1 Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission
2 Public Safety Must Be the #1 Priority
3 Grade Crossings in High Speed Rail Corridors Considerations Public Crossings Private Crossings Field Crossings Pedestrian Crossings Trespassers
4 High Speed Rail Corridor - Chicago to St. Louis
5 1 st Segment: Dwight to Godfrey MP 70 - MP Crossings 137 Public Grade 30 Private Grade 7 Pedestrian Grade 6 Field IDOT Union Pacific Railroad ICC Amtrak Local Road Agencies
6 Federal Guidelines - Sealed Corridors 1 Public crossing treatments for Emerging HSR ( < 110 mph) should provide an additional level of safety by blocking all lanes of travel, to prevent left turns from parallel roadways that inadvertently or discourage those who might attempt to go around the lowered gate 1. Four quadrant gates Median arrangements Paired one way streets with gate arms extending across all lanes of travel 1 Highway-Rail Grade Crossing Guidelines for High-Speed Passenger Rail, Federal Railroad Administration (11/09)
7 Four Quadrant Gates
8 HSR Four-Quadrant Gate Design Dynamic Mode - Primary form of operation Inductive loop detectors used for vehicle detection Both Exit and Entrance Gates descend together Timed Mode - Backup If Vehicle Detection System fails Rural Crossings; low traffic volumes Entrance Gates must be horizontal, at a minimum, prior to Exit Gates descending Exit Gates fail in the Up position Gates installed parallel to tracks Remote Monitoring at all crossings
9 Four Quadrant Gates - Presence Detection 1 Accepted design for four-quadrant gates includes a delay on the descent of exit gates to permit traffic on the crossing to clear before arrival of the train. Where a four-quadrant gate system is employed and storage is a potential issue, consideration should be given to using vehicle presence detection to maintain the exit gates in the raised position until traffic within the crossing clears. 1 Highway-Rail Grade Crossing Guidelines for High-Speed Passenger Rail, Federal Railroad Administration (11/09)
10 HSR Four-Quadrant Gate Design (Vehicle Detection System) Exit Gate Management System (EGMS) Loop Amplifiers integral part of EGMS Pre-formed Loops (as opposed to standard loop wire) Longer life expectancy Loop dimensions must be known prior to installation Primary loop and test loop enclosed in one jacket Loop junction boxes installed to signal bases Roadway approaches reconstructed full-depth both sides of crossings Pre-formed loops buried between asphalt lifts while repaving Longer life expectancy than the typical saw-cut loop.
11 Standard (Two Quadrant) Gates
12 MTCD* FOR STANDARD CROSSING Minimum Track Clearance Distance MTCD shown in red
13 Four-Quadrant Gates Exit Gates shown in red
14 Minimum Track Clearance Distance Quad Gates MTCD shown in red
15 Self-Checking Inductive Loop Detector The detector loop consists of two detector loops in one, the primary and the check. The detector amplifier continuously shorts the check loop to induce a call on the primary, thereby validating its operation.
16 Typical Vehicle Detection System Utilizing Loop Detectors Detector loops shown in red
17 Typical Plan - Quad Gates Pavement Reconstruction Bury Pre-formed Detector Loops
18 Four-Quadrant Gates March 2010 Guidance Document Previous Installations UP - Joliet to Springfield CSX - City of Chicago Criteria Special Considerations Checklist Typical Layouts Allow for Advancement
19 Federal Guidelines - Private Crossings 1 Private highway rail crossings constitute a significant part of the crossing safety problem in the United States, and in most States, there is no public regulation of this issue. On average, movements over private crossings are a greater risk to persons on trains because of the prevalence of heavy trucks and agricultural equipment: Public Access Crossings Industrial Crossings Residential Crossings Agricultural Crossings 1 Highway-Rail Grade Crossing Guidelines for High-Speed Passenger Rail, Federal Railroad Administration (11/09)
20 Private Crossings (Safe Access)
21 Field Crossings (Safe Access) Field Crossing w/o Active Warning Devices Field Crossing with User- Activated Devices
22 Federal Guidelines - Pedestrian Considerations 1 Pedestrian treatments at vehicular crossings and associated sidewalks, including pedestrian pathways, are an essential safety element: Active Warning for Pedestrians Channelization of Pedestrian Traffic Special Needs Road Users Crossings near Stations Flangeway Gaps 1 Highway-Rail Grade Crossing Guidelines for High-Speed Passenger Rail, Federal Railroad Administration (11/09)
23 Pedestrian Crossings
24 Pedestrian Crossings (Safe Access) Pedestrian Xing with R.O.W. Access Pedestrian Xing with Restricted R.O.W. Access
25 Federal Guidelines - Trespass Considerations 1 Trespassing on railroad property is the single largest cause of deaths associated with railroad operations HSR lines should be clearly posted against entry Consideration should be given to use of tamper resistant fencing, video surveillance, and similar measures in high traffic areas. Control of trespassing is also essential to the reliability and security of HSR service 1 Highway-Rail Grade Crossing Guidelines for High-Speed Passenger Rail, Federal Railroad Administration (11/09)
26 Trespassers (Restrict Access to RR R.O.W.)
27 Trespassers
28 Trespassers
29 Trespassers
30 QUESTIONS?? Michael E. Stead Rail Safety Program Administrator Illinois Commerce Commission 527 E. Capitol Avenue Springfield, IL (217)
Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationHIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak
HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationChicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014
Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980
More informationAttachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION
Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationHIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL
HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC UPRR/TPW Crossing in Chenoa, IL Written By Michael R. Garcia, P.E. Chief, Rail Engineering Bureau of Railroads Room 302 Illinois Department of
More informationNon-Motorized Transportation
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationAREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS
SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References
More informationQuiet Zone Process. Background:
Background: In order to reduce the impact of train horns on municipalities, the FRA (Federal Railroad Administration) has provided communities with the option to establish a QZ (Quiet Zone). A quiet zone
More informationUniversity Region Non-Motorized Plan 2015
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationProvincial Railway Technical Standards
GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements
More informationRailroad Safety in the United States. Ian Savage
Railroad Safety in the United States Ian Savage International Comparisons USA GB Ratio Population 320m 63m 5 times Route Miles 140k 10k 14 times Train Miles 766m 355m 2 times Passenger Miles 22 billion
More informationRAILROAD QUIET ZONE PROJECT
RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table
More informationQuiet Zone Evaluation for Huron, Ohio
Quiet Zone Evaluation for Huron, Ohio 9601 Camp Bowie West Fort Worth, TX 76116 +1 817 886 8210 (T) www.ctcinc.com Quiet Zone Evaluation City of Huron, OH Final Report August 2015 Introduction The City
More informationHIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM
HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation
More informationK SIGNAGE & TRAFFIC CONTROL. Table of Contents
Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...
More informationNeed County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low
PIONEER TRAILS REGIONAL PLANNING COMMISSION TRANSPORTATION NEEDS -- 2015 TRANSPORTATION PLANNING GOALS BY MODOT CATEGORIES Pioneer Trails transportation needs are listed according to MoDOT s two major
More informationThe Railroad Commission of California
Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute
More informationPART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS
Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................
More informationAgenda Cover Memorandum
Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:
More informationRailway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways
Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.
More informationLANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006
of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationThis section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.
4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing
More informationAviation, Rail, & Trucking 6-1
6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More informationRockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008
ockland County Safety & Quiet Zone Project Town of Orangetown Public Meeting January 30, 2008 Agenda Welcome and Introductions Project Goals Project Area and ailroad Facts How to Establish a Quiet Zone
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationHISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION
HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway
More informationLake Erie Commerce Center Traffic Analysis
LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table
More informationNFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue
Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationThe Olathe Quiet Zone
The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More informationDocument Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail
Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...
More informationMarch 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31
THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationLevel Crossings Configuration Standards
Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationRailroad Safety Trail
2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationA number of goals were identified during the initial work on this Big Lake Transportation Plan.
C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationProposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project
Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project 1.0 Introduction On November 21, 2011 the Surface Transportation Board (STB) issued a final decision (Docket
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationTRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES
TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More information9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING
Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST
More informationTANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)
Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1
More informationIntroduction. The City of Elk Grove
The Quiet Zone Application Process: Lessons Learned from Elk Grove, California 8/22/05 By: Dominic Spaethling, PB; Barry Lemke, PB; Gwen Owens, City of Elk Grove, CA Introduction The City of Elk Grove
More informationChicago and Alton Railroad
CHICAGO AND ALTON RAILROAD..................................................... Art. of consol. in IL, March 14, 1906 690.908 mi. First main track 159.434 mi. Second and other main tracks 359.308 mi. Yard
More informationGulf Coast MPO Obligated Projects
Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road
More informationMLS # $202, Acres residential development site in Bay County, Florida
MLS # 617466 $202,000 35.31 Acres residential development site in Bay County, Florida Highway 231 Fountain, FL Presented By: Don Nations Nations Real Estate 2325-A Frankford Avenue, Suite A Panama City,
More informationCITY OF BROOKFIELD Capital Improvement Fund Budget
CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationFRONT COVER. Derby Quiet Zone Study Cover
FRONT COVER Derby Quiet Zone Study Cover DERBY QUIET ZONE STUDY City of Derby April 9 City Council The Mayor and City Council comprise the Governing Body. These elected officials are the political leaders
More informationQuiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner
Quiet Zone along FEC Corridor Paul Calvaresi Regional Transportation Planner Calvaresip@browardmpo.org About the Quiet Zone Throughout all of Broward County on the FEC Tracks Deerfield Beach Pompano Beach
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationQueen s Circus Roundabout
Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationBlueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.
Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationNEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS
INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role
More informationCity of Berkeley Railroad Quiet Zone Study
City of Berkeley Railroad Quiet Zone Study Final Report Prepared for the City of Berkeley April 13, 2009 2 Adavant Consulting City of Berkeley Railroad Quiet Zone Study Final Report Adavant Consulting
More informationCHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS
CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationChapter 6: POLICY AND PROCEDURE RECOMMENDATIONS
Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationChapter 4 Route Window NE3 Manor Park station. Transport for London
Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the
More information3. Proposed Midwest Regional Rail System
3. Proposed Midwest Regional Rail System 3.1 Introduction The proposed Midwest Regional Rail System (MWRRS) will operate in nine states, encompass approximately 3,000 route miles and operate on eight corridors.
More informationIL 390 Station. Wood Dale Open House Summary 5/18/17
Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationMEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018
MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More informationModule TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014
GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents
More informationElectric System Serving Pierce County Current system and future investments
Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationWELCOME US 83 Public Meeting
WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationChapter 6 Route Window NE5 Seven Kings station. Transport for London
Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated
More informationSouthwest LRT Alignment Video Narration
Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
More informationChapter 2: Entire US287 Corridor
Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps
More informationROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982
ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982
More informationChapter 8 Route Window NE7 Chadwell Heath station. Transport for London
Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of
More information