team retained to undertake the detailed design of the park. Public meeting, February Park development linked to future development of adjacent lands. 4.0 hectares Strong environmental approach to design Design integrates art and culture in harmony with the environment CIVIC MALL (PHASE 1) North of Enterprise Boulevard between Rouge Valley Drive and Birchmount Road extension Phase I construction of the transit way from Rouge Valley Drive to Birchmount Road, operational early Start of construction, targeted Spring 2013 Total Park Land (Phase 1): 0.87 hectares The Civic Mall is envisioned as a unique urban space and multi-use corridor, accommodating safe movement of pedestrians, cycling and transit. Preliminary design concept incorporates principles of sustainability and reflects a high-quality public realm. TOWN OF MARKHAM - SOUTH TOWN CENTRE PARK North of Clegg Road, west of South Town Centre Boulevard 0.45 hectares Development: Urban park with water feature and seating areas SPRING 2013 For more information, visit 5

6 Commercial HILTON SUITES 8500 WARDEN AVENUE Total GFA (Build out): West of Warden Avenue, east of South Town Centre Boulevard, and south of Highway hectares 500 suites 48,000m² Hotel 43,800m² Convention centre 4,200m² H & R DEVELOPMENTS STRINGBRIDGE 3495 HIGHWAY 7 Projected Office/ Commercial Area: South side of Highway 7, between South Town Centre Boulevard and Rodick Road Site Plan endorsed by Development Services Committee, Summer construction has yet to commence 0.86 hectares 5507m² in one four-storey office building LIBERTY DEVELOPMENT CORPORATION LIBERTY SQUARE OFFICE BUILDINGS 3601 & 3621 HIGHWAY 7 EAST South Side of Highway 7, east side of South Town Centre Boulevard Total Office Area: 1.22 hectares 24,651m² within 12- and five-storey buildings, including grade related retail SPRING 2013 For more information, visit 6

7 Commercial IBM CANADA LIMITED 8200 WARDEN AVENUE Total Office Area: West of Warden Avenue, south of Cedarland Drive, and north of Highway 407 Phase 1 complete 35.6 hectares 130,000m² Phase 1 complete 54,000m² Phase 2 anticipated 76,000m² Bright Horizons Child Care and Early Education 1,500m² WORLEY PARSONS ( FORMALLY MOTOROLA CANADA) 8133 WARDEN AVENUE Total Office Area: East side of Warden Avenue, south side of Enterprise Boulevard, and north of Highway 407 Phase 1 complete 5.5 hectares 42,000m² Phase 1 complete 21,000m² DOWNTOWN MARKHAM REMINGTON GROUP HONEYWELL CANADA 85 ENTERPRISE BOULEVARD Total Office Area: South side of Enterprise Boulevard, east of Warden Avenue 2.4 hectares 14,319m² SPRING 2013 For more information, visit 7

8 Residential STRINGBRIDGE INVESTMENTS LIMITED JASON KAPTYN HOSPITALITY 3555 HIGHWAY 7 Southwest quadrant of Highway 7 and South Town Centre Boulevard Zoning bylaw approved by Ontario Municipal Board (OMB), December hectares Mixed use development Two buildings fronting Highway 7, the easterly building comprises a six-storey podium and 15- and 16-storey towers. The westerly building continues the six-storey podium with 13- and 15-storey towers A hotel proposed in easterly building, featuring 190 guest rooms, with conference facility, spa, health club, retail and restaurants 500 residential units TRIDEL / DORSAY DEVELOPMENTS CIRCA 23 & 33 COX BOULEVARD Projected Office/ Commercial: Total Residential Units: West of Town Centre Boulevard, east of Rodick Road, south of Cox Boulevard, and north of Highway 7 Phases l & II (Apartment & Townhomes) - complete Phase lll office/commercial - pending 7.5 hectares 20,000m² 942 units Projected Seniors Housing: 150 units No image available MARKHAM SUITES NOMINEE INC. (HILTON SUITES HOTEL) Proposed Development: Southwest corner of Highway 7 and Warden Avenue Public Meeting Fall Staff Recommendation Report to Development Services Committee targeted Spring hectares Conversion of the hotel s long-term stay wing (99 units) to residential condominium use, and a new condominium apartment building along the Clegg Road frontage of the property comprising two 21-storey towers and an eight-storey podium, accommodating approximately 445 apartment units SPRING 2013 For more information, visit 8

9 Residential TIMES INVESTMENTS LIMITED MAJESTIC COURT 50 CLEGG ROAD & 60 SOUTH TOWN CENTRE BOULEVARD Total Residential Units: Northwest corner of Clegg Road and South Town Centre Boulevard ha. 532 residential units with grade related retail along South Town Centre Boulevard and an approximate 1 acre park. LIBERTY DEVELOPMENT CORPORATION EKO MARKHAM CENTRE 55 & 75 SOUTH TOWN CENTRE ROAD 30 & 32 CLEGG ROAD Total Residential Units: The site is located east of South Town Centre Boulevard south of Highway 7, and north of Clegg Road 13,391m² 1.3 hectare Four buildings 9, 10, 13, and 16 storeys 589 units H & W DEVELOPMENTS 31 & 39 CLEGG ROAD 30 & 38 CEDARLAND DRIVE Proposed Development Phase 1 - Westerly block: The west half of the block bound by Clegg Road, South Town Centre Boulevard, Cedarland Drive and Warden Avenue. Under construction 1.15 hectares Four residential buildings, two 16-storey, two 12-storey and one 11-storey 663 residential units SPRING 2013 For more information, visit 9

10 Residential ARYEH CONSTRUCTION LTD East side of Warden Avenue, south of Highway 7 Draft plan of subdivision and zoning bylaw amendment approved by Ontario Municipal Board (OMB), January hectares Two 19-storey towers on eight- to nine-storey podiums 530 units.81 hectatres of site to be conveyed to the City of Markham for parkland TIMES GROUP INC. MARKHAM CENTRE UPTOWN DRAFT PLAN OF SUBDIVISION South side of Highway 7, between Warden Avenue and Sheridan Nurseries Precinct plan approved by Markham Council, February Draft plan of subdivision and implementing zoning approved by Ontario Municipal Board (OMB), May Subdivision agreement, Phase 1, Block six & seven in progress. Site services under construction hectares, including approximately 9.3 hectares of Rouge River valley land Apartments and an office tower, ranging from eight to 20 storeys 4,500 residential units 440,000-sq-ft of office 300,00-sq-ft of retail/commercial TIMES GROUP INC. CORPORATION MARKHAM UPTOWN - RESIDENTIAL - PHASE I 8228 BIRCHMOUNT ROAD, 1 UPTOWN DRIVE South side of Highway 7, west of Birchmount Road extension Under construction 1.27 hectares Two mixed-use buildings, eight storeys and 20 storeys, accommodating 581 units and 1,114-square-metres (11,992-square-feet) of commercial floor space SPRING 2013 For more information, visit 10

11 Residential TIMES GROUP INC. CORPORATION MARKHAM UPTOWN - RESIDENTIAL - PHASE 2(A) 18, 28 UPTOWN DRIVE South side, one block west of Birchmount Road Under Construction 1.04 hectares Two residential buildings, eight storeys and 20 storeys accommodating a total of 582 apartment units TIMES GROUP INC. CORPORATION MARKHAM UPTOWN - COMMERCIAL - PHASE HIGHWAY 7 South side of Highway 7, east of Birchmount Road Extension 3.79 hectares Shopping centre comprising seven commercial buildings with a combined commercial floor area of 13,250-square-metres (142,700-square-feet) No image available at this time SHERIDAN NURSERIES LTD HIGHWAY 7, UNIONVILLE, ON 4077 Highway 7 (south side, east of Birchmount Road) Applications under review 4.32 hectares Applications for plan of subdivision and implementing zoning to permit a mixed-use development accommodating approximately 1225 residential units and 4900 square metres (52,750 square feet) of commercial uses SPRING 2013 For more information, visit 11

12 Residential DOWNTOWN MARKHAM REMINGTON GROUP PRECINCT PLAN East of Warden Avenue, north of Hwy. 407, south of the Rouge River, and west of the GO rail line Draft plan approval endorsed by Council, July, 2003 Zoning bylaw approved in July Draft plan and Precinct Plan revisions endorsed by Council in June Precinct Plan to be updated to adjust retail focus and address interface with the Mobility Hub hectares, mixed-use development 3,900 residential units, total office/business park 362,750m² and 33,755m² retail Total Valley Land: 19.1 hectares and buffer adjacent to valley Four-hectare central park Remington Revised Precinct Plan DOWNTOWN MARKHAM REMINGTON GROUP BENCHMARK MANOR North east quadrant of Enterprise Boulevard and Rouge Valley Drive Site Plan endorsed by Council, June 2006 Under Construction, occupancy commenced 6.18 hectares Development: 175 townhome units, including a local park 0.3 hectares (0.74 acres) and a relocated heritage house DOWNTOWN MARKHAM REMINGTON GROUP BIJOU PHASE I ROUGE BIJOU & BIJOU TERRACE 1 & 21 UPPER DUKE CRESCENT Development: Northeast corner of Rouge Valley Drive and the Civic Mall 0.51 hectares 188 apartment units, within 10- and seven-storey buildings, linked by a one-storey lobby and oriented along the Civic Mall SPRING 2013 For more information, visit 12

13 Residential DOWNTOWN MARKHAM REMINGTON GROUP BIJOU PHASE II PROMENADE & ARBOUR 39 & 57 UPPER DUKE CRESCENT Development: North side of the Civic Mall, east of Rouge Valley Drive 0.68 hectares 244 apartment units within two buildings, seven storeys each DOWNTOWN MARKHAM REMINGTON GROUP VERDALE PROJECT 111, 131, 151 UPPER DUKE CRESCENT Development: West side of Verdale Crossing, south of Rouge Valley Drive 0.82 hectares 450 apartment units, within three buildings, two buildings at six and 10 storeys and one building at six and 14 storeys DOWNTOWN MARKHAM REMINGTON GROUP NEXUS 8110, 8130 BIRCHMOUNT ROAD Northwest corner of the Civic Mall and Birchmount Road extension Under construction, occupancy Fall hectares 376 units within two mixed use buildings at six and 10 storeys and 14 storeys, including 3,274m² (35,242-sq-ft) of grade related retail SPRING 2013 For more information, visit 13

14 Residential DOWNTOWN MARKHAM - REMINGTON GROUP PHASE I RETAIL PROGRAMME (BUILDINGS L & M) 169 & 179 ENTERPRISE BOULEVARD South side of Enterprise Boulevard, east side of Birchmount Road Site Plan endorsed by Council, November 2010 Under construction, opening Fall hectares The Phase 1 retail development initially consists of two buildings accommodating a variety of uses including retail, restaurant, office and cinema with a total commercial floor area of 25,750-square-metres (277,180-square-feet) DOWNTOWN MARKHAM - REMINGTON GROUP PHASE II RETAIL PROGRAMME (BUILDINGS J & K) 170 & 180 ENTERPRISE BOULEVARD North side of Enterprise Boulevard, east side of Birchmount Road Under construction 1.32 hectares The second phase of Remington s retail programme consists of two buildings (J & K) accommodating a variety of retail, restaurant, spa, hotel and residential uses. The westerly building (J) will be 16 storeys and contain 215 hotel suites, 149 residential units and approximately 1,193-square-metres (12,842-square-feet) of retail and restaurant uses. Building K will be 12 storeys with 156 dwelling units, and 3,569-square-metres (38,418-squarefeet) of retail and restaurant uses. MARKHAM CENTRE DEVELOPMENT CORPORATION North block: North side of Enterprise Boulevard between the Go rail line and Rivis Road Official Plan and Zoning Bylaw amendments permitting proposed development approved in July hectares Three residential buildings (28/29, 28 and 10 storeys) 981 residential units SPRING 2013 For more information, visit 14

15 Residential No image available at this time SYLMATT INVENSTMENT INC. 28 MAIN STREET Northwest corner of Main Street Unionville and Enterprise Boulevard Application under review 1.91hectares 3 residential buildings with heights of 9, 19, and 27 storeys comprising a total of 756 residential units MAIN STREET RESIDENCE (UNIONVILLE) INC. 34 MAIN STREET West side of Main Street South, north of Unionville Gate and Enterprise Boulevard Application for a retirement residence, Phase 1 Under construction, occupancy July hectares Approximately 283 units within two buildings, up to nine storeys each, to be constructed in two phases Future Phase 3, nine-storey building, further approvals required MOBILITY HUB STUDY (MARKHAM CENTRE PRICINCT PLAN) Project: Lands in the vicinity of the Unionville GO Station The targeted completion date is to be finalized with the affected agencies and consultants. A Mobility Hub Study is to be prepared in consultation with the affected transportation agencies, landowners and the community. The study is intended to provide framework for the introduction of a Mobility Hub with associated infrastructure and land use scenarios and also identify opportunities to integrate lands in the East Precinct with the Remington Group s Downtown Markham lands on the opposite side of the GO rail line. SPRING 2013 For more information, visit 15

16 Spring 2013 For more information, visit 16

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham LIVE. WORK. PLAY. STATUS OF DEVELOPMENT Produced for information by the Town of Markham Community TOWN OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD Completed in 1989. East of Town Centre Boulevard,

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524

More information

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT October 31, 2005 To: From: Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Final Report OPA and Rezoning Application 05 132450

More information

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study STAFF REPORT ACTION REQUIRED Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study Date: August 14, 2009 To: From: Wards: Reference Number: North York Community Council

More information

FOR LEASE UP TO 8,700 SF

FOR LEASE UP TO 8,700 SF Warden City Centre FOR LEASE UP TO,00 SF NEW GROUND FLOOR SUITE available FREE underground parking PODIUM SIGNAGE opportunity LOCATION 0 th Avenue is located at the corner of Warden Avenue and Highway

More information

TECHNOLOGY QUALITY OF LIFE CAREER CHOICES INNOVATION GTA RAPID TRANSIT URBAN LIVING TOP RANKED SCHOOLS FUN HOUSING OPTIONS ARTS NATURE STYLE CULTURE

TECHNOLOGY QUALITY OF LIFE CAREER CHOICES INNOVATION GTA RAPID TRANSIT URBAN LIVING TOP RANKED SCHOOLS FUN HOUSING OPTIONS ARTS NATURE STYLE CULTURE CAREER CHOICES INNOVATION QUALITY OF LIFE TECHNOLOGY HOUSING OPTIONS ARTS CULTURE URBAN LIVING GTA RAPID TRANSIT TOP RANKED SCHOOLS FUN NATURE STYLE DIVERSITY MARKHAM VAUGHAN RICHMOND HILL NEWMARKET AURORA

More information

FOR LEASE UP TO 8,700 SF

FOR LEASE UP TO 8,700 SF Warden City Centre FOR LEASE UP TO,00 SF NEW GROUND FLOOR SUITE available FREE underground parking PODIUM SIGNAGE opportunity LOCATION Warden Avenue and Highway 0 in Markham. WARDEN CITY CENTRE TOWER Suite

More information

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 401, 407-409 and 415 King Street West - Zoning Amendment Application - Preliminary Report Date: January 27, 2011 To: From: Wards: Reference Number: Toronto and East York Community

More information

Warden City Centre. for lease up to 100,000 sf. MOVE IN ready spaces FREE underground parking 3 per 1,000 sf SIGNAGE and branding available

Warden City Centre. for lease up to 100,000 sf. MOVE IN ready spaces FREE underground parking 3 per 1,000 sf SIGNAGE and branding available Warden City Centre for lease up to 00,000 sf MOVE IN ready spaces FREE underground parking per,000 sf SIGNAGE and branding available Property Summary Location Warden Avenue and Highway 0 in Markham. WARDEN

More information

OFFICE SPACE FOR LEASE TOWN CENTRE BOULEVARD MARKHAM, ON. 3,436 sf available Built-out suites in move-in condition Restaurant on-site

OFFICE SPACE FOR LEASE TOWN CENTRE BOULEVARD MARKHAM, ON. 3,436 sf available Built-out suites in move-in condition Restaurant on-site , sf available Built-out suites in move-in condition Restaurant on-site 00 + 0 TOWN CENTRE BOULEVARD MARKHAM, ON Avison Young Commercial Real Estate (Ontario) Inc., Brokerage Location Warden Avenue and

More information

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario Shadow Impact Assessment 2313 & 2323 Lake Shore Boulevard West Etobicoke, Ontario REPORT: GWE12-099-SHADOWS-2014 Prepared For: Peter Swinton, B.Arch., MCIP, RPP PMG Planning Consultants 227 Bridgeland

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

FOR LEASE UP TO 5,300 SF

FOR LEASE UP TO 5,300 SF Warden City Centre FOR LEASE UP TO,00 SF GROUND FLOOR SUITE with patio access FREE underground parking LOCATION 0 th Avenue is located at the corner of Warden Avenue and Highway 0 in Markham. WARDEN CITY

More information

PCAL Case Study Retail Areas: Rouse Hill Town Centre

PCAL Case Study Retail Areas: Rouse Hill Town Centre PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub

More information

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by: UPDATE JANUARY 2016 HISTORY IN THE MAKING The UK s most important city centre development outside London. Being delivered by: THE HEART OF THE CITY St Philip s Square Birmingham Museum & Art Gallery A

More information

BUILDING SIGNAGE FOR LEASE UP TO 67,000 SF. Warden City Centre. NEW MODEL SUITES FREE underground parking

BUILDING SIGNAGE FOR LEASE UP TO 67,000 SF. Warden City Centre. NEW MODEL SUITES FREE underground parking BUILDING SIGNAGE Warden City Centre FOR LEASE UP TO,000 SF NEW MODEL SUITES FREE underground parking PROPERTY SUMMARY LOCATION Warden Avenue and Highway 0 in Markham. Suite 0,8 sf LEASED Suite 0, sf Suite

More information

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES November 6, 2017 Regular Meeting of Council Recommendation THAT Council: Approve the Maplewood Village Centre and

More information

Cv-c; Re: Hotel Development Charges in York Region. March 24, 2016

Cv-c; Re: Hotel Development Charges in York Region. March 24, 2016 Regional Clerk's Office Corporate Services Department The Regional Municipality of York, 17250 Yonge Street, Newmarket, Ontario L3Y 6Z1 Tel: 1-877-464-9675 Fax: 905-895-3031 Internet: www.york.ca /C. Martin

More information

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District STAFF REPORT ACTION REQUIRED Bloor Corridor/Annex Block Planning Study Official Plan Amendment Final Report Date: November 30, 2016 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework Page 1 of Report PB-68-17 SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework TO: FROM: Committee of the Whole - Workshop Planning and Building Department Report Number: PB-68-17

More information

October 23, 2017 Council Workshop

October 23, 2017 Council Workshop MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES October 23, 2017 Council Workshop COMMUNITY PLAN Purpose of Council Workshop Highlight What We Heard Phase 3 & Key

More information

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000 1716 Willowbrook Cr, Dawson Creek BC Canada For SALE $2,847,000 This is a rare find, 32 townhomes in Dawson Creek, BC. Excellent investment in a single title multi family complex. Vendor has upgraded this

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,

More information

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE 2.1 Item: VMC Sub-committee Report DATE: Tuesday, June 12, 2018 WARD: 4 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE FROM: Jason Schmidt-Shoukri, Deputy City Manager, Planning

More information

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report STAFF REPORT ACTION REQUIRED 377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report Date: September 14, 2016 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report STAFF REPORT ACTION REQUIRED 3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report Date: March 15, 2017 To: From: Wards:

More information

Investing in Brampton s downtown

Investing in Brampton s downtown Investing in Brampton s downtown 1 REVITALIZING DOWNTOWN BRAMPTON The Next Chapter Public Information Session November 2, 2011, 7 9 pm AGENDA Welcome and opening remarks: City of Brampton Southwest Quadrant

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

Construction Staging Area 197 Redpath Avenue

Construction Staging Area 197 Redpath Avenue REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction Special study Areas Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN Introduction Beyond the boundaries of the 2030 General Plan, the City has defined Special Study

More information

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District STAFF REPORT ACTION REQUIRED 440, 444, 450 and 462 Front Street West; 425, 439, 441 and 443 Wellington Street West; 6-18 Spadina Ave. and 1 and 19 Draper Street Urban Design Guidelines Final Report Date:

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

CORPORATION STREET, COVENTRY. Another prestigious development by Award Winning Developer 1/7

CORPORATION STREET, COVENTRY. Another prestigious development by Award Winning Developer 1/7 CORPORATION STREET, COVENTRY Another prestigious development by Award Winning Developer 1/7 NEW PRIME OFFICE SPACE Award winning developer EDG Property is delighted to present Hawkins; newly refurbished

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information

325 RENFREW DRIVE UNIONVILLE, ON OFFICE CONDOMINIUM FOR SALE

325 RENFREW DRIVE UNIONVILLE, ON OFFICE CONDOMINIUM FOR SALE 325 RENFREW DRIVE UNIONVILLE, ON OFFICE CONDOMINIUM FOR SALE FOR MORE INFORMATION PLEASE CONTACT ASHLAR CROSBY CAIRO REALTY INC. Real Estate Brokerage 60 Renfrew Drive, Suite 240 Markham, ON L3R 0E1 T

More information

The District of North Vancouver FACT SHEET

The District of North Vancouver FACT SHEET The District of North Vancouver Community Planning Dept. 355 West Queens Road North Vancouver British Columbia, V7N 4N5 COMMUNITY PLANNING FACT SHEET APPLICANT: THE SITE: Musson Cattell Mackey Partnership

More information

DEVELOPMENT MAP 2017/18

DEVELOPMENT MAP 2017/18 INVEST IN DEVELOPMENT MAP 2017/18 WELCOME TO Situated in the very centre of the country and on the edge of the Peak District National Park, Chesterfield is highly ambitious. Over 1 billion of development

More information

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5 2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration

More information

COUNCIL MEETING AGENDA

COUNCIL MEETING AGENDA CITY OF VAUGHAN COUNCIL MEETING AGENDA Council Chambers Monday, March 17, 2003 Vaughan Civic Centre 2141 Major Mackenzie Drive Vaughan, Ontario 1:00 p.m. 1. PRESENTATIONS 2. CONFIRMATION OF AGENDA 3. DISCLOSURE

More information

WE HAVE THE EXPERIENCE

WE HAVE THE EXPERIENCE TM 2 Table of Contents We have the experience 4 We have the vision 6 We have the brands 9 We have the scope 10 We have the numbers 11 We have more 14 We have the access 17 We have variety 18 Renderings

More information

11th and Vermont Streets Special General Land Use Plan (GLUP) Study

11th and Vermont Streets Special General Land Use Plan (GLUP) Study 11th and Vermont Streets Special General Land Use Plan (GLUP) Study Planning Commission Agenda Item #3 May 11, 2017 Department of Community Planning, Housing and Development Presentation Contents 1. Background

More information

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2 Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2 WHY LEASE SPACE AT THE CHAMPAGNE CENTRE? A BOOMING HUB The Finch & Keele intersection is set to become Toronto s busiest transit hub, with

More information

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report STAFF REPORT ACTION REQUIRED 2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report Date: May 22, 2009 To: From: Wards: Reference

More information

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District STAFF REPORT ACTION REQUIRED 440, 444, 450 and 462 Front Street; 425, 439, 441 and 443 Wellington Street West; 6-18 Spadina Avenue and 1 and 19 Draper Street - Zoning and Official Plan Amendment Application

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

REGIONAL BOARD REPORT

REGIONAL BOARD REPORT REGIONAL BOARD REPORT Administrator s Office For the Board August 21, 2008 DATE: August 14, 2008 FILE NOS.: A-07-06377/8/9.000 FROM: RE: Chief Administrative Officer OCP and Zoning Amendment Application

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003)

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003) May 21, 2002 TO: FROM: APPLICANT: BY: SUBJECT: The County Board of Arlington, Virginia Ron Carlee, County Manager American Restaurant Corporation DBA Tivoli Restaurant 1700 N. Moore Street Arlington, Virginia

More information

To apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and

To apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and Corporate NO: R243 Report COUNCIL DATE: November 20, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: November 15, 2006 FROM: Acting General Manager, Planning and Development FILE: 0850-20 (CF) SUBJECT:

More information

places Mooloolaba s heart five

places Mooloolaba s heart five five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised

More information

Director, Community Planning, North York District

Director, Community Planning, North York District STAFF REPORT ACTION REQUIRED 3401 Dufferin Street and 1 Yorkdale Road - Yorkdale Shopping Centre Block Master Plan - Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: September

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017. Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Submitted via online portal 2 June 2017 Dear Sir /Madam, RE: DRAFT ENVIRONMENTAL AND LIVEABILITY STRATEGY The Green Building Council

More information

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation. Memorandum To: From: Amex Corporation c/- Greg Wood, Tract Consultants Matthew Lee Cc: Date: 12 June 2013 Subject: Economic Statement for Amex site Tarneit North PSP Dear Greg, This economic statement

More information

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services Sport Capital Improvement Plan Paul Borci Manager, Campus Planning Property & Campus Services What is SCIP? Property and Campus Services (PCS) in collaboration with Melbourne University Sport (MU Sport)

More information

Kingsland Global to develop Phnom Penh City Centre

Kingsland Global to develop Phnom Penh City Centre ASX / Media Release July 31, 2017 Kingsland Global to develop Phnom Penh City Centre Highlights: Kingsland Ventures Co Ltd (Kingsland Ventures), a wholly owned subsidiary of Kingsland Global Ltd (Kingsland

More information

GREENFIELD DEVELOPMENT PROJECTS

GREENFIELD DEVELOPMENT PROJECTS GREENFIELD DEVELOPMENT PROJECTS Highlights of development pipeline as at December 31, 2011, are as follows: Estimated square feet upon completion of the development project (thousands of square feet, except

More information

York Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers

York Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers York Region Rapid Transit Corporation 0 York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers 2014 Annual Report April 2015 1 2014 Annual Report - Overview

More information

Markham Sports, Entertainment & Cultural Centre April 20, 2012

Markham Sports, Entertainment & Cultural Centre April 20, 2012 Markham Sports, Entertainment & Cultural Centre April 20, 2012 Opportunity Markham has been offered a unique opportunity to partner on a Sports, Entertainment & Cultural Centre ( the Centre ), with approximately

More information

CREATING CONNECTIONS IN CLARINGTON

CREATING CONNECTIONS IN CLARINGTON CREATING CONNECTIONS IN CLARINGTON ANDRE MAROIS Director, RER Corridor Infrastructure Lakeshore East CHRIS BURKE Director, Service Planning, Planning & Development CLARINGTON GENERAL GOVERNANCE COMMITTEE

More information

HOUSING UNITS,

HOUSING UNITS, Mississauga Long-Range Growth Forecasts Housing Units, 2011-2041 The City of Mississauga has released long-range growth forecasts of population, housing and employment to the year 2041. These forecasts

More information

FINCH HYDRO CORRIDOR TRAIL PROJECT

FINCH HYDRO CORRIDOR TRAIL PROJECT FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event

More information

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC Greenwich Peninsula Investor and Analyst Day 12 March 2013 Agenda Maxwell James Chief Executive Anthony Gill Development Director, Greenwich Overview Greenwich Peninsula 2 Quintain Strategy Delivering

More information

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES

More information

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

COLLEGE STREET STUDY Community Consultation Meeting. December 2015 COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY?

WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY? WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY? The traditional business park format is no longer sustainable. Occupiers want more; more amenities, more convenience and a better working environment [work-life

More information

EMPLOYMENT,

EMPLOYMENT, Mississauga Long-Range Growth Forecasts Employment, 2011-2041 The City of Mississauga has released long-range growth forecasts of population, housing and employment to the year 2041. These forecasts were

More information

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO York Region Lake to Lake Trail Implementation City of Markham Staff Presentation PRESENTATION TO DEVELOPMENT SERVICES COMMITTEE September 6, 2016 1 Lake to Lake Route 2 Lake to Lake Route In 2008, the

More information

LEASING OPPORTUNITIES

LEASING OPPORTUNITIES LEASING OPPORTUNITIES ROB CHASMAR Personal Real Estate Corporation 1 604 661 0822 rob.chasmar@colliers.com JASON TEAHEN Personal Real Estate Corporation 1 604 661 0847 jason.teahen@colliers.com HIGHLIGHTS

More information

MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS Highlights of greenfield development pipeline as at March 31, 20, are as follows: Estimated square feet upon completion of the development project square feet) Retailer owned anchors Anticipated date of

More information

Appendix VII TTC Routes

Appendix VII TTC Routes Appendix VII TTC Routes Route: TTC 17A Birchmount Type: Local Description: A main north-south route operating along Birchmount Road in Markham southward to Warden Subway Station with peak service to Royal

More information

The optimum gross floor areas for the predominant land uses within Precinct Five are outlined below in Table 8.1.

The optimum gross floor areas for the predominant land uses within Precinct Five are outlined below in Table 8.1. 8.0 PRECINCT FIVE - CONVENTION CENTRE PRECINCT 8.1 Intent This Precinct is intended to function as an extension to the public purposes uses associated with the existing Performing Arts Complex. The primary

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

One Bangkok, Thailand s First Fully Integrated District, Begins Construction

One Bangkok, Thailand s First Fully Integrated District, Begins Construction 8 March 2018 One Bangkok, Thailand s First Fully Integrated District, Begins Construction Groundbreaking ceremony marks major milestone for One Bangkok, THB 120 billion landmark development, set to transform

More information

Aberdeen Exhibition and Conference Centre

Aberdeen Exhibition and Conference Centre Aberdeen Exhibition and Conference Centre Aberdeen Exhibition and Conference Centre 2 Progress to date and future projects David Anderson Managing Director Aberdeen Exhibition and Conference Centre 3 Our

More information

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/ Unit 2 Eclipse Office Park High Street Staple Hill Bristol BS16 5EL T: 0117 956 1916 E: all@tetlow-king.co.uk F: 0117 970 1293 W: www.tetlow-king.co.uk Ms P Goldfinger Date: 18 September 2017 Head of Programme

More information

Interim Growth Management Policies City of Brampton Council

Interim Growth Management Policies City of Brampton Council Interim Growth Management Policies City of Brampton Council October 24, 2007 Agenda City of Brampton 2006 Official Plan Brampton s Growth Management Initiatives Provincial Growth Plan Brampton s Growth

More information

VAUGHAN METROPOLITAN CENTRE SUB-COMMITTEE OCTOBER 18, 2017 DEVELOPMENT ACTIVITY UPDATE: DOWNTOWN UNDER CONSTRUCTION VAUGHAN METROPOLITAN CENTRE

VAUGHAN METROPOLITAN CENTRE SUB-COMMITTEE OCTOBER 18, 2017 DEVELOPMENT ACTIVITY UPDATE: DOWNTOWN UNDER CONSTRUCTION VAUGHAN METROPOLITAN CENTRE VAUGHAN METROPOLITAN CENTRE SUB-COMMITTEE OCTOBER 18, 2017 DEVELOPMENT ACTIVITY UPDATE: DOWNTOWN UNDER CONSTRUCTION VAUGHAN METROPOLITAN CENTRE Recommendation The Chief Corporate Initiatives and Intergovernmental

More information

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2.

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2. e: QuarryParkLOA@remingtoncorp.com w: remingtoncorp.com Quarry Park News INSIDE: New Amenities Set For 2016 Openings More on page 1 & 2. Amenities Opening in 2016 The Remington YMCA Quarry Park Recreation

More information

Addison Hall Business Park LOTS FOR SALE, AURORA (FROM 2 ACRES)

Addison Hall Business Park LOTS FOR SALE, AURORA (FROM 2 ACRES) Addison Hall Business Park LOTS FOR SALE, AURORA (FROM 2 ACRES) LI T S E S LE E RE H IG T Leslie Street Frontage Interior Parcels»» Lots are fully serviced, divisible to various sizes»» Business park features

More information

Union Station Rail Corridor East

Union Station Rail Corridor East Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed

More information

Welcome. North. Westgate

Welcome. North. Westgate Welcome Welcome to our exhibition. In 2015, Peterborough City Council granted planning permission for a leisure-led, mixed-use scheme at North, which was centered on the delivery of a cinema. Due to various

More information

DESIGN-BUILD OPPORTUNITY

DESIGN-BUILD OPPORTUNITY DESIGN-BUILD OPPORTUNITY BUILDING FOR YOUR FUTURE Metro East Business Park is 64 acres Situated minutes from Highway Metro East Business Park is First Gulf is a market leader with of employment land conveniently

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland

SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland SPHERE SOUTHPORT LIVING 154 Musgrave Ave, Southport Gold Coast, Queensland 6 May 2010 Regional Facilities Plan & Upgrade of Public Transport Stage One of the Gold Coast Rapid Transit System is scheduled

More information

Construction Staging Area 19 Western Battery Road

Construction Staging Area 19 Western Battery Road REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York

More information