1 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015
2 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction Prior to Rail Operations 3. Future Construction After Rail Operations
3 ACTIVE DESIGN AND CONSTRUCTION
4 NORTH Highway 101 ACTIVE CONSTRUCTION Puerto Suello Tunnel SMART Rail Line Paloma Avenue Pacheco Street Mission Avenue 5 th Avenue 4 th Street Road Crossings Downtown Station End of Initial Operating Segment (Third St)
5 ACTIVE CONSTRUCTION NORTH SMART Rail Line Track to be Reconstructed
6 1. Remove Existing Rail GENERAL TRACK CONSTRUCTION (SMART) ACTIVE CONSTRUCTION 2. Area Excavated 3. Rock (Ballast) Placed 4. Ties Placed 5. Steel Rail Attached 5. Lastly, additional rock is added to lock in the ties and the rail.
7 Existing Puerto Suello Pathway Mission Avenue Crossing Completed in November th Avenue Crossing Completed last Thursday 4 th Street Crossing Under construction today NTPP Puerto Suello Pathway to Transit Center
8 TRACK CROSSINGS AT ROADWAYS (SMART) ACTIVE CONSTRUCTION Mission Ave. Crossing completed in November th Avenue completed last Thursday 4 th Street under construction
9 TRACK CROSSINGS AT ROADWAYS (SMART) ACTIVE CONSTRUCTION Paloma Avenue Pacheco Street
10 Paloma Avenue Coleman Elementary School Pedestrian Overcrossing Access to School Pacheco Street Puerto Suello Multi-Use Pathway
11 ACTIVE CONSTRUCTION Existing Rail Pacheco St Looking toward Puerto Suello Pathway. Pacheco St Looking toward Lincoln Ave.
12 SMART plan Pacheco St. ACTIVE CONSTRUCTION
13 Existing Rail ACTIVE CONSTRUCTION Paloma Ave. Looking toward Puerto Suello Pathway. Paloma Ave Looking toward Lincoln Ave.
14 SMART plan Paloma Ave. ACTIVE CONSTRUCTION
15 ACTIVE CONSTRUCTION Tunnel Construction (SMART)
16 ACTIVE CONSTRUCTION Station Platform Construction (SMART) 4 feet Rail to Platform
17 SIGNAL OPERATIONS (SMART) ACTIVE CONSTRUCTION
18 Regional Transportation System Enhancements Project (City of San Rafael) ACTIVE CONSTRUCTION 23 Curb Ramps Installations/Upgrades 2 nd & Irwin 2 nd & Irwin 3 rd & Lincoln Each Ramp is different some require drainage modifications and retaining walls which can be expensive. 2 nd & Hetherton
19 Regional Transportation System Enhancements Project (City of San Rafael) 17 Traffic Signal Controller Upgrades Existing KFT Controller Cobalt Controller System
20 Sidewalk Widening Regional Transportation System Enhancements Project (City of San Rafael) ACTIVE CONSTRUCTION Count-Down Pedestrian Indications Blank Out Signs Pole Relocations
21 Regional Transportation System Enhancements Project (City of San Rafael) ACTIVE CONSTRUCTION AGENDA
22 Regional Transportation System Enhancements Project (City of San Rafael) Queue Cutter Installations
23 Regional Transportation System Enhancements Project (City of San Rafael) Traffic and Incident Monitoring New Central Monitoring System New CCTV Cameras Changeable Message Sign(s) Alerts & Quicker Response
24 ACTIVE CONSTRUCTION SMART Rail Line End of Existing Puerto Suello Pathway New Median NTPP Puerto Suello Pathway to Transit Center NTPP Puerto Suello Hill Path to Transit Center (City of San Rafael)
25 NTPP Puerto Suello Hill Path to Transit Center (City of San Rafael) ACTIVE CONSTRUCTION
26 San Rafael Downtown Integrated Traffic Center Study (City of San Rafael) ACTIVE End of Current Rail Service End of Platform Study will assess options for the Transit Center. DOWNTOWN PARKING AND WAYFINDING STUDY (City of San Rafael)
27 Transportation Authority of Marin Transit Study (City of San Rafael/Fairfax/San Anselmo) ACTIVE SMART Downtown Station West to San Anselmo West to Fairfax
28 CONSTRUCTION PRIOR TO DAY ONE OPERATIONS
29 Regional Transportation System Enhancements Project (City of San Rafael) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS) AGENDA
30 Signal Installation (SMART) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS) New Signal Poles to be installed
31 Station Architectural Finish Construction (SMART & San Rafael Council Subcommittee) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS)
32 Regulatory Approvals (SMART) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS)
33 Quiet Zones (City of San Rafael) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS) Pictures from SMART web site.
34 Taxi, Shuttle and Transit Connectivity (City of San Rafael & Other Agencies) CONSTRUCTION (PRIOR TO DAY ONE RAIL OPERATIONS) West Tamalpais between 3 rd and 2 nd Streets East Tamalpais between 3 rd and 4 th Streets will be behind East Rail Platform
35 FUTURE STUDIES, DESIGN AND CONSTRUCTION
36 Ramp Metering (Caltrans) FUTURE CONSTRUCTION (AFTER RAIL OPERATIONS) Ramp Metering Lights in place but not in operation Northbound 101 On-Ramp Southbound 101 On-Ramp
37 SMART Extension to Larkspur FUTURE CONSTRUCTION (AFTER RAIL OPERATIONS) Rail Extension to Larkspur Mahon Creek Crossing
38 SMART Extension to Larkspur FUTURE CONSTRUCTION (AFTER RAIL OPERATIONS) Future Rail line to Larkspur
39
40
41 SMART Extension to Larkspur FUTURE CONSTRUCTION (AFTER RAIL OPERATIONS) Future Rail line to Larkspur
42 CIVIC CENTER STATION RANCH ROAD CROSSING RANCHITOS ROAD CLASS II PUERTO SUELLO MULTI-USE PATHWAY ANDERSEN DRIVE CLASS 2 BIKE PATH
43 WEST FRANCISCO BLVD. DITCH TO BE LEFT OPEN
25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationRARE MARIN COUNTY TRIPLE NET INVESTMENT
RARE MARIN COUNTY TRIPLE NET INVESTMENT ±29,000 SF ±3.33 ACRES $12,950,000 PAD B Parcel 4 PAD C Parcel 5 JERRY SUYDERHOUD Sr. Managing Director jsuyderhoud@ngkf.com O: 415.526.7660 CA RE License #00633998
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationSan Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center
San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center Committee Members Present: Alex Amoroso Al Boro John Dupar Phil Frank Steve Kinsey Joan Lundstrom for Larry
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationSonoma-Marin Area Rail Transit District
Sonoma-Marin Area Rail Transit District General Manager s Report July 2018 5401 Old Redwood Highway, Suite 200 Petaluma, CA 94954 Tel: (707) 794-3330Fax: (707) 794-3037 www.sonomamarintrain.org Larkspur
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationMain Street Station Upgrades
Main Street Station Upgrades Public Meeting Hope United Church 1 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2 Main Street Station Aerial Bar
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationStrategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze
Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationArea Surrounding Maplewood Manor
BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationOrganization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator
Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationSANTA CLARA COUNTY I-280 CORRIDOR STUDY
SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study
More informationDowntown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA
14,374± sf Two Story Building REDUCED PRICE $2,700,000! Kevin Doran, Partner 1355 N Dutton Ave., Santa Rosa, CA 95401 (707) 528-1400 Fax: (707) 524-1419 Lic #: 01704987 KDoran@KeeganCoppin.com KEY FACTS
More informationEl Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012
Today s Date: Friday, September 7, 2012, #12-255 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationDesign Meeting Presentation
Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationCITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager
.. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Van Ness Avenue
More informationNFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue
Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along
More informationNortheast Corridor Transportation Update
Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer
More informationTRAIL ANNUAL REPORT
TRAIL ANNUAL REPORT 2016-17 Identify Undeveloped projects identified in the City s Greenprint or trail database 15.90 miles Study Projects that have been or are currently being studied to determine a feasible
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationFull I-35E Mainlane Closure at Beckley Avenue - July 27-30
July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationProgress Report for Projects of Regional Significance
SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on
More informationQUIET ZONE UPDATE. PUBLIC WORKS DEPARTMENT June 14, 2016
QUIET ZONE UPDATE PUBLIC WORKS DEPARTMENT June 14, 2016 Update Council on Quiet Zones in Novato Status of Quiet Zone No. 1 Highway 37 Freight Only Quiet Zone State Access Road Pedestrian Crossing Next
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationMarin County Transit District 2006 Draft Service Plan Revised: May 8 th, 2006
Marin County Transit District 2006 Draft Service Plan Revised: May 8 th, 2006... 2... 4... 8 Marin Local Fixed Route Service... 8... 14 MCTD School Routes Operating for School Year 2006/2007...14 Other
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationDamen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501
Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction
More informationNew Jersey Department of Transportation
Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationAs the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.
REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationProject Deliverable 4.1.3f Individual City Report - City of San Dimas
Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationList of Our Ongoing Noise and Vibration Monitoring Projects
List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Client: Metrolinx-Eglinton Crosstown
More informationOhio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.
Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015
More informationEast Link Project Update. Maintenance of Traffic During Construction. April 21, 2015
East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities
More informationSan Rafael General Plan Bus Tour Workbook
San Rafael General Plan 2040 Bus Tour Workbook June 13, 2018 Blank Back of Cover 2 Welcome to the San Rafael 2040 General Plan Steering Committee Bus Tour! The purpose of today s tour is to highlight long-range
More informationWichita Falls MPO - MTP Project List 1 of 6
Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS
More informationAPPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY
APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed
More informationBOARD OF DIRECTORS REGULAR MEETING MINUTES November 18, :30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954
BOARD OF DIRECTORS REGULAR MEETING MINUTES November 18, 2015-1:30 PM 5401 Old Redwood Highway, 1 st Floor Petaluma, CA 94954 1. Call to Order Chair Arnold called the meeting to order at 1:30 PM. Directors
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationTransit Options in Marin
Transit Options in Marin Inform and Connect June 29 th, 2016 1 Transportation Network Companies (TNC s) Transportation Network Companies (TNCs) hold charter-party carrier (TCP) permits to provide prearranged
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationWork in 2015 and Annual Mobility- Management Plan
Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationCity of Santa Rosa TO HWY 12 TO TODD RD (E) MH 3 (E) MH 4 LLANO ROAD DOYLE ROAD (E) MH 5 LEGEND WORK AREA MANHOLE REHABILITATION NORTH FLOW FLOW
TO HWY 12 (E) MH 3 Plot Date: 26 September 2016-8:32 AM Filename: N:\US\\Projects\111\11110074 SANTA ROSA SEWER MAIN LINING\06-CAD\Sheets\Public Notification Exhibits\Sewer MH Rehab - All Areas.dwg DOYLE
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationUpdate on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan
Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra
More information2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First
2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box
More informationInteroffice Memorandum
Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement
More informationCrenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017
Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 1 Project Overview Design-Build Contractors: Mainline - Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationAdditional Economic Development Strategy submissions- Klickitat County
Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationThe Light Rail System Safety & Grade Crossing Equipment
The Light Rail System Safety & Grade Crossing Equipment A Peer Review Provided by the American Public Transportation Association (APTA) Presented by: Mark Benedict, Director, Light Rail Operations and
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-145 WHEREAS, The San Francisco Municipal Transportation Agency has proposed parking and traffic on San Bruno Avenue included
More informationONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1
ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City
More informationOFFICE OF THE CITY MANAGER
OFFICE OF THE CITY MANAGER December 6, 2013 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items: On Wednesday, the ribbon was cut to signal
More informationReplace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure
Ramp Removed By Others Roadway Improvements By Others Ramp Improvements By Others Install ew Sign Structure Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Close
More informationTRANSPORTATION ELEMENT
Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...
More informationFlorida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY
RICK SCOTT GOVERNOR Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY November 29, 2018 Brian R. Rick, 863-519-2828 Brian.Rick@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH
More informationAnnual - TOTAL ADA ALL SETTINGS
2015-16 Annual - TOTAL ADA ALL SETTINGS Basic Aid DISTRICT K-3 4-6 7-8 9-12 Choice ADA Bolinas 36.98 27.03 30.76 - - 94.77 Dixie 887.20 605.33 479.83 - - 1,972.36 Kentfield 491.44 426.88 266.81 - - 1,185.13
More information