Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017
|
|
- Rosamund Terry
- 6 years ago
- Views:
Transcription
1 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1
2 The Crossrail Journey Construction May 2015 Dec 2018 Page 2
3 Crossrail the 15bn Railway Page 3
4 Construction update TfL Rail services today Staged Opening of Crossrail Benefits to London and the UK Page 4
5 Crossrail The History 1941 George Daw, article in London newspaper The Star 1974 GLC study first refers to the name Crossrail 1991 Private Members Bill defeated no case had been made 2005 to 2008 Hybrid bill goes through Parliament 2009 Construction started 2018 First trains through central section Page 5
6 Funding The funding framework for Crossrail was agreed in October 2007 when the Prime Minister announced that Crossrail s cost will primarily be met by Government, the Mayor of London and London businesses. Funding Source bn DfT Grant 4.7 Business Rate Supplements 4.1 Network Rail 2.3 Transport for London 1.9 Community Levy 1.1 Other 0.7 Total 14.8 Page 6
7 Building Crossrail Over 42km (26 miles) of new 6m diameter rail tunnels have been bored through central London Tunnelling began in May 2012 completed in June 2015 Page 7
8 Building Crossrail 8 Tunnel Boring Machines (TBM) were used to construct the main Crossrail running tunnels. Each TBM is up to 120 metres in length. Page 8
9 Surface Work Examples Railway Depots and Sidings 27 Stations (10 Major) Track 66km 61 Platform Extensions Electrification 146km Signalling Systems In cab CCTV Page 9
10 Railway and Station Systems Page 10
11 New Stations Page 11
12 Stations Tottenham Court Road Farringdon Page 12
13 Station Fit out Bond Street Station Paddington Station Page 13
14 Stations Canary Wharf Station Page 14
15 Crossrail Trains a new generation of trains New Class 345 Aventra will be built & maintained by BT Page 15
16 Crossrail Trains a new generation of trains Bombardier Class 345 ( Aventra design) 200m full length (9 car), 145 kph, 25kv 450 seats (1500 total capacity) 66 trains (15 initially in 7 car formation for TfL Rail) First 9 car train Heathrow Paddington May 2018 Maintained (initially) at Ilford, then Old Oak Common Page 16
17 Crossrail Signalling Eastern route Shenfield to Liverpool street Conventional line-side signalling Central operating section Siemens CBTC, moving block No line-side signals In-cab signalling for driver Trackside train detection Train auto-reverse at Westbourne Park, near Paddington Western route Paddington to Reading/Heathrow Enhanced TPWS ETCS level 2 on Heathrow Spur Page 17
18 Construction update TfL Rail services today Staged Opening of Crossrail Benefits to London and the UK Page 18
19 Start of Operations May 2015 as TfL Rail MTR took over existing rail services MTR took over operation of 12 stations Stratford to Brentwood Stations and trains rebranded as TfL Rail Page 19
20 Immediate Improvements All stations staffed first to last Stations Deep cleaned New ticket machines New gatelines Cleaned twice daily and maintained to improve standards Turn up and go, accessibility for all Better security Trains Deep cleaned and refreshed (seating, signage, panels) Turn round cleans and exterior washing Improved reliability Operating performance improved punctuality Page 20
21 Driver training programme Recruitment and training of over 300 new drivers 16,000 applicants Sophisticated assessment and psychometric testing Group-based training, PC-based simulators Driver ipad (no paper Rulebook), fault rectification Full Crossrail operation 390 drivers Page 21
22 Construction update TfL Rail services today Staged Opening of Crossrail Benefits to London and the UK Page 22
23 Stage 2 20 th May trains per hour (tph) service commences between Paddington and Heathrow Terminal 4 using full-length Class 345 trains Paddington Station (Crossrail) Artists impression Page 23
24 Stage 3 9 th Dec 2018 Central Operating Section (COS) opens between Paddington and Abbey Wood Abbey Wood Station (Crossrail) Artists impression Page 24
25 Stage 3 9 th Dec 2018 From Dec 18 Crossrail will become The Elizabeth Line On 23 rd February 2016, it was announced that Crossrail will be known as the Elizabeth Line once operational Page 25
26 Stage 4 May 2019 Eastern interface commissioned, services from Shenfield to Paddington commence through the Central Operating System (COS) Central Operating System (COS) Tunnel Page 26
27 Stage 5 Dec 2019 Western interface commissioned - completion of Crossrail Introduction of full end-to-end services Page 27
28 Construction update TfL Rail services today Staged Opening of Crossrail Benefits to London and the UK Page 28
29 Journey Times Bond Street - Shenfield 57 mins 48 min Maidenhead - Liverpool Street 67 mins 48 mins Paddington Liverpool St 25 mins 10 mins Heathrow - Canary Wharf 71 mins 40 mins Page 29
30 Generating Economic Value Page 30
31 Property and Regeneration Page 31
32 Legacy Learning Page 32
33 Skills for the Future Page 33
34 Crossrail 10% additional rail capacity for TfL Up to 24 trains per hour through central section Reduced journey times across London Best-in-class European Metro Page 34
35 Crossrail key lessons Strong focus on legacy from outset Effective and comprehensive communications and stakeholder strategy Shadow operator appointed early Page 35
Crossrail transforming travel across London - Infrarail
Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn
More informationCrossrail / Elizabeth Line An Update
Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with
More informationElizabeth line Services
Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of
More informationCROSSRAIL Moving London Forward
CROSSRAIL Moving London Forward XX Crossrail: Header here The Project max 30 characters Cost 14.8bn Net benefit 42bn Length 118km Stations 40 (10 new) Jobs supported 55,000 Business opportunities Trains
More information97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY
MOVING AHEAD ISSUE 34 MARCH 2015 WELCOME FROM ANDREW WOLSTENHOLME It s an exciting time for Crossrail, as we continue to build a new railway for London and the South East; safely, on time, and on budget.
More informationMOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT
ISSUE 42 MAY 2017 MOVING AHEAD PROJECT MAY UPDATE Howard Smith, Operations Director PROGRAMME 83% 60% In May this year, the Crossrail project will achieve a major milestone. The first of the new trains
More informationISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.
ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd CROSSRAIL PROGRAMME 67% 60% The programme to build the new railway for London and the South
More informationLondon and Crossrail 2. Chris Moores Transport for London
London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London
More informationMOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL
MOVING AHEAD www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED Tunnel Boring Machine (TBM) Ellie has begun her journey from Pudding Mill Lane
More informationA STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET
A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET PRESENTED BY DEVELOPMENT BY GREENVIEW COURT West London s newest destination for luxury living THE DEVELOPMENT Three
More informationCrossrail: Socio-Economic Technical Report
Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,
More informationCrossrail Business Case Update: Summary Report July 2011
Crossrail Business Case Update: Summary Report July 2011 This report provides an update to the July 2010 Crossrail business case, including taking into account a number of changes to the costs and revenues
More informationChapter 4 Route window W23 Taplow station. Transport for London
Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of
More informationISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd
ISSUE 40 OCTOBER 2016 MOVING AHEAD PROJECT OCTOBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd PROGRAMME 77% 60% The project is more than 75% complete. There is a huge amount of work underway to complete
More informationMOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT
ISSUE 43 AUGUST 2017 MOVING AHEAD PROJECT AUGUST UPDATE Andrew Wolstenholme, CEO PROGRAMME 85% 60% The Crossrail project team continues to work around the clock to deliver the Elizabeth line, the new railway
More informationJobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre
Crossrail Bulletin www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 20 Mar 2010 Crossing the Capital Connecting the UK Jobcentre Plus - at the Visitor Information Centre Crossrail is committed
More informationConsultation Round 2: Results and Crossrail s Response
Consultation Round 2: Results and Crossrail s Response February 2005 Crossing the Capital Connecting the UK Contents 01 Introduction 2 02 Why did we consult? 3 03 Who did we consult? 3 04 When did we consult?
More informationMaking Rail Accessible: Guide to Policies and Practices. TfL Rail May 2018
Making Rail Accessible: Guide to Policies and Practices TfL Rail May 2018 Page 2 of 16 Contents A. Our Strategy... 3 B. Management Arrangements... 5 C. Monitoring and Evaluation... 7 D. Access Improvements...
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationChapter 4 Route Window NE3 Manor Park station. Transport for London
Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the
More informationSpending round 2013: The case for investment in transport. Mayor s Office, May 2013
Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth
More informationMichèle Dix Managing Director 17 January 2018
Crossrail 2 Michèle Dix Managing Director 17 January 2018 1.Introduction 2.Hertfordshire s challenges 3.What Crossrail 2 would achieve 4.Next steps 3 Crossrail 2 A proposed new railway serving London and
More informationChapter 16 Route Window NE15 Brentwood station. Transport for London
Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment
More informationChapter 6 Route Window NE5 Seven Kings station. Transport for London
Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated
More informationPARKSIDE BOW, LONDON E3
A STUNNING PARKSIDE LOCATION MOMENTS FROM CANARY WHARF Presented By Galliard Homes Ltd / Hurlington Ltd Local Authority Tower Hamlets Location Furze Street, Bow E3 3RX Tenure 250 year leasehold Building
More informationravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential
64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole
More informationEDITED PRESS RELEASES
EDITED PRESS RELEASES TRANSPORT FOR LONDON TRANSPORT FOR LONDON INVITES ARCHITECTS TO SUBMIT PLANS ON 55 BROADWAY 5 August 2013 Transport for London has begun the process of tendering architects to assess
More informationMinutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.
Meeting title / subject: Date: 4 th December 2014 Venue: Heathrow Academy, CR3 Attendees: Name Organisation Fraser Brown (acting chairman) HEX Ian Frost HAL Derek Lawrence AOC Andrew Genever Network Rail
More informationChapter 8 Route Window NE7 Chadwell Heath station. Transport for London
Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of
More informationArriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.
Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains
More information33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION
33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION WELCOME TO WELBECK WORKS Computer generated image This imposing, traditional triple-fronted, brick building is
More informationRailway Upgrade Plan Western 2017/18
2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction
More informationAN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5
AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5 WHY BUY A HOME FROM ST GEORGE? St George is proud to be part of the Berkeley Group. For 40 years, the group has
More informationChapter 13 Route Window NE12 Harold Wood station. Transport for London
Chapter 13 Route Window NE12 Harold Wood station HAROLD WOOD STATION 13 Route Window NE12 Harold Wood station 13.8 Harold Wood station is on Gubbins Lane close to the junction of A12 Colchester Road and
More information24/28 QUEEN VICTORIA STREET READING RG1 1TG
24/28 QUEEN VICTORIA STREET READING RG1 1TG INVESTMENT SUMMARY Reading is an important and affluent, regional retail centre with an extensive primary catchment population of 692,000 and total catchment
More informationEALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm
EALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm PRESENT: Independent Members: Peter Smith (Independent Chair) Ealing Councillors: Councillors Bell, H Tailor, Joanna Dabrowska, David Millican,
More information98 Manor Way, Beckenham, Kent BR3 3LR
98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM
More informationForeword. Sir Robin Wales Mayor of Newham
Foreword Nowhere else in the UK is undergoing transformation on the scale of Newham. With an abundance of development land, excellent transport links and a young, energetic and increasingly skilled workforce,
More informationCROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE
CROSSRAIL INFORMATION PAPER DEVELOPMENT OF THE CROSSRAIL ROUTE This paper explains how the Crossrail route set out in the Crossrail Bill was developed. It will be of particular relevance to those interested
More informationBRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT
BRAND NEW FULLY-FITTED OFFICES OPPOSITE STATION AVAILABLE TO RENT 2,800 SQ FT Stratosphere Tower is a spectacular 36 storey tower located in the heart of Stratford, providing a luxurious collection of
More informationSuffolk Chamber Transport Board Greater Anglia. 16 January 2018
Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains
More informationCONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9
CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies
More informationNot to be shared or printed without prior authorisation. Croeso Welcome. Copyright and intellectual property TfW 2018
Not to be shared or printed without prior authorisation Croeso Welcome Copyright and intellectual property TfW 2018 Wales and Borders The Journey Begins Our structure So what does this mean for us For
More informationA NEW 109,000 SQ FT GRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT
A NEW 109,000 SQ FT GRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT 2 3 4 5 I N N E R SPACE 25 WINDSOR ROAD WILL BENEFIT FROM
More informationTransport Infrastructure Construction and RMI Market Report - UK Analysis
Transport Infrastructure Construction and RMI Market Report - UK 2017-2021 Analysis Published: 19/12/2017 / Number of Pages: 60 / Price: 845.00 Introduction and Overview The 6th Edition of the 'Transport
More informationAnglia Winter Key Route Strategy (KRS) 2017/18
Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions
More informationGREATER LONDON REVERSIONARY STUDENT INVESTMENT OPPORTUNITY MAKSONS HOUSE 52 STATION ROAD, WEST DRAYTON UB7 7BT
GREATER LONDON REVERSIONARY STUDENT INVESTMENT OPPORTUNITY MAKSONS HOUSE 52 STATION ROAD, WEST DRAYTON UB7 7BT (Rightmove West Drayton is the most in-demand area for home buyers in the capital 2018) INVESTMENT
More informationTHE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE
THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE SHIPPING BUILDING SHIPPING BUILDING The Shipping Building is a landmark art deco building designed by Wallis,
More informationAltitude 13, ,245 sq ft office space Available Q1 2019
Royal Albert Dock Altitude 13,886 120,245 sq ft office space Available Q1 2019 1 BUSINESS ISN T A DESTINATION MAKE THE JOURNEY IT S A JOURNEY RAD 2 3 A brand new waterside development and dynamic commercial
More informationNewly refurbished Grade A offices
Newly refurbished Grade A offices OUTSTANDING QUALITY Newly refurbished Grade A offices 4,000-52,176 sq ft To Let Building One Building Two & Three GRADE A IN EVERY ASPECT Concorde Park has recently undergone
More informationAn Introduction to HS2
July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.
More informationFREEING UP MELBOURNE'S BIGGEST BOTTLENECK
FREEING UP MELBOURNE'S BIGGEST BOTTLENECK PRESENTATION TO THE TOURISM INDUSTRY 29 AUGUST 2017 Evan Tattersall, CEO, Melbourne Metro Rail Authority MELBOURNE S CHALLENGES POPULATION GROWTH NORTHERN +450,000
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationTHEFUTUREWORKSSLOUGH.COM
BROUGHT TO YOU BY AGENTS THEFUTUREWORKSSLOUGH.COM THE FUTURE WORKS SLOUGH IS EVOLVING A three phase office development set within an entirely new commercial quarter in the Heart of Slough, providing 350,000
More informationLCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017
LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The
More informationChapter 21 Route window W6 West Ealing station. Transport for London
Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is
More informationENCOMPASS THE INFINITE POSSIBILITIES
ENCOMPASS THE INFINITE POSSIBILITIES A NEW 109,000 SQ FTGRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT 2 3 4 5 I N N E R SPACE
More informationReducing traffic: a new plan for public transport
Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail
More informationTime to discover LIFE AT
Time to discover LIFE AT LIVING SHOPPING RELAXING 03 Life begins at Hallsville Quarter A unique opportunity. A unique product. The creation and delivery of an entirely new town centre, providing the expanding
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationTHIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1
Converted warehouse building, comprehensively refurbished. Office suites arranged over the 1st, 2nd and 3rd floors located in one of London s most lively locations. Newly refurbished contemporary reception
More informationRound 2 Consultation Document August to October 2004
Developing Crossrail Round 2 Consultation Document August to October 2004 Update Crossing the Capital Connecting the UK Introduction from Crossrail s Chief Executive Crossrail wants to hear from you! That
More informationCONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT
CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT A BRIGHT AND FRIENDLY WELCOME DESIGNED TO MEET THE NEEDS OF A NEW BREED OF BUSINESS Agile, flexible and collaborative,
More informationThames Valley Branch Lines Notes of Meeting
Thames Valley Branch Lines Notes of Meeting Date: Time: Venue: Attendees: 05 December 2016 10.00am 4 Marlow Road, Maidenhead Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes,
More informationThe Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum
The Future for Rail TravelWatch NorthWest Chris Green, Railway Forum Overview Patients and Passengers Chris Green, ex Chairman Virgin Trains Rail industry delivering again 12 year Roller Coaster Nationalised
More information2 VINE ST UXBRIDGE UB8 1QE. 10,943 sq ft of newly refurbished modern town centre office space. Availabe now.
2 VINE ST UXBRIDGE UB8 1QE 10,943 sq ft of newly refurbished modern town centre office space. Availabe now. WELCOME TO THE UNEXPECTED Union totals approximately 24,000 sq ft of prime town centre office
More informationGB Railways Group Plc
New Railways for London Michael Schabas, Director, GB Railways Group Plc In the last few years, four major rail schemes have been completed in London. The Jubilee Extension, Heathrow Express, Docklands
More informationWelcome to the most international city on the planet
Why London Welcome to the most international city on the planet From our time zone and location to world renowned industries, education and research, London sits at the heart of the world and is a natural
More information10 reasons why the UK needs Crossrail 2 now
10 reasons why the UK needs Crossrail 2 now 10 reasons why the UK needs Crossrail 2 now Unlocking economic growth Crossrail 2 will support the strong economy our nation needs Creating jobs, boosting skills
More informationTHE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA RETAIL & LEISURE SCROLL TO DISCOVER MORE
THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA RETAIL & LEISURE SCROLL TO DISCOVER MORE CLICK THE SECTION TITLE TO NAVIGATE A GROWING PLACE FOR ALL RETAIL AND LEISURE The 0 million regeneration of The
More informationPHOENIX READING 80% NOW LET TO ONLY TOP FLOOR REMAINING - 5TH FLOOR UP TO 10,367 SQ FT AVAILABLE AND
PHOENIX 80% NOW LET TO AND HOEN ONLY TOP FLOOR REMAINING - 5TH FLOOR UP TO 10,367 SQ FT AVAILABLE TO LET REFURBISHED GRADE A AIR CONDITIONED OFFICES ONLY TOP FLOOR REMAINING UP TO 10,367 SQ FT 10 CAR SPACES
More informationWay to go: Improving public transport access to London s airports
A London TravelWatch report The voice of London transport users Way to go: Improving public transport access to London s January 2019 London TravelWatch is the official body set up by Parliament to provide
More informationQUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET.
QUALITY OFFICES SET WITHIN A TRANQUIL BUSINESS PARK TO LET www.pavilions-twyford.co.uk CONNECTED FROM 2019 Set in a unique and environmentally inspiring business park, The Pavilions offers year round natural
More informationTime to discover LIFE AT
01 Time to discover LIFE AT 03 Life begins at Hallsville Quarter A unique opportunity. A unique product The creation and delivery of an entirely new town centre, providing the expanding community of Canning
More informationNORTH HYDE GARDENS HAYES UB3 4QR
NORTH HYDE GARDENS HAYES UB QR NEW BUILD UNITS TO LET : 2,55-97,00 SQ FT DISTRIBUTION / LOGISTICS / DATA CENTRE USES INTRODUCTION AVAILABILITY NO HYD RTH R E GA GRAND U NION CA NAL PARKING 88 CARS PARKING
More informationBusiness Review and Analysis
Business Review and Analysis 88 MTR Corporation Business Review Mainland of China and International Businesses Railway Businesses in the Mainland of China Property Businesses in the mainland of China European
More informationNEWS AND NOTES NEW SIGNALLING
NEW SIGNALLING NEWS AND NOTES Above: L18 transferring to Hammersmith for CBTC testing on 2 June 2018, passing through Wood Lane on the westbound. It, and L17 on the east end, are the first (1969 Metro-Cammell-built)
More informationTRANSPORT UPDATE. September/October 2018
TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention
More informationRailways and Air Transport
eature Railways and Air Transport Heathrow Express Paul Le Blond Famous for 15 Minutes In 15 minutes every 15 minutes is the slogan of the new Heathrow Express rail link between Heathrow Airport, the world
More informationHeathrow Network Statement - Rail. June 2015
Heathrow Network Statement - Rail June 2015 Validity period: Sept 2015 - Dec 2016 Contents Contents... 2 Glossary of terms... 5 1 General... 6 1.1 Company information... 6 1.2 Introduction... 6 1.2.1
More informationSpotlight London Infrastructure: Connecting Opportunities Autumn 2014
Savills World Research UK Development Spotlight London Infrastructure: Connecting Opportunities Autumn 2014 SUMMARY London needs to expand its infrastructure to boost housing numbers Opening up new parts
More informationROYAL ARSENAL, LONDON SE18
ROYAL ARSENAL, LONDON SE18 - 8,000-30,000 SQ FT OF STUNNING OFFICE SPACE - EXCEPTIONAL CONVERTED WAREHOUSE - EXPOSED BRICK WALLS, PAINTED STEEL COLUMNS AND 4-6M CEILING HEIGHTS - 1 MINUTES WALK FROM CROSSRAIL
More information33 Farringdon Road London EC1. 5,952 sq ft of newly refurbished office space
33 Farringdon Road London EC1 5,952 sq ft of newly refurbished office space A refreshed office building for the Farringdon District Farringdon Point has been remodelled to offer 5,952 sq ft of sophisticated
More informationKent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch
Kent Route Utilisation Strategy consultation by Network Rail A response from London TravelWatch Published by London TravelWatch 6 Middle Street London EC1A 7JA Phone : 020 7505 9000 Fax : 020 7505 9003
More information101,000 SQ FT (9,400 SQ M)
R+ READING WELCOME LEADING THE WAY FOR COMMUNICATIONS AND PROFILE, R+ WILL BE THE LATEST ADDITION TO READING S ESTABLISHED INTERNATIONAL BUSINESS LANDSCAPE. A HEADQUARTERS OFFICE BUILDING OF THE HIGHEST
More informationThe Rail Network in Wales
The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This
More informationRoute Windows Central route section
Route Windows Central route section Route Window index Central route section Route Window Crossrail station Worksites / temporary features Shaft sites Permanent project C1 Royal Oak Portal Royal Oak Worksite
More informationAppendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes
Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of
More informationBrisbane Metro Infrastructure Association of Queensland 14 February 2018
Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning
More informationWESTON HOUSE HIGH HOLBORN WC1
WESTON HOUSE 242-246 HIGH HOLBORN WC1 High quality refurbished offices in London s Midtown 22,936 sq ft of grade A office space with available floors ranging from 1,800 sq ft to 8,612 sq ft MARYLEBONE
More informationSPRING/SUMMER Commercial
SPRING/SUMMER 2016 Commercial Welcome to Royal Wharf In 2010, a vision document by the Mayor of London described the future of the Royal Docks and identified 22 billion of development potential for a new
More informationHigh quality refurbished offices adjacent to Canary Wharf
High quality refurbished offices adjacent to Canary Wharf 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and flexible office accommodation
More informationHIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK
HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL
More informationTransport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool
Transport Focus 2016 Bus Passenger Survey Briefing 22 March 2017 - Liverpool Presentation of BPS 2016 results David Sidebottom & Robert Pain Bus Passenger Survey 2016 - Scope 42 areas in England: a. 6
More informationCrossrail. Development Pipeline Study. gva.co.uk. Report. March 2014
Crossrail Development Pipeline Study Report March 2014 gva.co.uk Crossrail Regional Map MAIDENHEAD BURNHAM LANGLEY WEST DRAYTON HEATHROW AIRPORT 1,2,3 HAYES & HARLINGTON HANWELL EALING BROADWAY TAPLOW
More informationTravel from Bristol and London Airports
Travel from Bristol and London Airports Bristol Airport to Wills Hall (Bus Stop is just outside the Airport) Cheapest option (unless 3 or more travelling together consider taxi) Go to Bus (look for sign
More informationHigh quality refurbished offices adjacent to Canary Wharf
High quality refurbished offices adjacent to Canary Wharf Image of remodeled entrance 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and
More informationQueensway House, High Street, Stratford E15 2TF
On the instructions of Timothy Perkin & David Barber of CBRE acting as Joint Fixed Charge Receivers Queensway House, 275-285 High Street, Stratford E5 2TF East London Residential Development Opportunity
More informationNEWS AND NOTES 40 YEARS TO THE AIRPORT
NEWS AND NOTES 40 YEARS TO THE AIRPORT Left: On 16 December 2017, it will be 40 years since the Piccadilly Line was extended to Heathrow Airport, having previously opened to Hatton Cross on 19 July 1975.
More informationEXTENSIVELY REFURBISHED GRADE A OFFICE BUILDING
EXTENSIVELY REFURBISHED GRADE A OFFICE BUILDING 1 7 The Grove, Slough, SL1 1QP theswitchslough.co.uk THE OPPORTUNITY A unique opportunity to acquire Grade A refurbished offices in the heart of Slough.
More information