BID NO ANNUAL CONTRACT FOR ASPHALT ROAD SURFACING PRODUCTS
|
|
- Reynard Charles
- 5 years ago
- Views:
Transcription
1 Corp 1 Hot Mix Asphaltic Concrete Pavement Type "A" (Course - Graded Base Course) NB NB NB NB A Recycled Hot Mix Asphaltic Concrete NB NB NB NB Hot Mix Asphaltic Concrete Pavement Type "B" (Fine - Graded Base Course) 2A Recycled Hot Mix Asphaltic Concrete Hot Mix Asphaltic Concrete Pavement Type "C" NB (Coarse - Graded Surface Course) 3A Recycled Hot Mix Asphaltic Concrete NB Hot Mix Asphaltic Concrete Pavement Type "D" (Fine - Graded Surface Course) 4A Recycled Hot Mix Asphaltic Concrete
2 5 Delivery Charge for Items 1-4 F.O.B. Job Site and dumped into self-propelled paver Corp 0.60 per 0.85 per 0.80 per Less than 5 miles per ; per 0.60 per 0.85 per 0.45 per Less than 5 miles per ; per 5A Delivery Charge for Items 1A - 4A F.O.B. Job Site and dumped into self-propelled paver 0.60 per 0.85 per 0.80 per Less than 5 miles per ; per 0.60 per NB 0.45 per Less than 5 miles per ; per
3 Corp 6 Hot Mix Cold Laid Asphalt Type "B" NB NB NB NB NB A Recycled Hot Mix Cold Laid Asphalt NB NB NB NB NB NB 7 Hot Mix Cold Laid Asphalt Type "C" NB NB NB NB NB A Recycled Hot Mix Cold Laid Asphalt NB NB NB NB NB NB 8 Hot Mix Cold Laid Asphalt Type "D" NB NB NB NB A Recycled Hot Mix Cold Laid Asphalt NB NB NB NB NB NB 9 Hot Mix Cold Laid Asphalt Type "F" NB NB NB NB NB A Recycled Hot Mix Cold Laid Asphalt NB NB NB NB NB NB 10 Delivery Charge for Items 6-9 F.O.B per TON NB NB NB NB.34 per 8.00 per TON NB NB NB NB.27 per 10A Delivery Charge for Items 6A - 9A F.O.B. NB NB NB NB NB.34 per NB NB NB NB NB.27 per
4 Corp 11 UPM High Performance Cold Mix NB NB NB NB NB 11A Recycled UPM High Performance Cold Mix NB NB NB NB NB NB 12 EAP Multi-Grade Cold Mix NB NB NB NB NB NB 12A Recycled EAP Multi-Grade Cold Mix NB NB NB NB NB NB 13 Warm Mix Asphaltic Concrete, Type "A" NB NB NB NB NB A Recycled Warm Mix Asphaltic Concrete NB NB NB NB NB Warm Mix Asphaltic Concrete, Type "B" NB NB NB A Recycled Warm Mix Asphaltic Concrete NB NB NB Warm Mix Asphaltic Concrete, Type "C" NB NB NB A Recycled Warm Mix Asphaltic Concrete NB NB NB Warm Mix Asphaltic Concrete, Type "D" NB NB NB A Recycled Warm Mix Asphaltic Concrete NB NB NB Warm Mix Asphaltic Concrete, Type "F" NB NB NB NB NB A Recycled Warm Mix Asphaltic Concrete NB NB NB NB NB 58.00
5 18 Delivery Charge for Items F.O.B. 18A Delivery Charge for Items 11A - 17A F.O.B. Corp NB NB 0.80 per NB.40 per NB NB 0.45 per NB.30 per NB NB 0.80 per NB.40 per NB NB 0.45 per NB.30 per
6 Corp Discount for Related Items not Specified 0% 0% 0% 0% 0% 0% Demurrage Charge Per Hour Normal Delivery Time After Receipt of Order As specified by order person 7:00 am-4:00 pm Tandem: HR Flowboy: HR As Required 2 HRS. ASAP; 1 HR 24 HRS. 48 HRS. Plant Location 1901 Cold Springs RD Ft Worth; 9500 Technology Blvd Ft Worth; 416 CR 1539, Chico 2301 Austin RD Ft Worth 7151 Randol Mill Road Ft Worth Harmonson, Justin Calloway Cemetery RD, Euless Hicks Field RD Saginaw 617 E. College St. Lewisville Camp Bowie W. Blvd Aledo
Recycled Asphalt Shingles
Recycled Asphalt NOTE: Refresh the page to view the most current list. The following producers are pre-qualified to supply recycled asphalt shingles (RAS), based on a history of satisfactory environmental
More informationReuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:
PASS Recycle/RAP Applications Definition RAP = Recycled Asphalt Pavement also called millings or grindings from: bump grinding of hot mix pavements millings from mill and fill operations large chunks of
More informationRecycled Asphalt Shingles
Recycled Asphalt NOTE: Refresh the page to view the most current list. The following producers are pre-qualified to supply recycled asphalt shingles (RAS), based on a history of satisfactory environmental
More informationCITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $
CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationFULL DEPTH RECLAMATION (FDR)
FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers
More informationFIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C
FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,
More information- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;
B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly
More informationRecycled Asphalt Shingles
Recycled Asphalt NOTE: Refresh the page to view the most current list. The following producers are pre-qualified to supply recycled asphalt shingles (RAS), based on a history of satisfactory environmental
More information532 - PAVEMENT MARKING - OPSS 532
532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationLongitudinal Joint Construction. Mike Robinson, PE
Longitudinal Joint Construction Mike Robinson, PE Inherently weaker than surrounding pavement Prone to deterioration Often drives rehabilitation FOD Longitudinal Joints Two predictors of success Density
More informationMADERA COUNTY. Measure T & SB-1 Projects
MADERA COUNTY Measure T & SB-1 Projects Measure T Projects: Avenue 26/Road 29 Rehabilitation (Measure T/FLAP) Oakhurst Midtown Connector (Measure T/SB-1 LPP) North Fork Roundabout (Measure T/CMAQ) Road
More informationKDOT announces approved December bids
FOR IMMEDIATE RELEASE Dec. 30, 2013 News Contact: Kim Stich, 785-296-3585 KDOT announces approved December bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationCity of Grand Island
City of Grand Island Tuesday, January 09, 2007 Council Session Item G7 #2007-6 - Approving Certificate of Final Completion for Asphalt Maintenance Project 2006-AC-1; Various Locations Throughout Grand
More informationPublic Service Department MONTHLY REPORT November 2017
- Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects
More informationO Hare Modernization Program
O Hare Modernization Program Presentation to Airports Council International April 27, 2009 O Hare Modernization Program Today s Presentation OMP Overview Benefits of OMP Accomplishments Future of the OMP
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationDALLAS-FORT WORTH 2017 TAX RATES
DALLAS-FORT WORTH 2017 TAX RATES CONTENTS COLLIN COUNTY... 03 DALLAS COUNTY... 04 DENTON COUNTY... 05-06 JOHNSON COUNTY... 07 KAUFMAN COUNTY... 07 PARKER COUNTY... 07 ROCKWALL COUNTY... 07 TARRANT COUNTY...
More informationMIDTOWN SQUARE PLANTATION. Julie ODell Owner, Broker
PLANTATION Julie ODell Owner, Broker 305.505.4448 julie@odelphia.com Heather Wulkan Commercial Associate 786.521.6836 heather@odelphia.com 777 AMERICAN EXPRESS WAY PLANTATION, FL 33324 Sawgrass Expy 6
More informationFY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council
Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationWELCOME. property shot or lifestyle. can t finish this page until I have actual photo can you edit any of the copy?
property shot or lifestyle can t finish this page until I have actual photo can you edit any of the copy? WELCOME THE SHOPS AT HIGHLAND VILLAGE IS SOUTH DENTON COUNTY S EXCLUSIVE OPEN-AIR TOWN CENTER,
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationHenderson Polk Transylvania. January 2018 UCC Report
Henderson Polk Transylvania January 2018 UCC Report Statewide Ticket and Transmission Data December: 2017 / 2016 Comparison Tickets 2017:120,249 2016: 136,076 Difference:-12.91% Transmissions 2017: 713,122
More information105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS
S P I C E W O O D A I R P O R T 8 8 R H A N G A R F O R L E A S E 105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS Available for immediate lease 7,200 SF (90 x 80 ) Class A Aircraft Hangar W / Climate Controlled
More informationCHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014
CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed
More informationTHE CITY OF MACON IS A 3RD CLASS CITY WITH A NON-PARTISAN MAYOR & COUNCIL FORM OF GOVERNMENT IT IS MY PLEASURE TO VISIT WITH YOU ABOUT THE CITY OF
THE CITY OF MACON IS A 3RD CLASS CITY WITH A NON-PARTISAN MAYOR & COUNCIL FORM OF GOVERNMENT IT IS MY PLEASURE TO VISIT WITH YOU ABOUT THE CITY OF MACON AND DISCUSS SOME OF THE EFFORTS AND PROGRESS THE
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationApparent Bids for Letting of August 14, 2018
Apparent Bids for Letting of August 14, 2018 Letting ID: 08142018 Cut-Off Time: 02:00:59 PM 010-0408220 Anderson SC 153 Median Improvements 1SS001 S AND S, OF AN 602 N. MCDUFFIE STREET Yes $1,168,049.97
More information80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS
11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationMAINTENANCE TOOLS? LANDSCAPE & MAINTENANCE TOOLS BROCHURE Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE &
MAINTENANCE? Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE & A: LOOK NO FURTHER THAN MESA EQUIPMENT & SUPPLY. www.mesaequipment.com LANDSCAPE & MAINTENANCE BROCHURE PEOPLE PRODUCT PERFORMANCE AIR COMPRESSORS
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationECLIPSE AEROSPACE, INC.
Page 1 2011-06-06 ECLIPSE AEROSPACE, INC. Model EA500 Airplanes Equipped With a Pratt and Whitney Canada, Corp. (PWC) PW610F-A Engine Amendment 39-16631 Docket No. FAA-2011-0199; Directorate Identifier
More informationItem Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
AGENCY: KENDALL Builders Paving D Construction, Inc. Gallagher Asphalt Corp. Geneva Construction Co. P. T. Ferro Construction Co. SECTION: 16-00000-00-GM, Plainfield Road, HMA Resurfacing, CMF 4413 Roosevelt
More informationExhibition times. Nordic Congress in Clinical Chemistry
Exhibition times Nordic Congress in Clinical Chemistry Moving in Moving out Opening times Goods transport You will find our range at www.monterservice.com Deadline date for orders and drawings: 2/9 Good
More informationComposite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover
Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area
More informationSteel Mill Products 1999
Steel Mill Products 1999 Issued December 2002 MA331B(99)-1(RV) (Formerly Series No. MA33B) Information about the scope of the survey, methodology, explanation of terms and historical notes for this survey
More informationLANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006
of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).
More informationDISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION
ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR
More informationFOR SALE DALLAS PARKWAY ADDISON, TX I LEASE 3,700-20,000 SQ. FT. SALE 62,000 SQ. FT. I THREE-STORY OFFICE BUILDING
FOR SALE 16803 DALLAS PARKWAY ADDISON, TX 75001 I LEASE 3,700 -,000 SQ. FT. SALE 62,000 SQ. FT. I THREE-STORY OFFICE BUILDING UNIQUE HEADQUARTER LOCATION 16803 Dallas Parkway is a 62,598 sf, three-story
More informationLIMESTONE ROAD BRANDON, MANITOBA INDUSTRIAL FOR SALE / FOR LEASE
59 LIMESTONE ROAD BRANDON, MANITOBA INDUSTRIAL FOR SALE / FOR LEASE Partnership. Performance. Managing Director, Broker Senior Associate Avison Young Commercial Real Estate has been appointed by the owner
More informationPresentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport
Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD
More informationPavement LCA Where Do We Go from Here!!
Pavement LCA Where Do We Go from Here!! Presented to: Pavement Life Cycle Assessment Symposium - 2017 Illinois Center for Transportation, Champaign, IL By: Navneet Garg, Ph.D. NAPMRC Program Manager (FAA)
More informationBellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.
Bellevue South Park Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Community Board 6 Review January 2, 2018 Christopher M. Crowley, RLA NYC Parks Total Budget: Project
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More information9111 CYPRESS WATERS BLVD - SUITE 245 WHERE BUSINESS AND LIFESTYLE INTERSECT LEASING INFORMATION LUCY BURNS MARIJKE LANTZ
9111 CYPRESS WATERS BLVD - SUITE 245 WHERE BUSINESS AND LIFESTYLE INTERSECT LEASING INFORMATION LUCY BURNS 214.270.0998 MARIJKE LANTZ 214.270.0970 BE LT L INE RD FRISCO THE COLONY PLANO PLANO ALLEN 75
More informationLawrence Loop SWOT Analysis
Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This
More informationBUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT
BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT 1 WE ARE A CATALYST FOR COMMERCE WE ARE CREATING THE CAPACITY FOR GREATNESS WE ARE DRIVING PRODUCTIVITY Q & A Attracting growth, fostering development,
More informationTEXAS PURPLE HEART ENTITITES
TEXAS PURPLE HEART ENTITITES t STATE Texas, USA 78701 CITIES/TOWNS Addison, TX 75001 Abernathy, TX 79311 Arlington, TX 76010 Austin, TX 78702 Belton, TX 76513 Boerne, TX 78006 Bullard, TX 75757 Burleson,
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationConnecting the Carolinas to the World
Charlotte Douglas International Airport Connecting the Carolinas to the World Airport Mission Charlotte Douglas International will be the preferred airport and airline hub by providing the highest quality
More informationTires Versus Pavement: Pilots, mechanics, and airport managers on the same page
Tires Versus Pavement: Pilots, mechanics, and airport managers on the same page Pilots often think tire pressure and condition are a mechanic s worry, not theirs. Similarly, the pavement strength of the
More informationChapter 14. Design of Flexible Airport Pavements AC 150/5320-6D
Chapter 14 Design of Flexible Airport Pavements AC 150/5320-6D AIRCRAFT CONSIDERATIONS. a. Load. maximum anticipated takeoff weight of the aircraft. The design procedure assumes 95 percent of the gross
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationNew Industrial & Commercial Building Permits Mississauga
New Industrial & Commercial Building Permits Mississauga January October 2013 Date Owner/Applicant Occupant Type Location Employment Districts Value ($000s) Size (sq. ft.) Airport CC Dixie EA Spec. Building
More informationMEMORANDUM NOTE DE SERVICE
REGION OF OTTAWA CARLETON RÉGION D OTTAWA CARLETON MEMORANDUM NOTE DE SERVICE Our File/N/Réf. 03 06-99-0017 Your File/V/Réf. DATE 18 June 1999 TO/DEST. FROM/EXP. SUBJECT/OBJET The Chair and Members of
More informationDISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP
DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO
More informationWMA A Contractors Experience. NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL. Tony Limas Granite Construction Company
WMA A Contractors Experience NAPA 56 th Annual Meeting February 5-9, 2011 Orlando, FL Tony Limas Granite Construction Company 1 Today's Discussion WMA By the Numbers Granite WMA Experience Observations
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationStorePoint Fashion JW Marriott Desert Ridge Resort & Spa, Phoenix, AZ. Surf Expo Winter January 25 27
2018 Trade Shows KBIS January 9 11 Swim Collective Imprinted Sportswear Long Beach Long Beach Convention Center, Long Beach, CA January 11 12 January 11 12 January 19 21 StorePoint Fashion January 21 24
More informationCapital Program Delivery
Capital Program Delivery Transportation & Public Works Department City Council FY 2013 Budget Workshop August 23, 2012 1 TPW Capital Programs 2013 Building Facilities Storm Water Management Roadway & Bridge
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationNavy Centrifuge-based Flight Environment Trainer (CFET) Student Training Information
Updated October 2016 Navy Centrifuge-based Flight Environment Trainer (CFET) Student Training Information Student check-in is promptly @ 0715 on the day of training, in the Academic Classroom, Bldg 170,
More informationApparent Bids for Letting of November 13, 2018
Apparent Bids for Letting of November 13, 2018 Letting ID: 11132018 Cut-Off Time: 02:00:59 PM 010-0425552 Anderson Anderson County Longline paint contract 1DU007 DURA MARK, INC. 72 EMERALD AVENUE STREETSBORO,
More informationAzOWRA P. O. Box Prescott, AZ
AzOWRA Arizona Onsite Wastewater Recycling Association AzOWRA P. O. Box 10866 Prescott, AZ 86304-0866 suzanne.ehrlich@co.yavapai.az.us Dedicated to the Education of the Onsite Wastewater Industry and the
More informationWellington International Airport Runway Overlay
Wellington International Airport Runway Overlay 2009. Parties involved Fulton Hogan Wellington Contractor. BECA - Consultant. Wellington international airport Ltd - Client. Contract Scope The contract
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationKDOT announces approved November bids
FOR IMMEDIATE RELEASE Nov. 25, 2013 News Contact: Kim Stich, 785-296-3585 KDOT announces approved November bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationWichita Falls MPO - MTP Project List 1 of 6
Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS
More informationTENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1
TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).
More informationCuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS
Cuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS We are asking for your assistance with ideas to make Cuyahoga County Airport a better facility. An important
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO
More information2620 Windsor Centre Trail Flower Mound, Texas 75028
2620 Windsor Centre Trail Flower Mound, Texas 75028 Projected Completion : December 1, 2017 Prepared by: O G H 4 3 2 5 W I N D S O R C E N T R E # 3 0 0 F L O W E R M O U N D, T X 7 5 0 2 8 Introduction
More informationNCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM
NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM CONSTRUCTION/BRIDGE/MAINTENANCE PROJECT STATUS REPORT DATE: 9-7-17 COUNTY: Cumberland TIP # ROUTE LOCATION WORK DESCRIPTION START DATE END DATE CONTACT
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationModern environments designed to grow your business
2015 Modern environments designed to grow your business Flexible Spaces Leases from 24hrs / 7 Days /Months /Years Lancaster House Amy Johnson Way Blackpool Lancashire FY4 2RP United Kingdom T: 01253 599
More informationWelcome to the September 2018 edition of my highways newsletter.
Welcome to the September 2018 edition of my highways newsletter. This publication is distributed monthly to members, town and parish councillors and other key decision makers. Please take a few minutes
More information9111 CYPRESS WATERS BOULEVARD THE OFFICES OF CYPRESS WATERS BELT LINE ROAD / IH 635 DALLAS, TEXAS 217,000 SF FOUR-STORY OFFICE DELIVERS Q1 2017
BUILDING FEATURES 217,000 SF overlooking on a one-acre park Four stories 50,000 to 56,000 SF floor plates 6:1,000+ parking with structured and surface spaces Five-minute drive to/from DFW Airport IH 635
More informationGolden Triangle Medical Park Development
Golden Triangle Medical Park Development Visit our website at www.castledevgroup.com 1 TABLE OF CONTENTS PROPERTY DEVELOPMENT SUMMARY DEVELOPMENT SUMMARY... 3 PROPERTY DESCRIPTION MAP... 4 AERIAL... 5
More informationBUILDING C MARY PLACE
SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA ±119,230 SF UNDER CONSTRUCTION Q1 2019 DELIVERY MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL
More informationDALLAS/FORT WORTH. LOCATION #: DESCRIPTION: I ft S/O Swisher ES CITY:
LOCATION #: 001704 DESCRIPTION: I-35 300 ft S/O Swisher ES Lake Dallas ZIP: 75065 FACING: Facing: North TAB PANEL ID: 380152 333.3 (Weekly EYES-ON Impressions In Thousands) 35e N Shady Shores Dr Main St
More informationApparent Bids for Letting of May 8, 2018
Apparent Bids for Letting of May 8, 2018 Letting ID: 05082018 Cut-Off Time: 02:00:59 PM 010-0125820 Abbeville 2018 FA Reconstruction/Rehab - FD Cement Reclamation 1SA015 SATTERFIELD 2111 HIGHWAY 72-221
More informationGOVERNMENT GAZETTE REPUBLIC OF NAMIBIA
GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$2.00 WINDHOEK - 29 November 2005 No.3544 CONTENTS GENERAL NOTICE MINISTRY OF FINANCE INVITATION FOR TENDERS AND APPLICATIONS FOR PREQUALIFICATION In terms
More informationWILLIAM R. SHAW, P.E., P.S. HOCKING COUNTY ENGINEER
HOCKING COUNTY ENGINEER S 2009 ANNUAL REPORT WILLIAM R. SHAW, P.E., P.S. HOCKING COUNTY ENGINEER ****************************************************************** TO THE CITIZENS OF HOCKING COUNTY: This
More informationBUILDING G MARY PLACE
SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA ±229,130 SF UNDER CONSTRUCTION Q1 2019 DELIVERY MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL
More informationThe Holes Creek Bridge Replacement By Bradley McClelland
The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes
More informationM101 Local and Limited-Stop Service
Bus Timetable Effective as of September 3, 2017 New York City Transit M101 Local and Limited-Stop Service a Between Washington Heights and East Village If you think your bus operator deserves an Apple
More informationNorth Cruise Berth Projects PortMiami
North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of
More informationApparent Bids for Letting of April 10, 2018
Apparent Bids for Letting of April 10, 2018 Letting ID: 04102018 Cut-Off Time: 02:00:59 PM 020-1147480 Cherokee 2018 Cherokee CTC Resurfacing 1FR001 F & R ASPHALT, INC. 128 REEVES LANE EASLEY, SC 29641
More informationDISCOVER THE DIFFERENCE OF A LANDMARK LOCATION.
DISCOVER THE DIFFERENCE OF A LANDMARK LOCATION. AMENITIES OCATION OVERVI CENTRALIZED The Towers at Williams Square is located in the heart of North Texas, just 15 minutes from downtown Dallas, DFW International
More informationFOR. Boeing Commercial Airplanes
Aircraft Classification & Airport Pavement Design Curves Prof. Dr. Shafik Jendia 2009/2010 1 A-1 BOEING 747-200 AIRPLANE CHARACTERSTICS FOR AIRPORT PLANNING & DESIGN BOEING Boeing Commercial Airplanes
More informationAWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost.
: Less Than 5 Million INTERSTATE 202 112417 LOCATION: VARIOUS (NFO)PM2N-060-F18, P401 ADAMS CONSTRUCTION COMPANY 1 $1,418,249.41 $1,440,244.38 ROANOKE PM02458 MONTGOMERY VA SALEM DISTRICT SGR - 2018 PLANT
More informationCENTER POINT AT LAKEWOOD RANCH Lakewood Ranch, Florida
MASTER SITE PLAN 50 acres OPENING DELIVERY End of 2019, 1st Q 2020 LOCATION SEC of University Parkway and Lakewood Ranch Blvd., Sarasota, FL LEASING CONTACTS Massimo Rastrelli 941.552.4336 OFFICE MRastrelli@castoinfo.com
More informationPlease return the forms listed by the date shown to receive the lowest rates. Addresses and phone numbers are listed on the Show Vendors page.
LONG BEACH DEADLINES & CHECKLIST Please return the forms listed by the date shown to receive the lowest rates. Addresses and phone numbers are listed on the Show Vendors page. DEADLINE SERVICE RETURN TO
More information