Link Union Station (LINK US)

Size: px
Start display at page:

Download "Link Union Station (LINK US)"

Transcription

1 Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail

2 Project Overview 1. A new expanded passenger concourse with passenger amenities, retail and potential mixed use development 2. Reconfiguration of the throat (station entry tracks), elevation of the rail yard, new run-through tracks and new loop track 3. Accommodation of California HSR and Metro s West Santa Ana Branch LRT 4. New environmental process (DEIS/DEIR)

3 Project Need - Why Do We Need Link US? 1. LA Union Station (LAUS) is approaching operational capacity 2. Ridership to grow from 110,000 to 200,000 daily passenger trips by Current stub-end (dead end) tracks limit efficiency and station capacity 4. Critical transportation needs due to increase in forecasted ridership

4 Project Benefits What Will Link US Provide?

5 Board Approved Alternative 2: 6 RR + 2 HSR Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional Rail Run-Through Tracks 2 HSR Run-Through Tracks (Integrated Design and Phased Construction) 7 Platforms (1 Gold Line, 1 WSAB Line, 1 HSR, 4 Regional Rail) Other Alternatives with 6+4 and 6+0 are being studied in the CEQA and NEPA environmental processes.

6 New Expanded Passenger Concourse At Grade Passenger Concourse Concept

7 World Class Transit Station At Grade Passenger Concourse Concept

8 New Expanded Passenger Concourse Elevator Escalator Restroom Way Finding Sample Images

9 New Expanded Passenger Concourse Baggage Handing Waiting Area Security Sample Images

10 Link US- Potential Development At Grade Passenger Concourse Concept View from Alameda Street

11 Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept

12 Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept

13 New Expanded Passenger Concourse Metro Life at Union Station Sample Images

14 New Expanded Passenger Concourse Retail Districts Circulation Diagram At Grade Passenger Concourse Concept

15 New Expanded Passenger Concourse Passenger Waiting/Arrival Areas Sample Images At Grade Passenger Concourse Concept

16 New Expanded Passenger Concourse Chef s Corner Sample Images At Grade Passenger Concourse Concept

17 New Expanded Passenger Concourse Grab-n-Go Sample Images At Grade Passenger Concourse Concept

18 Link US- Potential Development At Grade Passenger Concourse Concept View from Patsaouras Bus Plaza

19 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

20 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

21 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

22 Commercial Street Corridor

23 Commercial Street Corridor Potential Urban Design Opportunities

24 Commercial Street Corridor Potential Active Transportation Opportunities

25 Commercial Street Corridor Potential Urban Design Opportunities Sample Images

26 Commercial Street Corridor Potential Urban Design Opportunities Sample Images

27 Planned Circulation & Active Transportation Sample Images

28 Potential River Access Sample Images

29 Project Phasing

30 Project Schedule We Are Here Stage I Stage II Stage III Stage IV Notice of Intent/ Notice of Preparation Comment Period and Scoping Meeting Summer 2016 Alternatives Analysis Summer 2016 to Winter 2017 Draft EIR Comment Period Spring 2018 Draft EIS Comment Period Summer 2018 Final EIR Winter 2018 Final EIS and Record of Decision Spring 2019 Public Involvement Tentative Subject to Change

31 Project Cost and Funding Sources Preliminary Estimate Project Cost range from $1.7 to $2.5 Billion 1. Refining alternatives that reduce project costs including Integrated Design or Phased Construction and Above or Below Grade New Expanded Passenger Concourse. 2. Estimated Project Cost does not include potential mixed use development on the east portal and west plaza. Status of Funding 1. Environmental and Preliminary Engineering Funded 2. Design and Construction Actively Pursuing Funding

32 Questions?

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

November 9, Society of American Military Engineers

November 9, Society of American Military Engineers November 9, 2016 Society of American Military Engineers Transit Operator Transportation Planner Transportation Infrastructure Builder Transportation Funding Overseer 2 1,433 square-mile service area (nearly

More information

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018 West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Master Commercial Developer Industry Forum

Master Commercial Developer Industry Forum Master Commercial Developer Industry Forum Agenda 9:00 am Welcome Phil Washington, Metro CEO Metro Board Director Solis 9:15 am Introductions and Overview of the Event Jenna Hornstock, Executive Officer,

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail Overview ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail 1 What is Metro Doing? > Metro is building $30B in transit projects. > Regional Rail is building $1.2B

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE 9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE The Finance and Administration Committee recommends the adoption of the recommendations

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

REAL ESTATE TRANSACTION ADVISORY SERVICES

REAL ESTATE TRANSACTION ADVISORY SERVICES REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Scoping Meeting LAX Landside Access Modernization Program

Scoping Meeting LAX Landside Access Modernization Program Welcome Scoping Meeting LAX Landside Access Modernization Program Thursday, February 19, 2015 5:00 p.m. to 8:00 p.m. Proud Bird Restaurant 11022 Aviation Boulevard Los Angeles, CA 90045 Welcome Scoping

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations Los Angeles County Metropolitan Transportation Authority Metro Rail Gold Line Eastside Extension - Operations Metro Gold Line System Description The Metro Gold Line is currently a 13.6 mile, double track

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

DRAFT PLAN & DRAFT EIR

DRAFT PLAN & DRAFT EIR DRAFT PLAN & DRAFT EIR April 27, 2017 Transportation Authority of Marin Meeting Matt Maloney, MTC Principal Planner Plan Bay Area 2040 establishes a 24-year regional vision for growth and investment. Image

More information

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form PROPOSED FARE CHANGES Welcome Sign in Pick up comment form Visit stations to learn more Submit your comment form We re considering a new fare policy The Sound Transit Board of Directors is considering

More information

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017 Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

KCI New Terminal Update. Airport Committee Thursday, August 16, 2018

KCI New Terminal Update. Airport Committee Thursday, August 16, 2018 KCI New Terminal Update Airport Committee Thursday, August 16, 2018 AGENDA Design Progress Community Outreach General Updates Construction Phasing PROJECT TIMELINE Click to edit Master title style We are

More information

BOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES

BOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES BOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES 9:00 a.m. The Board of Los Angeles Convention and Tourism

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

Metro Green Line to LAX. January, 2012

Metro Green Line to LAX. January, 2012 Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Silver Line Rail Project Update

Silver Line Rail Project Update Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

Quality of Life Study

Quality of Life Study FasTracks: Quality of Life Study Transportation Systems Performance Measurement Conference May 19, 2011 Overview Quality of Life Study Background/Purpose Study Scope Reporting Example Measures 2 RTD Regional

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

AIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015

AIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015 AIRPORT DEVELOPMENT PLAN Design-Build Institute of America September 8, 2015 Lindbergh Field - 1935 3 Page 2 Lindbergh Field - 1944 3 Page 3 Lindbergh Field - 1955 3 Page 4 San Diego International Airport

More information

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS 1 [1 11 BOARD ITO Aide 001:4 Los Angeles World Airports REPORT TO THE Approved by: Justin rbacci - hief Innovation and Commercial St tegy Officer (--(AtSotA_ /1//r/'(10 PV Reviewed by: Samson Mengistu

More information

Update on Monarch Bay Shoreline Development Project. City Council Work Session October 9, 2017

Update on Monarch Bay Shoreline Development Project. City Council Work Session October 9, 2017 Update on Monarch Bay Shoreline Development Project { City Council Work Session October 9, 2017 Overview Monarch Bay Development Project 220 Room Hotel Public Amenities Monarch Bay Park, Pescador Park,

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25 Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2016-0249, File Type: Informational Report Agenda Number: 25 SYSTEM

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012 LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012 Response to the Draft Environmental Impact Report Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research. Now Available Two New Research Reports on Urban Rail Transport in India 2011 & Urban Bus Transport in India 2011 India Infrastructure Research www.indiainfrastructure.com Table of Contents URBAN RAIL TRANSPORT

More information

Caroline County / King George County Transit Studies. Meeting November 1, 2017

Caroline County / King George County Transit Studies. Meeting November 1, 2017 Caroline County / King George County Transit Studies Meeting November 1, 2017 1 FRED Routes C1 and C2 C1 C2 Caroline County Total FRED Total Ridership (FY 2017) 4,527 2,870 7,397 377,042 Revenue Hours

More information

Railway Master Plan in Tokyo (2016)

Railway Master Plan in Tokyo (2016) Railway Master Plan in Tokyo (2016) Future vision of railway network in Tokyo and necessary policies 7 July, 2017 Topic 1.Review of Railway Master Plan(2000) 2.New Railway Master Plan (2016) 3.Future vision

More information

Hampton Roads Passenger Rail Task Force. February 29, 2012

Hampton Roads Passenger Rail Task Force. February 29, 2012 Hampton Roads Passenger Rail Task Force February 29, 2012 The Newport News Multimodal Station Project will relocate and transform the existing Newport News Amtrak station into a state of the art multimodal

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Metrolink Service Expansion Program

Metrolink Service Expansion Program Rail and Facilities Program Update Metrolink Service Expansion Program Fullerton Turnback Facility 23.90 Laguna Niguel Turnback Facility 28.20 New Control Points & Signals Anaheim Layover Facility 18.30

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Presentation to the DRCOG Board August 16, 2017

Presentation to the DRCOG Board August 16, 2017 Presentation to the DRCOG Board August 16, 2017 Systemwide FY 2015-2016 July June FY 2016-2017 July June Riders 102,577 155,864 Revenue $1,014,781 $1,551,435 Fare Recovery FY = State Fiscal Year. 38% 53%

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

2018 Service Implementation Plan Executive Summary

2018 Service Implementation Plan Executive Summary 2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation

More information

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station

More information

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan Welcome The objectives of this open house are to: Share information on the new investments and funding proposed for the Phase Two Plan Gather feedback from people across the region about the Phase Two

More information

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Manager of Fixed Guideway Scheduling San Francisco Municipal Transportation Agency San Francisco, California SFMTA & the Municipal

More information

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING Report Date: 2005-09-07 Author: Michael Gordon Phone No.: 604.873.7665 RTS No.: 05449 CC File No.: 2605 Meeting Date: September 13, 2005 TO: FROM:

More information

Creating Sustainable Communities Through Public Transportation

Creating Sustainable Communities Through Public Transportation Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg

More information

State Route 189 Project and Draft Resolution of Support. November 2014

State Route 189 Project and Draft Resolution of Support. November 2014 State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?

More information

III. ENVIRONMENTAL SETTING

III. ENVIRONMENTAL SETTING III. ENVIRONMENTAL SETTING A. OVERVIEW OF ENVIRONMENTAL SETTING Regional Setting The project site is located in Los Angeles County, within the Hollywood community of the City of Los Angeles (see Figure

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

METRO Green Line ridership has already exceeded expectations in its first month.

METRO Green Line ridership has already exceeded expectations in its first month. Summer 2014 FINAL ISSUE METRO Green Line weekday ridership already tops 2015 projections METRO Green Line ridership has already exceeded expectations in its first month. In the first four weeks, there

More information

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building LA.09.TOR TORONTO DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Edward R. Sajecki, Commissioner of Planning and Building Proposed Rezoning and Master Plan Union

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments Table of Contents SUMMARY...S-1 S.1 Joint CEQA/NEPA Document...S-1 S.2 Overview of Project Area... S-2 S.3 Purpose and Need... S-6 S.4 Proposed Action... S-6 S.5 Project Impacts... S-11 S.6 Coordination

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

THE WORLD BANK Washington, DC

THE WORLD BANK Washington, DC Transforming Cities with Transit Transit and Land-Use Integration for Sustainable Urban Development Hiroaki Suzuki Robert Cervero Kanako luchi THE WORLD BANK Washington, DC Contents Acknowledgments About

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: October 28, 2015 Item Number: 8.B.1.b. Subject: Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016

First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016 First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016 1 Welcome & Opening Remarks Jean Duncan, P.E., Director City of Tampa Transportation and Stormwater Services Department

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 1, 2012 SUBJECT: LRT PROJECTS IN TORONTO - STATUS REPORT INFORMATION ITEM RECOMMENDATION It is recommended that the Commission

More information

About the Foothill Gold Line

About the Foothill Gold Line About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG

More information

This presentation is available online.

This presentation is available online. This presentation is available online www.kosmont.com 1 1 DRAFT Kosmont Companies Real Estate and Economic Advisory public + private transactions California Golden Fund Approved EB-5 Regional Center Kosmont

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

July 21, Mayor & City Council Business Session KCI Development Program Process Update

July 21, Mayor & City Council Business Session KCI Development Program Process Update July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,

More information

WATERBORNE TRANSIT. April 21, 2010

WATERBORNE TRANSIT. April 21, 2010 WATERBORNE TRANSIT CONCEPTS STUDY April 21, 2010 1 Overview: Summary of previous 2004/2005 Ferry Service analysis Results of recent study focusing on ferry service from Newport News Conclusions 2 2004/2005

More information