NETWORK RAIL Western and Wales Route WW 11

Size: px
Start display at page:

Download "NETWORK RAIL Western and Wales Route WW 11"

Transcription

1 PRIVATE AND NOT FOR PUBLICATION Page 1 of 223 NETWORK RAIL Western and Wales Route Week No. WW 11 WEEKLY OPERATING NOTICE Containing SAFETY NOTICES TEMPORARY SPEED RESTRICTIONS ENGINEERING ARRANGEMENTS SIGNALLING AND PERMANENT WAY ALTERATIONS (NEW ITEMS) (DETAILS OF WORK ALREADY CARRIED OUT) GENERAL INSTRUCTIONS AND NOTICES (AMENDMENTS TO OPERATING PUBLICATIONS) (MISCELLANEOUS INSTRUCTIONS) URDAY 10 JUNE 2017 to DAY 16 JUNE 2017 THIS NOTICE COVERS ALL LINES SHOWN IN THE WESTERN AND WALES ROUTE SECTIONAL APPENDIX If the weekly supply of this notice is not received at the normal time, application must be made to your local Manager

2 Western and Wales Route WON /18 Page S1 * * * s marked thus will not appear in future issues and a note must be taken of them by all concerned A thick vertical line denotes new or amended items WESTERN AND WALES ROUTE SAFETY NOTICES Page 2 of 223 NEW MEASUREMENT TRAIN (N.M.T) The N.M.T is comprised of a specially adapted High Speed Train set and operates frequently on most Main Line routes within Network Rail Routes, except Southern. Staff are to note that during movements the N.M.T emits a powerful light source which could be mistakenly identified as a binding brake or sparks being emitted from the bogies, and as such, does not require to be reported to the controlling Signaller. However, if in any doubt, then normal operating procedures should be carried out. (25/03/05 REV 17/02/10) (UFN) WARNING THE EQUIPMENT IDENTIFIED BELOW HAS BEEN ENERGISED AT 25000V AC AND MUST BE REGARDED AS LIVE AT ALL TIMES OVERHEAD LINE SYSTEM: Maidenhead Stabling Sidings Maidenhead Loop and Bourne End Branch Line on the Great Western Main Line The following equipment is being energised: New overhead line equipment on the Maidenhead Sidings Roads 1 to 6, from MLN1 24m 32ch to 24m 59ch; the Maidenhead Loop in its entirety, from MLN1 24m 3ch to 24m 51 ch; and the Bourne End Branch Line up from MLN1 25ch to WBB 24m 39ch. Group standard GE/RT8000 Module AC (AC Electrified Lines) and Company Standard NR/SP/ELP/29987 (Working on or about 25kV AC Electrified Lines) shall apply and all persons concerned shall ensure that they are supplied with a copy. There is no danger to persons providing these instructions are strictly observed. The Electrical Supply will be under the control of DIDCOT Electrical Control Room This is manned continuously and can be contacted on the following numbers British Telecom Railway ETD Railway ETD (BT Emergency ) Short Code 170 Queries in connection with the energisation of the OLE extension dealt with in this notice (other than situations requiring emergency action) should be referred to the Designated Project Engineer, Contact Address:- Network Rail Section 40 (1) Dawley Road Project Office Hayes and Harlington UB3 1EH (SN1012) (30/04/17) (12)

3 Western and Wales Route WON /18 Page S2 * * * s marked thus will not appear in future issues and a note must be taken of them by all concerned A thick vertical line denotes new or amended items WESTERN AND WALES ROUTE SAFETY NOTICES Continued Page 3 of 223 WARNING FROM 2200 HOURS ON URDAY 17JUNE 2017 THE EQUIPMENT IDENTIFIED BELOW WILL BE ENERGISED AT 25,000 VOLTS A.C. AND FROM THIS TIME MUST BE REGARDED LIVE AT ALL TIMES OVERHEAD LINE SYSTEM ON THE DOWN MAIN LINE, UP MAIN LINE AND DOWN RELIEF LINE ON THE GREAT WESTERN ROUTE The following equipment is being energized: The overhead line equipment on the Down Main Line and the Up Main Line from Reading West Junction Structure No. MLN 59/858 (37m 14ch), to Scours Lane Junction Structure No. MLN 60/854 (37m 63ch) and on the Down Relief Line from Reading West Junction Structure No. MLN 59/614 (37m 0ch) to Reading West Junction Structure No. MLN 59/849 (37m 14ch.) Group Standard GE/RT8000 Module AC (AC Electrified Lines) and Company Standard NR/SP/ELP/29987 (Working on or about 25kV A.C. Electrified Lines shall apply and all persons concerned shall ensure that they are supplied with a copy. There is no danger to persons, provided these instructions are strictly observed. The Electrical Supply will be under the control of Didcot Electrical Control that is staffed continuously and can be contacted on the following numbers British Telecom Railway ETD Railway ETD Emergency Only Railway ETD short code (SN1014 (17/06/17) (15)

4 SECTION A - TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g 20 the Rule Book Module SP, Section 4.3, (differential speed restrictions) applies. 40 Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h ** REFLECTORISED WARNING BOARDS ARE APPROVED FOR USE ON ALL NETWORK RAIL LINES ** GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) T2017/ Western and Wales WON /2018 Page A-1 West Drayton and Slough Down Main Page 4 of High Output Renewals From 0300 Tue 13/06/17 Network Rail High Output (NRHO) T2017/ Slough West and Dolphin Jn - Up Main Track Renewals From 0200 Mon 12/06/17 Babcock International GW105 GW1 AT UFFINGTON TO FORDGATE VIA BOX T2017/ South Marston and Highworth Jn Down Main Track Renewals From 0400 Mon 12/06/17 Babcock International T2017/ Chippenham and Wootton Bassett Jn - Up Main Track Renewals From 0100 Mon 12/06/17 S&C South Alliance (Western) T2017/ Bath Spa and Bath Goods Down Main ROUTE RUNNER TIME LOSS 0.68 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] Condition Of Structure (17/10) Network Rail Maintenance (Bristol)

5 Page 5 of 223 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW4501 GW450C STOKE GIFFORD JN TO BRISTOL BULK HANDLING TERMINAL T2017/ Western and Wales WON /2018 Page A-2 Bristol Bulk Handling Terminal and Charlton Tunnel West Engine Release/Up Departure/Up Avonmouth Dock GW4501 NOT AVAILABLE TO CHECK IN ROUTE RUNNER. NO PUBLISHED TIMETABLE PLANNING RULES ALLOWANCE Condition Of Track From 0800 Tue 13/06/17 Network Rail Maintenance (Bristol) GW500 GW5 A READING TO COGLOAD JN VIA WESTBURY & FROME A/LS T2016/ Hungerford and Kintbury - Up Westbury Condition Of Track (16/29) Network Rail Maintenance (Swindon) GW5001 GW50 B BEECHGROVE GF (INCL) TO WESTBURY SOUTH JN T2015/ Westbury North Jn and Westbury South Jn Geometric - Cyclic Top (15/35) Network Rail Maintenance (Swindon) GW510 GW51 B WESTBURY NORTH JN TO BATHAMPTON JN T2015/ Westbury North Jn and Westbury South Jn Geometric - Cyclic Top (15/35) Network Rail Maintenance (Swindon) T2015/ Youngs LC (UWC) and Claverton Crossing Down Trowbridge ROUTE RUNNER TIME LOSS 0.72 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] Condition Of Track (15/24) Network Rail Maintenance (Bristol) T2015/ Claverton Crossing and Youngs LC (UWC) - Up Trowbridge 70 ROUTE RUNNER TIME LOSS 0.45 MINS DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [1 MINUTE] Condition Of Track (15/24) Network Rail Maintenance (Bristol)

6 Page 6 of 223 Western and Wales WON /2018 Page A-3 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW560 GW56 B HEYWOOD ROAD JN TO FAIRWOOD JN VIA WESTBURY T2015/ Westbury North Jn and Westbury South Jn Geometric - Cyclic Top (15/35) Network Rail Maintenance (Swindon) GW570 GW57 B CLINK ROAD JN TO BLATCHBRIDGE JN VIA FROME T2016/ Frome North Jn and Clink Road Jn - Up Frome Condition Of Track (17/51) Network Rail Maintenance (Swindon) GW580 GW58 B EAST SOMERSET JN TO CRANMORE T2015/ East Somerset Jn (Witham) and Cross Cottage LC (UWC) Single Condition Of Track (15/26) Network Rail Maintenance (Swindon) GW700 GW70 B GLOUCESTER, BARNWOOD JN TO SEVERN TUNNEL JN T2016/ Gloucester West and Gloucester - Up Main (Reversible) 40 DOES NOT EXCEED TIMETABLE PLANNING RULES ALLOWANCES [0 MINUTE] Condition Of Track (16/31) Network Rail Maintenance (Bristol) TIMETABLE PLANNING RULES ALLOWANCE [1 MINUTE] T2017/ Ley LC and Broken Cross LC Condition of track  Cyclic top fault Down Main Condition Of Track (17/05) Network Rail Maintenance (Bristol) NO PUBLISHED TIMETABLE PLANNING RULES ALLOWANCE ROUTE RUNNER TIME LOSS 1.1 MINS DECISION - W WC - WEEK 05-19/04/17

7 Page 7 of 223 Western and Wales WON /2018 Page A-4 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW700 GW70 B GLOUCESTER, BARNWOOD JN TO SEVERN TUNNEL JN - Continued T2017/ Chepstow and Awre LC (CCTV) - Up Main High Output Renewals (17/10) Network Rail High Output (Swindon) GW730 GW73 B SEVERN BRIDGE JN TO NEWPORT, MAINDEE WEST JN T2017/ Vineyard Farm No.1 LC (UWC) and Llancillo Hall LC (UWC) - Up Main Condition Of Track From 0400 Mon 12/06/17 Works Delivery Wales T2017/ Llancillo Hall LC (UWC) and Vineyard Farm No.1 LC (UWC) Down Main Condition Of Track From 0400 Mon 12/06/17 Works Delivery Wales GW731 ABBEY FOREGATE TO RUABON T2016/ Weston Rhyn LC (AHB) and Chirk Tunnel Condition Of Culvert Until 1300 Tue 13/06/17 Network Rail Maintenance (Shrewsbury) GW734 DOVEY JN. TO PWLLHELI T2016/ Henblas LC and Bont-Y-Clettwr LC (UWC) This applies in the down direction only Single LC Sighting (16/06) LC Managers Wales Route T2014/ Fairbourne and Morfa Mawddach - Up & Down Other - Crossing Safety (14/13) Network Rail Maintenance (Machynlleth)

8 Page 8 of 223 Western and Wales WON /2018 Page A-5 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW734 DOVEY JN. TO PWLLHELI - Continued T2014/ Barmouth North GF and Llanaber Single Other - Crossing Safety (14/30) Network Rail Maintenance (Machynlleth) T2014/ Llanaber and Talybont - Up & Down/Single Other - Crossing Safety (14/14) Network Rail Maintenance (Machynlleth) T2015/ Llechryd LC (UWC) and Dyffryn Ardudwy - Up & Down Single LC Sighting (15/26) Network Rail Maintenance (Machynlleth) T2014/ Bennar Fawr LC (AOCL) and Dyffryn Ardudwy Single Other - Crossing Safety (14/23) Network Rail Maintenance (Machynlleth) T2014/ Dyffryn Ardudwy and Talwrn Bach LC (AOCL) - Up & Other - Crossing Safety Down/Single (14/33) T2016/ Dyffryn Ardudwy and Llanbedr LC Sighting (16/40) LC Managers Wales Route T2016/ Llwyn Cadwgan LC (UWC) and Pensarn LC Sighting (16/32) LC Managers Wales Route

9 Page 9 of 223 Western and Wales WON /2018 Page A-6 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW734 DOVEY JN. TO PWLLHELI - Continued T2016/ Traethmawr LC (AOCL) and Porthmadog LC (TMO) Single LC Sighting (16/02) LC Managers Wales Route T2016/ Penychain and Abererch LC Sighting (16/32) LC Managers Wales Route GW735 SHREWSBURY CREWE JN. TO NANTWICH T2017/ Brick Kiln Lane LC (UWC) and Whitchurch (Shropshire) - Up Main (Reversible) Condition of Embankment (17/10) Network Rail Maintenance (Shrewsbury) T2017/ Whitchurch (Shropshire) and Brick Kiln Lane LC (UWC) Down Main (Reversible) Condition of Embankment (17/10) Network Rail Maintenance (Shrewsbury) T2016/ Willaston LC and Nantwich - Up Main LC Sighting (17/49) Network Rail Maintenance (Shrewsbury) GW830 GW83 B MERTHYR TYDFIL TO BARRY ISLAND VIA CARDIFF QUEEN ST T2017/ Cathays and Llandaff - Up Llandaff LC Sighting From 0515 Mon 12/06/17 Network Rail Maintenance (Aber)

10 Page 10 of 223 Western and Wales WON /2018 Page A-7 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW830 GW83 B MERTHYR TYDFIL TO BARRY ISLAND VIA CARDIFF QUEEN ST - Continued T2017/ Llandaff and Cathays Down Llandaff LC Sighting From 0515 Mon 12/06/17 Network Rail Maintenance (Aber) T2017/ Barry Docks and Barry - Up Rail Defect (17/03) Network Rail Maintenance (Cardiff) GW834 GW834C HIRWAUN TO ABERCYNON T2015/ Hirwaun Pond (End of line) and Aberdare Single LC Sighting (16/46) Network Rail Maintenance (Aber) GW870 GW87 B BARRY TO BRIDGEND, BARRY JN (VALE OF GLAMORGAN LINE) T2016/ Aberthaw - Up Geometric - Cyclic Top (16/14) Network Rail Maintenance (Cardiff) GW900 GW9 A PILNING TO FISHGUARD HARBOUR T2017/ Llanwern Works East Connection and Maindee East Jn Down Main High Output Renewals (17/09) Network Rail High Output (Swindon) T2013/ Gaer Jn and Newport (Wales) Down Relief (Reversible) This TSR applies to both down trains and up trains on the Down Relief line Condition Of Track (14/51) Network Rail Maintenance (Newport) Warning boards are not provided for trains on the DM and UR proceeding to the DR for the TSR at 158m70c via 30mph crossover (8093 and 8099 points).

11 Page 11 of 223 Western and Wales WON /2018 Page A-8 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW900 GW9 A PILNING TO FISHGUARD HARBOUR - Continued T2017/ Marshfield - Up Relief Geometric - Cyclic Top (17/05) Network Rail Maintenance (Cardiff) T2017/ Rumney River Bridge Jn and Wentloog Freight Terminal West Jn - Up Relief Geometric - Cyclic Top (17/05) Network Rail Maintenance (Cardiff) T2017/ St. Fagans LC and Miskin Down Main High Output Renewals From 0430 Tue 13/06/17 Network Rail High Output (Swindon) T2016/ Bryn-y-Gwynon Footpath Crossing and Llanharan - Up Main LC Sighting (16/05) Network Rail Maintenance (Swansea) T2016/ Pembrey and Burry Port and Penybedd LC Down LC Sighting (16/35) Network Rail Maintenance (Swansea) T2016/ Penybedd LC and Pembrey and Burry Port - Up Main LC Sighting (16/35) Network Rail Maintenance (Swansea) T2017/ Kidwelly - Up Main Condition Of Track (17/05) Network Rail Maintenance (Haverfordwest)

12 Page 12 of 223 Western and Wales WON /2018 Page A-9 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW900 GW9 A PILNING TO FISHGUARD HARBOUR - Continued T2016/ Ffynnongain LC and St. Clears GF - Up Main Rail Defect (16/12) Network Rail Maintenance (Swansea) T2017/ Clunderwen - Up Main Condition Of Track (17/05) Network Rail Maintenance (Haverfordwest) GW910 GW910C CRAVEN ARMS JN TO LLANDEILO JN (CENTRAL WALES LINE) T2016/ Coxall Farm 1 LC (UWC) and Coxall Farm 2 LC (UWC) Single Earthworks (16/04) Network Rail Maintenance (Llandrindod) T2017/ Cefn Suran LC (UWC) and Dolau House Farm No 1 Down & Up Single LC Sighting (17/10) Network Rail Maintenance (Llandrindod) T2017/ Thomas No.2 LC (UWC) and Ty-Ddu LC (UWC) Single LC Sighting (17/05) Network Rail Maintenance (Llandrindod) T2017/ TirAllen Farm 3 LC (UWC) and Ystrad Farm LC (UWC) Single LC Sighting (17/05) Network Rail Maintenance (Llandrindod)

13 Page 13 of 223 Western and Wales WON /2018 Page A-10 SECTION A - TEMPORARY SPEED RESTRICTIONS Location Lines Affected Mileage Restr Remarks No. at or between iction M Ch M Ch m.p.h GW960 GW96 B CLARBESTON ROAD TO MILFORD HAVEN T2017/ Winsel LC (UWC) and Herbrandston Jn Single Condition Of Track (17/05) Network Rail Maintenance (Haverfordwest) NW3001 CREWE NORTH JN. TO HOLYHEAD T2017/ Crewe Steel Works and Dairy House Farm LC (UWC) Down Main Condition Of Track (17/03) Liverpool DU (IQRJ) T2017/ Dairy House Farm LC (UWC) and Beeston Castle and Tarporley SB (BC) Down Main Condition Of Track (17/03) Liverpool DU (IQRJ) NW3005 GOBOWEN TO SALTNEY JN T2016/ Weston Rhyn LC (AHB) and Chirk Tunnel Condition Of Culvert Until 1300 Tue 13/06/17 Network Rail Maintenance (Shrewsbury)

14 Page 14 of 223 Western and Wales WON /2018 Page B-1 Normally, signals are used to mark possession protection limits. Where points have to be used, this will be signified by the suffix "pts". Detonator protection for possessions arranged under Rule Book Module T3 must normally be placed at 400 metres beyond the protecting signal (or points or through crossings beyond the protecting signal) at the start of the possession and 400 metres on the approach to the signal (or points or through crossings) at the exit from the possession. Where this distance cannot be obtained, the detonator protection must be placed at the greatest distance possible from the signal (or points or through crossings) concerned. Where detonator protection has to be placed at less than the required 400 metres beyond the possession protecting signal (or points or through crossings) at the start of the possession or protection has to be placed at less than the required 400 metres on the approach to the signal (or points or through crossings) beyond the possession, then this will be indicated by a # symbol following the signal or points number quoted in the. GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) DAY 09 to URDAY 10 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 1 West Drayton and Slough West Iver and Langley Down and Up Relief Up Goods Langley Siding Sidings to 0630 to 0630 to m34ch and 18m50ch W2017/ Survey Work 14m60ch and 16m68ch W2017/ S&T Work 14m60ch and 18m34ch W2017/ Survey Work 16m0ch and 18m50ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 2335 Fri to 0630 Sat 4007DEFGMNP 4008ABCD Down Relief: Beyond T469# to Approach T529# Up Relief: Beyond T526# to Approach T466# Iver Goods Loop: Approach T8278pts# TRAINS OVER MAIN LINES TO/FROM SOUTHALL EAST JN & TO/FROM SLOUGH WEST. LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION

15 Page 15 of 223 Western and Wales WON /2018 Page B-2 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued DAY 09 to URDAY 10 JUNE Ref. No. P2017/ Manager Western IMDM Reading 2 Twyford West and Kennet Bridge Jn Down and Up Main Line Blockage 2335 to 0545 Patrolling 32m70ch and 33m60ch W2017/ Down Main: Beyond T1659 to Approach T Protecting Signal T1659 Up Main: Beyond T1666 to Approach T Protecting Signal T1666 TRAINS OVER RELIEF LINES TO/FROM RUSCOMBE & TO/FROM KENNET BRIDGE JN. DAY 09 to URDAY 10 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 3 Kennet Bridge Jn and Tilehurst East Down and Up Main Reading Platforms 9, 10, 11 Reading East Jn and Caversham Road Jn Reading New Jn and Reading Spur Jn Up Main Loop Down and Up Reading Spurs Reading Platforms & 8 Westbury Line Jn and Reading West Jn Festival Line to 0525 to 0525 to 0525 to 0525 to 0525 to 0525 Patrolling 35m20ch and 37m75ch W2017/ Rail Testing and Lubrication 35m20ch and 37m75ch W2017/ Patrolling 35m20ch and 37m75ch W2017/ Rail Testing and Lubrication 35m55ch and 36m74ch W2017/ Remove Rail Defects 36m0ch and 36m55ch W2017/ Reading and Oxford Road Jn Down and Up Westbury 0045 to 0525 Reading East Jn and Westbury Line Jn Down Main Loop 0045 to 0525

16 Page 16 of 223 Western and Wales WON /2018 Page B-3 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 3 CONTINUED 2330 Fri to 0045 Sat Down Main: Beyond T8399Bpts# to Approach T1767# Up Main: Beyond T1752# to Approach T8400pts# Up Main Loop/Platform 11: Beyond T8445Apts# Down Westbury: Approach T8418pts# Down Reading Spur: Beyond T1681# Up Reading Spur: Approach T Sat to 0525 Sat Down Main: Beyond T8399pts# to Approach T1767# Up Main: Beyond T1752# to Approach T8400pts# Up Main Loop/Platform 11: Beyond T8445Apts# Down Westbury: Approach T8808pts# Up Westbury: Beyond T8807pts# Down Reading Festival Line: Approach T8475pts# Down Reading Spur: Beyond T1681# Up Reading Spur: Approach T2780 BETWEEN 2330 AND 0045 ALL THROUGH TRAINS TO/FROM DIDCOT VIA RELIEF LINE PLATFORMS 12 TO 15. PLATFORMS 7 AND 8 ARE BAY PLATFORMS ACCESSIBLE TO/FROM THE WEST ONLY. BETWEEN 0045 AND 0525 ALL THROUGH TRAINS TO/FROM DIDCOT VIA RELIEF LINE PLATFORMS 12 TO 15. TRAINS BETWEEN OXFORD AND BASINGSTOKE VIA READING WEST CURVE. TRAINS BETWEEN PADDINGTON AND THE WEST OF ENGLAND VIA THE FEEDER LINES. LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION Reading DU Standard Mtce Block 4 - No additional work to be linked to this possession without the express permission of Reading DU DAY 09 to URDAY 10 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 4 Tilehurst East (inc.) and Moreton Cutting Down and Up Main 2230 to 0530 Patrolling 38m5ch and 48m40ch W2017/ Patrolling 38m5ch and 44m60ch W2017/ Patrolling 38m52ch and 40m65ch W2017/ OHL Inspection 44m60ch and 47m66ch W2017/ OHL Inspection 46m0ch and 48m40ch W2017/

17 Page 17 of 223 Western and Wales WON /2018 Page B-4 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 4 CONTINUED Down Main: Beyond T1767# to Approach SB901# Up Main: Beyond SB8528pts to Approach T1752# Structures Work 47m25ch and 47m66ch W2017/ TRAINS OVER RELIEF LINES TO/FROM KENNET BRIDGE JN FROM/TO MORETON CUTTING LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION URDAY 10 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 5 Paddington and Acton West Lines 4-6/Down and Up Relief Paddington Platforms 7 to 12 and 14 Portobello Jn (London) and Old Oak Common East Kensal Green and Old Oak Common East Old Oak Common East and Friars Jn Ladbroke Grove and Kensal Green Crossrail Depot Line 1 Carriage Line and Engine Siding WYC/Reception Line No. 1 Crossrail Depot Line to 0505 to 0505 to 0505 to 0505 to 0505 to m5ch and 3m25ch W2017/ Off Track Work 0m5ch and 0m29ch W2017/ S&C Maintenance 0m5ch and 1m28ch W2017/ S&T Points 0m61ch and 2m30ch W2017/ Portobello Jn (London) Marcon Siding Sidings 0005 to 0505 Paddington and Ladbroke Grove Line to 0405 Paddington Platform to 0405 ISOLATION OF ELECTRICAL SECTIONS 0005 Sat to 0505 Sat 803D1D2

18 Page 18 of 223 Western and Wales WON /2018 Page B-5 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 5 CONTINUED 0005 Sat to 0105 Sat Lines 4&5/Down Relief: Stopblocks Platforms 7-10 to Approach SN187# Up Relief/Line 6: Beyond SN8129pts# to Stopblocks Platforms 11, 12 & 14 Carriage Line/Engine Siding Line: Beyond SN8071Bpts# to Stopblocks Crossrail Depot Line 1: Beyond SN9006Bpts# Reception Line 1: Approach SN8078pts# Wycombe Single: Beyond SN166# 0105 Sat to 0405 Sat Line 3: Beyond SN8063Apts# to Stopblocks Platform 6 Lines 4&5/Down Relief: Stopblocks Platforms 7-10 to Approach SN187# Up Relief/Line 6: Beyond SN8129pts# to Stopblocks Platforms 11, 12 & 14 Carriage Line/Engine Siding Line: Beyond SN8071Bpts# to Stopblocks Reception Line 1: Approach SN8078pts# Crossrail Depot Line 1: Beyond SN9006Bpts# Wycombe Single: Beyond SN166# 0405 Sat to 0505 Sat Lines 4&5/Down Relief: Stopblocks Platforms 7-10 to Approach SN187# Up Relief/Line 6: Beyond SN8129pts# to Stopblocks Platforms 11, 12 & 14 Carriage Line/Engine Siding Line: Beyond SN8071Bpts# to Stopblocks Crossrail Depot Line 1: Beyond SN9006Bpts# Reception Line 1: Approach SN8078pts# Wycombe Single: Beyond SN166# FROM 0005 to 0105 & 0405 to 0505 AMENDED STATION WORKING. TRAINS TO TRAVEL OVER MAIN LINES AND LINES 1 TO 3. PLATFORMS 7 To 14 TO BE KEPT CLEAR. BETWEEN 0105 to 0405 AMENDED STATION WORKING. TRAINS TO TRAVEL OVER MAIN LINES AND LINES 1 & 2. PLATFORM 6 To 14 TO BE KEPT CLEAR. URDAY 10 JUNE Ref. No. P2017/ Repeated item, please see details under route GW URDAY 10 to DAY 11 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 6 Pangbourne and Didcot East Down and Up Relief Down and Up Main to 0800 to 0800 OHL Work 43m30ch and 51m64ch W2017/ S&T Maintenance 43m30ch and 49m15ch W2017/ S&T Work 44m0ch and 46m1ch W2017/

19 Page 19 of 223 Western and Wales WON /2018 Page B-6 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 6 CONTINUED CWR Stress Management 44m60ch and 48m40ch W2017/ S&T Work 46m6ch and 51m6ch W2017/ Structures Work 48m40ch and 48m50ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 2240 Sat to 0515 Mon 4013,4014, 4015,4016 Complete 4065A,4063 Complete 8007,8008 Complete, RW13XX,RW14ZZ, RW15ZZ,RW16ZZ, RW13YY, RW14YY,RW15YY, RW16XX, RW16YY,RW65ZZ, SR63XX,SR63YY,SR63ZZ 2240 Sat to 0050 Sun Down Relief: Beyond T807# to Approach SB907# Up Relief: Beyond SB8533Apts to Approach T786# 0050 Sun to 0800 Sun Down Relief: Beyond T807# to Approach SB907# Up Relief: Beyond SB8533Apts to Approach T786# Down Main: Beyond T805# to Approach SB905# Up Main: Beyond SB8537pts# to Approach T784# TRAINS TO RUN OVER MAIN LINES UNTIL 0035 AND FROM 0800 DAY. NO TRAINS TO RUN BETWEEN 0035 AND 0800 DAY. RAIL REPLACEMENT BUS SERVICE REQUIRED FOR PANGBOURNE. LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION URDAY 10 to DAY 12 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 7 Ruscombe and Kennet Bridge Jn Reading Train Care Depot Ruscombe (inc.) and Pangbourne (inc) Twyford West and Pangbourne (inc) Reading and Drakes No.2 Crossing Southcote Jn Down and Up Main Sidings BLOCKED To Electric Trains Down and Up Main Down and Up Relief Down and Up Westbury Down and Up Basingstoke to 0035 to 0515 to 0800 to 0800 to 0700 to 0700 OHL Work 29m10ch and 37m75ch W2017/ Preparatory Work 29m10ch and 32m7ch W2017/ S&T Maintenance 29m10ch and 34m65ch W2017/ OHL Work 29m60ch and 34m65ch W2017/ OHL Work 29m60ch and 35m5ch W2017/ Station Work 30m10ch and 32m10ch W2017/

20 Page 20 of 223 Western and Wales WON /2018 Page B-7 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 7 CONTINUED Westbury Line Jn and Reading West Jn Caversham Road Jn and Oxford Road Jn Caversham Road Jn and Scours Lane Festival Line Reading Platforms 1-3 Reading West Jn and Oxford Road Jn Reading East Jn and Westbury Line Jn Reading East Jn and Caversham Road Jn Kennet Bridge Loop Reading Spur Jn Reading Southern Jn and Reading East Jn Westbury Line Jn and Oxford Road Jn Reading Reading and Westbury Line Jn Ruscombe (inc.) and Kennet Bridge Jn Feeder Relief and Feeder Main Reading Up Passenger Loop Platforms 7 to 15 Down & Up West Curve Down and Up Main Loops Down and Up Relief Loop Kennet Passenger Loop Down Spur Up Spur Up & Down Low Level Reading Upper Triangle Sidings Sidings Traincare Depot Sidings Down and Up Westbury Down and Up Main to 0800 to 0800 to 0800 to 0700 to 0800 to 0800 to 0800 to 0800 to 0800 to 0800 to 0800 to 0800 to 0700 to 0800 to 0800 to 0510 Station Work 30m10ch and 32m10ch W2017/ Structures Work 30m25ch and 30m35ch W2017/ Structures Work 30m25ch and 30m35ch W2017/ Structures Work 30m69ch and 30m79ch W2017/ Structures Work 30m69ch and 30m79ch W2017/ Station Work 30m74ch and 31m23ch W2017/ OHL Work 32m0ch and 37m75ch W2017/ OHL Inspection 33m0ch and 36m0ch W2017/ C2 Rerail - Both Rails 33m20ch and 34m60ch W2017/ S&T Work 34m0ch and 37m72ch W2017/ m0ch and 37m73ch W2017/ S&T Work 34m20ch and 35m76ch W2017/ Point Heater Maintenance 34m72ch and 35m28ch W2017/ Station Work 35m65ch and 36m11ch W2017/ Cable Work 36m0ch and 37m60ch W2017/ S&T Points 36m0ch and 37m73ch W2017/ S&T Maintenance 36m0ch and 38m0ch W2017/ S&C Maintenance 36m58ch and 37m73ch W2017/ Patrolling 36m69ch and 37m73ch W2017/

21 Page 21 of 223 Western and Wales WON /2018 Page B-8 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 7 CONTINUED S&T Work 38m0ch and 40m52ch W2017/ OHL Work 38m0ch and 41m75ch W2017/ IBJ Work 38m0ch and 41m75ch W2017/ S&T Work 38m6ch and 41m32ch W2017/ Arc Repairs 38m15ch and 38m50ch W2017/ Structures Work 40m5ch and 40m15ch W2017/ Station Work 41m37ch and 41m75ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 2240 Sat to 0515 Mon 4013,4014, 4015,4016 Complete 4065A,4063 Complete 8007,8008 Complete, RW13XX,RW14ZZ, RW15ZZ,RW16ZZ, RW13YY, RW14YY,RW15YY, RW16XX, RW16YY,RW65ZZ, SR63XX,SR63YY,SR63ZZ

22 Page 22 of 223 Western and Wales WON /2018 Page B-9 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 7 CONTINUED 2100 Sat to 0035 Sun Down Main: Beyond T8370Bpts# to Approach T8399Bpts# Up Main: Beyond T8399Apts# to Approach T8371pts# 0035 Sun to 0700 Sun Down Main: Beyond T1609 to Approach T805# Up Main: Beyond T784# to Approach T1610# Down Relief: Beyond T1637# to Approach T807# Up Relief: Beyond T786# to Approach T8375Bpts# Down Reading Spur: Beyond T8789Diamond# Up Reading Spur: Approach T8788pts# Down Westbury: Approach T2831# Up Westbury: Beyond T2826# Down Basingstoke: Approach BE501 Up Basingstoke: Beyond T2810# Reading Low Level: Beyond T8793pts# 0700 Sun to 0800 Sun Down Main: Beyond T1609 to Approach T805# Up Main: Beyond T784# to Approach T1610# Down Relief: Beyond T1637# to Approach T807# Up Relief: Beyond T786# to Approach T8375Bpts# Down Reading Spur: Beyond T8789Diamond# Up Reading Spur: Approach T8788pts# Down Westbury: Approach T8437pts# Up Westbury: Beyond T8441Apts# Down Reading Festival Line: Beyond T8455pts# Down Reading West Curve: Beyond T8809pts# Up Reading West Curve: Approach T8808Diamond# Reading Feeder Main: Beyond T8807pts# Reading Low Level: Beyond T8793pts# 0800 Sun to 0510 Mon Down Main: Beyond T1609 to Approach T8399Bpts# Up Main: Beyond T8399Apts# to Approach T1610# TRAINS TO RUN VIA RELIEF LINES, EXCEPT WHEN BLOCKED to NO TRAINS TO RUN, GWR TO OUTSTABLE AT READING PLATFORMS 1 & 4. LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION URDAY 10 to DAY 12 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 8 Milton and Rushey Platt Junction Bourton and Rushey Platt Junction Up Main Down Main to 1300 to 1300 OHL Work 54m6ch and 57m0ch W2017/ Structures Work 56m30ch and 56m53ch W2017/

23 Page 23 of 223 Western and Wales WON /2018 Page B-10 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 8 CONTINUED Milton and Steventon Wantage Road and Challow Highworth GF and Swindon Stratton Green and Highworth GF Up Relief Up Relief Down Swindon Goods Up Swindon Goods Loop Swindon Platforms 3 and 4 Highworth Jn and Swindon East South Marston Swindon East and Rushey Platt Junction Highworth Jn and Swindon East South Marston Foxhall Jn and Rushey Platt Junction Wantage Road and Challow Foxhall Jn and Steventon Up Reception South Marston Goods Down Swindon Passenger Loop/Up Swindon Relief Line East End Headshunt Sidings Cocklebury Sidings Sidings Up Through Sidings Sidings South Marston Euro Terminal Sidings Down and Up Main Down Relief Didcot Relief Line Swindon Platforms 1 and 2 Swindon and Kemble (inc.) Kemble Swindon East and Hawksworth Steel Terminal Down and Up Kemble Kemble Sidings Sidings Hawksworth Steel Terminal Siding Sidings to 1300 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 to 0820 to 0500 to 0820 to 0820 to 0820 to 0820 to 0820 OHL HOPS Install Wire/SPS 57m5ch and 64m5ch W2017/ OHL Work 57m5ch and 64m5ch W2017/ m2ch and 60m42ch W2017/ Structures Work 60m10ch and 64m0ch W2017/ OHL Work 64m10ch and 67m34ch W2017/ Drainage Work 64m10ch and 66m0ch W2017/ Drainage Work 66m0ch and 67m30ch W2017/ m30ch and 66m70ch W2017/ OHL Work 67m39ch and 73m18ch W2017/ OHL HOPS Install Wire/SPS 67m39ch and 73m18ch W2017/ m0ch and 72m0ch W2017/ IBJ Work 71m0ch and 73m0ch W2017/ C14 Rerail Resleep Reball Form - Trax 73m23ch and 76m70ch W2017/ Structures Work 76m25ch and 78m10ch W2017/ S&T Work 76m25ch and 78m10ch W2017/ Station Work 76m75ch and 77m48ch W2017/ Scrap Removal 78m0ch and 86m40ch W2017/ Structures Work 83m16ch and 83m65ch W2017/

24 Page 24 of 223 Western and Wales WON /2018 Page B-11 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 8 CONTINUED Milton and Rushey Platt Junction Up Main Down Main to 0500 to 0500 Vegetation Clearance 88m0ch and 92m0ch W2017/ Milton and Steventon Didcot Relief Line 0820 to 0500 ISOLATION OF ELECTRICAL SECTIONS 2240 Sat to 0515 Mon 4013,4014, 4015,4016 Complete 4065A,4063 Complete 8007,8008 Complete, RW13XX,RW14ZZ, RW15ZZ,RW16ZZ, RW13YY, RW14YY,RW15YY, RW16XX, RW16YY,RW65ZZ, SR63XX,SR63YY,SR63ZZ 0130 Sat to 1300 Sat Down Main: Beyond SW1141# to Approach SW1221# Up Main: Beyond SW1222# to Approach SB952# Didcot Relief Line: Approach SB954# Up Swindon Passenger Loop: Beyond SW1190# Down Kemble: Beyond SW1312# Euro Terminal: Euro Terminal Stopblocks 1300 Sat to 0055 Sun Down Main: Beyond SB941# to Approach SW1221# Up Main: Beyond SW1222# to Approach SB938# Didcot Relief Line: Approach SB940# Up Swindon Passenger Loop: Beyond SW1190# Down Kemble: Beyond SW1312# Euro Terminal: Euro Terminal Stopblocks 0055 Sun to 0820 Sun Down Main: Beyond SB941# to Approach SW1221# Up Main: Beyond SW1222# to Approach SB938# Didcot Relief Line: Approach SB940# Down Kemble: Approach DK94# Up Kemble: Beyond UK94# Euro Terminal: Euro Terminal Stopblocks 0820 Sun to 0500 Mon Down Main: Beyond SB947# to Approach SW1221# Up Main: Beyond SW1222# to Approach SB952# Didcot Relief Line: Approach SB954# Up Swindon Passenger Loop: Beyond SW1190# Down Kemble: Beyond SW1312# Euro Terminal: Euro Terminal Stopblocks TRAINS DIVERTED VIA NEWBURY. RAIL REPLACEMENT BUS SERVICE BETWEEN DIDCOT PARKWAY AND CHIPPENHAM. TIME COST CALCULATED FOR HAND BACK TSR ON THE DOWN MAIN, 1 MIN 5 SEC. TIME COST CALCULATED FOR HAND BACK TSR ON THE UP MAIN, 1 MIN 14 SEC. LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION ENGINEERING TRAIN(S) IN POSSESSION: - 6C22, 6C23, 6C24, 6C25, 6C26, 6C27, 6C28, 6Y40, 6H07, 6H08,

25 Page 25 of 223 Western and Wales WON /2018 Page B-12 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 8 CONTINUED 6J44 & 6J86 POSSESSION TAKEN AROUND THE FOLLOWING TRAIN(S):- 6H07 AT SIGNAL SW1128 ON THE UP MAIN LINE 6H08 AT SIGNAL SB1002 ON THE UP RELIEF LINE 6C27 AT SIGNAL SW1129 ON THE DOWNN MAIN LINE CCTV LEVEL CROSSINGS WITHIN POSSESSION LIMITS CAUSEWAY CCTV LEVEL CROSSING PROTECTING SIGNALS: UP DIRECTION SB966/SB964, DN DIRECTION SB965/SB963/SB961 STOCKS LANE CCTV LEVEL CROSSING PROTECTING SIGNALS: UP DIRECTION SB966/SB964, DN DIRECTION SB965/SB963/SB961 DAY 11 JUNE Ref. No. P2017/ Manager Western IMDM Reading 9 Portobello Jn (London) and Royal Oak Line 3 Line Blockage + Disconnect 1115 to 1315 Patrolling 0m46ch and 1m33ch W2017/ Line 3 (East): Beyond SN8051Pts to Approach SN8027Pts Signal Routes Disconnected: SN106B, SN41(B) Points disabled normal: SN REPLACES P/ AS AGREED WITH HEX AND IN LINE WITH TIMES AGREED AT CPPP TRAINS OVER ALTERNATIVE LINES DAY 11 JUNE Ref. No. P2017/ Repeated item, please see details under route GW DAY 11 JUNE Ref. No. P2017/ Manager AECOM Ltd 10 Willesden High Level Jn and Acton Central Down & Up NLL Line Blockage +Detonators 0030 to 0810 Structures Examination 0m55ch and 1m30ch W2017/

26 Page 26 of 223 Western and Wales WON /2018 Page B-13 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 10 CONTINUED Down NLL: AW147 to AW101 Up NLL: AW102 to NL1050 Down Poplar: Approach to SN177 Up Poplar: Beyond AW146 Down Goods: Beyond AW581 pts Up Goods: Approach to AW582 pts DAY 11 to DAY 12 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 11 Paddington and Dolphin Jn Lines 1 to 3/Down and Up Main Paddington Platforms 1 to 5 Paddington and Subway Jn Ladbroke Grove and North Pole Depot Ladbroke Grove and Old Oak Common East Southall East Jn and Southall West Jn Heathrow Airport Jn and Heathrow Tunnel Jn Heathrow Airport Jn Southall and Brentford Goods Ladbroke Grove and Kensal Green Portobello Jn (London) and Old Oak Common East Southall East Jn and Southall West Jn Platform 6 Link Line/Royal Oak Sidings North Pole Line A and B E & C Line Southall West Loop Up Brentford Loop Down Airport Up Airport Single Crossrail Depot Line 2 Crossrail Depot Line 1 Down Brentford Siding Sidings to 0830 to 0830 to 0420 to 0500 to 0830 to 0830 to 0830 to 0830 to 0830 to 0130 to 0830 to 0830 to 0830 to m5ch and 3m25ch W2017/ Litter / Graffiti Clearance 0m5ch and 0m25ch W2017/ S&C Maintenance 0m5ch and 0m55ch W2017/ CWR Stress Management 0m5ch and 0m70ch W2017/ S&T Maintenance 0m5ch and 1m0ch W2017/ m5ch and 1m38ch W2017/ Patrolling 0m5ch and 2m0ch W2017/ OHL Work 0m5ch and 2m0ch W2017/ m5ch and 3m25ch W2017/ Cable Work 0m5ch and 3m25ch W2017/ m5ch and 3m25ch W2017/ m5ch and 3m25ch W2017/ Manual Correction 0m30ch and 0m70ch W2017/ Patrolling 0m45ch and 0m5ch W2017/

27 Page 27 of 223 Western and Wales WON /2018 Page B-14 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 11 CONTINUED Brentford GF and Day and Son GF Brentford GF and Brentford Goods Southall Yard Sidings Days Aggregates Terminal Sidings West London Waste Sidings West Waste Terminal Sidings North Pole Depot Transfer Sidings 1-6 Sidings Paddington and Dolphin Jn Lines 4 to 6/Down and Up Relief Paddington Platforms 7 to 12 and 14 Kensal Green and Old Oak Common East Old Oak Common East and Friars Jn Old Oak Common East Acton Wells Jn and Acton West Acton West and Dolphin Jn West Ealing West Ealing Jn and Greenford South Jn Hanwell Jn and Drayton Green Jn Heathrow Airport Jn and Heathrow Tunnel Jn Heathrow Airport Jn Carriage Line Engine Siding Reception Line 1 Reception Line 2 Down and Up Poplar Goods Loops West Ealing Bay Line / Platform 5 Down and Up Greenford Down and Up West Loop Up Airport Down Airport Relief Up Airport Relief to 0830 to 0830 to 0830 to 0830 to 0830 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 S&C Maintenance 1m35ch and 2m10ch W2017/ IBJ Work 1m45ch and 2m10ch W2017/ Remove Rail Defects 1m45ch and 2m15ch W2017/ OHL Work 1m55ch and 2m72ch W2017/ Patrolling 1m76ch and 1m33ch W2017/ Earthwork 2m32ch and 2m75ch W2017/ Structures Work 2m45ch and 3m8ch W2017/ m30ch and 8m20ch W2017/ m30ch and 8m20ch W2017/ Patrolling 3m50ch and 4m30ch W2017/ m50ch and 8m20ch W2017/ m74ch and 4m36ch W2017/ S&C Maintenance 3m75ch and 4m30ch W2017/ S&T Points 4m50ch and 5m50ch W2017/ Remove Rail Defects 5m25ch and 6m70ch W2017/ m40ch and 7m4ch W2017/ m31ch and 7m4ch W2017/ Follow-Up Work 6m40ch and 8m20ch W2017/ S&T Points 6m50ch and 7m30ch W2017/

28 Page 28 of 223 Western and Wales WON /2018 Page B-15 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 11 CONTINUED West Drayton and Colnbrook Oil Terminal Acton Main Line and Acton West (inc.) Single Acton Dive-Under Hayes and Harlington Up Bay Platform 5 Portobello Jn (London) Acton East and Acton West Langley West Drayton Old Oak Common East Heathrow Airport Jn Paddington and Ladbroke Grove Marcon Siding Sidings Acton Yard Sidings Langley Siding Sidings Yards & Sidings Sidings North Siding 3 Sidings South Sidings 8, 9, 11 & 12 Sidings Up Airport Line 1 Paddington Platforms 1-3 Paddington and Acton West L1-3/Down & Up Main Paddington Platforms 1 to 6 Ladbroke Grove and Old Oak Common East Ladbroke Grove and Kensal Green Portobello Jn (London) and Old Oak Common East Ladbroke Grove and North Pole Depot E & C Line Crossrail Depot Line 2 Crossrail Depot Line 1 North Pole Line A and B to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0420 to 0830 to 0010 to 0010 to 0500 to 0500 to 0500 to 0500 to 0500 to 0500 Preparatory Work 6m50ch and 8m10ch W2017/ Patrolling 7m30ch and 8m10ch W2017/ S&T Points 7m60ch and 8m20ch W2017/ Structures Work 7m73ch and 8m18ch W2017/ m25ch and 16m59ch W2017/ Welding and Grinding 2m10ch and 2m70ch W2017/ m25ch and 12m10ch W2017/ m25ch and 12m26ch W2017/ S&T Points 8m50ch and 9m15ch W2017/ m55ch and 9m26ch W2017/ Renew Pads / Nylons 9m0ch and 10m40ch W2017/ m40ch and 11m10ch W2017/ P & D Maintenance 9m48ch and 10m20ch W2017/ m56ch and 16m59ch W2017/ m31ch and 15m0ch W2017/ m31ch and 16m59ch W2017/ S&T Work 12m40ch and 16m20ch W2017/ Remove Rail Defects 14m0ch and 15m40ch W2017/ m38ch and 14m69ch W2017/

29 Page 29 of 223 Western and Wales WON /2018 Page B-16 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 11 CONTINUED Structures Examination 14m38ch and 14m69ch W2017/ m47ch and 16m54ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 0001 Sun to 0130 Sun Complete 807AG 808DE 812A1 4005DE 4006AB 0130 Sun to 0420 Sun Complete 807AG 808DE 809AEFGH 810D1D2D3 811E 812A1A2A3 4005DE 4006AB 4007FGMNP 4008AB 0420 Sun to 0830 Sun 801ABCDEF 802 Complete 807AB 808DE 812A1 4005DE 4006AB 0830 Sun to 0010 Mon 802ABCD 0010 Mon to 0500 Mon Complete 0001 Sun to 0830 Sun 807BCD 808ABC 0130 Sun to 0420 Sun 809BCC1C2C3D1D2JZZ 810AB1B2C

30 Page 30 of 223 Western and Wales WON /2018 Page B-17 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 11 CONTINUED 0001 Sun to 0130 Sun Line 1/Down Main: Stopblocks Platforms 1-3 to Approach T501 Up Main/Line 2&3: Beyond T500# to Stopblocks Platforms 4-6 Engine & Carriage Line: Beyond SN8076pts# Crossrail Depot Lines 1 & 2: Approach SN94# Brentford Branch: Staff Southall West Loop/Up Brentford Loop: Stopblocks Southall West Headshunt Down Airport: Approach SN8215pts# Up Airport: Beyond SN8211pts# SN8205pts & SN8212pts Maintained Normal 0130 Sun to 0420 Sun Line 1/Down Main: Stopblocks Platforms 1-3 to Approach T501 Up Main/Lines 2&3: Beyond T500# to Stopblocks Platforms 4-6 Brentford Branch: Staff Southall West Loop/Up Brentford Loop: Stopblocks Southall West Headshunt Down Airport: Approach SN8214Apts# Up Airport: Beyond SN8213Apts# Lines 4&5/Down Relief: Stopblocks Platforms 7-10 to Approach T503 Up Relief/Line 6: Beyond T502# to Stopblocks Platform 11, 12 & 14 Wycombe Single: Beyond SN166# Reception Line 2: Beyond SN8103pts# Down Poplar: Beyond SN177# Up Poplar: Approach AW146 Down Greenford: Approach GE51# Up Greenford: Beyond GE64Apts# Colnbrook Branch: No Protection Required 0420 Sun to 0830 Sun Line 1/Down Main: Stopblocks Platforms 1-3 to Approach T501 Up Main/Line 2: Beyond T500# to Stopblocks Platforms 4&5 Line 3: Approach SN8018Apts# Crossrail Depot Lines 1 & 2: Approach SN94# Engine & Carriage Line: Beyond SN8076pts# Brentford Branch: Staff Southall West Loop/Up Brentford Loop: Stopblocks Southall West Headshunt Down Airport: Approach SN8215pts# Up Airport: Beyond SN8211pts# SN8205pts & SN8212pts Maintained Normal 0830 Sun to 0010 Mon Line 1: Stopblocks Platforms 1-3 to Approach SN9001Bpts# 0010 Mon to 0500 Mon Line 1/Down Main: Stopblocks Platforms 1-3 to Approach SN201# Up Main/Lines 2&3: Beyond SN8135Apts# to Stopblocks Platforms 4-6 Crossrail Depot Lines 1 & 2: Approach SN94# Engine & Carriage Line: Beyond SN8075Bpts# TRAINS TO TRAVEL OVER LINES 4 TO 6/DOWN AND UP RELIEF, HEATHROW TRAINS TO TRAVEL VIA UP AIRPORT/AIRPORT RELIEF, EXCEPT WHEN THESE BLOCKED NO TRAINS TO RUN. AT PADDINGTON, TRAINS TO BE RE-PLATFORMED. GWR TO OUTSTABLE IN PLATFORMS WORK CONTENT = CROSSRAIL CONSTRUCTION WORKS

31 Page 31 of 223 Western and Wales WON /2018 Page B-18 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 11 CONTINUED LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION DAY 11 to DAY 12 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 12 Dolphin Jn (inc.) and Ruscombe Dolphin Jn (inc.) and Twyford East Slough and Windsor and Eton Central Slough West and Farnham Road Maidenhead West Maidenhead West and Maidenhead East Down and Up Main Down and Up Relief Bay Line & Single Up Goods Turnback Line Maidenhead Loop/Platform 5 Maidenhead West Maidenhead Stabling 1 Maidenhead and Bourne End Slough West Slough Dolphin Jn and Ruscombe Slough and Windsor and Eton Central Maidenhead Stabling 2 Single Slough Goods Loop Headshunt Sidings Tamper Siding Sidings Down and Up Main Bay Line & Single to 0815 to 0620 to 0815 to 0620 to 0620 to 0620 to 0620 to 0620 to 0620 to 0620 to 0620 to 0510 to 0510 C11 Rerail Resleeper Reballast - Trax 17m2ch and 20m0ch W2017/ S&T Maintenance 17m4ch and 19m55ch W2017/ Structures Work 17m50ch and 18m69ch W2017/ S&T Maintenance 18m0ch and 19m40ch W2017/ S&T Maintenance 18m0ch and 19m40ch W2017/ m10ch and 19m30ch W2017/ Litter / Graffiti Clearance 18m25ch and 18m45ch W2017/ IBJ Work 18m40ch and 21m19ch W2017/ IBJ Work 18m40ch and 21m19ch W2017/ m41ch and 19m0ch W2017/ m5ch and 25m0ch W2017/ m5ch and 25m0ch W2017/ m17ch and 20m36ch W2017/ Follow Up Tamping 20m20ch and 23m27ch W2017/ Patrolling 21m67ch and 24m19ch W2017/ S&T Points 22m31ch and 25m0ch W2017/

32 Page 32 of 223 Western and Wales WON /2018 Page B-19 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 12 CONTINUED 23m30ch and 25m0ch W2017/ m0ch and 25m0ch W2017/ Litter / Graffiti Clearance 24m10ch and 24m30ch W2017/ OHL Work 25m5ch and 29m40ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 0001 Sun to 0510 Mon 4005ABC 4006CDE MNDA11ABC MNDA22ABC SR09ZZ SR10XX 0130 Sun to 0620 Sun 4007ABCDEHLJK 4008CDEFG MNDA33ABC MNDA44ABC SR11ZZ SR12XX 0001 Sun to 0145 Sun Down Main: Beyond T501# to Approach T1609# Up Main: Beyond T1610 to Approach T Sun to 0620 Sun Down Main: Beyond T501# to Approach T1609# Up Main: Beyond T1610 to Approach T500 Down Relief: Beyond T503# to Approach T1635# Up Relief: Beyond T8374Apts# to Approach T502 Maidenhead Loop/Single/Platform 5: Token Windsor Branch: Stopblocks Slough to Stopblocks Windsor 0620 Sun to 0815 Sun Down Main: Beyond T501# to Approach T1609# Up Main: Beyond T1610 to Approach T500 Windsor Branch: Stopblocks Slough to Stopblocks Windsor 0815 Sun to 0025 Mon Down Main: Beyond T8302Apts# to Approach T1609# Up Main: Beyond T1610 to Approach T504# 0025 Mon to 0510 Mon Down Main: Beyond T8302Apts# to Approach T1609# Up Main: Beyond T1610 to Approach T504# Windsor Branch: Stopblocks Slough to Stopblocks Windsor TRAINS TO RUN OVER RELIEF LINES, EXCEPT WHEN THESE BLOCKED, NO TRAINS TO RUN. WORK CONTENT = PLTR UM SLOUGH & CROSSRAIL CONSTRUCTION WORKS. WINDSOR UNIT TO OUTSTABLE IN SLOUGH BAY GWR UNIT TO OUTSTABLE AT SLOUGH PLATFORM 1

33 Page 33 of 223 Western and Wales WON /2018 Page B-20 GW103 GW1 AR PADDINGTON TO UFFINGTON (EXCL) - Continued ITEM 12 CONTINUED LINE CLEAR VERIFICATION 'LCV' PROCESS APPLIES WITHIN THIS POSSESSION ENGINEERING TRAIN(S) IN POSSESSION: - 7W05, 6W06, 6W07, 6W08, 6W09, 6W04, 6J44 & 6U48 POSSESSION TAKEN AROUND THE FOLLOWING TRAIN(S):- 7W05 AT SIGNAL T505 ON THE DOWN MAIN LINE. 6W04 AT SIGNAL T534 ON THE UP MAIN LINE DAY 11 to DAY 12 JUNE Ref. No. P2017/ Manager Route Business Thames Valley 13 Caversham Road Jn and Didcot East Caversham Road Jn and Scours Lane Reading High Level Jn and Reading West Jn Reading West Jn and Oxford Road Jn Tilehurst East and Didcot East Down and Up Relief Reading Up Passenger Loop Festival Line Down & Up West Curve Down and Up Relief to 0400 to 0400 to 0400 to 0400 to 0515 OHL Work 36m30ch and 45m65ch W2017/ S&T Maintenance 36m30ch and 37m77ch W2017/ S&T Work 36m30ch and 41m32ch W2017/ Point Heater Maintenance 37m30ch and 37m65ch W2017/ Station Work 41m37ch and 41m75ch W2017/ S&T Work 41m37ch and 45m65ch W2017/ OHL Work 45m70ch and 51m64ch W2017/ S&T Work 45m70ch and 51m61ch W2017/ ISOLATION OF ELECTRICAL SECTIONS 2240 Sat to 0515 Mon 4013,4014, 4015,4016 Complete 4065A,4063 Complete 8007,8008 Complete, RW13XX,RW14ZZ, RW15ZZ,RW16ZZ, RW13YY, RW14YY,RW15YY, RW16XX, RW16YY,RW65ZZ, SR63XX,SR63YY,SR63ZZ 2130 Sun to 0400 Mon Down Relief: Beyond T8456pts# to Approach SB907# Up Relief: Beyond SB8533Apts# to Approach T8454Bpts# Down Festival Line: Beyond T8467pts# Down Reading West Curve: Beyond T8806Bpts# Up Reading West Curve: Approach T8804pts# 0400 Mon to 0515 Mon Down Relief: Beyond T8493pts# to Approach SB907# Up Relief: Beyond SB8533Apts# to Approach T8492Bpts TRAINS TO RUN OVER MAIN LINES. RAIL REPLACEMENT BUS SERVICE REQUIRED FOR PANGBOURNE.

Not to be shared or printed without prior authorisation. Croeso Welcome. Copyright and intellectual property TfW 2018

Not to be shared or printed without prior authorisation. Croeso Welcome. Copyright and intellectual property TfW 2018 Not to be shared or printed without prior authorisation Croeso Welcome Copyright and intellectual property TfW 2018 Wales and Borders The Journey Begins Our structure So what does this mean for us For

More information

NETWORK RAIL Anglia Route AR 9

NETWORK RAIL Anglia Route AR 9 PRIVATE AND NOT FOR PUBLICATION NETWORK RAIL Anglia Route Week No. AR 9 WEEKLY OPERATING NOTICE Containing SAFETY NOTICES TEMPORARY SPEED RESTRICTIONS ENGINEERING ARRANGEMENTS SIGNALLING AND PERMANENT

More information

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016

More information

Railway Upgrade Plan Western 2017/18

Railway Upgrade Plan Western 2017/18 2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction

More information

Cambrian Line Railcard. Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018

Cambrian Line Railcard. Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018 Cambrian Line Railcard Pwllheli - Machynlleth - Aberystwyth - Shrewsbury. Take your children for 2 each! Valid to 13 October 2018 W Cambrian Railcard.indd 1 17/07/2018 11:0 Value for money The Cambrian

More information

Mr Andrew Haines Managing Director First Group Rail Division 3rd Floor, E Block Paddington Station London W2 1FG

Mr Andrew Haines Managing Director First Group Rail Division 3rd Floor, E Block Paddington Station London W2 1FG Mr Andrew Haines (Andrew.Haines@Firstgroup.com) Managing Director First Group Rail Division 3rd Floor, E Block Paddington Station London W2 1FG Whittles House, 14 Pentonville Road London N1 9HF w www.passengerfocus.org.uk

More information

Project 43. Modular HST journeys for Western Mainlines (v4) from Just Trains

Project 43. Modular HST journeys for Western Mainlines (v4) from Just Trains Project 43 Modular HST journeys for Western Mainlines (v4) from Just Trains Build your own journey with handy bite size scenarios that reflect common FGW HST services around 2015 by driving scenarios in

More information

STIRLING TO KINCARDINE RE-OPENING OF LINE

STIRLING TO KINCARDINE RE-OPENING OF LINE PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th

More information

Thames Valley Branch Lines Notes of Meeting

Thames Valley Branch Lines Notes of Meeting Thames Valley Branch Lines Notes of Meeting Date: Time: Venue: Attendees: 05 December 2016 10.00am 4 Marlow Road, Maidenhead Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes,

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

M&EE Stabling Point Safety Survey

M&EE Stabling Point Safety Survey M&EE Stabling Point Safety Survey Location Southall West Siding Stannox number Date of assessment 27/06/2016 Compiled by Name Company Daniel Crisp Colas Rail Telephone 07753 798016 email address daniel.crisp@colasrail.co.uk

More information

FIRST FLOOR OFFICES 2,925 6,780 SQ FT ( SQ M) OUTSTANDING TOWN CENTRE PARKING (1:208 SQ FT) EMERALD HOUSE, NAPIER ROAD, READING, RG1 8BW

FIRST FLOOR OFFICES 2,925 6,780 SQ FT ( SQ M) OUTSTANDING TOWN CENTRE PARKING (1:208 SQ FT) EMERALD HOUSE, NAPIER ROAD, READING, RG1 8BW FIRST FLOOR OFFICES 2,925 6,780 SQ FT (272 630 SQ M) OUTSTANDING TOWN CENTRE ARKING (1:208 SQ FT) EMERALD HOUSE, NAIER ROAD, READING, RG1 8BW LOCATED ON THE NORTHERN SIDE OF READING TOWN CENTRE AROXIMATELY

More information

Crossrail: Socio-Economic Technical Report

Crossrail: Socio-Economic Technical Report Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,

More information

Investing in our local rail network June 2014

Investing in our local rail network June 2014 Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing

More information

Delivering a better railway for a better Britain Network Specification 2017 Wales

Delivering a better railway for a better Britain Network Specification 2017 Wales Delivering a better railway for a better Britain Network Specification 2017 Network Rail Network Specification: 02 Incorporating Strategic Routes: L: and Borders This Network Specification describes the

More information

HAWKE RIDGE BUSINESS PARK

HAWKE RIDGE BUSINESS PARK Brook Lane Trading Estate Northacre Park West Wilts Trading Estate WESTBURY BUSINESS PARK BUSINESS PARK BA13 4LD 35 acre business park (units up to 250,000 sq. ft.) Catchment area with a population of

More information

Newly refurbished Grade A offices

Newly refurbished Grade A offices Newly refurbished Grade A offices OUTSTANDING QUALITY Newly refurbished Grade A offices 4,000-52,176 sq ft To Let Building One Building Two & Three GRADE A IN EVERY ASPECT Concorde Park has recently undergone

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

Bath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery)

Bath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery) Bath Corridor Works Matt Barnes FGW Regional Development Manager Chris Prior FGW Project Manager (Major Possessions Delivery) Objectives To work collaboratively with Network Rail and key stakeholders such

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

At 1 Oct 2018 WELSH RAILWAYS RESEARCH CIRCLE COLLECTION, Page 1 RHIWDERIN ARCHIVE

At 1 Oct 2018 WELSH RAILWAYS RESEARCH CIRCLE COLLECTION, Page 1 RHIWDERIN ARCHIVE At 1 Oct 2018 WELSH RAILWAYS RESEARCH CIRCLE COLLECTION, Page 1 RHIWDERIN ARCHIVE Item Scope Date range Creator Axs Extent and Stored Co Co ELR WC Welsh Railways Research Circle Collection of archival

More information

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY Railfuture is pleased to submit this consolidated national response on Cross-Border Road and Rail

More information

Application for Authority to Operate a Penalty Fares Scheme

Application for Authority to Operate a Penalty Fares Scheme Annex 1 Application for Authority to Operate a Penalty Fares Scheme 1 Introduction 1.1 We, First Great Western, incorporating the British Airports Authority (BAA) Heathrow Connect services between Hayes

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Railfuture Cymru response to consultation: Inquiry into the priorities for the future of Welsh rail infrastructure

Railfuture Cymru response to consultation: Inquiry into the priorities for the future of Welsh rail infrastructure Campaigning for better services over a bigger rail network Enterprise and Business Committee National Assembly for Wales Pierhead Street Cardiff CF99 1NA SeneddEcon@Assembly.Wales please reply to: 61 Chantal

More information

APPENDIX 2. Welsh Government. Technical Note on Timetables and Diagramming

APPENDIX 2. Welsh Government. Technical Note on Timetables and Diagramming APPENDIX 2 Welsh Government Technical Note on Timetables and Diagramming December 2011 Technical Note on Timetables and Diagramming 117300-81 Draft 1 14 December 2011 Ove Arup & Partners Ltd 4 Pierhead

More information

Annex B FREIGHT IN WALES STATISTICS

Annex B FREIGHT IN WALES STATISTICS Annex B FREIGHT IN WALES STATISTICS Ports Table 1 shows the weight of freight traffic handled by Welsh ports in 212. Bristol and Liverpool are included for comparison purposes. The busiest ports in Wales,

More information

PAPER BY ARRIVA TRAINS WALES

PAPER BY ARRIVA TRAINS WALES RIPS(2) 02-06 (p.1) Rail Infrastructure and Improved Passenger Service Committee Date: 15 February 2006 Time: 9.00 to 12.30 Venue: National Assembly for Wales, Cardiff Bay Title: Arriva Trains Wales PAPER

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT

CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT A BRIGHT AND FRIENDLY WELCOME DESIGNED TO MEET THE NEEDS OF A NEW BREED OF BUSINESS Agile, flexible and collaborative,

More information

Wales & Borders Overview of W&B and the South Wales Metro. trc.llyw.cymru

Wales & Borders Overview of W&B and the South Wales Metro. trc.llyw.cymru Wales & Borders Overview of W&B and the South Wales Metro trc.llyw.cymru tfw.gov.wales @transport_wales Overview Transport for Wales (TfW) Procurement of Wales and Borders Rail Service and South Wales

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of

More information

OUTSTANDING COMBINATIONS

OUTSTANDING COMBINATIONS OUTSTANDING COMBINATIONS BALANCE COSTS & AMENITIES ENJOY LOW TOTAL OCCUPATION COSTS, HIGH SPECIFICATION AND EXCITING TOWN CENTRE AMENITIES AT READING BRIDGE HOUSE With all the benefits of being in Reading

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

24/28 QUEEN VICTORIA STREET READING RG1 1TG

24/28 QUEEN VICTORIA STREET READING RG1 1TG 24/28 QUEEN VICTORIA STREET READING RG1 1TG INVESTMENT SUMMARY Reading is an important and affluent, regional retail centre with an extensive primary catchment population of 692,000 and total catchment

More information

101,000 SQ FT (9,400 SQ M)

101,000 SQ FT (9,400 SQ M) R+ READING WELCOME LEADING THE WAY FOR COMMUNICATIONS AND PROFILE, R+ WILL BE THE LATEST ADDITION TO READING S ESTABLISHED INTERNATIONAL BUSINESS LANDSCAPE. A HEADQUARTERS OFFICE BUILDING OF THE HIGHEST

More information

Melksham Public Transport. TransWilts Members' Melksham timetables Summer & Autumn 2018

Melksham Public Transport. TransWilts Members' Melksham timetables Summer & Autumn 2018 Melksham Public Transport TransWilts Members' Melksham timetables Summer & Autumn 2018 with a complete list of all public bus, train and coach services in the Melksham area Melksham Public Transport Summer

More information

TO LET READY FOR OCCUPATION: FOUR NEW INDUSTRIAL / WAREHOUSE UNITS UNIT B: 64,181 SQ FT AND UNIT D: 40,423 SQ FT HAYES180.CO.UK

TO LET READY FOR OCCUPATION: FOUR NEW INDUSTRIAL / WAREHOUSE UNITS UNIT B: 64,181 SQ FT AND UNIT D: 40,423 SQ FT HAYES180.CO.UK UXBRIDGE ROAD I HAYES I UB4 0JN TO LET READY FOR OCCUPATION: FOUR NEW INDUSTRIAL / WAREHOUSE UNITS UNIT B: 64,181 SQ FT AND UNIT D: 40,423 SQ FT HAYES180.CO.UK DESCRIPTION IS A SECURE SITE OF 8.8 ACRES

More information

STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING

STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING 01 STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING < welcome > 2 BE AT 01 < inspirational and motivational working environment inside and out. > < welcome > FINAL < hello > SUITE

More information

TO LET THREE NEW INDUSTRIAL / WAREHOUSE UNITS FROM 27,802 SQ FT 108,022 SQ FT UNIT A UNDER OFFER NOW READY FOR OCCUPATION HAYES180.CO.

TO LET THREE NEW INDUSTRIAL / WAREHOUSE UNITS FROM 27,802 SQ FT 108,022 SQ FT UNIT A UNDER OFFER NOW READY FOR OCCUPATION HAYES180.CO. UXBRIDGE ROAD I HAYES I UB4 0JN TO LET UNIT A UNDER OFFER NOW READY FOR OCCUPATION THREE NEW INDUSTRIAL / WAREHOUSE UNITS FROM 27,802 SQ FT 108,022 SQ FT HAYES180.CO.UK DESCRIPTION IS A SECURE SITE OF

More information

Delivering a better railway for a better Britain Network Specification 2017 Western

Delivering a better railway for a better Britain Network Specification 2017 Western Delivering a better railway for a better Britain Network Specification 2017 Western Network Specification: Western Network Rail - Network Specification: Western 02 Incorporates Strategic Routes: J: London

More information

Improving rail links to Heathrow from the West and beyond

Improving rail links to Heathrow from the West and beyond Public Consultation Improving rail links to Heathrow from the West and beyond We are seeking your views on our proposed design to build a new rail link between the Great Western Main Line and London Heathrow

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET PRESENTED BY DEVELOPMENT BY GREENVIEW COURT West London s newest destination for luxury living THE DEVELOPMENT Three

More information

90,000 sq ft UNIT 11D SOUTH MARSTON PARK BROADMOOR ROAD, SWINDON SN3 4WD NEWLY REFURBISHED UNIT AVAILABLE NOVEMBER 2016

90,000 sq ft UNIT 11D SOUTH MARSTON PARK BROADMOOR ROAD, SWINDON SN3 4WD NEWLY REFURBISHED UNIT AVAILABLE NOVEMBER 2016 NEWLY REFURBISHED UNIT AVAILABLE NOVEMBER 2016 MODERN HIGH BAY DISTRIBUTION PREMISES TO LET STRATEGICALLY LOCATED ON A SELF-CONTAINED SECURED SITE 90,000 sq ft Swindon is strategically located on the M4

More information

Current Contents of Website, and Version History V5.17

Current Contents of Website, and Version History V5.17 Current Contents of Website, and Version History V5.17 The current contents of the website are: Articles on High Speed Rail Towards a High Speed Network v14.3 Towards a High Speed Network the Maps v2.0

More information

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential 64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole

More information

4. The Department for Transport will be consulting in 2018 on the next GWR franchise to run from 2020 or 2022, including service levels and patterns

4. The Department for Transport will be consulting in 2018 on the next GWR franchise to run from 2020 or 2022, including service levels and patterns Southampton to Swindon passenger train corridor 2019 proposal * Through trains Southampton Airport to Chippenham and Swindon * Increased peak and near-peak train services from Swindon to Westbury * Through

More information

HOW TO GET TO MARSTON ROAD SITE. Maps and Directions

HOW TO GET TO MARSTON ROAD SITE. Maps and Directions HOW TO GET TO MARSTON ROAD SITE Maps and Directions 1 WHERE WE ARE IN OXFORD Oxford is very well located and easy to get to from many places. It s only just over 50 miles away from central London, and

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

+ UNRIVALLED PROMINENCE. 02 R+ Reading

+ UNRIVALLED PROMINENCE. 02 R+ Reading R+ READING + UNRIVALLED PROMINENCE 02 R+ Reading + LANDMARK + LANDMARK + Dominating the entrance to the town centre and in the heart of Reading s business core, R+ is perfectly positioned directly opposite

More information

WR Reporting Numbers Summer Compiled by Ed Chaplin

WR Reporting Numbers Summer Compiled by Ed Chaplin WR Reporting Numbers Summer 1957 Compiled by Ed Chaplin This list is my best shot to date. I do not claim it is 100% correct or complete, but much time has been spent on getting to this stage. I want to

More information

CAMBRIAN LINES FRANCHISE 2018

CAMBRIAN LINES FRANCHISE 2018 CAMBRIAN LINES FRANCHISE 2018 For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl Jones - Williams Vice

More information

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council Welcome Fiona Piercy Oxford City and Oxfordshire County Council Oxford Station & UK Rail strategy David Sexton Department for Transport Oxford station and UK Rail Strategy David Sexton Department for Transport

More information

THEFUTUREWORKSSLOUGH.COM

THEFUTUREWORKSSLOUGH.COM BROUGHT TO YOU BY AGENTS THEFUTUREWORKSSLOUGH.COM THE FUTURE WORKS SLOUGH IS EVOLVING A three phase office development set within an entirely new commercial quarter in the Heart of Slough, providing 350,000

More information

Trading on the Wilts and Berks Canal

Trading on the Wilts and Berks Canal Vale and Downland Museum Local History Series Trading on the Wilts and Berks Canal Reg Wilkinson Since the formation of the Wilts & Berks Canal Amenity Group in October 1977, attention has focused on the

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

2 longwalk Stockley Park, Heathrow UB11 1BA

2 longwalk Stockley Park, Heathrow UB11 1BA www.2longwalk.com 2 longwalk Stockley Park, Heathrow UB11 1BA Newly refurbished 48,552 sq ft headquarter office building 2 longwalk Stockley Park, Heathrow UB11 1BA 2 Longwalk offers businesses bright,

More information

compromise. The best of everything. Close to anything. Work without

compromise. The best of everything. Close to anything. Work without The best of everything. Close to anything. Work without compromise. Directly opposite Forbury Gardens, Davidson is everything a modern workplace should be and is close to everything important - just a

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

Henbury rail loop and the sale of the former goods yard

Henbury rail loop and the sale of the former goods yard West of England Partnership Joint Scrutiny Committee 12 December 2008 Agenda item 9 Henbury rail loop and the sale of the former goods yard 1. Purpose of Report To review the recent sale of the former

More information

to do better business

to do better business BUILDING / LOCATION to do better business Kennet Place is a building with presence. Its warm stone and glass atrium offers a first impression that is welcoming and uplifting, promising a sophisticated

More information

Wales Rail Planning Assessment

Wales Rail Planning Assessment EL(3)-03-07 (p4) Wales Rail Planning Assessment July 2007 G/MH/2582/07-07 ISBN 978 0 7504 4335 7 July A-CMK-22-04-001(772) Typeset in 12pt Crown copyright 2007 Contents Forward Executive Summary 4 1 Introduction

More information

WAREHOUSE/INDUSTRIAL UNIT TO LET. Worldwide Heathrow Regional M4, M25, M3 Local A40, West London

WAREHOUSE/INDUSTRIAL UNIT TO LET. Worldwide Heathrow Regional M4, M25, M3 Local A40, West London WAREHOUSE/INDUSTRIAL UNIT TO LET ACCESS ALL ROUTES Worldwide Heathrow Regional, M5, M3 Local 0, West London Parkway Heathrow is strategically located for national and international companies seeking either

More information

RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE

RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE FINAL REPORT June 2006 RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE FINAL REPORT June 2006 If you would like further copies

More information

57 75 Kings Road, Reading RG13AB. a high quality office refurbishment available from 2,870 sq ft to 25,782 sq ft Kings Road, Reading RG13A

57 75 Kings Road, Reading RG13AB. a high quality office refurbishment available from 2,870 sq ft to 25,782 sq ft Kings Road, Reading RG13A 57 75 Kings Road, Reading RG13AB a high quality office refurbishment available from 2,870 sq ft to 25,782 sq ft 57 75 Kings Road, Reading RG13A 57 75 Kings Road, Reading RG13AB Riverside office designed

More information

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd ISSUE 40 OCTOBER 2016 MOVING AHEAD PROJECT OCTOBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd PROGRAMME 77% 60% The project is more than 75% complete. There is a huge amount of work underway to complete

More information

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. 1.3 ENVIRONMENT Up side crossing approach Down side crossing approach The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line. It is a public footpath

More information

Reading s hotspot for business and technology

Reading s hotspot for business and technology Reading s hotspot for business and technology The Campus A prime business and technology campus within 2.5 miles of Reading town centre Welcome to Manor Park Summary Manor Park is a 118,800 sq ft business

More information

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES Dated August 2009 Between HS1 LIMITED and EUROSTAR (U.K.) LIMITED THIS AGREEMENT is made the day of August 2009 BETWEEN: (1) HS1 Limited, a company

More information

13,445 58,142 SQ FT GRADE A OFFICE J12 M4 READING

13,445 58,142 SQ FT GRADE A OFFICE J12 M4 READING 03 13,445 58,142 SQ FT GRADE A OFFICE J12 M4 READING < welcome > 2 < welcome > THREE IS THE MAGIC < welcome > NUMBER < Headquarters office building set in a tranquil, established business environment.

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

2,950 33,024 SQ FT GRADE A OFFICE J12 M4 READING

2,950 33,024 SQ FT GRADE A OFFICE J12 M4 READING 02 2,950 33,024 SQ FT GRADE A OFFICE J12 M4 READING < welcome > 2 < welcome > < welcome > Hive 02 has undergone a stunning transformation to provide contemporary office accommodation within a beautiful

More information

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl

More information

THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU

THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU THAMES VALLEY TOWN CENTRE OFFICE INVESTMENT BELL TOWER HOUSE BELL STREET, MAIDENHEAD, SL6 1BU INVESTMENT SUMMARY Town Centre office investment in the heart of the Thames Valley Exceptionally well located

More information

HOW TO GET TO MARSTON ROAD SITE. Maps and Directions

HOW TO GET TO MARSTON ROAD SITE. Maps and Directions HOW TO GET TO MARSTON ROAD SITE Maps and Directions 1 WHERE WE ARE 2 IN OXFORD Oxford is very well located and easy to get to from many places. It s only just over 50 miles away from central London, and

More information

ENCOMPASS THE INFINITE POSSIBILITIES

ENCOMPASS THE INFINITE POSSIBILITIES ENCOMPASS THE INFINITE POSSIBILITIES A NEW 109,000 SQ FTGRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT 2 3 4 5 I N N E R SPACE

More information

An outstanding pre-let opportunity in an exclusive Thames Valley riverside location. 84,811 sq ft HQ office development set in 49.

An outstanding pre-let opportunity in an exclusive Thames Valley riverside location. 84,811 sq ft HQ office development set in 49. An outstanding pre-let opportunity in an exclusive Thames Valley riverside location M A R L O W 84,811 sq ft HQ office development set in 49.27 acres 306 car parking spaces Designed to BREEAM Excellent

More information

122 Malton Avenue, Slough, Berkshire, SL1 4QU

122 Malton Avenue, Slough, Berkshire, SL1 4QU jll.co.uk/property To Let Malton Avenue, Slough, Berkshire, SL1 4QU 17,897 sq ft (1,662.68 sq m) GEA Refurbished Full height electric loading door Fully fitted two storey offices 3-phase power Warehouse

More information

Response to Consultation on the re-planning of Network Rail s Investment Programme

Response to Consultation on the re-planning of Network Rail s Investment Programme Response to Consultation on the re-planning of Network Rail s Investment Programme To: hendyconsultation@dft.gsi.gov.uk via email From: Richard Tyndall on behalf of Thames Valley Berkshire Local Enterprise

More information

compromise. The best of everything. Close to anything. Work without

compromise. The best of everything. Close to anything. Work without The best of everything. Close to anything. Work without compromise. Directly opposite Forbury Gardens, Davidson is everything a modern workplace should be and is close to everything important - just a

More information

QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET.

QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET. QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET www.pavilions-twyford.co.uk CONNECTED FROM 2019 Set in a unique and environmentally inspiring business park, The Pavilions offers year round natural

More information

1 National Rail London Boroughs concessionary fares scheme freedom pass. 2 Midland Mainline GroupSave barred dates

1 National Rail London Boroughs concessionary fares scheme freedom pass. 2 Midland Mainline GroupSave barred dates N ewsrail E X P R E S S 309 WEEK ENDING 4 MARCH 2006 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS 1 National Rail London Boroughs concessionary fares scheme freedom pass

More information

DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES ASDA BOOKPOINT DAILY MAIL

DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES ASDA BOOKPOINT DAILY MAIL DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES BOOKPOINT DAILY MAIL CO N IN DE ST F M RU RA O CT ST LIT IO RU ION N C & UN TU DE RE RW AY ASDA DISTRIBUTION& LOGISTICS BOOKPOINT DAILY MAIL

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

CROSSRAIL Moving London Forward

CROSSRAIL Moving London Forward CROSSRAIL Moving London Forward XX Crossrail: Header here The Project max 30 characters Cost 14.8bn Net benefit 42bn Length 118km Stations 40 (10 new) Jobs supported 55,000 Business opportunities Trains

More information

SPECIFICATIONS. Ground floor

SPECIFICATIONS. Ground floor ATRIA SPACE TO PERFORM Whether you re looking for 10,000 sq ft or up to 30,000 sq ft, Atria is a Grade A office building, that offers you the space, transport links and amenities your company needs. Situated

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

121 King s Road, Reading RG1 3ES

121 King s Road, Reading RG1 3ES www.kennetplace.co.uk King s Road, Reading RG 3ES BUILDING The place to do better business Kennet Place is a building with presence. Its warm stone and glass atrium offers a first impression that is welcoming

More information

Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales. Guidance for the Tourism Industry

Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales. Guidance for the Tourism Industry Traffic Signs for Tourist Destinations on Trunk Roads and Motorways in Wales Guidance for the Tourism Industry August 2013 Figure 1: Motorway and Trunk Roads in Wales Holyhead A55 Bangor Conwy Llandudno

More information

THE DEEPINGS HILL BOTTOM

THE DEEPINGS HILL BOTTOM THE DEEPINGS HILL BOTTOM WHITCHURCH HILL F OXFORDSHIRE www.warmingham.com THE DEEPINGS HILL BOTTOM WHITCHURCH HILL F OXFORDSHIRE F Pangbourne on Thames - 2 miles (London Paddington within the hour) F Reading

More information

CELTIC BUSINESS PARK. 4hrs 3hrs 2hrs

CELTIC BUSINESS PARK. 4hrs 3hrs 2hrs CELTIC BUSINESS PARK Celtic Business Park is a major new 100 acre industrial and warehousing scheme occupying a strategic location at the gatew to South Wales, 12 miles from Cardiff and 30 miles from Bristol.

More information

ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH

ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH The building offers an occupier the chance to relocate their headquarters to one of the most prominent sites in London and benefit from unrivalled

More information

51 Queen Street CARDIFF

51 Queen Street CARDIFF 51 Queen Street CARDIFF Prime Retail Investment 1 Investment Summary Cardiff is the principal retail and commercial centre for South Wales The city is ranked in the top 6 for retail centres for the UK

More information

Connecting People, Connecting Business

Connecting People, Connecting Business Connecting People, Connecting Business Connecting People, Connecting Business 1 East West Rail is a scheme to re-establish a rail link between Cambridge and Oxford to improve rail services between East

More information

THE GATE IS OPEN 10,245 32,312 sq ft

THE GATE IS OPEN 10,245 32,312 sq ft THE GATE IS OPEN 10,245 32,312 sq ft Newly refurbished, self contained HQ office thegateworks.com THE GATE IS OPEN The Gate has undergone a comprehensive refurbishment. The building is an attractive self-contained

More information

ATTRACTIVE GATED OFFICE SCHEME WITH SHORT TO MEDIUM TERM DEVELOPMENT OPPORTUNITIES HARMONDSWORTH LANE, WEST DRAYTON, UB7 0LQ

ATTRACTIVE GATED OFFICE SCHEME WITH SHORT TO MEDIUM TERM DEVELOPMENT OPPORTUNITIES HARMONDSWORTH LANE, WEST DRAYTON, UB7 0LQ ATTRACTIVE GATED OFFICE SCHEME WITH SHORT TO MEDIUM TERM DEVELOPMENT OPPORTUNITIES THE LODGE, ANNEX AVIATION HOUSE HARMONDSWORTH LANE, WEST DRAYTON, UB7 0LQ THE LODGE, ANNEX AND AVIATION HOUSE, HARMONDSWORTH

More information

CONTENTS. Connections Windsor. Contact. Marlow. Slough. Bourne End. Maidenhead

CONTENTS. Connections Windsor. Contact. Marlow. Slough. Bourne End. Maidenhead The Evolution CONTENTS Marlow Bourne End Maidenhead Slough Introduction Floor Plans Connections Windsor Overview Location Contact One Globeside Amenities Availability Sports Clubs & Activities Introduction

More information