FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Size: px
Start display at page:

Download "FY Candidate Sidewalk Projects. Sidewalk Advisory Committee"

Transcription

1 FY Candidate Sidewalk Projects Sidewalk Advisory Committee

2 Sidewalk Advisory Committee December 2017 FY Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway Road Auburndale Gapway Road Old Berkley Road to Berkley Road Auburndale Old Polk City Road Odoniel Drive to Hammock Shade Drive N. N. Lakeland Hooker Street Old Hwy. 37 to DEE Bradley

3 C. Fred Jones Blvd./CR 559A Old Berkley Road 11,334 LF (MOL) Existing Sidewalk Berkley Accelerated Middle School and Berkley Charter School Gapway Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

4 Old Berkley Road at Gapway Road Looking northerly to Old Berkley Road from intersection Old Berkley Road Gapway Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

5 Looking northerly Old Berkley Road Undeveloped Frontage Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

6 Drainage Outfall/Endwall East side of road at Fish Haven Road Older Developed Frontage Along Lake Juliana/East-side Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

7 Looking northerly Newer Developed Frontage Existing Sidewalk Existing Sidewalk Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

8 School-Zone Beacon Looking north at Berkley Knights Drive Existing Sidewalk Sidewalk to Schools from Berkley Road ½ mile to ¾ mile walk along Berkley Knights Drive Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

9 Looking northerly to C. Fred Jones Blvd./CR 559A Swale Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

10 Looking northerly to C. Fred Jones Blvd./CR 559A Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

11 Existing Sidewalk Existing Sidewalk Looking southerly to Old Berkley Road from C. Fred Jones Blvd./CR 559A Sidewalk extends to SR 559 and Berkley Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

12 Old Berkley Road Total Score: 95 Limits: C. Fred Jones Blvd./CR 559A to Gapway Road Length: 11,334 LF (MOL) Requester: Resident via Comm. Dantzler Comments: Speed limit is 40 MPH. R/W = 35'-70' (MOL). No pedestrian crash history. Low potential for use. Some lengthy easements or R/W likely needed. Existing cross drains at Fish Haven Road will need extending or a pedestrian bridge may be required. Swale, some utility and mailbox relocations needed. Potential sidewalk damage from grove operations. Potential for extensive clearing along some frontages. Design and construction costs could exceed $1 M.

13 1,604 LF (MOL) Gapway Road Old Berkley Road to Berkley Road (Auburndale)

14 Gapway Road at Berkley Road Looking easterly to Gapway Road from intersection Gapway Road Existing Sidewalk Existing Sidewalk Berkley Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

15 Gapway Road Looking easterly from intersection at Berkley Road Gapway Road Existing Sidewalk Gapway Road Old Berkley Road to Berkley Road (Auburndale)

16 Gapway Road Looking easterly to intersection at Old Berkley Road Old Berkley Road Gapway Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

17 Gapway Road at Old Berkley Road Looking northerly to Old Berkley Road from intersection Old Berkley Road Gapway Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

18 Gapway Road Total Score: 75 Limits: Length: Old Berkley Road to Berkley Road 1,604 LF (MOL) Requester: Resident via Comm. Dantzler Comments: Speed limit is 40 MPH. with no road shoulder. No pedestrian crash history. Low potential for use. No developed frontage or homes accessing segment. Approximately 70% of the project limits have existing Type F curb and gutter. An easement or two may be needed west of Old Berkley Road.

19 Hammock Shade 4,121 LF (MOL) Odoniel Drive Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

20 Existing Sidewalk Looking southerly from Odoniel Drive to existing sidewalk Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

21 Looking northerly to Odoniel Drive from existing sidewalk 300 LF south Pipeline marker, O/H poles, at-grade telecom and shrubbery Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

22 Looking northerly along typical frontage (w/ ROW constraints) Swale O/H poles, mailboxes and at-grade utilities Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

23 Established entry landscaping. Looking south from Hammock Shade Drive Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

24 Old Polk City Road Total Score: 115 Limits: Length: Odoniel Drive to Hammock Shade Drive 4,121 LF (MOL) Requester: Jennifer Melton/Resident Comments: Speed limit is 45 MPH. R/W = 50'-60' (MOL). Pedestrian crash history, incl. one fatality in 5-years. Medium potential for use. An easement or two may be needed. Landscaping at The Oaks of Lakeland (Hammock Shade Drive) subject to removal. Could site behind utility poles on the east side to match existing 300' south of Odoniel Drive. Some utility relocation likely. Landscaping and shrubbery removal needed.

25 Transit Stop and Food Store ¼-⅓ mile west of Old Hwy. 37/Hooker Street Intersection 1,738 LF (MOL) Hooker Street Old Hwy. 37 to DEE (Bradley)

26 Hooker Street Looking easterly from Old Hwy. 37 to Nero Drive/Hooker Street Hooker Street Old Hwy. 37 to DEE (Bradley)

27 Old Hwy. 37 Swale Looking northerly from Hooker Street to Old Hwy. 37 Hooker Street Old Hwy. 37 to DEE (Bradley)

28 Looking westerly along Hooker Street at Community Center frontage/driveway Utilities (telecom and shut-off valves) Hooker Street Old Hwy. 37 to DEE (Bradley)

29 Swale Utility poles and signs within swale Looking westerly along Hooker Street at Wilson Ave. across from Community Center Swale Hooker Street Old Hwy. 37 to DEE (Bradley)

30 Swale Poles and valves in swale Looking west along Hooker Street from Central Ave. to Community Center Hooker Street Swale Central Avenue Hooker Street Old Hwy. 37 to DEE (Bradley)

31 Swale Swale Looking westerly along Hooker Street at Dead End East (typical frontage) Hooker Street Old Hwy. 37 to DEE (Bradley)

32 Hooker Street Total Score: 70 Limits: Length: Old Hwy. 37 to DEE 1,738 LF (MOL) Requester: Betty Stancil/Resident Comments: No observed speed limit. R/W = 40' (MOL). No pedestrian crash history. High potential for use. Swales close to the EOP on both sides of roadway. Drainage modifications (w/ handrail?) likely. Utility poles, traffic signs and water valves in southside swale(s). New sidewalk would act as a community spine path accessing six connecting residential streets. Site sidewalk at EOP at back of curb?

33 December 2017 SAC Sidewalk Projects Update SAC Project List Limits Status Schedule Old Dixie Hwy. E. Carroll Road to US Hwy. 92 COMPLETE Southern Avenue Wabash Community Center to Ariana Street COMPLETE Berkley Road SR 33 to Park COMPLETE Walt Williams Road South Chippendale Road to Watson Elem. School Preparing bid documents. Bids January 2018 Lake Ned Road Lakeside Townhomes to Park COMPLETE Walt Williams Road North Wendell Watson Elem. to Ashbury Drive COMPLETE

34 December 2017 SAC Sidewalk Projects Update SAC Project List Limits Status Schedule Cypress Gardens Road 7-11 store to Lake Fox Road South COMPLETE Odom Road Socrum Loop Road N. to Corona del Mar COMPLETE Swindell Rd East CR 542 to Swindell Road COMPLETE Palmetto Street Marigold Avenue to Audubon Road COMPLETE Cypress Gardens Road Lakeside Townhomes to Osprey Point Trees removal complete. Project being re-bid. Bids December 8. Construction starting January South Blvd. Orchid Drive to US Hwy. 27 COMPLETE Campbell Road North Banana Road to D.R. Bryant Road In Design. Awaiting survey at south tie-in point to existing sidewalk. Design to be completed by January Construction starting February Eloise Loop Road 1,000 LF gap west of West Lake Ruby Drive Dollar General Store COMPLETE CR630 (Frostproof) Palm Avenue to Lake Avenue Contacted new City of Frostproof staff, who are uncertain about participating in project. Initially, Frostproof would secure needed ROW/easements. Insufficient ROW available for construction. TBD Swindell Road West Ponderosa Drive to N. Galloway Road COMPLETE Allegheny Road Lake Hatchineha Road to Bayberry Street COMPLETE Washington Avenue US Hwy. 27 to Community In Design. Pending easement. Construction TBD

Lighting Evaluation Form

Lighting Evaluation Form Lighting Evaluation Form s: 36 th Street NW from Avenue M NW to Avenue J NW Marianna Road from Dairy Rd to Whispering Pines Dr Peterson Road from CR 37B to Tillery Road South Carter Road from Crescent

More information

hauger bunch Town Center - Mixed Use Site 44+ Acres Outparcels/Major Retail US 98 South, Lakeland, Florida SITE

hauger bunch Town Center - Mixed Use Site 44+ Acres Outparcels/Major Retail US 98 South, Lakeland, Florida SITE Town Center - Mixed Use Site 44+ Acres US 98 South, Lakeland, Florida I-4 & Tampa S Florida Ave Polk Parkway LAKELAND Lakeland Highlands Rd County Road 40 I-4 & Winter Haven Highland City Town Center Polk

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

LAKEPARK AT TRADITION - PLAT 1 P.B. 70, PG. 35 TRADITION PLAT NO. 19 - TOWNPARK PHASE ONE P.B. 47, PG. 32 SOUTHERN GROVE PLAT NO. 4 P.B. 56, PG. 18 SOUTHERN GROVE PLAT NO. 4 P.B. 56, PG. 18 EMERGENCY ACCESS

More information

Culpeper District. Albemarle County Monthly Report. September 2012

Culpeper District. Albemarle County Monthly Report. September 2012 Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

Draft Year 2040 Cost Feasible Plan

Draft Year 2040 Cost Feasible Plan Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)

More information

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date SPECIAL COMMITTEE ON US ROUTE NUMBERING MEETING MINUTES FOR OCTOBER 17, 2013 AND REPORT TO SCOH OCTOBER 18, 2013 SHERATON DOWNTOWN DENVER, DENVER, COLORADO ADDENDUM OCTOBER 28, 2013 The meeting of the

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

APPENDIX G MULTI-USE TRAILS DOWNTOWN LAKELAND

APPENDIX G MULTI-USE TRAILS DOWNTOWN LAKELAND MULTI-USE TRAILS DOWNTOWN LAKELAND POINCIANA PARKWAY Multi-Use Trails Trail Name From To Status Regional Network Surface Length Present Day Cost Chain-of-Lakes Trail Bridge South of US 17/92 North of US

More information

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE FIRST EDITION, SEPTEMBER 2011 Covers Section TN1 Base of Lookout Mountain to Soddy Daisy, TN THIS GUIDE IS NOT FOR SALE OR RESALE Guide To The Great Eastern

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5131 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5131 FOR PUBLIC HEARING The Sustainable Streets Division of the San Francisco Municipal Transportation Agency will hold a public hearing on Friday, August 2, 2013, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton

More information

Florida Department of Transportation MIKE DEW SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY July 5, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #27 FOR WEEK OF

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:

More information

MUSCATINE COUNTY BOARD OF SUPERVISORS

MUSCATINE COUNTY BOARD OF SUPERVISORS MUSCATINE COUNTY BOARD OF SUPERVISORS Robert Howard, District One Matt Bonebrake, District Two Scott Sauer, District Three Nathan Mather, District Four Jeff Sorensen, District Five AGENDA 9:00 a.m. 1.

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Construction Projects Report

Construction Projects Report Construction Projects Report Week of Mar 26-Apr 01, 2018 Street/Intersection From To CURRENT PROJECTS Proposed Date of Construction Auburn Dr. Georgetown Bowling Green 2/19/18 4/13/18 Proposed Date of

More information

September 30, 2016 PUBLIC HEARING RESULTS

September 30, 2016 PUBLIC HEARING RESULTS The Sustainable Streets Division of the San Francisco Municipal Transportation Agency held a public hearing on Friday,, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place,

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

See Yellow Highlighted for Major Closures

See Yellow Highlighted for Major Closures Projects Report Week of Apr 30-May 06, 2018 Street/Intersection From To CURRENT PROJECTS of Ave. A Maple Eagle 3/19/18 6/30/18 Barbara St. Audra Beverly 5/7/18 5/21/18 Bonnie Brae St. Roselawn West of

More information

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP BONITA BEACH ROAD May 18, 2016 Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA Greg Diserio, RLA Tara Salmieri, AICP Toole Design Group Engineers Planners Landscape Architects Authors BONITA BEACH

More information

Welcome to the Cross County Trail Public Input Session!

Welcome to the Cross County Trail Public Input Session! Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED

More information

2017 LIST OF PRIORITY PROJECTS

2017 LIST OF PRIORITY PROJECTS 0 LIST OF PRIORITY PROJECTS Adopted April, 0 Amended August, 0 by the Lake~Sumter MPO GOVERNING BOARD Coverage of Fiscal Years 0/ through 09/0 Prepared by the Lake~Sumter Metropolitan Planning Organization

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years Bay County Citizen s Plan Tentative Work Program Fiscal Years 2019-2023 The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, including Title VI of the

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

THE STATE OF GRAYSLAKE

THE STATE OF GRAYSLAKE THE STATE OF GRAYSLAKE Presented by: Mayor Rhett Taylor January 23, 2014 The State of Grayslake Economic Development Transportation Village Center Plans Economic Development Cost Savings Programs: Village

More information

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK Santa Fe, Oregon, and California ational Historic Trails Olathe: overview W 135th St W 143rd St GARDER 91: p.117 SATA FE UICORPORATED JOHSO COUTY W Santa Fe St ELM GROVE CAMPGROUD OREGO TRAIL W Dennis

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

Special Committee on U.S. Route Numbering

Special Committee on U.S. Route Numbering Special Committee on U.S. Route Numbering Friday, May 4, 2007 Reg. 1 - K Sweeney, ME Reg. 2 - D Vaughn, AL Reg. 3 - K Keith, MO Reg. 4 - M Behrens, TX, Chair Secretary: Marty Vitale, AASHTO Staff At its

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Pasco County Public Works. Maintained Sidewalk and Multi-Use Path Inventory (Updated 1/24/2018)

Pasco County Public Works. Maintained Sidewalk and Multi-Use Path Inventory (Updated 1/24/2018) Alico Pass River Crossing Blvd to Starkey Blvd 4 6,350 4 S/W South Anclote Blvd Baillies Bluff Rd -E- to Sweetbriar Dr 3 2,740 4 S/W North Baillies Bluff Rd Anclote Blvd -N- to Hickory Ln 3 285 4 S/W West

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-145 WHEREAS, The San Francisco Municipal Transportation Agency has proposed parking and traffic on San Bruno Avenue included

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Amending Transportation Code, Division II to prohibit parking on

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA

More information

Janitorial Service Needed

Janitorial Service Needed HEPATITIS A - HAND WASHING STATIONS (HWS) - PLACEMENT LIST - OCTOBER 6, 2017 By Date and Method of Placement No. Site Address Jurisdiction 1 Balboa Park - Cabrillo Bridge / Museum of Man 1329 El Prado,

More information

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting AGENDA WEDNESDAY, SEPTEMBER 23, 2015 6:00 PM or immediately after the ICTC meeting County Administration Building, 2 nd Floor Board of Supervisors Chambers 940 W. Main St. El Centro, CA 92243 CHAIRPERSON:

More information

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 171205-153 WHEREAS, The San Francisco Police Department has requested that the SFMTA add No Stopping Anytime, Except Marked

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)

More information

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP Expansive Views Entitlements for 20 Residential Lots Previously Graded Entitled for 14 Detached Lots, 6 Townhome Units DOWNTOWN SAN DIEGO ASKING PRICE: $1,395,000 - OFFERS DUE JULY 14, 2017 Monterey Heights

More information

Members: Guest(s): USRN DECISION CHANGE

Members: Guest(s): USRN DECISION CHANGE AASHTO Special Committee on U.S. Route Numbering () Report to the Standing Committee on Highways (SCOH) Decisions & Meeting Minutes October 29, 2010 - Biloxi, Mississippi Members: Guest(s): Chair Don Vaughn,

More information

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE

More information

I-70/I-71 Project Public Meeting Presented By

I-70/I-71 Project Public Meeting Presented By I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Independence: overview

Independence: overview : overview Kentucky Ave 8: p.30 SUGAR CREEK SATA FE. OREGO, CALIFORIA 7: p.29 6: p.28 9: p.31 10: p.32 Square, Jackson County Courthouse. Photo: Vireo Trail swale area, Santa Fe Trail. Photo: Vireo HISTORIC

More information

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017 DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION

More information

City of North Liberty

City of North Liberty City of North Liberty City Council Agenda Special Session August 3, 11 AGENDA North Liberty City Council August 3, 11 Special Session :3 p.m. Council Chambers 1. Call to order.. Roll call. 3. Approval

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Florida Department of TRANSPORTATION. First Coast Expressway

Florida Department of TRANSPORTATION. First Coast Expressway Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Van Ness Avenue

More information

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features: Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley

More information

Montgomery Citizens Advisory Committee Meeting Minutes

Montgomery Citizens Advisory Committee Meeting Minutes Voting Members Mr. James Brown Ms. Ruth Ott Mr. Crews Reaves Mr. Blair Rehnberg Mr. Charles Rowe Mr. Rich Beauchamp Ms. Gracie Stroud Mr. Theodore White Montgomery Citizens Advisory Committee Meeting Minutes

More information

Public Works Department. Fiscal Year 2019 Projects

Public Works Department. Fiscal Year 2019 Projects Public Works Department Fiscal Year 2019 Projects Palm Avenue Drainage Improvements Description: Neighborhood drainage improvement and flood abatement Phase: Currently in design (began FY18) Schedule:

More information

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

Community Development Department Council Chambers, 7:30 PM, December 20, 2012 STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Lee County Board of County Commissioners January 24, 2017 Workshop Meeting

Lee County Board of County Commissioners January 24, 2017 Workshop Meeting Lee County Board of County Commissioners January 4, 017 Workshop Meeting 1 Review Current Transportation Priorities (Tiers 1,, 3) Discuss Status of Projects 3 Discuss Ranking Recommendations 1 State of

More information

Legoland Area Commercial Development Site Directly Across From Legoland Main Entrance Winter Haven, FL

Legoland Area Commercial Development Site Directly Across From Legoland Main Entrance Winter Haven, FL HIGHLIGHTS 1,500 feet from Legoland gates Frontage on Roosevelt Drive just east of Cypress Gardens Blvd. Previously planned for 108 hotel units or $12,000 per key Current zoning allows for hotel, retail,

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

Ponte Vedra High School

Ponte Vedra High School Bus Number: 119 Bus 119 Neck-Broken Pottery-Gate 8:25 Ponte Vedra Blvd & Gnarled Oaks Dr 8:27 Ponte Vedra Blvd & Broken Pottery Dr 8:31 1158 Ponte Vedra Blvd 8:32 1208 Ponte Vedra Blvd 8:34 1242 Ponte

More information

June 17, 2016 PUBLIC HEARING RESULTS

June 17, 2016 PUBLIC HEARING RESULTS The Sustainable Streets Division of the San Francisco Municipal Transportation Agency held a public hearing on Friday,, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place,

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

Chapter 4. Development Alternatives

Chapter 4. Development Alternatives Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined

More information

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY November 29, 2018 Brian R. Rick, 863-519-2828 Brian.Rick@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV. 02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA

More information