Riverside County Transportation Department Summary of Bids
|
|
- Hilary Wheeler
- 5 years ago
- Views:
Transcription
1 COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B Santa Ana, CA ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 5, , , RELOCATE ROADSIDE SIGN EA , , WATER POLLUTION CONTROL LS 1 3, , , , DUST ABATEMENT LS 1 1, , , , DEVELOP WATER SUPPLY LS 1 1, , , , TRAFFIC CONTROL SYSTEM LS 1 5, , , , RELOCATE IRRIGATION SYSTEM [SPRINKLERS] LS 1 5, , , , Subtotal (Base Bid - Schedule 1) 86, , Items 1-7 COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 2: Project No. B Santa Ana, CA ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT DUST ABATEMENT LS 1 2, , , , WATER POLLUTION CONTROL LS 1 3, , , , TRAFFIC CONTROL SYSTEM LS 1 10, , , , COLD PLANE ASPHALT CONCRETE PAVEMENT (0.17') SQYD , , RELOCATE MAILBOX EA , , RE-ESTABLISH LANDSCAPE AREAS LS 1 5, , , , REMOVE TRAFFIC STRIPE LF , , CLEARING AND GRUBBING LS 1 1, , , , ROADWAY EXCAVATION CY , , FINISHING ROADWAY LS 1 2, , , , CLASS 2 AGGREGATE BASE CY , , ASPHALT CONCRETE (TYPE B) TON , , MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) (CRS 201, 202 & 211) LF 1, , , MINOR CONCRETE (CURB RAMP) (CRS403 - CASE B) EA 2 1, , , , MINOR CONCRETE (CROSS-GUTTER AND SPANDREL) SQFT 1, , , MINOR CONCRETE (DRIVEWAY APPROACH) (CRS 207) SQFT , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 4, , , ROUT AND SEAL RANDOM CRACKS LS 1 2, , , , PAINT TRAFFIC STRIPE [DETAIL 12, 22 & 38] LF 1, , , PAVEMENT MARKER (REFLECTIVE) EA THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING SQFT Subtotal (Base Bid - Schedule 2) 206, , Items 8-28 Page 1 of 6
2 COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 3: Project No. B Santa Ana, CA ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT TRAFFIC CONTROL SYSTEM LS 1 5, , , , DEVELOP WATER SUPPLY LS 1 1, , , , DUST ABATEMENT LS 1 2, , , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 3, , , RELOCATE ROADSIDE SIGN EA WATER POLLUTION CONTROL EA 1 3, , , , Subtotal (Base Bid - Schedule 3) 62, , Items Project Totals: 354, , Page 2 of 6
3 TYNER PAVING COMPANY MCKENNA GENERAL ENGINEERING, INC. Schedule 1: Project No. B Los Angeles, CA Corona, CA MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 5, , , RELOCATE ROADSIDE SIGN EA , , WATER POLLUTION CONTROL LS , , DUST ABATEMENT LS , , DEVELOP WATER SUPPLY LS , , TRAFFIC CONTROL SYSTEM LS 1 1, , , , RELOCATE IRRIGATION SYSTEM [SPRINKLERS] LS 1 1, , , , Subtotal (Base Bid - Schedule 1) 42, , Items 1-7 TYNER PAVING COMPANY MCKENNA GENERAL ENGINEERING, INC. Schedule 2: Project No. B Los Angeles, CA Corona, CA DUST ABATEMENT LS 1 1, , , , WATER POLLUTION CONTROL LS , , TRAFFIC CONTROL SYSTEM LS 1 3, , , , COLD PLANE ASPHALT CONCRETE PAVEMENT (0.17') SQYD , , RELOCATE MAILBOX EA , RE-ESTABLISH LANDSCAPE AREAS LS 1 2, , , , REMOVE TRAFFIC STRIPE LF , , CLEARING AND GRUBBING LS 1 20, , , , ROADWAY EXCAVATION CY , , FINISHING ROADWAY LS 1 2, , , , CLASS 2 AGGREGATE BASE CY , , ASPHALT CONCRETE (TYPE B) TON , , MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) (CRS 201, 202 & 211) LF 1, , , MINOR CONCRETE (CURB RAMP) (CRS403 - CASE B) EA 2 1, , , , MINOR CONCRETE (CROSS-GUTTER AND SPANDREL) SQFT 1, , , MINOR CONCRETE (DRIVEWAY APPROACH) (CRS 207) SQFT , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 4, , , ROUT AND SEAL RANDOM CRACKS LS 1 6, , , , PAINT TRAFFIC STRIPE [DETAIL 12, 22 & 38] LF 1, , PAVEMENT MARKER (REFLECTIVE) EA THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING SQFT Subtotal (Base Bid - Schedule 2) 221, , Items 8-28 Page 3 of 6
4 TYNER PAVING COMPANY MCKENNA GENERAL ENGINEERING, INC. Schedule 3: Project No. B Los Angeles, CA Corona, CA TRAFFIC CONTROL SYSTEM LS 1 1, , , , DEVELOP WATER SUPPLY LS , , DUST ABATEMENT LS 1 1, , , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 3, , , RELOCATE ROADSIDE SIGN EA WATER POLLUTION CONTROL EA , , Subtotal (Base Bid - Schedule 3) 26, , Items Project Totals: 291, , Page 4 of 6
5 SOUTHLAND CONSTRUCTION GRANITE CONSTRUCTION COMPANY Schedule 1: Project No. B Irvine, CA Indio, CA MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 5, , , RELOCATE ROADSIDE SIGN EA , WATER POLLUTION CONTROL LS 1 2, , , , DUST ABATEMENT LS 1 1, , , , DEVELOP WATER SUPPLY LS 1 1, , , , TRAFFIC CONTROL SYSTEM LS 1 3, , , , RELOCATE IRRIGATION SYSTEM [SPRINKLERS] LS 1 2, , , , Subtotal (Base Bid - Schedule 1) 43, , Items 1-7 SOUTHLAND CONSTRUCTION GRANITE CONSTRUCTION COMPANY Schedule 2: Project No. B Irvine, CA Indio, CA DUST ABATEMENT LS 1 1, , , , WATER POLLUTION CONTROL LS 1 2, , , , TRAFFIC CONTROL SYSTEM LS 1 5, , , , COLD PLANE ASPHALT CONCRETE PAVEMENT (0.17') SQYD , , RELOCATE MAILBOX EA , RE-ESTABLISH LANDSCAPE AREAS LS 1 3, , , , REMOVE TRAFFIC STRIPE LF , , CLEARING AND GRUBBING LS 1 10, , , , ROADWAY EXCAVATION CY , , FINISHING ROADWAY LS 1 40, , , , CLASS 2 AGGREGATE BASE CY , , ASPHALT CONCRETE (TYPE B) TON , , MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION) (CRS 201, 202 & 211) LF 1, , , MINOR CONCRETE (CURB RAMP) (CRS403 - CASE B) EA 2 2, , , , MINOR CONCRETE (CROSS-GUTTER AND SPANDREL) SQFT 1, , , MINOR CONCRETE (DRIVEWAY APPROACH) (CRS 207) SQFT , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 4, , , ROUT AND SEAL RANDOM CRACKS LS 1 1, , , , PAINT TRAFFIC STRIPE [DETAIL 12, 22 & 38] LF 1, , , PAVEMENT MARKER (REFLECTIVE) EA THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING SQFT Subtotal (Base Bid - Schedule 2) 284, , Items 8-28 Page 5 of 6
6 SOUTHLAND CONSTRUCTION GRANITE CONSTRUCTION COMPANY Schedule 3: Project No. B Irvine, CA Indio, CA TRAFFIC CONTROL SYSTEM LS 1 1, , , , DEVELOP WATER SUPPLY LS , , DUST ABATEMENT LS , , MINOR CONCRETE (SIDEWALK) (CRS 401) SQFT 3, , , RELOCATE ROADSIDE SIGN EA WATER POLLUTION CONTROL EA 1 1, , , , Subtotal (Base Bid - Schedule 3) 25, , Items Project Totals: 352, , Page 6 of 6
7 Sub-Contractors listed by Hardy & Harper, Inc. Item Subcontractor 14,25,26,27,28 Sudhakar Company Int.
CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $
CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationKansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:
Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More information9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF
Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationCity of Shenandoah Transportation Projects. September 20, 2018 By: Derek Wind, PE, CFM
City of Shenandoah Transportation Projects September 20, 2018 By: Derek Wind, PE, CFM Shenandoah Proposed Improvements Montgomery County Precinct Boundary Precinct 2 North West side of I-45 and Research
More informationTENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1
TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).
More informationCHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014
CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed
More informationCity of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020
Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More information,271
Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest
More information2017 APC/PennDOT Fall Seminar. Deputy Secretary for Highway Administration George W. McAuley Jr., P.E.
2017 APC/PennDOT Fall Seminar Deputy Secretary for Highway Administration George W. McAuley Jr., P.E. Introduction 30 year Career Deputy Secretary Role Goals & Objectives Strengthen Relationships Improve
More informationAPPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS
Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER
More informationGale Rossi Facilities and Maintenance Manager, City of Albany 548 Cleveland Avenue Albany, CA 94710
RDG 14 April 2017 Gale Rossi Facilities and Maintenance Manager, City of Albany 548 Cleveland Avenue Albany, CA 94710 RE: Albany Hill / Final Concepts and Costs for Albany Hill Projects CC: Chelle Putzer,
More informationHOST KA
W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD
More informationCONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park
OMPREHENSIE REREATIONAL MASTER PLAN ONTEXT MAP to irginia ivil War Trails NOT TO SALE iver tr rara A Riverside Mountains to Sea Trail Rowe Environmental School The Ararat River reenway is located along
More informationMONTANA CONSTRUCTION REPORT 06 / 14 / 2016
MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl
More information- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;
B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly
More information22-23 Pavement Marking Items. (Pages 7 & 8 removed)
22-23 Pavement Marking Items (Pages 7 & 8 removed) SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable
More informationFlorida Department of Transportation MIKE DEW SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY July 5, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #27 FOR WEEK OF
More information532 - PAVEMENT MARKING - OPSS 532
532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationNew Indio Juvenile and Family Courthouse JCC Project No.: FSO JR Judicial Council of California Indio, CA Prequalified* Bidders List
New Indio Juvenile and Family Courthouse JCC Project No.: FSO-2018-17-JR Judicial Council of California Indio, CA Prequalified* Bidders List The following firms are prequalified* for the New Indio Juvenile
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT
More informationTrail Feasibility Study
VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way
More informationFlorida Department of Transportation Daniels Parkway Fort Myers, FL 33913
RICK SCOTT GOVERNOR Florida Department of Transportation 10041 Daniels Parkway Fort Myers, FL 33913 MIKE DEW SECRETARY July 27, 2017 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE DISTRICTWIDE
More informationProposal Quote/Bid. Permit Required. Oversight AITE. Doors
Doors AITE 1. Repair front doors BOE No 2 Materials ordered 2. Smoke E-Vac system BOE Yes/Vendor 4 Review pending Cloonan 3. Refinish auditorium stage floor BOE State Bid No 2 Walkthrough scheduled 4.
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationCity of Rolling Hills INCORPORATED JANUARY 24, 1957
City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 INSTRUCTIONS FOR COMPLETION OF THE LOT COVERAGE FORMS TOTAL STRUCTURES
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationFORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008
FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008 Transportation access to Fort Washington Office Center is negatively affected
More informationFY Candidate Sidewalk Projects. Sidewalk Advisory Committee
FY 18-19 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee December 2017 FY 18-19 Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationPublic Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702
Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans
More informationCrenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017
Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 1 Project Overview Design-Build Contractors: Mainline - Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationCity of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda
City of Sutherlin Planning Commission Meeting Tuesday, September 15, 2015 7:00 p.m. Sutherlin Civic Auditorium Agenda Pledge of Allegiance Welcome and Introductions Introduction of Media Approval of Minutes:
More informationFlorida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY November 29, 2018 Brian R. Rick, 863-519-2828 Brian.Rick@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationNew Jersey Department of Transportation
Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)
More informationPublic Service Department MONTHLY REPORT November 2017
- Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects
More informationCITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director
CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION June 1,2017 TO: FROM: SUBJECT: ATTACHMENTS: Traffic & Parking Commission Aaron Kunz, Deputy Director North Santa Monica Boulevard Reconstruction Project
More informationMonday, September 18, 2017 Sunday, October 1, 2017
Monday, September 18, 2017 Sunday, October 1, 2017 CONSTRUCTION UPDATE* Hurricane Irma cleanup is complete and some landscaping repairs are underway. The project was secure and no major damages were encountered.
More informationReport to Council. Report: COR Date: 25 Jul 2016
Report to Council To: Mayor Linton and Members of Council Prepared By: Mark Bradey, Financial Manager / Deputy Treasurer Report: COR2016-58 Date: 25 Jul 2016 RE: Recommendation for Award of Tender T-17-16
More informationAKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"
6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,
More informationAnnual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)
Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal
More informationAloha Township Local Road Ratings Report for 2018
Cheboygan County Road Commission Aloha Township Local s Report for 2018 The goal of the Road Commission is to use Asset Management Strategies when planning projects for the roads under the jurisdiction
More informationRECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1
PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special
More informationArkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)
ROUTE: 17 COUNTY: WOODRUFF KESSER INTERNATIONAL, INC. LITTLE ROCK, AR PHILLIPS HARDY, INC. BOONVILLE, MO PATRIARCH CONTRACTING, LLC SEARCY, AR COMMON CONSTRUCTION LLC SEARCY, AR SEAGRAVES CONSTRUCTION,
More informationRFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017
RFP No. 6-17-C001 Fixed Base Operator, Dulles Airport May 3, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: RFP Section I.I. Is Jet Aviation Dulles,
More informationCity of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019
City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationLatest Mile Marker Released
District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system
More informationAND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).
PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationApparent Bids for Letting of November 13, 2018
Apparent Bids for Letting of November 13, 2018 Letting ID: 11132018 Cut-Off Time: 02:00:59 PM 010-0425552 Anderson Anderson County Longline paint contract 1DU007 DURA MARK, INC. 72 EMERALD AVENUE STREETSBORO,
More informationBirthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.
TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE
More informationBID NO ANNUAL CONTRACT FOR ASPHALT ROAD SURFACING PRODUCTS
Corp 1 Hot Mix Asphaltic Concrete Pavement Type "A" (Course - Graded Base Course) NB NB 54.70 NB NB 55.00 1A Recycled Hot Mix Asphaltic Concrete NB NB 52.70 NB NB 53.00 2 Hot Mix Asphaltic Concrete Pavement
More informationNoise from Dane County Regional Airport. A Neighborhood View
Noise from Dane County Regional Airport A Neighborhood View Neighborhoods Around the County Airport Total population within 3 miles of airport in 2010: 68,287 people = Sun Prairie, Verona, Stoughton, Oregon
More informationAppendix B PAVEMENT CONDITION AND HISTORY
Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. To: Mayor and Council File No.: R11-131, R11-135
The Corporation of Delta COUNCL REPORT Regular Meeting To: Mayor and Council File No.: R11-131 R11-135 From: Engineering Department Date: August 9 2011 Pedestrian Facilities 55B Street Centre Street Tender
More informationCity of Clovis Bidder's List PRIME CONTRACTOR SUBS/SUPPLIER DBE UDBE Type of Work BID AMOUNT
City of Clovis Bidder's List 05-06 COUNCIL AWARD DATE PROJECT CIP # Funding Source DOT ASSISTED PROJECT BID RANK PRIME CONTRACTOR SUBS/SUPPLIER DBE UDBE Type of Work BID AMOUNT 7/6/05 Alluvial Avenue Street
More informationPROJECT NO , "CORPORATE YARD PERIMETER WALL" Subcontractor/Material Supplier List. B. W. SIMMONS, INC. List of Subcontractors
PROJECT NO. 2012-03, "CORPORATE YARD PERIMETER WALL" Subcontractor/Material Supplier List B. W. SIMMONS, INC. B. W. SIMMONS, INC. ANGELUS BLOCK CO. 14515 WHITTRAM AVE FONTANA CA 92335 909-350-0244 RANCHO
More informationSACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY
SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated
More informationMEMORANDUM NOTE DE SERVICE
REGION OF OTTAWA CARLETON RÉGION D OTTAWA CARLETON MEMORANDUM NOTE DE SERVICE Our File/N/Réf. 03 06-99-0017 Your File/V/Réf. DATE 18 June 1999 TO/DEST. FROM/EXP. SUBJECT/OBJET The Chair and Members of
More informationDistrict One Contacts
District 1 District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us
More informationWMA A Contractors Experience. NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL. Tony Limas Granite Construction Company
WMA A Contractors Experience NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL Tony Limas Granite Construction Company 1 Today's Discussion WMA By the Numbers Granite WMA Experience Observations
More informationADA Compliance Projects Summary Sheet
District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:
More informationDISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP
DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO
More informationCaltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management
District 5 Highway 1 near Big Sur in Monterey County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system to enhance California s economy and livability.
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More information2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director
2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that
More informationApparent Bids for Letting of April 10, 2018
Apparent Bids for Letting of April 10, 2018 Letting ID: 04102018 Cut-Off Time: 02:00:59 PM 020-1147480 Cherokee 2018 Cherokee CTC Resurfacing 1FR001 F & R ASPHALT, INC. 128 REEVES LANE EASLEY, SC 29641
More informationCommunity Park Capital Project. February 6, 2017
Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationBID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationBID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS April 14, 2016 Award Date April 21, 2016 COMMISSION DISTRICT 1 Job 1 Federal Project HSIP-B151109 involving installing Shur-Tite delineators and miscellaneous work at various locations in Transportation
More informationLatest Mile Marker Released
Caltrans District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation
More informationWeekly Bid Results. Friday, October 21, Red Lodge Creek Road Bridge Replacement (RL2) WWTF Pretreatment Building, Embankment, & An
Red Lodge Creek Road Bridge Replacement (RL2) Bid Date 10/17/2016 Location Red Lodge, MT $259,030.00 Battle Ridge Builders, LLC $311,667.00 D.W. Oxendahl Construction, LLC $314,359.52 Eagle Rock Timber,
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationCOASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12
COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationMEMORANDUM VILLAGE OF NORTHBROOK
MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April
More informationMERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.
1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and
More informationB10. Agate Beach State Recreation Site
B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth
More information