ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Size: px
Start display at page:

Download "ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE"

Transcription

1 ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where conflict occurs between the unit price and the total amount named for any item, the unit price shall prevail, and the totals shall be corrected to conform thereto. SCHEDULE A - S 312TH ST (PACIFIC HWY S TO 28TH AVE S) TOTAL DESCRIPTION QUANTITY PRICE 1,100 HR $52.00 $57, HR $52.00 $5, HR $75.00 $21, DAY Roadside Cleanup 1 FA $3, $3, Asphalt/Cement Concrete Sawcutting 10,568 LF CY ,200 SY TN Maintenance Rock for Shoulder Reconstruction, Incl. Haul 55 TN Planing Bituminous Pavement 8,472 SY HMA Class 1/2" PG ,096 TN Widening 700 TN Adjust Manhole 9 EA Adjust Catch Basin 10 EA Install Conversion Riser for Type I Catch Basin Repair or Rebuild Manhole Adjust Existing Utility to Grade Sod Lawn, Incl. 4 In Topsoil 20 SY Cement Conc. Curb and Gutter 26 LF Precast Sloped Mountable Curb 5 LF Asphalt Overlay Project PWC ver

2 Precast Dual Faced Sloped Mountable Curb Adjust Monument Case & Cover Cement Conc. Sidewalk Cement Conc. Approach Cement Conc. Curb Ramp Type 1 Parallel Cement Conc. Curb Ramp Type 2 Parallel Cement Conc. Curb Ramp Type 1 Perpendicular MMA-Style Truncated Dome Detectable Warning Surface Pedestrian Push Button Detector Loop R3-9A and R3-9B L Sign and Post Painted Traffic Arrow Painted Bike Symbol Plastic Shared Lane Marking Profiled Plastic Wide Line Profiled Plastic Dotted Wide Line 115 LF 6.4 HUND 8 EA 80 SY 32 SY 9 EA 10 SF 4 28 EA 14,220 LF 2,914 LF 1,071 LF 300 LF 1,290 LF 177 LF 26 EA SUBTOTAL SCHEDULE A SCHEDULE B - 23RD AVE S (S 312TH ST TO S 319TH PL) DESCRIPTION Asphalt Overlay Project PWC ver QUANTITY PRICE TOTAL 670 HR $52.00 $34, HR $52.00 $2,600.00

3 HR $75.00 $10, DAY Roadside Cleanup 1 FA $4, $4, ,000 LF 215 CY 1,000 SY 200 TN Planing Bituminous Pavement 7,198 SY HMA Class 1/2" PG ,730 TN Widening 440 TN Adjust Manhole 4 EA Adjust Catch Basin Install Conversion Riser for Type I Catch Basin Sod Lawn, Incl. 4 In Topsoil 3 SY Adjust Monument Case & Cover Cement Conc. Curb and Gutter 13 LF 3.4 HUND Cement Conc. Sidewalk 18 SY Cement Conc. Curb Ramp Type 1 Parallel Cement Conc. Curb Ramp Type 1 Perpendicular MMA-Style Truncated Dome Detectable Warning Surface 202 SF Detector Loop 60 EA Painted Bike Lane Arrow 1 Painted Bike Symbol 1 5,949 LF 2,968 LF Profiled Plastic Wide Line 884 LF 1,180 LF Asphalt Overlay Project PWC ver

4 LF 2 SUBTOTAL SCHEDULE B SCHEDULE C - WEYERHAEUSER WAY S PAVEMENT REPAIR TOTAL DESCRIPTION QUANTITY PRICE 360 HR $52.00 $18, HR $52.00 $1, HR $75.00 $4, DAY 5,654 LF 235 CY 1,000 SY 150 TN Widening 405 TN 1 HUND 1,000 LF 1,300 LF 100 LF 60 LF SUBTOTAL SCHEDULE C SCHEDULE D - S 328TH ST PAVEMENT REPAIR Traffic Control Labor DESCRIPTION Asphalt Overlay Project PWC ver QUANTITY 120 HR $52.00 $6, HR $52.00 $ DAY PRICE TOTAL

5 ,338 LF 45 CY 50 SY 30 TN Widening 90 TN 0.25 HUND Paint Line 1,050 LF SUBTOTAL SCHEDULE D Asphalt Overlay Project PWC ver

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

ADA Compliance Projects Summary Sheet

ADA Compliance Projects Summary Sheet District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

22-23 Pavement Marking Items. (Pages 7 & 8 removed) 22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable

More information

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area

More information

Table of Contents. Riser Rings. Riser Rings. Riser Rings. Product Description Page

Table of Contents. Riser Rings. Riser Rings. Riser Rings. Product Description Page Riser Ring Catalog Table of Contents Riser Rings Product Description Page Riser Rings Steel And Cast Iron Riser Rings Adjustable Riser Rings Steel Manhole Riser Rings Steel Catch Basin Riser Rings Steel

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

HOST KA

HOST KA W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD

More information

FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008

FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008 FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008 Transportation access to Fort Washington Office Center is negatively affected

More information

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216 Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012 Today s Date: Friday, September 7, 2012, #12-255 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max: Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Welcome to Dayton Parkway Interchange Open House. November 26, 2018 Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Second Street Improvements Project Project Update Archive

Second Street Improvements Project Project Update Archive Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020 Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Appendix E. Build Alternative Design Information

Appendix E. Build Alternative Design Information Appendix E. Build Alternative Design Information NORTHERN LIGHTS EXPRESS C/L SHIFTED MAINLINE TRACK C/L MAINLINE TRACK 5" 24: PROFILE GRADE 24: 24: PROFILE GRADE 24: 22' - 0" 22' - 0" SINGLE TRACK ON CURVES

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Culpeper District. Albemarle County Monthly Report. September 2012

Culpeper District. Albemarle County Monthly Report. September 2012 Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

Sample Estimate Reports Estimate Reports were created in XL-Pro Software Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

B10. Agate Beach State Recreation Site

B10. Agate Beach State Recreation Site B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017 RFP No. 6-17-C001 Fixed Base Operator, Dulles Airport May 3, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: RFP Section I.I. Is Jet Aviation Dulles,

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO

More information

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

80' MIN 100'-0 15'-0 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS 11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee FY 18-19 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee December 2017 FY 18-19 Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand

More information

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

Weekly construction update

Weekly construction update November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Application to Impose and Use Passenger Facility Charges - #16

Application to Impose and Use Passenger Facility Charges - #16 Application to Impose and Use Passenger Facility Charges - #16 Submitted to: The Federal Aviation Administration By: The Des Moines International Airport June 23, 2017 Ms. Sheila Bridges PFC Coordinator

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

National Model Railroad Association

National Model Railroad Association National Model Railroad Association Home :: Achievement Program :: Engineer - Civil Achievement Program Model Railroad Engineer - Civil The requirements for Model Railroad Engineer - Civil may look long

More information

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016 CITY OF WATERLOO ACCESSIBILITY STANDARDS FINAL ACCESSIBILITY STANDARDS June 20, 2016 Waterloo City Centre 100 Regina Street South, Waterloo, ON N2J 4A8 P. 519.886.1550 F. 519.747.8760 TTY. 1.866.786.3941

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

PARKS & RECREATION BOARD MISSION STATEMENT

PARKS & RECREATION BOARD MISSION STATEMENT I. Call to order II. III. IV. Welcome Student Representatives 151 Martin Street Birmingham, Mi 48009 248-530-1800 Parks and Recreation Board Agenda Department of Public Services 851 South Eton-Conference

More information

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road. Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015

More information

Quiet Zone Evaluation for Huron, Ohio

Quiet Zone Evaluation for Huron, Ohio Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN RACINE, WISCONSIN CAPITAL IMPROVEMENT PLAN 2010. 2011. 2012. 2013. 2014 TABLE OF CONTENTS Summary of C.I.P. Expenditures by Department 1 Methods of C.I.P. Financing 2 General Administration 5 Fire Department

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.

More information

THE BIG PICTURE. Week of March 4, Bring your dog. Bring your kids. Bring a picnic and spend the day with us! Free and open to the public.

THE BIG PICTURE. Week of March 4, Bring your dog. Bring your kids. Bring a picnic and spend the day with us! Free and open to the public. We're celebrating Buda's 138th Birthday with free cupcakes and bubble fun! Come hang out with us at the visitor center in Stagecoach Park for a free cupcake donated by our local Walmart and play under

More information

Design Considerations For Accessible Parks & Trails

Design Considerations For Accessible Parks & Trails Design Considerations For Accessible Parks & Trails Measuring Up: Campbell River 2008 Dave Calver Consulting City of Campbell River Legacies Now: Measuring Up Design Guidelines Design Considerations for

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing

More information

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

Steven Bauer, Policy Advisory Committee Chairperson, Presiding MINUTES BAY-LAKE REGIONAL PLANNING COMMISSION SHEBOYGAN METROPOLITAN AREA TECHNICAL AND POLICY ADVISORY COMMITTEES October 26, 2017 Sheboygan County Administration Building (Room 119), Sheboygan MEMBERS

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park

CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park OMPREHENSIE REREATIONAL MASTER PLAN ONTEXT MAP to irginia ivil War Trails NOT TO SALE iver tr rara A Riverside Mountains to Sea Trail Rowe Environmental School The Ararat River reenway is located along

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information