1 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5

2 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway. Total project cost $1.7 billion which includes $500 million of non toll road improvements including Construction of 7 miles of 4 and 6-laning of SR 46 in Lake and Seminole Counties Reconstruction of the US 441/SR 46 interchange in Mount Dora Relocation of CR 46A to provide improved wildlife connectivity and additional local road system benefits Provides connectivity to SR 417 and I-4 corridors 2

3 Wekiva Parkway Seminole County Lake County Orange County 9.4 Miles Expressway Arterial < x > Number of Lanes Both Directions 3

4 Tolled/Non-Tolled Segments US 441/SR 46 Interchange Redesign CR 46A Realignment Service Road Seminole County SR 46 Six-Laning SR 46 Six-Laning Lake County Orange County Frontage Roads 4

5 Funding Partners Florida Department of Transportation District 5 Florida s Turnpike Enterprise Orlando Orange County Expressway Authority 5

6 Project Construction Sections D R A F T 6

7 FDOT/OOCEA Agreement in Principle For each agency s respective section they will: Perform Final Design Construct Finance Operate Maintain Collect Tolls Keep all toll revenue 7

8 Project Status - Environmental FONSI Finding of No Significant Impactapproval anticipated soon FHWA has given the go ahead to advertise Sections 4A & 4B for Design Build Procurement 8

9 Project Status 15 %Design 15% preliminary engineering currently being performed by D5 FDOT. HNTB - Sections 1-5 Atkins Sections 6-8 Identifying Right of Way Requirements Value Engineering Risk Assessment Determining logical terminii for final design/segments 9

10 Project Status Final Design FDOT Final Design procurement for Sections 3A, 3B, 5, 6, 7A Begin this summer Last contract executed early winter 2013 Each design segment will last approximately 2 years. OOCEA Sections 1A, 1B, 2A, 2B, 2C Begin this summer 10

11 Project Status - Construction Section 4A & 4B - Fall 2012 Section Section Section 3A & 3B Section 5 & Section 7B Section 7A 2017 Section

12 OOCEA Section 1 Orange Co. N. of Kelly Park Rd. N. Of US 441

13

14 Kelly Park Interchange

15 OOCEA Section 1A & 1B Orange Co. Section 1A - From 0.25 Mi. N, of US 441 to mi. N. of Ponkan Road Section 1B - From Mi. N. of Ponkan Rd to mi. N. of Kelly Park Rd Final Design - Design consultants have been selected. Construction Begin January 2015 Complete Summer 2016 Estimated Costs 1A - $65,000,000 1B - $76,000,000

16 OOCEA Section 2 Orange & Lake Co. Systems Interchange

17

18

19 OOCEA Section 2A, 2B, & 2C Orange & Lake Co. SR 429/SR 46 Systems Interchange Final Design Currently in Procurement Section 2A Systems Interchange In advertisement Section 2B & 2C Systems Interchange connections to SR 429 in Orange Co. and SR 46 in Lake Co. Advertised after 2A selected Construction Begin Spring 2015 Complete Summer 2017 Total Estimated Costs - $124,000,000

20 Section 3A Lake Co. East of Round Lake Rd. East of Pond Rd.

21

22

23 Section 3A Lake Co. FP SR 46 From mi. East of Pond Road to mi. East of Round Lake Road Widen Existing SR 46 to 6-lanes Urban Section Final Design - Fall 2012 Construction Begin Spring 2016 Complete Summer 2019 Estimated Costs $11,000,000

24 Section 3B Lake Co. E of Pond Road. W of US 441

25

26 Section 3B Lake Co. FP US441/SR 46 Interchange - from 0.2 mi. W of US 441 to Mi. East of Pond Rd 6 lane US lane SR 46 SB to WB flyover ramp Final Design Summer 2012 Construction Begin Summer 2016 Complete Summer 2019 Estimated Costs $32,000,000

27 Section 4A & 4B Lake & Orange Co. W. Of Old McDonald Rd. Mt. Plymouth/CR 435

28 Section 4A & 4B

29 Section 4A & 4B Lake & Orange Co. FP & From CR 435/Mt. Plymouth to mi. W. of Old McDonald Rd NO New Construction 4 lane rural section Construction CONTACT Design Build Advertised March 16, Week Advertisement 2 Phase Adjusted Score Design Build Procurement Commitment to turn dirt Fall 2012 Estimated Costs $34,000,000 See Advertisement for direction on how to obtain additional information on the project

30 Section 5 Lake Co. N. of Arundel Way SR 46

31

32 Section 5 Lake Co. FP Realignment of CR 46A from SR 46 to 0.04 mi. N of Arundel Way Removal of portions of Existing 46A Final Design Fall 2012 Construction Begin July 2016 Complete July 2020 Estimated Costs - $10,000,000

33 Section 6 Lake Co. E of Wekiva River Rd W. of Old McDonald Rd

34

35

36 Section 6 Lake Co. FP From Mi. W. of Old McDonald Rd to 0.5 mi. East of Wekiva River Rd Includes approximately 8000 of wildlife bridging Extensive Environmental considerations Replacement of existing Wekiva River Bridge Wekiva River National Wild & Scenic River State Wild & Scenic River Florida Aquatic Preserve OFW Outstanding Florida Waterway

37 Section 6 Lake Co. FP SR 429 Typical Section - 4-lanes expandable to 6-lanes Non-tolled frontage roads Final Design Fall 2012 Construction Begin July 2016 Complete July 2020 Estimated Cost - $198,000,000

38 Section 7A Seminole Co. East of Wekiva River Rd. Orange Blvd.

39

40

41

42 Section 7A Seminole Co. FP SR 429 from 0.5 mi. East of Wekiva River Rd. to Orange Blvd Non-tolled frontage roads Significant Utility effort Final Design Fall 2012 Construction Begin - Summer 2017 Complete Summer 2020 Estimated Costs - $108,000,000

43 Section 7B Seminole Co. W. of Center Rd. W. Of I-4

44

45 Section 7B Seminole Co. FP SR 46 from mi. West of Center Rd to Interstate 4 Widen existing SR 46 from 4 to 6 lanes Final Design Concept Complete Draft RFP Complete Construction Design Build Begin Summer 2016 Complete Winter 2017 Estimated Costs - $17,000,000

46 Section 8 Seminole Co. I-4 Interchange

47

48

49

50 Section 8 Seminole Co. FP I-4 Interchange Currently performing Design Initial Line & Grade Line & Grade complete Fall 2012 Construction Design Build Begin - July 2018 Complete - December 2021 Estimated Costs - $260,000,000

51 QUESTIONS? FDOT - Suzanne Phillips Suzanne.Phillips@dot.myflorida.com OOCEA - Glenn Pressimone - PressimoneG@oocea.com

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville First Coast Outer Beltway August 2012 Project Location DUVAL Jacksonville First Coast Outer Beltway CLAY ST. JOHNS Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll

More information

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. Central Florida

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. Central Florida Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities Central Florida Effective: October 29, 20 Florida s Turnpike Northern Coin System (SR 91) Osceola,

More information

FUNDED FOR CONSTRUCTION

FUNDED FOR CONSTRUCTION Priority CENTRAL FLORIDA ALLIANCE 2016 SIS HIGHWAY PROJECTS FOR PRIORITIZATION FDOT Financial Project Phase(s) Estimated Management Project Name or Length Latest Project Remaining Remaining Cost Designation

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith Tolling New Capacity An Important Policy Direction for Florida DOT Ed Regan CDM Smith Express Toll Lanes Express Toll Lanes: where tolling and transportation management come together in a way which redefines

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

Appendix C Agency Coordination and Correspondence

Appendix C Agency Coordination and Correspondence Appendix C Agency Coordination and Correspondence C-1 Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks letter dated December 13, 2005 C-2 Orange County Environmental

More information

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS Priority FY 2018/19 CENTRAL FLORIDA ALLIANCE - LIST OF PRIORITY PROJECTS FY 2018-2019 SIS HIGHWAY PROJECTS FDOT Financial Management Number Project Name From To Work Description Latest Project Phase Funded

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016 Florida Department of TRANSPORTATION 2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016 Jim Boxold, Secretary SECRETARY S CHALLENGE 2 2016 GENERAL

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

I-35 Reconstruction Project

I-35 Reconstruction Project I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,

More information

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Florida Department of TRANSPORTATION 2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Presenter: Jim Boxold, Secretary 1 Florida s Continued Growth

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

MEETING NOTES Project Development and Environment Study SR 408 East Extension from SR 50 to SR 50/SR 520 Intersection

MEETING NOTES Project Development and Environment Study SR 408 East Extension from SR 50 to SR 50/SR 520 Intersection Project Advisory Group (PAG) Meeting #2 CFX Administration Building Ibis Conference Room 4974 ORL Tower Road, Orlando, Florida 32807 Wednesday, February 23, 2016 1:30 PM The second Project Advisory Group

More information

Williamsburg Town Hall Meeting

Williamsburg Town Hall Meeting Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

GATEWAY PLAZA NWC OF ROCK SPRINGS RD & LESTER RD APOPKA, FLORIDA NEW RETAIL DEVELOPMENT FOR LEASE

GATEWAY PLAZA NWC OF ROCK SPRINGS RD & LESTER RD APOPKA, FLORIDA NEW RETAIL DEVELOPMENT FOR LEASE GATEWAY PLAZA NWC OF ROCK SPRINGS RD & LESTER RD APOPKA, FLORIDA 32712 NEW RETAIL DEVELOPMENT FOR LEASE PROPERTY OVERVIEW RETAIL SPACE AVAILABLE IN RAPIDLY GROWING AREA OF APOPKA SPACE FROM 1,500± SF AND

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

The Transportation Corridor Overlay District

The Transportation Corridor Overlay District The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given

More information

Westshore Development Forum April 9, 2014

Westshore Development Forum April 9, 2014 Florida Department of TRANSPORTATION Westshore Development Forum April 9, 2014 District Seven Secretary Paul Steinman Agenda D7 Overview Current Projects Future Projects Vision Florida Department of TRANSPORTATION

More information

District 3 ITS Project Update

District 3 ITS Project Update District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer Key ITS Projects in District 3 Bay County Advanced Traffic Management System (ATMS) Okaloosa County Computerized Traffic Control

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS National Scenario Planning Peer Exchange July 10, 2012 2012, All Rights Reserved. 1 MAG Transportation

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

Mainline Description

Mainline Description Mainline Description The Mainline component of Florida s Turnpike extends for 320 miles and consists of five distinct sections as shown in the figure above. These sections are the SR 821 (HEFT), Southern

More information

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD Florida Department of TRANSPORTATION I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD From North of State Road (SR) 44 to North of US 92 (International Speedway Boulevard) Volusia

More information

2017 LIST OF PRIORITY PROJECTS

2017 LIST OF PRIORITY PROJECTS 0 LIST OF PRIORITY PROJECTS Adopted April, 0 Amended August, 0 by the Lake~Sumter MPO GOVERNING BOARD Coverage of Fiscal Years 0/ through 09/0 Prepared by the Lake~Sumter Metropolitan Planning Organization

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY OPERATIONS COMMITTEE MEETING September 19, :00 P.M.

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY OPERATIONS COMMITTEE MEETING September 19, :00 P.M. AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY OPERATIONS COMMITTEE MEETING September 19, 2018 1:00 P.M. Meeting location: Central Florida Expressway Authority Board Room 4974 ORL Tower Road Orlando, FL 32807

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

Draft Year 2040 Cost Feasible Plan

Draft Year 2040 Cost Feasible Plan Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Florida Department of TRANSPORTATION. First Coast Expressway

Florida Department of TRANSPORTATION. First Coast Expressway Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

I-70/I-71 Project Public Meeting Presented By

I-70/I-71 Project Public Meeting Presented By I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning

More information

ASSESSMENT OF MULTI-USE TRAIL ACCOMMODATION

ASSESSMENT OF MULTI-USE TRAIL ACCOMMODATION ASSESSMENT OF MULTI-USE TRAIL ACCOMMODATION WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY Orange, Lake, and Seminole Counties, Florida Financial Project ID: 238275 1 22 01 and 240200 1 22 01 Federal

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington

More information

APPENDIX A: Planning Consistency Checklist

APPENDIX A: Planning Consistency Checklist APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces

More information

FY 2011 TRANSPORTATION AUTHORITY MONITORING AND OVERSIGHT REPORT

FY 2011 TRANSPORTATION AUTHORITY MONITORING AND OVERSIGHT REPORT FY 2011 TRANSPORTATION AUTHORITY MONITORING AND OVERSIGHT REPORT Commission s Charge In 2007, HB 985 amended Section 20.23, FS, expanding the Commission s oversight role Monitor the efficiency, productivity,

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016 Overview of Highway 37 Project Napa County Board of Supervisors December 20, 2016 1 Project Location-Caltrans District 4 2 SR 37 Corridor Features 2 to 4 lane 21 mile corridor traversing Solano, Sonoma,

More information

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE www.lakesumtermpo.com BICYCLE & PEDESTRIAN ADVISORY COMMITTEE AGENDA Thursday, May 10, 2012 Regular Meeting, 3:00 p.m. 1616 South 14 th Street Leesburg, Florida 34748 Phone (352) 315-0170 Fax (352) 315-0993

More information

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018 Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,

More information

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

Predictive Economic Impact Study for the Mount Dora to Seminole Wekiva Trail

Predictive Economic Impact Study for the Mount Dora to Seminole Wekiva Trail Predictive Economic Impact Study for the Mount Dora to Seminole Wekiva Trail Prepared By: Valerie Seidel vseidel@balmoralgroup.us 341 N. Maitland Ave., Suite 100 Maitland, FL 32751 Phone (407) 629-2185

More information

The St Joe Compan November 2009

The St Joe Compan November 2009 The St. Joe Company November 2009 Forward Looking Statements e ts This presentation contains forward-looking statements about future events that are subject to numerous assumptions, risks and uncertainties.

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Monthly SunPass Transponder Sales Inception to June 2012

Monthly SunPass Transponder Sales Inception to June 2012 Monthly SunPass Transponder Sales Inception to June 2012 This graph shows the monthly SunPass transponder sales since inception. The significant increase in transponder sales during March 2004 is attributed

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

NEW YORK AVENUE TOWN HOME SITE

NEW YORK AVENUE TOWN HOME SITE NEW YOR AVENUE TOWN HOME SITE EXCLUSIVE LISTING DELAND, FLORIDA LOCATION The Property is located in DeLand, FL on the south side of New York Avenue (SR 44) between Frankfort Avenue on the east, Fairview

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ALACHUA COUNTY Highways: Interstate 4230716 I-75(SR121)WILLISTON RD SR222(NW

More information

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE The Orlando North Airpark Enterprise Zone is a rare opportunity for any company desiring to relocate or open a new operation in the State of Florida.

More information

A New Era of Transportation Solutions

A New Era of Transportation Solutions A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively

More information

Regional Planning for Tri-Rail Coastal Link

Regional Planning for Tri-Rail Coastal Link 2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,

More information

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion Darren Henderson, AICP Today s s Discussion How bad is congestion? What has been done about it? What else can be done? How Bad is

More information

STATE ROUTE CHANGE DESCRIPTION USRN DECISION IOWA

STATE ROUTE CHANGE DESCRIPTION USRN DECISION IOWA AASHTO Special Committee on U. S. Route Numbering (USRN) Report to the Standing Committee on Highways (SCOH) May 4, 2011 Decision and Meeting Minutes May 2, 2011 Las Vegas, Nevada Members: Chair Don Vaughn,

More information

A Presentation to: Project Advisory Group Meeting #6

A Presentation to: Project Advisory Group Meeting #6 A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

DEVELOPMENT LAND FOR SALE

DEVELOPMENT LAND FOR SALE Lake Louisa 51± Planned Commercial 249± acres Proposed Wellness Center 152± acres Proposed 600 Single-Family Lots FOR SALE: 44± acres Planned Commercial/ Multi-Family FOR SALE: 231± gross acres (120± net

More information

LIST OF PRIORITY PROJECTS (LOPP) 2017/ /35

LIST OF PRIORITY PROJECTS (LOPP) 2017/ /35 (LOPP) 07/8-0/ Adopted August, 0 Amended December, 0 Prepared by the Lake~Sumter Metropolitan Planning Organization South th Street Leesburg, FL 78 This report was financed in part by the Federal Highway

More information

DEVELOPMENT LAND FOR SALE

DEVELOPMENT LAND FOR SALE centrally LOCATED! Minutes from WALT DISNEY WORLD! Lake Louisa INCREDIBLE LOCATION Located on east side of US 27 approx. 2 miles south of Clermont in Lake County, FL. SIZE 721± acres Seller will divide.

More information

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS APPENDIX C TRANSPORTATION PLANNING DOCUMENTS 5151 FLYNN PARKWAY, SUITE 404 CORPUS CHRISTI, TEXAS 78411 TEL: 361.884-0687 FAX: 361-884-8529 EMAIL: ccmpo@cctxmpo.us www.corpuschristi-mpo.org July 19, 2013

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose

More information

Chapter 4. Development Alternatives

Chapter 4. Development Alternatives Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined

More information

LAND FOR SALE. LAKE COUNTY PLANNED TOWN CENTER MIXED USE LAKEFRONT 721± acres Lake County, FL INCREDIBLE LOCATION SIZE FRONTAGE

LAND FOR SALE. LAKE COUNTY PLANNED TOWN CENTER MIXED USE LAKEFRONT 721± acres Lake County, FL INCREDIBLE LOCATION SIZE FRONTAGE centrally LOCATED! Minutes from WALT DISNEY WORLD! Lake Louisa INCREDIBLE LOCATION Located on east side of US 27 approx. 2 miles south of Clermont in Lake County, FL. SIZE 721± acres Seller will divide.

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

Transform66: Inside the Beltway

Transform66: Inside the Beltway Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a

More information

Southern Beltway Projects Summary

Southern Beltway Projects Summary Southern Beltway Projects Summary The Pennsylvania Turnpike Commission is proposing the construction of a 30-mile, tolled fourlane limited-access highway, known as the Southern Beltway that will be located

More information

A VISION FOR I-95. January 12, Delaware Department of Transportation

A VISION FOR I-95. January 12, Delaware Department of Transportation A VISION FOR I-95 January 12, 2011 Delaware Department of Transportation The East Coast s Main Street Along with SR 1, the most significant highway in Delaware 29 miles to I ".', 2 Sponsoring / Cooperating

More information

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009 The St. Joe Company Raymond James Institutional Investors Conference March 10, 2009 Forward Looking Statements This presentation contains forward-looking statements about future events that are subject

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date SPECIAL COMMITTEE ON US ROUTE NUMBERING MEETING MINUTES FOR OCTOBER 17, 2013 AND REPORT TO SCOH OCTOBER 18, 2013 SHERATON DOWNTOWN DENVER, DENVER, COLORADO ADDENDUM OCTOBER 28, 2013 The meeting of the

More information

State Route 189 Project and Draft Resolution of Support. November 2014

State Route 189 Project and Draft Resolution of Support. November 2014 State Route 189 Project and Draft Resolution of Support November 2014 Corridor Location Image sources: ADOT Statewide and National Importance: CANAMEX Corridor Image source: FHWA Statewide and National

More information

Special Committee on U. S. Route Numbering

Special Committee on U. S. Route Numbering Special Committee on U. S. Route Numbering Franklin, Tennessee- Franklin Marriott Cool Springs Monday May 21, 2018 5:30 PM (Central Daylight Time) Conference Call- Tel 1-888-585-9008, Conf. Room No. 191-374-518

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information