1 Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail
2 Project Overview 1. A new expanded passenger concourse with passenger amenities, retail and potential mixed use development 2. Reconfiguration of the throat (station entry tracks), elevation of the rail yard, new run-through tracks and new loop track 3. Accommodation of California HSR and Metro s West Santa Ana Branch LRT 4. New environmental process (DEIS/DEIR)
3 Project Need - Why Do We Need Link US? 1. LA Union Station (LAUS) is approaching operational capacity 2. Ridership to grow from 110,000 to 200,000 daily passenger trips by Current stub-end (dead end) tracks limit efficiency and station capacity 4. Critical transportation needs due to increase in forecasted ridership
4 Project Benefits What Will Link US Provide?
5 Board Approved Alternative 2: 6 RR + 2 HSR Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional Rail Run-Through Tracks 2 HSR Run-Through Tracks (Integrated Design and Phased Construction) 7 Platforms (1 Gold Line, 1 WSAB Line, 1 HSR, 4 Regional Rail) Other Alternatives with 6+4 and 6+0 are being studied in the CEQA and NEPA environmental processes.
6 New Expanded Passenger Concourse At Grade Passenger Concourse Concept
7 World Class Transit Station At Grade Passenger Concourse Concept
8 New Expanded Passenger Concourse Elevator Escalator Restroom Way Finding Sample Images
9 New Expanded Passenger Concourse Baggage Handing Waiting Area Security Sample Images
10 Link US- Potential Development At Grade Passenger Concourse Concept View from Alameda Street
11 Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept
12 Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept
13 New Expanded Passenger Concourse Metro Life at Union Station Sample Images
14 New Expanded Passenger Concourse Retail Districts Circulation Diagram At Grade Passenger Concourse Concept
15 New Expanded Passenger Concourse Passenger Waiting/Arrival Areas Sample Images At Grade Passenger Concourse Concept
16 New Expanded Passenger Concourse Chef s Corner Sample Images At Grade Passenger Concourse Concept
17 New Expanded Passenger Concourse Grab-n-Go Sample Images At Grade Passenger Concourse Concept
18 Link US- Potential Development At Grade Passenger Concourse Concept View from Patsaouras Bus Plaza
19 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept
20 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept
21 New Expanded Passenger Concourse Above Grade Passenger Concourse Concept
22 Commercial Street Corridor
23 Commercial Street Corridor Potential Urban Design Opportunities
24 Commercial Street Corridor Potential Active Transportation Opportunities
25 Commercial Street Corridor Potential Urban Design Opportunities Sample Images
26 Commercial Street Corridor Potential Urban Design Opportunities Sample Images
27 Planned Circulation & Active Transportation Sample Images
28 Potential River Access Sample Images
29 Project Phasing
30 Project Schedule We Are Here Stage I Stage II Stage III Stage IV Notice of Intent/ Notice of Preparation Comment Period and Scoping Meeting Summer 2016 Alternatives Analysis Summer 2016 to Winter 2017 Draft EIR Comment Period Spring 2018 Draft EIS Comment Period Summer 2018 Final EIR Winter 2018 Final EIS and Record of Decision Spring 2019 Public Involvement Tentative Subject to Change
31 Project Cost and Funding Sources Preliminary Estimate Project Cost range from $1.7 to $2.5 Billion 1. Refining alternatives that reduce project costs including Integrated Design or Phased Construction and Above or Below Grade New Expanded Passenger Concourse. 2. Estimated Project Cost does not include potential mixed use development on the east portal and west plaza. Status of Funding 1. Environmental and Preliminary Engineering Funded 2. Design and Construction Actively Pursuing Funding
32 Questions?
SCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationNovember 9, Society of American Military Engineers
November 9, 2016 Society of American Military Engineers Transit Operator Transportation Planner Transportation Infrastructure Builder Transportation Funding Overseer 2 1,433 square-mile service area (nearly
More informationWest Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018
West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationMaster Commercial Developer Industry Forum
Master Commercial Developer Industry Forum Agenda 9:00 am Welcome Phil Washington, Metro CEO Metro Board Director Solis 9:15 am Introductions and Overview of the Event Jenna Hornstock, Executive Officer,
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationMeasure R Program Update
Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th
More informationTHE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE
THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island
More informationExecutive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment
Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit
More informationOverview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail
Overview ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail 1 What is Metro Doing? > Metro is building $30B in transit projects. > Regional Rail is building $1.2B
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationWhy we re here: For educational purposes only
Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)
More information9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE
9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE The Finance and Administration Committee recommends the adoption of the recommendations
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationLAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013
LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development
More informationFLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING
(PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan
More informationREAL ESTATE TRANSACTION ADVISORY SERVICES
REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationScoping Meeting LAX Landside Access Modernization Program
Welcome Scoping Meeting LAX Landside Access Modernization Program Thursday, February 19, 2015 5:00 p.m. to 8:00 p.m. Proud Bird Restaurant 11022 Aviation Boulevard Los Angeles, CA 90045 Welcome Scoping
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationDirector, Community Planning, Toronto and East York District
STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524
More informationNFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue
Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along
More informationHartsfield Jackson Update prepared for:
Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport
More informationSouth Bay Metro Green Line Extension
South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings
More informationThe Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension
The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released
More informationLos Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations
Los Angeles County Metropolitan Transportation Authority Metro Rail Gold Line Eastside Extension - Operations Metro Gold Line System Description The Metro Gold Line is currently a 13.6 mile, double track
More informationNorthwest Corridor LRT Line to Irving/DFW
Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions
More informationDRAFT PLAN & DRAFT EIR
DRAFT PLAN & DRAFT EIR April 27, 2017 Transportation Authority of Marin Meeting Matt Maloney, MTC Principal Planner Plan Bay Area 2040 establishes a 24-year regional vision for growth and investment. Image
More informationWelcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form
PROPOSED FARE CHANGES Welcome Sign in Pick up comment form Visit stations to learn more Submit your comment form We re considering a new fare policy The Sound Transit Board of Directors is considering
More informationAloha Stadium Conceptual Redevelopment Report. April 5, 2017
Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a
More informationNorthwest Corridor LRT Line to Irving/DFW
Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationKCI New Terminal Update. Airport Committee Thursday, August 16, 2018
KCI New Terminal Update Airport Committee Thursday, August 16, 2018 AGENDA Design Progress Community Outreach General Updates Construction Phasing PROJECT TIMELINE Click to edit Master title style We are
More informationBOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES
BOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES 9:00 a.m. The Board of Los Angeles Convention and Tourism
More informationIndustry briefing NOVEMBER 2017
Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start
More informationMetro Green Line to LAX. January, 2012
Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationSilver Line Rail Project Update
Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project
More informationSouth Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings
South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008
More informationQuality of Life Study
FasTracks: Quality of Life Study Transportation Systems Performance Measurement Conference May 19, 2011 Overview Quality of Life Study Background/Purpose Study Scope Reporting Example Measures 2 RTD Regional
More informationAppendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis
Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationBonita to Bridgeport January 24, 2019
Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita
More informationSouth Bay Light Rail Extension Summer/Fall 2017 Project Briefing
South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationCOMMENT PERIOD INTRODUCTION
To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO
More informationAIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015
AIRPORT DEVELOPMENT PLAN Design-Build Institute of America September 8, 2015 Lindbergh Field - 1935 3 Page 2 Lindbergh Field - 1944 3 Page 3 Lindbergh Field - 1955 3 Page 4 San Diego International Airport
More informationBOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS
1 [1 11 BOARD ITO Aide 001:4 Los Angeles World Airports REPORT TO THE Approved by: Justin rbacci - hief Innovation and Commercial St tegy Officer (--(AtSotA_ /1//r/'(10 PV Reviewed by: Samson Mengistu
More informationUpdate on Monarch Bay Shoreline Development Project. City Council Work Session October 9, 2017
Update on Monarch Bay Shoreline Development Project { City Council Work Session October 9, 2017 Overview Monarch Bay Development Project 220 Room Hotel Public Amenities Monarch Bay Park, Pescador Park,
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More informationMetro. Board Report. File #: , File Type: Informational Report Agenda Number: 25
Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2016-0249, File Type: Informational Report Agenda Number: 25 SYSTEM
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More information5 Rail demand in Western Sydney
5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network
More informationLAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012
LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012 Response to the Draft Environmental Impact Report Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationNow Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.
Now Available Two New Research Reports on Urban Rail Transport in India 2011 & Urban Bus Transport in India 2011 India Infrastructure Research www.indiainfrastructure.com Table of Contents URBAN RAIL TRANSPORT
More informationCaroline County / King George County Transit Studies. Meeting November 1, 2017
Caroline County / King George County Transit Studies Meeting November 1, 2017 1 FRED Routes C1 and C2 C1 C2 Caroline County Total FRED Total Ridership (FY 2017) 4,527 2,870 7,397 377,042 Revenue Hours
More informationRailway Master Plan in Tokyo (2016)
Railway Master Plan in Tokyo (2016) Future vision of railway network in Tokyo and necessary policies 7 July, 2017 Topic 1.Review of Railway Master Plan(2000) 2.New Railway Master Plan (2016) 3.Future vision
More informationHampton Roads Passenger Rail Task Force. February 29, 2012
Hampton Roads Passenger Rail Task Force February 29, 2012 The Newport News Multimodal Station Project will relocate and transform the existing Newport News Amtrak station into a state of the art multimodal
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationMetrolink Service Expansion Program
Rail and Facilities Program Update Metrolink Service Expansion Program Fullerton Turnback Facility 23.90 Laguna Niguel Turnback Facility 28.20 New Control Points & Signals Anaheim Layover Facility 18.30
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationPresentation to the DRCOG Board August 16, 2017
Presentation to the DRCOG Board August 16, 2017 Systemwide FY 2015-2016 July June FY 2016-2017 July June Riders 102,577 155,864 Revenue $1,014,781 $1,551,435 Fare Recovery FY = State Fiscal Year. 38% 53%
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More information2018 Service Implementation Plan Executive Summary
2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation
More informationFLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES
FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station
More informationWelcome. Share information on the new investments and funding proposed for the Phase Two Plan
Welcome The objectives of this open house are to: Share information on the new investments and funding proposed for the Phase Two Plan Gather feedback from people across the region about the Phase Two
More informationLessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld
Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Manager of Fixed Guideway Scheduling San Francisco Municipal Transportation Agency San Francisco, California SFMTA & the Municipal
More informationCITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING
CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING Report Date: 2005-09-07 Author: Michael Gordon Phone No.: 604.873.7665 RTS No.: 05449 CC File No.: 2605 Meeting Date: September 13, 2005 TO: FROM:
More informationCreating Sustainable Communities Through Public Transportation
Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg
More informationState Route 189 Project and Draft Resolution of Support. November 2014
State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National
More informationmsp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010
MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationCentral Broward Transit (CBT) Phase 1 Public Open House January 21, 2016
Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?
More informationIII. ENVIRONMENTAL SETTING
III. ENVIRONMENTAL SETTING A. OVERVIEW OF ENVIRONMENTAL SETTING Regional Setting The project site is located in Los Angeles County, within the Hollywood community of the City of Los Angeles (see Figure
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationMETRO Green Line ridership has already exceeded expectations in its first month.
Summer 2014 FINAL ISSUE METRO Green Line weekday ridership already tops 2015 projections METRO Green Line ridership has already exceeded expectations in its first month. In the first four weeks, there
More informationChairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building
LA.09.TOR TORONTO DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Edward R. Sajecki, Commissioner of Planning and Building Proposed Rezoning and Master Plan Union
More informationNational Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014
National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration
More informationCHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments
Table of Contents SUMMARY...S-1 S.1 Joint CEQA/NEPA Document...S-1 S.2 Overview of Project Area... S-2 S.3 Purpose and Need... S-6 S.4 Proposed Action... S-6 S.5 Project Impacts... S-11 S.6 Coordination
More informationSouthwest LRT Alignment Video Narration
Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
More informationTHE WORLD BANK Washington, DC
Transforming Cities with Transit Transit and Land-Use Integration for Sustainable Urban Development Hiroaki Suzuki Robert Cervero Kanako luchi THE WORLD BANK Washington, DC Contents Acknowledgments About
More informationFinal Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa
This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL
More information9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University
Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation
More informationResolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: October 28, 2015 Item Number: 8.B.1.b. Subject: Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationFirst Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016
First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016 1 Welcome & Opening Remarks Jean Duncan, P.E., Director City of Tampa Transportation and Stormwater Services Department
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 1, 2012 SUBJECT: LRT PROJECTS IN TORONTO - STATUS REPORT INFORMATION ITEM RECOMMENDATION It is recommended that the Commission
More informationAbout the Foothill Gold Line
About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG
More informationThis presentation is available online.
This presentation is available online www.kosmont.com 1 1 DRAFT Kosmont Companies Real Estate and Economic Advisory public + private transactions California Golden Fund Approved EB-5 Regional Center Kosmont
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationJuly 21, Mayor & City Council Business Session KCI Development Program Process Update
July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,
More informationWATERBORNE TRANSIT. April 21, 2010
WATERBORNE TRANSIT CONCEPTS STUDY April 21, 2010 1 Overview: Summary of previous 2004/2005 Ferry Service analysis Results of recent study focusing on ferry service from Newport News Conclusions 2 2004/2005
More information