US 380 FEASIBILITY STUDY

Size: px
Start display at page:

Download "US 380 FEASIBILITY STUDY"

Transcription

1 US 380 FEASIBILITY STUDY Denton County CSJ(s): , Public Meeting(s): January 15 & 22, 2019

2 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15 & 22, :00 P.M. - 8:00 P.M. Presentation at 7:00 P.M. US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

3 DENTON COUNTY POPULATION 136% PROJECTED INCREASE IN DENTON COUNTY POPULATION GROWTH FROM * 23.5% INCREASE IN DENTON COUNTY POPULATION FROM *Assume the Migration scenario for 2014 Texas Population Projections US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

4 EXISTING CONDITIONS 4-6 LANE ARTERIAL SIGNIFICANT CONGESTION DURING PEAK HOURS RATED IN ENGINEERING TERMS AS AN F LEVEL OF SERVICE (THE WORST) ROW WIDTH VARIES ( ) US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

5 TRAFFIC INCREASES LOCATION PERCENT INCREASE ( ) DENTON 22% CROSS ROADS/ LITTLE ELM/ PROVIDENCE VILLAGE LITTLE ELM/ FRISCO/PROSPER 25% 50% VEHICLES PER DAY AVERAGE DAILY TRAFFIC VOLUMES US ,000 39,000 36,509 36,397 34,000 30,000 39,389 29,766 29,000 30,333 24,000 30, YEAR TRAFFIC VOLUMES ALONG US 380 IN DENTON COUNTY, EAST OF LOOP 288, INCREASED OVER 30% BETWEEN 2011 AND US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

6 PLANNED IMPROVEMENTS: US 380 DENTON WIDEN & GRADE SEPARATIONS (In-Progress) SIX-LANE WITH RAISED MEDIAN GRADE SEPARATIONS AT FM 720 Legacy Drive Teel Parkway Navo Road FM 423 US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

7 provides vital connectivity between Collin and Denton counties. Similar to for Dallas and Tarrant counties. Future Loop 288 US 380 Denton County Study US 380 Collin County Study Three studies working together. N US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

8 PURPOSE OF FEASIBILITY STUDY Analyze potential transportation options, including improving the existing alignment or utilizing new alignments. Helps determine if the project should move on to more advanced phases of project development. Do nothing (No Build) is a possible outcome. Identifies high level or critical elements of engineering, impacts to stakeholders and the public, and economic feasibility of potential new roadways or improvements to existing roadways. Provide a basis for corridor preservation Study is not intended to result in detailed design, environmental analysis, or cost estimates. US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

9 STUDY AREA Limits: I-35 to west of CR 26 (Collin County Line) Total Length: 21 miles US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

10 GOALS AND OBJECTIVES Regional Provide regional connectivity by providing an East-West connection serving Collin and Denton Counties. Local Provide reliable travel time and minimize congestion Enhance driver expectations Minimize human and environmental impacts Provide roadway network reliability US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

11 EVALUATE MODES OF TRANSPORTATION TO RELIEVE CONGESTION BIKE/PEDESTRIAN Cannot relieve congestion alone, but facilities would be included in future plans TRANSIT ROADWAY Cannot solely relieve congestion as it only serves a small portion of the trips Variety of options ranging from no new improvements to grade separations to controlled access highway alignments All modes are critical to move goods, improve mobility, and provide access throughout the area US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

12 TRAVEL DEMAND MODEL EVALUATIONS 2017 EXISTING APPROX. AVG DAILY TRAFFIC VOLUME 40,300 vehicles per day 2045 AVG. TRAFFIC DEMAND VOLUME FORECAST 112,500 vehicles per day SIGNIFICANT DEMAND FOR THIS CORRIDOR 2017 Data Obtained from TxDOT AADT Station Flag 61H4 for the year Estimate Data Travel Demand model scenarios which incorporated a controlled access highway down the existing alignment of US 380 US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

13 TYPICAL SECTIONS FOUR-LANE WITH TWO-WAY LEFT TURN LANE (EXISTING) Within existing right-of-way Continuous access 4-6 Lanes - Insufficient capacity for existing traffic Rated in engineering terms as an F level of service (the worst) US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

14 TYPICAL SECTIONS SIX-LANE WITH RAISED MEDIAN & GRADE SEPARATIONS (IN-PROGRESS) Some additional right-of-way Enhanced safety/less access Minor 6 Lanes Right-of-Way Continuous Improves level Access of service at key intersections Rated Does not in engineering accommodate terms 2045 as travel an F demand level of service volume (the forecast worst) Key Intersections: FM 720 Legacy Drive Teel Parkway Navo Road FM 423 US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

15 TYPICAL SECTIONS SIX-LANE WITH RAISED MEDIAN (URBAN ARTERIAL) Would be in addition to the In-progress project 180 right-of-way footprint 6 Lanes Does not accommodate 2045 travel demand volume forecast US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

16 TYPICAL SECTIONS CONTROLLED ACCESS HIGHWAY right-of-way footprint Enhanced safety Minor Limited Right-of-Way access Continuous 6-8 Lanes mainlanes Access and 4-6 lanes of frontage road Rated Accommodates in engineering 2045 terms travel as demand an F volume level of forecast service (the with worst) acceptable level of service US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

17 INITIAL ALTERNATIVE ALIGNMENTS SOME ALIGNMENTS MAY NOT BE VIABLE US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

18 KEY FACTORS FOR CONSIDERATION Engineering/Mobility Safety Traffic Multimodal Existing & Planned Utilities Constructability Environmental Residential and Commercial Developments Community Elements (Parks, Schools, etc.) Stakeholder & Public Input Hazardous Materials Endangered Species Habitat Economic Construction Costs Connectivity Existing and Planned Land Use Planned Improvements Noise USACE Protected Lands (Wetlands, WOTUS, etc.) Floodplains and Floodways US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

19 US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

20 FILL OUT A SURVEY AND COMMENT FORM PROVIDE VERBAL COMMENT TO COURT REPORTER SURVEY: ONLINE OR PAPER COPY Go online to & click on Denton County Feasibility Study Surveys and comment forms must be submitted by February 6, 2019 to be included in study documentation US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

21 NEXT STEPS Data Collection Initial Alternative Alignments Public Meeting #1 Viable Alignments Public Meeting #2 Preferred Alignment Public Meeting #3 Final Report Site Visits Crash Analysis Travel Demand Model Scenarios Alternatives Development Stakeholder Meetings Solicit input from public on study and alignments Refine alignments per public s input. Screen Alignments Solicit input from public on viable alignments Refine per public s input Stakeholder Meetings Identify preferred alignment Solicit input from public on the preferred alignment Refine preferred alignment and document findings Develop draft schematic Spring - Fall 2018 Fall - Winter 2018 Winter Spring 2019 Summer 2019 Fall 2019 Winter 2019 Winter We are Here SUBJECT TO CHANGE US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

22 TXDOT HAS DONE ANALYSIS OF THE NEED AND POTENTIAL SOLUTIONS Planning the next steps for the US 380 corridor will take time. That is why it is so important work begins NOW to plan for the future FEASIBILITY STUDY CORRIDOR IDENTIFIED CORRIDOR IS SEPARATED INTO INDEPENDENT PROJECTS AND PRIORITIZED ENVIRONMENTAL STUDY AND DESIGN SCHEMATIC FINAL DESIGN, CONSTRUCTION PLANS, COST ESTIMATES AND UTILITIES COORDINATION NO FUNDING HAS BEEN COMMITTED TO DATE. PHASED CONSTRUCTION CORRIDOR PRESERVATION THROUGH LAND USE PLANNING AND PURCHASES WE ARE HERE INPUT FROM THE PUBLIC IS IMPORTANT AND CONSIDERED BY TxDOT AT EVERY PHASE OF PROJECT DEVELOPMENT US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

23 STUDY CONTACTS Stephen Endres, P.E. TxDOT Project Manager Brian Swindell, P.E. HDR Project Manager Ryan Lafontaine TxDOT Public Information Office US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

24 THANK YOU For taking the time to provide input and help shape the future of US 380 and Denton County. Visit Drive380.com and click on DENTON COUNTY US 380 FEASIBILITY STUDY for study information and updates. US 380 FEASIBILITY STUDY SERIES #1 PUBLIC MEETINGS, JANUARY 15 & 22,

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012 US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda

More information

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

I-35 Reconstruction Project

I-35 Reconstruction Project I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Welcome to Dayton Parkway Interchange Open House. November 26, 2018 Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

WELCOME TO THE OPEN HOUSE

WELCOME TO THE OPEN HOUSE WELCOME TO THE OPEN HOUSE US 281 North Loop 1604 to Borgfeld Drive CSJ: 0253-04-146 & 0253-04-138 May 12, 2016 Please sign in Explore the exhibits Submit a comment form Ask questions We want to know your

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

PUBLIC INFORMATION SESSION #2

PUBLIC INFORMATION SESSION #2 Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 Subject: FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY From: VDOT-News To: Time: Tuesday, December 12, 2017 9:05:36 AM -08:00 RELEASE: IMMEDIATE Michelle Holland,

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

CITY OF DALLAS TRAIL NETWORK UPDATE

CITY OF DALLAS TRAIL NETWORK UPDATE CITY OF DALLAS TRAIL NETWORK UPDATE Trinity River Corridor Project Committee: June 10, 2013 Briefing Outline The Purpose of this briefing is to provide an overview of: The current status of the Dallas

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4434-P1 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle GUIDANCE FOR FUTURE DESIGN OF FREEWAYS WITH HIGH- OCCUPANCY VEHICLE (HOV) LANES BASED ON

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Project Advisory Group. May 23, 2013

Project Advisory Group. May 23, 2013 Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011 Imagine the result Laredo Urban Transportation Study August 31 st, 2011 Bus Rapid Transit Feasibility Study Prepared for: Laredo Urban Transportation Study Prepared by: ARCADIS U.S., Inc. 2410 Paces Ferry

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August

More information

2015 BICYCLE AND PEDESTRIAN TRAFFIC COUNT REPORT

2015 BICYCLE AND PEDESTRIAN TRAFFIC COUNT REPORT 2015 BICYCLE AND PEDESTRIAN TRAFFIC COUNT REPORT 1 NCTCOG Public Meeting East Regional Library, Fort Worth Kevin Kokes, AICP June 13, 2016 North Central Texas Council of Governments The Importance of Active

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

Update on Route 1 Efforts

Update on Route 1 Efforts County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda.

LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda. Texas Department of Transportation Project Office - Matt MacGregor, Project Manager IH 635 ( Freeway) West Section Public Hearing Public Hearing Charles R. Tucker, P.E. ( Freeway - West Section) From:

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

Appendix H: North Corridor Alternatives Through Western University - July 2017

Appendix H: North Corridor Alternatives Through Western University - July 2017 Appendix H: North Corridor Alternatives Through Western University - July 2017 1 Overview The North corridor to Masonville Place from Downtown was examined with respect to three possible routings: 1. Utilizing

More information

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101 TRANSPORTATION ADVISORY BOARD 1) Call to Order 2) Adoption of Agenda Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101 NOTICE OF A MEETING of the PLANNING COMMITTEE Thursday, June

More information

TBARTA: 2015 Master Plan and Tampa Bay Express Project

TBARTA: 2015 Master Plan and Tampa Bay Express Project TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

PUBLIC SCOPING MEETING APRIL 2018

PUBLIC SCOPING MEETING APRIL 2018 Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the

More information

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905) !" # $ !" # $ Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557 www.itransconsulting.com November 2009 %&'('$&$ 1. West Brampton Road Network...

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

Building Level Planning Committee March 30, 2016

Building Level Planning Committee March 30, 2016 Arlington Public Schools Wilson School Site Evaluation Traffic Analysis and Pick-up/Drop-off location Building Level Planning Committee March 30, 2016 1 SAN ANTONIO-BEXAR COUNTY PEDESTRIAN SAFETY ACTION

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

November 11, 2009 BY  . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr. November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Overview of Highway 37 Project. Novato Rotary November 4, 2016 Overview of Highway 37 Project Novato Rotary November 4, 2016 Project Location-Caltrans District 4 SR 37 Corridor Features Two to Four lane 21 mile corridor traversing Solano, Sonoma, and Marin Counties.

More information

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Prepared for: Town of East Greenbush 225 Columbia Turnpike Rensselaer, New York 12144

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia Prepared by PARSONS Fairfax, Virginia on behalf of the: Rappahannock-Rapidan Regional Commission in cooperation with Orange County, Virginia Virginia

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,846,222 Award Type Amount Current Allocation in 2013 in 2014 in 2015 in 2016

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

I-3 DFW Extension Public Hearing. June 2, 2011

I-3 DFW Extension Public Hearing. June 2, 2011 1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Multimodal Planning Studies

Multimodal Planning Studies Multimodal Planning Studies Commuter Park and Ride Study Steering Committee Meeting June 6, 2013 Agenda 1. Update on Project Schedule 2. Update on Online Interactive Mapping 3. Key Themes from the Open

More information