1 Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005
2 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions Next Steps
3 DART Project Development Process System Planning Ongoing Major Investment Study 1999 PE / Environmental Documentation Scoping May/June 2005 Needs Assessment Select Alternative 2000 Record of Decision Spring 2007 Refine Alignment 2004 Final Design Approvals Pending Construction Public Meetings 1/21/04 (Project Introduction) 4/28/04 (Corridor Alternatives) 11/20/04 (Line Section Analysis) 3/10/05 (Scoping) Operation Scoping Meetings Agency (5/25/05) Public (4/29/05)
4 NW to Irving/DFW 2000 MIS 2002 DFW Access Study
5 to North to North to Central to South I-3 Airport Access NW to Irving/DFW Corridor Analysis (4/28/04) North Central South I-2 Las Colinas Line Section Analysis (11/20/04) Alignment Refinement Potential Ridership Constructability Compatibility with Plans I-1 Urban Center Alignment Length Travel Time Activity Centers Station Population Station Employment Station Urbanization Station Access Station Needs TOD Potential Environmental Issues Public/Agency Support Capital Cost Cost per Mile ROW Acquisition Number of Crossings Design Complexity SH 114 Access Analysis to date: I-2 South Alignments Rated Highest
6 NW to Irving/DFW North (MIS Alignment) Central SH 161 SH 114 I-2 I-2 Lowest Potential Ridership Roadways/Development not Conducive to Transit Isolated Destinations Some TOD Potential Longest Route to DFW Some Opposition Good Ridership Potential Dense Development Limit TOD Potential SH 114 Expansion Plans Limited ROW Complex Design Complex Access Potential Displacement Avoid SH SH 161
7 NW to Irving/DFW South Preserved ROW I-2 Highest Ridership Potential Utilizes preserved rail ROW Public/Agency Support Shortest, Quickest Route to DFW Property Least Complex Good Transit Destinations High TOD Potential Pending Actions: Ridership Modeling Compare Alternatives Determine Parking Requirements & Bus activity Staff Recommendation DART Board Action System Plan Amendment Future Actions: Environmental Process Service Plan Amendment Alignment, Stations, Grade Separations Public Hearing
8 NW to I-3 13 th Station Irving/DFW DFW Access Issues: Engineering Issues Perimeter Taxiways Roadway Crossings Pedestrian Ways APM Tail track Operational Inefficiencies Atypical Terminus No System Expansion Other Rail Modes 13 th Station Interface Uncertain Operations
9 Northwest Corridor to Irving/DFW 13 th Station Terminal F DFW North I-3 DFW Access Options To North to 13 th Station To South to 13 th Station To South to DFW North (East) [Dash] To South to DFW North (West) To Central (Tunnel) to 13 th Station To South Surface to Terminal F To South Tunnel to Terminal F [DASH] I-1/I-2 Consider Project Phasing
10 Northwest Corridor to Irving/DFW I-1 & I-2 Line Section NW Hidden Ridge r rs B rme Beltline a to F DFW North UC ty i in r T U of D er v Ri llton arro California Crossing (future) South UC Federal Agency Participation USCOE FTA (Limited Involvement) FAA (Briefed 1/10/05) /C anch North Lake
11 FAA Issues: NW to Irving/DFW FAA to coordinate all DFW Rail Access EIS required for airport property use Includes I-1/I-2 Phase FAA: Lead Agency in Local Funded EIS Review entire corridor FAA must select the consultant to conduct the EIS (Significant Delays) DFW Beltline Hidden Ridge North Lake North UC California Crossing (future) South UC U of D
12 Northwest Corridor to Irving/DFW DFW North FAA Recommendation : Concur with Project Phasing Concept: Phase 1: To Irving Phase 2: To DFW Terminate the Irving Phase prior to DFW North Lake College as temporary terminus 13 th Station Terminal F Phase 2: To DFW I-3 Phase 1: To Irving I-1/I-2
13 NW to Irving/DFW DFW Beltline Hidden Ridge FAA Recommendation Issues: Terminus Station North Lake Station Access Parking Beltline Logical Terminus North UC North Lake California Crossing (future) South UC Phase 2: Phase 1: To DFW I-3 To Irving I-1/I-2 U of D
14 DART NW to Irving/DFW DFW North February 23, DFW Access Coordination meeting DFW 13th Station Beltline Terminal F Hidden Ridge North UC North Lake California Crossing (future) South UC Phase 2: Phase 1: To DFW I-3 To Irving I-1/I-2 U of D The-T DCTA FTA FAA NCTCOG DFW
15 NW to Irving/DFW DFW North 13 th Station Terminal F February 23, DFW Access Coordination meeting All Rail Access to DFW will be coordinated with a Federal EIS LRT & Commuter Rail
16 NW to Irving/DFW a to F Phase 1: To Irving I-1/I-2 NW DFW Phase I can be extended to Beltline: Federal Fund portion of project Conduct Federal EIS FTA - Lead agency FAA - Co-Lead or Cooperating Agency Beltline Station must serve any DFW access option Avoid Segmentation Adds considerable process Official Notifications Official Review Extends length of study but may not impact overall schedule California Crossing (future) South UC U of D llton arro North Federalizing Project: Lake /C anch North UC r rs B rme Hidden Ridge
17 Northwest Corridor to Irving/DFW DFW North Segmentation Issue Independent utility Logical Terminus 13 th Station Terminal F Phase 2: To DFW I-3 Phase 1: To Irving I-1/I-2
18 NW to Irving/DFW Logical Terminus Beltline Road Major Park & Ride Good Highway & Roadway Access California Crossing (future) South UC U of D llton arro North Lake /C anch North UC r rs B rme Hidden Ridge a to F Phase 1: To Irving I-1/I-2 NW DFW Independent Utility 9.5 mile Corridor Serves Irving Residents Irving Businesses Through Commuters Major Destinations University of Dallas Las Colinas Urban Center North Lake College Planned Development
19 NW to Irving/DFW Independent Utility 3 6 mile Corridor Provides LRT Access to DFW from Entire DART System Provides Multi-Agency Interface DART/The T/ DCTA Provides Multi-Modal Hub LRT/APM/Commuter Rail DFW North Logical Terminus DFW Core Terminal F DFW North 13 th Station Terminal F
20 Northwest Corridor to Irving/DFW Staff Recommendation (Pending Ridership Modeling) NW DFW a to F California Crossing (future) South UC U of D llton arro Phase 1: To Irving I-1/I-2 North UC /C anch North Lake r rs B rme Hidden Ridge
21 NW to Irving/DFW Scoping: Receive Early Public/Agency Input Purpose & Need Alternatives Agency Coordination Significant Issues Opportunities for Public Involvement
22 NW to Irving/DFW Scoping: Purpose & Need NW MIS Serve General NW-SE Travel Pattern Enhance Mobility Provide Additional Capacity Reduce Congestion Enhance Quality/Reliability of Transit Improve Safety & Operating Efficiency Strengthen Economic Conditions DFW Access Study To provide a seamless, customer sensitive, affordable, clearly achievable rail interface between the regional rail system and the DFW International Airport Central Terminal Area.
23 DFW North NW to Irving/DFW Scoping: Alternatives I-1/I-2 Alignment South? Central? North? Project Phasing Terminus Station Locations I-3:DFW Access 13th Station Terminal F South DFW to North to Central North Central South to South Hidden Ridge North Lake North UC California Crossing (future) South UC U of D
24 Northwest Corridor to Irving/DFW Scoping: Agency Coordination STATE TxDOT THC TP&W NW FTA FAA USACOE FHWA EPA a to F DFW FEDERAL r rs B rme /C anch Regional DFWIA NCTCOG ty i in r T er v Ri llton arro LOCAL The-T DCTA City of Irving City of Dallas DCURD
25 NW to Irving/DFW Scoping:Significant Issues Environmental Topics Included in EIS Land Use Air Quality Noise/Vibration Visual & Aesthetic Resources Wetlands Aquatic Habitat Wildlife Hydrology Water Quality Safety & Security Construction Impacts Cultural/Historic Resources 4(f) Parklands Environmental Justice
26 Northwest Corridor to Irving/DFW Scoping: Significant Issues NW a to F DFW 3 2 ty i in r T er v Ri 1 llton arro SPECIFIC ISSUES 1. Trinity River Crossing 2. Levee 3. Las Colinas APM 4. Campion Trail 5. Residential Adjacency 6. DFW Airport 7.???? 4 /C anch 5 r rs B rme 6
27 Northwest Corridor to Irving/DFW Scoping: Significant Issues by Agency er v Ri 2 41 ty i in r T llton arro 4 7 /C anch 4 r rs B rme a to F DFW NW SPECIFIC ISSUES 1. USACOE 2. TxDOT 3. NTTA 4. SHPO 5. FRA 6. DFW Airport 7. NCTCOG 8. The-T/DCTA
28 NW to Irving/DFW Scoping: Public Involvement Public Meetings ICAC Special Briefings Elected Officials Homeowner s Associations Boards (DCCCD, DFWIA, RTC) Organizations (Chambers, Schools, etc) Newsletter Quarterly Web Site Newsletters Presentations Documents
29 NW to Irving/DFW Project Schedule Current Project Implementation Schedule - Irving/DFW LRT Corridor Work Program Year PE/EA, I - 1 & 2 Line Sections PE/EA, I - 3 Line Section To Be Determined FD, I - 1 Line Section FD, I - 2 Line Section FD, Irving - 3 Line Section To Be Determined Const., I - 1 & 2 Line Sections Const., I - 3 Line Section Rev. Ops., I - 1 & 2 Line Sections Rev. Ops., I - 3 Line Section To Be Determined To Be Determined
30 NW to Irving/DFW Decisions Final Alignment Phasing Station Locations Parking, Buses, Access Grade Separations Environmental Impacts Mitigation
31 NW to Irving/DFW Next Steps: Ridership Modeling Public Scoping Meeting (June 29, 2005) Staff Recommendation to Board Project Phasing I-1/I-2 Alignment System Plan Amendment Environmental Documentation Develop I-3 Implementation Schedule Service Plan Amendment Alignment, Station Locations, Grade Separations
Northwest Corridor LRT Line to Irving/DFW
Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions
More informationI-3 DFW Extension Public Hearing. June 2, 2011
1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationSouth Bay Metro Green Line Extension
South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationUS 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012
US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationProject Advisory Group. May 23, 2013
Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open
More informationI-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon
I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, 2010 9:00 AM to Noon Welcome Mark Mathews, the Facilitator, welcomed the I-35 Corridor Segment Committee 1
More informationLink Union Station (LINK US)
Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationWest Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018
West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments
More informationMAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council
MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES November 6, 2017 Regular Meeting of Council Recommendation THAT Council: Approve the Maplewood Village Centre and
More informationOntario Municipal Board Commission des affaires municipales de l Ontario
Commission des affaires municipales de l Ontario ISSUE DATE: July 25, 2014 CASE NO: PL130788 PROCEEDING COMMENCED UNDER subsection 17(36) of the Planning Act, R.S.O. 1990, c. P.13, as amended Subject:
More informationFort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR
Fort Lauderdale City Commission Transit Presentation July 21, 2009 CAR 109 0932 Agenda Overview City Transit Vision Commission Direction 2035 LRTP Long Range Transportation Plan THOR Transit/Housing Oriented
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationNational Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014
National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationInterstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by
Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationMiami Orlando Passenger Rail Project Overview
Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along
More informationNorthaven Trail Phase 2 Initial Project Overview
Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationCentral Broward Transit (CBT) Phase 1 Public Open House January 21, 2016
Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?
More informationSummary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)
ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,486,222 Award Type 1 - Strategic Awards to Small Transit Providers 2 - RTC Has
More informationOctober 23, 2017 Council Workshop
MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES October 23, 2017 Council Workshop COMMUNITY PLAN Purpose of Council Workshop Highlight What We Heard Phase 3 & Key
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationEast Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff
Route 110 Alternatives Analysis Public Meeting #2 April 27, 2015 East Farmingdale Fire Department 930 Conklin Street Source: Parsons Brinckerhoff Agenda Welcome/Project Background Jonathan Keyes Director,
More informationDOWNTOWN BRT ALTERNATIVE - 19th AVE
DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing
More informationThe Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014
The Atlanta BeltLine & Sustainable Development GAFM Conferance // March 25, 2014 04/22/2014 Atlanta BeltLine // 2013 Page 1 // Organizational Structure Project Owner and Sponsor Redevelopment Authority
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More information2016 Regional Transportation Alternatives Program (TAP) Grant Application
2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City
More informationPlanning for RAV: Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER
Planning for RAV: Achieving Public Objectives in the Context of a PPP Project Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner Presentation Outline Vancouver and the Region The RAV
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationFLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING
(PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan
More informationTechnical Advisory Committee. May 14, 2013
Technical Advisory Committee May 14, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delayed
More informationMemorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility
Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,
More informationThe Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension
The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationCOMMENT PERIOD INTRODUCTION
To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationParkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan
Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More informationAGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY
March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails
More informationBonita to Bridgeport January 24, 2019
Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita
More information// Atlanta Streetcar System Plan
// Atlanta Streetcar System Plan Citywide Conversation April 23, 2015 4/23/2015 Atlanta BeltLine // 2015 Page 1 // Overview A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationDISCOVER THE DIFFERENCE OF A LANDMARK LOCATION.
DISCOVER THE DIFFERENCE OF A LANDMARK LOCATION. AMENITIES OCATION OVERVI CENTRALIZED The Towers at Williams Square is located in the heart of North Texas, just 15 minutes from downtown Dallas, DFW International
More informationPUBLIC SCOPING MEETING APRIL 2018
Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the
More informationHonorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee
Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationExecutive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment
Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.
More informationChapter 4. Development Alternatives
Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined
More informationApproval of August 2019 Service Changes
Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service
More informationYork Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016
York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current
More informationCall for Public Hearing August 2019 Service Changes
Call for Public Hearing August 2019 Service Changes Operations, Safety & Security Committee January 8, 2019 Rob Smith, AVP Service Planning & Scheduling 1 Recommendation To call a Public Hearing on March
More informationArea of Potential Effect Report
Area of Potential Effect Report Southeastern Pennsylvania Transportation Authority (SEPTA) King of Prussia Rail, Extension of the Norristown High Speed Line Upper Merion Township, Montgomery County, and
More informationWhy we re here: For educational purposes only
Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationUS 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More informationMetro Green Line to LAX. January, 2012
Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned
More informationWake Bus Plan. Short Range Transit Plans. Proposed Transit Service Projects and Changes. GoCary. Volume 3 DRAFT
Short Range Transit Plans Proposed Transit Service Projects and Changes Volume 3 GoCary DRAFT Table of Contents Information on the Short Range Transit Plans Project Sheet Route Index... 1 Project Sheet
More informationRoberts Bank Terminal 2 Project
SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More informationGeorgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.
Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide
More information12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization
REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationDallas Area Rapid Transit Light Rail Transit. Rail Fleet Management Plan Revision I
Dallas Area Rapid Transit Light Rail Transit Rail Fleet Management Plan Revision I February 2009 RAIL FLEET MANAGEMENT PLAN REVISION HISTORY REVISION REVISION DATE B November 1998 DESCRIPTION OF CHANGES
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationDallas/Fort Worth International Airport Commercial Development Department. Urban Land Institute Fall Meeting October 18, 2012
Dallas/Fort Worth International Airport Commercial Development Department Urban Land Institute Fall Meeting October 18, 2012 Business Overview Owner Cities of Dallas and Fort Worth Jointly-owned by the
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationmsp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010
MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September
More informationLIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham
LIVE. WORK. PLAY. STATUS OF DEVELOPMENT Produced for information by the Town of Markham Community TOWN OF MARKHAM CIVIC CENTRE 101 TOWN CENTRE BOULEVARD Completed in 1989. East of Town Centre Boulevard,
More informationAbout the Foothill Gold Line
About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG
More informationSouth Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings
South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008
More informationOther Principle Arterials Minor Arterial Major Collector Minor Collector Local
CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationAPPENDIX M TRANSIT FARE STRUCTURE
APPENDIX M TRANSIT FARE STRUCTURE The following is a description of the proposed fare structure for the North South Transportation Initiative s transit alternatives. These alternatives include commuter
More informationIMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More informationSouth Bay Light Rail Extension Summer/Fall 2017 Project Briefing
South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R
More informationMONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC
SITE B-CC MS #2 SITE ANALYSIS PROGRAM CONCEPT OPTIONS PRESENTED DEVELOPED CONCEPT OPTIONS 4, 5, AND 6 FEASIBILITY STUDY PLAN OPTION 1 FEASIBILITY STUDY SITE SECTION OPTION 1 FEASIBILITY STUDY SITE SECTION
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationUnion Station Rail Corridor East
Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed
More informationLAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013
LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationUpdate on Route 1 Efforts
County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section
More informationRequest to Improve Transit along the Dufferin Street Corridor
For Action Request to Improve Transit along the Dufferin Street Corridor Date: July 10, 2018 To: TTC Board From: Chief Customer Officer Summary The 29 Dufferin bus route is one of the top five busiest
More information