Claremont Project Background and Update Community Meeting September 11, 2017

Size: px
Start display at page:

Download "Claremont Project Background and Update Community Meeting September 11, 2017"

Transcription

1 Claremont Project Background and Update Community Meeting September 11, 2017

2 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions Page 2

3 Gold Line s 3 Phases = $3 Billion Investment Los Angeles-Pasadena Pasadena-Azusa Glendora-Montclair Los Angeles to Pasadena Completed On Time/Under Budget (2003) 13.7 Miles, 3 Cities, 13 Stations Pasadena to Azusa Completed On Time/Under Budget (2015) 11.5 Miles, 5 Cities, 6 Stations Glendora to Montclair Breaking Ground October 21, Miles, 6 Cities, 6 Stations Page 7

4 Glendora to Montclair Segment Page 8

5 What has already been done? Cities along the alignment have been working with the Authority on planning for more than the last 15 years. During this time, Claremont has considered several options for station location and design. Chose an artist and public art component. Considered conceptual parking structure sizes. Considered how the Gold Line will enhance the Transit Oriented Development (TOD) and the Village and community as a whole. Page 9

6 What is ongoing? In the last year, the City Council has discussed the potential for a grade separation at Indian Hill Blvd. Staff has been meeting monthly with the Authority to review plans and provide feedback on the following: Configurations of grade crossings. Impacts of the construction and rail line on city streets and surrounding areas. Size and configuration of the parking structure. City Standards and construction regulations. Construction Plan review (June 21 received an updated Draft Advance Conceptual Engineering Drawings) Page 12

7 Claremont Segment Information Page 13

8 Claremont Segment information Shared Corridor with BNSF and Metrolink through the entire alignment. Four At Grade Crossings: Claremont Blvd. College Ave. Indian Hill Blvd. Cambridge Ave. More than 200 trains a day Average Headway is 7 minutes on Azusa to Arcadia Segment Page 14

9 Light Rail Metrolink Metro Gold Line - Light Rail Vehicle Passenger rail cars operate on steel tracks Trains are electrically-powered by overhead wire Vehicles may operate in single-car or multi-car trains/stations are planned to handle three-car trains Top speeds - 55 miles per hour Three-car trains hold up to 200 passengers per car (sitting and standing)

10 Safety at At-Grade Crossings Safety Equipment: Exit Gates (Quad Gates) for vehicles and pedestrians Raised Medians (approximately 100 feet on either side of tracks) New Red Curbs (approximately 100 feet on all curbs) Turn restrictions from driveways within 100 feet of tracks Look Both Ways-LED signals

11 At-Grade Crossings - Street Changes New Medians; Red Curbing; Turn Restrictions (within 100 ft.) New restrictions are required by the CPUC for safety Each crossing is unique, but will include similar measures

12 Future Claremont Station Claremont Station View West from College Avenue

13 Claremont Station Site Plan Includes shared parking structure with Metrolink 1,260 parking spaces

14 Claremont Station Art

15 Project Timeline Page 23

16 Glendora to Montclair Work Plan Ground Breaking October 2017 Utility Relocation Contract Alignment Contract October 2018 Alignment Contract Final Engineering Project 1 Freight/Metrolink Relocation Construction Substantial Completion Project 2 Light Rail Construction

17 Discussion Topics Page 25

18 Parking Structure EIR calls for 1,260 space parking structure. Plans are just now getting to the phase of what it will look like. Staff has been working with a Contract Architect on concepts for the parking structure to make it an asset for the project and the City. City staff is continuing to meet with The Authority and Metro staff as the parking structure planning progresses. Page 26

19 Indian Hill Grade Separation On July 26, 2016, the City Council requested that the crossing at Indian Hill Blvd. should be At Grade. PUC staff has indicated they will oppose an At Grade Crossing at Indian Hill Blvd., due to the following: Number of trains. Number of vehicle trips. Number of pedestrians. Number of tracks. Configuration of the crossing and proximity to First street. Page 27

20 Indian Hill Grade Separation In addition, Metro completed a grade crossing study, which ranked Indian Hill Blvd. as the third worst crossing out of more than 100 grade crossings in the county. Based on these factors, staff believes it is prudent to begin additional community discussion about the possibility of a grade separation and what type of design for a grade separation, might be acceptable to the community if at all, and within the budget constraints to build such a seperation, prior to the PUC review. Feedback from these community meetings will be presented to the City Council for final recommendation to the Gold Line Authority. Page 28

21 Indian Hill Grade Separation To begin this conversation, staff has enlisted the Contract Architect to prepare some conceptual designs to work with the Authority staff on what is feasible. Page 29

22 Original Bridge Page 30

23 Original Bridge Page 31

24 Preliminary Alternative Page 32

25 Preliminary Alternative Page 33

26 Upcoming Meetings Page 34

27 Upcoming meetings September 28, 7PM Traffic and Transportation Meeting October 10, 6:30PM City Council Meeting Page 35

28 Questions? Page 36

About the Foothill Gold Line

About the Foothill Gold Line About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018 West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments

More information

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail Overview ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail 1 What is Metro Doing? > Metro is building $30B in transit projects. > Regional Rail is building $1.2B

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Foothill Gold Line Phase 2B (Glendora to Montclair) artwork note Montclair Transcenter art structure in background

Foothill Gold Line Phase 2B (Glendora to Montclair) artwork note Montclair Transcenter art structure in background Foothill Gold Line Phase 2B (Glendora to Montclair) artwork note Montclair Transcenter art structure in background Last Friday, Council Member Bill Ruh and I attended the State of the Project 2016, a conference

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations Los Angeles County Metropolitan Transportation Authority Metro Rail Gold Line Eastside Extension - Operations Metro Gold Line System Description The Metro Gold Line is currently a 13.6 mile, double track

More information

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Figure San Dimas Bonita at San Dimas Avenue (view looking west) The adjoining neighborhood has an eclectic assortment of building types and uses, including: the historically significant but not architecturally or visually noteworthy San Dimas Lemon Association Packing

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Capital Programs Update

Capital Programs Update Capital Programs Update Capital Programs Summary 2 Grade Separations - Overview Seven grade separation projects planned on the BNSF Orangethorpe corridor Cost: from $65 to $117 million Current Status:

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION

More information

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE

More information

DURFEE DURFEE PECK ROAD AVENUE SOUTH EL MONTE, CA EL MONTE SOUTH EL MONTE HIGH SCHOOL. THE GOLDWYN (116 newly developed homes)

DURFEE DURFEE PECK ROAD AVENUE SOUTH EL MONTE, CA EL MONTE SOUTH EL MONTE HIGH SCHOOL. THE GOLDWYN (116 newly developed homes) 1225 DURFEE AVENUE SOUTH EL MONTE, CA 91733 SOUTH EL MONTE HIGH SCHOOL THE GOLDWYN (116 newly developed homes) EL MONTE 1225 DURFEE PECK ROAD EXECUTIVE SUMMARY Marcus & Millichap has been selected to exclusively

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1

More information

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Link Union Station (LINK US)

Link Union Station (LINK US) Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

A Presentation to: Project Advisory Group Meeting #6

A Presentation to: Project Advisory Group Meeting #6 A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings

More information

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 1 Project Overview Design-Build Contractors: Mainline - Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

DESIGN AND CONSTRUCTION OPEN HOUSE

DESIGN AND CONSTRUCTION OPEN HOUSE DESIGN AND CONSTRUCTION OPEN HOUSE The purpose of tonight s meeting is to provide: Design progress of the new Operations and Maintenance Facility in Bellevue. Agenda 6:00 p.m. Open House Approved transit

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25 Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2016-0249, File Type: Informational Report Agenda Number: 25 SYSTEM

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Union Station Rail Corridor East Enhancements Project

Union Station Rail Corridor East Enhancements Project Union Station Rail Corridor East Enhancements Project Transit Project Assessment Process Public Meeting #1 Presentation Wednesday June 28, 2017 GRIDLOCK COSTS OUR ECONONY REGIONAL TRANSFORMATION GO EXPANSION

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016 MARTA & City of Atlanta Sales Tax Referendums 1 MARTA & City of Atlanta Sales Tax Referendums Public Hearings May 25 & 26, 2016 June 1 & 2, 2016 MARTA & City of Atlanta Sales Tax Referendums 2 Guiding

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

North Metro Rail Line Elected Officials Briefing. November 16, 2017

North Metro Rail Line Elected Officials Briefing. November 16, 2017 North Metro Rail Line Elected Officials Briefing November 16, 2017 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs Eagle P3 Project The first transit project of its kind in the U.S.

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting March 22 nd, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting March 22 nd, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting March 22 nd, 2018 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance Facility:

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3

More information

Use this option if you plan to arrive to the Rose Bowl anytime after 10:00 am

Use this option if you plan to arrive to the Rose Bowl anytime after 10:00 am Option 1 Public Transportation to the Rose Bowl Game with Free Shuttle option Use this option if you plan to arrive to the Rose Bowl anytime after 10:00 am Free Shuttle Information and Hours: On January

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

Program: Year 84 Week 43 November 2, 2012 November 7, DoubleTree Hotel. 555 W. Foothill Blvd. Claremont, CA Fridays, 12:10 PM.

Program: Year 84 Week 43 November 2, 2012 November 7, DoubleTree Hotel. 555 W. Foothill Blvd. Claremont, CA Fridays, 12:10 PM. Year 84 Week 43 November 2, 2012 November 7, 2012 DoubleTree Hotel 555 W. Foothill Blvd. Claremont, CA 91711 Fridays, 12:10 PM Website Full Color editions of this newsletter and back issues are always

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Project Deliverable 4.1.3f Individual City Report - City of San Dimas Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement. ~ King County PIBBI. YourBigBa~

145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement. ~ King County PIBBI. YourBigBa~ 145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement ~ King County PIBBI YourBigBa~ The Trail & the Tourism District Growing pedestrian traffic between tourism destinations

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES SALE PRICE: $1,795,000 PRICE PER LOT: $18,505 PRICE PER SF: $2.35 LOT SIZE: 17.48 Acres APN #: 034-151-018 & -019 ZONING: PUD 6,000 R-1 Residential MARKET: City Of Madera PROPERTY FEATURES Shovel-ready

More information

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by:

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by: FEASIBILITY STUDY SEPTEMBER 13, 2013 prepared for: holdings prepared by: Table of Contents Project Feasibility... 3 Project Background... 4 Project and Community Context... 5 Site constraints... 6 Statement

More information

Carlisle Connectivity Projects Communication Plan and Project Status

Carlisle Connectivity Projects Communication Plan and Project Status Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

The Olathe Quiet Zone

The Olathe Quiet Zone The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF

More information

EP8.2 Presentation Exhibition GO Station Improvements

EP8.2 Presentation Exhibition GO Station Improvements EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts

More information

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018 TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018 2018-2019 SCHEDULE Project progress Contract signed with the winning consortia on April 12, 2018 Project office set up for the

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Westbrook Station. Transit Oriented Development Opportunity

Westbrook Station. Transit Oriented Development Opportunity DEVELOPM Westbrook Station Transit Oriented Development Opportunity OPPOR Table of Contents Prime Real Estate Development Opportunity page 1 Calgary City of Opportunity page 3 What is Transit Oriented

More information

FRONT COVER. Derby Quiet Zone Study Cover

FRONT COVER. Derby Quiet Zone Study Cover FRONT COVER Derby Quiet Zone Study Cover DERBY QUIET ZONE STUDY City of Derby April 9 City Council The Mayor and City Council comprise the Governing Body. These elected officials are the political leaders

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017 Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4. COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

November 9, Society of American Military Engineers

November 9, Society of American Military Engineers November 9, 2016 Society of American Military Engineers Transit Operator Transportation Planner Transportation Infrastructure Builder Transportation Funding Overseer 2 1,433 square-mile service area (nearly

More information